Activity ID Activity Description r u R RESP Early Start Early Finish PROJ 1077 South Main MT4221 Electric - 1077 S. Main ELEC 17JUN21 17JUN21 21-361730 A-1 Building EN401 Renovate computer science HUDICK 10MAY21 23JUL21 20-2048-00 EN471 Replacing generator GEN 10MAY21 11MAY21 EN661 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714 MT0011 Electric - A1 ELEC 10MAY21 10MAY21 21-361653 MT0101 Acid Clean water heaters HART 10MAY21 11MAY21 21-361557 MT3231 Replace fire dampers CLEMENTS 24MAY21 26MAY21 A-2 Building EN461 Rm 2301 lighting HUDICK 10MAY21 30JUN21 20-2043-00 EN671 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714 MT0031 Electric - A2 ELEC 10MAY21 10MAY21 21-361654 A-3 Building EN391 Re-caulk exterior DERROW 10MAY21 25JUN21 20-346280 EN681 Replcing telecom duct bank DERROW 10MAY21 16JUL21 21-359714 MT0111 Acid Clean water heaters HART 10MAY21 11MAY21 21-361559 MT4111 Electric - A-3 ELEC 10MAY21 10MAY21 21-361655 A-3B EN691 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714 MT4401 Electric-A-3B ELEC 10MAY21 10MAY21 21-361656 MT4511 Update BAS controls BAS 10MAY21 10MAY21 MT4231 Acid clean water heater- HART 12MAY21 13MAY21 Alumnae Hall MT0041 Electric -Alumnae ELEC 17MAY21 17MAY21 21-361678 APC MT3021 Electric - APC ELEC 11MAY21 11MAY21 21-361659 MT3131 Clean Dryer Vents HVAC 17MAY21 21MAY21 MT3651 Plumbing - APC PLUMB1 26MAY21 27MAY21 21-361914 MT3051 acid clean water heater HART 01JUN21 02JUN21 21-361567 ARBORETUM MT0461 Electric-arboretum plecker ELEC 01JUL21 01JUL21 21-361791 2010 APR MAY JUN JUL AUG SEP 8 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 © Primavera Systems, Inc. Start Date 05APR21 Finish Date Data Date 05APR21 Run Date 31MAR21 13:23 Early Bar Float Bar Progress Bar Critical Activity SS21 JMU FM 2021 Summer Schedule Classic Schedule Layout Sheet 1 of 22 Date Revision Checked Approved
Transcript
  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    1077 South Main

    MT4221 Electric - 1077 S. Main ELEC 17JUN21 17JUN21 21-361730

    A-1 Building

    EN401 Renovate computer science HUDICK 10MAY21 23JUL21 20-2048-00

    EN471 Replacing generator GEN 10MAY21 11MAY21

    EN661 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714

    MT0011 Electric - A1 ELEC 10MAY21 10MAY21 21-361653

    MT0101 Acid Clean water heaters HART 10MAY21 11MAY21 21-361557

    MT3231 Replace fire dampers CLEMENTS24MAY21 26MAY21

    A-2 Building

    EN461 Rm 2301 lighting HUDICK 10MAY21 30JUN21 20-2043-00

    EN671 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714

    MT0031 Electric - A2 ELEC 10MAY21 10MAY21 21-361654

    A-3 Building

    EN391 Re-caulk exterior DERROW 10MAY21 25JUN21 20-346280

    EN681 Replcing telecom duct bank DERROW 10MAY21 16JUL21 21-359714

    MT0111 Acid Clean water heaters HART 10MAY21 11MAY21 21-361559

    MT4111 Electric - A-3 ELEC 10MAY21 10MAY21 21-361655

    A-3B

    EN691 Replacing telecom duct bank DERROW 10MAY21 16JUL21 21-359714

    MT4401 Electric-A-3B ELEC 10MAY21 10MAY21 21-361656

    MT4511 Update BAS controls BAS 10MAY21 10MAY21

    MT4231 Acid clean water heater- HART 12MAY21 13MAY21

    Alumnae Hall

    MT0041 Electric -Alumnae ELEC 17MAY21 17MAY21 21-361678

    APC

    MT3021 Electric - APC ELEC 11MAY21 11MAY21 21-361659

    MT3131 Clean Dryer Vents HVAC 17MAY21 21MAY21

    MT3651 Plumbing - APC PLUMB1 26MAY21 27MAY21 21-361914

    MT3051 acid clean water heater HART 01JUN21 02JUN21 21-361567

    ARBORETUM

    MT0461 Electric-arboretum plecker ELEC 01JUL21 01JUL21 21-361791

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 1 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Anthony-Seeger Hall

    MT0281 Oil Burner-Anthony Seeger OB2 03MAY21 07MAY21 21-360038

    MT0261 Electric - Anthony Seeger ELEC 26MAY21 26MAY21 21-361632

    Alantic Union Bank Center

    MT0051 Plumbing-AUBC PLUMB1 28JUL21 30JUL21 21-361888

    Bell Hall

    HKHK611 Total Clean - Bell 10MAY21 10MAY21

    MT0191 Carpentry - Bell CARP1 10MAY21 10MAY21 21-361819

    MT0211 HVAC Maint- Bell HVAC 3 10MAY21 10MAY21 21-361881

    MT1531 Summer Paint-Bell PAINT 10MAY21 10MAY21

    MT0241 Utility - Bell UTIL2 24MAY21 28MAY21 21-361992

    MT0291 Electric - Bell ELEC 01JUN21 01JUN21 21-361641

    MT0201 Plumbing - Bell PLUMB1 03JUN21 04JUN21 21-361889

    MT0231 Oil Burner - Bell OB1 07JUN21 11JUN21 21-360026

    University Bookstore

    MT0271 Oil Burner-Bookstore OB2 19APR21 23APR21 21-360036

    MT0301 Electric - Bookstore ELEC 11MAY21 11MAY21 21-361657

    Bridgeforth Stadium

    MT3851 Water heaters- at Stadium OB2 12APR21 16APR21

    MT3781 Plumbing -Bridgeforth PLUMB2 10MAY21 10MAY21 21-361928

    MT3811 Electric - Bridgeforth ELEC 11MAY21 11MAY21 21-361660

    Burruss Hall

    EN421 Replace flooring in lab HUDICK 10MAY21 10MAY21

    EN431 Replace stairwell landings UTILITIE 10MAY21 21MAY21

    EN631 Replacing VAV boxes 2nd HVAC 10MAY21 11JUN21

    MT0311 Electric- Burruss ELEC 18MAY21 18MAY21 21-361685

    CANTRELL D

    MT0741 Electric - Cantrell Deck ELEC 21MAY21 21MAY21 21-361619

    Cardinal House

    MT0331 Electric - Cardinal ELEC 28JUN21 28JUN21 21-361795

    Carrier Library

    MT0341 Electric - Carrier library ELEC 07JUN21 07JUN21 21-361702

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 2 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    CARRIER DR

