Title of the procedure: EGNOS V3 Site Surveys
Procedure reference: GSA/OP/21/15
Annex I to Invitation to Tender
‘Tender Specifications’
Ref: GSA 217774
Issue: 1 Rev 0
Date: 15/01/2016
Page 2/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
OVERVIEW ................................................................................................................................................... 4
1.1 CONTEXT OF THE TENDER ......................................................................................................................... 4 1.1.1 The EGNOS Programme .................................................................................................................. 4
1.1.2 The European GNSS Agency ............................................................................................................ 4 1.2 OUTLINE OF THE TENDER AND PROCEDURAL PROCESS .............................................................................. 5 1.3 PURPOSE OF THE FRAMEWORK CONTRACT ................................................................................................ 7
TERMS OF REFERENCE ........................................................................................................................... 8
2.1 APPLICABLE LEGAL ACTS ......................................................................................................................... 8 2.2 TERMS OF REFERENCE – FRAMEWORK CONTRACT ................................................................................... 9
2.2.1 Background ...................................................................................................................................... 9 2.2.2 APPLICABLE DOCUMENTS .......................................................................................................... 9 2.2.3 Reference documents ........................................................................................................................ 9 2.2.4 Proprietary Information ................................................................................................................. 10 2.2.5 Tasks ............................................................................................................................................... 11 2.2.5.2 Task #1: Interference and Logistics survey on site ........................................................................ 11 2.2.5.3 Task#2: Interference, infrastructure and Logistics survey data post-processing in contactor’s
office 11 2.2.5.3 Task #1 and #2 time schedule and deliverables ............................................................................. 12 2.2.5.4 Task#3 site management engineering support ............................................................................... 12 2.2.6 Specific requirements ..................................................................................................................... 13 2.2.7 Contract Management & Administration ....................................................................................... 13
2.3 TERMS OF REFERENCE – SPECIFIC CONTRACT #1 ................................................................................... 14 2.4 LEGAL AND CONTRACTUAL TERMS OF REFERENCE ................................................................................. 14
2.4.1 Participation conditions ................................................................................................................. 14 2.4.2 Form of contract............................................................................................................................. 15 2.4.3 Description of the framework contract........................................................................................... 15 2.4.4 Place of performance ..................................................................................................................... 16 2.4.5 Volume of the contract ................................................................................................................... 16 2.4.6 Duration ......................................................................................................................................... 16 2.4.7 Language of the contract ................................................................................................................ 16 2.4.8 Subcontracting ............................................................................................................................... 16 2.4.9 Participation of consortia .............................................................................................................. 18 2.4.10 Confidentiality, Security, Conflicts of Interest ............................................................................... 18 2.4.11 Compliance with environmental, social and labour law ................................................................ 19
ASSESSMENT OF TENDERS ................................................................................................................... 19
3.1 EXCLUSION CRITERIA .............................................................................................................................. 19 3.2 SELECTION CRITERIA .............................................................................................................................. 20
3.2.1 Legal capacity ................................................................................................................................ 20 3.2.2 Economic and financial capacity criteria ...................................................................................... 21 3.2.3 Technical and professional capacity criteria ................................................................................. 21
3.3 AWARD CRITERIA .................................................................................................................................... 22 3.3.1 Qualitative Award Criteria ............................................................................................................ 23 3.3.2 Financial Award Criteria ............................................................................................................... 23
Page 3/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
CONDITIONS FOR SUBMISSION OF TENDERS ................................................................................ 25
4.1 DISCLAIMER ............................................................................................................................................ 25 4.2 VARIANTS ............................................................................................................................................... 25 4.3 PREPARATION COSTS OF TENDERS ........................................................................................................... 25 4.4 CONTENT OF THE TENDER TO BE SUBMITTED .......................................................................................... 25
4.4.1 Presentation of the Tender ............................................................................................................. 25 4.4.2 General ........................................................................................................................................... 25 4.4.3 Administrative file .......................................................................................................................... 26 4.4.4 Technical Offer ............................................................................................................................... 27 4.4.5 Financial offer ................................................................................................................................ 27
4.5 SUBMISSION ............................................................................................................................................ 29 4.6 OPENING OF THE TENDERS ...................................................................................................................... 30 4.7 PERIOD OF VALIDITY OF THE TENDERS .................................................................................................... 31 4.8 FURTHER INFORMATION .......................................................................................................................... 31 4.9 INFORMATION FOR TENDERERS ............................................................................................................... 31 4.10 DATA PROTECTION SPECIFIC TO THE TENDER PROCESS ........................................................................... 32
LIST OF ACRONYMS AND ABBREVIATIONS USED ........................................................................ 32
LIST OF ANNEXES .................................................................................................................................... 33
Page 4/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Overview
The present Tender Specifications (TS) are attached to the Invitation to Tender (ITT) and are
intended to complement the information contained in the Contract Notice 2016/S 041-066290
providing tenderers information on scope of the contract potentially awarded as a result of this call
for tender and organisation of this procurement process.
1.1 Context of the tender
1.1.1 THE EGNOS PROGRAMME
EGNOS (European Geostationary Navigation Overlay Service) is Europe's first concrete venture into
satellite navigation. EGNOS uses geostationary satellites and a network of ground stations to
receive, analyse and augment GPS, and in the next version (EGNOS V3) Galileo signals.
EGNOS increases the accuracy of existing satellite positioning signals while providing a crucial
‘integrity message', informing users in the event of signal problems. It also transmits an extremely
accurate universal time signal.
EGNOS makes existing satellite navigation signals suitable for safety critical applications such as
flying aircraft or navigating ships through narrow channels. EGNOS was certified for civil aviation in
2011.
1.1.2 THE EUROPEAN GNSS AGENCY
The European GNSS Agency (hereinafter ‘GSA’, ‘the Agency’ or ‘the Contracting Authority’) is an
official European Union regulatory authority formed by the European Union to accomplish specific
tasks related to the European GNSS programmes1.
In addition to the exploitation of EGNOS, already operational, the Agency’s strategic objectives
include the achievement of a fully operational Galileo system. This includes the laying of
foundations for a fully sustainable and economically viable system and its security. Moreover, the
Agency’s key objective is to make Galileo not just a functioning system but also the world's leading
satellite navigation system for civilian applications.
Further information can be found on the Agency’s web site at http://www.gsa.europa.eu/.
1 REGULATION (EU) No 912/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 22 September 2010 setting up the European
GNSS Agency, as modified by REGULATION (EU) No 512/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014
Page 5/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
1.2 Outline of the tender and procedural process
Title: EGNOS V3 Site Surveys
Procurement procedure reference: GSA/OP/21/15
Procedure: Open procedure in accordance with Article 127(1)(2) RAP2 for procurement of
services with a single framework contract.
It is important to note that:
The tenders will have to fulfil the conditions of submission set out in section 4 of these tender specifications;
When drawing up the tender, tenderers should keep the provisions of the draft framework contract (see Annex II to the Invitation to Tender) in mind. In particular, the draft framework contract indicates the method and the conditions for payments to the contractor;
Tenderers will be required to accept all the terms and conditions set out in the invitation to tender, tender specifications & draft framework contract and, where appropriate, waiver of the tenderer’s own general or specific terms and conditions;
The terms and conditions set out in the invitation to tender, tender specifications and draft framework contract shall be binding on the tenderer to whom the framework contract is awarded for the duration of the framework contract;
Please note that any attempt by a tenderer to obtain confidential information, enter into
unlawful agreements with competitors or influence the evaluation committee or the GSA
during the process of examining, clarifying, evaluating and comparing tenders will lead to
the rejection of his tender and may result in administrative penalties;
The invitation to tender is in no way binding on GSA. GSA’s contractual relationship
commences only upon signature of the contract with the successful tenderer/s;
Until the signature of the contract, GSA may decide to abandon procurement or cancel the
award procedure. Such actions shall not entitle the tenderers to claim any compensation.
The following schedule is planned for this procurement procedure:
2 Commission Delegated Regulation (EU) No 1268/2012 of 29 October 2012 on the rules of application of Regulation (EU, Euratom) No
966/2012 of the European Parliament and of the Council on the financial rules applicable to the general budget of the Union.
Page 6/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Event
Date Comments
Launch of tender 17/02/2016 Submitted to Official Journal for publication
Submission of request to enter
into a non-disclosure agreement
(hereafter referred to as ‘NDA’) for
Proprietary Information until
29/03/2016 In accordance with section 2.2.4
The tenders are advised to keep this deadline
in order to have enough time to prepare their
tenders
Deadline for request of
clarifications to GSA 08/04/2016 Requests to be sent in writing only to:
Last date on which clarifications
are issued by GSA 18/04/2016 All clarifications including / related to Proprietary
Information will be sent via email to the
economic operators who have signed NDAs in
accordance with section 2.2.4; clarifications not
including / related to proprietary information
shall be published on
http://www.gsa.europa.eu/gsa/procurement
Deadline for submission of
tenders 27/04/2016
According to conditions for submission under
Section 4 of these specifications
Opening session 04/05/2016 Prague, CZ, 11:00 am local time.
Completion date for evaluation of
tenders May 2016 Estimated
Award decision and information June 2016 Estimated
Signature of contracts June 2016 Estimated
Page 7/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
IMPORTANT NOTE: In these tender specifications, the requirements tagged as shallx, indicate the minimum requirements that are to be met, where X is the unique number of the requirement. Non-compliance with any of these requirements shall lead to rejection of the tender.
