BRUHAT BANGALORE MAHANAGARA PALIKE PROGRAMME OF WORKS PROPOSED FOR THE YEAR 2008-2009
Transcript
Page 1: Programme_Of_Works_2008-2009

������������ �������������������������������� �������������������������������� �������������������������������� ������������������������

BRUHAT BANGALORE MAHANAGARA PALIKE

����������������������������������������������������������������������������������������������������������������������������������������

PROGRAMME OF WORKS PROPOSED FOR THE YEAR 2008-2009

����������������

Page 2: Programme_Of_Works_2008-2009
Page 3: Programme_Of_Works_2008-2009

1 Bytarayanapura 1 - 22

2 Mahadevapura 23 - 33

3 Bommanahalli 34 - 43

4 Rajarajeshwari Nagar 44 - 55

5 Dasarahalli 56 - 65

6 Bangalore West 66 - 107

7 Bangalore South 108 - 139

8 Bangalore East 140 - 166

9 Major Roads 167 - 176

10 CE Projects-1 176 - 183

11 Enhanced Allocation 183

INDEX

Sl No Name of the Zone Page No.

Page 4: Programme_Of_Works_2008-2009
Page 5: Programme_Of_Works_2008-2009

Civ

il W

orks

Elec

tric

al W

orks

18%

Tota

l

Cap

ital

Mai

nten

ance

Cap

ital

Mai

nten

ance

No

of W

orks

Am

ount

No

of W

orks

Am

ount

No

of W

orks

Am

ount

No

of W

orks

Am

ount

No

of W

orks

Am

ount

No

of W

orks

Am

ount

1R

ajar

ajes

hwar

i Nag

ar15

623

9183

874

2350

013

300

3072

030

547

85.0

0

2B

ytar

ayan

apur

a17

122

50.5

111

1039

.523

105.

536

304.

561

810

402

4510

.00

3B

omm

anah

alli

117

2984

8429

633

350

715

036

720

277

4500

.00

4M

ahad

evap

ura

140

2459

.975

807.

634

325

1118

9.5

5571

831

545

00.0

0

5D

asar

ahal

li10

031

8810

111

1528

37

160

3175

616

344

98.0

0

6B

anga

lore

Wes

t33

228

8022

780

066

233.

495

672.

4982

612

802

5197

.89

7B

anga

lore

Sou

th13

215

45.5

387

1698

.25

2610

090

900

7872

071

349

63.7

5

8B

anga

lore

Eas

t16

423

19.2

114

985.

722

1646

398

456

692.

5879

949

97.5

0

9M

ajor

Roa

ds14

718

200

1820

0.00

10C

E P

roje

cts-

196

1079

929

2627

.413

800

1422

6.40

11E

nhan

ced

Allo

catio

n40

040

0.00

12A

ppro

ach

Roa

ds to

Vill

ages

2000

2000

.00

Tota

l15

5551

017.

111

2092

39.4

722

219

12.9

722

3660

.49

442

6948

.58

3776

7277

8.54

Abs

trac

t of P

rogr

amm

e of

Wor

ks fo

r B

BM

P

Sl N

oN

ame

of th

e Zo

ne

Am

ount

(in

Lakh

s)

Page 6: Programme_Of_Works_2008-2009
Page 7: Programme_Of_Works_2008-2009

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) I. (Original Works)

A) Buildings1 Construction of 2 Nos. of Garbage Transit Plant in Amruthahalli Circle Limit 3.00

2 Construction of Samparka Bandhu Building and Providing Furnitures inAmruthahalli Circle Limit 10.00

B) Roads & Drains

1 Improvements and Asphalting to Roads and Construction of Drains inKempapura, Amruthahalli Circle Limit 20.00

2 Improvements and Construction of Drains to Coffee Board Layout inAmruthahalli Circle Limit 20.00

3 Improvements and Asphalting to Roads and Construction of Drains to CrossRoads at Amruthahanagar in Amruthahallli Circle Area 20.00

4 Improvements and Asphalting to Roads and Construction of Drains fromAmruthahalli Circle to Dasarahalli Main Road Via Tank Bund 30.00

5 Improvements and Asphalting to Roads and Construction of Drains fromAmruthahalli Circle to Dasarahalli Main Road Via Arkavathi Layout 30.00

6 Improvements and Asphalting to Roads and Construction of Drains inByatarayanapura 20.00

C) Bridges & Culverts1 Construction of Bridge at Amruthahalli Tank Bund Road 11.00

D) Side Walks & Ducts1 Construction of Side Walks from NH-7 to Amruthahalli Circle Main Road 20.00

E) Concrete RoadNil

F) Water SupplyNil

G) Playground & Protection of BBMP PropertiesNil

II. (Maintenance Works)A) Buildings

1 Maintenance of BBMP, Byatarayanapura Zonal Office 10.002 Providing Furnitures and Fixtures to BBMP, Byatarayanapura Zonal Office 5.00

B) Roads & Drains

1 Asphalting to Main Roads in Coffee Board Layout of Amruthahalli Circle Limit 40.00

2 Asphalting to Cross Roads in Coffee Board Layout of Amruthahalli Circle Limit 20.00

3 Asphalting to Main Roads in Tala Cauvery Layout of Amruthahalli Circle Limit 24.00

4 Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roadsin Amruthahalli Circle 8.00

5 Maintenance of Roads in Amruthahalli Circle 10.00C) Water Supply

NilD) Maintenance of Under Ground Drainage

NilE) Flyover, Underpass & Grade Separators

Nil

Byatarayanapura Division Virupakshapura Sub-Division

1

Page 8: Programme_Of_Works_2008-2009

IV. (Other Works)B) Other Works

1 Maintenance of Byatarayanapura Zone Control Room Office 25.002 Providing Street Signage Boards in Amruthahalli Circle Limit 1.00

3 Improvements and Geometrical corrections to Circles at Amruthahalli andHebbal Kempapura in Amruthahalli Circle limit 15.00

4 Providing Grant-in-Aid to Schools During National & State Festivals inAmruthahalli Circle Limit 1.00

Total 343.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Construction of Sub Division Office of Byatarayanapura Zone at Sahakaranagar 30.00

2 Construction of 2 Nos. of Garbage Transit Plant in Sahakaranagar Circle Limit 3.00

3 Construction of Samparka Bandhu Building and Providing Furnitures at Thindluin Sahakaranagar Circle Limit 10.00

B) Roads & Drains1 Improvements to Roads in Kodigehalli Village at Sahakaranagar Circle Limit 30.00

2 Improvements and Asphalting to Roads and Construction of Drains fromKodigehalli Railway Station to Canara Bank Layout Connecting Road 20.00

3 Improvements and Asphalting to Roads and Construction of Drains to MainRoads and Cross Roads of Devinagar Layout 20.00

4 Improvements to Roads and Construction of Drains in Hanumaiah Layout ofThindlu Village in Sahakaranagar Circle Limits 26.00

C) Bridges & Culverts1 Construction of Bridge at Gurudarshan Layout in Thindlu Village 10.002 Construction of Culverts in Sahakaranagar Circle Limits 8.00

D) Side Walks & DuctsNil

E) Concrete RoadNil

F) Water SupplyNil

G) Playground & Protection of BBMP Properties1 Protection to BBMP Property Near Thindlu Village 7.50

II. (Maintenance Works)A) Buildings

1 Repairs and Maintenance to Panchayat Office at Kodigehalli Village 2.002 Maintenance of Nirmala Souchalaya at Kodigehalli Village 1.50

B) Roads & Drains

1 Improvements and Asphalting to Roads and Construction of Drains to MainRoads and Cross Road at Sahakaranagar Layout - CQAL & Defence Colony 25.00

2 Improvements and Asphalting to Roads and Construction of Drains to MainRoads and Cross Road at Sahakaranagar Layout - A & B Block 25.00

2

Page 9: Programme_Of_Works_2008-2009

3 Improvements and Asphalting to Roads and Construction of Drains to MainRoads and Cross Road at Sahakaranagar Layout - C & D Block 25.00

4 Improvements and Asphalting to Roads and Construction of Drains to MainRoads and Cross Road at Sahakaranagar Layout - E, F & G Block 25.00

5 Improvements and Asphalting to Roads and Construction of Drains at Tatanagar 25.00

6 Providing Pot Hole Filling to Roads in Sahakaranagar Circle Limits 10.00

7 Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roadsin Sahakaranagar Circle 8.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Providing Street Signage Boards in Sahakarangar Circle Limit 1.00

2 Improvements and Geometrical corrections to Circle at Kodigehalli inSahakaranagar Circle limit 5.00

3 Providing Grant-in-Aid to Schools During National & State Festivals inSahakaranagar Circle Limit 1.00

Total 318.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Construction of Public Library Building at Jakkur (Balance Work) 8.00

2 Construction of Additional Building and Improvements to Satyam ShivamSundaram Orphanage School at Jakkur 7.00

3 Construction of 2 Nos. of Garbage Transit Plant in Dasarahalli Circle Limit 3.00

4 Construction of Samparka Bandhu Building and Providing Furnitures atHegdenagar in Dasarahalli Circle Limit 10.00

B) Roads & Drains

1 Improvements to Road and Construction of Drains from NH-7 to Dasarahalli ViaBhuvaneshwarinagar 30.00

2 Improvements and Asphalting to Road from JNRC to Srirampura - MestripalyaRoad 25.00

3 Improvements to Road and Construction of Drains to Nagawara - ThanisandraRoad (Ch: 0.90 Km to 1.60 Km) 25.00

4 Balance Work of Asphalting to Road from 5th Cross to 9th Cross ofBhuvaneshwarinagar 20.00

5 Improvements to Road and Construction of Drains from 10th Cross to 18thCross of Bhuvaneshwarinagar 20.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Byatarayanapura DivisionThanisandra Sub Division

Circle : Dasarahalli

3

Page 10: Programme_Of_Works_2008-2009

6 Improvements and Construction of Drains, Asphalting to 2nd Cross ofCauverynagar Near Sai Baba Temple Road in Dasarahalli Circle Limit 3.00

7 Improvements and Asphalting to 2nd Main Road of Hegdenagar and RamaiahRoad to Arkavathi Layout 20.00

8 Improvements to Road and Construction of Drains to Cross Roads ofNavyanagar & BGS Layout Near Jakkur 10.00

9 Improvements and Asphalting to Main Road of Ashwathanagar and AnamEnclave Layout in Thanisandra 10.00

10 Improvements and Asphalting to Main Road of Vidyasagar in Thanisandra 10.00

11 Improvements to Road and Construction of Drains to Cross Roads ofRachenahalli Village 5.00

12 Improvements to Road and Construction of Drains to Cross Roads ofSampigehalli & Srirampura Village 10.00

13 Improvements to Road and Construction of Drains to Cross Roads of JakkurVillage 10.00

14 Improvements and Asphalting to Roads from MCEH Layout to Arkavathi Layout 8.00

C) Bridges & Culverts

1 Construction of Culvert Across Local Halla Near Ashwathnagar in ThanisandraMain Road 8.00

2 Construction of Culvert Across Local Halla Near Bharathnagar in ThanisandraMain Road 8.00

3 Construction of Culvert Across Local Halla Near Nagenahalli Cross inHegdenagar - Nagenahalli Road at Dasarahalli Circle Limit 5.00

D) Side Walks & DuctsNil

E) Concrete RoadNil

F) Water SupplyNil

G) Playground & Protection of BBMP Properties1 Protection to BBMP Property in Dasarahalli Circle 5.00

II. (Maintenance Works)A) Buildings

1 Repairs and Maintenance of BBMP Sub Division Office at Thanisandra 1.002 Repairs and Maintenance of Ward Office at Dasarahalli 2.00

B) Roads & Drains1 Maintenance and Emergency Repairs to Roads in Dasarahalli Cirlce 10.00

2 Improvements and Asphalting to Balance Length of Thanisandra - RachenahalliRoad 25.00

3 Engaging Tractor & Road Gang for Emergency Repairs and Maintenance ofRoads in Dasarahalli Circle 8.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Providing Street Signage Boards in Dasarahalli Circle Limit 1.00

4

Page 11: Programme_Of_Works_2008-2009

2 Improvements and Geometrical corrections to Circle at Thanisandra inDasarahalli Circle limit 10.00

3 Providing Grant-in-Aid to Schools During National & State Festivals inDasarahalli Circle Limit 1.00

Total 318.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Construction of 2 Nos. of Garbage Transit Plant in Nagawara Circle Limit 3.00

2 Construction of Samparka Bandhu Building and Providing Furnitures at HBRLayout in Nagawara Circle Limit 10.00

B) Roads & Drains1 Improvements and Asphalting to Roads at Illalnagar Roads 25.00

2 Construction of Drains at Arabic College, Rashadnagar, Omarnagar andByranakunte 25.00

3 Improvements and Asphalting to Govindapura Roads 15.00

4 Improvements to Drains and Footpath at 80 Feet Road Nagawara Main Road toKacharakanahalli Main Road in Thanisandra Sub Division 20.00

5 Improvements to Drains and Footpath to Kacharakanahalli Main Road inThanisandra Sub Division 20.00

6 Construction of SWD of 1 mt. vent on 9th main, 2nd block, HBR 1st stage fromhouse no. 727 to join 80 ft road, Kacharakanahalli 10.00

C) Bridges & CulvertsNil

D) Side Walks & DuctsNil

E) Concrete RoadNil

F) Water SupplyNil

G) Playground & Protection of BBMP PropertiesNil

II. (Maintenance Works)A) Buildings

1 Repairs and Maintenance of Nirmala Souchalaya Toilet Block at NagawaraCircle 3.00

2 Repairs and Maintenance of Nagawara Ward Office 4.00B) Roads & Drains

1 Repairs and Maintenance of Roads at Nagawara Circle 5.002 Improvements and Asphalting to Subashnagar Main Road (Balance Work) 10.00

3 Improvements and Asphalting to Roads at HBR 5th Block, 15th, 16th and 17thMain Road 30.00

4 Improvements and Asphalting to Roads at HBR 5th Block, 15th, 16th, 17th,Service Road and Parallel Road 24.00

5 Improvements and Asphalting to Roads at HBR 4th Block, 4th Cross 20.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Byatarayanapura DivisionThanisandra Sub Division

5

Page 12: Programme_Of_Works_2008-2009

6 Improvements and Asphalting to Roads at Cross Roads of HBR 3rd Block NearGanesh Temple 20.00

7 Improvements and Asphalting to Roads Beside BDA Complex at HBR 2nd Stageand Cross Roads 30.00

8 Improvements and Asphalting to Roads at HBR 2nd Stage Near Narendra Tent 20.00

9 Engaging Tractor and Road Gang for Emergency Repairs and Maintenance ofRoads in Nagawara Circle 8.00

10 Improvements to Roads and Drains at Ambedkar Colony at Veeranapalya inNagawara Circle Limit 9.00

11 Improvements to Roads and Drains at Fathima Layout, Umarnagar in NagawaraCircle Limit 25.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Providing Street Signage Boards in Nagawara Circle Limit 1.00

2 Improvements and Geometrical corrections to Circles at Nagawara Ward Office& Opp. To HBR B.D.A Complex in Nagawara Circle limit 15.00

3 Providing Grant-in-Aid to Schools During National & State Festivals inNagawara Circle Limit 1.00

Total 353.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Construction of 2 Nos. of Garbage Transit Plant in Kothanur Circle Limit 3.00

2 Construction of Samparka Bandhu Building and Providing Furnitures at Hennurin Kothanur Circle Limit 10.00

B) Roads & Drains

1 IMPROVEMENTS TO CROSS ROADS AND DRAINS OF HENNUR GOWDARA COLONY AND VILLAGE IN THANISANDRA SUB DIVISION 20.00

2IMPROVEMENTS TO ROADS AND DRAINS AND PROVIDING CONCRETE TO NARROW ROADS OF CHELKERE AND MEGHANAPALYA IN THANISANDRA SUB DIVISION

15.00

3 IMPROVEMENTS AND ASPHALTING TO MAIN ROAD FROM RING ROAD TO CHELAKERE IN THANISANDRA SUB DIVISION 20.00

4IMPROVEMENTS AND ASPHALTING TO ROAD FROM HENNUR ROAD TO CHELAKERE BEHIND INDIAN ACADEMY IN THANISANDRA SUB DIVISION

10.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Byatarayanapura DivisionThanisandra Sub Division

Circle : Kothanur Circle

6

Page 13: Programme_Of_Works_2008-2009

5PROVIDING AND LAYING R.C.C COVERING SLAB TO RAIN WATER DRAIN IN HENNUR NEAR GOVERNAMENT SCHOOL IN THANISANDRA SUB DIVISION

5.00

6ASPHALTING AND IMPROVEMENTS TO MAIN ROAD FROM KRISTHU JAYANTHI COLLEGE TO K. NARAYANPURA CROSS IN THANISANDRA SUB DIVISION

10.00

7ASPHALTING AND IMPROVEMENTS TO MAIN ROAD FROM K. NARAYANPURA CROSS TO NAGARESHWAR NAGENAHALLI IN THANISANDRA SUB DIVISION

15.00

8 IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF BYRATHI VILLAGE IN THANISANDRA SUB DIVISION 10.00

9 IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF BILISHIVALE IN THANISANDRA SUB DIVISION 10.00

10 PROVIDING AND ASPHALTING TO MAIN ROAD FROM KYLASANAHALLI TO BILISHIVALE IN THANISANDRA SUB DIVISION 40.00

11IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF BABUSABPALYA NEAR LOGUS CHURCH IN THANISANDRA SUB DIVISION

20.00

12 IMPROVEMENTS TO CROSS ROADS AND DRAINS OF THIRUMALA LAYOUT IN THANISANDRA SUB DIVISION 20.00

13IMPROVEMENTS TO HORAMAVUAGARA MAIN ROAD FROM RAILWAY GATE TO HORAMAVU AGARA IN THANISANDRA SUB DIVISION

8.00

14 IMPROVEMENTS TO ROADS FROM VADARAPALYA MAIN ROAD TOWARD SAIBABA TEMPLE IN THANISANDRA SUB DIVISION 8.00

15 IMPROVEMENTS TO ROADS AND DRAINS IN HORAMAVU AGARA VILLAGE IN THANISANDRA SUB DIVISION 7.00

16PROVIDING AND LAYING R.C.C COVERING SLAB TO RAIN WATER DRAIN IN SUSHILAMMA LAYOUT HENNUR IN THANISANDRA SUB DIVISION

10.00

C) Bridges & Culverts1 Construction of Bridges at Kothanur halla 25.00

D) Side Walks & DuctsNil

E) Concrete RoadNil

F) Water SupplyNil

G) Playground & Protection of BBMP Properties1 Protection to Govt. property in Kothanur in Thanisandra Sub Division 5.002 Protection to Govt. property in Chalkere village in Thanisandra Sub Division 5.00

II. (Maintenance Works)A) Buildings

1 IMPROVEMENTS AND PROVIDING PARTITION WORK TO WARDOFFICE IN KOTHANUR IN THANISANDRA SUB DIVISION 5.00

2 IMPROVEMENTS AND MAINTENANCE TO THE EXISTING SULABHSOUCHALAYA IN KOTHANUR CIRCLE LIMIT 2.00

7

Page 14: Programme_Of_Works_2008-2009

B) Roads & Drains

1ENGAGING TRACTOR AND ROAD GANG FOR EMERGENCY REPAIRSAND MAINTENANCE OF ROADS IN KOTHANUR CIRCLE OFTHANISANDRA SUB DIVISION

8.00

2 MANITANANCE OF ROADS AND DRAINS IN KOTHANUR CIRCLE INTHANISANDRA SUB DIVISION 10.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Providing Street Signage Boards in Kothanur Circle Limit 1.00

2Improvements and Geometrical corrections to Circles at Hennur VillageJunction, Kothanur Cross Junction and Byrathi Cross Junction in KothanurCircle limit

15.00

3 Providing Grant-in-Aid to Schools During National & State Festivals inKothanur Circle Limit 1.00

Total 318.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Constrruction of Help Point building in chikkabommasandra circle 5.00B) Roads & Drains

1 Improvements to Roads and Drains in Chikkabommasandra Village Cross andMain Roads 25.00

2 Improvements to Roads and Drains in Sharadanagara Village in Yelahanka NewTown 15.00

3 Improvements to Roads and Drains in Mathru Layout in Yelahanka New Town 20.00

4 Improvements to Roads and Drains in P.M Layout in Yelahanka New Town 10.005 Improvements to Roads From puttenahalli to BBMP Border 28.00

C) Bridges & Culverts1 Construction of Culverts in 10 to 15th cross main roads in B sector 10.002 Construction of Culverts in cross main roads 407 sector 10.00

D) Side Walks & DuctsNil

E) Concrete Road1 Formation of concrete road in B secter sanitery core (interior roads) 8.002 Formation of concrete road in 707, 407 secter 3rd phase (interior roads) 18.00

F) Water SupplyNil

G) Playground & Protection of BBMP PropertiesNil

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Yelahanka Upanagara Sub Division

8

Page 15: Programme_Of_Works_2008-2009

II. (Maintenance Works)A) Buildings

NilB) Roads & Drains

1 Improvements to drain and asphalting 5th phase Yelahanka New Town 16.00

2 Improvements to drain and asphalting in 10, 14, 15th and 16th A sector Balanceportion cross roads Yelahanka New Town 15.00

3 Improvements to drain and foot path to 12nd main 11 main,14 main in A sectorYelahanka New Town 10.00

4 Improvements to drain and foot path to 13nd main 1st to 3rd main in A sectorYelahanka New Town 20.00

5 Improvements to drain and footpath to 5nd main 6 main,7,8,9,10 main in Asector Yelahanka New Town 9.00

6 Improvements to drain and footpath in 407 SFS Yelahanka New Town 10.00

7 Improvements to drain and footpath in 10, 14, 15th and 16th A sector Balanceportion cross roads Yelahanka New Town 10.00

8 Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roadsin Chikkabommasandra Circle 8.00

9 Improvements to asphalting to cross roads from 13 A Main to 15th A Main in ASector Yelahanka New Town 17.00

10 Patch repairs in Chikkabommasandra circle 8.00C) Water Supply

NilD) Maintenance of Under Ground Drainage

NilE) Flyover, Underpass & Grade Separators

NilIV. (Other Works)

A) Other Works1 Providing street sinage boards in Chikkabommasandra Circle 1.002 Providing garbage transit place in Chikkabommasandra Circle 2.00

Total 275.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Constrruction of Help Point building in Attur circle 5.002 Construction of ward office in Attur circle 10.00

B) Roads & Drains1 Improvements and Construction of roads & drain in Mathru Layout 10.002 Improvements and Construction of road & drain in P.M.Layout 10.003 Improvements and Construction of roads& drain in Doddabettahalli village 10.004 Improvements and Construction of roads & drain in Chikkabettahalli village 10.005 Improvements and Construction of roads & drain in Adithya nagar 1st stage 14.006 Improvements and Construction of roads & drain in Attur village chikkadinne 15.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Yelahanka Upanagara Sub Division

9

Page 16: Programme_Of_Works_2008-2009

7 Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roadsin Attur Circle 8.00

8 Maintenance of Roads in Attur Circle 7.009 Improvements to Roads in Doddabettahalli Village 20.00

10 Improvements to Roads in Chikkabettahalli Village 15.0011 Asphalting in AMS layout to cross and Main roads 25.0012 Asphalting in Vinayaka layout and puttenahalli village to cross and Main roads 10.0013 Improvements to Roads in Sushelamma Layout 10.00

C) Bridges & Culverts1 Construction of culverts in Mathru Layout 10.002 Construction of culverts in P.M.Layout 10.003 Construction of culverts in Thirumalanagar 10.004 Construction of culverts in Doddabettahalli village 10.005 Construction of culverts in Adithya nagar 1st stage 10.00

D) Side Walks & DuctsE) Concrete Road

NilF) Water Supply

NilG) Playground & Protection of BBMP Properties

NilII. (Maintenance Works)

A) Buildings1 Renovation of Grama Panchayat Building at Doddabettahalli 20.00

B) Roads & DrainsNil

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

IV. (Other Works)A) Other Works

1 Providing Street Signage boards, Ornamental boards in Attur circle 6.002 Providing garbage transit place in Attur Circle 2.00

3 Providing Grant-in-Aid to Schools during national & state festivals in Attru circle 1.00

4 Improvements and Geometrical corrections to Circles at Thirumala Dhaba andDairy Circle in Attur Circle limit 14.00

Total 272.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Beautification of Kempegowda platform at Yelahanka old town bus stop 5.002 Construction of Office Building in Yelahanka 46.003 Construction of Help point Building in Gandhi nagara circle 5.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Maruthi Nagara Sub DivisionCircle : Gandhinagara

10

Page 17: Programme_Of_Works_2008-2009

B) Roads & Drains1 Construction of drain and formation of roads in Maheshwari Layout. 8.00

2 Asphalting Balance portion road from Yelahanka police station circle to KogiluCircle. 30.00

3 Widening of road from Police station circle to Kogilu circle. 25.004 Construction of drain from both sides NES circle to Police station circle. 20.00

5 construction of drain and Formation of Road at Ayyappa temple at yalahanka Oldtown. 5.00

6 Providing covering to drain from Janapriya apartments to Muneshwara temple atAllalasandra . 5.00

7 Construcation of Drain from Allalasandra road to Judicial Layout. 5.008 Asphalting 21st Main road in Judicial Layout. 13.00

C) Bridges & Culverts

1 Construction of footpath and decks from Police station circle to NES circle atYelahanka 10.00

D) Side Walks & DuctsNil

E) Concrete Road1 Construction of C.C payment in yelahanka iedga behind railwheel factory 5.00

2 Formation of concrete road in Hosbeedi to Deshad pete Road, Old Post Officeroad and Left Side Govt.Primary School,balanceVokkaligara Beedi Roads. 11.00

3 Formation of concrete road and improvemets to drain in chowdeshwari layoutmain and cross roads 8.00

4 Providing concrete roads to 18th cross upto 22nd cross and 1st to 6th cross ofKondappa layout 5.00

F) Water SupplyNil

G) Playground & Protection of BBMP Properties1 Protection to BBMP property at Gandi nagara circle. 5.00

II. (Maintenance Works)A) Buildings

1 Improvements to RudraBhoomi at yalahanka Old Town 5.002 Demolition of Unauthorsied buildings/clearance in Maruthi nagara Subdivision 6.00

B) Roads & Drains

1Improvements to drain and Roads at 2nd main to 3rd main and 1st cross to 4thcross at Gandhi nagara ,1st main and Three cross roads in Neharu nagara atYelahanka.

10.00

2 Engaging Laboureres and tractors for daily maitainance of emergency works inthe jurisdiction of Gandhi nagara circle. 8.00

3 Depot Collection in Gandhinagar Circle 2.00C) Water Supply

NilD) Maintenance of Under Ground Drainage

NilE) Flyover, Underpass & Grade Separators

NilIV. (Other Works)

A) Other Works1 Providing street sinage boards in Gandhinagar Circle 6.002 construction of garbage transit plant in Gandhinagar Circle 2.003 Construction of immersion tank for Lord Ganesh in Yelahanka Amani kere 10.00

11

Page 18: Programme_Of_Works_2008-2009

4 Improvements and Geometrical corrections at junction of Old town bus stopcircle in Gandhi Nagar 6.00

5 Maintenance of Byatarayanapura Zone Control Room Office 25.006 Providing Fencing and Drain Parrallel to Railway line in Gadhinagara Circle 8.00

Total 299.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings - B) Roads & Drains

1 Extending 1st main road of Maruthinagara by providing drain and formation ofroad from km 1.00 to 2.60 25.00

2 Construction of drains and formation of cross roads at Chokkanahalli noornagara village. 5.00

3 Construction of drain and formation of link road from Thirumenahalli toAgrahara village 20.00

4 Construction of drain and formation of main road and cross roads atKattigenahalli extension. 5.00

5 Construction of drain and formation of road at Bhadranna layout nearMaruthinagara 10.00

6 Improvements and Asphalting to Roads in Agrahara Layout 25.007 Improvements and Asphalting to Roads in Agrahara Village 9.008 Improvements and Asphalting to Roads in Kogilu Layout 30.009 Providing Concrete Roads in Chokkannahalli Village 6.00

10 Asphlting in Kattigenahalli Village 5.00C) Bridges & Culverts

1 Construction of culvert at Kogilu circle towards Kogilu Kannur road 10.00D) Side Walks & Ducts

NilE) Concrete Road

1 Providing and laying concrete roads at Aggrahara Layout 5.002 Providing and laying concrete roads at Kogilu Layout. 5.003 Providing and laying concrete roads at Venkatala village. 5.50

F) Water SupplyNil

G) Playground & Protection of BBMP Properties1 Protection to BBMP property at Dwaraka Nagar near storm water drain 10.00

II. (Maintenance Works)A) Buildings

1 Repairs and improvements to Kattigenahalli Panchayath offifce 1.502 Celebretion of National festivals/State festivals in Maruthi nagara sub division 3.00

B) Roads & Drains

1 Engaging Laboureres and tractors for daily mantenance of emergency works inthe jurisdiction of Kogilu circle. 12.00

2 Improvements drain and Asphalting at Maruthinagara 2nd and 3rd main roadsand cross roads of 7th to 15 at maruthi nagara. 12.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Maruthi Nagara Sub DivisionCircle: Kogilu

12

Page 19: Programme_Of_Works_2008-2009

3 Improvements drain and Asphalting at Maruthinagara From 16thcross to 25thcross roads at maruthi nagara. 10.00

4 Improvements to road and Asphalting to Bande Road at Kogilu layout. 13.00

5 Improvemants drain and Asphalting to Vinayakanaga 2nd main road atkattigenahalli panchayat.. 5.00

6 Improvements drain and asphalting to Roads in papanna layout. 7.00 Re-Construction of culverts at Aggrahara layout. 6.008 Improvements to Concrete road at palanahalli village. 3.009 Depot Collection in Kogilu circle 2.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Improvements and Geometrical corrections to Bagalur Circle in Kogilu Circlelimit 10.00

2 Providing street sinage boards in Maruthi Nagar and Kogilu Circle 6.003 Providing garbage transit plant in Kogilu Circle 2.00

4 Providing Grant-in-Aid to Schools During National & State Festivals in kogiluCircle Limit 1.00

Total 269.00

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

NilB) Roads & Drains

1 Improvements to cross rodas in Raghavendra Layout, Chikkavenkatappa Layoutof D.B. sandra. 10.00

2 Improvements to cross roads in Byrappa layout, Muneshwara Layout, D.B.sandra. 10.00

3 Improvements of Ramaiah Layout, Ayyanna Layout of RamachandrapuraVidyaranyapura Sub Division 10.00

4 Improvements of roads cross roads and main roads Bloom field garden, PillappaGarden in Ramachandrapura layout Vidyaranyapura Sub Division 10.00

5 Improvements of roads cross roads and main roads Kempanna layout, HanumanLayout of Ramachandrapura Vidyaranyapura Sub Division 10.00

6 Improvement to roads Velangani Layout, Mathru koti layout in VidyaranyapuraSub Division 10.00

7 Improvement to roads in Gangamma gudi circle of Vidyaranyapura Sub Division 10.00

8 Asphalting to cross roads in Chikkavenkatappa main road fromDoddabommasandra arch to Jurisdiction of Vidyaranyapura Sub Division 10.00

9 Asphalting to for Ramachandrapura main road to Gangammagudi circle inVidyaranyapura Sub Division 10.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Vidyaranyapura Sub Division

13

Page 20: Programme_Of_Works_2008-2009

10 Asphalting to cross roads and main roads of Gangamma gudi circle Velanganilayout and Mathukutti layout V.Pura Sub Division 10.00

11 Asphalting to cross roads and main roads of Devappa layout and Kempannalayout V.Pura Sub Division 15.00

12 Asphalting to cross roads and main roads of Nanjappa circle V.Pura SubDivision 18.00

13 Asphalting to cross roads and main roads of Bloom field garden and pillappalayout of V.Pura Sub Division 20.00

14 Asphalting to cross roads and main roads of Subbanna layout Nethaji layout andMuneshwara Layout in DB Sandra of V.Pura Sub Division 10.00

15 Asphalting to DBsandra main road from Nanjappa circle to BEL arch 10.00

16 Improvements to roads Doddabommasandra arch to Vidyaranyapura SubDivision Jurisidiction. 10.00

C) Bridges & Culverts

1 formation of foot path V.Pura main road to bloom field garden onfRamachandrapura main road in V.Pura Sub Division 6.00

2 formation of from Nanjappa layout to Ramachandrapura cross V.Pura main roadin V.Pura Sub Division 12.00

D) Side Walks & DuctsNil

E) Concrete Road

1 concrete roads near St.Philomina school D.B.Sandra Vidyaranyapura SubDivision 8.00

2 concrete road in AK colony of DB sandra of Vidyaranyapura Sub Division 8.00

3 improvements roads to old village of Ramachandrapura Vidyaranyapura SubDivision 8.00

4 Improvements roads to old village of Doddabommasandra Vidyaranyapura SubDivision 8.00

F) Water SupplyNil

G) Playground & Protection of BBMP Properties

1 Construction of compound wall of Sy.No:12 of Ramachandrapura inVidyaranyapura Sub Division 9.00

II. (Maintenance Works)A) Buildings

NilB) Roads & Drains

1 Repairs to roads and Culverts in Doddabommasandra Village 5.00C) Water Supply

NilE) Flyover, Underpass & Grade Separators

NilIV. (Other Works)

A) Other Works1 Providing Garbage transit plant in Doddabommasandra Circle 2.00

2 Improvements and Geometrical Corrections of Junction at Nanjappa circle, inDoddabommasandra Circle 5.00

3 Providing Street Signage boards, Ornamental boards in Attur Circle 8.504 Celebretion of National festivals/State festivals in Vidyaranyapura sub division 0.50

Total 263.00

14

Page 21: Programme_Of_Works_2008-2009

Sl. No. Name of Works Estimated Cost

(Rs. In Lakhs) 1 2 3

I. (Original Works)A) Buildings

1 Construction of Ward office/Subdivision office building in Defence layout atVidyaranyapura Sub Division 40.00

B) Roads & Drains

1 Asphalting to cross roads and main roads of HMT 1st block to 6th block V.PuraSub Division 32.50

2 Asphalting to cross roads and main roads of BEL layout 1st and 5th blockV.Pura Sub Division 24.00

3 Estimate for Improvements asphalting to Main road and cross roads inNarasipura 1st stage V.Pura Sub Division 15.00

4 Estimate for Improvements asphalting to Main road and cross roads inNarasipura 2nd stage V.Pura Sub Division 15.00

5 Estimate for Improvements asphalting to Main road and cross roads in BalajiLayout 1st and 2nd stage V.Pura Sub Division 15.00

6 Estimate for Improvements asphalting to Main road and cross roads in VishnaviLayout 1st and 2nd stage V.Pura Sub Division 10.00

7 Estimate for Improvements asphalting to Main road and cross roads in SrinidhiLayout 1st and 2nd stage V.Pura Sub Division 10.00

8 Estimate for Improvements asphalting to Main road and cross roads in TechersLayout V.Pura Sub Division 10.00

9 Estimate for Improvements asphalting to Main road and cross roads inRagavendra Layout V.Pura Sub Division 10.00

10 Estimate for Improvements asphalting to Main road and cross roads in M.S.Palya1st and 2nd stage V.Pura Sub Division 10.00

11 Estimate for Improvements asphalting to Main road and cross roads inVaradaraja Nagara 1st and 2nd stage V.Pura Sub Division 10.00

12 Estimate for Improvements asphalting to Main road and cross roads inVinayakaNagara Bharath Nagara 1st and 2nd stage V.Pura Sub Division 10.00

13 Estimate for Improvements asphalting to Main road and cross roads in Singapura1st and 2nd stage V.Pura Sub Division 10.00

14 Estimate for Improvements asphalting to Main road and cross roads in N.T.Ilayout to M.S palya 10.00

C) Bridges & CulvertsNil

D) Side Walks & DuctsNil

E) Concrete RoadNil

F) Water SupplyG) Playground & Protection of BBMP Properties

NilII. (Maintenance Works)

PROGRAMME OF WORKS FOR THE YEAR 2008-09 Yelahanka Division

Vidyaranyapura Sub DivisionCircle: Kuvempunagara

15

Page 22: Programme_Of_Works_2008-2009

A) BuildingsNil

B) Roads & Drains1 Demolition of Unauthorsied buildings/clearance in Vidyaranyapura Subdivision 2.00

2 Engaging Laboureres and tractors for daily maitainance of emergency works inthe jurisdiction of Vidyaranyapura Subdivision. 10.00

3 Repairs to Drains in Kuvempunagara Cross Roads 3.004 Repairs to Culverts in Diffence Layout 2.005 Patch repairs in Vidyaranyapura Subdivision 5.00

C) Water SupplyNil

D) Maintenance of Under Ground DrainageNil

E) Flyover, Underpass & Grade SeparatorsNil

IV. (Other Works)A) Other Works

1 Providing garbage transit plant in Doddabommasandra Circle 1.502 Providing street sinage boards in Kuvempunagar Circle 3.00

3 Improvements and Geometrical Corrections of Junction at Vidyaranyapuracircle, in Kuvempunagara Circle 3.00

4 Celebretion of National festivals/State festivals in Vidyaranyapura sub division 1.00Total 262.00

Zone Total 3290.00

A) 18% Programme

1 Construction of Low Cost Houses to SC / ST Beneficiaries in AmruthahalliCircle Limit (6 Nos.) @ Rs. 3.00 Lakhs Per Unit 18.00

2 Construction of Toilets at Janatha Colony, Bangarappa Colony, Byatarayanapura& Amruthahalli in Amruthahalli Circle Area 7.00

3 Improvements and Construction of Anganawadi Centres at Amruthahalli CircleArea 5.00

4 Improvements and Construction of Class Rooms at Bangarappa Colony inAmruthahalli Circle Area 10.00

5 Improvements and Construction of Community Centres in Amruthahalli CircleArea 7.00

6 Improvements to Roads in Byatarayanapura, Janatha Colony, BangarappaColony and Amruthahalli in Amruthahalli Circle Area 25.00

A) 18% Programme

1 Construction of Toilets at Thindlu A.K. Colony, Kodigehalli A.K. ColonyMaruthinagar, Saneevivinagar & B.B. Nagar in Sahakaranagar Circle Area 20.00

2 Improvements to the Existing Anganawadi Centre in Sahakaranagar Circle Area 7.00

3 Improvements to Schools and Construction of Compound Walls to GovernmentSchool in Kodigehalli & Kothi Hosahalli in Sahakaranagar Circle Area 20.00

4 Improvements to Roads in Thindlu A.K. Colony, Kodigehalli & B.B. Nagar inSahakaranagar Circle Area 25.00

A) 18% Programme

1 Construction of Low Cost Houses to SC / ST Beneficiaries in Dasarahallli CircleLimit (10 Nos.) @ Rs. 3.00 Lakhs Per Unit 30.00

BYTARAYANAPURA ZONEPROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

16

Page 23: Programme_Of_Works_2008-2009

2 Construction of 2 Nos. of Community Toilets Each in Jakkur Layout &Dasarahalli Colony in Dasarahalli Circle Limits 7.00

3 Construction of Anganawadi Centre in Hegdenagar, Dasarahalli Circle Limits 5.004 Construction of Class Room in Dasarahalli Circle Limits 5.00

5 Improvements and Construction of Community Centres in Dasarahalli CircleLimits 10.00

6 Improvements to Roads in Jakkur Layout A.K. Colony of Dasarahalli CircleLimit 15.00

A) 18% Programme

1 Balance Work of Basavalingappa Bhavan Nagawara in Nagawara Circle Limits 30.00

2 Construction of Toilets in Nagawara Circle Area 7.003 Improvements to the Existing Anganawadi Centres in Nagawara Circle Area 10.00

4 Construction of Community Centre at Basavalingappanagar in Nagawara CircleArea 20.00

5 Improvements to Harijan Burial Ground at Nagawara in Nagawara Circle Area 5.00

A) 18% Programme

1 Construction of Low Cost Houses to SC / ST Beneficiaries in Kothanur CircleLimit (7 Nos.) @ Rs. 3.00 Lakhs Per Unit 21.00

2 Construction of 2 Nos. of Community Toilets Each in Babusabpalya Colony,Horamavu Janatha Colony in Kothanur Circle Limits 7.00

3Improvements to the Existing Anganawadi Centres in Kothanur Circle Limitsand Construction of Anganawadi Centres in Chellkere & Kothanur in KothanurCircle Limits

11.00

4 Improvements and Construction of Class Rooms in Kothanur Circle Limits 10.00

5 Improvements and Construction of Community Centres at Chellkere, HoramavuAgara & Nagareshwara Nagenahalli in Kothanur Circle Limits 15.00

6 Improvements to Roads in Babusabpalya Colony of Kothanur Circle Limit 8.00A) 18% Programme

1 Acquring land for landless people in A - sector(Approximatly Rs 3.00 lakhs perbeneficiery) 30.00

2 Improvements to Roads and Drains in Slum Clearance Board Area inChikkabommasandra 21.00

3 Construction of Public Toilet block in Ambedkarnagar 9.00A) 18% Programme

1Construction of Houses For SC/ST In J P Nagara, AK,Colony, Puttanahalli,Kenchenahalli for 10 beneficiers 30.00

2Construction of Houses For SC/ST In MS Pallaya, Chikkabettahalli,Dodabettahalli 20.00

3 Construction of concrete roads in SC/ST Colony kenchenahalli, Nagenahalli 10.00A) 18% Programme

1 Construction of Samudaya bhavana in JP colony at Yelahanka 8.002 Construction of concrete roads in JP colony at Yelahanka 15.003 Construction of Community centre in AK colony at Yelahanka old town 7.00

4 Construction of houses beneficiaries at AK colony, AD colony, JP colony atYelahanka old town 30.00

III. (18% Programme )

1 Construction of new houses/Additions/Alterations etc for 10 beneficiers inAgrahara, Kogilu, Katigenahalli 30.00

2 Providing concrete roads in SC/ST colony at Agrahara village, Srinivasapuravillage 20.00

17

Page 24: Programme_Of_Works_2008-2009

3 Construction of Community hall in Kogilu village, Ambedkar nagara inKatigenahalli 10.00

A) 18% Programme1 Construction of concrete roads in Doddabommasandra. 14.002 Construction of individval toilets/Common toilets 5.003 Construction of houses in SC /ST Coliony of Doddabommasandra circle 24.004 Construction of community centre/Anganavadi in Doddabommasandra 10.00

5 Construction of class rooms to the governament school in Doddabommasandra 7.00

A) 18% Programme1 Construction of Community Hall/Anganavadi in Kuvempu nagara 5.002 Construction of concrete roads in Gangamma gudi area 15.003 Construction of houses in ST/SC colony in Kuvempu nagara 30.004 Construction of concrete roads in Singapura village 10.00

Total 720.00

Sl.NO NAME OF WORK ESTIMATED COST

(IN LAKHS)1 4 5I

Total 2.00

INSTALLATIONS OF 12 MTR HI-MAST LIGHTS IN THINDLU CIRCLE, BHADRAPPA LAYOUT ENTRANCE FROM RING ROAD CIRCLE 8.00

Total 8.00

NIL 0.00Total 0.00

II

OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER VIRUPAKSHAPURA SUB DIVISION AREAS - PACKAGE NO -1 22.00OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER VIRUPAKSHAPURA SUB DIVISION AREAS- PACKAGE NO.II 22.00

Total 44.00

IMPROVEMENTS OF STREET LIGHTS IN COFFYBOARD LAY OUT 1 TO 8 MAIN 4.00

IMPROVEMENTS OF STREET LIGHTS IN SAHAKAR NAGAR ALL BLOCK JUNCTIONS & CANARA BANK MAIN ROAD & CROSSES 4.00

IMPROVEMENTS OF STREET LIGHTS IN TATA NAGAR AREA 3.00IMPROVEMENTS TO STREET LIGHTS IN VIRUPAKSHAPURA & MV LAYOUT 1 TO 11 MAINS & CROSSES 5.00

ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL BUILDINGS UNDER VIRUPAKSHPURA SUBDIVISION 4.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09EXECUTIVE ENGINEER (PROJECT )

ELECTRICALDIVISION: BYATARAYANAPURA

A

B

2.00PROVIDING TUBULAR POLES & LINES TO PRAKRITI MEDOWS LANE.