    EN531 Installing new duct bank DERROW 01JUN21 10JUL21 21-359714

    CHAMPIONS

    MT0781 Electric - Champions ELEC 15JUN21 15JUN21 21-361718

    Chandler Hall

    MT0631 Utility-Post- Chandler UTIL1 10MAY21 10MAY21 21-361986

    MT1581 Carpentry - Chandler CARP2 10MAY21 10MAY21 21-361842

    MT3571 Summer Paint - Chandler PAINT 10MAY21 10MAY21

    MT3621 HVAC Maint Chand- A Wing HVAC 4 10MAY21 10MAY21 21-361884

    MT3751 HVAC Maint -Chand- B wing HVAC 4 10MAY21 10MAY21

    MT3031 Electric - Chandler ELEC 13MAY21 13MAY21 21-361667

    MT3581 Plumbing Chandler - PLUMB2 17MAY21 19MAY21 21-361927

    MT3611 Acid clean water heater HART 19MAY21 19MAY21 21-361565

    MT3631 Acid clean water heater HART 19MAY21 20MAY21 21-361566

    MT3551 Utility - Chandler UTIL1 24MAY21 28MAY21 21-361985

    HKHK401 Total Clean - Chandler KIM COLL 02JUN21 17JUN21

    EC751 Heritage Culture TICE 21JUL21 25JUL21 CAMP

    HKHK441 Clean After Camps 26JUL21 30JUL21

    Chappelear Hall

    HKHK61 Total Clean - Chapp 10MAY21 10MAY21

    MT0421 Carpentry - Chappelear CARP2 10MAY21 10MAY21 21-361843

    MT0911 Utilities - Chapp UTIL3 10MAY21 14MAY21 21-361999

    MT2711 Summer paint -Chapp PAINT 10MAY21 10MAY21

    MT0511 Clean Dryer Vents HVAC 17MAY21 21MAY21

    MT0571 Plumbing -Chapp PLUMB2 20MAY21 21MAY21 21-361916

    MT2731 Electric-Chapp ELEC 04JUN21 04JUN21 21-361700

    MT0431 Oil burner-Chappalear OB1 14JUN21 18JUN21 21-360027

    CHBS

    MT0351 Electric- East Tower ELEC 20MAY21 20MAY21 21-361616

    MT0361 Acid clean water heater HART 28JUN21 29JUN21 21-361577

    Cheapeake Ave Deck

    MT0891 Electric- Ches ave parking ELEC 15JUN21 15JUN21 21-361719

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 3 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Chesapeake Hall

    MT0441 Carpentry - Chesapeake CARP1 10MAY21 10MAY21 21-361820

    MT0581 HVAC Maint -Ches B Wing HVAC 4 10MAY21 10MAY21 21-361885

    MT0831 Summer Paint - Ches PAINT 10MAY21 10MAY21

    MT0851 Plumbing -Ches PLUMB1 10MAY21 12MAY21 21-361892

    MT0901 HVAC Maint - Ches A Wing HVAC 4 10MAY21 10MAY21 21-361885

    MT0961 Utility - - Chesapeake UTIL1 10MAY21 14MAY21 21-361987

    MT1321 Utility - Post Chesapeake UTIL1 10MAY21 10MAY21 21-361989

    MT0591 Electric -Chesapeake ELEC 13MAY21 13MAY21 21-361665

    MT0681 Acid Clean Water Heater - HART 17MAY21 18MAY21 21-361563

    MT0701 Acid Clean Heater - HART 17MAY21 18MAY21 21-361564

    HKHK101 Total Clean-Chesapeake C.ESTEP 24MAY21 04JUN21

    EC1391 Summer MS TICE 13JUN21 19JUN21 CAMP

    EC1721 Summer Band Camp TICE 06JUL21 10JUL21 CAMP

    EC1231 Walsworth East Yearbook TICE 19JUL21 22JUL21 CAMP

    HKHK1211Clean after Camps-Ches 26JUL21 30JUL21

    Cleveland Hall

    EN641 Make repairs to exterior DERROW 10MAY21 23JUL21 21-359209

    MT0381 Electric - Cleveland ELEC 18MAY21 18MAY21 21-361686

    College Of Business

    EN651 Renovations to Showker G. WAYLA 01JUN20 30JUL21

    Converse Hall

    EN381 Replace steam vault VISCOMI 10MAY21 30JUN21 21-352409

    MT0451 Carpentry - Converse CARP1 10MAY21 10MAY21 21-361821

    MT0661 HVAC Maint - converse HVAC 2 10MAY21 10MAY21 21-361876

    MT0671 Plumbing - Converse PLUMB2 10MAY21 11MAY21 21-361917

    MT0791 Summer Paint PAINT 10MAY21 10MAY21

    MT0621 Utility - Converse UTIL6 24MAY21 28MAY21 21-362020

    MT0761 Electric-Converse ELEC 24MAY21 24MAY21 21-361-623

    HKHK331 Total Clean-converse 10JUN21 17JUN21

    EC1381 Next Steps-summer dance TICE 20JUN21 27JUN21 CAMP

    EC1341 Kenya Christian group TICE 30JUN21 04JUL21 CAMP

    EC1421 Summers Honors TICE 10JUL21 17JUL21 CAMP

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 4 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    EC1501 Space Camp TICE 18JUL21 24JUL21 CAMP

    EC081 VA latina higher ed TICE 22JUL21 24JUL21 CAMP

    EC1551 Pleasentville NY ASP TICE 24JUL21 25JUL21 CAMP

    HKHK1091Clean after Camps-Conv 26JUL21 30JUL21

    MT0711 Utility - post - Converse UTIL6 26JUL21 13AUG21 21-362019

    Convocation Center

    MT0971 acid clean water heater HART 26MAY21 27MAY21 21-361569

    MT0731 Electric - Convo ELEC 01JUL21 01JUL21 21-361790

    MT0751 Plumbing - Convo PLUMB1 26JUL21 27JUL21 21-361891

    D-HALL

    MT0991 acid clean water heaters HART 10MAY21 10MAY21 21-361576

    MT1151 Electric-D-Hall ELEC 14MAY21 14MAY21 21-361675

    DARCUS jOHNSON HAll

    MT1281 Electric Darcus Johnson ELEC 09JUN21 09JUN21 21-361708

    DHUB

    MT0811 Electric-DHUB ELEC 10JUN21 10JUN21 21-361713

    Dingledine Hall

    HKHK121 Total clean - Ding 10MAY21 10MAY21

    MT0861 Carpentry - Ding CARP2 10MAY21 10MAY21 21-361844

    MT3771 summer paint-Ding PAINT 10MAY21 10MAY21

    MT0841 Utilities - Ding UTIL3 17MAY21 21MAY21 21-362000

    MT0871 Plumbing - Ding PLUMB2 24MAY21 25MAY21 21-361918

    MT0921 Oil Burner-Ding OB2 01JUN21 04JUN21 21-360043

    MT0801 Electric - Ding ELEC 03JUN21 03JUN21 21-361649

    Duke Hall

    MT0881 Electric - Duke ELEC 18MAY21 18MAY21 21-361688

    MT1051 Acid Clean Water Heater HART 07JUN21 08JUN21 21-561570

    Dukes Dining

    EN561 MUltiple projects SHANTZ 05JAN21 05JAN21 21-358994

    MT1191 Plumbing - Dukes Dining PLUMB 3 14MAY21 14MAY21 21-361980

    Eagle Hall

    HKHK631 Total Clean - Eagle 10MAY21 10MAY21

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 5 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    MT0931 Carpentry - Eagle CARP2 10MAY21 10MAY21 21-361847