1.3 Purpose of the framework contract
The purpose of the framework contract is the provision of site survey services for EGNOS New Generation V3 Ranging and Integrity Monitoring Stations (RIMS) and Navigation Land Earth Station (NLES) aiming at assessing the suitability of those sites with respect to the interference environment, infrastructure and logistics. Today EGNOS V2 is composed of approximately 40 RIMS and 6 NLES located mainly in EU territories and neighbouring countries. In view of the further evolution of the EGNOS service (EGNOS V3 Dual Frequency, Dual GPS and GALILEO Constellations, potential export of EGNOS to Africa, etc.) assessment of the compatibility with the new V3 requirements of the existing V2 sites, and new sites in Europe and beyond, is needed. For the sites to be re-used, the specific case of collocation of V2 and V3 independent RIMS on the same site during the transition phase is to be considered in terms of infrastructure, logistics and interferences impacts. Performance of site surveys at different phases of the site deployment process may become needed - for example before and after civil work if the sites need to be adapted. Site surveys linked to other projects may also be awarded under the present contract.
Page 8/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Terms of Reference
2.1 Applicable Legal Acts
Participation in the tender is subject to applicable legal restrictions and obligations. The reference documents include:
REGULATION (EU) No 1285/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2013 on the implementation and exploitation of European satellite navigation systems and repealing Council Regulation (EC) No 876/2002 and Regulation (EC) No 683/2008 of the European Parliament and of the Council3;
REGULATION (EU) No 912/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL setting
up the European GNSS Agency as amended by Regulation (EU) No 512/2014 of 16 April 20144.
The procurement procedure will be carried out in accordance with the rules of:
European GNSS Agency Financial Regulation and its Implementing Rules 2014 adopted by its Administrative Board on 25 April 2014;
COMMISSION DELEGATED REGULATION (EU) No 1271/2013 of 30 September 2013 on the framework Financial Regulation for the bodies referred to in Article 208 of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council5;
REGULATION (EU, EURATOM) No 966/2012 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 25 October 2012 on the financial rules applicable to the general budget of the Union, repealing Council Regulation (EC, Euratom) No 1605/20026 as amended by REGULATIUON (EU, EURATOM) No 1929/2015 of 28 October 2015;
COMMISSION DELEGATED REGULATION (EU) No 1268/2012 of 29 October 2012 on the rules of application of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council on the financial rules applicable to the general budget of the Union7 as amended by COMMISSION DELEGATED REGULATIUON (EU) No 2462/2015 of 30 October 2015.
In the general implementation and for the processing of tendering procedures in particular, regarding confidentiality and public access to documents, the following rules shall be observed:
Directive 95/46/EC of the European Parliament and of the Council of 24 October 1995 and Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data, and;
3 OJ L 347, 20.12.2013, p. 1 4 OJ L 150, 20.5.2014, p. 72 5 OJ L 328, 7.12.2013, p. 42 6 OJ L 298, 26.10.2012, p. 1 7 OJ L 362, 31.12.2012, p. 1
Page 9/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Council Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to European Parliament, Council and Commission documents.
IMPORTANT NOTES: (1) Beyond the legal acts listed above, it shall be the Contractor’s duty and corresponding sole responsibility to comply and ensure full compliance with all applicable laws of any part of performance under the contract contemplated to be awarded as a result of the current procedure. (2) The purpose of this procurement and the ensuing contract is not to replace GSA staff. The contractor shall take all measures to ensure this understanding with its personnel and shall indemnify and hold the GSA harmless against any claim which the GSA would face in this respect. For the purpose of this tender and any ensuing contract the term “contractor’s personnel” or “contractor’s employees” shall cover also any consortium or group member’s or subcontractor’s personnel performing services under the contract. The tenderer/contractor shall ensure that the entire content and legal implications of this note are clearly communicated, understood, and endorsed by any consortium member and subcontractor, as the case may be.
2.2 Terms of Reference – Framework Contract
2.2.1 BACKGROUND
For the purpose of the present contract the EGNOS sites are divided in two groups - located in the
territory of European Union or outside the territory of the European Union.
Within the frame of the present contract the contractor shall be requested to:
- Assess the suitability of a pre-defined site from interference, infrastructure and logistics
perspectives;
- Provide recommendations to improve compliance to the established requirements;
- Provide technical support to the GSA for the management of site infrastructure upgrade.
The GSA shall provide to the contractor the contact points of the entities hosting the sites for which
site surveys are to be delivered (name, contact person, location).
2.2.2 APPLICABLE DOCUMENTS
[AD-1] Programme Security Instruction concerning European GNSS programmes (hereinafter: the
European GNSS PSI), Issue: 4.1
2.2.3 REFERENCE DOCUMENTS
[REF-1] EGNOS V3 Site RF Requirements, issue 1.4, ESA-DTEN-NF-TN/03441
Page 10/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
[REF-2] EGNOS v3 Implementation Site Requirements, GNSS-EV3-REQ-ESA-X-00117 - Issue 2 Rev 08
2.2.4 PROPRIETARY INFORMATION
The applicable and the reference documents listed in sections 2.2.2 and 2.2.3 contain Proprietary
Information and shall be made available to the tenderers subject to entering into a non-disclosure
agreement (NDA) in the form provided in Annex I.9 according to the procedure described below:
In order to be given access to the Proprietary Information the interested economic operators /
potential tenderers shall submit a request to the GSA via email to [email protected] including
a scan of a duly signed Non-Disclosure Agreement according to template provided in Annex I.9 (two
original examples to follow by mail) with attached to it filled and signed Legal Entity Form in the
form provided in and the attachments requested in (annex A to the NDA), proving compliance of
the tenderer with the participation condition set in section 2.4.1.
Important notes:
The interested economic operators / potential tenderers shall submit individual NDAs for
each consortium member (in case of a consortium) and each subcontractor (if any), each
individually signed by them respectively;
Previously signed NDAs giving access to the same proprietary information to economic
operators shall not be regarded as fulfilling the NDA requirements under the present
procurement procedure.
The GSA endeavours to deliver the documentation within 10 working days from the date of the
request, providing all documents required are duly submitted and demonstrate compliance with
the requirements set.
The following restrictions apply:
The GSA reserves the right to refuse access to documentation if the conditions for access
are not fulfilled.
The GSA reserves the right to further inquire about any request in case of doubt of eligibility
for access.
8 A revision with minor modification of this IRD may be provided before the Kick Off of the Specific Contract
#1.
Page 11/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
2.2.5 TASKS
2.2.5.2 TASK #1: INTERFERENCE AND LOGISTICS SURVEY ON SITE
The objective of the task is to assess the suitability of the sites nominated by the GSA against the V3 related requirements, specified in the present tender specifications and in the applicable and reference documents as follows:
- Radio Frequency requirements [REF-1]: limited to the interference part, excluding the multipath part (chapter 2.2, 2.2.3, 4.2 are not applicable);
- Infrastructure/logistics requirements [REF-2]. The contractor shall1 perform the site survey and Data Collection using the tools identified in its proposal.
The contractor shall2 implement the survey procedure on each site following the schedule below:
- The contractor shall3 communicate to the GSA the dates of the visit to the site and the
activities they intend to perform at least two weeks in advance9.
- Not later than 1 month after the Kick-Off (KO) meeting for starting the work on the particular site (SiteX-KO) the contractor shall4 deliver a Site Data Collection Report [DEL- 1] specifying:
1) whether the site is compliant (OK) / non-compliant (NOK) with all criteria, 2) all elements which shall be needed for the post-processing.
- The contractor shall5 hold a “Site Data Collection Meeting” [DEL-2] with the GSA to present the results not later than one week after the submission of the Site Data Collection Report.
The Site Data Collection Report and the site Data Collection Meetings may cover one site or a group of sites, which were surveyed simultaneously / during particular period.
2.2.5.3 TASK#2: INTERFERENCE, INFRASTRUCTURE AND LOGISTICS SURVEY DATA POST-PROCESSING IN
CONTACTOR’S OFFICE
The objective of the task is to assess the compliance of the site against the requirements set in the present specifications and provide recommendations to improve the compliance level (when not fully reached) as follows:
- The contractor shall6 perform the site data post-processing for sites confirmed to be
suitable at the Site Data Collection.
- No later than 2 months after KO of the respective site, the contractor shall7 deliver a Site
Survey Report [DEL-3] providing the detailed level of compliance of the site with the
requirements. In case non (or partial) compliances to some parameters are identified,
detailed recommendations shall8 be provided to improve compliance, with a justification
that the implementation of these recommendations is feasible and sound. During this
9 Minimum time period for the current EGNOS V2 Service Provider to organize the visit with the Hosting Entity.
Page 12/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
activity the contractor shall9 assume that the EGNOS V2 equipment must remain in an
operational configuration until the EGNOS V3 System is fully operational (i.e. several years
after the RIMS/NLES on-site installation).
- One week after the delivery of [DEL-2], a “Site Survey Conclusion Meeting” meeting [DEL-4] shall10 be organised by the Contractor with the GSA.
2.2.5.3 TASK #1 AND #2 TIME SCHEDULE AND DELIVERABLES
For each assigned site the contractor shall perform Task#1, while Task#2 shall be performed only
for the sites assessed as acceptable as a result of Task#1. Following timeline shall11 apply to the
performance of the two tasks for each site:
Deadline Event Expected task Deliverable
T0 Kick Off (SiteX-KO) Kick off meeting
Site survey schedule
review and
acceptance
T0 + 1 month
Contractor to perform
the site data collection
(Task#1)
Site Data Collection
Report [DEL-1]
T0 + 1 months and 1
week
Site Data Collection
Meeting
Minutes of Meeting
[DEL-2]
T0 + 2 months
Contractor to perform
the site data post-
processing if the site is
retained at the Site Data
Collection Meeting and if
needed to propose
recommendations to
improve compliance
(Task#2)
Site Survey
Conclusion Report
[DEL-3]
T0 + 2 months and 1
week
Site Survey Conclusion
Meeting
Minutes of Meeting
[DEL-4]
2.2.5.4 TASK#3 SITE MANAGEMENT ENGINEERING SUPPORT
The objective of this task is to provide technical support to the GSA for the management of site infrastructure, typically during meetings with the GSA and:
Hosting Entities or
the European Space Agency (ESA) responsible of the system design or
the European EGNOS Service Provider (ESSP) responsible for the system operation and the service toward the users.