C

A

B

18

Page 25: Programme_Of_Works_2008-2009

ELECTRICAL MAINTENANCE OF PARKS COMING UNDER BYATARAYANAPURA DIVISION 4.00

LIGHTING ARRANGEMENT FOR IMMERSION OF GANESHA IDOL IN DIVISION LAKES 1.50

Total 25.50

IMPROVEMENTS OF STREET LIGHTS IN AMRATALLI & JANATA COLONY 6.00IMPROVEMENTS OF STREET LIGHTS IN KG NAGAR, BB NAGAR, KOTI HOSAHALLI 6.00IMPROVEMENTS OF STREET LIGHTS IN JAKKURU VILLAGE& AK COLONY 7.00PROVIDING STREET & LINES TO THE KEMPAPURA & JANATA COLONY 6.00

Total 25.00Sub Total 104.50

I

INSTALLATIONS OF NEW LINES AND STREET LIGHTS TO THE HORAMAVU AGARA CIRCLE TO HENNURU MAIN ROAD 4.00INSTALLATIONS OF NEW LINES AND STREET LIGHTS TO THE KOTTANURU NARAYANPURA CIRCLE HEGDE NAGAR RASTROTHAN CIRCLE 4.00INSTALLATIONS OF NEW LINES AND POLES FROM GEDDALHALLI TO BAIRATI BANDE 20.00PROVIDING TUBULAR POLES & LINES TO I STAGE 3RD BLOCK HBR CREMETERY ROAD 2.00

Total 30.00

12 MTR HI-MAST INSTALLATIONS IN BDA COMPLEX HBR, SHIVAM HOSPITAL CIRCLE 2ND BLOCK HBR, 8.00

Total 8.00

UPGRADATION OF STREET LIGHTS IN MEGHANAPALYA ROAD FROM RING ROAD 2.50UPGRADATION OF STREET LIGHTS IN CHELEKERE ROAD FROM RING ROAD 2.50UPGRADATION OF STREET LIGHTS IN BABUSA PALYA ROAD FROM RING ROAD 2.50UPGRADATION OF STREET LIGHTS IN HENNURU ROAD FROM RING ROAD 2.00UPGRADATION OF STREET LIGHTS IN BABUSA PLAYA NANJAPPA GARDEN ROAD 3.00UPGRADATION OF STREET LIGHTS FROM DASARAHALLI CIRCLE TO BUVANESHWARI NAGAR MAIN ROAD 3.00

Total 15.50

C

A

B

C

19

Page 26: Programme_Of_Works_2008-2009

II

OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER THANISANDRA SUB DIVISION AREA PACKAGE - I 22.00OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER THANISANDRA SUB DIVISION AREA PACKAGE - II 22.00

Total 44.00

IMPROVEMENTS OF STREET LIGHTS IN HBR STREETS & LANES 3.00IMPROVEMENTS OF STREET LIGHTS IN DASARAHALLI I MAIN & CROSSES 3.00IMPROVEMENTS OF STREET LIGHTS IN GEDDALA HALLI MAIN ROAD & CROSS ROADS 4.00IMPROVEMENTS OF STREET LIGHTS FROM 80 FEET ROAD TO NAGARESHWAR NAGENALLI TO K.NARAYANPURA CIRCLE 2.4 KM LENGTH 4.00PROVIDING STREET & LINES TO THE HENNUR MAIN ROAD FROM HORAMAVU AGAR CROSS TO THE GEDDALHALLI(SRINIVAS TRADERS) 4.00IMPROVEMENTS OF STREET LIGHTS IN AMERJYOTI L/O,ASHWATHNAGAR & SARAYI PLAYA LAY OUTS 4.00ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL BUILDINGS UNDER THANISANDRA SUBDIVISION 4.00

Total 26.00

IMPROVEMENTS OF STREET LIGHTS IN HEGDE NAGARA STREET & LANES 8.00IMPROVEMENTS OF STREET LIGHTS IN BILISHIVALE & BAIRATI MAINS & CROSS ROADS 10.00IMPROVEMENTS OF STREET LIGHTS IN VADDAR PALYA,AK COLONY ETC 4.00

Total 22.00Sub Total 145.50

Grand Total (A) 250.00

Sl.NO NAME OF WORK ESTIMATED COST

(IN LAKHS)I

INSTALLATIONS OF NEW LINES & LIGHTS TO ATTUR LAY OUT 6.00Total 6.00

NILTotal

PROVIDING STREET LIGHTS & LINES IN NEW TOWN INDUSTRIAL AREA 4.00UPGRADATION OF STREET LIGHTS IN 'A'SECTOR YELAHANKA NEWTOWN 4.00UPGRADATION OF STREET LIGHTS IN 'B'SECTOR YELAHANKA NEWTOWN 4.00

Total 12.00

A

B

B

C

DIVISION: YELAHANKA

A

B

C

20

Page 27: Programme_Of_Works_2008-2009

II

OPERATION & MAINTENANCE OF STREET LIGHTS IN YELAHANKA UPANAGARA AREA PACKAGE – I 16.00OPERATION & MAINTENANCE OF STREET LIGHTS IN YELAHANKA UPANAGARA AREA PACKAGE - II 16.00

Total 32.00

ELECTRICAL MAINTENANCE OF PARKS COMING UNDER YELAHANKA SUBDIVISION 3.00

ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL BUILDINGS UNDER YELAHANKA NEWTOWN SUBDIVISION 5.00LIGHTING ARRANGEMENT FOR IMMERSION OF GANESHA IDOL IN YELAHANKA DIVISION LAKE 2.00

Total 10.00

IMPROVEMENTS OF STREET LIGHTS IN ATTURU VILLAGE 5.00Total 0.00

Sub Total 65.00I

PROVIDING TUBULAR ELECTRICAL POLES & STREET LIGHTS FROM KEMPEGOWDA CIRCLE TO YELAHANKA BUS STOP. 8.00

INSTALLATIONS OF NEW POLES & STREET LIGHTS FROM KATTIGENALLI CROSS TO RING ROAD SIGNAL OF KOGILU ROAD

8.00

INSTALLATION OF NEW CONTROL LINES & SWITCHES IN KATTIGENALLI VILLAGE AREAS LIKE CHAKKANALLI,VINAYAK NAGAR DWARAKANAGAR,THIRUMENALLI

8.00

Total 16.00

NIL - Total -

PROVIDING STREET LIGHTS IN YELAHANKA OLD TOWN AREA 6.00Total 6.00

II

OPERATION & MAINTENANCE OF STREET LIGHTS IN MARUTHI NAGARA SUB DIVISION AREA PACKAGE – I 25.00

Total 25.00

IMPROVEMENTS OF STREET LIGHTS IN MARUTINAGAR 1 TO 3 MAINS & CROSSES 8.00

IMPROVEMENTS OF STREET LIGHTS IN JUDICIAL LAY OUTS & ALLALSANDRA AREA 8.00

IMPROVEMENTS OF STREET LIGHTS IN GANTIGANALLI MAIN ROAD & ALL CROSSES 7.00

ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL BUILDINGS UNDER MARUTINAGARA SUBDIVISION 5.00

Total 28.00

A

B

C

A

B

C

A

B

21

Page 28: Programme_Of_Works_2008-2009

PROVIDING STREET LIGHTS, ELECTRIFICATION NEAR KOGILU LAYOUT NEAR COLONY 8.00

Total 8.00Sub Total 83.00

I

INSTALLATION OF NEW CONTROL LINES IN KUVEMPU NAGAR AREA 3.00

Total 3.00

12 MTR HI-MAST INSTALLATIONS IN SINGAPURA CIRCLE,NANJAPPA CIRCLE 8.00

Total 8.00

NIL - Total -

II

OPERATION & MAINTENANCE OF STREET LIGHTS IN VIDYARANYAPURA SUB DIVISION AREA PACKAGE – I 25.00

Total 25.00

IMPROVEMENTS OF STREET LIGHTS IN CHAMUNDESHWARI L/O 1 TO 10 CROSSES & MAINS 5.00

IMPROVEMENTS OF STREET LIGHTS IN HMT LAY OUTS 1 TO 6 BLOCK MAIN & CROSSES 6.00

IMPROVEMENTS OF STREET LIGHTS IN AMS LAYOUT 1 TO 4 MAINS & CROSSES 4.00

IMPROVEMENTS OF STREET LIGHTS IN LAKSHMIPURA & DODDABETTALLI MAIN ROAD 5.00

PROVIDING AND FIXING OF SODIUM VAPOUR LIGHTS AT SINGAPUR MAIN ROAD FROM AIRFORCE OFFICE GATE TO SINGAPUR CIRCLE TO MS PALYA CIRCLE

7

ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL BUILDINGS UNDER VIDYARANYAPURA SUBDIVISION 5

IMPROVEMENTS OF STREET LIGHTS IN BEL 1 TO 6 BLOCK MAIN ROADS & CROSSES 4.00

Total 36.00

IMPROVEMENTS OF STREET LIGHTS IN SINGAPURA OLD VILLAGE VARADARAJANAGARA, VINAYAKA NAGAR 11.00

IMPROVEMENTS OF STREET LIGHTS IN MS PALYA & SRINIDHI LAYOUT CROSS ROADS & GRAM THANA AREA. 8.00

IMPROVEMENTS OF STREET LIGHTS IN RAMACHANDRAPURA L/O & MAINS & AK COLONY 11.00

Total 30.00Sub Total 102.00

Grand Total (B) 250.00

Grand Zone Total 4510.00

C

A

B

C

C

A

B

22

Page 29: Programme_Of_Works_2008-2009

Sl No Name of Work Estimate Cost1 Development and asphalting to main road, Devarabisanahalli 58.002 Development of road from Yamalur tank waste wier to Kareyammana Agrahara 25.00

3 Improvements of Belendur tank bund road 6.004 Development of Tulasi Theater road at Marathahalli 10.005 Improvements to road from ring road to Munekolala village via S.J.R. College 50.00

6 Improvements to road from HAL compound to Belendur Kere kodi 25.007 Improvements to road from Samudaya Bhavana to Basava Nagara main road

(Vibhuthipura main road) 50.00

8 Improvements to road from Varthur road to Eshwara Temple at Marathahalli (Chowdeshwari Temple road)

20.00

9 Improvements to road from Vignanagara main road from Kaggadasapura main road to Basavanagara Bus stand

65.00

10 Improvements to Ramesh Nagara main road 10.0011 Developments to Jagadish Nagara main road 25.0012 Improvements to Abbayya reddy layout main road 15.0013 Improvements to roads and drains at Vinayaka Nagara 17.0014 Improvements to roads and drains at Veerabhadra Nagar and Thalakaveri

Nagara) 15.00

15 Improvements to roads and drains at Annasandrapalya 10.0016 Development of Marathahalli, Sanjaya Nagara loop road 15.0017 Development of Jagadish Nagara to Jyothi Nagara loop 10.0018 Improvements to Ashwath Nagara cross roads 10.0019 Construction of RCC rain water drain lead up to SWD in Kalappa layout main

road 10.65

20 Providing and laying Asphalting of Yamalur to Kempapura road 20.0021 Providing RCC drain at Kere kodi S.T.P. to Railway track at Panathur 15.0022 Providing and Construction of road divider and footpath walk –way at Kundala

halli Gate Circle (Marathahalli Varthur main road )10.00

24 Improvements to roads and drains at L.B.Shastri Nagara 10.0025 Improvements to roads and drains at Shivananda Nagara 8.0026 Construction of RCC drain at Near Sree Rama Temple at Panathur main road 4.0027 Construction of Star motor drain from BWSSB treatment plan to K.C. valve 20.0028 Construction of RCC culverts and drain at Boganahalli road 6.0029 Improvements to roads and drains at P.R. Layout 10.00

1 Providing side walks to Yamalur main road 15.001 Providing Barbad wire fencing to Yamalur Burrial ground 5.002 Providing Barbad wire fencing to Challagatta Burrial ground 3.003 Providing Barbad wire fencing to Ashwath Nagar Burrial ground 3.004 Providing Barbad wire fencing to Panathur Burrial ground 5.00

MAHADEVAPURA ZONEPROGRAMME OF WORKS (POW) 2008-09 Marathhalli division

( WORK PROPOSED FOR 2008-09)

23 Improvements to roads and drains at Islampura 10.00

23

Page 30: Programme_Of_Works_2008-2009

1 Repairs and maintance to Samudhaya Bhavana at Yamalur 1.002 Repairs and maintance to Samudhaya Bhavana at B.Nagasandra 1.00

4 Repairs and maintance to Govt Higher Primary School at Marathahalli 1.005 Repairs and maintance to Govt Higher Primary School at Challaghatta 1.006 Repairs and maintance to Govt Higher Primary School at Annasandrapalya 1.00

8 Repairs and maintance to Govt Higher Primary School at Islampura 1.009 Repairs and maintance to Govt Higher Primary School at Devarabisanahalli 1.00

10 Repairs and maintance to Govt Primary School at Balagere 1.001 Desilting of Tresery drains at HAL Area 5.002 Desilting of Tesery drains at Marathahalli Area 5.003 Desilting of Tesery drains at Panathur Area 3.004 Engaging road Gang and Tractor at HAL Area 2.005 Engaging road Gang and Tractor at Marthahalli Area 2.006 Engaging road Gang and Tractor at Panathur Area 2.007 Depo Collection of metal and gravel for pot hole filling at Marathahalli Sub-

division 5.00

8 Prahari maintanece in emergency 6.009 For unuthorised building demolition 4.001 Providing Sighn boards for BBMP works progress and divertion of roads at

Marathahalli sub-division 6.00

2 Providing and fixing sighn boards at Street/roads at Marathahalli sub-divisionArea

10.00

Sub Total 650.25Mahadevapura Sub-division,

I. Original Works Sl No Name of the Work Est.Cost

A.Building works - NilB. Construction of Roads and drains

1 Construction Main roads and cross roads in Pai layout 30.002 Construction of drain beside of Selam railway track upto Rajakaluve in Pai

layout.29.00

3 Construction of road from Anugraha layout main road to Ring road (via Swarnadhama layout)

15.00

4 Construction of road from Doddanekundhi Railway track to Marathally main road

20.00

5 Construction of road and drains in Hemanthanagara and Anandanagara of Chinnappanahally

20.00

6 Construction of the RCC drain in Doddanekundhi Village 15.007 Construction of RCC drain and road in Ramanjaneya layout of Chinnappanahally 20.00

9 Construction of the road from Garudacharpalya to RHB Colony 10.0010 Construction of the road in Ramakka layout 10.0011 Construction of the RCC drain in main road of Mahadevapura village 15.0012 Widenting and Construction of the Hoody main road from ITPL main road to

Hoody railway gate 30.00

Sl. No.

7 Repairs and maintance to Govt Higher Primary School at Vibhuthipura 1.00

8 Construction of RCC drain and road in Chinnappanahally Village 15.00

Maintainance Works

3 Repairs and maintance to Aganawadi Building at Devarabisanahalli 0.60

24

Page 31: Programme_Of_Works_2008-2009

13 Construction of cross roads and drains in Hoddy village 10.0014 Construction of the RCC drain and road in Nagappa layout and Sitaramapalya in

Basavannanagara20.00

15 Construction of roads and drains of Singaianapalya main roads 20.0016 Construction of main roads and cross roads in Industrial area Singainapalya 20.0017 Construction of road and drain in SRR layout and KGF Munireddy layout 20.0018 Construction of road and drain in Baddi Krishnappa layout 20.00

339.00Sl No Name of the Work Est.Cost

C. Culverts and Bridges1 Construction of RCC culverts in Garudacharpalya and RHB Colony 5.002 Construction of RCC culverts in Mahadevapura village and Layout. 3.003 Construction of RCC culverts in cross road of Hoody village and Thigarapalya 3.00

5 Construction of RCC culverts in cross road of Udayanagara 2.006 Construction of RCC culverts in cross road of A.Narayanapura 2.00

18.00D. Side walks and Ducts - Nil -E. Cement Concrete Roads – Nil -F. Water Supply Nil -G. Fencing of Play ground and BBMP Assets

1 Fencing of Burrial ground in Singaiana palaya 2.002 Fencing of Burrial ground in B.Narayanapura 2.00

4.00II. Maintenance Works

Sl No Name of the Work Est.CostA. Buildings

1 Repairs and maintenance of Samudaya Bhavana inA.Narayanapura 1.002 Repairs and maintenance of Anganavadi Building in Kundalahallly 1.003 Repairs and maintenance of Anganavadi B uilding in Chinnappanahally 1.004 Repairs and Annual maintenance of Anganavadi Building in Garudacharpalya 1.005 Repairs and Annual maintenance of Samudaya Bhavana and Anganavadi in

Kaverinagara 2.00

6 Annual Maintenance of the Mahadevapura Range office and sub-division office 10.00

7 Repairs and maintenance of Anganavadi Building in Andhra colony 1.0017.00

B. Maintenance of Roads and drains1 Asphalting of main road from A.Narayanapura main road from New light to

DRDO Compound.75.00

2 Asphalting of main road of AECS layout and ABC Block of Kundalahally 50.003 Engaging of road gange labours and hireing of tractor for maintenance of roads

and drains in Mahadevapura sub-division15.00

4 Asphalting of main and cross roads in Mahadevapura Village 35.005 Asphalting of main and cross roads in Hoody Village 30.006 Improvements of roads and drains in Baddi Krishnappa layout and Gangamma

Layout 10.00

215.00

4 Construction of RCC culverts in cross road of Kaverinagara 3.00

25

Page 32: Programme_Of_Works_2008-2009

C. Side walk and ducts - NilD. Water supply and Underground drainage

1 Maintenance of UGD line in MEG layout 2.002 Maintenance of UGD line in AECS layout Kundalahally 5.003 Maintenance of UGD line in Singaina playa and Industrical area 8.00

15.00E. Subways, Fly overs, and drains under pass - NilF. Other works

1 Construction of Welcome arch at Entrance of Mahadevapura Zonal office 4.002 Desilting of drains in Mahadevapura Sub-division area 10.003 Construction of Vehicles Shed in Mahadevapura Zonal Office 10.004 Providing and fixing of Sign boards in Mahadevapura Sub-division area 8.00

32.00Sub Total 425.00

I. Original WorksSl.No Name of the Work Est. Cost

A. Build Works Nil Nill

1 Construction of roads and drains of Edga road, Chowdeshwari road andVinayaka layout and Halasahally road

30.00

2 Construction of roads and drains in Madhuranagara Village 26.003 Construction of roads and drains Vinayaka layout, Bairappa layout of Whitefield 10.00

4 Construction of roads and drains in Ward No. 19 Kadugodi 20.005 Construction of roads and drains in Kodigehalli Village 30.006 Construction of main road and cross roads in Vijayanagara 25.007 Construction of main road and cross roads in Immadhihalli 15.00

9 Construction of main road and cross roads &Tubarahalli playa main road,Tubarahalli Village

25.00

10 Construction of main road and cross roads in Siddapura 40.0011 Construction of main road and cross roads in Ramgondanahalli 20.0012 Construction of roads and drains from Siddapura gate to Nellurahalli 40.0013 Construction of Burrial ground Compound wall in Vijaynagar 15.0014 Construction of Compound wall to BBMP land at Amedkar gutta 10.0015 Construction of main road and cross roads and drains at Karumariyamma temple

road10.00

16 Construction of RCC Covering slab and drain improvement at Inner circle andother circle

6.00

337.00

1 Construction of RCC culverts in Madhuranagara 5.002 Construction of RCC culverts and cross roads in Kadugodi Village 5.003 Construction of RCC culverts in Gandhipura cross roads 5.004 Construction of RCC culverts between Ramgondanahalli main road to

Narayanapura road5.00

5 Construction of RCC culverts and drain improvement in Post office road Whitefield

3.00

23.00

8 Construction of main road and cross roads in Hagaduru 15.00

MAHADEVAPURA ZONE, WHITEFIELD SUB-DIVISION

26

Page 33: Programme_Of_Works_2008-2009

Nil ----

1 Construction cement concrete road in Bairappa layout 5.002 Construction cement concrete road in Gandhipura 5.003 Construction cement concrete road in Ramgondanahalli village 20.004 Construction cement concrete road in Gunjur playa (Jogi colony) 20.00

50.00

1 Fencing of vacant land in Siddapura Gate 1.502 Fencing of vacant land in Hosahalli 1.503 Fencing of government land in Ambedkar gutta 2.00

5.00II. Maintenance Works

Sl.No Name of the Work Est. Cost

1 Repairs and Annual Maintenance of Anganavadi Buildings in Beltur and Beltur Colony

2.00

2 Repairs and Annual Maintenance of Anganavadi Buildings in Varthur village 2.003 Repairs and Annual Maintenance of Anganavadi Buildings in Pattanduru

agrahara1.00

5.00

1 Asphalting of main road and cross road Prashanth Layout 30.002 Asphalting of cross roads in Inner Circle and Outer 30.003 Asphalting of main roads & cross road in BEML Layout and Tubarahalli 50.004 Asphalting of main and cross roads in Kumbena Agrahara and Sadaramangala

Village30.00

5 Asphalting of main and cross roads in IInd main and IIIrd main of Gandhipura 25.006 Asphalting of main and cross roads Maithry layout 29.007 Engaging of road gange labours and hireing of tractor for maintenance of roads

and drains in Whitefield Sub-Division10.00

204.00

Nil ----

Nil --

Nil ----

1 Providing and fixing of Sign boards in Whitefield Sub-Division 10.002 Desilting of drains in Whitefield Sub-Division area 10.003 Engaging Prahari equpments and mechanaries and labours 6.004 Enforcement charges for demolistion of unauthorised constructions in BBMP

lands 5.00

31.00

656.001 Samparka Kendra at K.R.Puram

2Construction of temporary garbage handling plat form at near BWSSB Treatment plant K.R.Puam 10.00

F. Other works

MAHADEVAPURA ZONE, KR PURAM SUB-DIVISION

A. Buildings

B. Maintenance of Roads and drains

C. Side walk and ducts

D. Water supply and Underground drainage

F. Water Supply Nil

27

Page 34: Programme_Of_Works_2008-2009

Pipe Line

3Providing pipe line for ducting NH-4 Bhattarahalli to Anandapura via T.C.Palya 25.00

4 Providing pipe line for ducting NH-4 to Hoodi Railway gate ( Shanthi Nagar ) 25.005 Providing pipe line for ducting NH-4 to Bhattarahalli G.C.C. College 19.00

6Providing pipe line for ducting NH-4 Ayyappa Nagar Circle via Chikka Basavanapura 19.00

7 Traffic development works 10.008 Providing of signage Boards at K.R.Puram Sub-Division Area 6.009 Protection of BBMP Property with Barbed wire / Chain link fencing 15.00

10Providing of Tractor & Gangmen for Help centre in K.R Puram Sub-Division Limits 20.00

11 Demolition of unauthorised & Enchroached structures 5.0012 Toilet blocks & removal of night soil in soak pits in Govt office 1.00

Prahari arrangement in emergency 6.00Demolition of unauthorised & Enchroached structures 6.00

Roads

13Providing Metalling & Construction of Culverts at Thippaiah Layout Krishna Nagar 7.00

14 Metalling & Asphalting to Masjid road in Devasandra 20.00

15Construction of SSM drains to the road from Hoodi Burrial Ground to Ayyappa Nagar 22.00

16Providing SSM Drain & Metalling and Construction of Culvert Shanimahathama Temple road in Devasandra 18.00

17 Metalling and Construction of Culvert in Vijaya Bank Colony & Krishna Nagar 20.00

18Providing SSM Drain at down Streem side at waste weir Chikka Basavanapura Over Head Tank 5.00

19 Metalling and Construction of Culvert in Gayathri Layout 2nd Stage 15.0020 Metalling and Construction of Culvert in Ekthanagar 5th Cross Road 10.00

21 Providing Metalling and Construction of Culvert in Lakshmipura Layout in Devasandra 5.00

22 Providing Metalling and Construction of Culvert in Manjunatha ayout in Devasandra 15.00

23 Providing Metalling and Construction of Culvert in R.R.Temple Area road 20.00

24 Providing Metalling and Construction of Culvert in R.R.Layout & Muneshwara Layout 12.00

25 Providing Metalling and Construction of Culvert in Priyadarshini Layout 10.0026 Widening of T.C.Palya Main road ( Balance length ) 60.00

27 Providing roads & drains From K.R.Puram to T.C.Palya ( Balance length ) 30.00

28Providing roads & drains From Manjunath Layout Sunshine Layout of Anandapura 15.00

29 Providing roads & drains of Venkateshwara Tent Road ( Balance length ) 15.0030 Providing roads & drains of ITI Compound to Anandapura Road 25.00

31 Providing Drainages formation of road metalling & Asphalting at Shanthinikethan & Adjecent Layout 35.00

32 Providing Asphalting to road from NH4 to Medahalli Border ( ) 15.0033 Providing Metalling & Asphalting to road and drain in Vinayaka Nagar 20.00

28

Page 35: Programme_Of_Works_2008-2009

34 Providing Metalling & Asphalting to Nrupathunga road in Bhattarahalli 25.0035 Providing Asphalting to roads at Banashankri Layout 25.0036 Providing Metalling & Asphalting to roads at Bhattarahalli Village limits 25.0037 Providing Metalling to roads at Medahalli Village limits 20.00

Sub Total 656.00

S.No Name of Work Amt in lakhs (a) Building Works

1 Construction of Library Building at kalkere 3.00 Total Rs 3.00

(b)Roads and Drains

1Improvements and Asphalting to vivekananda road From R.M.Nagara main road to Shanthilayout road in Ramamurthynagara 25.00

2Improvements and Asphalting to Khrishthaking school road,Kamadenu road in Ramamurthynagara 20.00

3Improvements to roads at Sir M.V.Nagar 1st block and 2nd blockin Ramamurthynagara 35.00

4Improvements and Asphalting to Ghandiji road and Lakshmi theater road and upto Balaji street road and cross roads in Ramamurthynagara 40.00

5Improvements and Asphalting to Muninanjappa layout and yerraiahnapalya mainroad and garden street and Piramid Show room road in Ramamurthynagara 30.00

6Improvements to Roads and drains from Shanthi layout to Yoginarayana Ashrama in R.M.Nagara. 30.00

7Construction of drains, culverts and Improvements to roads at Kotthur main road and cross roads in Vijinapura 15.00

8Improvements and Asphalting to roads and drains at I.T.I Layout main road and cross roads in Vijinapura 10.00

9 Improvements to roads and drains at O.H.T.Area and A.& B.blocks in Vijinapura 15.00

10Improvements to roads and drains at chinnappa layout and sheshappa colony roads and opp-F.C.I.main road in Vijinapura 14.00

11 Improvements to roads and drains at S.P.Naidu layout cross roads in Vijinapura 20.00

12Improvements and Asphalting to roads and drains at kuvempunagara and R.R.Layout roads in Vijinapura 10.00

13Improvements and Asphalting to roads and drains at Chandrashekara Layout roads in Vijinapura 10.00

14Improvements and Asphalting to roads at Brundavanlayout and old kotthur area in Vijinapura 20.00

15Construction of culverts,drains and Improvements to mother Theresa school main road of varanasi. 15.00

16 Improvements to roads and drains from kanakanagara to k.channasandra 10.00

17Improvements and Asphalting to Horamavu main road from outer ring road to horamavu border 98.00

18Improvements and Asphalting to Kalkere main road via N.R.I Layout in Horamavu 30.00

19 Providing drains and culverts and Improvements to Shakthi nagara main road and cross roads in Horamavu. 10.00

MAHADEVAPURA ZONE, RAMAMURTHYNAGAR SUB-DIVISION

29

Page 36: Programme_Of_Works_2008-2009

20

Providing Hume pipe culverts and Improvements and Asphalting to roads ,drains at babusabpalya main road (V.V.Choultry road) and cross roads at Kalyananagara H.R.B.R.layout 35.00 Total Rs 492.00

(c) Protection of B.B.M.P.Property (Capital works )

1Providing B.S. slab Compound wall to Existing Govt land near Horamavu Jayanthigrama. 9.00

2Providing B.S. slab Compound wall to Existing burial ground near Horamavu lake in Jayanthi grama 6.00 Total Rs 15.00

(d) Building Works ( Maintenance Works )1 Annual Maintenance and Repairs of Community halls(4nos) at R.M.Nagara 0.50

2Annual Maintenance and Repairs,Painting of Horamavu office buiding & kalkere commercials shops buiding 0.50 Total Rs 1.00

(e) Capital works (Other Works )1 Construction of Garbage center and Handling of Garbage 10.00

2Providing Pipe Line to ducting main roads and cross roads in R.M.Nagar sub division 93.00

3 Providing Sign Boards, Banners and Flex boards, Caution boards, 6.00

4Dismantling of Buildings and Compounds,Sheds, Enchroachment of footpaths R,M,Nagara sub-Division 6.00

5 Providing Gangmens and tractor in R,M,Nagara Area 5.006 Providing Gangmens and tractor in Vijinapura Area 5.007 Providing Gangmens and tractor in Horamavu Area 5.00

8Hiring of J.C.B/Troctor/Gangmans/ machenories For flood Damage works and Emergency works 2.00

9 Traffic Develovpemental works for Barricading,shoulders, medians. 10.0010 IIIumination on special occasion in R.M.Nagara sub division 1.00

Prahari arrangement in emergency 6.00 Total Rs 149.00Total 3046.25

Name of work Estimated

Cost in (Lakhs)1 Rehabiliatation works 72.002 Construction of Anganawadi Centre at Seegehalli in K.R Puram 12.003 Construction of Anganawadi Centre at Bhattarahalli in K.R Puram 12.004 Construction of Class rooms at Seegehalli in K.R Puram 7.005 Construction of Class rooms at Bhattarahalli in K.R Puram 7.006 Construction of cement concrete road at Jyothi Nagar in K.R.Puram 8.007 Construction of cement concrete road at Parvathi Nagar in K.R.Puram 8.00

8 Construction of cement concrete road at Chikka Basavanapura in K.R.Puram 4.009 Construction Community Hall at Priyanka nagar 14.00

10 Construction of Community Center in Kaverinagara 5.0011 Construction of School building at Kaverinagara 20.0012 Purchasing of land for rehabitation of SC & STs 72.0013 Construction individual Toilet for SC, STs 14.0014 Construction of the Cement Concrete road in A.Narayanapura old village 8.00

PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR MAHADEVAPURA ZONE

30

Page 37: Programme_Of_Works_2008-2009

15 Construction of the Cement Concrete road in Kaverinagara 5.00

16Construction of the Cement Concrete road and drain in A.K.Colony of Doddanekundhi

8.00

17Construction of the Cement Concrete road and drain in A.K.Colony of Singainapalya

4.00

18 Developments of road in A.K.Colony of Hoody Village. 9.0019 Reserved for purchase of land Rehabilition of S.C., S.T Houses 72.0020 Upgradation of Sulab Sowchalaya at Ambedkar Nagara (Jagadish Nagara) 5.0021 Construction of Sulab Sowchalaya at Devarabisanahalli 8.0022 Repairs to Aganwadi Centres at Balagere Village 1.0023 Construction of Aganwadi Centres at Vibhuthipura 4.0024 Construction of Aganwadi Centres at Kadubisanahalli 4.0025 Construction of Aganwadi Centres at B.Nagasandra 4.00

26Major repairs to Nallurpura Govt. School Building (Jagadesh Nagar) main road 5.00

27 Repairs & maintance of Govt. School 1.5028 Repairs & maintance of Govt. School building at Devarabisanahalli 1.0029 Repairs & maintance of Govt. School building at Kadubisanahalli 1.0030 Repairs & maintance of Govt. School building at Sanjay Nagar 1.5031 Repairs & maintance of Samudhaya Bhavana at Devarabisanahalli 1.0032 Repairs & maintance of Samudhaya Bhavana at Vibhuthipura 1.5033 Repairs & maintance of Samudhaya Bhavana at B.Nagasandra 2.0034 Repairs & maintance of Samudhaya Bhavana at Munekolalu 2.00

35Construction and Improvements to Samudhaya Bhavana at Manjunatha Nagara 6.00

36 Repairs & maintance of Samudhaya Bhavana at Kadubisanahalli 1.50

37Providing Concrete roads at Kadubisanahalli S.C. Colony ( 1st and 2nd Crossroads)

38 Providing Concrete roads at Kadubisanahalli S.C. Colony ( 1st and 2nd Cross road 8.0039 Providing Concrete roads at Vibhuthipura S.C. Colony 7.0040 Providing Concrete roads at Manjunatha Nagara Cross roads 7.00

41Construction of Additional class rooms to Existing Primary and higer Primery School building at Ambedkarnagar in R.M.Nagara. 12.50

42 Repairs to Primery scholl building at Jayanthigrama of Horamavu 1.5043 Purchase of land for Rehabitations 72.0044 Construction and repairs of Anganawadi centers 10.00

45 Construction of Community halls in Horamavu Jayanthigrama of R.M.Nagara Sub-Division 14.00

46 Providing cement concrete road to Ambedkarnagar cross roads in R.M.Nagara 14.0047 Providing cement concrete road to Ambedkarnagar cross roads in vijinapura 10.00

48Providing cement concrete road to kalkere & Horamavu S.C/S.T. colony cross roads in R.M.Nagara 6.00

49 Purchasing of land for rehabitation of SC & ST peoples 72.0050 Construction of individual toilets for SC & ST 14.0051 Construction of School building at Ambedkar Gutta 14.0052 Construction of Aganawadi building at Tubarahalli Colony 5.0053 Construction of Aganawadi building at Gandhipura 5.0054 Construction of the drains in Harijana Colony in Gunjur Palya 10.0055 Construction of the road & drain in Pattandur Agrahara colony 10.0056 Construction of the Cement concrete road in Tubarahally Colony 15.00

Total 718.00

31

Page 38: Programme_Of_Works_2008-2009

ELECTRICALMAHADEVAPURA

Sl.No

1 Providing New street light fittings in HAL Area 15.002 Providing New street light fittings in Marathahalli Area 15.003 Providing New street light fittings in Panathur & Bellendur Panchayat Area 15.004 Shifiting of Electric poles at existing lines in Marathahalli Area 5.005 Replacement of U.G Cable and New poles at New lines in Marathahalli Area 10.006 Instalation of Himast street light 10.001 Operation and Maintances of street light fittings in Marathahalli Sub-division

Area 30.00

Mahadevapura Sub-division,1. Original works

a. New lines Street lights (Extension of street lights and Providing of new Electric poles and new fittings)

6.00

b. Replacement of UG Cable and repair of Street light of MS Pole from Doddanekundhi road to Marathahally road

10.00

c. Providing and laying UG Cable and Street light from KAIDB main road to Rayan School

25.00

d. Repairs and replacing of UG cables and street light of MS Poles of Chinnappanahally main road

10.00

51.00e. Providing and fixing Highmast light (10 to 16 mtr)

1. Garudacharpalya Circle 1 no 4.002. Mahadevapura 1 no 4.003. Chinnappanahally 1 no 4.00

12.00f. Up gradation -

2. Operation and Maintenancea. Operations and Maintenance of street light fittings 40.00b. Providing street light fittings - Sodium fittings 10.00c. Building electrical Management 0.50d. Illumination on special occasion 1.00

51.50

Sl.No Name of the Work Est. Cost

a. Supply and fixing of Street ligths in Whitefield Sub-Division area 30.00b. Replacement of UG Cable and related works for MS pole streetligths in Sai

Asharama to Sadaramangala, GE road, Borewell road, Nallurahalli, AmbedkarGutta, Hagaduru, ECC road, Vijaynagara, Immdhihalli & Kadugodi

20.00

c. Installation Of Himasts In whitefield subdivision 10.00d. Shifting of poles and BESCOM deposit in Whitefield Sub-Division 5.00e Emergency works in whitefield Subdivision 2.00

67.00

a. Operations and Maintenance of Street light fittings 32.00b. Maintenance of building and other electrical installations in Whitefield sub

division1.00

33.00

1. Original Works

2. Operation and Maintenance

Name of Work Estimate Cost

MAHADEVAPURA ZONE, WHITEFIELD SUB-DIVISION

32

Page 39: Programme_Of_Works_2008-2009

K.R.Puram Sub-Division Mahadevapura Zone BangaloreElectrical Work

pital WorSupply and fixing of streetlights in K R Pura sub division. 20.00Supply and replacement of streetlight fittings in K R Pura sub division. 5.00Building electrification improvement works in K R Pura sub division. 1.00Pole Shifting and Bescom Deposits in K.R Puram sub division 5.00 Installation of hi-masts in K R Pura Sub-division 12.00Cable replacement works for MS Pole streetlights in Seegehalli to Bhattarahalli and Seegehalli to Kodige halli main road

8.00

Cable replacement works for MS Pole streetlights in Ayappa Nagara to Bhattara halli and Ayappa Nagara to Devasandra Main road

7.00

Emergency works in K.R Puram sub division 2.00aintainan Operation and Maintenance of Street lights in K R Pura Sub-division 38.00

Maintenance of building and other electrical installations in K.R Puram sub division

2.00

Sub-Total 100.00Ramamurthynagara Subdivision

Capital works1 Supply and fixing of streetlights in Rammurthi Nagara sub division. 30.002 Supply and replacement of streetlight fittings 5.003 Building electrification improvement works 1.004 Pole Shifting and Bescom Deposits in Rammurthi Nagara sub division 5.005 Installation of hi-masts in Rammurthi Nagara Sub-division 12.006 Cable replacement works for MS Pole streetlights in Akshya Nagar to Koshi

Hospital Road.5.00

7 Cable replacement works for MS Pole streetlights in Rammurthy Nagar Main road and Naidu Layout roads.

5.00

8 Emergency works in Rammurthi Nagara sub division 2.00

9 Operation and Maintenance of Street lights in Rammurthi Nagara sub division. 33.00

10 Maintenance of building and other electrical installations in Rammurthi Nagara sub division

2.00

Total 100.00Sub Total 514.50Grand Total 4500.00

Maintenance Works

33

Page 40: Programme_Of_Works_2008-2009

CAPITAL WORKS1 Construction of compound wall to Burial ground at Bellandur village 15.002 Construction of HSR Sub Division Bldg at HSR Layout 30.00

3 Construction of School Buildings at Arakere BDA Road Near Vyshya BankCircle 15.00

4 Construction of School Rooms at Weavers Calony Gottigere 15.005 Construction of Puttenahalli sub divisional Office 30.006 Construction of Ward Office in the place of Konanakunte Panchayathi Office. 30.00

Total 135.00

1 Providing 4 culverts , metaling the remaining 2 cross roads and asphalting toroads of Green Glen Layout in Bellandur village. 60.00

2 Providing metaling, asphalting to road near Ramesh redy house, Yallamma andMunireddy house, road in Bellandur village. 30.00

3Providing side Drain , construction of culverts ,Metaling and Asphalting to roadfrom ring road to Munireddy house , sunrise villa road and Pearl apartment roadin Bellandur village.