    MT2511 Utility - Eagle UTIL4 10MAY21 21MAY21 21-362016

    MT3911 Summer Paint-Eagle PAINT 10MAY21 10MAY21

    MT1381 Clean dryer vents HVAC 17MAY21 21MAY21

    MT2541 Electric - Eagle ELEC 27MAY21 27MAY21 21-361638

    MT2571 Plumbing - Eagle PLUMB1 07JUN21 09JUN21 21-361907

    MT2531 Oil Burner-Eagle OB1 22JUN21 25JUN21 21-360028

    EC DECK

    MT1411 Electric EC deck ELEC 15JUN21 15JUN21 21-361720

    EC DINNING

    MT3601 Oil Burner East Campus OB1 12APR21 16APR21 21-360020

    MT3591 Electric - EC Dining ELEC 12MAY21 12MAY21 21-361663

    Festival

    MT0981 Electric - Festival ELEC 12MAY21 12MAY21 21-361661

    MT1001 acid clean water heater HART 12MAY21 13MAY21 21-361562

    MT1161 Plumbing 1- Festival PLUMB1 01JUN21 02JUN21 21-361893

    Field hockey

    MT3261 Electric -Field hockey ELEC 22JUN21 22JUN21 21-361807

    Football Practice Field

    MT4431 Electric - Football practice ELEC 28JUN21 28JUN21 21-361792

    Frederikson Hall

    EN621 Replace roof ED ROACH 10MAY21 30JUL21 21-2024-00

    HKHK861 Total Clean - Fred 10MAY21 10MAY21

    MT1021 Carpentry -Fred CARP1 10MAY21 10MAY21 21-361822

    MT3801 Summer paint -Fred PAINT 10MAY21 10MAY21

    MT1791 Oil Burner-Frederikson OB2 17MAY21 21MAY21 21-360041

    MT1011 Utilities - Fred UTIL3 24MAY21 28MAY21 21-362001

    MT1741 Plumbing - Fred PLUMB2 26MAY21 27MAY21 21-361920

    MT1061 Electric-Fred ELEC 03JUN21 03JUN21 21-361650

    GABBIN HAL

    MT4331 Electrical - Gabbin ELEC 08JUN21 08JUN21 21-361707

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 6 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Garber Hall

    HKHK851 Total clean - Garber 10MAY21 10MAY21

    MT1101 Carpentry - Garber CARP1 10MAY21 10MAY21 21-361823

    MT1211 Summer Paint-Garber PAINT 10MAY21 10MAY21

    MT1691 Plumbing - Garber PLUMB1 10MAY21 10MAY21 21-361901

    MT1261 Clean Dryer vents HVAC 17MAY21 21MAY21

    MT1141 Electric - Garber ELEC 03JUN21 03JUN21 21-361652

    MT1681 Utilities - Garber UTIL3 07JUN21 11JUN21 21-362002

    MT1081 Oil burner-Garber OB1 05JUL21 09JUL21 21-360031

    MT1391 Clean convectors-Garber OB1 05JUL21 09JUL21

    Gifford Hall

    EN711 Replace steam vault VISCOMI 10MAY21 30JUN21 21-352409

    MT1031 Carpentry - Gifford CARP1 10MAY21 10MAY21 21-361824

    MT1651 Plumbing - Gifford PLUMB 3 10MAY21 11MAY21 21-361934

    MT2001 Utility sweep- LS -Gifford UTIL6 10MAY21 10MAY21

    MT2021 Utilitiy Post-Gifford UTIL6 10MAY21 10MAY21 21-362021

    MT2261 HVAC Maint - Gifford HVAC 2 10MAY21 10MAY21 21-361877

    MT3861 summer paint-Gifford PAINT 10MAY21 10MAY21

    MT1641 Utility - Gifford UTIL6 17MAY21 21MAY21 21-362022

    HKHK801 Total Clean - Gifford KIM COLL 24MAY21 01JUN21

    MT2421 Electric-Gifford ELEC 24MAY21 24MAY21 21-361324

    EC1151 Softball 1 TICE 22JUN21 24JUN21 CAMP

    EC801 Summer band camp concert TICE 06JUL21 10JUL21 CAMP

    HKHK251 Clean after Camps-Gifford 02AUG21 06AUG21

    Godwin Hall

    EN371 Replace Fire Dampers ASA 10MAY21 07AUG21

    EN721 Replace golf turf-estimate DERROW 10MAY21 10MAY21 21-357832

    MT1171 Electric -Godwin ELEC 11MAY21 11MAY21 21-361658

    MT1341 Clean Dryer vents HVAC 17MAY21 21MAY21

    EN611 Replace flooring in restoom DERROW 12JUN21 26JUN21 21-0041-00

    GRACE PARK

    MT1241 Electric - Grace St Deck ELEC 21MAY21 21MAY21 21-361622

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 7 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Grace Street Apartments

    HKHK201 Total Clean-Grace 1st floor MAYHEW 10MAY21 21MAY21

    HKHK221 Total clean Grace -2nd floor KIM COLL 10MAY21 21MAY21

    HKHK301 Total clean Grace -3rd floor ARMENT 10MAY21 21MAY21

    MT1131 Summer paint-Grace st PAINT 10MAY21 13AUG21

    MT2411 Utilities -Grace St UTIL9 10MAY21 10MAY21 21-362049

    MT2481 Carpentry sweep-grace st CARP2 10MAY21 10MAY21 21-361850

    MT2721 Oil Burner- grace st OB1 10MAY21 14MAY21 21-360022

    MT2431 Electric -Grace St. Apartments ELEC 14MAY21 14MAY21 21-361676

    EC1411 Summer School ORL 17MAY21 06AUG21 ORL

    HKHK321 Total Clean Grace 4th floor C.ESTEP 17MAY21 21MAY21

    HKHK411 Total clean 4th flr GSA ARMENT 24MAY21 28MAY21

    MT1981 Plumbing -Grace St PLUMB2 26JUL21 28JUL21 21-361922

    Grafton-Stovall Theatre

    MT1181 Electric - Grafton Stoval ELEC 19MAY21 19MAY21 21-361691

    Hanson Hall

    HKHK171 Total clean - Hanson 10MAY21 10MAY21

    MT1041 Carpentry - Hanson CARP1 10MAY21 10MAY21 21-361825

    MT1561 Plumbing - Hanson PLUMB1 10MAY21 10MAY21 21-361894

    MT4061 summer Paint -Hanson PAINT 10MAY21 10MAY21

    MT1121 Electric-Hanson ELEC 03JUN21 03JUN21 21-361651

    MT1071 Utilities - Hanson UTIL3 14JUN21 18JUN21 21-362005

    MT1091 Oil Burner-Hanson OB2 14JUN21 18JUN21 21-360045

    Harper- ALlen-Lee Hall

    EC1111 Orientation - Transfer Team TICE 05APR21 05APR21 CAMP

    HKHK1351Total Clean Harper/Allen 10MAY21 10MAY21

    MT0221 Carpentry -Harper/Allen CARP1 10MAY21 10MAY21 21-361827

    MT0481 HVAC Maint- Harper/Lee HVAC 2 10MAY21 10MAY21 21-361878

    MT0491 Utility LS -Harper/Lee UTIL6 10MAY21 10MAY21

    MT2691 Summer paint -Harper/Lee PAINT 10MAY21 10MAY21

    MT0471 Plumbing - Harper/Lee PLUMB 3 12MAY21 13MAY21 21-361932

    EC1371 International Study TICE 16MAY21 06AUG21 CAMP

    EC1281 NSF-Chemistry TICE 22MAY21 30JUL21 CAMP

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 8 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    EC1291 NSF BIO TICE 22MAY21 30JUL21 CAMP