This support shall12 be provided on a case by case basis:
Page 13/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
- by a member of the team performed the site survey (Survey engineer) or - by a senior RF expert involved in the post-processing of site survey data collection and in
the recommendation of site upgrade in case the compliance to RF interference requirement is not reached, or
- by a senior contract management expert, who shall be expected to provide support in the management of the contract with the hosting entity and contribute to the future management of the hosting entities.
The senior expert shall13 have: Minimum 10 years of experience in their domain (radio navigation systems, site hosting
contract management); For the senior contract management expert - a good knowledge of the European laws and
regulations; Capacity to prepare clear and concise reports in English; Capacity to adapt to different cultural working environments; Proficiency in technical and business English.
The support task will be reported monthly in a dedicated monthly progress report [DEL-5].
2.2.6 SPECIFIC REQUIREMENTS
The Contractor shall14 be able to survey up to 45 sites within a period of 12 months (up to 12 sites
per quarter).
2.2.7 CONTRACT MANAGEMENT & ADMINISTRATION
The contractor shall nominate a contract project manager who shall be responsible for the overall
management/administration of the contract including formal communication with the GSA,
organisation of work of the assigned persons, giving instructions and forwarding GSA work requests,
ensuring proper management of time sheets and activity reporting, invoicing etc.
The nominated focal point/administrator shall be able to communicate fluently in English language
(B2 level according to Europass CV categorisation10). All documents and forms in communication
with the GSA must be in English.
The contractor shall provide a single e-mail address and phone number to which all communication
from the GSA for implementation of the contract shall be channelled.
The contractor shall ensure that all services are executed with a customer-oriented approach; that
services are available on time and deliverables are provided within the set deadlines.
10 http://www.europass.at/fileadmin/dateien_redaktion/sprachenpass/sprachenpass_instructions_en.pdf
Page 14/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
2.3 Terms of Reference – Specific Contract #1
The GSA intends to award the first specific contract under the contemplated framework contract
immediately after the framework contract signature. To this end, the tender shall15 provide as part
of its tender a proposal for specific contract 1 (SC 1).
Specific Contract #1 shall16 include the performance of site surveys of all EGNOS V2 RIMS and NLES
sites listed in Annex I.7.
The following requirement shall17 apply to SC #1:
(1) Scope:
Task#1 and Task #2 (applicable only to the sites retained at Task#1) for EGNOS V2 RIMS and
NLES sites as per the detailed list provided in Annex I.7
(2) Maximum duration of the time period for all site surveys fulfilment: 12 months after the
signature of SC#1.
(3) Deliverables – as per section 2.2.5
(4) Payment – quarterly payments as per the model framework contract (Annex II to the
Invitation to Tender)
(5) Content of the technical proposal – as per section 4.4.4
(6) Content of the financial proposal – as per section 4.4.5
(7) Validity of the offer – 9 months of the deadline for proposal submission
(8) Project planning – a detailed project plan, compliant with the SC#1 fulfilment deadline set
in section 2.3 (2) above and foreseeing a rate of minimum 4 sites per month shall be
proposed by the contractor in its offer (part of the tender offer).
(9) Milestones
The timely performance of SC#1 is of essence. Milestones shall be set at the end of 3rd, 6th, 9th and
12th month after the SC#1 signature. The GSA shall have the right to impose liquidated damages as
defined in Article II.12 of the draft framework contract, should the contractor fail to timely perform
as per the predefined schedule due its fault. The liquidated damages (if any) shall be calculated
based on the value of the services due to be performed during the respective quarter and the time
period for their performance as defined in the specific contract.
2.4 Legal and Contractual terms of reference
2.4.1 PARTICIPATION CONDITIONS
The contractor and sub-contractors shall18 be entities registered in European Union Member
States (EU-28) to be authorised to enter on sites and proceed on the surveys.
For properly undertaking of its duties under the provision of the current contract, contractor’s staff
will need to be granted access to many sites within EU-28 + Norway + Switzerland as well as at third
states sites.
Page 15/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
2.4.2 FORM OF CONTRACT
The aim of this procurement is to award a single framework contract for the provision of services
described in the present tender specifications.
Signature of a framework contract imposes no obligation on the GSA to purchase. Only
implementation of the framework contract through specific contracts is binding for the GSA.
When drawing up their tenders, tenderers should bear in mind the draft framework contract (Annex
II to the Invitation to Tender).
The GSA reserves the right to launch an exceptional negotiated procedure for similar services with
the same contractor in case of need, as foreseen in Art. 134(1)(e) RAP.11
2.4.3 DESCRIPTION OF THE FRAMEWORK CONTRACT
A framework contract is a legal agreement between two parties - in this case, GSA and the
contractor. It acts as the basis for possible future purchase of services by the Agency. The
framework contract contains, inter alia, a description of the scope of services that can be purchased
by GSA, methodology, timing and fees to be respected by the contractor. It is a contract of a fixed
duration (within a fixed maximum duration of 4 years) but with no fixed value, only a maximum
total value. The framework contract itself is not an order for services or supplies and does not
constitute a financial commitment.
Implementation of the framework contract
The Agency intends to issue individual and successive specific contracts over the period of validity
of the framework contract.
Services shall be requested under “specific contracts” linked to particular activities, over a given
period.
Specific contracts shall take the form of one of the documents provided under Annexes III.a and
III.b to the draft framework contract. Either format may be used for implementation of the
framework contract indiscriminately, depending on the Agency’s needs. The specific contract
model proposed under Annex III.b to the draft framework contract may also be referred to as an
“Order Form”.
NB: No legal or financial commitment exists on behalf of either party until the specific contract is
signed by both parties.
11 Commission Delegated Regulation (EU) No 1268/2012 of 29 October 2012 as amended
Page 16/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Implementation of the Contract
Specific contracts shall be issued on depending on the needs and at full discretion of the Agency. The first specific contract shall be issued immediately after the framework contract signature and shall cover the provision of site surveys of all existing V2 sites, listed in Annex I.7.
2.4.4 PLACE OF PERFORMANCE
The place of performance will be in the cities defined in each specific contract or in contractor’s premises, depending on the nature of tasks awarded.
The specific contract kick-off should be a meeting with physical attendance.
The survey kick-off (SiteX-KO) and conclusion meetings with GSA shall be held via videoconferences, unless specified otherwise in the requirements.
2.4.5 VOLUME OF THE CONTRACT
The indicative budget estimated for the maximum duration of the Framework Contract (including
extension of the total duration up to four years) is between 5 000 000 EUR (five Million Euro) and
10 000 000 EUR (ten Million Euro) .
This budget is only indicative; it will be subject to budget allocations given to the GSA.
2.4.6 DURATION
The Framework Contract is intended to be signed for an initial period of one year. It shall be
renewable up to three times for a total maximum duration of four years under the same conditions.
2.4.7 LANGUAGE OF THE CONTRACT
The working language of the contract shall19 be English with application of further requirements as
specified in these Tender Specifications.
2.4.8 SUBCONTRACTING
Application of the GNSS Regulation
According to Article 26 of the GNSS Regulation:
1) the Contracting Authority shall request the tenderer to subcontract a share of the contract by competitive tendering at the appropriate levels of subcontracting to companies other than those that belong to tenderer’s group in particular to new entrants and SMEs;
2) The Contracting Authority shall express the requisite share of the contract to be subcontracted in the form of a range from a minimum to a maximum percentage. It shall ensure that such percentages are proportionate to the objective and value of the contract, taking into account the nature of the sector of activity concerned, and in particular, the competitive conditions and the industrial potential observed;
3) If the tenderer indicates in its tender that it intends not to subcontract any share of the
Page 17/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
contract or to subcontract a share smaller than the minimum range referred to in paragraph 2, it shall provide the reasons therefore to the Contracting Authority. The Contracting Authority shall submit that information to the European Commission;
4) The Contracting Authority may reject subcontractors selected by the tenderer at the stage of the main contract award procedure or by the tenderer selected for the performance of the contract. It shall justify its rejection in writing, which may be based only on the criteria used for selection of tenderers for the main contract”.
In line with the above mentioned provision, the intention of the GSA is to favour wide participation
of various economic operators, while securing smooth and effective GEO-3 service provision.
On this basis and for the purposes of paragraph 2 of Article 26, the GSA envisages the following
indicative shares for subcontracting:
a) minimum share: 10%
b) maximum share: 90%
The minimum and maximum indicative subcontracting shares have been established taking into
account:
(i) the subcontractors to be selected by competitive tendering outside the tenderer’s Group12;
(ii) the subcontractors chosen by the tenderer, other than those under letter (i) above,
including those part of the Core Team13.
For the purposes of paragraph 1 of Article 26, the GSA envisages the following indicative minimum
share for subcontracting which the tenderers shall implement by competitive tendering outside the
tenderer’s Group: 10%.
General principles:
For the purpose of Article 26 of the GNSS Regulation, in its tender the tenderer shall20 indicate clearly which parts of the work will be subcontracted and which part of the work shall be subcontracted by competitive tendering to companies other than those that belong to tenderer’s group and to what extent (proportion in % and the subcontracted activity's exact description);
12 The expression Group is meant to encompass i) the entity or the group of entities acting as a tenderer, ii) the entity /entities to which
the tenderer or any of the members of the Group acting as a tenderer is affiliated, iii) the entities affiliated to the tenderer or to any of
the members of the Group acting as a tenderer.
13 the Core Team includes the Prime contractor, including all consortium members, and those subcontractors
which are essential in order for the tenderer to meet the selection criteria under section 3.2.