40.00

4 Providing cement concrete to lane roads from Sweet well water road to AngalaParameshwari temple in Bellandur village 10.00

5 Providing side drain, culvert, metaling and asphalting to road from Ring road toJanaradhana Reddy house in Bellandur village 20.00

6Providing side Drain , construction of culverts ,and metaling , Asphalting inAmbalipura Janajiva apartment road and Bekary road and 2 cross road atAmblipura village

30.00

7 Providing drain, culvert and foot path paving , kerb stones to the road from outerring road to shahi garments at Ambalipura. 80.00

8Providing and refixing side Drains , construction of culverts ,Metaling ,Asphalting to transformer factory road and two adjacent roads in Sarjapura roadat Ambalipura village.

25.00

9Providing and widening side Drain , construction of culverts , Asphalting indoddakanahalli main road from Gear college to Kadabissanahalli road atDoddakanelli village .

73.00

10Providing asphalting to 2 roads in front of Anjanadri School and left side road ofGovernment hostel and left side 3 roads of Doddakannelli main road near wardoffice

10.00

11Providing side Drain , construction of culverts , Asphalting from Sarjapura mainroad to Narayana reddy house in Junnasandra village.( from 0 - 240 m chainageand 590m-1500m chainage)

45.00

12 Providing side Drain , construction of culverts ,Metaling , Asphalting at TulasiLayout 1st & 2nd cross roads at Kasavanahalli village. 25.00

13Providing side Drain , construction of culverts ,Metaling , Asphalting to 1st,2nd, 3rd main and 1st, 2nd, 3rd, 4th Cross roads Velliyamma Layout atKasavanahalli village .

45.00

14 Providing asphalting to 5th main road in Ibbluru village 6.50

15 Providing to road infront of La Casa hotel 1st, 2nd and 3rd cross roads inKasavanahalli village 8.00

Bruhath Bangalore Mahanagar PalikeBOMMANAHALLI ZONE

PROGRAMME OF WORKS (POW) 2008-09( WORK PROPOSED FOR 2008-09)

Sl No Name of work Estimate cost (in lakhs)

34

Page 41: Programme_Of_Works_2008-2009

16 Providing drains construction of culverts, metalling and asphalting to roads at 1st, 2nd Cross, Isha Mazid Road at Mangammanapalya. 30.00

17Providing drains construction of culverts, metalling and asphalting to roads at 1st and 2nd Cross Roads at Yellukunte from patel Chennappa Circle to Govt School & Nelakanteswara Layout.

30.00

18 Metalling and asphalting to the road from Somasandra palya leading to Haraluru 20.00

19 Providing drains and cement concrete to roads at kudlu village (Vinayaka layout 1st cross and Connecting Lines) 24.00

20 Providing CC to Agara village main road 30.00

21 Providing asphalting to 11th Cross, 13th Cross, 20th Main Road from BES COM to 7th Cross, Police station Road from 27th to 17th Main road 25.00

22 Remodling of 1st 'B' Main road at MHBC Colony in HSR Layout from 15th Cross to Service Road 30.00

23 Providing asphalting to 20th, 21st, 23rd & 24th Cross Roads in HSR Layout 20.00

24 Asphalting to road from hosur main road to Channakeshavanagar Main Road @ 1st Main Road 15.00

25 Providing metalling and asphalting to roads at GK Layout @ Parappana Agrahara and Baratena Agrahara (Western side) 20.00

26 Providing metalling to road from Naganathpura Main Road to Doctors Layout and Bangalore English School 18.00

27 Asphalting to 15th Cross Road and 16th B Cross road in HSR Layout 6th Sector 32.00

28 Metalling and chip carpeting to 1st Main road and Cross roads in Rajiv Gandhinagar HSR Layout 6th Sector 26.00

29 Providing drains, metalling and asphalting to Main road Alsur Munivenkatappa Road & Muneswara Road Hospalya 20.00

30 Providing drains, metalling and asphalting to 1st Cross to 5th Cross at Kudlu village 23.00

31 Formation of roads and Drains, Matalling and chip carpeting the road from Hosur Main Road to wards Krishna Reddy Indl. Area behind Toyota Showroom

20.00

32 Construction of culverts at 10th Cross, 25th A Main, 1st Sector and 3rd Sector of HSR Layout 10.00

33 Construction of Side walks at 27th Main in HSR Layout from Ring Road, Ch 0.00 44.00

34 Construction of drains and metaling to roads at Kaja Masidi 2nd Cross to Secondary drain of Rajakaluve Madeenanagara 21.00

35 Metaling & asphalting to the balance reach in Hosur Road to Country club roadin Singasandra (0.00 to 220.00 M) 25.00

36 Metaling and asphalting the road from Begur Main road to Devarachikkanahallimain road (via 11th Main), Hongasandra (0.00 to 1.20 KM) 40.00

37 Metaling and asphalting the main roads in Singasandra 18.00

38 Providing BS Slab drain, Culverts and Metaling to Subashnagara main road inSubashnagara 25.00

39 Providing BS Slab drains, Metaling and Asphalting the main road in MuniyappaLayout (Near Gajalappa house) at Hongasandra 35.00

40 Providing Metaling and Asphalting the 11th Main road to Mandi road inBommanahalli 30.00

41 Providing drains, Metaling and Asphalting to Bhagathsingh road at Hongasandra 20.00

35

Page 42: Programme_Of_Works_2008-2009

42 Providing drains and Asphalting to Oni road balance reach at Garvebavipalya(Begur main road to Hosur road) 30.00

43 Providing drains, Metaling and Asphalting Hosur road to Garvebavipalya (viaMunireddy layout) 18.00

44 Asphalting the main road in Narasimahareddy layout at Garvebavipalya 15.0045 Metaling and Asphalting Kodichikkanahalli main road 22.00

46 Metaling and Asphalting main road of Sir M Vishweshwraya road (via Hosurroad joining to Roopena Agrahara) 35.00

47 Metaling and Asphalting main road and cross roads at Krishna layout inDevarachikkanahalli 40.00

48 Metaling and Asphalting in Balaji layout via 4th main road in Hongasandra 30.00

49 Metaling and Asphalting the road from Begur road to Devarachikkanahalli (viaDeo heights layout) 25.00

50 Metaling and Asphalting Devarachikkanahalli main road to DevarachikkanahalliBus stand (via Royal shelter) 35.00

51 Metaling and Asphalting main roads and cross roads near Srinivasa KalyanaMantapa in Hongasandra 23.00

52 Re Metaling and Asphalting to road from 1st main to 11th Main inShanthinikethan layout 30.00

53 Re Metaling and Asphalting to road from A to N Cross in Shanthinikethanlayout 30.00

54 Metaling and Asphalting to Thayappa Garden cross roads (6 crosses) 25.00

55 Metaling and Asphalting to Panduranga Nagara colony roads (4 cross) and mainroad 30.00

56 Metaling and Asphalting to Roads in Venkatadri Layout (3 cross and 1 mainroad) 30.00

57 Asphalting to Roads in Doresanipallya behind Apolo Hospital road and Tempostand roads 20.00

58 Asphalting to Roads in Nidhi Layout 1 main road and 4 crosses in NS Palya area 25.00

59 Widening and Asphalting to Road from BG Road to Kothanuru Main road 40.00

60 Asphalting to roads and providing footpaths from Ayappa Swamy Temple toBilekahalli main road in Vijaya Bank Layout (1 Main road and 6 cross roads) 60.00

61 Asphalting to roads and providing footpaths from HSBC Bank to Namana Hoteland 1 to 8 crosses in Vijaya Bank Layout 60.00

62 Metaling & Asphalting to Road from Chikkammanahalli village to Koppa mainroad 20.00

63 Formation, Metaling and Asphalting to Road From B.G.Road to KammanahalliMain Road via Nobo Nagar 20.00

64 Metling & Asphalting to colony roads in Nobo Nagar (5 cross roads) 10.0065 Asphalting to road from Hulimavu main Road to Someshwara Temple 25.00

66 Widening and Asphalting to Begur Main Road from Sriram Temple to BDA roadin Hulimavu 25.00

67 Metaling and Asphalting of road from Binnibande to Begur Road via ThejaswiniNagara 20.00

68 Construction of culverts, providing metalling and Asphalting to road fromHarinagara to Chunchghatta circle via Srinidhi layout Ch 0.00 to 0.80 KM 40.00

69 Construction of culverts, providing metalling and Asphalting to road fromKothanur to BDA road Ch 0.00 to 0.75 KM 50.00

70 Providing metalling and Asphalting to widen the existing road from Kuvempucircle to Brigade Millenium from 7.00M to 10.00 M wide 15.00

36

Page 43: Programme_Of_Works_2008-2009

71 Providing metalling & Asphalting of roads in Naidu layout, Jaraganahallivillage. 25.00

72 Providing metalling & Asphalting to cross roads of Ganapathipura, GanapathiTemple road 20.00

73 Providing metalling & Asphalting of roads in New bank colony 1st, 2nd and 3rdCross roads 25.00

74 Providing metalling & Asphalting of main roads of Srinidhi layout (1st mainroad and 2nd cross road) 30.00

75 Providing metalling & Asphalting of roads in Beereshwara nagara 2nd, 3rd and4th Cross roads and main road 20.00

76 Providing metalling & Asphalting of roads in Sharada layout 1st main, 1st and2nd cross roads 20.00

77 Providing metalling & Asphalting of roads in Sreyas colony 3rd main road 20.00

78 Providing metalling & Asphalting of roads in Aradhana layout main and crossroads 20.00

79 Providing metalling & Asphalting of roads in Navodaya nagara 6th and 7thMain road 25.00

80 Providing CC Roads in Harinagara 1st main of Muneshwara layout 25.00

81 Providing metalling & Asphalting of roads in Jambo savari dinne 1st, 2nd and3rd cross roads 25.00

82 Providing CC Roads in Basavana pura 1st and 2nd cross roads 20.00

83 Providing metalling & Asphalting of roads behind Siddeshwara theatre underSarakki thota 9th to 12th cross roads 25.00

84 Providing CC Roads in Pillaganahalli village 1st to 3rd cross roads 20.0085 Providing metalling & Asphalting of roads to Narashimaiah garden 20.00

86 Providing CC Roads around the Pillaganamma Temple under Sarakki, Ramannalayout to Masjid road 20.00

87 Providing metalling & Asphalting of roads in Chikkaswamy layout underJaraganahalli village ( 5 to 7 th cross ) 13.00

88 Providing metaling to the Annayappa Layout Roads (C1, C2, C3) at AnjanapuraVillage. (Approx. 350 x 5 mtr.) 12.50

89 Construction of SSM drain in Kidwai Layout at Anjanapura Village. (Approx.200 mtr). 12.00

90 Providing asphalting to the road from Avalahalli Petrol Bunk to Gollahalli BusStop. (Approx 600 x 700 mtrs.) 40.00

91 Providing asphalting to the road from Anjanapura Masjid to SubramanyapuraTemple & anjanapura village (Approx. 600 x 7m). 40.00

92 Providing metalling & Asphalting to the roads in Shetty Layout in GollahalliVillage (C1, C2) (Approx. 600 x 6 mtrs.) 23.00

93 Providing asphalting to the road from Anjanapura main road to ShaneshwaraTemple at Avalahalli Village. (Approx. 100 x 8m & 200 x 7 m) 6.00

94 Construction of SSM drain from 5th Block to Fareeda House, Near ChikkaMasjid. (Approx. 400 mtrs.) 10.00

95 Construction of SSM drain from Haribabu's House to Moullas House (Approx.400 mtr.). 10.00

96 Providing metalling & Asphalting to the road from Kothanoor Main Road toBDA Road in Avalahalli Village (Approx. 500 x 5 mtr.). 16.00

97 Providing asphalting and construction of slab drain from Kanakapura Main Roadto Vajramuneshwara Temple at Thalaghattapura Village (Approx. 1400 x 4 mtr.). 50.00

98 Providing metalling & Asphalting to the Saraswathi Nagara Main Road atThalagattapura Village (Approx. 350 x 5 mtrs.). 6.00

37

Page 44: Programme_Of_Works_2008-2009

99 Providing asphalting of the HM Colony Road upto BDA road andthalaghattapura Village (Approx. 1150 x 6.75 mtr.). 50.00

100 Providing concrete to the Munramu Layout appraoch road, construction of Ldrains at Raghuhalli Village (Approx. 120 x 3 m.) 6.00

101 Providing asphalting to the Raghuvanahalli Layout cross roads (C1, C2, C3, C4& C5) at Raghuvanahalli Village (approx. 1300 x 6m). 15.00

102 Providing asphalting to the Manjunath Nagar Cross Roads in RaghuvanahalliVillage (1 to 6th Cross (approx. 1000 x 5.5 mtr.) 30.00

103 Providing asphalting to the road next to the Canara Bank road near KonanakunteCross (approx. 1000 x 5 mtrs.). 15.00

104 Providing asphalting to the Appaianna cross roads (C1 & C2) at KonanakunteVillage (Approx. 450 x 7 mtrs.). 17.00

105Providing concrete to the cross roads (C1 to C5), construction of L drainscoming under Vasanthpura Main Road in Konanakunte Cross (Approx. 500 x 4mrs.).

10.00

106 Providing metalling and Asphalting to the Vallabha Nagara Main Road (C1 toC4) at Konanakunte Cross (Approx. 900 x 7 mtrs.) 30.00

107 Providing asphalting to the IPS Kemmapaiah Road in Kuvempu Nagar atDoddakalasandra (Approx. 300 x 7 mtrs.) 12.50

108 Providing metalling and Asphalting to the roads of Anjanadri Layout (C1, C2,C3) at Doddakalasandra Village (Approx. 300 x 5 mtrs.). 11.50

109 Providing asphalting to the road from the Doddakallasandra Village to NarayanaNagara Block-I at Doddakalasandra Village (Approx. 1200 x 7 mtrs.). 18.00

110 Providing Asphalting and construction of slab drain to the cross roads atAvalahalli village (C1, C2, C3 & C4) 17.00

111 Providing Asphalting to the road connecting Gokul nagara from Kanakpura mainroad at Doddakallasandra village 12.00

Total 2849.00Sub Total - 1 2984.00

MAINTENANCE WORKS1 Annual maintenance and special repairs of sub division office at Bellandur 1.002 Annual maintenance and special repairs of ward office at Doddakanneli 0.503 Annual maintenance of Samudaya Bhavana and Annexure buildings at Ibbluru 0.504 Schools & other Buildings Maintenance in HSR Sub Division 5.005 Improvements and maintenance of Zonal Office Building 30.006 Special repairs to ward office at Bilekahalli 0.50

7 Special repairs and construction of compound wall to ward office atDoresanipalya 1.50

8 Special repairs to ward office (Old GP Office) at Gottigere 0.509 Special repairs to School building at Gottigere 1.00

10 Construction of Compound wall to Veterinary Hospital at Gottigere 2.0011 Ward Office 1.00

Total 43.501 Pothole filling at Bellandur Sub Division 2.002 Pot holes filling at HSR 1st, 2nd and 3rd Sector Roads 3.003 Pot holes filling at Village roads in HSR Sub Division 2.00

4 Improvements and Maintenance of drains and culverts at 27th Main & Surrounding Area HSR 1st Sector 2.00

5Improvements and Maintenance of drains and culverts at 24th Main, 15th Main Road Surrounding Area in 2nd & 3rd Sector HSR Layout HSR 2nd and 3rd Sector

2.00

38

Page 45: Programme_Of_Works_2008-2009

6 Improvements and Maintenance of drains and culverts at near 17th Cross & Surrounding area of HSR 4th, 6th and 7th Sector 2.00

7 Pot holes filling at HSR Layout 4th, 6th and 7th Sector 4.008 Pothole filling to Begur Main road 2.00

9 Improvements and maintanance of drains and culverts in Kodichikkanahalli andDevarachikkanahalli 2.00

10 Improvements and maintanance of drains and culverts in Roopena Agrahara 1.5011 Improvements and maintanance of drains and culverts in Hongasandra 2.00

12 Improvements and maintanance of drains and culverts in Garvebavipalya andLakshmi layout 3.00

13 Pothole filling to Bilekahalli main Road and colony roads in Bilekahalli 2.0014 Pothole filling to Hulimavu main road and colony roads in Hulimavu 1.00

15 Pothole filling to Arakere main road, Mico Layout main road, colony roads inMico Layout, Brundhavan layout 2.00

16 Pothole filling to BDA BTM 6th Stage roads in Arakere Sub Division 2.00

17 Providing pot holes filing to existing asphalted roads under Puttenahalli subdivision 3.00

18 Pot hole filing in Konanakunte Sub Division roads 3.00Total 40.50

1 Provision to meet Demolition charges (Buildings in Bellanduru sub divison) 2.00

2 Providing Signage board for road diversions and construction works ofBellandur Sub Divisions 1.00

3 Providing Signage board to road and lane in layouts and main roads BellandurSub Divisions 2.00

4 Providing fencing to BBMP recovered Properties 2.005 Construction of plastic & garbage collection points 1.006 Provision to meet Demolition charges in HSR Sub Division Jurisdiction 2.00

7 Providing signage board for road diversions and construction works of HSR Sub Division 1.00

8 Providing signage board to road and lane in layouts and main roads HSR Sub Division 2.00

9 Providing fencing of BBMP recovered properties HSR Sub Division Jurisdiction 2.00

10 Construction of plastic & grabage collection point HSR Sub Division Jurisdiction 1.00

11 Provision for Demolition charges in Bommanahalli sub division Jurisdiction 2.00

12 Providing signage board for road diversions and construction works ofBommlanahalli sub division 1.00

13 Providing signage board to road and lane inlayouts and main roadsBommanahalli sub Divison 2.00

14 Providing fencing of BBMP recovered properties in Bommanahalli sub division 1.00

15 Construction of plastic & garbage collection point Bommanahalli sub division 1.0016 Demolition of Buildings in Arakere Sub Division 2.00

17 Providing Sinage Board for Road Diversion and Construction works of ArakereSub Division 1.00

18 Providing Sinage Board for Roads & informatry boards in Arakere Sub Division 1.00

19 Providing fencing to BBMP recovered properties 2.0020 Construction of Plastic & Garbage collection points 1.0021 Provisions to meet Demolition charges 2.00

39

Page 46: Programme_Of_Works_2008-2009

22 Providing signales board for road diversions and construction works inPuttenahalli sub division 1.00

23 Providing signales board to road and lane in layouts and main roads inPuttenahalli sub division 1.00

24 Providing fencing to BBMP recovered properties under Puttenahalli sub division 2.00

25 Construction of plastic & garbage collection points 1.0026 Provision to meet Demolition charges pertaining to Konanakunte Sub Division. 2.00

27 Providing Signage board for road diversions for construction works atKonanakunte Sub Division Jurisdiction. 1.00

28 Providing Signage board to roads and lanes in layouts and main roads coming atKonanakunte Sub Division Jurisdiction. 1.00

29 Providing fencing to BBMP recovered properties coming under KonanakunteSub Division. 2.00

30 Construction of plastic & garbage collection points coming under KonanankunteSub Division Jurisdiction. 1.00

Total 44.001 Payment charges for Computer Operator and Security (Contact point 2 Nos.) 3.472 Providing Tata Sumo and tractor to Help points 2 Nos. 8.403 Providing Stationaries 2 Nos. 0.20

4 Payment charges for computer Operator and security (2 No of help points X 1.65 lakhs/year) in HSR Sub Division Jurisdiction 3.30

5 Providing Tata Sumo and tractor to help points (2 No of help points X 4.20 lakhs/year) in HSR Sub Division Jurisdiction 8.40

6 providing Stationaries (2 No of Help points 0.2 lakhs/year) in HSR Sub Division Jurisdiction 0.20

7 Payment charges for computer operator and security (3 no of help points X 1.65lakhs / year) inBommanahalli sub division 5.00

8 Providing Tata Sumo and tractor to help points (3 No. of help points X 4.20lakhs / year) in Bommanahalli sub division 12.60

9 Providing stationaries (3 No of help points 0.20 lakhs / year) in bommanahallisub dition 0.30

10 Provision for deploying PRAHARI for Bommanahalli Zone 17.40

11 Payment charges for Computer Operator and Security (6 No of Help points X1.65 lakhs / years) 10.00

12 Providing Tata Sumo and tractor to Help points (6 No of Help points X 4.32lakhs / year) 26.00

13 Providing Stationaries (6 No of help points X 0.20 lakhs / year) 0.30

14 Payment charges for Computer Operator and Security (4 No of Help points X1.65 lakhs / years) 6.60

15 Providing Tata Sumo and tractor to Help points (4 No of Help points X 4.32lakhs / year) 17.33

16 Providing Stationaries (4 No of help points X 0.20 lakhs / year) 0.30

17 Provision for the payment charges for the computer operator and security (3 Nos.of Help points x 1.80 lakhs / year) 5.40

18 Providing Tata Sumo and Tractor to Help points (3 Nos. of Help points x 4.20lakhs / year) 12.60

19 Providing Stationaries (3 Nos. of Help point x 0.2 lakhs / year). 0.20Total 138.00

1 Provision to meet emergency works in Bellandur Sub Division 5.002 Provision to meet emergency works in HSR Sub Division Jurisdiction 5.003 Provision to meet emergency works in Bommanahalli sub division 5.00

40

Page 47: Programme_Of_Works_2008-2009

4 Provision to meet Emergency works in Arakere Sub Division 5.005 Provision to meet Emergency works in Puttenahalli Sub Division 5.006 Provision to meet emergency works in Konanakunte Sub Division 5.00

Total 30.00Sub Total - 2 296.00Zone Total 3280.00

1 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.002 Construction of Toilets (Individual) at Bellandur Sub Division 10.003 Construction of Anganawadi building in colony at Kasavanahalli village 10.00

4 Construction of Class rooms to Government Higher Primary School atJunnasandra village 15.00

5 Construction of drains and WBM to Rajeevgandi in Ashraya Colony atDoddakannelli village 25.00

6 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00

7 Construction of Toilets (Community / Individual) at Bandepalya & Parangi palya 10.00

8 Construction of Aganawadi Building at Bandepalya 10.009 Construction of Class rooms/Reading room at HSR Sub Division Jurisdiction 15.00

10 Construction of Community Hall at Jursdiction of HSR Sub Division 15.0011 Construction of Cement concrete road in Colony at Ambedkar nagar 10.0012 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.0013 Construction of Toilets (Community / Indivisdual) at Hongasandra AK Colony 10.0014 Construction of Anganawadi School at NGR Layout 10.0015 Construction of Class rooms / Reading room at Gulbarga slum 15.0016 Construction of Community Hall at NGR Layout 15.0017 Construction of Cement concrete road in Colony at Devarachikkanahalli 10.0018 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00

19 Construction of Toilets at Doresanipallya slum and Nyanappanahalli Bhovicolony 10.00

20 Construction of Anganawadi Schools at Nyanappanahalli Bhovi colony 10.00

21 Construction of Class rooms/Reading room at Doddakammanahalli &Chikkammanahalli AK colonies 15.00

22 Construction of Community Hall at Nyanappanahalli Bandepalya 15.0023 Construction of Cement concrete Road at Bilekahalli AK colony 10.0024 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 55.0025 Construction of Community Toilet block at Pillaganahalli colony 5.0026 Construction of Community Toilet block at Puttenahalli palya 5.0027 Construction of Anganawadi School at Pillaganahalli colony 5.0028 Construction of Anganawadi School at vaddarapalya 5.0029 Construction of Class rooms at Puttenahalli Govt. school 20.0030 Construction of Community hall at Jambo savaridinne 15.0031 Construction of Cement concrete road at vaddarapalya 1st main 5.0032 Construction of Cement concrete road at Puttenahalli colony 5.0033 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00

34 Construction of Toilets (Community / Individual) at Konanakunte Sub Div.Jurisdiction. 10.00

35 Construction of Anganawadi School at Konanakunte Sub Div. Jurisdiction. 10.00

36 Construction of Class Rooms / Reading Rooms at Konanakunte Sub Div.Jursdiction. 15.00

PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR BOMMANAHALLI ZONE

41

Page 48: Programme_Of_Works_2008-2009

37 Construction of Commuinty Hall at Konanakunte Sub Division Jursidiction. 15.00

38 Construction of cement concrete road at colonies coming under KonanakunteSub Division Jurisdiction. 10.00

Sub Total - 3 720.00ELECTRICAL

BOMMANAHALLI1 Supplying and fixing of Street lights in Bellandur and Ebbalur 12.002 Supplying and fixing of Street lights in Boganahalli and Kaikondanahalli 12.00

3 Supplying and fixing of Street lights in Kasavanahalli, Junnasandra and Ambalipura 11.00

4 Supplying and fixing of Street lights in Doddakanahalli 12.00

5 Supplying and fixing of Street lights in Rupena Agrahara, Bommanahalli and Hongasandra 12.00

6 Supplying and fixing of Street lights in Singasandra, Doddathoguru and chikkathoguru 11.00

7 Supplying and fixing of Street lights in Beratena Agrahara and Begur 11.00

8 Supplying and fixing of Street lights in Devarachikkanahalli, Kodichikkanahalli and Garvebhavipalya 12.00

9 Supplying and fixing of Street lights in Arekere and Nyanapanahalli 11.0010 Supplying and fixing of Street lights in Billekahalli and Hulimavu 12.00

11 Supplying and fixing of Street lights in Yelenahalli, Chandrashekarapura and Kammanahalli 11.00

12 Supplying and fixing of Street lights in Kallena Agrahara and Gorattigere 12.0013 Supplying and fixing of Street lights in Konankunte 11.0014 Supplying and fixing of Street lights in Jaraganahalli and Doddakallasandra 10.00

15 Supplying and fixing of Street lights in Raghuvanahalli, Thippasandra and Vajarahalli 10.00

16 Supplying and fixing of Street lights in Avalahalli, Anjanapura, Gollahalli and Talagatapura 12.00

17 Supplying and fixing of Street lights in Puttenahalli and Sarakki 11.00

18 Supplying and fixing of Street lights in Pillaganahalli, Basavanapura and kembathalli 12.00

19 Supplying and fixing of Street lights in Kothanur 10.0020 Supplying and fixing of Street lights in Chunchanagatta 12.0021 Supplying and fixing of Street lights in Agara and Sommasundrapalya 11.0022 Supplying and fixing of Street lights in Harallur and Kudlu 10.0023 Supplying and fixing of Street lights in Parappana Agrahara and Nagnathpura 10.0024 Supplying and fixing of Street lights in H.S.R Layouts 11.00

25 Supplying and fixing of Street lights in Harallukunte, Ellukunte and Parangipalya 11.00

Total - 1 280.00

1 Suppy and fixing of High mast light at Vijaya Bank Enclave Circle in Bommanahalli Sub Division 5.00

2 Suppy and fixing of High mast light at Shanthinikethana Circle in Arakere Sub Division 5.00

3 Suppy and fixing of High mast light at BK Circle in Puttenahalli Sub Division 5.00

4 Suppy and fixing of High mast light at Khode Glass facotyr circle in Konanakunte Sub Division 5.00

5 Suppy and fixing of High mast light at Raghavanahalli circle in Konanakunte Sub Division 5.00

6 16 Mtrs High Masts at Kembridge School Junction at HSR Layout 5.00

42

Page 49: Programme_Of_Works_2008-2009

Total - 2 30.00

1 Supplying and fixing of MS Tubulara Poles in Arekere BTS layout to Devarachikkanahalli 20.00

2 Supplying and fixing of MS Tubulara Poles in B.K circle to Gorattigere colony 20.00Total - 3 40.00

1 O & M of Street Lights in Bellandur Sub Division 15.002 O & M of Street Lights in Bommanahalli Sub Division 25.003 O & M of Street Lights in Arekere Sub Division 25.004 O & M of Street Lights in Konankunt Sub Division 25.005 O & M of Street Lights in Puttenahalli Sub Division 20.006 O & M of Street Lights in HSR Sub Division 20.007 Provision for Emergency works 20.00

Total - 4 150.00Grand Total 500.00Grand Zone Total 4500.00

43

Page 50: Programme_Of_Works_2008-2009

Sl. No. Name of works Estimated amount in Lakhs

2 3I- ORIGINAL WORKS

A-BUILDINGS1 Providing Partition & AR, SR to RR Nagar Zonal office 20.00

Sub Total 20.00B-NEW ROADS

1 Providing metalling to Main road and cross road for durga parameshwari layout 10.00

2 Providing metalling and drain from JSS Collage to Omkar hills 10.003 Providing metalling and drain at Shankarappa Layout and infront of Jnanakshi

Rajarajshwari Temple15.00

Sub Total 35.00C-DRAINS

1 Construction Of RCC box drains at Pattanagere village 20.00Sub Total 20.00

D- CONSTRUCTION OF FOOTPATH1 Construction of footpath from BBMP Complex to Ideal home circle

(nimishambha temple Circle)30.00

2 Construction of footpath from Ideal home circle to Andhra Bank 25.00Sub Total 55.00

E-CONCRETE ROADS1 Providing Concrete road Lanes to Gankal Village 15.002 Providing Concrete road Lanes to Kenchenahalli Village 15.003 Providing Concrete road Lanes to Pattanagere Village 15.00

Sub Total 45.00II-MAINTENANCE WORKS

ROADS AND DESILTING OF DRAINS1 Providing Asphalting to 1st stage Ideal Homes and Balance Roads 35.002 Providing Asphalting Main and Cross road to Ideal Home 40.003 Providing Asphalting from Pattanagere to RR Temple and Adjoining

MainRoad, and Cross Roads of Kenchenehalli and Pattanagere20.00

4 Providing Asphalting to Panchasheela Layout 12.005 Providing Asphalting to BEML 4th Stage and Adjoining Roads 25.006 Providing Asphalting to BEML 5th Stage and Adjoining Roads 25.007 Providing Asphalting to Main and Cross Roads of Kenchenahalli 15.008 Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of RR

Nagar Sub Division.5.00

9 Providing Asphalting Kenchenahalli Bridge to Mysore Road, 20.0010 Providing Asphalting to BHEL, Pattanagere and Concord Layout 20.0011 Providing Asphalting to Durgaparameshwari Layout and Adjoining Road of

Halagewaderahalli and Shivanna layout25.00

12 Providing Asphalting to Adjoining cross Road of Reddy farm and Raghavendra Temple

15.00

13 Providing Asphalting to Roads parallel to Fabmall and roads around it 25.00

Bruhath Bangalore Mahanagar PalikeRajarajeshwari Nagar Zone, Bangalore

Rajarajeshwari Nagar Division, Bangalore PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO RAJARAJESHWARINAGARA SUB-

DIVISION

44

Page 51: Programme_Of_Works_2008-2009

14 Desilting of Drain at 1st and 2nd Stage of Ideal Homes 5.0015 Desilting of Drain and Berm Cutting at BEML Layout and Other Layout 5.0016 Providing Ornamental Sign Board for RR Nagar Sub Division 12.0017 Providing Name Boards to Main and cross Road for RR Nagar Sub Divisions 12.0018 Maintenance of Footpath Clearance 12.0019 Emergency works 25.00

Sub Total 353.00Total 528.00

Sl. No. Name of works Estimated amount in Lakhs

I- ORIGINAL WORKSA-BUILDINGSConstruction of Ward Offices 20.00B- ROADS

1 Construction of drains, Mettalling and Asphalting of roads at Pramod layout 20.002 Mettalling and Asphalting of roads at Gurudatta layout 20.003 Construction of Drains, Improvements of roads at Bangarappanagar 10.00

4 Construction of Drains, Improvements and Asphalting of roads at Channasandra Colony 10.00

5Mettalling and Asphalting of Balance roads at Sai Lotus Layout,Dwarakanagat,Raithakaarmikanagar and Asphalting of roads in front of RNS College

10.00

6 Construction of Drains, Mettalling and Asphalting of roads at Gattigere Siddananjappa layout 12.00

7 Construction of Drains, Mettalling of roads at Bagegowda layout near Ring road 10.00

8 Construction of Drains, Mettalling and Asphalting of roads at Doddakempaiah layout and Marappa Layout 20.00

9 Construction of Drains, Improvements of roads at Kerekodi paalya 12.00

10 Construction of Drains, Mettalling and Asphalting of main roads and cross roads at Javaraiahna Doddi 27.00

11 Construction of Drains and Culverts, Improvements of roads at Uttarahalli Vaishnavi layout, appayya swamy layout 20.00

12 Construction of Drains and Culverts, Mettalling roads at Uttarahalli NandaKumara layout 15.00

13 Construction of Drains, Improvements, Mettalling of roads at Uttarahalli Arjun kaval, Muneshwara Block, Turahalli Village 15.00

14 Construction of Drains and Culverts, Improvements to roads in between Ittamadu road and AGS Layout 30.00

15 Construction of Drains and Culverts, Improvements to roads Uttarahalli Narasappa layout and near Anjaneya Swamy Temple and Netaji layout 10.00

Sub Total 241.00D-FOOTPATH NIL

II-MAINTENANCE WORKSA - BUILDINGS NIL

Sub Total 0.00B-ROADS AND DRAINS

1 Asphalting to roads at Southern Poornapragna layout 15.002 Asphalting to roads at Northern Poornapragna layout 15.003 Improvements and Asphalting of roads at D'souzanagar, Muneshwaranagar 15.00

PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO UTTARAHALLI SUB-DIVISION

45

Page 52: Programme_Of_Works_2008-2009

4 Asphalting of roads at Gattigere hanumayya layout 10.00

5 Asphalting to main road from Pantharapaalya petrol Bunk to Pramod layout and Construction of Drains, Improvements of cross roads 20.00

6 Asphalting of roads at Gattigere Haridasa layout 15.007 Asphalting and Improvements of remianing roads at Gattigere Layout 15.00

8 Improvements of roads from Bangarappanagara Hosakerehalli cross to Basaveshwara layout via Arunachalam Residence 30.00

9 Improvements and Asphalting of roads at Ajjappa layout 10.0010 Improvements of roads at Arehalli Naydu Layout 20.0011 Improvements and Asphalting of roads at Arehalli AGS Layout 15.0012 Improvements and Asphalting of roads at Arehalli and Srinivasa Colony 15.00

13 Asphalting and Improvements of roads at Chikkallasandra Doctors layout, Sapthagiri layout and Sarvabhoumanagara 10.00

14 Asphalting of Chikkallasandra Abbayya Naydu Studio road 10.00

15 Improvement and Asphalting of roads from Arehalli Ittamadu road to Chikkallasandra Ramanjaneya Layout 15.00

16 Improvement and Asphalting of roads from Uttrahalli main road to Arehalli Ittamadu road 15.00

17 Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of Uttrahalli Sub Division.

5.00

18 Maintenance of Footpath Clearance 12.0019 Emergency works 25.00

Sub Total 287.00IV-OTHER WORKS

1 Providing Ornamental Sign Board for Uttarahalli Sub Division 15.002 Providing Name Boards to Main and cross Road for Uttarahalli Sub Divisions 15.00

Sub Total 30.00Total 578.00

Sl. No. Name of works Estimated amount in Lakhs

1 2 3I- ORIGINAL WORKS

A-BUILDINGS NilB-NEW ROADS

1 Improvements and Asphalting the roads at Iliyasnagar 20.002 Improvements and Asphalting the roads at Ramakrishnanagar 15.003 Improvements and Asphalting the roads at Rajyotsavanagar 15.004 Improvements and Asphalting the roads at J.C.Industrial Area 15.005 Improvements and Asphalting the roads at Yelachenahally 20.00

6 Improvements and Asphalting the roads at Bikasipura & Paul Chanappa Layout 20.00

7 Improvements and Asphalting the roads at Prashanthanagar 20.00

8Improvements and Asphalting the roads at Behind Balamuri Ganapathi Temple at Kumarswamy Layout 15.00

9Improvements and Asphalting the roads at 2nd Phase (BDA) of Kumaraswamy Layout 15.00

10 Improvements and Asphalting the roads at Chandranagar 15.0011 Providing RCC drain at main road of Chandranagar 15.0012 Improvements and Asphalting the roads at Sunrise & Nanjappa layouts 15.00

PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO SUBRAMANYAPURA SUB-DIVISION

46

Page 53: Programme_Of_Works_2008-2009

13 Improvements and Asphalting the roads at Kanakanagar & Faiyazabad layouts 16.00

14 Improvements and Asphalting the roads at Gubbalala-Ramanjaneyanagar 15.0015 Improvements and Asphalting the roads at Turahali Village 18.0016 Improvements and Asphalting the roads at Paramahamsanagar 18.0017 Improvements and Asphalting the roads at Uttarahalli Bangarappanagara 15.0018 Improvements and Asphalting the roads at Uttarahalli Vallabhanagar 10.00

19Improvements roads from Uttarahalli main road to join Canara Bank Colony via Burrial ground 15.00

20 Improvements to roads at Muniswamynaidu Layout 15.0021 Improvements to roads & Providing drainage system at Sharadhanagar 15.0022 Improvements and Asphalthing the roads at Desai Garden 15.0023 Improvements and Asphalthing the roads at Reshmanagar in Ganigarapaalya 20.0024 Improvements to roads at Vasanthapura Village 18.0025 Improvements to roads from Bhuvaneshwarinagar toTurahalli Village 12.00

Sub Total 402.00C-BRIDGES AND CULVERTS NILD-CONCRETE ROADS

1Providing Concrete roads at Kashin agar, Yelachenahalli, Chandranagar, kanakanagar, Faiyazabad and Ramakrishnaanagar 15.00

2 Providing Concrete roads at Yadalamnagar 15.00Sub Total 30.00

II MAINTENANCE WORKSB-MAINTENANCE OF ROADS AND DRAINAGES

1

Maintenance of roads and drainages at Yelachenahalli, Iliyzsnagar, kanakanagara, Chandranagar, Fiayazabad, Ramakrishnanagar, Rajyotsavanagar 15.00

2

Maintenance of roads and drainages at Chikkallasandra, Canara Bank Colony, Udayanagar, Manjunathanagar, Gowdayyanapaalya, Ankappa layout, paramahamsa nagar, maruthinagar, Vallabhanagar, Sharadanagar, hosahalli and Gubbalala Village

15.00

3Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of Subramanyapura Sub Division.

5.00

4 Maintenance of Footpath Clearance 12.00Sub Total 47.00

D-MAINTENANCE OF WATER SUPPLY AND UGD SYSTEMS NILIV-OTHER WORKS

1 Providing Ornamental Sign Board for Subramanyapura Sub Division 15.00

2Providing Name Boards to Main and cross Road for Subramanyapura Sub Divisions 15.00

3 Emergency Works 25.00Sub Total 55.00

Total 534.00

a) BuildingsSl

No Name of work Amount

b) New Roads I WBM Two layers1 Improvements to Babasahebarpalya cross roads 10.00

PROPOSED WORKS LIST TO BE TAKEN IN KENGERI DIVISION FOR THE YEAR 2008-09Kengeri Sub Division

1) ORGINAL WORKS

47

Page 54: Programme_Of_Works_2008-2009

2 Improvements to balance roads of Ramjyoti nagar 10.00Total 20.00

ii Asphalting 1 Improvements and ashphalting to road from B.M. Road to Doddabele 25.002 Improvement and Ashphalting to SriRam lay out roads 10.004 Improvements and ashphalting to railway 2 nd parallel and other roads of KST 20.005 Improvement and Ashphalting Valgerahally roads in KST 20.006 Re ashphalting to 2nd and 3rd main road and cross roads of KST 25.007 Re ashphalting to 4 th and 5th main road and cross roads of KST 25.008 Improvemnts and Re ashphalting to 6th main from komaghatta road 30.009 Improvements and asphalting to 7 th main and cross roads in KST 20.0010 Ashphalting to MTS lay out roads 25.0011 Improvements to roads of krishnappa layout and other roads in KST 20.0012 Re ashphalting to road from hoysala circle to SWD of KST 20.0013 Improvement and ashphalting to roads of K.H.B apartment balnace roads 15.0014 Ashphalting to mylasandra BEML lay out roads 30.0015 Ashphalting to mylasandra Mukambika lay out roads 10.0016 Improvements and asphalting to Kodipalya kengeri road 25.00

17Improvements and ashphalting to Auto stand and Gutte anjaney road in Kengeri Town 15.00

18 Improvements to cross roads of vidyapeeth roads in kengeri town 10.0019 Improvements ,construction of side drain and asphalting to Komaghatta road 35.00

Total 380.00c) Bridges and CulvertsImprovements to bridge at balaji layout in kengeri town 20.00d) Side walks and ducts (Foothpath)

Nil Nili) Concrete Nilii) B.S. Slabs Nile) Concrete Roads - Less than 4.00M width.