    MT3061 Electric - Harper/Allen ELEC 24MAY21 24MAY21 21-361626

    MT0061 Acid clean water heater HART 03JUN21 04JUN21 21-361553

    EC831 IST TICE 06JUN21 10JUL21 CAMP

    MT0411 Utility - Harper/Allen UTIL6 07JUN21 11JUN21 21-362026

    EC1201 Orientation Assist TICE 26JUN21 24JUL21 CAMP

    EC861 SLC Masters Program TICE 28JUN21 06AUG21 CAMP

    EC091 College Partnership Program TICE 06JUL21 09JUL21 CAMP

    Harrison Hall

    EN601 Renovate lobby HUDICK 10MAY21 16JUL21 21-360098

    MT1201 Electric - Harrison ELEC 25MAY21 25MAY21 21-361629

    University Health Center

    MT1231 Electric-Health Center ELEC 20MAY21 20MAY21 21-361692

    Hillcrest

    MT1401 Electric - Hillcrest ELEC 09JUN21 09JUN21 21-361711

    Hillside Hall

    HKHK491 Total Clean - Hillside 10MAY21 10MAY21

    MT1111 Carpentry - Hillside CARP2 10MAY21 10MAY21 21-361851

    MT1501 HVAC Maint - Hillside HVAC 3 10MAY21 10MAY21 21-361882

    MT4681 Summer Paint-Hillside PAINT 10MAY21 10MAY21

    MT1441 Plumbing - Hillside PLUMB 3 17MAY21 19MAY21 21-361933

    MT2591 Utility - Hillside UTIL2 17MAY21 21MAY21 21-361993

    MT2151 Oil Burner - Hillside OB2 24MAY21 28MAY21 21-360042

    MT1221 Electric - Hillside ELEC 01JUN21 01JUN21 21-361643

    MT2611 Utility Post-Hillside UTIL2 21JUN21 30JUN21 21-361994

    Hoffman Hall

    MT2501 Utility Hoffman UTIL7 10MAY21 14MAY21 21-362034

    MT2601 Carpentry -Hoffman CARP2 10MAY21 10MAY21 21-361853

    MT3201 HVAC Maint- Hoffman HVAC 1 10MAY21 10MAY21 21-361862

    MT4691 Summer Paint-Hoffman PAINT 10MAY21 10MAY21

    MT2081 Plumbing - Hoffman PLUMB1 20MAY21 21MAY21 21-361903

    HKHK231 Total Clean - Hoff MAYHEW 24MAY21 31MAY21

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 9 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    MT1971 Electric - Hoffman ELEC 25MAY21 25MAY21 21-361631

    MT2141 Maintenance MAINT 07JUN21 11JUN21

    EC1841 Sean' o reagan Team TICE 18JUN21 20JUN21 CAMP

    EC1321 Volleyball Advaced TICE 10JUL21 13JUL21 CAMP

    EC1441 Volleyball Advaced Camp TICE 10JUL21 13JUL21 CAMP

    EC1561 Volleyball positions TICE 14JUL21 15JUL21 CAMP

    EC1571 Volleyball Team Camp I TICE 17JUL21 19JUL21 CAMP

    EC1361 JMU Football Players TICE 19JUL21 23JUL21 CAMP

    HKHK911 Clean after Camps-Hoff 26JUL21 30JUL21

    MT2521 Utility Post- Hoffman UTIL7 26JUL21 13AUG21 21-362035

    Huffman Hall

    HKHK241 Total Clean - Huffman 10MAY21 10MAY21

    MT1571 Carpentry - Huffman CARP1 10MAY21 10MAY21 21-361829

    MT1671 Summer Paint Huffman PAINT 10MAY21 10MAY21

    MT1481 Oil burner-Huffman OB1 17MAY21 21MAY21 21-360023

    MT1491 clean convectors-Huff OB1 17MAY21 21MAY21

    MT1451 Plumbing - Huffman PLUMB2 01JUN21 02JUN21 21-361919

    MT1251 Electric - Huffman ELEC 02JUN21 02JUN21 21-361645

    MT1461 Utilities - Huffman UTIL3 21JUN21 25JUN21 21-362006

    Ikenberry Hall

    HKHK211 Total clean - Ike 10MAY21 10MAY21

    MT3501 Carpentry-Ikenberry CARP1 10MAY21 10MAY21 21-361830

    MT3511 Summer Paint -Ike PAINT 10MAY21 10MAY21

    MT1361 Clean Dryer vents HVAC 17MAY21 21MAY21

    MT1271 Electric - Ike ELEC 02JUN21 02JUN21 21-361646

    MT3831 Plumbing - Ike PLUMB2 03JUN21 04JUN21 21-361930

    MT1551 Oil burner-IKE OB2 21JUN21 25JUN21 21-360047

    MT1541 Utilities - Ike UTIL3 28JUN21 02JUL21 21-362008

    JENNINGS

    HKHK311 Total Clean-Jennings 10MAY21 10MAY21

    MT3341 Oil Burner- Jennings OB2 10MAY21 14MAY21 21-360039

    MT3351 Carpenter-Jennings CARP1 10MAY21 10MAY21 21-361832

    MT3381 Paint-Jennings PAINT 10MAY21 10MAY21

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 10 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    MT3421 HVAC - Jennings HVAC 1 10MAY21 10MAY21 21-361864

    MT3431 Utility sweep-Jennings UTIL 10 10MAY21 28MAY21

    MT3391 Electrical-Jennings ELEC 13MAY21 13MAY21 21-361673

    MT3411 Plumbing - Jennings PLUMB 3 24MAY21 26MAY21 21-361941

    1021 South Main St.

    MT1291 Electric - JMAC 1 ELEC 24JUN21 24JUN21 21-361800

    1017Harrison St.