Page 18/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
The GSA reserves the right to reject subcontractors selected by the tenderer at the stage of the procurement procedure or during the subsequent contract. Rejection shall be justified in writing;
The contractor shall21 remain the sole partner and person legally and financially responsible and liable vis-à-vis the GSA;
If the identity of the intended subcontractor(s) is already known at the time of submitting the tender, tenderer shall22 submit the required evidence demonstrating the eligibility of the subcontractor and its compliance with the requirements set in the tender specifications;
If the identity of the subcontractor(s) is not known at the time of submitting the tender, the tenderer who is awarded the contract shall23 seek GSA’s prior written authorisation before entering into a subcontract;
Where no subcontracting is indicated in the tender the work will be assumed to be carried out directly by the tenderer.
IMPORTANT NOTE: In case the tenderer relies on a subcontractor to fulfil specific selection criteria,
i.e. capacity requirements, it has to mention that subcontractor already clearly in the tender,
accompanied with the subcontractor letter of intent (Annex I.6).
2.4.9 PARTICIPATION OF CONSORTIA
Consortia may submit a tender on the condition that it complies with the rules of competition.
A consortium may be a permanent, legally-established grouping or a grouping which has been
constituted informally for a specific tender procedure.
Such grouping (or consortium) must specify the company or person heading the project (the leader)
and must also submit a copy of the document authorising this company or person to submit a
tender on behalf of the consortium. All members of a consortium (i.e. the leader and all other
members) are jointly and severally liable to the Contracting Authority.
In addition, each member of the consortium must provide the required evidence for the exclusion
and selection criteria (see section 3.1 and 3.2 of these tender specifications). Concerning the
selection criteria “economic and financial capacity” as well as “technical and professional capacity”,
the evidence provided by each member of the consortium will be checked to ensure that the
consortium as a whole fulfils the criteria.
The participation of an ineligible person will result in the automatic exclusion of that person. In
particular, if that ineligible person belongs to a consortium, the whole consortium will be excluded.
2.4.10 CONFIDENTIALITY, SECURITY, CONFLICTS OF INTEREST
The Proprietary Information according to section 2.2.4 shall only be released after the
establishment of an NDA as specified therein.
Page 19/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
The contractor shall commit towards the Agency to ensure through adequate arrangements with
its service providing personnel that they:
are bound to follow any security rules as may be set by the Agency from time to time for anyone entering into or staying in the premises of GSA – any such rules shall be provided to the contractor;
are ready to sign a “declaration on confidentiality and absence of conflict of interest” with the GSA before commencing any service provision. The current form of such declaration is attached as Annex III to the specific contract form (Annex III to the framework contract) for information on the understanding that such form is liable to evolve and possibly cover additional aspects from time to time and shall not in any way relieve the contractor from any of its obligations.
2.4.11 COMPLIANCE WITH ENVIRONMENTAL, SOCIAL AND LABOUR LAW
The tenders submitted shall24 be compliant with applicable environmental, social and labour law obligations established by European Union law, national legislation , collective agreements or the applicable international social and environmental conventions listed in Annex X to Directive 2014/24/EU. Tender shall include a statement in this sense.
Assessment of tenders
All admissible tenders will be assessed. The assessment of the tenders is carried out in successive
stages against the exclusion and selection criteria set out below:
1) Exclusion stage - to check, on the basis of the exclusion criteria, whether tenderers can take part in the tendering procedure, including absence of conflicts of interest of each tenderers.
2) Selection stage - to check, on the basis of the selection criteria, (a) economic and financial capacity and (b) the technical and professional capacity, including the capacity to manage security aspects of the contract.
3) Award stage - to assess, on the basis of the award criteria, each tender that has passed the
exclusion and selection stages.
A single framework contract will be concluded with the tenderer ranked best as the result of the
evaluation of admissible tenders.
3.1 Exclusion criteria
Participation in this tender is only open to tenderers (all entities involved, including sub-contractors) who will be able to sign the Declaration of Honour (Annex I.4). Failure to do so will lead to exclusion from the procurement process.
Page 20/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Before the signature of contract the successful tenderer will have to submit supporting documents to the Declaration of Honour (listed therein).
3.2 Selection criteria
To be assessed in selection stage, the tenderers must have passed the exclusion stage described above.
Tenderers must fulfil all the economic and financial capacity as well as the technical and
professional capacity to perform the tasks required in these Tender Specifications.
3.2.1 LEGAL CAPACITY
Ref. # Legal capacity To be evidenced by
L1 Registration
Tenderers (including all consortium
members and any proposed sub-
contractors) shall25 be authorised to
perform the contract under the national law
as evidenced by inclusion in a trade or
professional register, or a sworn declaration
or certificate, membership of a specific
organisation, express authorisation or entry
in the value added tax (VAT) register.
Tenderer shall provide a duly filled in and
signed Legal Entity Form (see Annex I.2). In
case of award of contract, the tenderer shall
further provide upon request and within the
time limit set by the GSA the documents
requested in said annex.
Where a tenderer has already signed another
contract with the GSA, it may provide instead
of the legal entity file and its supporting
documents a copy of the legal entity file
provided on that occasion, unless a change in
its legal status occurred in the meantime or
the legal entity file or its supporting
documents are older than 1 (one) year.
L2 Compliance with the participation
conditions set in section 2.4.1
Tenderers (including all consortium
members and any proposed sub-contractors
shall26 provide evidence of registration in
EU28, keeping in mind the provisions that
the bidder’s staff having the need to access
current or future EGNOS sites are bearing
nationality from EU-28 + Norway +
Switzerland.
Tenderer shall provide evidence of
registration.
Page 21/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
L3 Absence of conflicting interests
In its proposal, the tenderer shall27 submit a
declaration of honour specifying that it has
no conflicting interests which may
negatively affect the performance of the
contract
Tenderer shall provide a duly filled
Declaration of Honour (Annex I.4).
3.2.2 ECONOMIC AND FINANCIAL CAPACITY CRITERIA
Each tenderer (incl. all legal entities belonging to a consortium) shall demonstrate the financial and
economic capacities required for performance of the contract.
Financial and economic capacities shall28 be demonstrated by:
If, for some exceptional reason which GSA considers justified, a tenderer is unable to provide one
or other of the above documents, the tenderer may prove its economic and financial capacity by
any other document which GSA considers appropriate. In any case, GSA must at least be notified
of the exceptional reason and its justification in the tender. GSA reserves the right to request any
other document enabling it to verify the tenderer's economic and financial capacity.
3.2.3 TECHNICAL AND PROFESSIONAL CAPACITY CRITERIA
The following criteria shall29 be fulfilled by each tenderer as indicated for evaluating its technical
and professional capacity for performance of the contract (input to be submitted):
Ref. # Financial and Economic capacity criterion
To be evidenced by
F1. Tenderer must be in a stable financial position and have the economic and financial capacity to perform the contract.
Duly filling in and submitting the Financial and Economic Capacity Table of Answers in Annex I.5. Submitting a full copy of the tenderer’s annual accounts (balance sheet, profit and loss account, notes on the accounts and auditors' remarks when applicable (with reference to Annex I.5).
F2 The tenderer (all members of consortium
cumulatively) is expected to prove
minimum general turnover of EUR
2,500,000 (two million five hundred
thousand Euro) per year.
Submitting a statement of overall turnover and turnover relating to the relevant services of the last three years, as approved by the competent body of the company and, where applicable, audited and/or published (with reference to Annex I.5).
Page 22/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Ref. #
Technical and professional capacity criterion To be evidenced by
T1 The tenderer must have conducted site surveys
for radio navigation systems.
List and description of similar
services/contracts.
Please note: The Agency reserves the right
to verify any of the information provided,
therefore the Agency may elect to contact
any of the presented
organisations/companies for reference.
With provision of the requested
information the tenderer’s permission is
assumed granted unless otherwise
specified in the offer.
T2 The tenderer must have a suitable
organisational structure in order to be able to
provide the services described in these tender
specifications.
Presentation of the tenderer’s internal
organisational structure.
T3 The tenderer must prove that the competence
built in previous similar projects is retained and
available for this contract
Presentation of the tenderer’s internal
process for retaining knowledge and CV of
expert.
Further documents may be requested at a later stage for the purpose of providing evidence of
compliance with the Agency’s requirements.
IMPORTANT NOTE: An economic operator may rely on the capacities of other entities to fulfil the
selection criteria, regardless of the legal nature of the links which it has with them. The tenderer
must in that case prove to the Contracting Authority that it will have at its disposal the resources
necessary for performance of the contract, by producing a Subcontractor Letter of Intent (in the
form provided in Annex I . 6 ) on the part of those entities to place those resources at its disposal.
Ensure that task for which the support will be provided is clearly indicated in the Declaration.
3.3 Award criteria
To be assessed in the award stage, the tenderer must have passed the exclusion and selection stage
described above.
Page 23/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
The assessment of the tenders in the award stage is carried out against the qualitative and the
financial award criteria set out below.
3.3.1 QUALITATIVE AWARD CRITERIA
The quality of technical offers reaching this stage will be evaluated against the award qualitative
award criteria in the following evaluation grids.
Tenders scoring below the minimum score in any given quality award criterion and/or below 60
(seventy) of the total minimum score will be excluded from the following assessment procedure.
3.3.2 FINANCIAL AWARD CRITERIA
Following the appraisal of the qualitative award criteria the tender will be evaluated with regard to
the price which shall be provided by filling in and signing the Financial Offer (Annex I.8)
The price quotes given in Annex I.8 constitute the Price of Tender, are binding for the tenderer and
will be considered as prices for the framework contract.
In order to allow for a comparison of the offers an evaluation scenario as defined in Annex I.8 shall
be used. The data in the evaluation scenario reflect the volume estimates of the Agency for a period
of contract duration of four years for the different types of services as defined in the terms of
reference. Please note that these estimates are only indicative and do not constitute any kind of
legal obligation or commitment for the Agency.