1 Improvements and consruction of concrete Roads to Beedi karmikara colony 30.002 Construction of Cement concrete roads in Gattigerepalya roads 7.003 Improvements to roads of Chikkegowdanapalya village roads 8.00

4Improvements and consruction of concrete Roads to Muniyappana vatara& adjecent Roads 10.00

5 Improvements to roads of Jattigarahally village 10.00Total 85.00

f) Water Supply Nilg) Play ground and protectiion of BBMP Properties

1 Providing chain link Fencing at BBMP Assets Parks at Kengeri 10.00Total 10.00

1Providing JCB tractor and labours for maintenance of Roads and foothpaths& Removel of Encroachments in Kengeri Sub Division 10.00

2 Providing Pot hole fillings at Kengeri sub divisions 5.00Total 15.00

e) Fly overs and under Passes, Grade separaters and securites NilF) Other Works

1 Providing Street name boards in Juridiction of Kengeri sub division 5.002 Providing Ornamental name boards&street sign boards in Juridiction of Kengeri 5.00

Total 10.00

II Maintenance Works:b) Roads and Drains Remettling, Rechifcorpetting- Reconstruction of Drains

48

Page 55: Programme_Of_Works_2008-2009

1 Emergency fund 5.00Total 5.00

Grand Total Rs 525.00

Sl.No Name of work Amount (in lakhs)

b) New Roads I WBM Two layers1 Improvements Road in BDA Layout Block No.1 & 3 12.00

2Improvements of roads in BDA Layout 9th Block and sapthageri Layout At Nagarabavi II stage 15.00

3Providing and asphalting and improvements of road at chanadana layout in nagarabavi 20.00

4Providing asphalting & improvementswork mallathahalli Kengunte main road Nagarabavi 10.00

5Providing asphalting & improvements of Roads work at chandrashekara layout Nagarabavi\ 20.00

Total 77.00ii Asphalting

1Improvements of road and Asphalting work in Ramakrishna Badavane Malagalu Nagarabavi 18.00

2 Improvements Road Asphalting work block No. 4,5, nagarabavi II Stage 21.00

3Providing asphalting & improvements of roads in byraveshwarnagar Hanumantharayana palya at Nagarabavi 20.00

4Providing asphalting & improvements of roads work at Eranapalya Roads at Nagarabavi 20.00

5Providing asphalting & improvements of roads work at D Group layout at Nagarabavi 23.00

6Providing asphalting & improvements of road at Rajajinagar housing society layout I Stage at Nagarabavi 19.00

7Providing asphalting & improvements of road work at M.P.M. Layout at Nagarabavi 15.00

8Providing asphalting & improvements of roads work at hanumathanagar at Nagarabavi 10.00

9Providing asphalting & improvements of roads work at muddiayanapala near doddanna circle Nagarabavi 15.00

10 Providing asphalting & improvements work in Nuggali palya at Nagarabavi 10.00

11 Providing asphalting and improvements of roads at health layout at Nagarabavi 20.00

12 Providing asphalting & improvements of roads at Arradhya layout at Nagarabavi 10.00

13Providing asphalting & improvements of roads at Jayalakshmi layout at Nagarabavi 10.00

14Improvements roads and providing asphalting roads at Rajajinagar housing society layout II Stage at Nagarabavi 20.00

15 Providing asphalting & improvements of roads at I.T.I Layout at Nagarabavi 10.00TOTALRs 241.00

Nagarabavi Sub Division1) ORGINAL WORKS a) Buildings

49

Page 56: Programme_Of_Works_2008-2009

iii Drains

1Construction of Road side drain and improvements of roads in Block No.8 at Nagarabavi II stage 20.00

2Construction of Drain and Road at Nagarabavi II stage at BDA Layout Block No.10 and 11 at Nagarabavi 22.00

3Construction of road side drain and improvements Road and asphalting work At vinayaka layout 4th Stage13th Block in Nagarabavi II Stage 18.00

4Construction of road side drain and re asphalting work in NGEF Layout 12th & 14 Block at Nagarabvi II stage 18.00

5Construction of Missing length of drain and R C C Deck at Kebbehalla, and Sriganda kaval at Nagarabavi 9.00

Total 87.00c) Bridges and Culverts Nild) Side walks and ducts (Foothpath)i) Concrete

1 Providing and constructing foothpathas around the BDA Complex at Nagarabavi 15.00

2Providing and constructing foothpathas in annapoorneshwari nagar and health layout Nagarabavi 15.00

Total 30.00ii) B.S. Slabs Nile) Concrete Roads - Less than 4.00M width.

1Improvements of Road ( Concrete Road) in Kottige palya, Malagal, Saje palya, and Old villages nagarabavi II stage 18.00

2 Providing and laying concrete roads at kebbehalla Cross roads at Nagarabavi 15.00Total 33.00

f) Water Supply Nilg) Play ground and protectiion of BBMP Properties

1 Providing chain link Fencing at BBMP Assets Parks at Nagarabavi area 15.00Total 15.00

a)Buildings including Nirmal Toilets

1Repair work works of office of BBMP Sub Division Nagarabavi and community Centers 5.00

Total 5.00

1Desilting works of strom water drains and improvements of strom water drain at nagarabavi II stage 5.00

2Providing JCB Tractior and labours for maitatinence of Roads, and foothpaths clearance&Removel of Encroachment in Nagarabavi sub division 10.00

3 Providing Pot hole fillings at nagarabavi sub divisions 4.00Total 19.00

e) Fly overs and under Passes, Grade separaters and securitesF) Other Works

1Providing Street sign boards and ornamental name Boards in nagarabavi Sub Division

8.00

Total 8.001 Emergency fund 10.00

Total 10.00Grand Total 525.00

II Maintenance Works:

b) Roads and Drains Remettling, Rechifcorpetting- Reconstruction of Drains

50

Page 57: Programme_Of_Works_2008-2009

Sl.No. Name of Work Amount(In lakhs)

1Construction of BBMP office Complex at C.A Site at Mallathalli in front of Ambedkar college 50.00Total 50.00

b) New Roads

1Asphalting to Mallathalli Main Road from Outer Ring Road Up to Bus Stand and Cross Rorads 25.00

2 Metallin g & Asphalting and other development work to Harinatha Layout 15.003 Construction of Culverts , Metalling & Asphalting to Jnanganga nagar 20.00

4Providing metalling & Asphalting to Revenue Layout Near Mallathalli Bus Stop on Western side of Outer Ring road 20.00

5

Construction of Culverts, Road side drian & improvements of road at Jagajyothi nagar Around the Kengeri Division office. (Western Side of Ring road) 20.00

6 Construction of Road side drian & improvements of road at Upadhya nagar 20.00

7Construction of Road side drian & improvements of road at Dubasi Palya N.K Form & J.K. Form Remaining Works) 15.00

8Formation Road & Metallin g to Revenue Layout. On southern side of NGEF Layout Mallathalli 20.00

9

10Construction of Road side drian , & Asphalting road at Nisarga Badavane (balance roads) 8.00

11Construction of Road side drian Mettalling and asphalting road at mariyappana Palya 20.00

12Providing Road side drains and constuction of Culverts and improvements of Roads in RR Layout at Ulala sub - division 10.00

13 Improvements of Works Balanace roads in KHBCS Society 15.0014 Improvements of Nagadevana halli Main road Asphalting 16.0015 improvements & Asphalting works at Doddabasthi Main Road 25.0016 Improvements of Maruthi nagar Sy No. 9 roads 20.0017 Improvements Sonnenahlli Sy No.17 Roads 20.00

18Construction Box type drain and improvements road in Buvaneshwari nagar III stage 15.00

19Improvements roads & construction road at Raju layout Around the Horizen school 20.00

20Construction of Culvert, Drain, mettalling, and asphalting At NGEF Layout Roads 25.00

21 Construction of Culvert, Drain, mettalling, and to Byrigowda layout 20.0022 Asphalting to road from Ullal main road to Matha Amruthmayi School 15.0023 Construction of Culvert, Drain, mettalling, and to Byrigowda layout 20.0024 Asphalting to Kengunte main road from SWD to Mallathalli tank 30.00

Total 434.00c) Bridges and Culverts

1 Construction of Bridge Across SWD & Asphaltimg in Ullalu Road, Near Vidynikethan School 30.00

2 Con structiion of Culvert and Drain & mettalling in Ullalu village Raods, 16.00

Total 46.00

Ullalu Sub- division1) ORGINAL WORKS

a) Buildings

51

Page 58: Programme_Of_Works_2008-2009

d) Side walks and ducts (Foothpath)i) Concrete

Total Nilii) B.S. Slabs

NILe) Concrete Roads - Less than 4.00M width.

1 Concreting to Narrow roads in Ullal village 15.00

Total 15.00g) Play ground and protectiion of BBMP Properties

Total 0.00II Maintenance Works:

a)Buildings including Nirmal Toilets

1 Providing JCB Tractior and labours for maitatinence of Roads, and foothpaths clearance and Removel of encroachment in ullal sub division 10.00

2 Pot hole filling of roads in the judisdiction of ullal subdivision 5.00Total 15.00e) Fly overs and under Passes, Grade separaters and securitesF) Other Works

1 Providing metal Street name boards in the Juridiction of Ullal sub division 10.00Total 10.00

1 Emergency fund 5.00Total 5.00Grand Total Rs. 575.00Zone Total 3265.00

SL No. Name of Work Estimated Cost 1 Constuction of Nirmrala toilets in Rajarajeshwrinagar Range 20.002 Constuction of Nirmrala toilets in Subramanyapura Range 20.003 Constuction of Nirmrala toilets in Uttarahalli Range 20.004 Constuction of Nirmrala toilets in Kengeri Range 20.005 Constuction of Nirmrala toilets in Ullalu Range 20.006 Constuction of Nirmrala toilets in Nagarabhavi Range 20.007 Constuction of Anganavadi Buildings in Rajarajeshwrinagar Range 15.008 Constuction of Anganavadi Buildings in Subramanyapura Range 15.009 Constuction of Anganavadi Buildings in Uttarahalli Range 15.00

10 Constuction of Anganavadi Buildings in Kengeri Range 15.0011 Constuction of Anganavadi Buildings in Ullalu Range 15.0012 Constuction of Anganavadi Buildings in Nagarabhavi Range 15.0013 Constuction of Classroom Buildings in Rajarajeshwrinagar Range 20.0014 Constuction of Classroom Buildings in Subramanyapura Range 20.0015 Constuction of Classroom Buildings in Uttarahalli Range 20.0016 Constuction of Classroom Buildings in Kengeri Range 20.0017 Constuction of Classroom Buildings in Ullalu Range 20.0018 Constuction of Classroom Buildings in Nagarabhavi Range 20.0019 Providing & laying of Concrete Roads in slums of Rajarajeshwrinagar Range 50.0020 Providing & laying of Concrete Roads in slums of Subramanyapura Range 50.0021 Providing & laying of Concrete Roads in slums of Uttarahalli Range 50.00

RAJARAJESHWARI NAGARA ZONEPROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

Rs in LakhsI Capital Works

52

Page 59: Programme_Of_Works_2008-2009

22 Providing & laying of Concrete Roads in slums of Kengeri Range 50.0023 Providing & laying of Concrete Roads in slums of Ullalu Range 50.0024 Providing & laying of Concrete Roads in slums of Nagarabhavi Range 50.0025 Construction of community centres /Repairs in Rajarajeshwrinagar Range 15.0026 Construction of community centres /Repairs in Subramanyapura Range 15.0027 Construction of community centres /Repairs in Uttarahalli Range 15.0028 Construction of community centres /Repairs in Kengeri Range 15.0029 Construction of community centres /Repairs in Ullalu Range 15.0030 Construction of community centres /Repairs in Nagarabhavi Range 15.00

720.00Zone Total 3985.00

SL No. Name of Work Estimated Cost 1 Replacement of Damaged LTUG cables &street lights in Nagarabhavi range 22.002 Replacement of Damaged LTUG cables& street lights in , Kengeri range . 27.00

3 Replacement of Damaged LTUG cables & street lights in Rajarajeshwari nagar range. 8.00

4Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Malagalu,Kottigepalya,Sajjepalya & other area in Nagarabhavi Range

19.00

5Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of BDA 1 to 13 blocks,nagarabhavi 2nd stage & other area in Nagarabhavi Range

24.00

6Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of NGEF lay out,BDA 14th block & other area in Nagarabhavi Range

18.00

7Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Sunkadakatte,Kebbehalla,Annapoorneshwrinagar & other area in Nagarabhavi Range

22.00

8

Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Srigandadakaval,Rajajinagar HBCS,Group D lay out,ITI lay out,MPM layout,Kengunte,Gidadakonenahalli & other area in Nagarabhavi Range

20.00

9Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Ullalu,Railway lay out,Balaji lay out,NGEF 2nd stage,Mallathahalli, & other area in Ullalu Range

22.00

10Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Govt press lay out,Jnanajyothinagar,Jnanaganganagar & other area in Ullalu Range

23.00

11

Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of BDAlay out,mariappanapala,Bhuvaneshwarinagar,maruthinagar & other area in Ullalu Range

24.00

12Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Nagadevanahalli,RR lay out,jagajyoti lay out,Kalyan HBCS,Dubasipalya & other area in Ullalu Range

25.00

Total

RAJARAJESHWARI NAGARA ZONEELECTRICAL DIVISION

PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO ELECTRICAL WORKS FOR THE YEAR Rs in Lakhs

I Capital Works

53

Page 60: Programme_Of_Works_2008-2009

13Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Kengeri satelite town,Shirke appartment,MTS lay out,Bunde mutt,BDA lay out & other area in Kengeri Range

25.00

14Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Mylasandra,kodipalya,Kengeri,Newly added villages & other area in Kengeri Range

24.00

15Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Ideal homes,BEML lay out & other area in Rajarajeshwarinagar Range

22.00

16Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Kenchenahalli,pattanagere,BHEL lay out,Halagevaderahalli & other area in Rajarajeshwarinagar Range

25.00

17Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Channasandra,Krishna Garden,Ganakal & other area in Rajarajeshwarinagar Range

16.00

18Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Pantarapalya,Pramod lay out,Kerekodipalya & other area in Uttarahalli Range

22.00

19Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Ags lay out,Poornaprajna lay out & other area in Uttarahalli Range

24.00

20Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Chikkalasandra,Naidu lay out,Uttarahalli & other area in Uttarahalli Range

20.00

21Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Canara bank colony,subramanyapura,vasanthapura & other area in Subramanyapura Range

26.00

22Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Yelachenahalli,Ilyasnagar,chandranagar & other area in Subramanyapura Range

22.00

23Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control line,in roads / lay out of Jayanagar HBCS,gubbalalu,Turahalli,Hosahalli & other area in Subramanyapura Range

20.00

500.00

1 Street light Maintanance( in Packages for the year 2008-09 )Package A Nagarabhavi Range 27.00

2 Street light maintenance (in Packages for the year 2008-09)-Package B Nagarabhavi Range 24.00

3 Street light maintenance (in Packages for the year 2008-09)-Package C Ullalu Range 23.00

4 Street light maintenance (in Packages for the year 2008-09)-Package D Ullalu Range 22.00

5 Street light maintenance (in Packages for the year 2008-09)-Package E Kengeri Range 24.00

6 Street light maintenance (in Packages for the year 2008-09)-Package F Kengeri Range 24.00

7 Street light maintenance (in Packages for the year 2008-09)-Package G Rajarajeshwarinagar Range 22.00

8 Street light maintenance (in Packages for the year 2008-09)-Package H Rajarajeshwarinagar Range 21.00

Sub total 1II Maintenance Works

54

Page 61: Programme_Of_Works_2008-2009

9 Street light maintenance (in Packages for the year 2008-09)-Package I Uttarahalli Range 21.00

10 Street light maintenance (in Packages for the year 2008-09)-Package J Uttarahalli Range 21.00

11 Street light maintenance (in Packages for the year 2008-09)-Package K Subramanyapura Range 24.00

12 Street light maintenance (in Packages for the year 2008-09)-Package L Subramanyapura Range 21.00

13 Annual Maintenance of BBMP building electrification in Rajarajeshwarinagar zone 26.00

300.00800.00

Grand Zone Total 4785.00Grand TotalSub total 2

55

Page 62: Programme_Of_Works_2008-2009

DASARAHALLI ZONEDetails of Programme of works for the year 2008-09

(Works proposed for 08-09)DASARAHALLI ZONE

Sl.no Name of work Approximate

Estimaed cost in lakhs1 Emergency grant 20.00

Total 20.00Original works

a Buildings Nilb Roads & Drains

1 Metaling of roads,drains& culverts in Bhuvaneshwarinagara ,Kalyananagara 20.00

2Asphalting Mettling of roads,drains& culverts in Prashanthanagara,Officers model colony,Krishnegowda layout 30.00

3Metaling of roads,drains& culverts in,panchyath colony area,Patel sawmill back side area 20.00

4 Metaling of roads,drains& culverts in Kammagondanahalli 25.005 Metaling of roads,drains& culverts in Vidyanagara 25.006 Metaling of roads,drains& culverts in Kempegowda nagara 25.00

7 Metaling of roads,drains& culverts in Kammagondanahalli Village 30.008 Metaling of roads,drains& culverts in Mallasndra Village 25.009 Metaling of roads,drains& culverts in Abbigere Village 30.00

10Asphalting to WIMAC factory to BBMP border ,Abbigere pipe line road and Abbigere village 40.00

11 Asphalting to Mallasandra 25.00

12Asphalting to Lakshmivenkateshwara layout,Ragavendra colony and prakash layout, 30.00Total 325.00

C Culvert and Bridges Nild side walk & Duct Nile Concrete road

1 Providing concrete roads to Kalasti nagara and Prashathanagara 30.002 Providing concrete roads to Vidyanagara 30.00

3Providing concrete roads to Kammagondanahalli,KG halli AK colony,KG halli Muneshwara temple area 25.00

4 Providing concrete roads to Cross lane at Mallasandra 25.005 Providing Concerete Roads, drains & culverts in Officers model colony 25.006 Providing Concerete Roads, drains & culverts in Maheshwari nagara 25.007 Providing Concerete Roads, drains & culverts in Dasarahalli 35.00

Total 195.00f Water supply Nilg Play ground & protection of BBMP assets

1Improvements to Drains and Providing covering slabs in Dasarahalli high school play ground 10.00Total 10.00

h Storm water drains Nil

PROGRAMME OF WORKS FOR YEAR 2008-2009 IN DASARAHALLI SUB DIVISION

56

Page 63: Programme_Of_Works_2008-2009

2 Maintenance worka Buildings

1 Special repairs to public toilet buildings at Kamagondanahalli slum area 10.00Total 10.00

b Roads & Drains NILc side walk & Duct Nild Water supply & UGD Nile Fly over,under pass & pedestrian NILf Other Works

1 Fencing of BBMP properties 15.002 BBMP sighn boards 5.003 Street name boards 11.00

Total 31.00

1 Metaling of roads,drains& culverts in Mallasandra and kalanagara 20.002 Asphalting to Kalasthinagara , and Maheshwarinagara 30.003 Asphalting to Ravindranagara,and Mini BHEL colony area 25.00

Total 75.00Total 666.00

Sl. No. Name of Work Est. Amount (Lakhs)

I Orginal works a) Buildings

1 Construction of Sub division Office Building in MEI Colony 65.00Total 65.00

b) Roads and Drains

1 Asphalting the road from Laggere main road to outer ring road via IPP hospital 45.00

2 Asphalting the road from Laggere main road to Swatantra yodhara nagar (near Kurbar halli bridge ) 45.00

3 Asphalting the road from Rajagopal nagar main road to Laggere main road via fiends circle 45.00

4 Asphlating balance length of Rajgopal nagar main road 45.00

5 Mettling and asphalting cross and main roads of Muneshwara Badavane,Gunddapa Badavane and near IPP hospital 45.00

6 Asphalting cross and main road of LG Rammaiah Badavane Lavakusha nagar and Byraveshwara nagar 40.00

7 Mettling the main roads of Kempegowda layout and Chowdeshwari nagar 35.008 Mettling the main roads and construction of slab drain at Rajgopal nagar 35.00

Total 335.00C)Bridges & culverts

1 Construction of RCC deck slab at juunctions of main and cross roads at Rajeshwaari nagar, Shambavi nagar and Kasturi Badavane 50.00

2 Construction of RCC Box Drain For Raja Kaluve in Chowdeshwari nagara from Pushpa Bar Main Road to BWSSB Pipeline road 50.00

DASARAHALLI ZONEPROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

Programme of works for the year 2008-09 LAGGERE SUB -DIVISION

57

Page 64: Programme_Of_Works_2008-2009

3 Construction of RCC Box Drain For Raja Kaluve in front of Kempegowda arch in Hanumaiah Badavane 50.00

Total 150.00D)Bridges & culverts

NILLE) Concrete road

NILLF) Water supply

NILLG) Play Ground & protection of BBMP assets

NILL

II. Matainanace Worka) Builings

NILLb) Roads & Drains

NILLc) Water supply

NILLd) Maintainance of UGD

NILLe) Fly over, Under pass & pedestrian subway

NILL

III. 18% Grants

1

Construction of Concrete roads for cross & main roads of Laggere Old Village & Near Basappanakette and construction of RCC box type bridge at Basappana katte

80.00

2 Construction of community hall in Laggere Old Village. 15.003 Junction improvement and winding of Laggere circle 25.00

IV) Other Worksa) Other Works

NILLTotal 120.00

Grand total 670.00

Sl. No. Name of Work Est. Amount (Lakhs)

Capital Worksa) Buildings

1 Construction of Sub-Division office Building @ H.M.T layout 50.00

2 construction Samudaya Bhavna at Sy No 64 of Doddabidarakallu village in Thippenahalli 50.00

b) Roads and Drains1 Improvement Asphalting to roads in HMT Layout . 45.002 45.00

3 Improvement and metalling to the roads at Venugopala nagara CN Palya Mysore lamp Layout Bhavani nagara. 45.00

4 Improvement and Metalling to the roads at Byraveshwaranagara . 10.00

Programme of Works for the Year 2008-09 of Chokkasandra sub division

58

Page 65: Programme_Of_Works_2008-2009

5 Formation of Road & Culverts from Thippenahalli to Thirumalapura BBMP Boudary 10.00

6 Asphalting to road from PIA to NH 4 (Chokkasandra main road ) 15.00

7 Formation of Road , Drain and culverts in Muniswamappa Badavane in chennanayakana palya 25.00

8 Formation of Road , Drain and culverts in Bhavani nagar & Colony 2nd Stage 20.009 Asphalting to road from ICML to Magadi main road via maruthi layout 25.00

10 Formation of Road , Drain and culverts in Sapthagiribadare in Doddabidarekallu Villege 20.00

12 Improvement Formation of Road , Drain and culverts in Maruti Badavane (Rajanna ) at in Doddabidarekallu Villege 30.00

13 Improvement and Formation of Roads in Layout Krishnappa Badavane adjuscent to HMT layout 30.00

14 Formation of Road , Drain and culverts in Suvrna nagara 2 nd Stage 30.00

15 Construction of approching road to the solid waste management site at Doddabidarakallu. 40.00C) Bridges & Culverts

NilD)Side walks & Ducts

NilE)Concrete roads

Formation of concrete roads in Doddabidrakallu village and Chokkasandra 15.00F) Water supply

NilG)Play ground & protection of BBMP properties

1 Construction of compound wall to govt properties in Chokkasandra sector 36.00

(II) Maintance worksA) Buildings

1 Maintanance of Sub-Division Office Building located at SGSJRY Building 4.00

B) Roads & Drains

1 Pot hole fillings of roads in Chokkasandra, Nagasandra and Dodddabidarakallu sector. 5.00

C) water supplyNil

D) Flyover , Under pass & Grade seperatorNil

(III) 18% Programme1 Construction of Concrete roads in Doddabidarakallu colony 30.002 Construction of Concrete roads in Nagamma Badavane. 35.003 Construction of Concrete roads in Nagasandra Colony and old Village 40.00

4 Rehebilitation and Reconstruction of collapsed CD works in Chokkasandra sub- division. 15.00

5Pot holes filling and repairs to the roads in Chokkasandra , Nagasandra and Doddabidarakallu Sector. 10.00

665.00

59

Page 66: Programme_Of_Works_2008-2009

Herohalli

Sl.No. Name of Works Est Amt in Lakhs1 2

I.(Original works )A) Buildingsnil

B) Roads and drains

1Asphalting of om shakti temple road from Hegganahalli cross to Nadakereppa Indutrial main road 49.00

2 Asphalting of Shankaranti Dhaba main road 48.00

3Asphalting of Sreenivasa Nagar Tent road From Magadi Road to Karim Sab layout main road via K.T.G. College 40.00

4Improvement & Asphalting of P & T Layout Main Road From magadi road to Pipeline 49.00

5Industrial Estate Main Road From Herohalli Main Road to Andrahalli Main Road 49.00

6Improvement & Asphalting of Kempegowda Main Road From Magadi Road Police Quarters 35.00

7 Asphalting of cross & Main roads of B.E.L Layout 1st Stage, 25.008 Asphalting of Magadi Road From Janapriya Apartments 25.00

9Providing B.S. Slab drains and Formation and Construction of Culverts At Cross & Main Roads Of Hosahalli 25.00

10Providing B.S. Slab drains and Formation and Construction of Culverts At Annapoorneshwari Nagar, Hegganahalli 25.00

11Providing B.S. Slab drains and Formation and Construction of Culverts At Lakshmana Nagar 25.00

12Providing B.S. Slab drains and Formation and Construction of Culverts At Thyagaraja's house Road,and Crooss Roads, Anjana Nagara. 15.00

13Providing B.S. Slab drains and Formation and Construction of Culverts At Vasanathappa Badavane, Herohalli 20.00

14Providing B.S. Slab drains and Formation and Construction of Culverts At Cross & main Roads of Tunganagar,Herohalli. 21.50

15Providing B.S. Slab drains and Formation and Construction of Culverts At Anjaneya swamy Temple Roads & Cross Roads of anjeevininagar,Hegganahalli. 25.00

16Providing B.S. Slab drains and Formation and Construction of Culverts At Shanakarappa Industrial Estate, Sunkadakatte. 25.00

17Providing B.S. Slab drains and Formation and Construction of Culverts At Srigandakaval, Srinivasnagar. 25.00

18Providing B.S. Slab drains and Formation and Construction of Culverts At Byraveshwara Industrial Estate & Muneshwaranagar ,Hegganahalli 19.50Nil

III. (18% Programme )A) 18% Programme

1 Concreting and improvement works of cross roads of Colony of Hosahalli 25.00

POW (Works Proposed For 2008-09)PROGRAMME OF WORKS FOR THE YEAR 2008-09

60

Page 67: Programme_Of_Works_2008-2009

2Providing B.S. Slab drains and Construction of Culverts and formation of Roads and Cosntruction of Culverts At Janatha colony, and Bilekallu. 20.50

3 Improvement & Asphalting of Hosahalli Main Road 49.50

4At Electrician Kumar Hose Road ( Behind Chandragiri Bar), Mayura Nagar, Hegganahalli 5.00

5 Construction of School rooms at Hosahalli 15.006 Construction of Angana vadi at Hegganahalli School Premises 5.00

IV. (Other Works )Nil

Grand Total 666.00

Sl No Name of Work Est. Amount (Lakhs)

a) Buildings1 construction of School Building at Andrahalli Village in N G Halli Sub Div. 15.002 construction of School Building at Thigalarapalya in N G Halli Sub Div. 10.003 construction of School Building at Karihobanahalli in N G Halli Sub Div. 10.004 Corstruction of Nelagadaranahalli sub division office at Gruehalakshmi Layout. 50.00

b) Roads and Drains

1 Formatiion of road and construction of B.S slab drain &culverts at cross roads of Tigrapalya Main road in N G Halli Sub Div. 30.00

2 Formation of Roads at Vidyamanyanagara East main Road & Cross Roads N G Halli Sub Div. 30.00

3 Formation of Roads and construction of culverts at Vidyamanyanagara West main Roads & Cross Roads N G Halli Sub Div. 30.00

4 Formation & constructions of Drains and construction of culverts at cross roads between Thigalarapalya and Andrahalli main Road N G Halli Sub Div. 25.00

5 Construction of Storm water drain at Raja Caluve in between Andrahalli & Thigalarapalya main Road N G Halli Sub Div. 40.00

6 Construction of SSM drain in Kalikanagara Area N G Halli Sub Div. 30.00

7Formation of Roads & Construction of B S Slab drain & Culverts From Siddagangamma Layout to Ragavendranagar main Road & Doddanna Layout in N G Halli Sub Div.

20.00

8 Formation of Roads & Construction of B S Slab Drain & culverts at cross Roads of Andrahalli main Road N G Halli Sub Div. 20.00

9 Formation of Roads & Construction of B S Slab & SSM Drains at Karihobanahalli N G Halli Sub Div. 30.00

10 Construction of Culverts & construction of B.S slab drain at Shivapura & Nelagadrahalli N G Halli Sub Div. 30.00

11 Construction of B.S.slab drains & culverts at N.G.Halli new layout adjecent to HMT layout N G Halli Sub Div. 15.00

13 Formation of Roads and construction of B.S.slab drain at Siradisai nagar cross roads in NG halli sub -division . 25.00

14 Asphalting to Guhalakshmi Layout in N G Halli Sub Div. 30.00

15 Asphalting to Nelagadaranahlli and Shivapura main roads in N G Halli Sub Div. 30.00

16 Providing name boards in Nelagadaranahalli Sub-Division in N G Halli Sub Div. 5.00

programe of Work for the Year 2008-09 of Nelagadaranahalli Sub division

Orginal works

61

Page 68: Programme_Of_Works_2008-2009

17 Construction if SSM Drain at Storm Water Drain near Shiva Temple at Andrahalli in N G Halli Sub Div. 21.00

18 Cinstruction of RCC Drain @ Aralikatte road 6th cross 1st main Shivapura Ward no 23 in N G Halli Sub Div. 20.00

C) Bridges and CulvertsNill

D) Side Walks & DuctsNill

E) Concrete Roads

1 Proiding CC Paving to narrow lanes at N.G.Halli & Shivpura Village colony N G Halli Sub Div. 30.00

F) Water Supply Nill

II Maintenance a) Buildings

Nillb) Roads & Drains

Nillc) Water Supply

Nilld) Maintenance of UGD

Nille) Flyover, Underpass& Grade Separater

NillIII 18% Programme

1 Formation of Road & Drains in old Andrahalli Village belind & beside Govt Schoolin N G Halli Sub Div. 20.00

2 Formation of Road & Construction of Drains at old Thigalarapalya in N G Halli Sub Div. 20.00

3 Formation of Roads Drains & Construction of Calverts Pilavanarapalya at Thigalarapalyain N G Halli Sub Div. 30.00

4 Formation of Road & Construction of B S Slab drain at Shivapura Colony in N G Halli Sub Div. 26.00

5 Providing CC road at Andrahalli Old Village in N G Halli Sub Div. 23.00TOTAL AMOUNT IN LAKHS 665.00

SL NO Name of Work Estimated cost

Building Rs.In Lakhs1 Constructiomn of offies bulbing in bagalanunte sub division 50.00

Road and Drain Works1 Improvement and Asphalting of sidedahalli main road from KM 1.1to 1.5 50.002 improvements to rcross roads of GeleyaraBalaga Layout 40.003 improvements to cross rods of Shettyhalli 50.00

4 improvements road from Hesaragatta main road to maruthi service station (Krishnamurthy layout) 20.00

Bridges and Roads 1 Formation of road drain and culverts in defance colony 35.00

POW (WORK PROPOSED FOR 2008-09) PERTAINING TO BAGALAGUNTE SUB DIVISION ( Rs.IN LAKHS)

I Original Works

62

Page 69: Programme_Of_Works_2008-2009

2 Formation of roads drain and culverts in Vidyanagara and Vishweshwaraya Colony 45.00

1 Formation of footpath and side walk in Sidedahalli main road 95.002 Formation of footpath and side walk MEI layout 95.00

480.00

1 improvements and special repairs to schools 10.002 Improvements to Special repairs to Anganavadi Buildings 10.00

Maintenance of UGD1 Maintenance of UGD in old CMC ward No.7 10.00

Maintenance of UGD in old CMC ward No.8 10.00Maintenance of UGD inChikkasandra, Shettyhalli and Medarahalli Village 18.00

58.00

1 improvements to Cross roads of Havnoor Badavane and Soundarya layout 50.002 Formation of road drain and Culvert in Chikkasandra Village 30.003 Formation of road drain and Culverts in Manjunathnagara 45.00

125.00

1 Providing and fixing of side board, stret name board and boundry limit board 3.003.00

666.00

1. MAINTENANCE WORKS.

1 Annual operation and maintenance of street lights within the limits of dasarahallisub division , Bruhath Bangalore Mahanagar palike , Dasarahalli zone.

25.00

2 Annual operation and maintenance of street lights Within the limitsofBagalagunte sub division , Bruhath Bangalore Mahanagar palike , Dasarahallizone.

22.50

3 Annual operation and maintenance of street lights within the limits ofChokkasandra sub division , Bruhath Bangalore Mahanagar palike ,Dasarahalli zone.

22.50

4 Annual operation and maintenance of street lights within the limits ofNelagadaranahalli sub division , Bruhath Bangalore Mahanagar palike ,Dasarahalli zone.

25.00

5 Annual operation and maintenance of street lights within the limits of Laggeresub division, Bruhath Bangalore Mahanagar palike , Dasarahalli zone.

25.00

6 Annual operation and maintenance of street lights under Herohalli sub division ,Bruhath Bangalore Mahanagar palike , Dasarahalli zone.

30.00

7 Electical Maintenace of Bruhath Bangalore Mahanagar palike Buildings,schools, and IPP Centers within the limits of B.B.M.P, Dasarahalli Zone.

10.00

Side Walks and Decks

ii Maintenance works

iii 18% Programme

IV Other Works

Grand Total (I+ii+iii+IV)

Rs in Lakhs

S.L NO NAME OF THE WORKAPPROX. ESTIMATE

COST.

TOTAL 160.00

63

Page 70: Programme_Of_Works_2008-2009

2 ORIGINAL WORKS

APPROX. ESTIMATE COST.

Rs in Lakhs

1

Providing tube light street light fittings and timer switches within the limits ofDasarahalli Subdivision , Bruhath Bangalore Mahanagar palike , DasarahalliZone. 20.00

2

Providing tube light street light fittings and timer switches within the limits ofBagalagunte Subdivision , Bruhath Bangalore Mahanagar palike , DasarahalliZone. 20.00

3

Providing tube light street light fittings and timer switches within the limits ofChokkasandra Subdivision , Bruhath Bangalore Mahanagar palike , DasarahalliZone. 20.00

4

Providing tube light street light fittings and timer switches within the limits ofNelagadaranahalli Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 20.00

5

Providing tube light street light fittings and timer switches within the limits ofLeggere Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli Zone.

20.00

6

Providing tube light street light fittings and timer switches within the limits ofHerohalli Subdivision , Bruhath Bangalore Mahanagar palike , DasarahalliZone. 20.00

7

Providing Sodium Vapour street light fittings and timer switches within thelimits of Dasarahalli Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 20.00

8

Providing Sodium Vapour street light fittings and timer switches within thelimits of Bagalagunte Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli zone. 20.00

9

Providing Sodium Vapour street light fittings and timer switches within thelimits of Chokkasandra Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone 20.00

10

Providing Sodium Vapour street light fittings and timer switches within thelimits of Nelagadaranahalli Subdivision , Bruhath Bangalore Mahanagar palike, Dasarahalli Zone. 20.00

11

Providing Sodium Vapour street light fittings and timer switches within thelimits of Leggere Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 20.00

12

Providing Sodium Vapour street light fittings and timer switches within thelimits of Herohalli Subdivision , Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 20.00

13Providing 12.5 Mtr High mast light at TVS Cross Junction, Leggere near RingRoad Bridge, Hegganahalli , Magadi main road, Near BEL layout. 16.00

14

Providing Illumination to Hegganahalli Main Road from Peenya 2ND Stage toSunkadakatte Within the limits of Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 25.00

283.00

S.L NO NAME OF THE WORK

15Shifting of Electrical poles and Lines obstructing Traffic flow in Roads.

2.00TOTAL

64

Page 71: Programme_Of_Works_2008-2009

III. ORIGINAL WORKS-18% PROGRAMME

APPROX. ESTIMATE COST.

Rs in Lakhs

1

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Kammagondanahalli Colony, Abbigere Colony, Ravindra Nagar,Mallasandra colony, kalasthi nagar, Under Dasarahalli subdivision, within thelimits of Bruhath Bangalore Mahanagar palike , Dasarahalli Zone. 15.00

2

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Bagalagunte Colony, and Manjunath Nagr Colony UnderBagalagunte Subdivision , within the limits of Bruhath Bangalore Mahanagarpalike , Dasarahalli Zone. 5.00

3

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Narayanpura colony, nethaji nagar, Under ChokkasandraSubdivision , within the limits of Bruhath Bangalore Mahanagar palike ,Dasarahalli Zone. 7.50

4

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Nelagadaranahalli colony, Shivpura Colony,Thigalarapalya Colony,Channanayakanahalli colony, Doddabidarakallu Colony etc UnderNelagadaranahalli Subdivision , within the limits of Bruhath BangaloreMahanagar palike , Dasarahalli Zone. 12.00

5

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Lakshmidevi nagar colony, Rajgopal nagar colony, leggere colonyetc. Under Leggere Subdivision , within the limits of Bruhath BangaloreMahanagar palike , Dasarahalli Zone. 10.00

6

Providing Tube Light, Sodium Vapour Street light fittings, Control wires &Switches at Heggenahalli colony. Maruthi nagar, Herohalli colony etc. UnderHerohalli Subdivision, within the limits of Bruhath Bangalore Mahanagarpalike , Dasarahalli Zone. 7.50

57.00Zone Total 4498.00

Total

S.L NO NAME OF THE WORK

65

Page 72: Programme_Of_Works_2008-2009

WEST ZONEDetails of Programme of works for the year 2008-09

(Works proposed for 08-09)

Pertaining to Yeshwantapura Sub Division-ISl No. Name of the work Est. cost

I. General Worksa. Capital Works

1 Providing Asphalting to HMT high school to ISRO in Ward No. 1 10.00

2 Providing Asphalting to Ayyappa Ngr, Udupa garden Jalahalli Village to missing bits in ward no. 1 8.00

3 Providing Asphalting to Peenya, Saradambanagara in Jalahalli Village & Saradambanagara (new layout) W-1 10.00

4 Providing CC to 1st, 1st Am 2nd & 5th Crs. of Sharadamba Ngr in Ward No. 110.00

5 Formation of Footpath, consruction drain & shoulder drain from ST plant towards HMT high school in W-1 10.00

6 Construction of balance portion of SSM drain near Gruhalakshmi Apts. Upto NH-4 in Ward No. 1 10.00

7 Imp. to drain & culverts in Jalahalli Village in Ward No. 1 5.00

8 Construction of SSM drain & RCC covering slab, park road, Jalahalli in Ward No. 1 9.00

9 Construction of Compound wall to Protect Corporation property near Ward Office in Ward No.1 3.00

Sub - Total = 75.00b. Maintenance

10 Procurement of Bitumen Emulsion for filling potholes in W-1 1.0011 Depot Collections for the year 2008-09 in Ward No. 1 1.00

12 Improvements & special repairs to Ward-1 Office, Tailoring Hall, Anganwadi & Gymnasium building 4th cross at Jalahalli Village in W-1 3.00

13 Providing & Painting of street name boards in Ward No. 1 1.0014 Supply of sign boards & baricades for execution of works in W-1 1.00

Sub - Total = 7.00A. General Works Total = 82.00

II. Contact Points15 Maintenance of Contact Point at Ward-1 Office, 4th Crs Jalahalli in ward no. 1

10.0016 Emergency fund (JC/CE) 13.00

II. Contact Points Total = 23.00Details of Programme of works for the year 2008-09

(Works proposed for 08-09)Pertaining to Yeshwantapura Sub Division-II

a. Capital Works1 Construction of Plastic Collection centre near Chowdeshwari bus stop in W-2 1.00

2 Providing Metalling, Culverts, deck slab & Asphalting to 12th A , F cross & surroundings, in Mutyala Ngr W-2 23.00

3 Providing Metalling, Culverts, deck slab & Asphalting to 15th C, H, T & sourrounding crosses, in Mutyala Ngr W-2 12.00

4 Improvements to Drains & Culverts in Brindavan Nagar Ward No. 2 6.005 Providing deck slab over SWD infront of J P Park in W-2 10.006 Improvements to Drains & culverts in M K Ngr W-2 5.007 Improvements to Drains & culverts in Chinnappa Gdn W-2 5.00

66

Page 73: Programme_Of_Works_2008-2009

8 Improvements to Drain & providing covering slab along pipline road (northern side) w-2 5.00

9 Providing Metalling & improvements to drain in Muthyala Ngr W-2 9.00Sub - Total = 76.00

B. Maintenance10 Procurement of Bitumen Emulsion for filling potholes in W-2 1.0011 Providing & Painting of street name boards in Ward No. 2 1.0012 Supply of sign boards & baricades for execution of works in W-2 1.00

13Improvements & special repairs to Post Office, Veternary Hospital & Tailoring Centre, 1st Mn Rd Jalahalli, Ward-2 Office building, near Chowdeshwari Bus W2 3.00

Sub - Total = 6.00I. General Works Total = 82.00

II. Contact Points

14 Maintenance of Contact Point - I at Ward-2 Office, Chowdeshwarai Bus stop in ward no. 2 10.00

15 Emergency fund (JC/CE) 13.00II. Contact Points Total = 23.00

Details of Programme of works for the year 2008-09 (Works proposed for 08-09)

Pertaining to Yeshwantapura Sub Division-IIIa. Capital Works

1 Construction of Help Line centre @ Government High School premises Gokula 1st stg, 1st Ph. In W-3 9.50

2 Additions & special repairs to Ward-3 Office, Tailoring centre & Quarters at Pipe line road, W-3 3.00

3 Providing Cement Concrete to Crs road from 2nd Mn towards SWD Gokula 1st stage, 3rd Ph & Bandappa street & formation of L drain on northern side of Bandappa street in Ward No.3 16.00

4 Providing Aspalting to balance roads in Gokula 1st stage 3rd phase, 12th cross. 2nd Mn Rd B K Ngr & surrounding crosses in Wrd No. 3 10.00

5 Construction of box dain & providing covering slabs along 2nd main road, B K Ngr (Eastern side) from Bandappa Road in Ward No. 3 8.00

6 Reconstruction of drain & providing covering slabs over drain from Shanimahatma Temple to IPP Hospital, 1st Mn Rd, B K Ngr W-3 7.00

7 Improvements to drains & junction in front of Rly Station in Ward No. 3 12.008 Improvements to drains & Providing Covering slabs to 15th cross B K Nagara in

Ward No. 3 6.009 Construction of Samudaya Bhavana (Balance Works), 1st Main Road, BK

Nagara in Ward No 3 60.00Sub - Total = 131.50

b. Maintenance9 Procurement of Bitumen Emulsion for filling potholes in W-3 1.00

10 Depot collection for the year 2008-09 W-3 1.0011 Improvements & special repairs to Corporation High School, Junior College at

Gokula 1st stg, 1st Ph, Nursery School behind Metarnity Hospital at Yeshwantpura & IPP Hospital at 1st Mn Rd, B K Ngr in W-3 6.00

12 Providing fencing to corporation property at 1st E Mn & Painting of name boards in Ward No. 3 1.50

13 Supply of sign boards & baricades for execution of works in W-1 1.00Sub - Total = 10.50

I. General Works Total = 142.00

67

Page 74: Programme_Of_Works_2008-2009

II. Contact Points14 Maintenance of Contact Point - I at Ward-3 Office, Pipeline road in ward no. 3

10.0015 Emergency fund (JC/CE) 13.00

II. Contact Points Total = 23.00

1

Providing Cement concreting to narrow roads (6th, 6th ‘A’ cross &1st ‘A’ mainroad) in K.N. Extenstion and Gokula 1st stage 2nd phase (lane joining 4th crossroad & 5th cross road) & 1 'B' road in M.K. Estn., & 3rd main road inChikkamaranahalli in Ward No.04.

