Street Smart. World Wise. Cost Consulting & Project Management, Altus Group Limited 2020 - 4th Street SW, Suite 310, Calgary , Alberta, T2S 1W3 Canada T 403.508.7770 F 403.228.1020 Procurement Risk: Strategies for Cost Mitigation There are always going to be many moving parts when designing and constructing a building; parts that must be executed at just the right point for a smooth process. Recognizing when each part, and therefore player, is to become involved in the project is key, not just for a welltimed project, but to help manage costs of said project as well. The best way to minimize risk of any sort is to proactively understand what risk there is. Below are four areas of common areas where risk has the potential to increase your project costs. By looking at these, you can proactively develop strategies to mitigate costs both in the design and construction of your building. 1. Procurement Cycles Procurement cycles look at when you should be acquiring the goods, labour, and materials for your project. Because of Canadas climate, most companies will do their design work in the winter to help minimize cold weather construction costs (e.g. concrete pours in the cold can be astronomical), preparing for physical construction to start in the spring. As Altus has seen a 4 6% increase on both labour and materials in the past year, you should understand that the best time to start engaging contractors, designers, and subcontractors in your construction process isnt in the spring, or even at the end of the winter. Rather, it should be right at the beginning of the concept / design phase. Doing this, you are able to mitigate costs through proper party engagement, proactive purchase of goods / materials, and by developing a full project scope, limiting last minute changes.
Transcript
Page 1: Procurement Risk: Strategies for Cost Mitigation

Street Smart. World Wise.

 Cost Consulting & Project Management, Altus Group Limited

2020 - 4th Street SW, Suite 310, Calgary , Alberta, T2S 1W3 Canada T 403.508.7770 F 403.228.1020  

altusgroup.com  

Procurement Risk: Strategies for Cost Mitigation

 There  are  always  going  to  be  many  moving  parts  when  designing  and  constructing  a  building;  parts  that  must  be  executed  at  just  the  right  point  for  a  smooth  process.  Recognizing  when  each  part,  and  therefore  player,  is  to  become  involved  in  the  project  is  key,  not  just  for  a  well-­‐‑timed  project,  but  to  help  manage  costs  of  said  project  as  well.    

 The  best  way  to  minimize  risk  of  any  sort  is  to  proactively  understand  what  risk  there  is.  Below  are  four  areas  of  common  areas  where  risk  has  the  potential  to  increase  your  project  costs.  By  looking  at  these,  you  can  proactively  develop  strategies  to  mitigate  costs  both  in  the  design  and  construction  of  your  building.      1.        Procurement  Cycles      Procurement  cycles  look  at  when  you  should  be  acquiring  the  goods,  labour,  and  materials  for  your  project.  Because  of  Canada'ʹs  climate,  most  companies  will  do  their  design  work  in  the  winter  to  help  minimize  cold  weather  construction  costs  (e.g.  concrete  pours  in  the  cold  can  be  astronomical),  preparing  for  physical  construction  to  start  in  the  spring.  As  Altus  has  seen  a  4  -­‐‑  6%  increase  on  both  labour  and  materials  in  the  past  year,  you  should  understand  that  the  best  time  to  start  engaging  contractors,  designers,  and  subcontractors  in  your  construction  process  isn'ʹt  in  the  spring,  or  even  at  the  end  of  the  winter.  Rather,  it  should  be  right  at  the  beginning  of  the  concept  /  design  phase.  Doing  this,  you  are  able  to  mitigate  costs  through  proper  party  engagement,  proactive  purchase  of  goods  /  materials,  and  by  developing  a  full  project  scope,  limiting  last  minute  changes.        

Page 2: Procurement Risk: Strategies for Cost Mitigation

Street Smart. World Wise.  

Cost Consulting & Project Management, Altus Group Limited

2020 - 4th Street SW, Suite 310, Calgary , Alberta, T2S 1W3 Canada T 403.508.7770 F 403.228.1020  

altusgroup.com  

 

 2.        Contractor  Relationships      Tied  closely  with  procurement  cycles,  building  relationships  with  contractors  and  their  subcontractors  is  crucial  to  minimizing  costs.      By  bringing  the  contractor  into  the  process  much  earlier,  they  are  better  able  to  advise  on  realistic  timelines  and  whether  things  can  or  cannot  be  done.  Through  this,  you  have  a  much  higher  chance  of  getting  them  on  board  and  on  site  when  they  need  to  be.  This  shows  that  there  is  a  respect  of  their  time  and  needs,  as  well  as  their  relationships  with  supply  change.      This  will  also  remove  any  last  minute  tender  packages  that  need  to  be  developed,  assessed,  and  reviewed.  You  are  setting  your  project  up  from  the  start,  knowing  WHO  will  be  working  on  your  building  and  WHEN.  Bringing  collaboration,  along  with  expertise,  is  crucial  to  minimizing  risk.      3.        Government  Labour  Support    Specifically  in  Calgary,  there  is  a  wealth  of  building  projects  currently  in  development,  as  well  as  future  development.  What  is  happening  is  that  we  are  finding  there  is  often  a  constraint  on  qualified  labour  to  actually  (safely)  complete  the  work  in  a  timely  and  cost  conscious  manner.      However,  there  is  labour  coming  into  the  country.  Unfortunately,  not  all  are  qualified.  For  instance,  if  the  government  allows  4,000  workers  in,  often,  only  3,000  of  these  individuals  will  actually  be  qualified  to  work  on  the  projects  being  developed.  To  mitigate  these  safety  risks  and  costs,  your  project  should  be  working  with  the  government  for  support  in  receiving  QUALIFIED  workers.  By  having  qualified  individuals  working  with  your  contractors  /  subcontractors,  your  building  is  much  more  likely  to  meet  deadlines  (not  meeting  scheduled  timelines  always  has  a  cost  attached  to  it),  without  liability  issues.    

Page 3: Procurement Risk: Strategies for Cost Mitigation

Street Smart. World Wise.  

Cost Consulting & Project Management, Altus Group Limited

2020 - 4th Street SW, Suite 310, Calgary , Alberta, T2S 1W3 Canada T 403.508.7770 F 403.228.1020  

altusgroup.com  

 

4.        Global  Ideas    As  our  world  is  becoming  more  connected,  we  must  stop  trying  to  reinvent  the  wheel  when  it  has  been  invented  elsewhere.  Specifically,  countries  such  as  the  U.K.  and  Australia  have  adopted  great  cost  minimization  design  and  management  strategies  through  BIM  (Building  Information  Modelling).  How  can  we,  in  Canada,  look  at  implementing  this  same  cost  and  time  saving  tool,  and  improve  upon  it  to  fit  with  our  own  building  and  procurement  cycles?  Looking  at  international  best  practices  can  help  learn  new  ways  of  being  proactive,  minimizing  procurement  risks  and  costs.      As  materials,  software,  and  techniques  continue  to  improve  in  the  construction  industry,  it  is  crucial  to  understand  what  is  needed  to  make  them  work  and  be  effective  for  you.  If  you  are  interested  in  learning  more  about  cost  mitigation  or  how  you  can  build  strategies  into  your  own  construction  project,  contact  David  Crane  at  [email protected].      