Ref. #
Qualitative award criteria Minimum points
Maximum points
Q1. Organisation of the work - breakdown of tasks, coordination between the team members; Adequacy of the tasks distribution within the team, efficiency in the use and allocation of expertise for handling the different tasks.
15 25
Q2. Adherence to standard schedule requirements – efficiency of the implementation schedule proposed
15 25
Q3. Quality and relevance of the approach (methodology, procedure, etc.) for the site survey services proposed (data collection, data analysis, definition of the measures to be taken)
15 25
Q4. Quality of the risk assessment, identification and analysis of critical issues and proposed mitigation measures
15 25
Total Min/Max Score: 60 100
Page 24/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
For ease of simulation, the below scenario is based on the following underlying parameters:
Coverage of the period of four years of the contract duration;
The firm fixed initial prices applicable for the entire duration of the contract.
The financial evaluation will be made on the basis the total scenario price, calculated using the unit
prices offered in the financial proposal.
The price index will be calculated as follows: the least expensive total evaluation scenario price for
a tender that is above the technical threshold will receive 100 points. The other tenders receive the
points according to the ratio between the least expensive offer and their one, and then multiplied
by 100, as shown in the formula below:
Financial score for tender Y = 100*(cheapest total scenario price of all bidders / total scenario price for tender Y)
IMPORTANT NOTE: No article is to be omitted or added to the Model Financial Offer in Annex I.8.
Omissions will result in an incomplete tender and exclusion from the tender process.
3.3.3 Calculation of final score and ranking of tenderers
The framework contracts will be awarded to the tenderer having passed the selection stage and
offering the best value for money, i.e. the highest score in the final evaluation to be determined as
follows:
The economically most advantageous tender is established by weighting technical quality
against price on a 60/40 basis.
The consolidated score for each tenderer will be calculated as follows:
Final score for Tender X= Technical score*0.6 + Financial score*0.4
Page 25/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Conditions for submission of tenders
4.1 Disclaimer
This invitation to tender is in no way binding on the GSA. The GSA's contractual obligation
commences only upon signature of the contract with the successful tenderer. Up to the point of
signature, the Contracting Authority may either abandon the procurement or cancel the award
procedure, without the tenderers being entitled to claim any compensation. This decision must be
substantiated and the tenderers notified.
4.2 Variants
Variants are not permitted under this tender procedure, therefore tenders shall not deviate from the services requested.
4.3 Preparation costs of tenders
Costs incurred in preparing and submitting tenders are borne by the tenderers and shall not be reimbursed.
4.4 Content of the tender to be submitted
4.4.1 PRESENTATION OF THE TENDER
It is strictly required that tenders be presented in the correct format and include all
documents necessary to enable the GSA to assess them. Failure to respect these
requirements will constitute a formal error and may result in the rejection of the tender.
GSA retains ownership of all applications received under this procedure. Consequently
tenderers shall have no right to have their tenders returned to them.
4.4.2 GENERAL
The tender must consist of:
A. The Cover Letter, dated and signed by the tenderer or by any other duly appointed
representative, declaring acceptance of the conditions in these tender specifications and
annexes, and the framework contract and its annexes; the tenderer's commitment to
provide the services proposed in the tender and listing all the documentation
included/enclosed in the tender.
Page 26/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
In case of subcontracting, the tenderer shall indicate for which elements of the services and
to which overall proportion of the tender subcontracting is planned.
If the tender is presented by a consortium or group of service providers, it must be
accompanied by a letter signed by each member undertaking to provide the services
proposed in the tender and specifying each member's own role and qualifications.
B. The Administrative Files
C. The Technical Offer
D. The Financial Offer
In addition to the above, in general the tender must be:
signed by the tenderer or its duly authorised representative;
perfectly legible so that there can be no doubt as to words and figures;
(if necessary) drawn up using the model reply forms in the specification;
clear and concise, with continuous page numbering, and assembled in a coherent fashion
(e.g. bound or stapled).
Since tenderers will be evaluated on the content of their submitted bids, they must make it clear
that they are able to meet the requirements of the specifications.
The GSA reserves the right to request additional evidence in relation to the tender submitted for
evaluation or verification purposes.
4.4.3 ADMINISTRATIVE FILE
The Administrative File which shall consist of the following elements, completed and duly signed:
4.4.3.1 Identification Sheet of the Tenderer (Template provided in Annex I.1);
4.4.3.2 Legal Entity Form (Template provided in Annex I.2);
4.4.3.3 Financial Identification Form (Template provided in Annex I.3)
4.4.3.4 Declaration of Honour (Template provided in Annex I.4)
4.4.3.5 (In case of subcontracting: Subcontractor Letter of Intent – Annex I.5)
4.4.3.6 Duly filled in, signed, stamped and dated statement of compliance of the tender with the environmental, social and labour law according to section 2.4.11
Page 27/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
4.4.3.7 Storage device with tender documents in machine readable format (ref. section 4.6)
4.4.4 TECHNICAL OFFER
The technical proposal shall30 contain:
A. Framework contract level technical offer including at least:
all necessary information to allow evaluation of all the qualitative award criteria.
the hardware and software measurement and processing tool(s) for interference measurements and post processing of the results, justifying that the use of these tools will allow to perform the site survey to check the level of compliance of the site with the interference requirements from [REF-1];
the survey procedures compliant with to the RF/interference, infrastructure and logistics baseline provided in [REF-1] and [REF-2] outlining at least the 2 major steps: i) survey on site (task #1) and ii) post processing of the results in office (task #2) and demonstrate the highest logistical efficiency of its plan
the project organisation
the statement of compliance against each requirement of Tasks #1, #2 and #3
compliance matrix to the Terms of Reference (for each requirement marked with shallx)
the project schedule
the meeting plan
the deliverable item list
the risk register.
Please note that the tenderers shall endeavour to submit a technical offer as complete as possible, as the evaluation shall allow for limited / no possibility for clarifications on the offer submitted. Therefore any offer which is incomplete / lacks enough details to allow for its evaluation shall receive less points at the technical evaluation.
B. SC#1 specific technical offer – compliant with the requirements of section 2.3and including the information required under Article I.4.4 of the framework contract (Annex II to the Invitation to Tender)
4.4.5 FINANCIAL OFFER
The financial proposal shall31 contain:
A. A framework contract financial proposal:
The framework contract financial offer must be provided by filling in and signing Annex I.8 and attached to it cost sheets Annex I.8 a (to be presented on paper and in excel file format). In its financial offer, the contractor shall32 identify the unit costs:
per survey of a site14 in EU (Task #1) per survey of site out of EU (Task #1)
14 RIMS or NLES site, the scope of the survey being equivalent.
Page 28/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
per survey results post processing (Task #2) per man-day of support services provision – for each profile (Task #3).
The tenderer shall33 detail the formula/rules for overheads and profit estimation.
Overheads and profit shall be applied in a sound and reasonable manner. The tenderer shall detail the formula/rules for overheads and profit estimation. No profit is allowed on subcontractors work share.
o Tenderers shall provide Company Cost Element and price breakdown form Data-Sheets (CS-A1, A2, A2Ex. A, A2Ex. B, A8) as per Annex I.A in excel format, in total accordance with the template provided (exception may cause cancellation of the procedure)
o In case of optional activities a standalone subset of Data sheets shall be provided (CS-A1, A2, A2Ex. A, A2Ex. B, A8) as per Annex I.A in excel format, in total accordance with the template provided (exception may cause cancellation of the procedure)
The offer shall34 also be accompanied by its subcontractors’ tenders down to level N-1:
The FFP Unit price shall be broken down between:
o The activities of the tenderer; and
o The activities of the Subcontractors (if applicable in dedicated work packages).
o Subcontractors down to N-1 level, shall provide at least forms A1 and A2, A2 ex. A as per Annex I.8a in excel format, in total accordance with the template provided (exception may cause cancellation of the procedure)
The payment plan of each specific contract shall be precised at its award, however the following
general provisions shall35 apply - the GSA shall perform quarterly payments for the tasks completed
during the quarter / in case of award of single tasks the payment shall be effected within 30 days
after approval of the final report for the task.
B. SC#1 specific financial offer: compliant with the requirements of section 2.3, based on the unit prices proposed for the framework contract as per section 4.4.5 (A) and Annex I.8, including the information required under Article I.4.4 of the framework contract (Annex II to the Invitation to Tender)
4.4.5.1 Prices
The price must be quoted in Euro. It shall be fixed and not subject to revision during the performance of the contract, i.e. it shall be a Firm and Fixed Price (FFP).
The prices quoted in Financial Offer will constitute Pricelist for the duration of framework contract.
Page 29/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
4.4.5.2 VAT exemption
As the GSA is exempt from all taxes and dues, including VAT, pursuant to Articles 3 and 4 of the Protocol
on the privileges and immunities of the European Union, these must not be included in the price.
4.4.5.3 Currency and exchange rates
The price tendered must be all-inclusive and expressed in Euro, including for countries which are not
part of the Euro zone. For tenderers in countries which do not belong to the Euro zone, the price
quoted may not be revised in line with exchange rate movements. It is for the tenderer to select an
exchange rate and assume the risks or the benefits deriving from any fluctuation.
4.4.5.4 Unit prices
The unit prices will be firm and fixed and will include all costs and expenses.
Cost and expenses are: effort for all the tasks (including drawing up quotations and reports) necessary
for their performance, including all costs (management of the project, coordination, quality control,
support resources, etc.), all overheads (management of the firm, secretarial services, social security,
wages, etc.) necessary for the performance of the tasks described, incurred directly and indirectly by
the contractor in performance of the tasks that will be entrusted to him.