16.00

2Re-Asphalting of 3,4,5,6th Cross roads & 4,5,6th man roads AGS layout & 1st

Cross road & main road of Jaladarshini layout & roads of ITI layout &Venkateshwara layout in Ward No.04.

15.00

3Re-Asphalting to 1st ‘A’ to 1st ‘D’ Cross roads, 1st & 2nd main road in RMV 2nd

stage 3rd block & 1st to 6th cross roads, 1st to 3rd main roads in Chikkamaranahalliin Ward No.04

15.00

4 Re-Asphalting to 1st to 4th cross roads in R.K.Garden in Ward No.04. 13.00

5 Re-Asphalting of Pipeline road from BEL road to Nethaji Circle in Ward No.04 17.00

Sub-Total -1 76.00

6 Supply of Emulsion Tar 1.007 Depot Collection 1.008 Construction Plastic Collection centre in ward No 1.009 Providing Work Name Baords 1.00

10 Painting to Name boards in ward No 4 2.00Sub-Total -2 6.00

Total 82.00

13 Maintenance of Help line Centre in ward No 4 10.0014 Reserves Grants 13.00

Sub-Total -4 23.00

Sl. No. Name of the work Est Cost (In laksh)

1 Providing drains, metalling & Asphalting to Seenappa layout road in wardno.100

20.00

2 Re-Asphalting to cross roads from 1st to 6th cross roads & 2nd main road ofJaladarshini Layout. in ward no.100

15.00

3 Re-Asphalting to cross roads from 1st to 6th cross roads & main roads 1st to 5th

main roads of NGEF Layout. in ward no.10016.00

4 Re-Asphalting to 2nd main road & 11th cross roads of Dollars Colony RMV 2nd

stage & 2nd Block cross roads in ward no.10010.00

List of Proposed POW Works for 2008-09 In Ward No 4 Pertaining to Sanjaynagar Sub-division

Sl. No. Name of the work Est Cost

(In lakhs)CAPITAL WORKS

MAINTAINANCE WORKS

HELP LINE CENTRE

List of Proposed POW Works for 2008-09 In Ward No 100 Pertaining to Sanjaynagar Sub-division

CAPITAL WORKS

68

Page 75: Programme_Of_Works_2008-2009

5 Re-construction of culverts at Patellappa layout, Geddalahalli & KEB layout inward no.4.

10.00

6 Construction of Culverts across SWD near ISRO main Builiding in ward no.100 5.00

Sub-Total -1 76.00

7 Supply of Emulsion Tar 1.008 Depot Collection 1.009 Construction of Plastic collection centre in ward no.100 1.00

10 Providing Work Name Boards 1.0011 Paiting to name boards in ward no.100 2.00

Sub-Total -2 6.00

14 Maintenace of Helpline Centre in ward No 100 10.0015 Reserves Grants 13.00

Sub-Total -5 23.00

Sl.No Name of the Work Est. cost in Lakhs I. CAPITAL WORKS

1Providing Cement Concrete to Conservancy Lane (Behind food world) &Providing Covering slab infront of Sevasadana and Construction of Culverts(T.Chowdeshaiah road ) in IDEL park Malleshwaram in ward no.5

10.00

2 Improvements to footpath C.V Raman in ward no.5 19.00

3Improvements to Footpath & Drain, 11th Cross from 3rd Cross to toward 3rdMain Road, Vyalikaval and 12th A cross, Kodhandaramapura,Malleshwaram inward no.5

16.00

4 Providing Asphalting and Footpath at 4th Cross Road in S.P.Extension in ward no.5

5.00

5 construction of RCC drain & Covering Slab from Sankey tank to Maramma Circle in ward no.5

15.00

6 Improvements to Public Toilet at 12th Cross, Kodandharampura & Ward office in ward no.5

3.00

7 Improvements of Open Air Theatre, Gymnasium Building and Improvements to Kabaddi Ground at 12 th Cross, Kodandaramapura in Ward No 5

50.00

Sub Total - 1 118.00II. Maintenance Works

7 Annual Maintenance of Samudhaya Bhavana & I.P.P Building in ward no.5 4.008 Depot Collection for the year 2008-09 in ward no.5 1.009 Providing Painting to Kerb stone & Name Boards in ward no.5 1.50

10 Supplying Tools & Plants & Signed Boards in ward no.5 1.5011 Supply of emuslion tar for Potholes filling in ward no.5 1.00

12 Barricading & Desilting for the Imerssion of Ganesh Idol at Sankey Tank in ward no.5 5.00

Sub Total - 2 14.00Total for General Grant 132.00

MAINTAINANCE WORKS

HELP LINE CENTRE

BRUHATH BANGALORE MAHANAGARA PALIKE

POW (Works Proposed for 2008-09) in ward no.5, Malleshwarm Sub division

69

Page 76: Programme_Of_Works_2008-2009

Sl.No Name of the Work Est. cost in LakhsI.Capital Work

1 Improvements to Road side drain & Footpath from Dhattatreya Temple to Sheshadripuram 1st cross, Malleshwaram in ward no.6

10.00

2Providing Concrete to Conservancy lane, 1st street, Anjaneya Block Back side and Providing RCC covering slab for concrete drain between 6th and 8th cross left side CCA road in ward no.6

15.00

3 Asphalting to Nagappa Street Main Road from Vinayaka Circle to Sheshadripuram, 1st Main Road , Malleshwaram in ward no.6

10.00

4 Improvements to Road side Drain and Footpath Resitting at Gutthalli Main Road,Malleshwaram in ward no.6

15.00

5Improvements to drain & Footpath at 10th Cross from sampige Road to 2nd Temple Road & 5th cross Pipe line road to SWD Malleshwaram in ward no.6

13.00

6 Improvements to Railway paraller Road side drain & Foothpath from Sampige theatre to Railway Bridge & 4th main, M.D. Block in ward no.6

13.00

7 Improvements to ward office in ward no.6 1.00Sub Total - 1 77.00

II. Maintenance Works8 Depot Collection for the year 2008-09 in ward no.6 1.009 Providing Painting to Kerb stone & Name Boards in ward no.6 1.50

10 Supplying Tools & Plants & Signed Boards in ward no.6 1.5011 Supply of emuslion tar for Potholes filling in ward no.6 1.00

Sub Total - 2 5.00Total for General Grant 82.00

Sl.No Name of the Work Est. cost in LakhsI. Capital Works

1 Construction of Gymnasium Building at Pit Colony Play ground in ward no.7 6.00

2 Providing Asphalting to 1st to 4th Main, M.T.Layout , bad reaches of 9th &7th Cross, Malleshwaram in ward no.7 10.00

3Improvements to Drains & Footpath at 6th Cross, 7th Cross, (Between 4th Main & 6th Main) & at 6th Main Road, Malleshwaram, and Improvements to Drain atS.C.Road, Shariff Slum in in ward no.7

14.00

4 Improvements to footpath at Sir. C.V.Raman Road from Maramma Circle to MSR Road (Southern side) in ward no.7

18.00

5 Providing Reconcreting to Conservancy lanes between 6th Cross & 11th Cross Malleshwaram in ward no.7

9.00

6 Improvements to drains & Culverts at 10th Main & 12th cross, Malleshwaram in ward no.7

20.00

Sub Total - 1 77.00II. Maintenance

7 Depot Collection for the year 2008-09 in ward no.7 1.00

8 Providing Painting of Kerb Stones & Name boards in Malleshwarm in ward no.7 1.50

9 Supply of emuslion for patches of Potholes in ward no.7 1.0010 Supply of Tools & Plants & Signed Boards to ward no.7 1.50

Sub Total 2 5.00Total for General Grant 82.00

POW (Works Proposed for 2008-09) in ward no.6,Malleshwarm Sub division

POW (Works Proposed for 2008-09) in ward no.7, Malleshwarm Sub division

70

Page 77: Programme_Of_Works_2008-2009

MAHALAKSHMIPURAM SUB DIVISION

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Capital Works 1 Providing and constructing SSM drain 9th Main, Srirampuram and Kalappa

Block surrounding areas in ward No.25.10.00

2 Reconstruction of drain and providing deck slab at Nagendra Garden in Ward No.25.

8.00

3 Providing cement concrete road and lanes at 5th, 6th and other surrounding area of Gopalapuram in Ward No.25.

7.00

4 Providing cement concrete road and lanes at Modamoddhin block in Ramachandrapura in Ward No.25.

9.00

5 Providing cement concrete road and lane at Pillamma Block, 1st Cross, 2nd Cross and surrounding.

9.00

6 Providing cement concrete at Saibabanagar 1st, 2nd, 3rd and 4th Cross in Ward No.25.

8.00

7 Providing cement concrete road 1st and 2nd Cross New Kalappa block in Ward No.25.

7.00

8 Providing cement concrete road in Selva Nagar Main Road in Ward No.25. 7.009 Providing cement concrete road and drain at Aurandathi nagar In ward No.25. 5.00

10 Providing cement concrete roads and drain (Missing bits) in Gopalapuram and surrounding areas in Ward No.25.

7.00

II. Maintenance Works 11 Procurement of Bitumen mulsion for filling pot holes in Ward No.25 1.0012 Depot Collections for the year 2008-09 in Ward No.25. 1.0013 Providing painting of street name boards in Ward No.25 1.0014 Supply of Sign boards and barricades for execution of works in Ward No.25 1.0015 Providing painting to kerb stones in ward no.25 1.00

Sub total 82.00II. Contact Points (Help Line Centre)

20 Maintenance of Contact point at Ward No.25, Office 10.0021 Emeregency Fund (JC / CE ) 13.00

Sub Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Capital Works 1 Providing drain & Cement concrete to roads & lanes in Shastrinagar in Ward

No.26.9.00

2 Providing Cement Concrete to lanes in Papanna Block in Ward No.26. 9.003 Providing Cement Concrete to lanes in Swatantrapalya in Ward No.26 9.004 Providing Cement Concrete to lanes in Swatantrapalya 1st Main Road 9.005 Providing Cement Concrete to lanes in Hanumanthapura 1st & 2nd Main &

Cross Roads in Ward No.26.10.00

II. Maintenance Works 6 Improvements to drain at Kasturinagar & Providing Cement Concrete to Cross

Roads in Ward No.26.7.00

7 Reconstruction of primary SWD & Providing RCC Coveringin Papanna Block in Ward No.26.

14.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 25

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 26

71

Page 78: Programme_Of_Works_2008-2009

8 Special repairs to public toilet Behind church Vatal Nagaraj Road, Okalipuram slum , Narayan Colony & Improvements to Surrounding area in Ward No.26.

5.00

9 Special repairs to public toilet Jai Bheem Nagar & VST Colony Slum & Imrpvoements to Surrounding area in Ward No.26.

5.00

10 Procurement of Bitumen mulsion for filling pot holes in Ward No.26 1.0011 Depot Collections for the year 2008-09 in Ward No.26 1.0012 Providing painting of street name boards in Ward No.26 1.0013 Supply of Sign boards and barricades for execution of works in Ward No.26 1.0014 Providing painting to kerb stones in ward no.26 1.00

Sub total 82.00II. Contact Points (Help Line Centre)

19 Maintenance of Contact point at Ward No.26, Office 10.0020 Emeregency Fund (JC / CE ) 13.00

Sub Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Capial Works 1

Construction & formation of drains to cross roads in K.P. West in Ward No.27. 5.002

Providing and construction of drain in and around Nehrunagar in Ward No.27. 5.003 Construction of drain & providing RCC slab covering (N/Side) from palace road

to 1st Main road Gandhinagar, Kalidasa Marga in Ward No.27. 7.004 Construction of footpath in the surrounding area of Gandhinagar School in K.P.

West in Ward No.27. 5.005 Formation & Providing cement concrete to lanes & narrow lanes in the

surrounding areas of P.C. Road in Ward o.27. 5.006 Providing Cement Concrete to Hospital road at Balepet in Ward No.27. 5.007 Annual maintenance to Community Hall at Resildar Street in Ward No.27. 5.008 Special repairs to toilet block at Rilsdar, V.V. Giri Colony and Lakshmanpuri

and Himayala Slum in Ward No.27. 6.009 Improvements to drains of lanes and By-lanes in Laxmanpuri Colony in Ward

No.27. 5.00III. Maintenance of Work

10 Improvements to drains in the surroundings of Sirurpark at Sheshadripuram in Ward No.27. 5.00

11Imprvoements to drains & Providing RCC slab covering to drains (W/Side) of Sheshadripuram 1st Main from Kino Theatre to Sheshadri Circle in Ward No.27. 5.00

12Improvements to drains & footpath in Balepet surrounding areas in Ward No.27. 5.00

13 Improvements, rejuvenation and beautification of footpaths at Dr. T.C.M. Royan Circle in Ward No.27. 5.00

14 Annual maintenance of Sub Way at Railway Station in Ward No.27. 5.0015 Procurement of Bitumen mulsion for filling pot holes in Ward No.27 2.0016 Depot Collections for the year 2008-09 in Ward No.27 2.0017 Providing painting of street name boards in Ward No.27 3.0018 Supply of Sign boards and barricades for execution of works in Ward No.27 2.00

Sub Total 82.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 27

72

Page 79: Programme_Of_Works_2008-2009

II. Contact Points (Help Line Centre)22 Maintenance of Contact point at Ward No.27, Office 10.0023 Emeregency Fund (JC / CE ) 13.00

Sub Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Original Works a. Buildings

1 Construction of 2nd floor at 25th cross Cubbonpet 10.00Concrete road

2 Providing Cement concrete road to 2nd cross Sowrastrpet 10.00

3Providing Cement concrete road to OTC road B/w BVK Iyengar road to Balepet road 60.00

4 Providing Cement concrete road to S.V. Lane Crosses 10.005 Providing Cement concrete road to D.K. Lane crosses 5.00

II. Maintenanceb. Roads drains

1 Desilting & Improvements to footpath Avenue road 25.002 Depot Collection for the year 2008-09 2.003 Desilting and Improvements to footpath at OT pet road 15.004 Desilting and Improvements to footpath at Balepet main road 15.005 Annual Maintenance to Help point in 10th cross S.P. Extension 1.006 Repairs to road cutting works in concrete roads 5.007 Improvements to Akkipet main road 25.008 Filling up of pot holes 5.00

Total 183.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Original Works a. Buildings

1 Construction of gents public toilet at Nagammanagara main road 10.002 Construction of Gents toilet at Vinny colony magadi road 10.003 Construction of Urinals at DR.TCM Royan road 3 Nos 20.004 Construction of gents toilet at Nethajinagar Magadi road 10.005 Construction of Ladies toilet at Ist main road Magadi road Vinny colony 10.00

II. Maintenancea. Buildings

1 Repairs to Urinal & toilet 15.00b. Road and drains

1Providing Cement concrete road Balance portion from ETA apartment to Eshwara Temple road 20.00

2Providing Cement concrete road and box drain and L shape drain at Ist cross road 18.00

3Construction of box drain and desilting of L shape draina nd Providing culverts at Magadi road 6th cross 18.00

4Providing Cement concrete road from cottonpet main road to Akkipet main road including desilting of drain & impts to drains 15.00

5Providing cement concrete road and desilting and iMpts to drain at K.V. Lane cross roads 10.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 28

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 29

73

Page 80: Programme_Of_Works_2008-2009

6Providing Cement concrete road from Dr. TCM Royan road to cottonpet main road ( Mill road) 15.00

7Providing Cement concrete road and desilting and Impts to footpath & drain at Kurubarpet cross road 25.00

8 Providing CC road at Agrahara 6th cross road 15.00

9 Desilting & construction of box drain & L shape drain at Magadi road Ist cross to Keshavanagara 20.00

10 Desilting and construction of drain at 13th main road at Agrahara sub cross ( near Nataraj work shop) 10.00

11 Repairs to road cutting works 10.0012 Desilting and reconstruction of drain at 10th cross Ashwathnagar 15.00

13Deislting and construction of drain and culverts at 14th main near ( sureka shop) magadi road 15.00

14 Desilting & construction of drain 8th , 9th & 9th A B C cross road 10.0015 Filling of pot holes 6.00

Side Walk Duct

1Providing Cment concrete road and footpath concrete and desilting and Impts to drain fromm Belimutt road to Binny mill road 50.00

2 IMpts to footpath from Mill road cross road to K.V. lane near Vandrana Hotel 10.00

3Desiting and iMpts to drain and Providing footpath concrete from leprosy hospital to railway cross 20.00

4Deislting & Construction of drain and footpath concrete from Eshawara temple to mill road 15.00

5 Impts to footpath from railway crossing to Eshwara temple road at Agrahara 10.0018% grantsa Original works

1 Construction ogf Samundayabhavan at Vinny colony 10.00Total 412.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Original Works a. Buildings

1 Construction of addition room adjacent to gymnasium building at bhakshi garden 25.00

2 Construction of office complex building at Dr. TCM Royan road 20.00II. Maintenancea. Buildings

1 Repairs to urinal & otilet 10.002 Improvements to K.R market building 40.003 Repairs to nursery building & health office at Ranasingpet 10.004 Impts to Nursery School at Beeradevaragudi 6.005 Impts to Nursery School at Ranasingpet 6.006 Providing Civic aminities verternary hospital at Dr. TCM Royan road 20.00

b. Road & drains1 Providing Cement concrete road and culverts and desilting in P.V.R. ropad 25.002 Providing Cment concrete toad at cart stand road 30.003 Providing Cement concrete road atA.S> char street 25.004 Providing Cement concrete to cross road at Anjanappa garden 15.005 Repairs to road cutting 10.006 Construction of box drain at siddarthanagara 9.007 Filling up of holes 5.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 30

74

Page 81: Programme_Of_Works_2008-2009

F. sidewalk &duct

1 Providing Cement concrete footpath desilting od drain & construction of drain at Dr. T.C.M. Royan road 40.00

2Providing Cement concrete footpath, deislting of drain and Construction of drain from Veterinary hospital to Vinataka talkies 20.00

3 Providing footpath and desilting of drain at tank bund road 25.004 Providing cement concrete footpath & desilting of drain at police road 10.005 Providing Cment concrete footpath from CCB office to A.S. char street 20.00

6 Providing Cement concrete footpath from cottonpet P.S. station to CCB office 20.00Flyover & sub way

1 Repairs to footpath & repairs to expansion joints & asphalting fly over 50.0018% grants

1 Construction of first floor school building in bhaski garden 30.00Total 471.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Providing asphalting to cross roads of 1st Phase, Manjunathnagar in Ward No.15. 9.00

2 Providing asphalting to cross roads of 2nd Phase, Manjunathnagar in Ward No.15. 9.00

3 Providing cement concrete to footpath, Northern Side of Thimmaiah Road from Dr. Modi Road to 1st Main, Manjunathnagar. 9.00

4 Providing cement concrete to footpath, Southern Side of Thimmaiah Road from Dr. Modi Road to Border Road. 9.00

5 Construction of Urinals at Navarang Play Ground in Ward No.15. 4.006 Construction of Plastic collection point in Ward No.15. 2.00

Sub Total 42.00

7 Supply of Sign Board and Barricades for execution of works in Ward No.15. 2.008 Improvements of office chamber to MOH Office at Rajajinagar. 2.009 Special Repairs to Gymnasium at 4th Main, 1st Phase, Manjunathnagar. 2.00

10 Providing painting to existing Name boards. 2.0011 Maintenance of Dr. Rajkumar Kalakshethra 10.0012 Departmental Collection for Maintenance of Roads in Ward No.15. 2.0013 Improvements to drains and culverts in 1st Phase, Manjunathnagar. 6.0014 Improvements to drains and culverts in 2nd Phase, Manjunathnagar. 6.0015 Improvements to footpath at Thimmaiah road. 7.0016 Procurement of Bitumen Emulsion for Filling of potholes in Ward No.15. 1.00

Sub Total 40.00I. General Works Total 82.00

19 Maintenance of Contact Point (1 No.) 10.0020 Emergency Works [JC(W)/CE(W)] 13.00

III. Contact Point Total 23.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO RAJAJINAGAR SUB DIVISION

WARD NO.15, RAJAJINAGAR

I. GENERAL WORKSa) Capital Works

b) Maintenance Works

III. CONTACT POINT

75

Page 82: Programme_Of_Works_2008-2009

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

a) Capital Works

1 Providing SSM drain, Northern side of Kurubarahalli Main Road in Ward No.16. 10.00

2 Providing SSM drain, Southern side of Kurubarahalli Main Road in Ward No.16. 10.00

3 Construction of footpath from Netaji arch to Kamalanagar Market Right side in Ward No.16. 10.00

4 Providing SSM drain, RCC culverts at Shakthi Ganapathinagar Main Road on both side in Ward No.16. 8.00

5 Providing Ornamental Street Name Boards for Main Roads and Cross Roads of KEC Colony. 5.00

6 Construction of Culverts at Kirloskar 1st and 2nd Stage in Ward No.16. 10.007 Construction of Plastic collection point in Ward No.16. 2.00

8 Asphalting to Cross Roads of Kasturi Badavane at 1st, 2nd and 3rd Cross Roads, Kamalanagar. 5.00

9 Asphalting to Cross Roads of Kirloskar L at 1st Cross, 2nd Cross and 3rd Cross 6.00Sub Total 66.00

10 Departmental collection for the year 2008-09 of Ward No.16. 3.00

11 Maintenance of Ward Office, Tailoring Centres, Health Centers of Ward No.16. 2.0012 Procurement of Bitumen emulsion for filling potholes in Ward No.16. 1.00

13 Regrading of drain and providing flagging course to Ward Office Road in Ward No.16. 5.00

14 Providing painting to existing name boards in Ward No.16. 1.0015 Supply of Sign Board and Barricades for execution of works in Ward No.16. 4.00

Sub Total 16.00I. General Works Total 82.00

20Maintenace of Helpline Centers (2 Nos.) at Ward Office, 15th Main, Water TankRoad, Kirloskar Colony and Primary Health Center, Near Shankarnag Bus Stop, Kamalanagar. 20.00

21 Reserve Grants for the Emergency Works (JC(W) / CE (W) 3.00III. Contact Point Total 23.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO RAJAJINAGAR SUB DIVISION

WARD NO.16, KAMALANAGAR

I. GENERAL WORKS

b) Maintenance Works

III. CONTACT POINT

76

Page 83: Programme_Of_Works_2008-2009

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Construction of Helpline Center building in the premises of Ward Office. 10.00

2 Construction of drain and covering slabs in Magadi Main Road toKamakshipalya 5th Main Road in Ward No.17. 10.00

3 Construction of Size Stone Masonry Drain and providing a covering slab in 2ndMain Road of Vrushabhavathinagar in Ward No.17. 10.00

4 Providing SSM Drain and RCC Covering slab both sides in 14th Main Road andCross Roads in Nanjappa Layout in Ward No.17. 10.00

5 Providing SSM Drain and RCC Covering slab both sides in 11th Main Road andCross Roads in Nanjappa Layout in Ward No.17. 10.00

6 Providing SSM Drain and RCC Covering slab both sides in 12th Main Road andCross Roads in Maruthinagar in Ward No.17. 10.00

7 Construction of Plastic collection point in Ward No.17. 2.00Sub Total 62.00

8 Supply of sign boards and barricades for execution of works in ward No.17. 2.009 Providing and painting street name boards in Ward No.17. 2.00

10 Maintenance of Ward Office, Tailoring Centres in ward No.17. 2.0011 Depot collection for the year 2008-09 in Ward No.17. 3.0012 Procurement of Bitumen Emulsion for filling potholes in Ward No.17. 2.00

13 Improvements to drain and providing a covering slab both sides in Harali MaraMain Road in Maruthinagar in Ward No.17. 9.00

Sub Total 20.00I. General Works Total 82.00

17 Maintenace of Contact Point at Ward No.17 Office, BEML Layout. 10.0018 Emergency fund (JC/CE) 13.00

III. Contact Point Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Providing BS Slab footpath at 60 Feet Road from Havanoor Circle to BMTC Bus Stand. 15.00

2 Providing Ornamental Street Name Boards for Main Roads and Cross Roads of KHB Colony. 5.00

3 Providing SSM Drain and RCC covering slab for 3rd Main Road (Eastern Side of BBMP Property) at KHB Colony. 5.00

4 Asphalting to Roads at 7th Main and Surrounding Cross Roads at Kamakshipalya. 7.50

5 Asphalting to Roads at 6th Main, 8th Main, 9th Main, 10th Main and Cross Roads at Kamakshipalya. 6.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO SREERAMAMANDIRA SUB DIVISION

WARD NO.17, VRUSHABHAVATHINAGAR

I. GENERAL WORKSa) Capital Works

b) Maintenance Works

III. CONTACT POINTS

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO SREERAMAMANDIRA SUB DIVISION

WARD NO.18, KAMAKSHIPALYA

I. GENERAL WORKSa) Capital Works

77

Page 84: Programme_Of_Works_2008-2009

6 Asphalting to Roads at 3rd Main, 4th Main, P&T Road, Ashtagrama 2nd Stage, Kamakshipalya. 7.00

7 Asphalting to Roads at 4th, 5th Main, 6th Main and 3rd B Cross of KHB Colony. 6.00

8 Construction of Plastic collection point in Ward No.18. 1.009 Construction of Tax payment building near Auto Stand, Sharada Colony. 7.00

Sub Total 59.50

10 Maintenance of Ward Office, Tailoring Centres, Health Centers, Horticulture Buildings of Ward No.18. 3.00

11 Improvements to culverts and drains at 1st Main Road, 2nd Cross, 2nd A Cross, 3rd B Main, 4th Main, 5th Main of KHB Colony. 5.00

12 Improvements to culverts and drains at 4th Main, 7th Main, 8th Main & 9th Mainof Kamakshipalya. 5.00

13 Improvements to culverts and drains at Eastern side of Aladamara Park of Sharada Colony. 5.00

14 Depot collection for the Maintenance of road in Ward No.18. 1.5015 Procurement of Bitumen Emulsion for filling potholes in Ward No.18. 1.0016 Supply of sign boards and barricades for execution of works in ward No.18. 2.00

Sub Total 22.50I. General Works Total 82.00

20 Maintenace of Helpline Centers (1 No.) 10.0021 Reserve Grants for the Emergency Works 13.00

III. Contact Points Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Providing asphalting to badly damaged roads at 1st and 3rd Block, 3rd Stage, Basaveshwaranagar. 10.00

2 Improvements to drain and culverts at 9th and 10th Crosses, Manjunathnagar in Ward No.19. 10.00

3 Improvements to drain and culverts at 10th A and 11th Crosses, Manjunathnagar in Ward No.19. 10.00

4 Providing Ornamental Street Name Boards for Main Roads and Cross Roads of Bhovi Colony, Saneguruvanahalli. 5.00

5 Providing Cement concrete to Cross Roads in Saneguruvanahally (Old Village). 10.00

6 Improvements to footpath and side drains at Thimmaiah Road, Near KEB Office in Ward No.19. 10.00

7 Improvements to drain and culverts at University Layout in Ward No.19. 10.00

8 Improvements to drain and culverts at 14th A Main at 1st Block, Basaveshwaranagar in Ward No.19. 10.00

9 Construction of Plastic Collection Point in Ward No.19. 2.00Sub Total 77.00

b) Maintenance Works

III. CONTACT POINTS

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO RAJAJINAGAR SUB DIVISION

Ward No.19, Basaveshwaranagar

I. GENERAL WORKSa) Capital Works

78

Page 85: Programme_Of_Works_2008-2009

10 Providing painting to existing Name Boards. 2.0011 Supply of Sign Board and Barricades for execution of works in Ward No.19. 2.0012 Procurement of bitumen emulsion for filling of potholes in Ward No.19. 1.00

Sub Total 5.00I. General Works Total 82.00

16 Maintenance of Contact Point at Ward Office in Ward No.19. 10.0017 Reserve Grants for the Emergency Works 13.00

II. Contact Point III) Contact Point Total 23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Construction of contact point building at Sy. No.25, Shivanahalli 10.00

2 Providing Asphalting to Main and Cross Road to 5th Phase, Mahaganapathinagar. 10.00

3 Providing Asphalting to Main and Cross Road to 6th Phase, Mahaganapathinagar. 10.00

4 Providing cement concrete to footpath at Thimmaiah Main from 1st Main to Pushpanjali Theater. 10.00

5 Construction of plastic collection point in Ward No.20. 2.00Sub Total 42.00

6 Supply of Sign Board and Barricades for execution of works in Ward No.20. 2.007 Providing painting to existing Name boards. 2.008 Departmental Collection for the year 2008-09 in Ward No.20. 2.00

9 Improvements to drain and culverts of main and cross roads, 5th Phase, Mahaganapathinagar. 9.00

10 Improvements to drain and culverts of main and cross roads, 6th Phase, Mahaganapathinagar. 9.00

11 Improvements to Footpath of Thimmaiah Road and 1st Main, Basaveshwaranagar. 10.00

12 Procurement of Bitumen Emulsion for filling up of potholes in Ward No.20. 1.0013 Improvements to drain and culverts to Main and Crosses of Shivanahlly. 5.00

Sub Total 40.00I. General Works Total 82.00

14 Maintenance of contact point (1 No.) 10.0015 Emergency grants (JC(W) & CE(W)) 13.00

III. Contact Point Total 23.00GRAND TOTAL (I+II+III) 105.00

b) Maintenance Works

III. CONTACT POINT

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO RAJAJINAGAR SUB DIVISION

WARD NO.20, SHIVANAGAR

I. GENERAL WORKSa) Capital Works

b) Maintenance Works

III. CONTACT POINT

79

Page 86: Programme_Of_Works_2008-2009

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Providing and constructing drain and RCC covering slabs in both sides of Industrial Estate 1st Main Road and Cross Roads in Ward No.21. 12.00

2 Providing SSM drain and RCC covering slabs in Andalamma Mutt at Industrial Town in Ward No.21. 12.00

3 Construction of drains and culverts at Dasarahalli in 4th Main road and its Cross Roads in Ward No.21. 10.00

4 Providing RCC deck covering slabs at Industrial Town in Ward No.21, near Raheja Park of Agrahara Dasarahalli. 10.00

5 Construction of Plastic collection point in Ward No.21. 2.00Sub Total 46.00

6 Supply of sign boards and barricades for execution of works in ward No.21. 2.007 Providing and painting street name boards in Ward No.21 2.008 Maintenance of Ward Office, Tailoring Centres in ward No.21. 2.009 Depot collection for the year 2008-09 in Ward No.21. 3.00

10 Procurement of Bitumen Emulsion for filling potholes in Ward No.21. 2.00

11 Improvements to drain and providing a covering slab both sides in AgraharaDasarahalli in 8th Main Road in Ward No.21. 8.00

12 Maintenance of Ward Office, Tailoring Centres, Health Centers, Buildings of Ward No.21. 5.00

13Maintenance and Providing painting to Sub Division Office, Communitee Hall, Computer Center, Hospital Building and Ward Office in Agrahara Dasarahalli in Ward No.21.

6.00

14 Maintenance of Higher Primary school and High School building near Jai Muni Rao Circle in Agrahara Dasara Halli in Ward No.21. 6.00

Sub Total 36.00I. General Works Total 82.00

16 Providing and constructing Size stone masonry drain and covering slab to existing drain in Kanteerava Colony in ward No.21. 9.00

Sub Total 9.00b) Maintenance Works Nil

II. 18% Grants Total 18.00

17 Maintenace of Contact Point A50at Ambedkar Stadium and Agrahara Dasarahalli in Ward No.21. 20.00

18 Reserve Grants for the Emergency Works 3.00III. Contact Points Total 23.00

GRAND TOTAL (I+II+III) 123.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO SREERAMAMANDIRA SUB DIVISION

WARD NO.21, INDUSTRIAL TOWN

I. GENERAL WORKSa) Capital Works

b) Maintenance Works

III. CONTACT POINTS

80

Page 87: Programme_Of_Works_2008-2009

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

1 Providing BS Slab footpath from Bhashyam Circle to 72nd Cross both sides. 15.00

2 Providing Ornamental Street Name Boards for Main Roads and Cross Roads of Ward No.22. 5.00

3 Providing cement concrete road to KB Temple Street. 15.004 Providing concrete road to Cross Road at Jedarahalli, 5th Block, Rajajinagar. 5.005 Construction of Plastic collection point in Ward No.22. 1.006 Construction of Roll Call Shulter in Ward No.22. 7.00

Sub Total 48.00

7 Supply of sign boards and barricades for execution of works in ward No.22. 2.00

8 Improvements to footpath at 2nd Main Road, Balance Portion, 4th Block, Rajajinagar, Bangalore. 7.00

9 Depot collection for the year 2008-09 in Ward No.22. 2.0010 Procurement of Bitumen Emulsion for filling potholes in Ward No.22. 1.00

11 Improvements to footpath from Bhashyam Circle to Malle Gowda Road Back side. 5.00

12 Improvements to footpath from 6th Block Circle to Entrance in Dr. Rajkumar Road in Ward No.22. 6.00

13 Improvements to culverts and drain at 6th Main Road, 58th Cross, Rajajinagar in Ward No.22. 6.00

14 Maintenance of grating and footpath in underpass near entrance. 2.0015 Depot collection for the Maintenance of road in Ward No.22. 2.0016 Procurement of Bitumen Emulsion for filling potholes in Ward No.22. 1.00

Sub Total 34.00I. General Works Total 82.00

III. CONTACT POINT

20 Maintenace of Helpline Centers at Ward Office and Tailoring Center, 11th Main, Near Ramamandira Ground, Rajajinagar in Ward No.22. 20.00

21 Reserve Grants for the Emergency Works 3.00III. Contact Points Total 23.00

Sl.No. Name of workI General Grants

(a) Captial works(b) MAINTENANCE WORK1 Maintanence of toilets/Urinals in ward no.08 1.502 Maintenance of corporation building in ward no.08 10.003 Maintenace of water supply systems in ward no.08 0.50

4 Providing electrical repairs to corporation market building @ Gayathrinagara in ward no.08 4.00

5 Providing electrical repairs to LN Pura market building in ward no.08 4.00

6 Providing electrical repairs to Corporation shopping complex near devaiah park in ward no.08 4.00

7 Maintenance of asphalted roads in ward no.08 3.008 Pot hole fillings in ward no.08 2.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09PERTAINING TO SREERAMAMANDIRA SUB DIVISION

WARD NO.22, SREERAMAMANDIRA

I. GENERAL WORKSa) Capital Works

b) Maintenance Works

BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.08, GAYATHRINAGARA SUB

81

Page 88: Programme_Of_Works_2008-2009

9 Asphalting to cross roads in Nagapappa block, in ward no.08 5.0010 Restoration of road cut portion in ward no.08 2.0011 Maintenace of drains in ward no.08 5.0012 Reconstruction of bridge across SWD in L.N.Pura in ward no. 15.0013 Maintenace of footpath, MKK road in ward no.08 3.0014 Maintenace of footpath, for puttaswamiah road in ward no.08 2.0015 Maintenace of footpath, for Railway parallel road in ward no.08 2.0016 Maintenace of footpath, for Dr. Rajkumar Road. 2.0017 Construction of retaining wall near SWD @ LN Pura in ward no.08 5.0018 Maintenance of chain link fencing & grills in ward no.08 1.00

19 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.08 3.00

20 Reconstruction of secondary drain & concreting to conservency lanes @ A.D block in ward no.08 10.00

21 Depot collection in ward no.08 2.0022 Maintenance & improvements to drains @ D block in ward no.08 4.0023 Maintenance & improvements to drains @ C block in ward no.08 4.0024 Maintenance & improvements to drains @ Maruthi extension in ward no.08 2.0025 Purchase of bitumen barrels in ward no. 08 2.0026 Reserved for Emergency works 20.00

82.00II Help Line Center Maintenance 27 Help line center @ Gayathrinagara shopping complex in ward no.08 10.0028 Help line center @ Market building, L.N.Pura in ward no.08 10.0029 Emergency grants for help line work in ward no.08 3.00

23.00

Sl.No. Name of workI General Grants

(a) Capital Works

1 Providing CC to 7th cross and 2nd cross (old 8th cross) B block, Subramanya nagara in ward no.09 10.00

2 Providing RCC deck slab to SWD near 8th A cross, Gandhi grama B block, Rajajinagara in ward no.09 10.00

3 Asphalting to 2nd to 5th main road and 2nd to 5th cross roads, Milk colony, A block in ward no.09 10.00

4 Asphalting to Gayathrinagara main road, Subramanya nagara main road, 5th cross (E-block) & 17th cross, Subramanya nagara in ward no.09 10.00

(b) Maintenance

5 Improvements to drain & culverts at A,B and E block at Subramanya nagara in ward no.09 10.00

6 Maintenance of ward office, community hall, high school building & Gymansium buildings in ward no.09 5.00

7 Improvements to drains & culverts @ E & B block 2nd stage, Rajajinagara in ward no.09 10.00

8 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.09 3.00

9 Maintenance of roads and potholes filling in ward no.09 3.0010 Purchase of bitumen barrels in ward no. 09 2.0011 Depot collection in ward no.09 2.0012 Reserved for Emergency works 7.00

82.00

Total

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.09 MAHALAKSHMIPURAM

Total

82

Page 89: Programme_Of_Works_2008-2009

II Help Line Center Maintenance 13 Help line center @ Dr.Raj Kumar road near ESI hospital in ward no.09 10.0014 Help line center @ 8th A cross, Gandhi grama in ward no.09 10.0015 Emergency grants for help line work in ward no.09 3.00