    MT1301 Electric - JMAC 2 ELEC 24JUN21 24JUN21 21-361798

    Financial Services Building

    MT2071 oil burner shop-JMAC3 OB1 26APR21 30APR21 21-360021

    1015 Harrison St.

    MT1311 Electric - JMAC 4 ELEC 24JUN21 24JUN21 21-361797

    1041 South Main St.

    MT1331 Electric - JMAC 5 ELEC 24JUN21 24JUN21 21-361796

    Johnston Hall

    MT1351 Electric - Johnston ELEC 17MAY21 17MAY21 21-361680

    Keezell Hall

    MT1421 Replace fire dampers CLEMENTS10MAY21 14MAY21

    MT1371 Electric - Keezell ELEC 09JUN21 09JUN21 21-361710

    Lake A

    MT3291 Summer Paint PAINT 13MAY19 31MAY19

    HKHK1151Total Clean - Lake A 10MAY21 10MAY21

    MT1661 Carpentry - Lake A CARP2 10MAY21 10MAY21 21-361854

    MT3721 HVAC Maint- Lake A HVAC 1 10MAY21 10MAY21 21-361869

    MT1871 Utility - Lake A UTIL7 17MAY21 16MAY21 21-362036

    MT3731 Plumbing - Lake A PLUMB 3 27MAY21 28MAY21 21-361942

    MT4251 Electric - Lake A ELEC 16JUN21 16JUN21 21-361722

    MT1711 Oil burner-Lake A OB1 12JUL21 15JUL21 21-360032

    Lake B

    HKHK431 Total Clean - Lake B 10MAY21 10MAY21

    MT1701 Carpentry -Lake B CARP2 10MAY21 10MAY21 21-361855

    MT3241 Summer paint -Lake B PAINT 10MAY21 10MAY21

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 11 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    MT4391 HVAC Maint -Lake B HVAC 1 10MAY21 10MAY21 21-361870

    MT1901 Utility - Lake B UTIL7 24MAY21 28MAY21 21-362037

    MT1721 Plumbing - Lake B PLUMB 3 01JUN21 02JUN21 21-361935

    MT4261 Electric - Lake B ELEC 16JUN21 16JUN21 21-361723

    Lake C

    HKHK291 Total clean - Lake C 10MAY21 10MAY21

    MT1771 Carpentry - Lake C CARP1 10MAY21 10MAY21 21-361833

    MT1781 HVAC Maint - Lake C HVAC 1 10MAY21 10MAY21 21-361871

    MT4121 Summer paint -Lake C PAINT 10MAY21 10MAY21

    MT1761 Plumbing - Lake C PLUMB 3 20MAY21 21MAY21 21-361936

    MT1931 Utility Lake C UTIL7 01JUN21 04JUN21 21-362038

    MT4271 Electric - Lake C ELEC 16JUN21 16JUN21 21-361724

    Lake D

    HKHK281 Total Clean - Lake D 10MAY21 10MAY21

    MT1821 Carpentry -Lake D CARP2 10MAY21 10MAY21 21-361856

    MT1841 HVAC Maint - Lake D HVAC 1 10MAY21 10MAY21 21-361872

    MT4131 Summer paint -Lake D PAINT 10MAY21 10MAY21

    MT1831 Plumbing - Lake D PLUMB 3 03JUN21 04JUN21 21-361937

    MT1851 Utility - Lake D UTIL7 07JUN21 11JUN21 21-362040

    MT4281 Electric - Lake D ELEC 16JUN21 16JUN21 21-361725

    Lake E

    HKHK261 Total clean - Lake E 10MAY21 10MAY21

    HKHK451 Clean After Camp 10MAY21 10MAY21

    MT1881 Carpentry - Lake E CARP1 10MAY21 10MAY21 21-361834

    MT4021 HVAC Maint -Lake E HVAC 1 10MAY21 10MAY21 21-361873

    MT4151 Summer Paint Lake E PAINT 10MAY21 10MAY21

    MT1891 Plumbing - Lake E PLUMB 3 07JUN21 08JUN21 21-361938

    MT4031 Utility - lake E UTIL7 14JUN21 18JUN21 21-362041

    MT4291 Electric - Lake E ELEC 16JUN21 16JUN21 21-361726

    MT4011 Oil Burner-Lake E OB2 05JUL21 08JUL21 21-360050

    Lake F

    HKHK271 Total clean - Lake F 10MAY21 10MAY21

    MT1941 Carpentry - Lake F CARP1 10MAY21 10MAY21 21-361835

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 12 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    MT1951 HVAC Maint -Lake F HVAC 1 10MAY21 10MAY21 21-361874

    MT2801 Summer paint -Lake F PAINT 10MAY21 10MAY21

    MT1991 Plumbing - Lake F PLUMB 3 09JUN21 10JUN21 21-361939

    MT4301 Electric - Lake F ELEC 16JUN21 16JUN21 21-361727

    MT2311 Utility Lake F UTIL7 21JUN21 25JUN21 21-362042

    lakeview

    MT2321 Oil Burner-Lakeveiw OB2 26APR21 30APR21 21-360037

    MT2471 Electric-lake veiw ELEC 27MAY21 27MAY21 21-361636

    Leeolou Alumni Center

    EN701 New Telecom duct bank DERROW 10MAY21 16JUL21 21-359714

    MT2011 Electric - Leeolou ELEC 12MAY21 12MAY21 21-361662

    MT2091 Acid clean water heaters HART 07JUN21 08JUN21 21-361585

    Logan Hall

    MT2031 Carpentry - Logan CARP2 10MAY21 10MAY21 21-361857

    MT2061 HVAC Maint - Logan HVAC 2 10MAY21 10MAY21 21-361879

    MT2331 Utility sweep -Logan UTIL6 10MAY21 14MAY21 21-362029

    MT3701 Summer Paint-Logan PAINT 10MAY21 10MAY21

    MT4381 Utility LS- Logan UTIL6 10MAY21 10MAY21

    MT4601 Utility - Post - Logan UTIL6 10MAY21 10MAY21 21-362030

    MT2041 Plumbing - Logan PLUMB1 13MAY21 14MAY21 21-361902

    MT4311 Electric - Logan ELEC 24MAY21 24MAY21 21-361628

    HKHK521 Total clean - Logan MAYHEW 18JUN21 25JUN21

    EC1431 Volleyball Advaced Camp TICE 10JUL21 13JUL21 CAMP

    EC1611 Volleyball team TICE 17JUL21 19JUL21 CAMP

    HKHK341 Clean after Camps-Logan 20JUL21 23JUL21

    Madison Hall

    MT4421 Electric- Madison Hall ELEC 20MAY21 20MAY21 21-361618

    MT3661 Oil Burner-Madison Hall OB1 02AUG21 06AUG21 21-360034

    Mason Street Deck

    MT4411 Electric- Mason St Deck ELEC 15JUN21 15JUN21 21-361721

    Massanutten Hall (JMAC 3)

    EN571 Repair EFIS SHANTZ 10MAY21 10MAY21 20-352129

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 13 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Mauck Stadium