4.5 Submission
Tenders must be submitted in accordance with the double envelope system:
The outer envelope or parcel should be sealed with adhesive tape, signed across the seal and
carry the following information:
the ref. number of the invitation to tender GSA/OP/21/15
the project title “EGNOS V3 Site Surveys “
the name of the tenderer
the indication “Tender - Not to be opened by the internal mail service”
the address for submission of tenders as indicated below
the date of posting (if applicable) should be legible on the outer envelope
The outer envelope must contain three (3) separate inner envelopes containing the tender clearly
marked in sections and separated according to the content required under section 4.5.2 of these
Tender Specifications:
Envelope 1- Administrative File (incl. electronic files – ref. below);
Page 30/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Envelope 2-Technical Offer;
Envelope 3- Financial Offer.
Each document shall be submitted as paper “ORIGINAL” and paper “COPY”, each clearly marked
accordingly. In addition, each tender shall also be provided on CD-ROM or USB key with the full set
of documents in machine readable format (MS Office 2003 or later, or Adobe Reader Version 8.0
or later) with three separate folders reflecting the three separate envelopes and their respective
content.
Tenders should be drafted in one of the official languages of the European Union, preferably
English.
Tenders sent by post mail are to be sent not later than on date specified in section 1.2 above, in
which case the evidence of the date of dispatch shall be constituted by the postmark or the date
of the deposit slip, to the following physical address:
European GNSS Agency
Legal and Procurement Department Janovskeho 438/2
170 00 Prague 7 Czech Republic
Tenders sent by express mail, commercial courier or hand-delivered should be addressed to the
same postal address not later than 17.00 (CET) on date specified in section 1.2 above. In this case,
a receipt must be obtained as proof of submission, signed and dated by the reception desk officer.
The reception is open from 08.00 to 17.00 Monday to Thursday, and from 8.00 to 16.00 on Fridays.
It is closed on Saturdays, Sundays, European Commission holidays and some Czech national
holidays.
4.6 Opening of the Tenders
Tenders will be opened at 11.00 a.m. on date indicated in section 1.2 above at the following
location:
Office address:
European GNSS Agency
Janovského 438/2
170 00 Prague 7 – Holesovice
An authorised representative of each tenderer may attend the opening of the tenders. Companies
wishing to attend are requested to notify their intention by sending an e-mail at least 48 hours in
Page 31/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
advance to [email protected] . This notification must be signed by an authorised officer of
the tenderer and specify the name of the person who will attend the opening of the tenders on the
tenderer's behalf.
4.7 Period of validity of the tenders
Period of validity of the tenders, during which tenderers may not modify the terms of their tenders
in any respect: six (6) months from the closing date for the reception of the tenders.
4.8 Further information
Contacts between the Contracting Authority and tenderers are prohibited throughout the
procedure save in exceptional circumstances and under the following conditions only:
Before the final date for submission of Tenders:
At the request of the tenderer, the Contracting Authority may provide additional
information solely for the purpose of clarifying the nature of the contract.
Any requests for additional information must be made in writing only to
[email protected]. The subject line of the e-mail has to quote the reference of the
procurement procedure.
Requests for additional information received after deadline specified in section 1.2 will not
be processed (for practical reasons).
The GSA may, on its own initiative, inform interested parties of any error, inaccuracy,
omission or any other clerical error in the text of the call for tenders.
After the opening of tenders:
If, after the tenders have been opened, some clarification is required in connection with a
tender, or if obvious clerical errors in the submitted tender must be corrected, the GSA may
contact the tenderer, although such contact may not lead to any alteration of the terms of
the submitted tender.
4.9 Information for tenderers
The GSA will inform tenderers of decisions reached concerning the award of the contract in due
course, including the grounds for any decision not to award a contract or to recommence the
procedure.
If a written request is received, the GSA will inform all rejected tenderers of the reasons for their
rejection and all tenderers submitting an admissible tender of the characteristics and relative
advantages of the selected tender and the name of the successful tenderer.
Page 32/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
However, certain information may be withheld where its release would impede law enforcement
or otherwise be contrary to the public interest, or would prejudice the legitimate commercial
interests of economic operators, public or private, or might prejudice fair competition between
them.
4.10 Data protection specific to the tender process
Processing your reply to the invitation to tender will involve the recording and processing of
personal data (such as your name, address and CV). Such data will be processed pursuant to
Regulation (EC) No 45/2001 on the protection of individuals with regard to the processing of
personal data by the Community institutions and bodies and on the free movement of such data.
Unless indicated otherwise, your replies to the questions and any personal data requested are
required to evaluate your tender in accordance with the specifications of the invitation to tender
and will be processed solely for that purpose by the GSA. You are entitled to obtain access to your
personal data on request and to rectify any such data that is inaccurate or incomplete. If you have
any queries concerning the processing of your personal data, you may address them to the GSA.
You have the right of recourse at any time to the European Data Protection Supervisor for matters
relating to the processing of your personal data.
You are informed that for the purposes of safeguarding the financial interest of the Communities,
your personal data may be transferred to internal audit services, to the European Court of Auditors,
to the Financial Irregularities Panel and/or to the European Anti-Fraud Office (OLAF).
Data of economic operators which are in one of the situations referred to in Articles 93, 94, 96(1)(b)
and 96(2)(a) of the Financial Regulation15 may be included in a central database and communicated
to the designated persons of the European Commission, other institutions, agencies, authorities
and bodies mentioned in Article 95(1) and (2) of the Financial Regulation. This refers as well to the
persons with powers of representation, decision making or control over the said economic
operators. Any party entered into the database has the right to be informed of the data concerning
it, up on request to the accounting officer of the European Commission.
List of acronyms and abbreviations used
Acronym / Abbreviation
Complete Designation
CV Curriculum Vitae
EC European Commission
15 Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 (OJ L 248 of 16.09.2002), as amended by
Council Regulation (EC, Euratom) No 1995/2006 of 13 December 2006 (OJ L 390 of 30.12.2006)
Page 33/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
EGNOS European Geostationary Navigation Overlay Service
EU European Union
EUR Euro
GNSS Global Navigation Satellite System
GPS Global Positioning System
GSA European GNSS Agency
IRD Interface Requirement Document
KO Kick Off
NDA Non Disclosure Agreement
PSI Programme Security Instruction
RF Radio Frequency
RIMS Ranging and Integrity Monitoring Station
SRD System Requirement Document
TN Technical Note
TWAN Transport Wide Area Network
USB Universal Serial Bus
VAT Value Added Tax
WBS Work Breakdown Structure
WP Work Package
List of Annexes
These Tender Specifications (Annex I to the Invitation to Tender) have the following annexes either
attached or to be down-loaded at the given web-address. The boxes () indicate who shall submit
the documents.
Administrative Files
Coordinator/Group leader in consortium tender
In case of a consortium All partners in a consortium
Single or Main Contractor
Sub-contractor
Annex I.1 –
Identification Sheet of
the Tenderer
Annex I.2 – Legal Entity
Form
Annex I.3 – Financial
Identification Form
Annexes I.1 to I.3. may be downloaded at http://www.gsa.europa.eu/gsa/procurement
Page 34/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.4 – Declaration
of Honour relating to
relating to the Exclusion
and Selection Criteria
Annex I.5 – Financial
and Economic Capacity
Table of Answers
Annex I.6 –
Subcontractor Letter of
Intent
Annex I.7
List of V2 sites for the
purpose of SC#1
Annex I.8
Model Financial Offer
Annex I.9
Template NDA
Page 35/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.1 to Tender Specifications
Template Identification Sheet of the Tenderer
Page 36/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
IDENTIFICATION OF THE TENDERER
(Each service provider, including subcontractor(s) or any member of a consortium or grouping,
must complete and sign this identification form)
Identity
Name of the legal entity
Legal status of the legal entity
Description of role within the Tenderer
Reference of the NDA relating to this
procurement procedure
Date of registration
Country of registration
Registration number
VAT number
Page 37/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Description of statutory social security
cover (at the level of the Member State of
origin) and non-statutory cover
(supplementary professional indemnity
insurance)16
Status as Small or Medium sized Enterprise
Address
Address of registered office of legal entity
Where appropriate, administrative address
of legal entity for the purposes of this
procurement process
Contact Persons
For procurement process management17
Surname:
First name:
Title (e.g. Dr, Mr, Ms) :
Position (e.g. manager):
Telephone number:
Fax number:
E-mail address:
Contact person for the communications regarding the NDA
Surname:
First name:
16 For natural persons
17 One person per tenderer (legal entity, group or consortium) has to be identified for the purposes of this procurement
procedure. This person will be responsible for distributing information within the Tenderer.
Page 38/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Title (e.g. Dr, Mr, Ms) :
Position (e.g. manager):
Telephone number:
Fax number:
E-mail address:
Local Security Officer (for NDA)
Surname:
First name:
Title (e.g. Dr, Mr, Ms) :
Position (e.g. manager):
Telephone number:
Fax number:
E-mail address:
Legal Representatives
For the signature of the NDA
Names and functions of legal
representatives and of other
representatives of the legal entity who are
authorised to sign contracts with third
parties
For the signature of the Contract
Names and functions of legal
representatives and of other
representatives of the legal entity who are
authorised to sign contracts with third
parties
Declaration by an authorised representative of the organisation18
I, the undersigned, certify that the information given in this request to participate is correct and
that the request to participate is valid.
18 This person must be included in the list of legal representatives; otherwise the signature on the tender will be
invalidated.
Page 39/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Surname:
First name:
Signature:
Page 40/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.2 to Tender Specifications
Legal Entity Form
(separate .pdf file)
Page 41/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.3 to Tender Specifications
Template Financial Identification Form
Page 42/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
The template may be downloaded from the following website:
http://ec.europa.eu/budget/contracts_grants/info_contracts/financial_id/financial_id_en.cfm
In case of consortia, only one financial identification form for the whole consortium should be
submitted, nominating the bank account into which payments are to be made under the contract
(usually the account of the consortium leader) in the event that the respective tender is successful.