23.00

Sl.No. Name of workI General Grants

(a) Capital works1 Construction of health ward office in ward no.10 8.002 Constructionof tax collection centre in ward no.10 8.003 Construction of drain and culverts @ Industrial suburb in ward no.10 10.00

(b) Maintenance

4 Maintenance of community hall, Sub division office, corporation school, tailoring centre in ward no.10 4.00

5 Improvements and providing RCC deck slab at MLP further extension slum in ward no.10 10.00

6 Maintenance of roads and pot holes filling in ward no.10 3.007 Depot collection in ward no.10 2.008 providing sign boards, Barricading & tools & palnts in ward no.09 2.00

9 Maintenace of street name boards & providing new street name boards in ward no.10 3.00

10 Purchase of bitumen barrels in ward no. 09 2.00

11 Improvements to storm water drain, retaining wall repairs, bed treatment & covering deck slab at Mahalakshmi layout and shankara nagara in ward no.10 10.00

12 Plastic collection points in ward no.10 2.00

13 Providing bus shelter and libray building near mahalakshmi layout bus stand in ward no.10 10.00

14 Reserved for Emergency works 8.0082.00

II Help Line Center Maintenance 15 Help line center @ Sub division office in ward no.10 10.00

16 Help line center @ Shanimahathma temple road , Shankara nagara in ward no.10 10.00

17 Emergency grants for help line work in ward no.10 3.0023.00

Sl.No. Name of work

I Original Works(a) Capital Works1 Providing drains in peenya new extention in ward no.11 5.00

2 Improvements to roads in Muneshwara Industrial estate 1st stage peenya, PIA in ward no.11 10.00

3Improvements to roads 6th main (Raj kamal transport road) & 7th main by providing SSM drain and embakment, metalling @ 2nd phase, PIA in ward no.11

30.00

4 Providing SSM drain & deck slab culvert to cross roads of 4th block of G.G.Palya in ward no.11 5.00

5 Providing CC & SSM drains to cross roads (Near NH4 petrol bunk ) peenya village in ward no.11 5.00

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 10 MAHALAKSHMIPURAM

Total

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 11

83

Page 90: Programme_Of_Works_2008-2009

(b) Maintenance6 Maintenance of ward office, tailoring centre, School building and health ward

office in ward no 11 3.007 Maintenance of roads and potholes filling in ward no.11 5.008 Plastic collection in ward no.11 1.00

9 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.11 3.00

10 Depot collection in ward no.11 2.0011 Purchase of bitumen barrels in ward no. 11 2.0012 Reserved for Emergency works 11.00

82.00II Help Line Center Maintenance 13 Help line center @ G.G.Palya in ward no.11 10.0014 Help line center @ Peenya in ward no.11 10.0015 Emergency grants for help line work in ward no.11 3.00

23.00

Sl.No. Name of workI General Grants

(a) Capital Works

1 Construction of Anganawadi building & Rangamandira at Jai maruthi nagara in ward no.12 10.00

2 Improvements & re-modeling of drain at 2nd and 3rd and 4th main road at parimalanagara in ward no.12 5.00

3 Improvements to drains and culverts at Rajiv gandhi layout in ward no.12 10.004 Providing CC to Narrow roads at 7th and 8th main 4th block in ward no.12 8.00

5 Proviidng CC to narrow roads b/w 1st and 2nd main of Jai maruthi nagara in ward no.12 5.00

6 Providing chain link fencing to BBMP Property at Rajiv Gandhi layout in ward no.12 10.00

(b) MAINTENANCE

7 Maintenance ward office tailoring hall, Library building, Anganawadi building and help line centers in ward no.12 4.00

8 Road cuttings and pot holes filling in ward no.12 4.009 Depot collection for maintenance of road in ward no.12 2.0010 Painting kerbs, chain link fencing and Name boards in ward no.12 3.0011 Providing plastic collection center in ward no.12 2.00

12 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.12 3.00

13 Purchase of bitumen barrels in ward no. 12 2.0014 Maintenance of footpath in Ward No.12. 3.0015 Reserved for Emergency works 11.00

82.00II Help Line Center Maintenance 16 Help line center @ Kanteerava nagara in ward no.12 10.0017 Help line center @ ward office in ward no.12 10.0018 Emergency grants for help line work in ward no.12 3.00

23.00

Total

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 12

Total

Total

84

Page 91: Programme_Of_Works_2008-2009

Sl.No. Name of workI General Grants

(a) Captial works(b) Maintenance1 Maintenace of road & pot hole filling in ward no.14 5.002 Improvements to Drains & culverts in 8th B cross @ J.S.Nagara in ward no.13 5.00

3 Improvements to Drains & culverts in 1st B main @ J.S.Nagara in ward no.13 5.00

4 Improvements to Drains & culverts in 14th C cross, 60 feet road 1st B main road @ J.S.Nagara in ward no.13 10.00

5 Improvements to Drains & culverts in 1st B,2nd main road @ J.S.Nagara in ward no.13 10.00

6 Improvements to Drains & culverts in 2nd main road to 3rd main road @ J.S.Nagara in ward no.13 10.00

7 Improvements to Drains & culverts in 3rd main road to J.S.Nagara in ward no 13 10.00

8 Improvements to Drains & culverts in 3rd cross, College of pharmacy, D Cross, pipeline road @ J S Nagara in ward no 13 5.00

9 Improvements to Drains & culverts in D cross pipeline road Ch 0.00 to 150.00 Mtrs@ J.S.Nagara in ward no.13 5.00

10 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.12 3.00

11 Purchase of bitumen barrels in ward no. 12 2.0012 Reserved for Emergency works 12.00

82.00II Help Line Center Maintenance 13 Help line center @ in ward no.13 10.0014 Emergency grants for help line work in ward no.13 13.00

23.00

Sl.No. Name of work

I General grants(a) Capital works

1 Providing chain link fencing around scating rink in Dr. Rajkumar Play Ground in Ward No.14. 9.00

2 Providing and constructing RCC retaining wall, near existing skating rink at Dr. Rajkumar Play Ground in Ward No.14. 10.00

3 Providing and constructing RCC retaining wall, near existing at Dr. Rajkumar Play Ground in Ward No.14. 8.00

4 Construction of store room and office room at Dr. Rajkumar play ground. 8.00(b) Maintenance

5 Providing water supply & sanitary connection to the computer center building @ 1st N block Rajajinagara in ward no.14 5.00

6 Reparis & improvements to engineering & health ward office @ ward no.14 1.00

7 Providing asphalting to bad roads @ west of chord road 2nd stage area in ward no.14 10.00

8 Depot collection in ward no.14 3.00

9 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.14 3.00

BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.13 GAYATHRINAGARA SUB DIVISION

Total

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARDNO.14 GAYATHRINAGARA

SUB DIVISION

85

Page 92: Programme_Of_Works_2008-2009

10 Purchase of bitumen barrels in ward no. 14 2.00

11 Providing & improvements to footpath & drain @ Vidyavardaka Sangha road (10th cross) in 1st block, Rajajinagara in ward no.14 13.00

12 Reserved for Emergency works 10.0082.00

II Help Line Center Maintenance 13 Help line center @ in ward no.14 10.0014 Emergency grants for help line work in ward no.14 13.00

23.00

Sl.No. Name of workI General Grants

(a) Capital Works1 Construction of toilet block @ G.D.Park in ward no.23 5.00

(b) Maintenance Works2 Maintanence of toilets/Urinals in ward no.23 0.50

3 Providing flagging cours & improvements around Gymnasium building @ G.D.Park in ward no.23 3.00

4 Providing electrical repairs works & annex building in ward no.23 2.005 Providing asphalting to 59th B cross in ward no.23 19.006 Providing asphalting to roads @ Prakash nagara in ward no.23 15.007 Restoration of road cut portion in ward no.23 2.008 Maintenace of footpath, MKK road in ward no.23 2.009 Maintenace of drains in ward no.23 2.5010 Maintenace of drains in @ 4th N block in ward no.23 3.0011 Maintenance of drains in ward no.23 3.0012 Maintenace of footpath, @ Ayappa temple road in ward no.23 2.0013 Maintenace of footpath, @ Dr.Raj Kumar road in ward no.23 2.0014 Strengthening of retaining wall near SWD @ Mariyappana palya in ward no.23 5.0015 Maintenance of chain link fencing & grills @ G.D.Park in ward no.23 1.5016 Maintenance of chain link fencing @ Sai college play ground in ward no.23 1.5017 Providing CC to Narrow roads, in ward no.23 4.0018 Reserved for Emergency works 5.00

19 Maintenance of street name boards & providing sign boards, Barricading & tools & palnts in ward no.23 2.00

20 Depot collection in ward no. 23 1.0021 Purchase of bitumen barrels in ward no. 23 1.00

82.00II Help Line Center Maintenance 22 Help line center @ Prakash nagara Adjacent to ward office in ward no.23 10.0023 Help line center @ 4th N block, Prakash nagara in ward no.23 10.0024 Emergency grants for help line work in ward no.23 3.00

23.00

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I.Capital Works 1 Construction of electrical office at wards office premises in Ward No.24. 8.002 Providing cement concrte road and lane in between 7th and 8th main

Srirampuram in Ward No.24.7.00

3 Providing cement concrete missing bits at Ambedkarnagar and R.K.S. Nagar in Ward No.24.

6.00

Total

TotalBUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.23, GAYATHRINAGARA

Total

TotalBUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 24

86

Page 93: Programme_Of_Works_2008-2009

4 Providing cement concrete roads and improvements drains Pillamma Block in Ward No.24.

7.00

5 Providing cement concrete road near ESI Hospital in Ward No.24. 5.00II. Maintenance

6 Special repairs to Ambedkar Bhavan at 5th Cross Dayananda in Ward No.24 5.007 Special repairs to Nursery School 7th Cross, Anganawadi at 5th Main

Srirampuram in Ward No.24.5.00

8 Special repairs toLibrary buildings & Anganawadi Kendra at 6th Cross, RJI Colony in Ward No.24.

7.00

9 Improvements to BBMP Quarters in Ward No.24 5.0010 Reconstruction of drain and providing cement concrete to Bhashyamnagar 1st,

2nd, 3rd, 4th cross road in Ward No.24.7.00

11 Reconstruction of SSM and providing deck slb at Bandi reddy Circle in Ward No.24.

5.00

12 Reconstruction of drain and providing deck slab and cement concrete roads and lane at Gouthamnagar in Ward No.24.

7.00

13 Improvements to drain and footpath at 7th and 9th Main Srirampuram in Ward No.24.

8.00

Sub Total 82.00II. Contact Points (Help Line Centre)

20 Maintenance of Contact point at Ward No.24, Office 10.0021 Emeregency Fund (JC / CE ) 13.00

Sub total 23.00

( WORKS PROPOSED FOR 08 - 09 )

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Genearl worksa. Capital Works

1 Construction of culverts at 8th cross from Sirsi road to 5th Main road Chamarajpet in ward no.46

10.00

2 Providing cement concrete to footpath at 3rd, 4th, 5th Main road Chamarajpet and from 7th cross to 8th cross in ward no.46

26.00

3 Providing cement concrete to lanes at Dasappa garden and Krishnna layout in ward no.46

10.00

4 Providing cement concrete to lanes at Raghavendrea colony in ward no.46 10.005 Providing cement concrete to conservency lane between 5th main and 4th main

form 5th cross to 6th cross in ward no.4610.00

6 Providing cement concrete to Appajappa Agrahara Main road in ward no.46 10.00Sub total 76.00b. Maintenance Works

7 Procurement of Bitumen emulsion for filling pot holes in ward no.46 1.008 Depot collection for the year 2008 - 09 in ward no.46 2.009 Special reparires to ward office and Shasakara Bhavan at 3rd Cross Chamarajpet

in ward no.461.00

10 Providing painting to street name boards in ward no.46 1.0011 Supply of Sign boards and barricads for execution of works in ward no.46 1.00

Sub total 6.00General Works TOTAL 82.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09

PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.46

87

Page 94: Programme_Of_Works_2008-2009

II. Contact points12 Maintenance of Contact point at 6th cross chamaraj pet in Ward No.46. 10.0013 Emeregency Fund (JC / CE ) 13.00

Contact points TOTAL 23.00

( WORKS PROPOSED FOR 08 - 09 )

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Genearl worksa. Capital Works

1 Construction of first floor to stores building at Dasappa Hospital Premises in ward no.47

20.00

2 Providing cement concrete and improvements to footpath at Siddanna lane balance portion in ward no.47

7.00

3 Providing cement concrete to Govindappa lane in ward no.47 6.004 Providing cement concrete to DCM lane and balance portion of Ranoji rao lane

in ward no.474.00

5 Construction of Nirmala Bangalore Toilet at Bamboobazar Main road and dispensary road Kalasipalya in ward No.47

10.00

6 Providing cement concrete to road cut portion at K.R.road in ward no.47 6.007 Providing drinking water borewells at Subansab lane and P.R.S lane in ward

no.477.00

8 Providing cement concrete to B.Oosman khan road from N.R.road 4th cross to 3rd cross in ward no.47

14.00

Sub total 74.00b. Maintenance Works

9 Procurement of Bitumen emulsion for filling pot holes in ward no.47 1.0010 Depot collection for the year 2008 - 09 in ward no.47 2.0011 Special repairs to ward office and Buildings at Dasappa Hospital premises in

ward no.472.00

12 Providing and painting to street name boards in ward no.47 1.0013 Supply of Sign boards and barricads for execution of works in ward no.47 1.0014 Special repairs to P.K quarters at Kumbargundi and Mothinagar in ward no.47 1.00

Sub total 8.00General Works TOTAL 82.00

II. Contact points15 Maintenance of Contact point at Dasappa Hospital premises in Ward No.47. 10.0016 Emeregency Fund (JC / CE ) 13.00

Contact points TOTAL 23.00

( WORKS PROPOSED FOR 08 - 09 )

Sl. No. Name of Work Est. Cost (Rs. In Lakhs)

I. Genearl worksa. Capital Works

1 Asphalting to Lalbagh road 4th cross and surrounding area in ward no.48 12.002 Asphalting to Mission road in ward no.48 8.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09

PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.47

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09

PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.48

88

Page 95: Programme_Of_Works_2008-2009

3 Asphalting to roads in CSI compound area in ward no.48 10.004 Asphalting to 1st, 2nd & 3rd cross of Srinivasa colony in ward no.48 8.005 Construction of RCC culvert and drain across Siddaiah road near Urvashi theater

in ward no.489.70

6 Providing cement concrete to lanes at Badamakan slum behind al-ameen college in ward no.48

5.30

Sub total 53.00b. Maintenance Works

7 Procurement of Bitumen emulsion for filling pot holes in ward no.48 2.008 Depot collection for the year 2008 - 09 in ward no.48 2.009 Removal of over burden earth and debries in ward no.48 5.0010 Special repairs to office complex building at J.C road in ward no.48 5.0011 Special repairs to town hall building at J.C Road in ward no. 5.0012 Improvements and providing R.C.C covering slabs to the drain at Srinivasa

colony in ward no.489.00

13 Providing and painting to Name boards and sign boards in ward no.48 1.00Sub total 29.00General Works TOTAL 82.00

II. Contact points14 Maintenance of Contact point at J.C road office in Ward No.48. 10.0015 Emeregency Fund (JC / CE ) 13.00

Contact points TOTAL 23.00Sub total 2788.00

III. 18% Granta. Capital Works

2 Provision for purchase of land / construction of toilet /construction of House 18.00Sub - Total = 18.00

B. 18% Maintenance Works--- NIL --- 0.00

Sub - Total = 0.00III. 18% Grant Total = 18.00

III. 18% Granta. Capital Works

3 Provision for purchase of land / construction of toilet /construction of House 14.00Sub - Total = 14.00

b. Maintenance Works3 Improvements to existing Anganwadi building at B K Nagara slum in Ward-3. 1.503 Improvements to existing toilets at B K Ngr slum in Ward-3 1.503 Improvements to existing toilet at sunnadagudu slum in Ward-3 1.00

Sub - Total = 4.00III. 18% Grant Total = 18.00

4 Purhase of land and Construction of Toilet 9.00

4 Construction of Bridge and Improvements to road at Jayaram slum in ward No4 9.00

Sub-Total -3 18.00100 Purchase of Land and Construction of Toilet 9.00100 Providing Cement Concreting to roads in Manjunath nagar in Ward No.100 9.00

Sub-Total -3 18.00

WEST ZONEPROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

89

Page 96: Programme_Of_Works_2008-2009

5 Providing Cement Concrete Road to Sankey Anjaneya Swamy Temple Road in ward no.5

9.00

5 Construction of Individual Toilets & Purchase of Land in ward no.5 9.00Sub Total - 3 18.00

6 Improvements to Drains and Concrete Roads at Karumariyamma Slum in ward no.6

9.00

6 Construction of Individual Toilets and Purchase of Land in ward no.6 9.00Sub Total - 3 18.00

7 Providing CC to Roads at Byrahanumaiah Slum in ward no.7 9.00

7 Construction of Individual Houses in Subedarapalya, New Harijan colony, Byrahanumaiah Slum & Karimandi Slum & Purchase of Land in ward no.7

9.00

Sub Total 3 18.00a) Capital Works

Purchase of Land 17.00b) Maintenance Works30 Maintenace of drains in Mariyapappana palya in ward no.08 1.00

18.00(a) Capital Works16 Purchase of land & Construction of SC/ST houses in ward no.09 9.00(b) Maintenance

17 Improvements to drains & providing covering slab @ A.K.Colony near madduramamma temple in ward no.09 9.00

18.00(a) Capital Works18 Purchase of Land & Construction of SC/ST houses in ward no.10 9.0019 Providing RCC deck slab to SWD @ Vijayananda nagara slum in ward no.10 9.00(b) Maintenace

18.00(a) Capital Works16 Purchase of Land & Construction of SC/ST houses in ward no.11 9.00

17 Improvements to drains & roads of 1st, 2nd main in Jai Bhuvaneshwari nagara & Kulee nagara slums in ward no.11 9.00

(b) Maintenance18.00

(a) Capital Works19 Purchase of land & Construction of SC/ST houses in ward no.12 9.00(b) MAINTENANCE21 Provding covering slab over drain @ Kanteerava nagara slum in ward no.12 5.0022 Providng A.C sheets to SC/ST houses in ward no.12 2.0023 Improvements to open wells at Kanteeravanagar Slum in Ward No.12. 2.00

18.00(a) Capital works15 Purchase of land & Construction of SC/ST houses in ward no.13 9.00(b) MAINTENANCE17 Improvements to CC & drains & culverts 25th F to H roads in ward no.13 5.0018 Improvements to CC & drains & culverts @ Handhi jogarahatti in ward no.13 4.00

18.00(a) Capital Works 15 Construction of SC/ST houses in ward no.14 9.00

Total

Total

Total

Total

Total

Total

90

Page 97: Programme_Of_Works_2008-2009

(b) MAINTENANCE17 Improvements to CC, culverts & drains @ Bhovi palay in ward no.14 5.0018 Providing covering slab to culverts & drains @ Bhovi palya in ward no.14 4.00

18.00a) Capital Works25 Purchase of land 16.00b) Maintenance Works26 Maintenace of drains in Mariyapappana palya in ward no.23 2.00

18.00Capital WorksConstruction of Individual houses / Purchase of Land / Construction of Urinals in Ward No.15. 9.00

Sub Total 9.00Maintenance WorksConstruction of Anganavadi Building, Gayatrhi HBCS, Ward No.15. 9.00

Sub Total 9.00II. 18% Grants 18.00

Caital WorksConstruction of Individual Houses in Sy. No.46 of Chandranagar Slum. 9.00

Sub Total 9.00Maintenance Works

Repairs of Anganavadi Building, 4th Main, 3rd Cross, Sy.No.46, Kamalanagar. 2.00

Providing flagging course to drain at Kaverynagar Slum. 3.00Providing SSM Drain in Sanjaygandhinagar Slum. 4.00

Sub Total 9.00II. 18% Grants Total 18.00

Capital WorksProvision for purchase of land / construction of toilet / construction of House. 9.00Improvements to footpath and secondary drains at Sannakki Bylu in A.K. Colony in Ward No.17. 8.00

Sub Total 17.00Maintenance Works

Improvements to footpath to a approach road of A.K. Colony in Ward No.17. 1.00

II. 18% GRANTS Total 18.00Capital WorksConstruction of RCC Deck slab over drain at Sreeramanagara Slum. 5.00Construction of Compound wall around Dr. Ambedkar Bhavan and providing cement concrete to Roads at Karekallu, A.K. Colony. 4.00

Construction of Individual houses for the SC/ST beneficiaries at Sreeramanagar Slum, Karekallu A.K. Colony and Harijana Slum 9.00

Sub Total 18.00Maintenance Works Nil

II. 18% Grants Total 18.00Capital WorksConstruction of Individual houses / Purchase of Land / Construction of Urinals in Ward No.19. 18.00

Sub Total 18.00

Total

Total

91

Page 98: Programme_Of_Works_2008-2009

Maintenance WorksProviding CC to Main Road of Bhovi Colony and Improvements to footpath on either side of the Road in Ward No.19. 13.00

Reconstruction of Collapsed Road adjacent to SWD and raising the deck slab of SWD of Bhovi Colony in Ward No.9. 5.00

Sub Total 18.00II. 18% Grand Total 36.00

Capital Works NilMaintenance Works Nil

II. 18% Grants Total Nil18% GRANTSCapital WorksProvision for purchase of land / construction of toilet / construction of House in Ward No.21 9.00

Providing and constructing Size stone masonry drain and covering slab to existing drain in Kanteerava Colony in ward No.21. 9.00

Sub Total 18.00Maintenance Works Nil

II. 18% Grants Total 18.0018% GrantsCapital WorksConstruction of Anganavadi Building at Chamundi Slum in Ward No.22. 5.00Providing flagging course and construction of culverts in Bhuvaneshwari Slum at Rajajinagar in Ward No.22. 4.00

Providing Individual houses in Chamundi and Bhuvaneshwari Slum 9.00Sub Total 18.00

Maintenance Works NilII. 18% Grants Total 18.00

III. 18% Grantsa. Original WorksProviding individual sanitary and water connections for SC/ST in Ambedkar Nagar R.K.S. Nagar Gowtham Nagar ward No.24.

9.00

b. Maintenance WorksProcurement of Bitumen mulsion for filling pot holes in Ward No.24 2.00Depot Collections for the year 2008-09 in Ward No.24. 2.00Improvement to public toilet in Dayananda Nagar ,Ambedkar Nagar & Aundathi Nagar in Ward No.24.

3.00

Providing painting of street name boards in Ward No.24 1.00Supply of Sign boards and barricades for execution of works in Ward No.24. 1.00Sub total 18.00III. 18% Grantsa. Original Works

16 Providing individual sanitary facilities to SC/ST houses in Ward No.25. 9.00b. Maintenance Works

17 Improvement to Sulab Showchalaya in Gopalapura Near Iyyappa Temple& Jataka Stand in Magadi road in Ward No.25.

3.00

18 Special repairs to public toilet in Selva Nagar at Ward No.25. 3.0019 Special repairs to public toilet & Improvements to Surrounding area at

Aurandathi Nagar In Ward No.25.3.00

Sub total 18.00

92

Page 99: Programme_Of_Works_2008-2009

III. 18% Grants _a. Original Works _

15 Providing Cement Concrete to balance portion in Jakkarayanakere in Ward No.26.

9.00

16 Providing individual sanitary facilities to SC/ST houses in Ward No.26. 5.00b. Maintenance of Works

17 Special repairs to public toilet 1st main Road, Behind Tailoring Center & near 6th cross Swathanthrara Palya (Near Railway line) in Ward No.26.

2.00

18 Special repairs to Public toilet Hanumanthapura 2nd Main , Vivekananda colony , Laxman Rao nagara and Narayan Rao Colony ( Opp Bharathinagara( & Improvements surrounding area in Ward No.26.

2.00

Sub Total 18.00III.18% grantsa. Original Works

19 Providing cement concrete to cross roads and lanes near old savar lane at Risldar Street in Ward No.27. 5.00

20 Improvements to drain and reconstruction of Masonary drain in Laxmanpuri Colony in Ward No.27 5.00

21 Providing cement concrete to lanes and bylanes in and around Risaldar Park in ward No.27. 8.00b. Maintenance Sub Total 18.00

Purchasing of land. 18.00Total Amount 18.00

Construction of Indiviual Toilet in Agrahara 4.00Supplying A.C sheet for poor family 5.00Providing C.C to Nagamma Nagara roads 5.00Constructions drain and culverts and cc to Muneshwara temple Road 4.00Total Amount 18.00

Construction of Indiviual Toilets in Bakshi Garden & Anganappa garden 5.00Supplying A.C sheet for poor family 4.00Construction of masonry drain & Covering Slabs opposite to balekayi mandi 5.00Construction of drain & Disilting at Anganappa & Bakshi Garden 4.00Total Amount 18.0018% Grantsa. Capital Works Provision for purchase of land / Construction of toilet / construction of House. 9.00Sub total 9.00b. Maintenance Works Improvement to toilet at Ananda pura slum, Venkatarama nagara slum in ward no.46

4.00

Providing cement concrete to lanes at Venakatarama nagara slum in ward no.46 5.00

Sub total 9.0018% GRANTS TOTAL 18.0018% Grantsa. Capital Works Provision for purchase of land / Construction of toilet / construction of House 9.00Sub total 9.00

93

Page 100: Programme_Of_Works_2008-2009

b. Maintenance Works Improvement to toilet and providing cement concrete to lanes at Kumbaragundi slum in ward no.47.

9.00

Sub total 9.0018% GRANTS TOTAL 18.0018% Grantsa. Capital Works Provision for purchase of land / Construction of toilet block in ward no.48 9.00Sub total 9.00b. Maintenance Works Repairs to toilet blocks at sudhama nagara and Rajagopala garden in ward no.48 4.00Providing cement concrete to lanes at K.S garden slum in ward no.48 5.00Sub total 9.0018% GRANTS TOTAL 18.00

18 % Works1 Providing Electrification to the SC/ST Houses at

Siddarth Nagar and Jalahally Slum 2.002 Providing Electrification to the SC/ST Houses at

Jalahally Slum 2.003 Providing Electrification to the SC/ST Houses at

Yeswanthpura Slum 2.004 Providing Electrification to the SC/ST Houses at

Sanjeevappa Garden, AK colony, Mathikere 2.009 Providing Electrification to the SC/ST Houses at

AK Colony, Subramanya Nagar. 0.1010 Providing Electrification to the SC/ST Houses at

Ashokpura and Gowtham nagar slum 2.0010 Providing Electrification to the SC/ST Houses at

Kanteerava Nagar slum 2.0030 Providing Electrification to the Gym Building at

Bakshi Garden 1.9730 Providing Electrification to the community hall

at Bakshi Garden 0.72Total 14.79

Sub total 612.00ELECTRICAL

WESTCapital Works

Sl CostNo. Name of the Work Rs. in lakhs1 Providing poles with fittings, Control Wire, Cable etc, to

Katha Nagar Main Road. 8.002 Re-errection of Released Tubular Poles from Bellary Road, the

Same is fixed to C.V. Raman road, and Sankey Raod. 5.003 Providing poles with fittings, Control Wire, Cable etc, to Bescom Road

Govt. Press Road, Volvo Road & S.M. Road and 1st PhasePeenya Industrial Area. 10.00

4 Providing poles with fittings, Control Wire, Cable etc, from Tumkur Road toDevraj Urs Truck Terminal Circle and Burial ground Road 10.00

5 Providing poles with fittings, ACSR Wire etc to the 3, 4, 5 & 6th Main and 3rdand 5th Cross at 2nd Stage, Peenya Industrial Area 10.00

94

Page 101: Programme_Of_Works_2008-2009

6 Providing poles with fittings, ACSR Wire etc to the 3rd A, B,C, D, E, F Mains, 6th, 7th, 8th, 9th & 10th Cross Roads,1st Stage Peenya Industrial Area. 10.00

7 Providing poles with fittings, Control Wire, Cable etc, from Shiva Form Rudramma and Rugdre Gowda ConventionalHall road, 9th Cross and other cross, in Kamakshipalay. 10.00

8 Providing poles with fittings, ACSR Wire etc to the 2nd, 3rd 4th Main and Industrial Estate Area at Industrial Town 5.00

9 Providing poles with fittings, Control Wire, Cable etc, fromLeprosay Hospital to APMC Yard Circle 5.00

10 Providing poles with fittings, Control Wire, Cable etc, fromSubbaiah Circle to Lalbagh Road Circle. 5.00

11 Providing poles with fittings, Control Wire, Cable etc, from KH Road LalbaghCircle to Flyover Bridge Via Mission Road Upto Siddaih Circle to Lalbagh 10.00

12 Providing poles with fittings, Control Wire, Cable etc, fromRailway line road, Lottegollahally, Sanjay nagar. 5.00

13 Providing Mini High Mast light at the Junction ofM.S.Ramaiah hospital Circle, HMT Road, Mathikere 4.00

14 Providing Mini High Mast light at the Junction ofTVS Cross Junction, Peenya KIDB Road. 4.00

15 Providing Mini High Mast light Near Petrol Bunk Circle 6th Main, Peenya KIDB Road, 4.00

16 Providing Mini High Mast light at the Junction of Saraswathipura Main and Nandini Layout Bus stand Road, 4.00

17 Providing High Mast lights Opp. Shankarama Circle 4.0018 Providing High Mast lights Opp. Nandini Layout Busstand 4.0019 Providing High Mast lights at BWSSB Office Circle, 3rd Block, Rajaji Nagar 4.0020 Providing High Mast lights at

Okalipura Railway Bridge Under pass( Near Weaver Building) 4.0021 Providing High Mast lights at Kalidasa Circle, Gandhi Nagara 4.0022 Providing High Mast lights at City Market Gate(Inside) SKR Market 6.0023 Providing High Mast lights at Royan Circle, Chamarajpet 4.0024 Providing High Mast lights at Subbaih Circle, Lalbagh Road 4.0025 Providing High Mast lights at Opp. Town Hall 8.0026 Providing High Mast lights at BEL Road & Club road jn, Sanjay Nagar 4.0027 Upgradation of Street lights including cable Panel Box etc., at Tumkur Road

from Metro to GG Palya 20.0028 Upgradation of Street lights including cable Panel Box etc., at KIDB Road

from Jalahally Circle to Ring Road 20.0029 Upgradation of Street lights including cable Panel Box etc., Govt. Soap

Factory circle to Magadi Road 20.0030 Upgradation of Street lights to Mysore deviation road

from Krishna floor Mill circle upto Magadi raod,Drainagae 20.0031 Upgradation of Street lights at KH Road 10.0032 Providing Street light fittings to the HMT Quarters MainRoad and Cross roads 5.0033 Providing Street light fittings to the

RTO Office, 3rd Main, 1st phase, Peenya Industrial area 5.0034 Providing Street light fittings to the 15th & 19th Cross,

8th Main etc., Bandappa Garden. 5.0035 Providing SV/MH fittings to the LIG, MIG, HIG and 1 to

6th Main, Circular road, Singapura Layout. 10.00

95

Page 102: Programme_Of_Works_2008-2009

36 Providing SV/MH fittings to the 1st to 15th Main 4th Block and Railway Layout and Ramakrishana nagar 10.00

37 Providing SV/MH fittings to the 16th Main to 33rd mainroads at Srinivasa nagar, BHEL and Sakamma layout. 10.00

38 Providing SV/MH fittings to the 1st Main to 8th Main,Jaimaruthi Nagar and 1st Main to 5th Main, Ravi layout. 5.00

39 Providing SV/MH fittings to the 1st Main to 8th Main and 1st cross to 5th crossin Parimala Nagar and 1st Main to 8th Main in Rajeev Gandhi Nagar 6.00

40 Providing SV/MH fittings to the Leprosay HospitalCircle to Perumal drain bridge ( Magadi Road ). 8.00

41 Providing SV/MH fittings to the Leprosay Hospital Circle to Okalipuram underpass railway bridge upto Binny Mill Circle 8.00

42 Providing SV/MH fittings to the Nagamma Nagar,Nethaji nagar, from Sudha lodge to CCB Office. 5.00

43 Providing UG Cable/ ACSR Wire etc., to the Binny Mill roadfrom Binny Mill Circle to RMC Yard. 2.00

44 Providing SV/MH fittings to the Mutton Market, Anjanappa Garden, Bakshi Garden, Chaluvadi palya. 8.00

45 Providing SV/MH fittings to the N.T. Pet and Sarrounding area, Anandapura Slum 5.0046 Providing Street light fittings to S.P. lane, Kumbarpet Ganigarpet, SJP Raod

crosses, Dharmaraya swamy Temple Area 1.5047 Providing Street light fittings to the 2nd Cross to 7th cross

and 1 to 6th Main at Postal Colony. 5.0048 Providing Street light fittings to the 1st Main to 7th main

and 1st cross to 5th Cross, NGEF Layout. 5.0049 Providing Street light fittings to the Judicial layout 1st main and Channamma

kalayana mantapa main road, and Sanjay nagar Main road 10.0050 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office at 4th Cross, Jalahalli Village. 0.1051 Providing Fan and TL fittings to the Anganawadi and Gymnasium

building at HMT Area 0.1052 Providing Electrification to the Newly Constructed Vetarnary

Hospital at Jalahally 0.5053 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office Adjacent to J.P. Park ( Near Chowdeswari Temple ) 0.1054 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office Model Street, Yeswanthpura. 0.1055 Providing Fan and TL fittings to the Tailoring and Library

Building at Yeswanthpura 0.1056 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Nethaji Circle, Mathikere. 0.1057 Providing Additional, Points, fixtures etc., to the Help center at Ward Office,

swimming pool extension, 10th Cross, Sudhindranagar 0.1058 Providing Additional, Points, fixtures etc., to the Help center at

PHU Center, kodandarampura, 13th Cross, SP Extension, Malleswaram 0.1059 Providing Additional, Points, fixtures etc., to the Help center at

ARO Office, 16th Cross, Malleswaram,( Next to IPP Building) 0.1060 Providing Additional, Points, fixtures etc., to the Help center at

BBMP Office,( Next to to Ward Office) 5th Cross, Malleswaram 0.1061 Providing Additional, Points, fixtures etc., to the Help center at

Office of AEE, Malleswram 2nd Temple Street. 0.10

96

Page 103: Programme_Of_Works_2008-2009

62 Providing Additional lighting to the Malleswaram play ground 2.0063 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Yeswanthpura Maternity Home 7.0064 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, 5th Cross, 5th Main, Malleswaram. 0.1065 Providing Additional, Points, fixtures etc., to the Help center at

BBMP Complex, Yeswarnthpura S.C. 0.1066 Providing Standby Submersible Pumpset and Panel Board, GI pipe

etc., Yeswanthpura shopping complex. 0.7567 Providing Additional, Points, fixtures etc., to the Help center at LN Pura Market 0.1068 Providing Additional, Points, fixtures etc., to the Help center at

Dr. Raj Kumar Road, E' block, Subramanya nagar 0.1069 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, 3rd Main, behind Vani School. 0.1070 Providing Additional, Points, fixtures etc., to the Help center at

Subramanya nagar community hall. 0.1071 Providing lighting system to the Sahakarnagar Park and Play ground 1.0072 Providing Additional, Points, fixtures etc., to the Help center at

Sub-division Office, Vasavi temple Road. 0.1073 Providing Additional, Points, fixtures etc., to the Help center at

Tailoring Center, Shankar nagar. 0.1074 Providing Fan and TL fittings to the Gymnasium Building at

Srikanteshwara nagar. 0.1075 Providing additional lighting to Hindu burial ground at GG Palya 3.0076 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, near Burial Groun, Goragunte playa. 0.1077 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Peenya Village. 0.1078 Providing Fan and TL fittings to the Ward Office at Peenya Village 0.1079 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Circular Park, Nandini Layout, 0.1080 Providing Additional, Points, fixtures etc., to the Help center at

Veternary Hospital, Kanteerava nagar, near BWSSB Water Tank. 0.1081 Providing Fan & TL fittings to the Newly constructed tailoring

Center at Nandini Layout. 0.1082 Providing Fan & TL fittings to the Anganavadi Center, Nandini Layout 0.1083 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, 2nd ‘A Main,MICO L/O. JC Nagar. 0.1084 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office compound 0.1085 Providing Additional, Points, fixtures etc., to the Help center at

Reading room, Uday kumar park, Keethamarana hally village 0.1086 Providing additional lighting to Dr. Raj Kumar Kala mandira

and BBMP Office at Rajaji nagar shopping complex. 2.0087 Providing Additional, Points, fixtures etc., to the Help center at

Engineering Ward Office, Mustering center, 19th main, 2nd Block, Rajaji nagar 0.1088 Providing Additional, Points, fixtures etc., to the Help center at

Manjunatha Nagar Tailoring Center, 0.1089 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, 1st Main, Kamala Nagar. 0.1090 Providing Additional, Points, fixtures etc., to the Help center at

Health Center, Shankar nagar bus stand, Kamala Nagar 0.10

97

Page 104: Programme_Of_Works_2008-2009

91 Providing Additional, Points, fixtures etc., to the Help center atEngineering Ward Office, BEML Colony, 5th Main, Vrushabhavathinagar 0.10

92 Providing Additional, Points, fixtures etc., to the Help center atTailoring center, 8th Main, SBI Colony, Kamakshi Palya 0.10

93 Providing Electrification to the Newly constructed Anganawadi kendraKamakshipalya. 0.10

94 Providing Additional, Points, fixtures etc., to the Help center at Ground floor.Ward Office, 7th Main, Basaveshwara nagar. (Tailoring Centre upstair) 0.10

95 Providing Additional, Points, fixtures etc., to the Help center at Site OfficeBuilding, Manjunatha Nagare, 1st Main, Sy.No-25. Opp Shanimahatama Temple 0.10

96 Providing Additional, Points, fixtures etc., to the Help center atAmbedkar stadium, 1st Main, Basaveshwara nagar 0.10

97 Providing Additional, Points, fixtures etc., to the Help center atBBMP Health center, 4th Cross, Agrahara Dasarahalli, 0.10

98 Supplying and commissioning of 30KVA 3R-1040 Watercooling DG Set at Sreeramamandira Maternity Home 7.00

99 Providing Additional, Points, fixtures etc., to the Help center atWard Office, 6th main, 4th Block, Rajaji nagar, (Opp. Spandana ) 0.10

100 Providing UG Cable etc to Srirama mandira play ground. 0.50101 Providing Additional, Points, fixtures etc., to the Help center at

, Corporation community hall, Rajaji nagar 0.10102 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office building, Mariyappana palya. 0.10103 Providing Additional, Points, fixtures etc., to the Help center at

Tailoring Center, 59th ‘B’ Cross, 4th N Block, Rajaji nagar. 0.10104 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Sreerampuar Maternity Home 7.00105 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Dayananda nagar. 0.10106 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Gowtham Nagar, 7th Main, Sriranga, 0.10107 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Saibaba Nagar. 7th Main, 0.10108 Providing Electrification to the Newly constructed

Anganawadi and computer center shastri nagar, Okalipura, 0.80109 Providing Electrification to the Newly constructed

Anganawadi and computer center Bapuji Block, Srirampura. 0.45110 Providing Electrification to the Newly constructed

Anganawadi Center at Lakshman rao road, Okalipura, 0.18111 Providing Electrification to the Newly constructed Angawadi

and computer center Swathanthra palay, Srirampura. 0.49112 Providing Additional, Points, fixtures etc., to the Help center at

5th Main, Ward Office, Okalipuram 0.10113 Providing Additional, Points, fixtures etc., to the Help center at

Tailoring Center, Kasturi Nagar 0.10114 Providing Battries to U.P.S at D.C West Office, Seshadripuram 0.10115 Providing Electrificaiton to BBMP Toilet at VV Giri colony, Gandhi Nagar 0.10116 Providing Additional Points, Grounding, fixtures etc. to the

BBMP advocate office at Chickalal bagh, 0.10

98

Page 105: Programme_Of_Works_2008-2009

117 Providing Additional, Points, fixtures etc., to the Help center atZonal Office premises, Seshadripuram. 0.10

118 Providing Additional, Points, fixtures etc., to the Help center atopp. To Medical Health Office, Upparpet police station, Gandhi nagar 0.10

119 Providing Perment illumination to the Kranthi veera sangoli RayannaStatue Opp. Railway Station, Gandhi Nagar. 0.10

120 Providing Standby Motor Pumpset at ARO Office Chickpet 0.10121 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Cottonpet Maternity Home 7.00122 Providing Additional, Points, fixtures etc., to the Help center at

Chickpet ARO Office, Chikka Lalbagh 0.10123 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Manavarthpet Maternity Home 7.00124 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, TCM Royan Road 0.10125 Providing Additional, Points, fixtures etc., to the Help center at

IPP Health Center, Anjanappa Garden, near Binny Mill 0.10126 Providing Additional, Points, fixtures etc., to the Help center at

