Progetto: LIFE11 ENV/IT/109 «SOREME»
«Low cost sorbent for reducing mercury emissions»
Start: 01/01/2013End: 31/12/2014
27/01/201412 month progress meeting
PISAICCOMCNR premises
AGENDA
TECHNICAL & PROGRESS MEETING
09:30 [ICCOMCNR] Welcome and opening of the meeting
09:40 [All] Actions carried out by each partner (please prepare a ppt presentation and include SOREME logo and LIFE logo in each slide) and scheduled activities till the end of December 2013. In particular videos and photos of the demonstration of the SOREME sorbent use at semi-industrial level will be showed.
10:30 [All] Open discussion on actions carried out
11:00 [All] Coffee break
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
AGENDA
TECHNICAL & PROGRESS MEETING
11:15 [All] SOREME Technical future issues:• [ICCOMCNR] Technical activities scheduled in the next
six months of the project• [All] Open discussion on actions to be carried out in the
next six months of the project.
12:00 [ICCOMCNR] Management and dissemination issues
12:20 [All] General questions
12:30 End of progress meeting
13:00 Lunch
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
AGENDA
ADMINISTRATIVE MEETING
14:30 [EC Monitor team] SOREME administrative issues:• [All] the EC monitoring expert will check all the project
administrative documents (timesheets, invoices, etc.) with each partner
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
Technical Actions carried out by each partner in the last six months
ACTION B.3 Demonstration of the innovative mercury sorbent at laboratory level (ended) ACTION B.4 Demonstration of the innovative mercury sorbent at semi-industrial level ACTION B.5 Demonstration of the innovative mercury sorbent at industrial level (start) ACTION C.1 Environmental monitoring of the innovative mercury sorbent at laboratory level (ended) ACTION C.2 Environmental monitoring of the innovative mercury sorbent at semi-industrial level ACTION C.3 Environmental monitoring of the innovative mercury sorbent at industrial level
Technical Actions carried out by each partner in the last six months
Presentations of: ICCOMCNR
ENEA CONER EPENZ
Technical Actions carried out by each partner in the last six months
[All] Open discussion on actions carried out
Dissemination activities
ACTION D.1: Project web site ACTION D.2: LIFE+ information boards ACTION D.4: Articles and press releases ACTION D.5: Networking ACTION D.7: Diffusion material preparation ACTION D.8: Demonstration workshop, seminars, conferences
and other events ACTION D.9: International fairs and other events ACTION D.10: Digital supports for international diffusion
Dissemination activities
ACTION D.1: Project web site• ECOFATTING website in English: www.pi.iccom.cnr.it/soreme• ICCOMCNR has prepared the Italian version• ICCOMCNR with the help of EPENZ is preparing the Estonian version• Each partner has prepared the link between the SOREME website to
the beneficiary website
Dissemination activities
ACTION D.2: LIFE+ information boards• ICCOMCNR produced 12 SOREME Notice boards and sent them to
all the beneficiaries• All the beneficiaries put the SOREME Notice board in a public space
Dissemination activities
ACTION D.4: Articles and press releases• A description of the SOREME project was reported in the section
“NEWS” of the ENEA web site (http://www.enea.it/it/enea_informa/news/progetto-soreme-sorbenti-innovativi-per-ridurre-le-emissioni-di-mercurio-nei-processi-industriali).
• The same news was reported in the ENEA newsletter distributed among the ENEA personnel on 29 July 2013.
• ICCOMCNR has produced 1 article in a general newspaper• ICCOMCNR is producing a TV interview • In addition, during this period, all partners started to have some
contacts with different general and technical newspapers in order to define the production of project press articles.
Dissemination activities
ACTION D.5: Networking• Cluster with DEPOTEC, RESAFE, ECOFATTING,OXATAN,
SHOELAW, PODEBA, SOREME, BioNaD, CLEANSED, After-Cu, MICROTAN, C02SHOE, SHOEBAT and BIOREM (LIFE 09-10-11-12 projects)
Dissemination activities
ACTION D.7: Diffusion material preparation• Logo definition and design• ICCOMCNR has produced 1 roll-up in English• ICCOMCNR has produced 1,500 brochures in Italian and 1,500
brochures in English• ICCOMCNR has produced 1 poster in English• ICCOMCNR has produced 100 t-shirts with SOREME and
beneficiaries logos as project gadget • ICCOMCNR has produced an official BIOREM power point
presentation in English and Italian to be used in events• EPENZ is working on the production of an official BIOREM power
point presentation in Estonian to be used in events
Dissemination activities
ACTION D.8: Demonstration workshop, seminars, conferences and other events
CONER organised the following events where presented the SOREME project:
• SOREME project have been introduced and discussed during 2 different general assemblies of CONER. Each event involved 18 staff people from 9 different regional provinces plus 8-to-10 enterprises.