    MT4321 Electrical - Mauck ELEC 28JUN21 28JUN21 21-361794

    McGraw-Long Hall

    MT2051 Carpentry - McGraw CARP2 10MAY21 10MAY21 21-361858

    MT2111 Utility sweep - McGraw UTIL2 10MAY21 14MAY21 21-361995

    MT2121 HVAC Maint - McGraw HVAC 3 10MAY21 10MAY21 21-361883

    MT2201 Summer paint - McGraw PAINT 10MAY21 10MAY21

    MT2241 Bathroom ceiling B-section PLUMBERS10MAY21 14MAY21

    HKHK581 Total clean - McGraw ARMENT 31MAY21 07JUN21

    MT4341 Electrical - McGraw Long ELEC 01JUN21 01JUN21 21-361644

    MT2131 Oil Burner-McGraw OB2 07JUN21 11JUN21 21-360044

    MT2171 Plumbing - Mcgraw Long PLUMB 3 14JUN21 15JUN21 21-361940

    EC731 Katonah Appalachian group II TICE 26JUN21 27JUN21 CAMP

    EC581 Katonah Appalachian group II TICE 03JUL21 04JUL21 CAMP

    EC621 Greenfield Appalachian TICE 03JUL21 04JUL21 CAMP

    EC1101 Pleasentville NY TICE 17JUL21 18JUL21 CAMP

    HKHK1411Clean after Camp-McGraw 19JUL21 23JUL21

    MT2351 Utility Post -Mcgraw UTIL2 19JUL21 23JUL21 21-361996

    Memorial annex

    MT4371 Electrical-Memorial annex ELEC 14JUN21 14JUN21 21-361717

    Memorial Hall

    EN451 Renovate College of HUDICK 05JAN21 05JAN21

    MT4351 Electrical - Memorial ELEC 10JUN21 10JUN21 21-361715

    MT0821 Oil Burner-Memorial # 1 OB1 28JUN21 02JUL21 21-360029

    MT0951 OilBurner Memorial # 2 OB1 28JUN21 02JUL21

    Miller Hall

    MT4361 Electric - Miller ELEC 18MAY21 18MAY21 21-361689

    MT4451 acid clean water heater HART 09JUN21 10JUN21 21-361572

    MT4521 clean humidifier HART 09JUN21 11JUN21 21-361587

    MLK STREET

    EN481 Utilities Relocation-on MLK DERROW 05JAN21 30JUN21 18-2000-05

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 14 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Moody Hall

    MT2921 Electric - Moody ELEC 08JUN21 08JUN21 21-361704

    Convenience Store (Mr. Chips)

    MT2941 Electric - Mr Chips ELEC 10JUN21 10JUN21 21-361714

    Music Building

    EN521 Replace EFIS SHANTZ 10MAY21 10MAY21 20-345775

    MT2951 Electric - Music ELEC 17MAY21 17MAY21 21-361681

    PERFORMING

    MT1731 Oil Burner Performing arts OB2 05APR21 09APR21 21-360051

    MT3321 Electric -Estes ELEC 26MAY21 26MAY21 21-361633

    MT3451 Electric - Roberts ELEC 26MAY21 26MAY21 21-361633

    MT1631 Oil Burner -Performing arts- OB2 12JUL21 16JUL21 21-360052

    Roop Hall

    MT3071 Electric - Roop ELEC 08JUN21 08JUN21 21-361705

    ROSE LIBRA

    MT4081 Electric- Rose Library ELEC 07JUN21 07JUN21 21-361703

    Sheldon Hall

    EN441 Replace fire alarms HUDICK 10MAY21 23JUL21 20-346872

    MT3091 Electric - Sheldon ELEC 17MAY21 17MAY21 21-361682

    MT3121 Replace fire dampers CLEMENTS17MAY21 21MAY21

    SHENANDOAH

    MT2101 Carpentry - Shenandoah CARP2 10MAY21 10MAY21 21-361859

    MT2161 Utility - Shenandoah UTIL8 10MAY21 21MAY21 21-362047

    MT2381 HVAC Maint Shen -A wing HVAC 4 10MAY21 10MAY21 21-361887

    MT2391 HVAC Maint- Shen -B Wing HVAC 4 10MAY21 10MAY21

    MT3461 Summer paint -Shen PAINT 10MAY21 10MAY21

    MT3371 Electric - Shenandoah ELEC 13MAY21 13MAY21 21-361668

    MT2191 Plumbing - Shenandoah PLUMB1 17MAY21 19MAY21 21-361904

    HKHK571 Total Clean - Shen C.ESTEP 07JUN21 18JUN21

    EC721 Summer Band Camp TICE 06JUL21 10JUL21 CAMP

    EC601 Laxology (W) - Elite Camp TICE 12JUL21 14JUL21 CAMP

    EC1031 UDA Dance B-wing TICE 15JUL21 19JUL21 CAMP

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 15 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    EC1011 UCA Cheer Camp TICE 20JUL21 24JUL21 CAMP

    HKHK591 Clean after camps-Shen 26JUL21 30JUL21

    MT2281 Utility Post - Shenandoah UTIL8 26JUL21 06AUG21 21-362048

    Shorts Hall

    HKHK641 Total Clean - Shorts 10MAY21 22MAY21

    MT1591 Carpentry -Shorts CARP1 10MAY21 10MAY21 21-361836

    MT1751 Bathroom ceiling 2nd flr PLUMBERS10MAY21 28MAY21

    MT4181 Summer paint -Shorts PAINT 10MAY21 10MAY21

    MT2551 Utility - Shorts UTIL4 24MAY21 04JUN21 21-362017

    MT3101 Electric - Shorts ELEC 27MAY21 27MAY21 21-361640

    MT2561 Plumbing - Shorts PLUMB1 10JUN21 11JUN21 21-361905

    MT1601 Oil Burner-Shorts OB1 19JUL21 23JUL21 21-360033

    MT1621 Clean Convectors-Shorts OB1 19JUL21 23JUL21

    Soccer Field

    MT2631 Electric - Soccer Field ELEC 22JUN21 22JUN21 21-361805

    Sonner Hall

    MT2661 Oil burner-Sonner OB1 19APR21 23APR21 21-360019

    MT2641 Electric - Sonner ELEC 27MAY21 27MAY21 21-361639

    South Main Garage

    MT1471 Elect -south main garage ELEC 23JUN21 23JUN21 21-361803

    Spotswood Hall

    HKHK351 Total clean - Spotswood 10MAY21 10MAY21

    MT2671 Carpentry - Spotswood CARP1 10MAY21 10MAY21 21-361837

    MT2761 Summer paint-spotswood PAINT 10MAY21 10MAY21

    MT3401 Utility - Spotswood UTIL5 10MAY21 28MAY21 21-362018

    MT3151 Electric - Spotswood ELEC 17MAY21 17MAY21 21-361684

    MT2701 Plumbing - Spotswood PLUMB1 14JUN21 14JUN21 21-361909

    Student Success

    EN411 Replace steam line VISCOMI 10MAY21 25JUN21 20-355066

    MT2291 acid clean water heater HART 10MAY21 10MAY21 21-361574

    MT2301 No Hot water VISCOMI 10MAY21 25JUN21

    MT2271 Electric - Student success ELEC 19MAY21 19MAY21 21-361617

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 16 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    South Main Storage Warehouse