R.O. Market Office 0.10127 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Sirsi Road Maternity Home 7.00128 Providing Additional, Points, fixtures etc., to the Help center at

BBMP School, 6th Cross, 2nd Main, Chamarajpet 0.10129 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Dasappa Hospital Maternity Home 7.00130 Providing Additional, Points, fixtures etc., to the Help center at

Ward Office, Dasappa Maternity Hospital extension, SJP Road 0.10131 Supplying and commissioning of 30KVA 3R-1040 Water

cooling DG Set at Siddiah Road, Maternity Home 7.00132 Providing Additional, Points, fixtures etc., to the Help center at

BBMP Office Building , behind sub-division Office, J.C. Road 0.10Total 432.57

Maintenance Works1 Providing Temprovary illumination in connection with Immersion

of Lord Ganesha Idols to the Sankey Tank. 1.502 Providing Temprovary illumination to West Zonal offce in connection

with Kempegowda day Cellebration. 0.103 Providing Temprovary illumination to SKR MARKET 0.104 Providing Temprovary illumination in connection with Karaga Festival 1.005 Providing Temprovary illumination in connection with Karaga

Kempegowda day Cellebration to the Town Hall Building. 0.16 Providing Additional, Points, fixtures etc., to the Help center at

Health Center, Sanjay Nagar Main Road( Near Water Tank ) 0.107 Operation and Maintenance of Street Lights under Yeshvanthpura sub-dvn 0.358 Operation and Maintenance of Street Lights under Sanjay Nagar Sub Division 40.009 Operation and Maintenance of Street Lights under Malleswaram Sub Division 35.0010 Operation and Maintenance of Street Lights under Gayathrinagar Sub Division 50.00

11 Operation and Maintenance of Street Lights under Mahalakshmipuram Sub Dvn 52.0012 Operation and Maintenance of Street Lights under Rajajinagar Sub Division 43.0013 Operation and Maintenance of Street Lights under Srirammandir Sub Division 40.0014 Operation and Maintenance of Street Lights under Gandhinagar Sub Division 41.0015 Operation and Maintenance of Street Lights under Chickpet Sub Division 30.00

99

Page 106: Programme_Of_Works_2008-2009

16 Operation and Maintenance of Street Lights under Chamarajpet Sub Division 47.0017 Repairs to Park lights / Pumpset etc., to the Sharadamba Layout park,HMT area 0.1018 A.M.C of Electrical Installation by engaging Electrician Wiremen, Helper,with

maintenance materials of theBBMP building complete in Malleswaram Const 2.0019 Providing Fixtures to the Newly constructed community hall at HMT area 0.6020 Repairs to Park lights / Pumpset etc., to the Sundar Nagar park Jalahalli 0.1021 AMC of Electrical Crematorium by engaging required staff including periodically

repairs of furnaces, DG Sets cleaning of scrubber, chimney, repairs to motors etccomplete at Medi agrahara Electric Crematorium 10.00

22 AMC of Solar lights at JP park 10.0023 A.M.C. of Park lights, Pumpsets Fountain etc., JP Park 3.0024 Repairs to Park lights / Pumpset etc., to the LIC Colony Park, Yashvantpura 0.1025 Repairs and Providing additional fixtures to the Yeshwantpur Maternity Home 0.1026 Repairs and Providing additional fixtures to the IPP Building at BK Nagar 0.1027 Repairs to Pumpset, Panel Board etc., to the Yeshwanthpur maternaty Home 0.1028 Repairs to Pumpset, Panel Board etc., to the Veternary Hospital, Yeshwantpur 0.1029 A.M.C of Electrical Installation by engaging the wiremen, Operator, DG Set, Lift

Pumpset & Building etc., Teshwantpur Shopping Complex 3.0030 Repairs to Pumpset, Panel Board etc., to the range office at Nethjinagar, Mathi 0.1031 Repairs and Providing Additional lighting system to Sankey Tank Park 5.0032 Repairs to Park lights / Pumpset etc., to the AGS office layout park 0.1033 Repairs to Park lights / Pumpset etc., to the Dathathreya temple park, KR pura 0.1034 Repairs to Park lights / Pumpset etc., to the IDL Traingular Park 0.1035 Repairs to Park lights / Pumpset etc., to the Sankey Tank Park, K R Pura 0.1036 Repairs to Park lights / Pumpset etc., to the KRPura Park 0.1037 Repairs and Providing additional fixtures to the Boys highschool at KR Pura 0.1038 Repairs and Providing additional fixtures to the ARO Office, 16th cross, KR Pura 0.10

ARO Office, 16th Cross, KR Pura,.39 Repairs to Pumpset, Panel Board etc., to the 0.10

ARO Office compound, KR Pura,.40 Repairs to Pumpset, Panel Board etc., to the 0.10

Park at 3rd Cross, K R Pura.41 Repairs to Pumpset, Panel Board etc., to the 0.10

Dhobhi Ghat, K R. Pura.42 A.M.C of Electrical Installation by engaging the

wire men, Helper, Pumpset etc., at Sankey Tank Park. 2.0043 A.M.C of Electrical Installation by engaging the

wire men, Operator, DG Set, A.C, Pumpset , PublicAddress system at IPP Building, KR Pura. 3.00

44 Repairs to Pumpset, Panel Board etc., to theK.C. General Hospital Park. 0.10

45 Repairs to Pumpset, Panel Board etc., to theBoys School, Pit colony, Malleswaram. 0.10

46 Repairs to Pumpset, Panel Board etc., to theYeswanthpura Shopping complex ( Water Pump ). 0.10

47 Repairs to Pumpset, Panel Board etc., to theYeswanthpura Shopping complex ( Sump pit Motor ) 0.10

48 Repairs and Providing additional fixtures to theYeswanthpura Shopping complex 0.10

49 Repairs to Pumpset/ Street light at Burial Ground,Subedarpalya. 0.10

100

Page 107: Programme_Of_Works_2008-2009

50 AMC of Electrical Installation, Lift, Generator at yeswanth-pura shopping complex for the year 2008-09. 1.00

51 Repairs to Park lights / Pumpset etc., to theAne Park, 9th Cross, Malleswaram. 0.10

52 Repairs to Park lights / Pumpset etc., to theBala Subramanya Nagar Park, 17th Cross, Malleswaram. 0.10

53 Repairs to Park lights / Pumpset etc., to thebetween 11 & 12th Cross Park, Malleswaram. 0.10

54 Dismantling the existing M/s. Kone Elevator lift and commissiongof New lift at yeswanthpura shopping complex. 12.00

55 Releasing of Tubular poles at Yeswanthpura Circle due to construction of fly-over 0.60

56 Repairs to Electrical Installation and Providing Fixtures to 17th crossQuarters, Malleswaram. 0.10

57 A.M.C of Electrical Installation by engaging thewire men, Helper, BBMP Building etc., completein Rajaji angar Constituency. 2.00

58 Repairs and Providing additional fixtures to theHarischandara Ghat, Srirampura, 0.10

59 AMC of Electrical Crematorium by engaging required staff including periodically repairs of furnaces, DG Sets cleaning ofscrubber, chimmney, repairs to motors etc., complete at Harischandara Ghat, Srirampura, 10.00

60 Repairs to Pumpset, Panel Board etc., to theCommunity Hall, Subramanya Nagar. 0.10

61 Repairs to Park lights / Pumpset etc., to theAyyapa temple park, Subramanya nagar, 0.10

62 Repairs to Park lights / Pumpset etc., to theSangoli Rayanna park, 0.10

63 Repairs to Park lights / Pumpset etc., to theMilk Colony Park. 0.10

64 Repairs to Park lights / Pumpset etc., to theAnjanaiah Hillrock park, 0.10

65 Repairs to Park lights / Pumpset etc., to theVasavi park, in Mahalaxmipura, 0.10

66 Repairs to Park lights / Pumpset etc., to theBNEL park, in Mahalaxmipura, 0.10

67 Repairs to Park lights / Pumpset etc., to theVasavi park, in Mahalaxmipura, 0.10

68 Repairs to Park lights / Pumpset etc., to theSharana Seva Samaja park, in Mahalaxmipura, 0.10

69 Repairs to Park lights / Pumpset etc., to the Usha park, in Mahalaxmipura, 0.10

70 Repairs to Park lights / Pumpset etc., to theShankar Nagara park, in Mahalaxmipura, 0.10

71 Repairs to Park lights / Pumpset etc., to theHare Krishna Park, 0.10

72 Repairs to Park lights / Pumpset etc., to theIndira priyadarshini park, in Mahalaxmipura, 0.10

73 Repairs to Park lights / Pumpset etc., to theKSDL soap factory Circle Park, 0.10

101

Page 108: Programme_Of_Works_2008-2009

74 Repairs to Pumpset, Panel Board etc., to theAnjanaiah Hill rock Park, Mahalaxmipura 0.10

75 Repairs and Providing additional fixures to the High school andmiddle, Marappana palya. 0.10

76 Repairs to Pumpset, Panel Board etc., to theCommunity Hall, Ashokpura 0.10

77 Repairs to Electrical Installation to the I PP building atJaibhuvaneshwari Nagar, Nandini Layout. 0.10

78 Repairs to Park lights / Pumpset etc., to thejark Bande Park, GG Palya. 0.10

79 Repairs to Park lights / Pumpset etc., to theTVS Cross Park, Peenya. 0.10

80 Repairs to Park lights / Pumpset etc., to the2nd Stage Park, Peenya Industrial Area. 0.10

81 Repairs to Park lights / Pumpset etc., to theK.I.D.B. Park. Peenya. 0.10

82 AMC of Electrical Crematorium by engaging required staff including periodically repairs of furnaces, DG Sets cleaning ofscrubber, chimmney, repairs to motors etc., complete at Peenya Electric Crematorim. 10.00

83 Repairs to Park lights / Pumpset etc., to theSFHS Park, Nandini Layout. 0.10

84 Repairs to Park lights / Pumpset etc., to theCircular Park, Nandini Layout. 0.10

85 Repairs to Park lights / Pumpset etc., to theSFHS Balamuri Ganapathi Park, Nandini Layout. 0.10

86 Repairs to park lights/ Pumpset at C.A.Site Park,Geleyarabalaga 0.10

87 Repairs to park lights/ Pumpset at Pipe line park Part-1 & 2Geleyarabalaga 0.10

88 Repairs to park lights/ Pumpset at Pipe line park Part- 3 & 4Geleyarabalaga 0.10

89 Repairs to park lights/ Pumpset at Pipe line park Part-5 & 6Geleyarabalaga 0.10

90 Repairs to Park lights / Pumpset etc., to theSiddaruda Park, Nagapura. 0.10

91 Repairs to Park lights / Pumpset etc., to theViveshwaraiah Park, Nagapura. 0.10

92 Repairs to Park lights / Pumpset etc., to theHigh Tension Park. 0.10

93 Repairs to Park lights / Pumpset etc., to theSwamy Vivekananda Park, 0.10

94 Repairs to Park lights / Pumpset etc., to theKarimariyamma temple park, Nagapura. 0.10

95 Repairs to Park lights / Pumpset etc., to theUday Kumar park. 0.10

96 Repairs to Park lights / Pumpset etc., to thePipe line Park, Nagapura. 0.10

97 Repairs to Park lights / Pumpset etc., to the1st Block Bus stop Park, 0.10

98 Repairs to Park lights / Pumpset etc., to theUsha Park, Mahalaxmipura. 0.10

102

Page 109: Programme_Of_Works_2008-2009

99 Repairs to Park lights / Pumpset etc., to theViveshwaraiah Park, Nagapura. 0.10

100 Repairs to Park lights / Pumpset etc., to theShankar mata Park, 0.10

101 Repairs to Park lights / Pumpset etc., to theGovt. Soap Factory Park. 0.10

102 Repairs and Providing additional fixtures to Usha Park and Hare Krishna Park 1.00

103 Repairs to Pumpset/ Street light at Dhobhi Ghat,Nagapura. 0.10

104 providing Fixtures to the Newly constructed BBMP Buildingat Ward Office, 0.10

105 Repairs to Pumpset, Panel Board etc., to theRajaji nagar shopping complex. 0.10

106 Repairs to Park lights / Pumpset etc., to theNavarang Park. 0.10

107 Repairs to Fountain atNavarang Park, Rajaji nagar. 0.10

108 Repairs to Park lights / Pumpset etc., to theMaruthi layout park, Rajaji nagar. 0.10

109 A.M.C of Electrical Installation by engaging thewire men, Helper, Operator. DG Set, A C, Aditoriumpumpset & BBMP office etc., at Rajajinagar shopping complex. 4.00

110 Repairs to Park lights / Pumpset etc., to theKempe gowda Park, Kamala nagar. 0.10

111 Repairs to Park lights / Pumpset etc., to theKuvempu Park, Kamala nagar. 0.10

112 Repairs to Park lights / Pumpset etc., to theKEC Colony Park, Kamala nagar. 0.10

113 Repairs to Park lights / Pumpset etc., to theKirloskar colony park, Kamala nagar. 0.10

114 Repairs to Park lights / Pumpset etc., to theSBI Colony park, Kamala nagar. 0.10

115 Repairs to Park lights / Pumpset etc., to theShamba Murthy Park, 0.10

116 Repairs to Park lights / Pumpset etc., to theWard Office Park, Vrushabhavathi Nagar park, 0.10

117 Repairs to Park lights / Pumpset etc., to the Vrushabhavathi Nagar park, 0.10

118 Repairs to Fountain atAladamara Park,Kamakshipalya. 0.10

119 Repairs to Park lights / Pumpset etc., to theAladamara Park,Kamakshipalya. 0.10

120 Repairs to Park lights / Pumpset etc., to theSBI Colony Park, 0.10

121 Repairs and Providing additional fixtures to IPP buidings at Kamakshipalya. 1.50

122 Repairs and Providing additional fixtures to S.C. Bose Play ground at Basaveshwaranagar 2.00

123 Repairs to Park lights / Pumpset etc., to theUniversity Park, Basaveshwara Nagar. 0.10

103

Page 110: Programme_Of_Works_2008-2009

124 Repairs to Park lights / Pumpset etc., to theKHB Colony 2nd Stage, 5th Cross Park. 0.10

125 Repairs to Park lights / Pumpset etc., to theSubash Chandra Bose park, KHB Colony. 0.10

126 Repairs to Park lights / Pumpset etc., to theNandava Vana Park, Industrial Town. 0.10

127 Repairs to Park lights / Pumpset etc., to theBule ward Park. 0.10

128 Repairs to Park lights / Pumpset etc., to theDr. B.R.Ambedkar Park, 0.10

129 Repairs to Park lights / Pumpset etc., to theBasavana Park. 0.10

130 Repairs and Providing additional fixtures to IPP buidings at KHB Colony, Industrial Town. 0.10

131 Repairs and Providing additional fixtures to BBMP Community hall at 6th Block, Rajaji nagar. 0.10

133 Repairs to Pumpset to BBMP Community hall at 6th Block, Rajaji nagar. 0.10

134 A.M.C of Electrical Installation by engaging thewire men, Helper, Pumpset etc., at Dr. AmbedkarStadium. 1.00

135 Repairs to Pumpset, Providing additional fixtures to Maternity Home at Sreerama mandira. 0.10

136 Repairs to Park lights / Pumpset etc., to the64th Cross, Sreerama mandira 0.10

132 Repairs to Park lights / Pumpset etc., to theSoundarya Park, 76th Cross, 6th Block, Rajaji nagar. 0.10

137 Repairs to Park lights / Pumpset etc., to theDhobhi Ghat Park, 5th Block, Rajaji nagar. 0.10

138 Repairs to Park lights / Pumpset etc., to theMahadev Banakar park, 0.10

139 Repairs to Park lights / Pumpset etc., to thepark, Opp. Madhu Hotel, West of chord road. 0.10

140 Repairs to Park lights / Pumpset etc., to the G.D. Park, Prakash Nagar. 0.10

141 Repairs to Fountain at G.D. Park, Prakash Nagar. 0.10142 Repairs and Providing Additional fittings cable etc. at

G.D. Park, Prakash Nagar. 1.00143 Providing fixtures to the Newly constructed BBMP Building

at 4th N Block, Prakash Nagar. 0.10144 Repairs to Pumpset, Panel Board etc., to the

Community hall, Dayananda nagar. 0.10145 Repairs to Pumpset, Panel Board etc., to the

Sri rampura Maternity Home. 0.10146 Repairs to Pumpset, Panel Board / Mono Block pump

etc., to the Sri rampura Maternity Home. 0.10147 Providing Fixtures to the Newly constructed Building at

Srirampura Maternity Home 0.50148 Repairs to Pumpset, Panel Board etc., IPP Center

at Gopala Pura, 0.10149 A.M.C of Electrical Installation by engaging the

wire men, Helper, Operator. DG Set, AC etc, at JC West Zonal Office. 4.00

104

Page 111: Programme_Of_Works_2008-2009

150 A.M.C of Electrical Installation by engaging thewire men, Helper, Operator. DG Set, A C,etc., atCity Railway station and Sangam Sub-way, Gubbi Veerana Drama Gandhi nagar 4.00

151 Repairs to A.C. at J.C. West Chamber, Seshadripuram 0.10152 Repairs to A.C. Health Office, JC West Annexure building,

Seshadripuram 0.10153 Repairs to Submersible pump/Panel Board at

J.C.west, zonal office, Seshadripuram 0.10154 Repairs to Pump motor to

J.C.west, zonal office, Seshadripuram 0.10155 Repairs to Electrical Installaiton / Pump motor to

Seshadripuram Park 0.10156 Repairs to Electrical Installation to Gym building/community

hall/pumpset at Resildar street, Gandhi nagar 0.10157 Repairs to Motor Pump to ARO/AEE ( Civil )Office

Good shed road, Gandhi nagar 0.10158 Repairs to Submersible pump/Panel Board at BBMP

Girls High School, Gandhi nagar. 0.10159 Repairs to Submersible pump/Panel Board at

Bashyam Park. 0.10160 Repairs to Fountain Motor and Submersible motor to

Bashyam Park, Seshadripuram 0.10161 Repairs to Fountain Motor and Submersible motor to

Thulasi Thota. 0.10162 Repairs to Pump Motor and Panel at Railway

Station at Sub-way. 0.10163 Repairs to Submersible pump/Panel Board at

Gubbi veerana Drama Theater, Gandhi nagar. 0.10164 Repairs to Inter-com to J.C.West Zonal Office(West )

Seshadripuram 0.10165 A.M.C of Electrical Installation by engaging the

wire men, Helper, Operator. DG Set, motors etc., at S.K.R. Chickpet constituecny. 2.00

166 Repairs to Pump Motor at Chickpet Maternity Home. 0.10167 Repairs to Pumpset at BBMP Girls High School

KV Temple Street, chickpet 0.10168 Repairs and Providing MV fittings to the Bannapa Park,

Cubbonpet 3.00169 Repairs to Elelctrical Installation

Cottonpet Maternity Home. 0.10170 Repairs to Pumpset / Panel Board at

Manvarthpet Maternity Home. 0.10171 Repairs to Pump Motor at

Muniyan park. 0.10172 A.M.C of Electrical Installation by engaging the

wire men, Helper, Operator. DG Set, motors etc., at S.K.R. Market, Market Sub-way, 8.00

173 Repairs to Pump Motor atMutton Market. 0.10

174 Repairs to Pumpset / Panel Board atMutton Market. 0.10

105

Page 112: Programme_Of_Works_2008-2009

175 Repairs to Pumpset / Panel Board atto SKR market Sub-way. 0.10

176 Repairs to 6Nos. Pumpset / Panel Board atto SKR market, Basement floor 1.00

177 Repairs and Servicing 2Nos. Of DG sets 125KVA at SKR Market 0.60

178 Repairs to the Electrical Installation, Panel Board etc.,complete at Mutton and Fish Matket. 3.00

179 A.M.C of Electrical Installation by engaging thewire men, Helper, Operator. DG Set, , at Set, Dasappa Hospital Annexure building and other B.B.M.P. Buildings in Chamarajpet constituency., 4.00

180 Repairs to Pump Motor atB.B.M.P. Junior College Chamarajpet 0.10

181 Repairs to Pumpset / Panel Board atMakkalakoota Park. 0.10

182 Repairs to Submersible Pump Motor atMakkalakoota Park. 0.10

183 Repairs to Pumpset / Submersible Motor at HinduBurial Ground, Chamarajpet. 0.10

184 A.M.C of Electrical Installation by engaging thewire men, Helper, etc. at Whole Sale Yard,Kalasipalya. 3.00

185 Repairs to Pump Motor atWhole Sale Yard. 0.10

186 Repairs to Submersible Pump Motor atSJP park part-1 0.10

187 Repairs to Submersible Pump Motor atSJP park part-11 0.10

188 Repairs to Submersible Pump Motor atDasappa Maternity Home. 0.10

189 Repairs to Submersible Pump Motor atDasappa Hospital Annexure Building. 0.10

190 Repairs to A.C. Unit at Dasappa Hospital Annexure Building. 0.10

191 Repairs to Pumpset / Panel Board atBBMP Car Shed. 0.10

192 Repairs to Pumpset / Panel Board atBannappa Park. 0.10

193 Repairs to Pumpset / Panel Board atJanatha Colony, BBMP Park 0.10

194 Repairs to Pumpset / Panel Board atCSI, BBMP Park. 0.10

195 A.M.C of Electrical Installation by engaging thewire men, Helper, Operator. DG Set, , at Town hall, Transformer Yard etc., 3.00

196 Repairs to Submersible Pumpset / Panel Board atTown Hall. 0.10

197 Repairs to Submersible Pump Motor atJ.C. Raod Office Complex. 0.10

198 Repairs to Submersible Pump Motor at

106

Page 113: Programme_Of_Works_2008-2009

J.C. Raod Car parking. 0.10199 Repairs to 7.5KVA D.G.Set at Siddiah Road,

Maternity Home 0.10200 Repairs to Submersible Pump Motor at

Siddiah Road Maternity Home 0.10201 AMC of Nyaya Degula complex engaging with lift operator etc.,

at Siddaiah Road. 1.00202 Repairs to Pumpset, Panel Board etc., to the

Judicial Layout park, Sanjay nagar., 0.10203 Repairs to Pumpset, Panel Board etc., to the

AECS 2nd Stage, 7th main park, Sanjay nagar., 0.10204 Repairs to Pumpset, Panel Board etc., to the

Amar jyothi Layout park, Sanjay nagar., 0.10205 Repairs to Pumpset, Panel Board etc., to the

Central Excise Layout park, Sanjay nagar., 0.10206 Repairs to Pumpset, Panel Board etc., to the

RMV 2nd Stage park, Sanjay nagar., 0.10207 Repairs to Pumpset, Panel Board etc., to the

KEB Layout Park, Sanjay nagar. 0.10208 Repairs to Pumpset, Panel Board etc., to the

RMV 3rd Stage, Soundarya park, Sanjay nagar., 0.10209 Repairs to Pumpset, Panel Board etc., to the

RMV Hospital park, Sanjay nagar., 0.10210 Released and refixing Tubular poles with fittings from Bellary

road the same is refixed to the BEL Road, Sanjay nagar. 3.00Total 521.95

Sub Total 954.52Grand Total 5197.89

107

Page 114: Programme_Of_Works_2008-2009

SOUTH ZONEDetails of Programme of works for the year 2008-09

(Works proposed for 08-09)

Sl No. Name of the Work Estimated CostI1 Providing CC to Lanes in new Binny Layout 45.00

45.00II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00

2 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.00

3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 2.00

5 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

6 Annual maintenance of Range office building in 4th Cross, ward office building& School building in 2nd cross 5.00

7 Annual maintenance of Hospital & Nurse Quarters 2nd Cross, Magadi Road 4.00

8 House Keeping & maintenance of Range Office Building in 4th cross of Magadiroad 2.00

9 Annual maintenance of School building in 1st Cross of Magadi road 4.0010 Patching of pot holes to the internal roads 3.0011 Patching of pot holes to the Arterial and sub-arterial roads 5.00

12 Desilting of territiary drains in Bhuvaneshwarinagar from 1st cross to 8th crossof Magadi road & 6th cross to 16th cross of Bhuvaneshwarinagar 5.00

13 Asphalting to 5th main of Bhuvaneshwarinagar 5.0040.00

III BBMP Contact Point

1 Construction of BBMP contact point Building at CA site Vijayanagar 4th Main road 9.00

9.00IV1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.2995.29

Sl No. Name of the Work Estimated Cost1 2 3I

1 Formation of Cement Conrete Roads in 2nd & 3rd main of Bhuvaneshwarinagara 22.00

2 Formation of New roads in Ambedkar Layout next to 4th Cross 5.00

3 Construction of Genaral Toilet at 8th cross of Magadi road & 5th main ofB.Nagar 3.00

30.00II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Protection of recovered BBMP Properties in the Ward Juridiction 2.00

Details of Programme of Works for the Year 2008-09 pertaining to Ward No.32, Binnypet Sub Division

(A) Capital Works

Sub Total-1(B) Maintainence Works

Sub Total-2

Sub Total-3Annual Maintenance of BBMP properties

Grand Total

Details of Programme of Works for the Year 2008-09 pertaining to Ward No.31, Binnypet Sub Division

(A) Capital Works

Sub Total-1(B) Maintainence Works

108

Page 115: Programme_Of_Works_2008-2009

4 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.005 Patching of pot holes to the internal roads & Depot Collection 4.006 Patching of pot holes to the Arterial and sub-arterial roads 5.00

7 Desilting of territiary drain in Bhuvaneshwari nagar from 8th cross to 15th cross& 1st main to 10th main 5.00

8 Desilting of territiary drain in Telecom Layout & Ambedkar Layout 3.009 Restoration of roads cut potion in 22nd cross of Bhuvaneshwarinagar 10.00

10 Asphalting roads in Bhuvaneshwari nagar from 16th to 22nd Cross 15.0011 Restoration of Cement concrete road cut potion in Bhuvaneshwarinagar 8.00

55.00III BBMP Contact Point

1 Construction of BBMP contact point Building at CA site Vijayanagar 4th Main road 9.00

9.00IV1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.2995.29

Sl No. Name of the Work Estimated CostI

1 Construction of Library Building Computer Training Center Tailoring hall in4thmain Vijayanagara (Balance Portion) 30.00

2 Providing CC to Lanes along 1st Cross to 8th Cross, N.R. Garden 10.0040.00

II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 2.005 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

6 Annual maintenance of Pramila Bai Mane School & Library Building atManjunathanagara 2.00

7 Patching of pot holes to the 1st to 4th Main Road Vidyaranyanagara, 1st cross to10th Cholurpalaya. 5.00

8 Patching of pot holes to the Arterial and sub-arterial roads in Ward - 33 5.00

9 Desilting of territiary drains in Cholurpalya from 1st cross to 13th Cross &Manjunathanagara 1st cross to 10th cross & Vijayanagara 5.00

10 Asphalting to 1st Main to 9th Main, Vijayanagar 16.0011 Foot path maintenance of West of Chord Road & Magadi main road 2.0012 Foot path maintenance of roads 1st to 9th main Vijayanagar roads 3.00

45.00III BBMP Contact Point

1 Construction of BBMP contact point Building at CA site Vijayanagar 4th Main road 9.00

9.00IV1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.2995.29

Sub Total-2

Sub Total-3Annual Maintenance of BBMP properties

Grand Total

Details of Programme of Works for the Year 2008-09 pertaining to Ward No.33, Binnypet Sub Division

(A) Capital Works

Sub Total-1(B) Maintainence Works

Sub Total-2

Sub Total-3Annual Maintenance of BBMP properties

Grand Total

109

Page 116: Programme_Of_Works_2008-2009

Sl No. Name of the Work Estimated Cost1 2 3I

1 Construction of foot path at 5th road from 4th Cross to Rameshbabu Circle(balance work) 35.00

2 Providing CC to Roads 8th A and 8th B roads of BNASO Layout 10.0045.00

II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00

2 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.00

3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 2.00

5 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

6 Annual maintenance of Old ward office at 9th main road RPC Layout 2.007 Desilting of territiary drains in ward no.34 3.008 Depot collection for the year 08-09 1.009 Patching of pot holes to the internal roads 2.00

10 Construction of Culvert at 9th main and Railway parallel road junction 3.0011 Providing asphalting to 9th ABCD, 10th, 11th Main Road of RPC Layout 18.0012 Providing RCC cover to SWD at 10th Cross RPC Layout 4.00

40.00III BBMP Contact Point

1 Construction of BBMP contact point Building at CA site Vijayanagar 4th Main road 9.00

9.00IV1 Emergency repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-6 1.29126.29

S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants 1 Demolition of Building (Enforcement) 1.002 Re-Writing of street Name/Ornamental Name borads 1.003 Maintenance of Nirmala Toilets in Kanakanagar slum & Saraswathi nagar 2.00

4 Protection of recovered BBMP Properties _5 Temporary Tranisit Garbage Handling Points _6 Providing new street Name/omamental name boards 5.007 Construction of missing Culvert and providing missing tertiary drain in ward no

356.00

8 Providing CC to Lanes along 21st 'C' cross,5th and 6th Cross of Marenahalli 25.00

9 Patching of pot holes to the Arterial & internal roads in Ward - 35 5.0010 Desilting of territiary and secondary drains along 1st cross to 8th cross, 1st

Main to 9th Main of Marenahalli, 1st cross to 7th cross, 1st Main to 7th Main of Subbanna Garden,1st cross to 4th cross & 1st main to 6th Main of Vinayaka lyt 3rd stage

5.00

PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.35, Marenahalli in Govindarajnagar sub-

Sub Total-2

Sub Total-3Annual Maintenance of BBMP properties

Grand Total

Details of Programme of Works for the Year 2008-09 pertaining to Ward No.34, Binnypet Sub Division

(A) Capital Works

Sub Total-1(B) Maintainence Works

110

Page 117: Programme_Of_Works_2008-2009

11 Engaging private labourers for maintenance of Ward for the year 08-09 5.0012 Asphalting to 1st Cross to 6th Cross of GKW Layout & Vyalikaval Layout 25.00

13 Construction of lead off drain along 8th cross of Shivananda nagar and Marenhalli

5.00

85.00II Contact Point

Nil IV (1) Emergency repair works for Ward office Building 1.29

1.2998.29

S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants 1 Demolition of Building (Enforcement) 1.002 Re-Writing of street Name/Ornamental Name borads 1.003 Maintenance of Nirmala and other BBMP toilets 2.004 Protection of recovered BBMP Properties 3.005 Temporary Tranisit Garbage Handling Points _6 Providing new street Name/omamental name boards 2.008 Reconstruction of SSM drains and providing RCC desklab from

Sangollirayanna road to 4th main, M.C. Layout 5.00

9 Providing CC to Lanes at Govindarajnagar ottegere 25.0013 Asphalting to roads at Kaveripura 15.0014 Patching of pot holes to the internal roads 3.5015 Desilting of territory drains at low laying area at Muneshwara Block, Sy. No.43

at Malagala, Ranganathapura & Kaveripura 5.00

16 Engaging private labourers for maintenance of ward for the year 2008-09 5.0017 Restoration of footpath at 8th cross, M.C.Layout 5.0018 Construction of culverts & Providing BS slab drain at sy. No.43 at Malagala

village 10.00

19 Construction of culverts western side of 3rd Main Kaveripura 2.5085.00

II Contact Point Nil

_IV (1) Emergency repair works for BBMP Buildings 1.29

1.2986.29

S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants 1 Demolition of Building (Enforcement) 1.002 Re-Writing of street Name/Ornamental Name boards 1.003 Maintenance of Nirmala and other BBMP toilets4 Protection of recovered BBMP Properties _5 Temporary Tranisit Garbage Handling Points6 Providing new street Name/ornamental name boards7 Formation of new road and drain at 1st and 2nd cross of Kanakanagar 8.008 Construction of RCC Box drain at Kanakanagar 15.00

GRAND TOTALPROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.37, Amarjyothi nagar in Govindarajnagar sub-

PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.36, Govindarajanagar in Govindarajnagar sub-

TOTAL

TOTAL

TOTAL

TOTAL

TOTALGRAND TOTAL

111

Page 118: Programme_Of_Works_2008-2009

9 Providing CC to cross roads of Sampige Layout (10th E,F) and 1st A & B cross of SVG Nagar

10.00

10 Providing asphalting from 1st cross to 8th cross roads of Sanjeevininagar 15.00

11 Providing asphalting from 9th cross to 11th cross roads of Sanjeevininagar & Sangolli rayanna road

18.00

12 Desilting of territiary drain @ 1st Main, 2nd, 3rd main & Surrounding cross roads of Panchasheela nagar

5.00

13 Desilting of territiary drain @ 8th cross, 10th cross, 10th D,E cross of Sampige layout & 5th cross & 1st main of Kaveri layout

5.00

14 providing Pothole filling to Internal roads in ward no.37 2.0014 Engaging private labourers for maintenance of Ward for the year 08-09 5.00

85.00II Contact Point

1 Constructions of Contact point building in ward No.37 9.009.00

IV (1) Emergency repair works for Ward office Building & Corporation building 1.29

1.2995.29

S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants 1 Demolition of Building (Enforcement) 1.002 Re-Writing of street Name/Ornamental Name borads 1.003 Maintenance of Nirmala and other BBMP toilets _4 Protection of recovered BBMP Properties _5 Temporary Transit Garbage Handling Points _6 Providing new street Name/ornamental name boards 1.007 Providing protection grill and other allied works to BBMP college building at

Byraweshwaranagar10.00

8 Comprehensive development 0f 9th& 10 th cross of garden villas 14.009 Providing SSM drain & Covering slab at 2nd cross & 1st Main road at Janatha

colony in Panchasheela nagar 10.00

10 Construction of Balance compound wall at BBMP High school & Protective works at BBMP HP school

10.00

11 providing asphalting to bad roads in kalyana nagar 15.0012 providing asphalting to bad roads in garden villas,coconut garden & Manasa

Nagar 15.00

13 providing Missing culverts in ward no.38 5.0014 providing Pothole filling to Internal roads in ward no.38 3.00

85.00II Contact Point 1 Construction of Contact point centre at Vivekanada Park in BDA Layout in

ward no.38 9.00

9.00IV (1) Emergency repair works for BBMP Buildings 1.29

1.2995.29

TOTAL

TOTALGRAND TOTAL

TOTALGRAND TOTAL

PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.38, Moodala palya in Govindarajnagar sub-

TOTAL

TOTAL

TOTAL

112

Page 119: Programme_Of_Works_2008-2009

Sl.No. Name of Work Est.Amount (in lakhs)I1 Construction of watchmen quarters at ward office premises. 5.00

2 Construction of culverts and drain at Babaiahna Gudi main road in Vidyagiri Layout. 7.00

3 Construction of culverts at main and cross roads in I.T.I. Layout (Nayandahalli). 10.00

4 Providing cement concrete to 1st to 4th main in Metro Layout. 20.00

5Providing cement concrete to balance roads in Gangondanahalli slum (adjacent to 4th cross).

5.00

6 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

Sub Total-1 48.00II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 2.00

5Providing Asphalting to balance roads in Vidyagiri Layout, New Income Tax Layout and Chandra Layout 1st stage 1st phase (from 13th to 15th cross road). 10.00

6 Providing Asphalting to balance roads in I.T.I. Layout (Nayandahalli). 15.007 Desilting of tertiary drains in Gangondanahalli slum area. 2.008 Desilting of tertiary drains in Arundathi slum area. 2.009 Depot collection. 2.00

Sub Total-2 37.00III BBMP Contact Point

1 Construction of BBMP contact point Building at Gangondahalli main road below High tension line. 9.00

Sub Total-3 9.00V Annual Maintenance of BBMP properties 1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.29GRAND TOTAL 112.16

Sl.No. Name of Work Est.Amount (in lakhs)I1 Construction of road side drains at Railway Parallel lane and Maruthinagar. 10.00

2 Construction of culverts and drains at Chandra Layout and Venkateshwara Layout. 12.00

3 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

Sub Total-1 23.00II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00

(B) Maintenance Works

(A) Capital works

(B) Maintenance Works

Programme of Works for the year 2008-09 pertaining to Ward No.40, Attiguppe, Chandra Layout Sub Division, Chandra Layout Division

(A) Capital works

Programme of Works for the year 2008-09 pertaining to Ward No.39, Chandra Layout, Chandra Layout Sub Division, Chandra Layout Division

113

Page 120: Programme_Of_Works_2008-2009

4 Protection of recovered BBMP Properties in the Ward Juridiction 5.00

6 Providing Asphalting and Improvements to drains at Nisarga Layout, Maruthinagar, BCC Layout, Viwers Layout and C.H.B.S. Layout. 40.00

7 Improvements to drains and Footpath in front road of Skyline Apartment. 6.007 Maintenance of ward to ward office. 1.008 Filling of pot holes in jurisdiction in ward-40. 2.009 Maintenance of ward (Desilting) and other maintenance works. 2.0010 Depot Collection. 2.00

Sub Total-2 62.00IV Annual Maintenance of BBMP properties 1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.29GRAND TOTAL 94.09

Sl.No. Name of Work Est.Amount (in lakhs)I

1 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

Sub Total-1 1.00II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00

4 Providing Asphalting to roads in newly taken area BDA Layout in Sy no. 17/1. 15.00

5Providing Asphalting to 3rd, 4th & 6th to 10th cross in Byatarayanapura New Extension and 1st to 5th cross in Raghavanagar, 1st to 4th cross in Vinoba Colony and cross roads in Ganapathinagar.