In case the consortia prefer to have payments split in different bank accounts, one for each
contractor, one financial identification form per contractor shall be submitted.
Please pay attention to the supporting documents that should be submitted together with dully filled
in financial identification form.
Page 43/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.4 to Tender Specifications
Declaration of Honour on Exclusion and Selection Criteria
Page 44/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Declaration of honour on exclusion criteria and selection criteria
The undersigned ________________________________________________________________representing:
(only for natural persons) himself or herself
(only for legal persons) the following legal person:
________________________________________________________
ID or passport number:
Full official name: _________________________________________
________________________________________________________
Official legal form: _________________________________________
________________________________________________________
Statutory registration number: __________________
________________________________________________________
Full official address: ________________________________________
________________________________________________________
VAT registration number: ___________________________________
declares whether the above-mentioned person is in one of the following situations or not:
SITUATION OF EXCLUSION CONCERNING THE PERSON YES NO
Page 45/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
a) it is bankrupt, subject to insolency or winding up procedures, its assets are being administered by a liquidator or by a court, it is in an arrangement with creditors, its business activities are suspended or it is in any analogous situation arising from a similar procedure provided for under national legislation or regulations;
b) it has been established by a final judgement or a final administrative decision that the person is in breach of its obligations relating to the payment of taxes or social security contributions in accordance with the law of the country in which it is established, with those of the country in which the contracting authority is located or those of the country of the performance of the contract;
c) it has been established by a final judgement or a final administrative decision that the person is guilty of grave professional misconduct by having violated applicable laws or regulations or ethical standards of the profession to which the person belongs, or by having engaged in any wrongful conduct which has an impact on its professional credibity where such conduct denotes wrongful intent or gross negligence, including, in particular, any of the following:
(i) fraudulently or negligently misrepresenting information required for the verification of the absence of grounds for exclusion or the fulfilment of selection criteria or in the performance of a contract;
(ii) entering into agreement with other persons with the aim of distorting competition;
(iii) violating intellectual property rights;
(iv) attempting to influence the decision-making process of the contracting authority during the award procedure;
(v) attempting to obtain confidential information that may confer upon it undue advantages in the award procedure;
d) it has been established by a final judgement that the person is guilty of any of the following:
(i) fraud, within the meaning of Article 1 of the Convention on the protection of the European Communities' financial interests, drawn up by the Council Act of 26 July 1995;
(ii) corruption, as defined in Article 3 of the Convention on the fight against corruption involving officials of the European Communities or officials of EU Member States, drawn up by the Council Act of 26 May 1997, and in Article 2(1) of Council Framework Decision 2003/568/JHA, as well as corruption as defined in the legal provisions of the country where the contracting authority is located, the country in which the person is established or the country of the performance of the contract;
(iii) participation in a criminal organisation, as defined in Article 2 of Council Framework Decision 2008/841/JHA;
iv) money laundering or terrorist financing, as defined in Article 1 of Directive 2005/60/EC of the European Parliament and of the Council;
Page 46/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
(v) terrorist-related offences or offences linked to terrorist activities, as defined in Articles 1 and 3 of Council Framework Decision 2002/475/JHA, respectively, or inciting, aiding, abetting or attempting to commit such offences, as referred to in Article 4 of that Decision;
(vi) child labour or other forms of trafficking in human beings as defined in Article 2 of Directive 2011/36/EU of the European Parliament and of the Council;
e) the person has shown significant deficiencies in complying with the main obligations in the performance of a contract financed by the European Union’s budget, which has led to its early termination or to the application of liquidated damages or other contractual penalties, or which has been discovered following checks, audits or investigations by an Authorising Officer, OLAF or the Court of Auditors;
f) it has been established by a final judgment or final administrative decision that the person has committed an irregularity within the meaning of Article 1(2) of Council Regulation (EC, Euratom) No 2988/95;
g) for the situations of grave professional misconduct, fraud, corruption, other criminal offences, significant deficiencies in the performance of the contract or irregularity, the applicant is subject to:
i. facts established in the context of audits or investigations carried out by the Court of Auditors, European Anti-Fraud Office (OLAF) or internal audit, or any other check, audit or control performed under the responsibility of an authorising officer
ii. non-final administrative decisions which may include disciplinary measures taken by the competent supervisory body responsible for the verification of the application of standards of professional ethics;
iii. decisions of the European Central Bank, the European Investment Bank, the European Investment Fund or international organisations;
iv. decisions of the Commission relating to the infringement of the European Union's competition rules or of a national competent authority relating to the infringement of European Union or national competition law; or
v. decisions of exclusion by an authorising officer of an EU institution, of a European office or of an EU agency or body.
[Only for legal persons other than Member States and local authorities, otherwise please cross out
this table]
declares whether a natural person who is a member of the administrative, management or supervisory body of the above-mentioned legal person, or who haspowers of representation, decision or control with regard to the above-mentioned legal person (this covers the company directors, members of the management or supervisory bodies, and cases where one natural person holds a majority of shares) is in one of the following situations or not:
Page 47/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
SITUATIONS OF EXCLUSION CONCERNING NATURAL OR LEGAL PERSONS WITH POWER OF
REPRESENTATION, DECISION-MAKING OR CONTROL OVER THE LEGAL PERSON YES NO
Situation (c) above (grave professional misconduct)
Situation (d) above (fraud, corruption or other criminal offence)
Situation (e) above (significant deficiencies in performance of a contract )
Situation (f) above (irregularity)
declares whether a natural or legal person that assumes unlimited liability for the debts of the above-mentioned legal person is in one of the following situations or not:
SITUATIONS OF EXCLUSION CONCERNING NATURAL PERSONS ASSUMING UNLIMITED LIABILITY
FOR THE DEBTS OF THE LEGAL PERSON YES NO N/A
Situation (a) above (bankruptcy)
Situation (b) above (breach in payment of taxes or social security contributions)
declares whether the above-mentioned person is in one of the following situations or not:
GROUNDS FOR REJECTION FROM THIS PROCEDURE YES NO
h) has not distorted competition by being previously involved in the preparation of procurement documents for this procurement procedure;
i) has provided accurate, sincere and complete information to the contracting authority within the context of this procurement procedure;
acknowledges that the above-mentioned person may be subject to rejection from this procedure and to administrative sanctions if any of the declarations or information provided prove to be false.
REMEDIAL MEASURES
If the person declares one of the situations of exclusion listed above, it should indicate the measures it has taken to remedy the exclusion situation, thus demonstrating its reliability. They may include e.g. technical, organisational and personnel measures to prevent further occurrence, compensation of damage or payment of fines. The relevant documentary evidence which appropriately illustrates
Page 48/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
the remedial measures taken should be provided in annex to this declaration. This does not apply for the situations referred in point (d) of this declaration.
EVIDENCE UPON REQUEST
Upon request and within the time limit set by the contracting authority the person shall provide information on the persons that are members of the administrative, management or supervisory body, as well as the following evidence concerning the entity or the natural or legal persons which assume unlimited liability for the debt of the person:
For situations described in (a), (c), (d) or (f), production of a recent extract from the judicial record is required or, failing that, an equivalent document recently issued by a judicial or administrative authority in the country of establishment of the person showing that those requirements are satisfied.
For the situation described in point (a) or (b), production of recent certificates issued by the competent authorities of the State concerned are required. These documents must provide evidence covering all taxes and social security contributions for which the person is liable, including for example, VAT, income tax (natural persons only), company tax (legal persons only) and social security contributions. Where any document described above is not issued in the country concerned, it may be replaced by a sworn statement made before a judicial authority or notary or, failing that, a solemn statement made before an administrative authority or a qualified professional body in its country of establishment.
If the person already submitted such evidence for the purpose of another procedure, its issuing date does not exceed one year and it is still valid, the person shall declare on its honour that the documentary evidence has already been provided and confirm that no changes have occurred in its situation.
declares whether the above-mentioned person complies with the selection criteria as provided in the [tender specifications/Tender Information Package (TIP)]:
SELECTION CRITERIA
YES NO
(a) It has the legal and regulatory capacity to pursue the professional activity needed for performing the contract as required in section 3.2.1 of these tender specifications;
(b) It fulfills the applicable technical, professional, economic and financial criteria indicated in section 3.2.3. of these tender specifications;
(c) It has no conflicting interests which may negatively affect the performance of the contract as indicated in section 3.2.1. of these tender specifications.
declares that the above-mentioned person will be able to provide the necessary supporting documents listed in the relevant sections of the TIP and which are not available electronically upon request and without delay.
Page 49/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Full name of authorised representative of entity:
Date:
Signature:
Page 50/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.5 to Tender Specifications
Template Financial Statements Relating to the Selection Stage
Page 51/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Explanation – please read carefully before completing the financial capacity forms
Summary Information Sheet Tenderer submitting a request to participate has to fill in the Summary Information Sheet (table E.1) including entries for all legal entities involved- members of the consortium as well as sub-contractors. Simplified balance sheet and profit and loss account Within the form, financial data based on the company’s/organisation’s balance sheet are collected in a standardised form. Please find below a correspondence table giving an explanation on the regrouping of different accounts. You should complete this form carefully. Given its complexity, it is recommended that the form be completed by a professional accountant or an auditor. The data reported will be used to evaluate the financial viability of the company/organisation. Thus it is very important that data reported are accurate. The GSA may wish to cross check the data with those reported in the official certified accounts. For this purpose, apart from the present document duly filled-in by each applicant, the GSA requests copies of the full financial statements corresponding to the last three audited years. Please clarify the currency used in the simplified balance sheet and profit and loss account. Tenderers shall finally indicate if they are a profit or a non profit making organisation. Abbreviations t0, t-1 and t-2 The abbreviation t0 represents the last certified financial statements; t-1 and t-2 are the two last financial statements prior to the last certified one. Consequently, the closing date t0 is the closing date of the last certified historical balance sheet.