• Workshops with Associations and companies interested in testing the SOREME sorbent. From January to September, the following workshops have been held:o Unindustria Forlì Cesena (5-6 April 2013)o Unindustria Forlì Cesena (11 April and 22 May 2013)o Unindustria Piacenza (23 April 2013)o Unindustria Rimini (8 May 2013)
Dissemination activities
ACTION D.8: Demonstration workshop, seminars, conferences and other events
• presentation of the SOREME project in the frame of course co-funded by Italian Ministry of Foreign Affairs entitled “Governance and development of the SMEs in Libya” and aimed to the formation of Libyan officials (Faenza 2/12/2014)
SOREME power point presentations at LIFE CNR event in Pisa, 31 January 2014
Dissemination activities
ACTION D.9: International fairs and other events• ICCOM-CNR presented a SOREME abstract and poster in the
following fair: XXXVIII Colloquium Spectroscopicum Internationale in Tromsø,
Norway, June 16 – 20, 2013 XXIV Congresso della Divisione di Chimica Analitica 15- 19 Settembre
2013 a Sestri Levante (GE) ECOMONDO fair in November 5-8, 2013 at Rimini ECOCITY fair in November 21-24, 2013 at Pisa
Dissemination activities
ACTION D.9: International fairs and other events• ENEA presented SOREME in the following events: ENEA attended to the fair Research to Business 2013 which was
held at Bologna on 5-6 June 2013. ENEA attended to the congress ECERS 2013 held at Limoges on 23-
28 June 2013. ECOMONDO fair in November 5-8, 2013 at Rimini presentation of the SOREME project in the frame of course co-funded
by Italian Ministry of Foreign Affairs entitled “Governance and development of the SMEs in Libya” and aimed to the formation of Libyan officials (Faenza 2/12/2014)
• CONER presented SOREME in the following events: R2B: 8° International Industrial Research Exhibition, held in Bologna,
Italy, on 5-6 June 2013.
Dissemination activities
ACTION D.10: Digital supports for international diffusion
During this period, ICCOMCNR and ENEA started to have some contacts with different external companies expert in video making in order to select the final one for the SOREME video production.
During this period, all partners started to define the specific structure of the video of each specific partner.
Management activities
ACTION E.1: Project management ACTION E.2: Monitoring
ICCOMCNR has continuous contact with all project partners for monitoring project activities
ICCOMCNR prepares and sends a monthly summary (each 28th) of the project activities carried out to monitoring team
ICCOMCNR needs to receive from each partner technical inputs before each 28th
SOREME Technical future issues
ACTION B.4 Demonstration of the innovative mercury sorbent at semi-industrial level ACTION B.5 Demonstration of the innovative mercury sorbent at industrial level ACTION C.2 Environmental monitoring of the innovative mercury sorbent at semi-industrial level (end) ACTION C.3 Environmental monitoring of the innovative mercury sorbent at industrial level ACTION C.4 Feedback on SOREME mercury sorbent use (start)
SOREME Technical future issues
[All] Open discussion on actions to be carried out in the next six months of the project
SOREME Dissemination future issues for the next six months
ACTION D.1: Project web site: update ACTION D.2: LIFE+ information boards: OK OK (now 12 notice
boards; expected 5 notice boards) ACTION D.4: Articles and press releases: new articles (now 3
articles and 1 TV interview; expected 15 pubblications) ACTION D.5: Networking: OK OK (now 14 projects; expected 10
projects) ACTION D.6: SOREME sorbent characterisation and application
manual: start
SOREME Dissemination future issues for the next six months
• ACTION D.7: Diffusion material preparation: OK, production of new posters and brochures (now 1 roll-up, 1 poster, 3,000 brochures, 100 t-shirts as project gadget; expected 6 Posters, 4.000 leaflets/brochures)
ACTION D.8: Demonstration workshop, seminars, conferences and other events: OK, organisation and participation of new events (now 8 events; expected 10 events)
ACTION D.9: International fairs and other events: OK OK (now 8 fairs; expected 4 fairs)
ACTION D.10: Digital supports for international diffusion: start
ADMINISTRATIVE ISSUES
Amendment Inception Report result Progress Report Deliverables Partner cost analysis New Administrative excel documents Next project meeting
MANAGEMENTOld Budget
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
Personnel TravelExternal
assistance Consumables Overheads TOTAL EC CONTRIBUTION
ICCOM CNR 230,840 12,500 67,960 59,000 20,000 390,300.00 171938.00
ENEA 119,700 12,500 35,180 49,000 20,000 236,380.00 96576.00
CONER 161,900 12,500 43,860 79,000 20,000 317,260.00 158630.00