    MT1431 Electric - South main ELEC 23JUN21 23JUN21 21-361804

    Taylor Hall

    MT2741 Electrical - Taylor ELEC 19MAY21 19MAY21 21-361693

    MT2751 acid clean water heater HART 24MAY21 25MAY21 21-361556

    University Park

    MT3791 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361943

    MT4191 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361944

    MT4201 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361945

    MT4211 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361946

    MT4461 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361947

    MT4471 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361948

    MT4481 Plumbing - UPARK PLUMB 3 16JUN21 18JUN21 21-361949

    MT3841 Electric - UPARK ELEC 21JUN21 21JUN21 21-361732

    MT3921 Electric - UPARK ELEC 21JUN21 21JUN21 21-361815

    MT3991 Electric - UPARK ELEC 21JUN21 21JUN21 21-361814

    MT4001 Electric - UPARK ELEC 21JUN21 21JUN21 21-361813

    MT4041 Electric - UPARK - ELEC 21JUN21 21JUN21 21-361811

    MT4101 Electric - UPARK- urec gate ELEC 21JUN21 21JUN21 21-361734

    MT4161 Electric - UPARK-pavilion ELEC 21JUN21 21JUN21 21-361733

    MT4171 Electric -Upark- Indoor ELEC 21JUN21 21JUN21 21-361806

    University Recreation Center

    EN491 Inspect NE corner DERROW 05JAN21 05JAN21 20-351098

    EN541 Water leak Mac 3 SHANTZ 05JAN21 05JAN21 21-360230

    MT2851 Plumbing UREC PLUMB2 12MAY21 14MAY21 21-361924

    MT2971 Clean dryer vents HVAC 17MAY21 21MAY21

    MT3001 acid clean water heater HART 26MAY21 27MAY21 21-361568

    MT2811 Electric - UREC ELEC 04JUN21 04JUN21 21-361701

    University Services Building

    MT2821 Electric - USB ELEC 23JUN21 23JUN21 21-361802

    MT2831 Oil burner shop-USB OB2 23AUG21 27AUG21 21-360053

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 17 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    USB ANNEX

    MT3221 Electric- USB Annex ELEC 23JUN21 23JUN21 21-361801

    MT2981 Oil Burner USB annex OB1 23AUG21 27AUG21 21-360035

    Varner House

    MT2841 Electric - Varner ELEC 09JUN21 09JUN21 21-361712

    Veterans Memorial Stadium

    MT3961 Electric - VET Mem park ELEC 14JUN21 14JUN21 21-361716

    Wampler Hall

    EC1261 NODO interns TICE 09MAY21 24JUL21 CAMP

    MT2871 Summer Paint-Wampler PAINT 10MAY21 10MAY21

    MT2891 HVAC Maint -Wampler HVAC 2 10MAY21 10MAY21 21-361880

    MT2911 Carpentry - Wampler CARP2 10MAY21 10MAY21 21-361860

    EC1301 International Study TICE 16MAY21 06AUG21 CAMP

    EC1211 NSF-Chemistry TICE 22MAY21 30JUL21 CAMP

    EC1221 NSF BIO TICE 22MAY21 30JUL21 CAMP

    MT2881 Plumbing - Wampler PLUMB1 24MAY21 25MAY21 21-361910

    MT2901 Electric - Wampler ELEC 24MAY21 24MAY21 21-361625

    EC1091 Orientation - Transfer Team TICE 25MAY21 11JUN21 CAMP

    HKHK361 Total clean - Wampler MAYHEW 01JUN21 09JUN21

    MT2961 Acid clean water heater HART 03JUN21 04JUN21

    EC791 IST TICE 06JUN21 10JUL21 CAMP

    MT2861 Utility sweep- Wampler UTIL6 14JUN21 18JUN21 21-362032

    EC1141 Orientation Assist TICE 26JUN21 24JUL21 CAMP

    EC1171 Higher Achievement TICE 28JUN21 30JUN21 CAMP

    EC701 SLC Masters Program TICE 28JUN21 06AUG21 CAMP

    EC1121 Kenya Christian group TICE 30JUN21 04JUL21 CAMP

    EC071 College Partnership Program TICE 06JUL21 09JUL21 CAMP

    EC1791 Volleyball Team I TICE 17JUL21 19JUL21 CAMP

    EC1581 Vocal arts TICE 20JUL21 24JUL21 CAMP

    HKHK1101Clean after Camp-Wampler 26JUL21 30JUL21

    MT3361 Utility Post -Wampler UTIL6 26JUL21 13AUG21 21-362031

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 18 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Warren Hall

    MT2771 Electric -Warren ELEC 19MAY21 19MAY21 21-361695

    MT1611 Acid Clean Water Converter HART 24MAY21 25MAY21 21-361582

    WARSAW

    EN551 Repale covers SHANTZ 07JUL20 31MAR21

    MT3981 Electric -Warsaw ELEC 26MAY21 26MAY21 21-361634

    Wayland Hall

    HKHK1041Total Clean-Wayland C.ESTEP 10MAY21 14MAY21

    MT3891 HVAC Maint - Wayland HVAC 1 10MAY21 10MAY21 21-361875

    MT3931 Summer paint -Wayland PAINT 10MAY21 10MAY21

    MT3951 Carpentry - Wayland CARP1 10MAY21 10MAY21 21-361838

    MT3871 Electric - Wayland ELEC 14MAY21 14MAY21 21-361677

    MT4071 Utility sweep post - Wayland UTIL7 26JUL21 06AUG21 21-362043

    MT3901 Plumbing -Wayland PLUMB2 29JUL21 30JUL21 21-361931

    Weaver Hall

    HKHK371 Total Clean - Weaver 10MAY21 10MAY21

    MT3041 Carpentry - Weaver CARP1 10MAY21 10MAY21 21-361839

    MT3141 Clean dryer vents HVAC 17MAY21 21MAY21

    MT3331 Oil Burner-weaver OB1 01JUN21 04JUN21 21-360025

    MT3161 Electric - Weaver ELEC 02JUN21 02JUN21 21-361647

    MT3271 Plumbing - Weaver PLUMB2 07JUN21 08JUN21 21-361926

    MT3011 Utilities -Weaver UTIL3 05JUL21 09JUL21 21-36210

    White Hall

    HKHK381 Total Clean - White 10MAY21 10MAY21

    MT3191 Carpentry - White CARP2 10MAY21 10MAY21 21-361861

    MT4491 Summer paint -Weaver PAINT 10MAY21 10MAY21

    MT3211 Clean dryer vents HVAC 17MAY21 21MAY21

    MT3181 Oil Burner -White OB1 24MAY21 28MAY21 21-360024

    MT3171 Electric - White ELEC 02JUN21 02JUN21 21-361648

    MT3111 Plumbing -White PLUMB1 15JUN21 16JUN21 21-361911

    MT3081 Utilities - White UTIL3 12JUL21 16JUL21 21-362011

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 19 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    Wilson Hall