Page 52/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Table 1.
Summary Information Sheet
Legal entity no1
Name DESCRIPTION AMOUNT t0 AMOUNT t-1 AMOUNT t-2
Currency in m Currency in m Currency in m
Annual Turnover
Operating Profit
Net Profit
Non-current Assets
Current Assets
Owner’s Equity
Non-current Liabilities
Current Liabilities
Legal entity no2
Name DESCRIPTION AMOUNT t0 AMOUNT t-1 AMOUNT t-2
Currency in m Currency in m Currency in m
Annual Turnover
Operating Profit
Net Profit
Non-current Assets
Current Assets
Owner’s Equity
Non-current Liabilities
Current Liabilities
Continue with as many entries as necessary Name: Signature: Date:
Page 53/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Please fill in the last three columns (AMOUNTS), in line with the given DESCRIPTION, for the three following tables: ASSETS, LIABILITIES and PROFIT & LOSS ACCOUNT separately for each legal entity participating in the tendering procedure (all members of consortium as well as sub-contractors).
SIMPLIFIED BALANCE SHEET
Table 2.
ASSETS DESCRIPTION AMOUNT t0 AMOUNT t-1 AMOUNT t-2
Total fixed assets
Intangible fixed assets
Formation expenses as defined by national law Capitalised development costs within R& D activities Concessions, patents, licences, trade marks and similar rights Goodwill, to the extent that it was acquired for valuable consideration Payments on account
Tangible fixed assets
Land and buildings Plant and machinery Other fixtures and fittings, tools and equipment Payment on account and tangible assets in course of construction
Financial assets Shares in affiliated undertakings Loans to affiliated undertakings Participating interests Loans to undertakings with which the company is linked by virtue of participating interest Investments held as fixed assets Other loans and other shares
Debtors due after one Year
Trade debtors Amounts owed by affiliated undertakings Amounts owed by undertakings with which the company is linked by virtue of participating interest Others debtors
Page 54/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Prepayments and accrued income
Total current assets
Stocks and contracts in progress
Raw materials and consumables Work in progress Finished products and goods for resale Payment on account
Debtors due within one year
Trade debtors Amounts owed by affiliated undertakings Amounts owed by undertakings with which the company is linked by virtue of participating interest Others debtors Prepayments and accrued income
Other current assets
Shares in affiliated undertakings Own shares Other investments
Cash at bank and in hand
Cash at bank and in hand
Total assets
Name: Signature: Date:
Page 55/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Table 3.
LIABILITIES DESCRIPTION AMOUNT t0 AMOUNT t-1 AMOUNT t-2
Own funds
Subscribed capital
Subscribed capital Share premium account
Reserves
Revaluation reserve Legal reserve, in so far as national law requires such a reserve Reserve for own shares Reserves provided for by the articles of association Other reserves
Profit and loss brought forward
Profit and loss brought forward from the previous years
Profit and loss for the year
Profit or loss for the financial year
Debts and borrowed funds payable in +1 year
Long term non-bank debt
Provisions for pensions and similar obligations Provisions for taxation and other provisions Other loans Payments received on account of orders in so far as they are not shown separately as deductions from stocks Trade creditors Amounts owed to affiliated undertakings Amounts owed to undertakings with which the company is linked by virtue of participating interests Other creditors including tax and social security Accruals and deferred income
Page 56/65
UNCLASSIFIED
GSA/OP/21/15 EGNOS V3 Site Surveys
Long term bank debt
Amounts owed to credit institutions Bills of exchange payable
Debts and borrowed funds payable in -1 year
Short term non-bank Debt
Provisions for pensions and similar obligations Provisions for taxation and other provisions Other loans Payments received on account of orders in so far as they are not shown separately as deductions from stocks Trade creditors Amounts owed to affiliated undertakings Amounts owed to undertakings with which the company is linked by virtue of participating interests Other creditors including tax and social security Accruals and deferred income
Short term bank debt
Amounts owed to credit institutions Bills of exchange payable
Total liabilities
Name : Signature: Date:
Page 57 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Table 4.
PROFIT AND LOSS ACCOUNT
PROFIT & LOSS DESCRIPTION AMOUNT t0 AMOUNT t-1 AMOUNT t-2
Total operating income
Turnover Net turnover
Variation in stocks Variation in stocks of finished goods and work in progress
Other operating income
Work performed by the undertaking for its own purposes and capitalized Other operating income
Total operating expenditure
Costs of material and consumables
Raw materials and consumables Other external charges
Other operating charges Other operating charges
Staff costs Wages and salaries Social security costs and other related costs
Gross operating surplus = Total operating income – Total operating expenditure
Depreciation & amortization Depreciation & amortization
Net operating surplus = Gross operating surplus + depreciation & amortization
Financial products
Income from participating interests Income from other investments and loans forming part of the fixed assets Other interest receivable and similar income Value adjustments in respect of financial assets and of investments
Financial charges Financial charges
Extraordinary income Extraordinary income
Extraordinary charges Extraordinary charges
Tax on profits Tax on profit or loss on ordinary activities
Page 58 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Tax on extraordinary profit or loss Other taxes not shown under the above items
Profit or loss for the financial year
Profit or loss for the financial year
Name : Signature: Date:
Page 59 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.6 to the Tender Specifications
Subcontractor Letter of Intent
<Letterhead of the sub-contractor or other entity on whose resources to rely>
I, the undersigned ……………………………………, being the authorised signatory for the above-mentioned entity for the procedure GSA/OP/21/15 EGNOS V3 Site Surveys, hereby solemnly declare and confirm our irrevocable undertaking to collaborate with the tenderer [insert full legal name of tenderer] should they win the contract and that all appropriate and necessary resources from our part shall be put at the tenderer’s disposal for the performance and implementation of the contract.
______________________
Date and signature
Page 60 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.7 to the Tender Specifications
List of V2 sites for the purpose of SC#1
Id RIMS Site Country
1. AALBORG Denmark
2. ABU SIMBEL Egypt
3. AGADIR Morocco
4. ALEXANDRIA Egypt
5. ATHENS Greece
6. AZORES Portugal
7. BERLIN Germany
8. CANARY ISLAND Spain
9. CATANIA Italy
10. CORK Ireland
11. DJERBA Tunisia
12. EGILSTAADIR Iceland
13. GAVLE Sweden
14. GLASGOW United Kingdom
15. GOLBASI Turkey
16. HAÏFA Israel
17. HARTEBEESTHOEK South Africa
18. JAN MAYEN Norway
19. KIRKENES Norway
20. KOUROU French Guyana
21. LA PALMA ISLAND Spain
22. LAPPEENRANTA Finland
23. LISBON Portugal
24. MADEIRA Portugal
25. MALAGA Spain
26. MONCTON Canada
27. NOUAKCHOTT Mauritania
28. PALMA DE MALLORCA Spain
29. PARIS France
30. REYKJAVIK Iceland
31. ROMA Italy
32. SANTIAGO DE COMPOSTELLA Spain
33. SOFIA Bulgaria
34. SVALBARD Norway
35. SWANWICK United Kingdom
36. TOULOUSE France
37. TROMSO Norway
38. TRONDHEIM Norway
Page 61 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
39. WARSAW Poland
40. ZURICH Switzerland
41. KIEV Ukraine
42. AL‘AQABA Jordan 43. KUUSAMO Finland 44. ORAN Algeria
NLES Site Country
1 REDU Belgium
2 BEDZDORF Luxemburg
Page 62 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.8 to Tender Specifications
Model Financial Offer
Name of Tenderer:
Framework contract offer Evaluation Scenario*
Task
Total price for
the task per
site / daily
rate, [EUR]
(maximum)
Estimated
number of task
assignments /
number of
man-days*
Total scenario price per
type of task, EUR
(a) (b) ( a x b)
1
Task 1A Interference and logistics
survey on site - in EU
[total price per site, including all costs]
40
2
Task 1B Interference and Logistics
survey on site – outside EU
[total price per site, including all costs]
10
3
Task 2 Interference, infrastructure and
logistics survey data post-processing - in
contractor’s office
[total price per site, including all costs]
50
4
Task 3A Site management engineering
support
Survey engineer
[man-day rate]
50
5
Task 3B Site management engineering
support
Interference Senior RF expert
[man-day rate]
50
6 Task 3C Site management engineering
support
50
Page 63 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Senior contract management
expert
[man-day rate]
Total scenario price
(1+2+3+4+5+6)
* In order to allow for a comparison of the offers an evaluation scenario shall be used. The data in the
evaluation scenario reflect the volume estimates of the Agency for a period of contract duration of
four years for the different types of services (as defined in the terms of reference). Please note that
these estimates are only indicative and do not constitute any kind of legal obligation or commitment
for the Agency (see section 3.2.3 of the Tender Specification).
Note:
Prices must be quoted in EURO and include all expenses necessary to perform the contract. No further reimbursements shall be made whatsoever.]
A price shall be indicated for each category and must not amount to zero. Failure to comply with this requirement may lead to rejection of the offer.
The tenderer is required to verify that the results of all data entered in the financial offer are correct and ensure that all averages, sub-totals, totals etc. are correct and consistently provided.
The price quoted is fixed and shall be subject to NO revision.
Name
Date & Signature
Page 64 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.8a to Tender Specifications Cost Sheets
(separate .xls file)
Page 65 of 65
GSA/OP/21/15 EGNOS V3 Site Surveys
Annex I.9 to Tender Specifications
Template Non-Disclosure Agreement
(separate .pdf file)