DESOTEC 145,500 12,500 33,500 79,000 20,000 290,500.00 145250.00
EPENZ 169,200 12,500 35,900 79,000 20,000 316,600.00 158300.00
TOTAL 827,140 62,500 216,400 345,000 100,000 1,551,040.00 730694.00
MANAGEMENTNew Budget
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
MANAGEMENTNew Payments
Progetto: LIFE11 ENV/IT/ 109 «SOREME»«Low cost sorbent for reducing mercury
emissions»
EC CONTRIBUTION PREFINANZIAMENTO50% PREFINANZIAMENTO
ICCOM CNR 287,188.00 201,031.60 100,515.80
ENEA 116,576.00 81,603.20 40,801.60
CONER 168,630.00 118,041.00 59,020.50
EPENZ 158,300.00 110,810.00 55,405.00
TOTAL 730,694.00 511,485.80 255,742.90
INCEPTION REPORT RESULTS
“I wish to inform you that, on the basis of the information received
in
the report, the Commission considers that the project remains
viable and on track to achieve its objectives within the original
timeframe and is, therefore, allowed to proceed. “
INCEPTION REPORT RESULTS
Technical issues
1. The participation in a few scientific events is mentioned in your report (e.g. in the XXXVIII Colloquium Spectroscopicum Internationale in Tromso, Norway) but no presentations or other materials useful to understand the added value for participating in such events has been submitted. Please either submit such materials with your next report, or upload them to the project website, also with the aim of facilitating the assessment of the relevant costs claimed for travel, subscription fees, etc.
Web site updated. Materials will be attached to the SOREME next report.
INCEPTION REPORT RESULTSTechnical issues
2. Please be reminded that the project website needs to be regularly updated with the project progress and results. You are kindly advised to upload the recent results about the sorbent features and its absorption capacity in the dedicated section. Web site updated with documents.
Please also note that you need to update the website as:
- the Life logo redirects to the Soreme homepage instead of the Life website; The Life logo is part of the header of the website which redirects all together to the homepage. The link to the life website is embedded in the “The Life+ programme” window on the bottom left of the homepage.
- in the "Life+ programme" section, links to "selections of projects" redirect to incorrect addresses. We corrected the link of “selections of projects” which now points to the right url.
Finally, you are kindly advised to implement a section dedicated to promoting the Soreme sorbent amongst small and medium enterprises.
New Web site section implemented.
INCEPTION REPORT RESULTSTechnical issues
3. End-users and authorisations - please address in your next report the following issues:
• Provide qualitative and quantitative elements to show the importance in the sector market of the SMEs and confirm, on the basis of that data, that the decision of discarding industries with big plants does not narrow the scope of the project and its potential environmental impact; we will provide the requested elements in the next SOREME report
• Provide an hypothetical scenario that describes how the results obtained and lessons learnt in demonstration actions can be extended to the treatment of other mercury-polluted industrial effluents; we will provide the requested scenario in the next SOREME report
• Confirm that no environmental authorisations from the local regulatory authority are necessary for the project demonstration (actions B4 and B5). Authorisation needed
INCEPTION REPORT RESULTS
Financial ssues
Please provide with your Final Report the declarations attesting non-recoverability of VAT for ICCOM-CNR and ENEA.
we will provide the requested declarations in the SOREME Final report
NEXT DELIVERABLES
Preparation of dissemination material: Action D.7 Report on the semi-industrial level demonstration: Actions B.4 Report on the semi-industrial level monitoring: Actions C.2
PARTNER COST ANALYSIS
Budget monitoring with new modified budget
PARTNER CLAIM
Project Personnel
Dec 2013 Personnel
Project Travel
Dec 2013 Travel
Project External
assistance
Dec 2013 External
assistance
Project Consumable
s
Dec 2013 Consumabl
es
Project Prototyp
eDec 2013 Prototype
Project Overheads
Dec 2013 Overhead
sProject TOTAL
Dec 2013 TOTAL
ICCOMCNR 340.612
197.521,47
12.500
4.036,26
115.000
38.797,34
66.608
7.128,12
58.080
52.272,00
28.000
20.982,86
620.800
320.738,05
ENEA 139.700
84.833,52
12.500
1.575,09
45.180
49.000
5.857,64
30.000
10.000,00
276.380
102.266,25
CONER 161.900
67.318,30
12.500
3.069,26
63.860
33.682,25
79.000
89,00
20.000
7.291,12
337.260
111.449,93
EPENZ 169.200
727,50
12.500
1.420,00
35.900
201,17
79.000
20.000
164,41
316.600
2.513,08
TOTAL 811.412
350.400,79
50.000
10.100,61
259.940
72.680,76
273.608
13.074,76
58.080
52.272,00
98.000
38.438,39
1.551.040
536.967,31