    EN511 Remove sewage pump DERROW 10MAY21 10MAY21

    MT4051 Electric-Wilson ELEC 08JUN21 08JUN21 21-361706

    Wind turbine

    MT3971 Electric -wind turbine ELEC 01JUL21 01JUL21 21-361789

    Wine-Price Hall

    MT3881 acid clean water heater HART 01JUN21 02JUN21 21-361573

    MT3821 Electric - Wine Price ELEC 17JUN21 17JUN21 21-361728

    EC1001 Mens soccer clinic I(M) I TICE 15MAY21 16MAY21 CAMP

    EC1671 Orientations Transfer TICE 02JUN21 10JUN21 CAMP

    EC671 Madison Alumni TICE 04JUN21 06JUN21 CAMP

    EC371 Baseball ellite prospect camp TICE 05JUN21 06JUN21 CAMP

    EC1161 Mens soccer clinic (M) II TICE 06JUN21 06JUN21 CAMP

    EC1901 Womens soccer II TICE 07JUN21 11JUN21 CAMP

    EC341 Baseball youth camp I TICE 07JUN21 10JUN21 CAMP

    EC401 Basketball Camp I TICE 08JUN21 11JUN21 CAMP

    EC2071 Football prospect I TICE 11JUN21 11JUN21 CAMP

    EC1941 Womens soccer Goal keeper TICE 12JUN21 12JUN21 CAMP

    EC1771 Sean O' Regan Ellite TICE 13JUN21 13JUN21 CAMP

    EC421 Basketball Elite Camp TICE 13JUN21 13JUN21 CAMP

    EC1931 Sean O' Regan Individual TICE 14JUN21 17JUN21 CAMP

    EC841 JMU Institute in Counseling TICE 14JUN21 18JUN21 CAMP

    EC921 Baseball team camp TICE 16JUN21 18JUN21 CAMP

    EC2061 Football prospect II TICE 17JUN21 17JUN21 CAMP

    EC2081 Football prospect III TICE 18JUN21 18JUN21 CAMP

    EC1801 Basketball Day camp II TICE 21JUN21 24JUN21 CAMP

    EC311 Baseball prospect camp I- TICE 22JUN21 22JUN21 CAMP

    EC1821 Basketball team camp TICE 25JUN21 27JUN21 CAMP

    EC1631 Oientations TICE 28JUN21 22JUL21 CAMP

    EC771 Field Hockey I TICE 11JUL21 13JUL21 CAMP

    EC911 Field Hockey camp I-Bwing TICE 11JUL21 14JUL21 CAMP

    EC1131 Valley Scholars program day TICE 13JUL21 17JUL21 CAMP

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 20 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    EC1951 Sean O' Regan I TICE 13JUL21 16JUL21 CAMP

    EC1181 Softball II TICE 16JUL21 17JUL21 CAMP

    EC1481 Little dukes softball TICE 16JUL21 16JUL21 CAMP

    EC811 Baseball Team camp I TICE 16JUL21 18JUL21 CAMP

    EC1251 Field Hockey Camp II TICE 17JUL21 19JUL21 CAMP

    EC1921 Womens soccer II TICE 17JUL21 18JUL21 CAMP

    EC711 Volleyball Team camp TICE 17JUL21 19JUL21 CAMP

    EC931 Football Prospect IV TICE 17JUL21 17JUL21 CAMP

    EC1241 Softball III TICE 18JUL21 18JUL21 CAMP

    EC1751 Football Prospect III TICE 18JUL21 18JUL21 CAMP

    EC1811 Football Prospect V TICE 18JUL21 18JUL21 CAMP

    EC1471 Baseball team camp II TICE 23JUL21 25JUL21 CAMP

    EC1521 Baseball top prospect II TICE 23JUL21 25JUL21 CAMP

    EC1881 Mens soccer IV TICE 24JUL21 25JUL21 CAMP

    EC631 Baseball Team Camp II TICE 26JUL21 28JUL21 CAMP

    EC851 Womens Soccer Team TICE 26JUL21 28JUL21 CAMP

    EC2041 Mens soccer Day Clinics TICE 27JUL21 28JUL21 CAMP

    EC891 Baseball team camp III TICE 30JUL21 01AUG21 CAMP

    EC1401 Mark B basketball elite TICE 31JUL21 31JUL21 CAMP

    EC1191 Mark B Basketball Day camp TICE 02AUG21 05AUG21 CAMP

    EC991 Womens soccer team ID clinic TICE 02AUG21 04AUG21 CAMP

    EC1051 Baseball top prospect camp TICE 03AUG21 03AUG21 CAMP

    EC1861 Sean O'Regan ellite II TICE 03AUG21 03AUG21 CAMP

    EC661 Hall Directors EA ORL 04AUG21 25AUG21 ORL

    EC781 Football Staff ORL 04AUG21 25AUG21 ORL

    EC971 Baseball team Camp IV TICE 06AUG21 08AUG21 CAMP

    EC1021 Sean O'regan elite II TICE 07AUG21 07AUG21 CAMP

    EC611 Football Players EA 07AUG21 25AUG21 ORL

    EC681 Cheer Staff 07AUG21 25AUG21 ORL

    EC691 Football Staff (strength & 08AUG21 25AUG21 ORL

    EC1311 Baseball youth camp II TICE 09AUG21 12AUG21 CAMP

    EC1331 Mark B, Basketball Elite TICE 09AUG21 09AUG21 CAMP

    EC1351 FSL grads, Staff and AGCs TICE 09AUG21 25AUG21 CAMP

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 21 of 22

    Date Revision Checked Approved

  • Activity

    ID

    Activity

    Description

    Orig

    Dur

    PROJRESP Early

    Start

    Early

    Finish

    PROJ

    EC551 Soccer - (W) EAs ORL 09AUG21 19AUG21 ORL

    EC461 RA's JMU 14AUG21 25AUG21 ORL

    EC471 Volleyball -EA 14AUG21 25AUG21 ORL

    EC821 Softball II TICE 14AUG21 15AUG21 CAMP

    EC301 Orientations Staff - EA OPAs TICE 16AUG21 25AUG21 ORL

    EC381 Soccer M -EA 16AUG21 25AUG21 ORL

    EC501 Field Hockey - EA 16AUG21 25AUG21 ORL

    EC761 FSL grads, Staff and AGCs 16AUG21 25AUG21 ORL

    EC741 FSL housing managers 18AUG21 25AUG21 ORL

    EC291 Band staff 19AUG21 25AUG21 ORL

    EC211 Orientation Staff EA Frogs 20AUG21 25AUG21 ORL

    EC651 Football Staff-& Managers ORL 20AUG21 25AUG21 ORL

    EC981 Baseball team Camp V TICE 20AUG21 22AUG21 CAMP

    EC411 Band students 21AUG21 25AUG21 ORL

    EC431 Computing support 21AUG21 25AUG21 ORL

    EC561 Cheer Students 21AUG21 25AUG21 ORL

    EC591 Freshman Orientations 21AUG21 22AUG21 CAMPUS

    2010

    APR MAY JUN JUL AUG SEP

    28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26

    © Primavera Systems, Inc.

    Start Date 05APR21

    Finish Date

    Data Date 05APR21

    Run Date 31MAR21 13:23

    Early Bar

    Float Bar

    Progress Bar

    Critical Activity

    SS21

    JMU

    FM 2021 Summer Schedule

    Classic Schedule Layout

    Sheet 22 of 22

    Date Revision Checked Approved