20.00

6 Providing Asphalting to 1st to 5th cross in Veerabhadranagar. 10.00

7Providing Asphalting to 2nd to 5th cross in Muthachari Layout, cross roads in FCI Layout and main road & cross roads in Hanumanthappa Layout and Jyothinagar. 15.00

8 Annual maintenance to Health Centre in Muneswara Block. 2.009 Annual maintenance to Veterinary Hospital in Byatarayanapura. 2.0010 Filling of pot holes in jurisdiction in ward no.41. 2.00

11 Desilting of tertiary drains in Byatarayanapura, Vinoba Colony and Timber Yard Layout. 2.00

12 Desilting of tertiary drains in Hanumanthappa Layout, Ranghanatha Colony, Jyothinagar and F.C.I. Layout. 2.00

13 Depot Collection. 2.00

14 Special repairs, water supply and repairs to U.G.D. system to the Maternity Hospital in Kasturiba Nagar. 8.00

Sub Total-2 84.00III BBMP Contact Point1 Construction of BBMP contact point Building at Avalahalli. 9.00

Sub Total-3 9.00VI1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-4 1.29GRAND TOTAL 150.29

Annual Maintenance of BBMP properties

Programme of Works for the year 2008-09 pertaining to Ward No.41, Gali Anjaneya Temple, Chandra Layout Sub Division, Chandra Layout Division

(A) Capital works

(B) Maintenance Works

114

Page 121: Programme_Of_Works_2008-2009

Sl.No. Name of Work Est.Amount (in lakhs)I1 Construction of R.C.C. box drain at B.W.S.S.B. road. 5.002 Construction of L/shape concrete drains at Bapujinagar area. 5.003 Construction of S.S.M. drains at Bapujinagar area. 5.00

4 Providing Cement Concrete to roads in Kavika Layout in between V.Valley and West of Chord road. 10.00

5 Providing Cement Concrete roads in Shamanna Garden area. 8.00Sub Total-1 33.00

II1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 5.005 Temproary Transist of Garbage handling Points in the Ward Juridiction 1.00

6 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

7 Asphalting to roads at Chowdappa Layout and balance roads at Bapujinagar. 10.00

8 Reconstruction of damaged portion of S.W.D. in Maruthinagar and Shamanna Garden area. 9.00

9 Reconstruction of culverts at 16th and 17th cross roads Bapujinagar. 5.0010 Annual maintenance of Tailoring hall in Maruthinagar, Anganavadi building. 5.0011 Patching of pot holes to the inertial roads. 2.0012 Desilting of territory drains. 3.0013 Desilting of secondary S.W.D. 5.0014 Engaging private labour for maintenance of ward for the year 2008-09. 2.00

Sub Total-2 52.00IV1 Annual repairs to BBMP Properties in the Ward juridiction 1.29

Sub Total-5 1.29GRAND TOTAL 99.29

Sl.No. Name of Work Est.Amount (in lakhs)I

1 Providing RCC Deck Slab in between 6th & 7th Cross (Behind to Samudaya Bhavana) of Padarayanapura 5.00

2 Reconstruction & Improvements to Road Side drains @ 3rd Cross of Padarayanapura 4.00

3 Providing Cement Concrete to Lanes of Mominpura Slum 8.00

4 Providing Cement Concrete to Lanes & Improvemnets of drains @ Farooqia nagar 10.00

5 Reconstruction of Culvert & Improvements to Road Side drains @ 5th Cross of Padarayanapura 5.00

Sub Total-1 32.00

1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00

Annual Maintenance of BBMP properties

Programme of Works for the year 2008-09 pertaining to Ward No.43, Padarayanapura, JJRNagar Sub Division

(A) Capital works

(B) Maintenance Works

Programme of Works for the year 2008-09 pertaining to Ward No.42, Bapujinagar, JJRNagar Sub Division, Chandra Layout Division

(A) Capital works

(B) Maintenance Works

115

Page 122: Programme_Of_Works_2008-2009

4 Protection of recovered BBMP Properties in the Ward Juridiction 5.005 Providing new Street / Ornamental Name Boards in the Ward Juridiction 1.00

6 Clearence of debris / over burden earth from 12th Cross to 11th Cross in Padarayanapura (near Railaway Bridge) 2.00

7 Improvements to drains & Providing RCC Slabs @ 8th Cross of Padarayanapura 5.00

8 Desilting of Roads side drains & Maintenance of Shoulders in the Ward juridiction 3.00

9 Filling the pot holes & Depot collection for the year 2008-09 2.00

10 Annual repairs to BBMP Samudaya Bhavana, DDUrs nagar & Electric Cremitorium at 2nd cross, Mysore Road 3.00

11 Improvements to Footpath at Padarayanapura Main Road (from 1st cross end to 5th cross) 8.00

12 Providing Asphlating to 2nd to 6th Cross of Mysore road & Vinayakanagara Roads. 10.00

13 Reconstruction of drains at Nehru Road in Padarayanapura 5.00

14 Providing RCC Deck Slab to SWD at 12 th main (Balance Portion) of Padarayanapura (near Muneshwara Temple) 5.00

Sub Total-2 53.00GRAND TOTAL 101.34

Sl.No. Name of Work Est.Amount (in lakhs)I (A) Capital works

1 Improvements to drains & Providing RCC Deck Slab at 2nd Main Road, JJR Nagar 10.00

Sub Total-1 10.00(B) Maintenance Works

1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.003 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.004 Protection of recovered BBMP Properties in the Ward Juridiction 5.00

6 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

7 Improvements to Footpath at JJR Nagar Main Road (from Police Station to Church) and Tank bund Road (from CAR Quartres enterence to Darshini Hotel) 15.00

8 Painting to curb stones, improvements to Shoulders and desilting of drains at Mysore road 3.00

9 Desilting of Roads side drains in the Ward juridiction 2.0010 Filling the pot holes & Depot collection for the year 2008-09 2.00

11 Improvements to drains & Providing RCC covering slab at 9th Main Road, Padarayanapura 9.00

12 Providing Rechip Carpetting to Roads of Ranganathapura Colony 10.00

13 Imporovements to drains & Providing RCC covering slabs to 7th Main Road, Padarayanapura 9.00

14 Reconstruction of compund wall & Improvement Works at CAR Quarters (Eastern side) at Mysore Road 10.00

15 Improvements to Culverts & drains at 18th main VS Garden (Lower) & 3rd Cross, New pension Layout 5.00

Sub Total-2 75.00

Programme of Works for the year 2008-09 pertaining to Ward No.44, JJRNagar, JJRNagar Sub Division

116

Page 123: Programme_Of_Works_2008-2009

II BBMP Contact Point

1 Construction of BBMP Contact Point Building at CA site JJR Nagar Main Road 9.00

Sub Total-2 9.00IV Annual Maintenance of BBMP properties 1 Annual repairs to BBMP Properties in the Ward juridiction 1.29

Sub Total-5 1.29GRAND TOTAL 112.34

Sl.No. Name of Work Est.Amount (in lakhs)I (A) Capital works

1 Providing Cement Concrete to 1, 2, 6 and 7th Cross Roads to damaged Conservancy at Azadnagar.

10.00

2 Providing Cement Concrete to 1, 4, 5, 6 and 7th Cross Roads in Vittalnagar. 14.00

3 Providing Cement Concrete from 1st to 4th Cross Roads, 3rd to 4th Main Road at Kasturibhanagar.

10.00

4 Providing new Street / Ornamental Name Boards in the Ward Juridiction 1.00Sub Total-1 35.00

(B) Maintenance Works1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.002 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.003 Protection of recovered BBMP Properties in the Ward Juridiction 5.004 Providing Asphalting to 1, 2 and 3rd Main Roads of R.C. Agrahara. 6.00

5 Providing Asphalting to Main Roads of Rudrappa Garden and Ashwathakatte roads. 6.00

6 Improvement Works to Samudhaya bhavan at 6th Cross, Azadnagar . 4.00

7 Annual Repairs to Shishuvihar at 6th Cross, Primary Health Center at 1st Main, Azadnagar and Anganavadi building at 2nd Main, Valmikinagar . 3.00

8 Annual repairs to Health Ward Office and Play ground at Mysore Road near toll gate. 2.00

9 Annual repair works to SC/ST Hostel at 1st Main Road, Valmikinagar. 2.00

10 Annual Repairs to Kasturibha Junior College, Gymnesium, Anganavadi building and Shishuvihar at Kasturibhanagar. 2.00

11 Reconstruction of SSM wall to damaged portion of SWD in Valmikinagar and Vittalnagar. 5.00

12 Depot collection and pot holes filling for the Year 2008-09 2.0013 Desilting of territary drains in the Ward jurisdiction. 2.00

14 Improvements to culverts from 1st to 8th cross at Azadnagar and 1st to 4th cross roads, 3rd to 9th Main Road at Kasturibhanagar. 9.00

Sub Total-2 50.00II BBMP Contact Point1 Construction of BBMP Contact Point Building at 3rd cross of Azadnagar. 9.00

Sub Total-3 9.00IV Annual Maintenance of BBMP properties 1 Annual repairs to BBMP Properties in the ward juridiction 1.29

Sub Total-5 1.29GRAND TOTAL 105.49

Programme of Works for the year 2008-09 pertaining to Ward No.45, Azadnagar, J.J.R. Nagar Sub Division

117

Page 124: Programme_Of_Works_2008-2009

PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD NO.49

Ward No.

Name of Work Estimated Cost (Rs in lakhs)

49 Providing cement concrete to Conservancy from Govindappa road to V.V.road Pampamahakavi road to Shankar Nutt road, Vani Vilas road to S.B.M road W.A temple to Bull temple road Kabir mutt road to Masthi Venkatesh Iyengar road, N.A.Temple road to Dattatreya road in Ward No.49.

30.00

Sub Total-1 30.00

49 Demolition of Building (Enforcement) in Ward No.49. 1.0049 Re-Writing of street names/ Ornamental name boards in ward No.49. 1.0049 Maintenance of Nirmala and other BBMP toilets Ward No.49. 1.0049 Protection of recoverd BBMP properties in Ward No.49. 2.0049 Construction of Temporary transit garbage Handling points in Ward No.49. 1.0049 Providing new street name / Ornamental name boards in ward No.49. 1.0049 Depot collection in ward No.49. 2.0049 Removal of debries and lose stones in ward No.49. 2.0049 Removal of silt, slabs an resetting of slabs in K.G.Nagar 1st, 2nd, 3rd, 4th & 7th

cross road, Hanumanthanagar 1st, 2nd, 3rd, 4th, 5th, 6th & 7th cross road Shankarmutt 1st, 2nd, 3rd, 4th cross roads and K.R.road reconstruction of culverts at Gandhibazar main road, Shankar mutt 2nd, 3rd cross, Mount Joy 1st cross and Kabir mutt and Nijaguna road Junction in ward No.49.

15.00

49 Improvements to road side drains and construction of culverts at Sameerapura and Dhobi Nanjappa block in ward No.49. 15.00

49 Improvements to small lanes adjacent to Gandadagudi road in Sunkenahalli area ward No.49. 14.00

Sub Total-2 55.00 Sub Total 1+2 85.00

49 Construction of contact point Building near, Bulle ward, K.R.Road in Ward no.49. 9.00

Grand Total 94.00PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD NO.50

Sl No Name of Work Estimated Cost (Rs in lakhs)

CAPITAL WORKS1 Widening of 7th main road between 8th cross to 15th cross of II Block Jayanagar

in ward No.50. 9.00

2 Providing ornamental M.S grill for balance portion of 7th main road in II Block, Jayanagar in ward No.50. 9.00

3 Providing concrete to APS cross road and conservency between surveyor street & Vani Vilas road in ward No.50. 10.00

4 Widening of road from Madavarao circle to Armugam circle along Kanakapura road in Ward No.50. 10.00

Sub Total-1 38.00MAINTENANCE WORKS

1 Improvements to road side drain and footpath for the balance portion of 7th main between 8th cross & 15th cross of II nd block Jayanagar in Ward No.50. 12.00

2 Improvements to road side drain and footpath from 9th corss road to 15th cross of 9th main road in 2nd Block, Jayanagar in Ward No.50. 12.00

118

Page 125: Programme_Of_Works_2008-2009

3 Improvements to road side drain between Umar Shariff road & 9th cross in Ranoji Rao road in Ward No.50. 10.00

4 Improvement to road side drain & footpath in Das compound road in Ward No.50. 10.00

5 Providing new street name / Ornamental name boards in ward No.50. 1.006 Depot collection in ward No.50. 1.007 Removal of debries and lose stones in ward No.50 1.00

Sub Total-2 47.00 Sub Total 1+2 85.00

Grand Total 102.00PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD

NO.51Sl No Name of Work Estimated Cost

(Rs in lakhs)CAPITAL WORKS

1 Providing cement concrete to small road in TR Nagar, 3rd block to 6th cross and 5th main in ward No.51 15.00

2 Providing cement concrete to dead end roads adjacent to 6th main road of TR nagar in ward No.51 6.50

Sub Total-1 21.50MAINTENANCE WORKS

1 Improvement to drains & footpath of Bugal Rock road in between EAT street and Bull Temple road in ward No.51. 6.00

2 Improvement to drains & footpath of 1st, 2nd, 3 rd, 4th and 5th cross roads in between 4th and 6th Main road of TR Nagar in ward No.51. 12.00

3 Improvement to drains & footpath of Nethaji Road in between Nagasandra Main Road to 6th main road in ward No.51. 7.00

4 Improvement to drains along with 6th A main, 7th main, 7th A main, 8th main road of CT Bed Grape garden in ward No.51. 18.00

5 Providing chainlink fencing to BBMP property at CT Bed in ward no 51 5.006 Improvements to footpath Southend cross road in ward no 51 5.007 Improvement to drains & footpath of Market road and Kalappa Road at

Basavanagudi in ward No.51. 8.00

8 Providing street name board inward no51 1.509 Depot collection for the year 2008-09 1.001 Construction of contact centre building at Nagasandra Village in ward no 51 9.00

Grand Total 94.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD NO.52

Sl No Name of Work Estimated Cost (Rs in lakhs)

CAPITAL WORKS1 Providing cement concrete to lanes at Gavipuram village & Lakshmipura

quarters lane in ward No.52 12.00

Sub Total-1 12.00MAINTENANCE WORKS

1 Improvement to road side drains & Construction of culverts to balance roads in Hanumnathanagar area, Maruti circle and Weavers colony in ward No.52. 16.00

2 Improvements toroad side drains and construction of culverts to balance roads in Brundavanagar area in ward No.52. 10.00

119

Page 126: Programme_Of_Works_2008-2009

3 Improvements to road side drains and construction of culverts to Chandrashekar Azad road, Venkatesh palya roads and lanes behind Dasapp Kalyana Mantapa road in Ward No.52.

15.00

4 Removing resetting and replacing damage slabs at Shoka Chakravarthi road, Harsha Chakravarthi road in Lakshmipur and Hindu Maha Sagar road in ward No.52.

8.00

5 Improvments and Maintenance at path ways, MS grill and chain link fencing at deer park, Harihara gudda park and Ramanjaneya Gudda park in ward No.52. 10.00

6 Demolition of Building (Enforcement) in ward No.52. 1.007 Re-writing of street names/ Ornamental name blaord in ward No.52. 1.008 Maintenance of Nirmala and other BBMP properties in ward No.52. 1.009 Protection of recoverd BBMP properties in ward No.52. 2.00

10 Construction of Temporary transit garbage Handling points in Ward No.52. 1.0011 Providing new street name / Ornamental name boards in ward No.52. 1.0012 Pot hole filling in ward No.52. 1.0013 Removal of debries in ward No.52. 1.0014 Special reparies to Engineering ward office and staff quarters at Harihara gudda

park in ward No.52. 5.00

Sub Total-2 73.00 Total 1+2 85.00

1 Construction of contact point Building in ward No.52 9.00Total 9.00

Grand Total 118.00

Ward No.

Name of Work Estimated Cost (Rs in lakhs)

53 Providing cement concrete to cross roads at 22nd main, BSK 1st stage, 2nd block and 11th cross Ashoka nagar in ward No.53 6.00

Sub Total-1 6.00

53 Demolition of Building (Enforcement) in Ward No.53. 1.0053 Re-Writing of street names/ Ornamental name boards in ward No.53. 1.0053 Maintenance of Nirmala and other BBMP toilets in Ward No.53. 1.0053 Protection of recoverd BBMP properties in Ward No.53. 2.0053 Construction of Temporary transit garbage Handling points in Ward No.53. 1.0053 Providing new street name / Ornamental name boards in ward No.53. 1.0053 Depot collection for the year 2008-09 in ward No.53. 1.5053 Removal of debries and lose stones in ward No.53. 1.0053 Improvements to road side drains at 13th main & cross roads from 50 ft road to

Ramanjaneya road in ward No.53 8.00

53 Improvements to road side drains at 7th main Mount Joy from 50 ft road to pipe line road in ward No.53 8.00

53 Improvements to road side drains & construction of culverts at 10th main road Raghavendra block in ward No.53 6.00

53 Improvements to road side drains at 8th main from Kathriguppa main road to 8thcross, 9th cross from 8th main road to 2nd main road, Ashok nagar in ward No.53.

8.00

53 Improvements to road side drains at 2nd A cross Kalidasa layout in ward No.53. 5.00

120

Page 127: Programme_Of_Works_2008-2009

53 Improvements to road side drains at 4th cross to 10th cross Raghavendra block from 12th main to SWD in ward No.53. 16.50

53 Improvements to footpath at 22nd main E/S from 50 ft road to 80 ft road in ward No.53. 16.00

53 Re-doing the road cut portion done by BWSSB at 14th main Raghavendra block & 4th cross Mount Joy in Ward No.53. 2.00

Sub Total-2 79.00 Sub Total 1+2 85.00

Grand Total 85.00

Programme of works for the year 2008-09 in Srinivasanagara sub division ward-54 Amount

(In Lakhs )

1.

Temporary Gangman ( for Maintaining roads) 5

2.

Depot collection 3

3.

Pot hole filling & Road cutting in Ward roads including Arterial & sub Arterial roads

8

4.

Providing Name Boards in ward 10

5.

Re-Construction Secondary drain & Providing RCC deck slab to the balance portion at Hosakerehalli near by Ring road in ward No-54.

15

6.

Desilting & Re grading of Drain at low level area (vulnerable points ) 4

7.

Improvements to culverts and Drains at Kathriguppe Village . 5

8.

Improvements to culverts and Drains in BSK 2nd Phase, 3rd Stage. 6

9.

Improvements to culverts and Drains at Girinagar 6

10.

Demolition of building (Enforcement) 1

11.

Re-writing of street name/Ornamental name boards 1

12.

Maintenance of Nirmala & other BBMP toilets 2

13.

Providing New Street Name/Ornamental name boards 1

1 Contact point in Ward-54 92 Asphalting to selected bad roads 15

91127

Programme of works for the year 2008-09 in Padmanabha Nagar Sub Division in ward - 55

Sl.No. Details Amount in Lakhs.

1 Engaging special gangmen 42 Reserve fund for emergency works 103 Depo collection for the year 2008-09 and removal of debris. 104 Filling up of pot holes and road cutting in ward – 55 5

I – Ward Works

I- Maintenance works (Ward Works )

II- capital works

Total Grand Total

Sl. No Details

121

Page 128: Programme_Of_Works_2008-2009

5 Desilting of Territiary drain at JHBCS and regrading adjacent drains. 56 Desilting and regrading drains at KSRTC Layout, Kumaraswamy Layout,

BHBCS, R.K. Layout, Kanaka Layout, Padmanabhanagar. 7

7 Construction of culverts at Hanumagiri Main Road and regrading low layingdrains and desilting.

5

8 Construction of lead off drain at 1st Cross, Puttalingaiah Road,Padmanabhanagar.

13

9 Construction of RCC retaining walll to secondary SWD @ Muneshwara Nagara,1st Main to 18th Main, Padmanabhanagara. (Balance Portion)

10

10 Construction of head off drain and covering to balance portion opp. To D.G.Hospital.

5

11 Construction of culverts and regrading drains at 18th main Puttalingaiah Road,From Raj Katte to Petrol Bunk at Junction of 6th Cross, 13th Main, R.K. Layout,3rd Stage, Kanaka Layout.

5

12 Construction of culverts and improvements dain at Subhashchandra Road, atJHBCS and Minaz Nagar.

10

13 Demolishing of building for ward works 114 Re-writing of street name/ ornamental name boards. 115 Providing new street name/ornamental name boards. 1

1 Providing concrete road to Muneshwara Nagara, Narrow roads 10

1 Providing chipcarpet to Kumaraswamy Layout, (Govi Nayakana Halli) 252 Providing chipcarpet to 1st & 2nd Cross to Padmanabhanagara & Bendre Nagara

Crosses.13

3 Contact point at Ward No. 55 9TOTAL 150

Programme of works for the year 2008-09 in Padmanabha Nagar Sub Division in ward - 56

Sl.No. Details Amount in Lakhs.

1 Reserve fund for emergency works 102 Depo collection for the year 2008-09 and removal of debris. 103 Filling up of pot holes and road cutting in ward – 56 54 Providing grating to territtiary drains in Ward No. 56 105 Improvements to drains and culverts in changaiah Layout, T.R.Nagar. 106 Improvements to drains and culverts at Bhavani Nagar in BSK 2nd Stage, 107 Demolishing of building for ward works 18 Re-writing of street name/ ornamental name boards. 19 Maintenance of Nirmala and other BBMP toilets 2

10 Providing new street name/ornamental name boards. 1

1 Providing Re-chipcarpet to bad roads at Karisandra in BSK 2nd Stage. 102 Construction of councilor office at 9th Main Road in BSK Stage. 15

TOTAL 85Programme of works for the year 2008-09 pertaining to ward-55A in Srinivasanagara sub division Sl No Details Lakhs

1. Engaging special Gangman for the year 2008-09 in Ward No.55A 52. Depo collection for the year 2008-09 in Ward No.55A 33. Filling up of potholes and road cutting in Ward No.55A 5

II Capital works

Maintence works

II Concrete Road Works

III Capital works

I – Ward Works

122

Page 129: Programme_Of_Works_2008-2009

4. Demolition of Building (Enforcement) 15. Re-writing of street name / Ornamental Name Boards in Ward No.55A 1

1. Providing cement concrete to 12th and 13th cross behind Mookambica temple in Ward No.55A

10

2. Providing cement concrete to 14th and 15th cross behind Mookambica temple in Ward No.55A

10

3. Providing cement concrete to 16th and 17th cross behind Mookambica temple in Ward No.55A

10

4. Providing cement concrete to Subodh School road (Opp to Mookakmbica temple at Moocambicanagara in Ward No.55A

10

5. Providing cement concrete to E/side of 1st A 1st B main road Mookambicanagara in Ward No.55A

10

6. Providing cement concreting to 2nd main & 3rd main road, Mookambicanagara in Ward No.55A

10

7. Providing cement concrete to W/side of Ittamadu 5th & 6th cross road in Ward No.55A

10

8. Providing cement concrete to 7th cross Eashwarinagar in Ward No.55A 59.

1. Asphalting to Balance portion of Sriramanagar & Kuvempunagar in Ward No.55A

25

2. Asphalting to Eastern side of Dattatreyanagar 2nd main, 3rd main & 4th main road in Ward No.55A

25

1. Providing Network of Box drains to lead of storm water into main channel at Kalidasanagar in Ward No.55A

5

2. Providing flagging course & culverts in 6th , 7th & 8th crosses of Hrushikeshanagar in Ward No.55A

5

150

1. Maintenance of ward office and Corporation Buildings in Ward No.55A 1.29187.29

Sl.No Name of Work Estimate Cost WARD GRANTS

CAPITAL WORK1 Construction of cement concrete footpath in 4th Main Dollars layout in Ward

No-5715.00

2 Construction of flagging course, formation of footpath, providing kerb stone in 8th main J.P.Nagar 2nd Phase in Ward No-57

15.00

3 Construction of Cultural Stage at 'Anandavana' - Sannakadu, JP Nagar 3rd Phase, between 9th and 15th Cross in Ward No 57

5.00

Total 45.00MAINTENANCE WORK

1 Demolition of building ( Enforcement) in Ward No-57 1.002 Re-writing of street name / ornamental name boards in Ward No-57 1.003 Maintenance of Nirmala and other BBMP toilets in Ward No-57 2.004 Providing new street name / ornamental name boards in Ward No-57 1.00

Programme of Works for the Year 2008-2009 pertaining to Ward No-57, J.P.Nagar Jayanagara Sub

II-Asphalting works

III-Drain work & Culverts

Maintenance of Corporation Buildings

Grand Total

Capital works I-Road Concrete works

123

Page 130: Programme_Of_Works_2008-2009

5 Improvements to drain and culverts, desilting of drains in 1st and 2nd Phase J.P.Nagar in Ward No-57

12.50

6 Improvements to drain and culverts, desilting of drains in 3rd and 4th Phase J.P.Nagar in Ward No-57

12.50

7 Improvements to drain and culverts, desilting of drains in 5th and 6th Phase J.P.Nagar in Ward No-57

15.00

8 Pot hole and Road cutting filling in Ward No 57 5.009 Depot Collections and supply of emulsion Ward No-57 5.00

Total 55.00Total 100.00

CONTACT POINT 1 Construction of contact point in Ward No-57 9.00

MAINTENANCE OF BUILDING 1 Maintenance of Ward office , Health ward office , open air theatre, Tailoring

hall in Ward No-571.29

Grand Total 117.49

Sl.No Name of Work Estimate Cost WARD GRANTS

CAPITAL WORK1 Providing constructing to footpath at 39th cross road, from 11th Main to

22nd Main Road in 4th ' T ' Block Jayanagar in Ward No-5818.00

2 Providing concreting to footpath at 38th Cross from 15th Main to 11th Main Road in Ward No-58

5.00

Total 23.00MAINTENANCE WORK

1 Demolition of building ( Enforcement) in Ward No-58 1.002 Re-writing of street name / ornamental name boards in Ward No-58 1.003 Maintenance of Nirmala and other BBMP toilets in Ward No-58 2.004 Providing new street name / ornamental name boards in Ward No-58 1.005 Improvements to drains including construction of flagging course and

providing covering slabs with construction of culverts in 8th block and 5th block in Jayanagar Ward No-58

12.00

6 Providing asphalting and metaling including improvements to drain for the balance portion in 3rd main road (8th Block) from 36th cross to 46th cross road in Jayanagar Ward No-58

7.00

7 Improvements to the existing health ward office and contact point in jayanagar Ward No-58

10.00

8 Desilting of road side drains including removal of berm and debris in 7th block (West) , 8th Block and 5th block in Jayanagar Ward No-58

10.00

9 Desilting of road side drains including removal of berm and debris in 4th T block and 9th block Jayanagar in ward No-58

8.00

10 Filling up of holes and warnout surface in Jayanagar ward in Ward -58 7.0011 Depot collection and supply of emulsion in ward No-58 3.00

Total 62.0085.00

MAINTENANCE OF BUILDING 1 Improvements to engineering ward office and tailoring centre in Jayanagar in

ward No-581.29

Programme of Works for the Year 2008-2009 pertaining to Ward No-58, Jayanagar Jayanagara Sub

124

Page 131: Programme_Of_Works_2008-2009

Sl.No Name of Work Estimate Cost WARD GRANTS

CAPITAL WORK1 Construction of masonry box drain and providing RCC precast slab in 22nd

cross in 3rd block jayanagar in ward no-5911.00

2 Construction of masonry box drain and providing RCC precast slab in cross roads of K.R. Road , Rathna Vilas Road, Guptha Layout, Papu Cottage in ward no-59

15.00

Total 26.00MAINTENANCE WORK

1 Demolition of building ( Enforcement) in Ward No-57 1.002 Re-writing of street name / ornamental name boards in Ward No-57 1.003 Maintenance of Nirmala and other BBMP toilets in Ward No-57 2.004 Providing new street name / ornamental name boards in Ward No-57 1.005 Repairs and improvements to sammudaya bhavan and yediyur collage

building in S. Kariyappa Road ward No-5910.00

6 Construction of missing culverts and flagging course and RCC precast slabs for drains from 23rd to 26th Cross, 6th Block and 6th to 9th cross in 7th Block jayanagar in ward no -59

13.00

7 Desilting and improvements to RSD in 7th Block Jayanagar in Ward No-59 5.00

8 Desilting and improvements to road side drains at shastrinagar Tata silk farm, Yediyur in Ward No-59

5.00

9 Pot hole and Road cutting filling in Ward No 59 5.0010 Depot Collections and supply of emulsion Ward No-59 4.0011 Construction of missing culverts and flagging course in obalappa Garden ,

Tatasilk farm and Shastrinagar in ward no -5912.00

Total 59.00Total 85.00

CONTACT POINT 1 Construction of contact point in Ward No-58 9.00

MAINTENANCE OF BUILDING 2 Maintenance and repairs to ward office ,Tailoring centre and Gym buildings in

Ward No-59 1.29

Total 1.29Grand Total 95.29

Sl.No Name of Work Estimate Cost WARD GRANTS

CAPITAL WORK1 Providing concrete roads in 4th cross and lanes in LIC colony in Ward -No-

6010.00

2 Providing concrete to footpath including providing kerb stones to swagath theatre road and 32nd cross in 4th T Block Jayanagar in Ward No-60

13.00

Total 23.00

Programme of Works for the Year 2008-2009 pertaining to Ward No-59, Yediyur ,in Jayanagara Sub Division

Programme of Works for the Year 2008-2009 pertaining to Ward No-60, Pattabiramanagar Jayanagara Sub Division

125

Page 132: Programme_Of_Works_2008-2009

MAINTENANCE WORK1 Demolition of building ( Enforcement) in Ward No-60 1.002 Re-writing of street name / ornamental name boards in Ward No-60 1.003 Maintenance of Nirmala and other BBMP toilets in Ward No-60 2.004 Providing new street name / ornamental name boards in Ward No-60 1.005 Improvements to drain and metalling of widening portion of road in 36th

cross 4th block Jayanagar5.00

6 Improvements to community Hall at LIC colony in ward no-60 5.007 desilting of drain in LIC colony, byrsandra in ward no-60 5.008 desilting of drain in 3rd block and 4th block in Jayanagar in ward no-60 5.009 Filling of pot holes and warn out surface in ward no-60 7.0010 Depot collection and supply of emulsion 2.0011 Improvements to drain and construction of flagging course, providing

covering slabs and culvert improvements in swimming pool extension and 12th and 13 th main road , 3rd block Jayangar (East) in ward no-60

14.00

12 Improvements to drain and construction of flagging course and providing covering slab in 8th F Main and 24 th Cross in 3rd block Jayanagar in Ward No-60

14.00

Total 62.00Total 85.00

CONTACT POINT 1 Construction of contact point in Ward No-60 9.00

MAINTENANCE OF BUILDING 1 Improvements to the existing veterinary Hospital and health ward office at

4th Main , 3rd block Jayanagar1.29

Grand Total 102.49

I) General Grant 1 Demalition of building (Enforcement) in Ward No. 61 1.002 Re-writing of street name / ornamental name boards in Ward 61 1.003 Maintenance of Nirmala and other BBMP toilets in Ward 61 2.004 Providing new street name / ornamental name boards in Ward 61 1.00

5 Repairs and Desilting of drain in R.V. Road, Krumbigal Road and Mavalli Area in Ward No. 61 8.00

6 Providing CC roads in Arekempanahalli (Balance Portion) in Ward No. 61 9.00

7 Providing Cement Concrete to Cross & Main Roads in Venkatareddy Nagara in Ward No. 61 10.00

8 Providing CC roads in Someshwaranagara in ward 61 10.009 Construction of toilet block at Sushila Road in ward 61 2.00

10 Depot Collection for year 2008-09 in Ward No. 61 1.0011 Improvements to drainage system at KM Colony and Guttepalya in ward 61 3.0012 Engaging private labours for maintance of roads and footpath in ward No. 61 2.00

13 Repairs to Cement Concrete roads and improvements to approaches and providing Screen Barriars and other improvements to drains in ward No. 61 5.00

14 Reconstruction of culverts and improvements to drain in Siddapura Slum addjoinig road in Ward No. 61 5.00

15 Construction of SWD from Someshwaranagara to Hosur Road at (Near Abaya Hospital) in Ward No. 61 25.00

Sub Total-1 85.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 61, MAVALLI.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs

126

Page 133: Programme_Of_Works_2008-2009

II)Contact point1 Construction of Help line Centre in Mavalli Ward 61 9.00

Sub Total-2 9.00Sub Total-3 7.20

IV) Emergency Grant for the Building1 Repairs to Old BBMP Buildings in Mavalli Ward No. 61 1.29

Sub Total-4 1.29Grand Total: 102.49

I) General Grant 1 Demalition of building (Enforcement) in Ward No. 62 1.002 Re-writing of street name / ornamental name boards in Ward 62 1.003 Maintenance of Nirmala and other BBMP toilets in Ward 62 1.00

4 Protection of recovered BBMP properties - Maximum to be covered in Ward No. 62 Byrasandra 2.00

5 Temparary Transit Garbage Handling Points in Ward No. 62 1.006 Providing new street name / ornamental name boards in Ward 62 5.007 Depot Collection in ward No. 62 Hombegowdanagara 1.008 Engaging private labours for works in ward No. 62 2.009 Filling of potholes and road cutting in ward No. 62 5.00

10 Providing Cement Concrete roads and improvements to drains Krishnappa Garden in Ward No. 62 15.00

11 Providing Cement Concrete roads and improvements to drains to Narayanapura Slum in Ward No. 62 11.00

12 Desilting of SWD drains in Lakksandra, Wilson Garden and , 1st Block Jayanagara, in Ward No. 62 10.00

13 Improvements to roads and drains at Rajanna Layout and RBI Colony in Ward. 62 10.00

14 Providing Cement Concrete to lanes and improvements to drains in Kutty Colony in Ward 62 10.00

15 Asphalting to roads in 1st Block Jayanagara (Balance portion) ward 62 10.00Sub Total-1 85.00

II) Contact point1 Construction of Help line Centre in Ward No. 62 9.00

Sub Total-2 9.00IV) Emergency Grant for the Building

1 Special Repairs to Old BBMP Buildings in Ward No. 62 1.29Sub Total-4 1.29

GrandTotal: 95.29

I) General Grant 1 Demalition of building under (Enforcement) in Ward No. 63 1.002 Re-writing of street name / ornamental name boards in Ward No. 63 1.003 Maintenance of Nirmala and other BBMP toilets in ward No. 63 1.004 Protection of recovered BBMP properties in Ward No. 63 2.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 63, LAKKASANDRA.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 62 HOMBEGOWDANAGARA.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs

127

Page 134: Programme_Of_Works_2008-2009

5 Temparary Transit Garbage Handling Points at Lakkasandra & Chikkalakshamaiah Layout in Ward No. 63 1.00

6 Asphalting to Bad Roads in Lakkasandra Ward No. 63 30.00

7Providing Cement Concrete to 3rd, 4th, 5th and 6th Cross Road of Balajinagara (Between 3rd Main of Balajinagara & KM Layout main Road) and 7th & 8th Cross of Bharathi Layout

20.50

8 Improvements to Road side drain and Disilting of drain in Lakkasandra ward No. 63 10.00

9 Improvements to Road side drain in Adugodi Layout in Ward No. 63 4.50

10 Providing CC to roads and Improvements to Road side drain in Bhavaninagar in Ward No. 63 5.00

11 Improvements and Desilting of SWD from Banneragatta Road to Tavarekere Main Road in Ward No. 63 5.00

12 Depot Collection for the year 2008-09 in ward No. 63 2.00

13 Engaging private labours for maintance of roads and footpath for the period 2008-09 in Ward No. 63 2.00

Sub Total-1 85.00 II) Contact point

1 Construction of Help line Centre in Lakkasandra Ward No. 63 9.00Sub Total-2 9.00

IV) Emergency Grant for the Building1 Repairs to the Old BBMP Buildings in Lakkasandra Ward No. 63 1.29

Sub Total-4 1.29Grand Total: 95.29

1 Re-writing of street name / ornamental name boards in ward No. 64 1.002 Protection of recovered BBMP properties in Ward No. 64,Gurappanapalya 2.003 Providing new streetname / ornamental name boards in ward No. 64 1.004 Depot Collection in Ward No.64 2.005 Engaging of private labours for removal of debries and desilting of drains in ward 2.00

6 Providing L-Shape drain in Gurappanapalya and in B T M 1st Stage 10.007 Shifting of Electric poles in 28th main of 9th Block Jayanagar and painting to Ker 3.00

8 Construction of R C C Deck Culverts and Flagging Courses in B T M 1st Stage 15.009 Construction of Cement Concrete Foot Path in 9th Block Jayanagaa 20.00

10 Construction of R C C drain and C C Road in 8th main of Gurappanapalya 10.0011 Construction of R C C drain and C C Road in Krishanappa Garden Main Road 10.0012 Improvements to drain in 9th A Main of B T M 1st Stage 4.0013 Emergency Grants for low-lying Area in Ward No. 64 4.00

84.001 Construction of contact Point in Ward No. 64 9.002 Emergency Grants for the Building3 Special Repairs to Existing Ward Office Building in Ward No. 64 1.29

Sub Total 1.29

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 64,

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs

128

Page 135: Programme_Of_Works_2008-2009

Sl. No Name of Work Estimated Cost Rs. In Lakhs

1 Demolition of building (Enforcement) in Ward No. 65 1.002 Re-writing of street name / ornamental name boards in Ward 65 1.00

3 Protection of recovered BBMP properties in Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout) 2.00

4 Providing new street name / ornamental name boards in Ward 65 1.005 Depot Collection in ward No. 65 2.00

6 Engaging of private labours for desilting and removal of debris in Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout) 3.00

7 Providing asphalting to V.P.Road in Old Madiwala and Venkateswara layout inWard No. 65 Rashtra Kavi Kuvempunagar (BTM layout) 17.00

8 Providing metalling and asphalting to roads in Mustak layout in Ward No. 65Rashtra Kavi Kuvempunagar (BTM layout) 20.00

9 Providing concreting to 3rd main 2nd A B & C and 1st A V.P.Road in OldMadivala in Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout) 20.00

10 Mettaling and asphalting to road along SWD in Venkateswara layout in WardNo. 65 Rashtra Kavi Kuvempunagar (BTM layout) 18.00

Sub Total-1 85.00

1 Special repairs to existing ward office building in Ward No. 65 Rashtra KaviKuvempunagar (BTM layout) 1.29

Sub Total- 3 1.2986.29

Sl. No Name of Work Estimated Cost Rs. In Lakhs

1 Demolishing of building in ward No. 66 1.002 Re-writing of street Name board 1.003 Protection of recovered B.B.M.P properties 2.004 Providing New Name boards 2.005 Engaging of provate labours for desilting & emergency works 3.006 Providing concreting to by lanes of Maruthinagar & Channammalaout 20.007 Providing asphalting to bad roads of in Tavarekere Jakkasadra Venkatapura 23.008 Improvements to roads at Tengin Topu Madiwala Jakkasandra Venkatapura 30.009 Providing Name boards at Venkatapura Madiwala Ward No. 66 3.00

Sub Total-1 85.00Contact point

1 Construction of contact point in Ward No. 66 9.00Sub Total-2 9.00

1 Construction of M.O.H building or existing of A.E.E. building 12.00

2 Special repairs to existing ward office building in Ward No. 66 1.29Sub Total-4 13.29

107.29Total 3245.75

PROGRAMME OF WORKS FOR THE YEAR IN WARD NO. 66 MADIWALA

General Grant

Emergency Grants for the Building

GRAND TOTAL

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 65 RASHTRA KAVI KUVEMPUNAGAR (BTM LAYOUT)

General Grant

Emergency Grants for the Building

GRAND TOTAL

129

Page 136: Programme_Of_Works_2008-2009

1 Construction of Community Toilet for SC/ST People 7.00

2 Construction of Anganawadi center 1st Floor & Repairs Ground Floor Building 5.00

3 Construction of Community hall (Ambedkar Bhavan) at 1st Floor Building 2ndcross Hosahalli 7.00

4 Providing CC to 2nd & 10th,main road narrow cross of Hosahalli 10.0029.00

1 Reconstruction of drainage at A.K.Colony 5th Main Road 2.002.00

III 18% Grants1 Provision for Acquisition or purchase of land for rehabilitation for SC/St Slum

dwellers_

2 Construction of Community Toilets for the benefit of SC/ST slum dwellers _(1) Providing water supply connection to the individual building belongs to SC/ST Communty in kanakanagar slum

2.00

3 Construction of Anganawadi centres for the benefits of SC/ST slum dwellers _4 Construction of Additional Class rooms in existing school building where the

population of SC/ST students is More than 30%_

5 Construction of Community Halls (Ambedkar Bhavans) and repairs and improvements to existing Conmmunity Halls

_

6 Concreting of Narrow lanes along 4th cross in Kanaka nagara Slum 10.0012.00

III 18% Grants1 Provision for Acquisition or purchase of land for rehabilitation for SC/ST Slum

dwellers_

2 Construction of Community Toilets for the benefit of SC/ST slum dwellers _3 Construction of Anganawadi centres for the benefits of SC/ST slum dwellers _4 Construction of Additional Class rooms in existing school building where the

population of SC/St students is More than 30%_

5 Construction of Community Halls (Ambedkar Bhavans) and repairs and improvements to existing Conmmunity Halls

1.00

6 Concreting of Narrow lanes in Predominant SC/ST dwelling slums _IV

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers / Construction of indivual houses. 6.57

2 Construction of Community toilets for the benefit of SC/ST slum dwellers 2.003 Constructuion of Anganawadi centres for the benefit of SC/ST slum dwellers 1.50

4 Construction of Additional class rooms in existing school building where the population of SC/ ST students is more than 30% 2.00

5 Construction of Community Halls (Ambedkar Bhavana) and repairs and improvements to existing Community Halls 2.00

6 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80Sub Total-3 16.87

18% - Maintainence Works

Sub Total-5

TOTAL

18% Grant - Capital Works

SOUTH ZONEPROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE

18% - Capital Works

Sub Total-4

130

Page 137: Programme_Of_Works_2008-2009

III

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers / Construction of indivual houses. 5.00

2 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80Sub Total-3 7.80

IV

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers / Construction of indivual houses. 30.00

2 Constructuion of Anganawadi centres for the benefit of SC/ST slum dwellers 5.00

3 Construction of Additional class rooms in existing school building where the population of SC/ ST students is more than 30% 5.00

4 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 5.00Sub Total-4 45.00

V

1 Construction of Community Halls (Ambedkar Bhavana) and repairs and improvements to existing Community Halls 10.00

Sub Total-3 10.00III

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers 10.20

2 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80Sub Total-3 13.00

III

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers 10.20

2 Construction of individual toilets for the benefit of SC/ST slum dwellers 2.003 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.85

Sub Total-3 15.05

nilIV1 Annual repairs to BBMP Properties in the Ward juridiction 1.29

Sub Total-5 1.29III (A) 18% Grant - Capital Works

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers 10.20

2 Construction of individual toilets for the benefit of SC/ST slum dwellers 2.003 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.85

Sub Total-3 15.05(B) 18% Grant - Maintenance Works

1 Repairs of Community Halls (Ambedkar Bhavana) and improvements to existing Community Halls 2.00

Sub Total-4 2.00III 18% Grant - Capital Works

1 Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum dwellers 10.20

Sub Total-4 10.2018 % CAPITAL WORKS

1 Providing cement concrete roads in Dasara Colony in 2nd Block Jayanagar in Ward No.50. 12.00

18% Grant - Capital Works

18% Grant - Maintenance Works

Annual Maintenance of BBMP properties

18% Grant - Capital Works

18% Grant - Capital Works

18% Grant - Maintenance Works

18% Grant - Capital Works

131

Page 138: Programme_Of_Works_2008-2009

18 % MAINTENANCE WORKS2 Improvements & special repairs to training centre building at 7th main road,

2nd Block Jayanagar in ward No.50. 5.00

18 % works Total 17.0018% Improvements to drains at bhovi colony in ward no 51 3.00

18 % CAPITAL WORKS1 Providing concreting to lanes at A.K.Colony in ward No.52. 5.002 Provision for acquisition or purchase of land for rehabilitation for SC/ST slum

dwellwrs in ward No.52. 14.00

3 Construction of community toilets for the benefit of SC/ST slum dwellers in ward No.52. 3.00

4 Construction of Anganawadi centres for the benifit of SC/ST slum dwellers in ward No.52. 2.00

18 % works Total 24.0053 Provision for acquisition or purchase of land for rehabilitation for SC/ST slum

dwellwrs in ward No.53. 14.00

53 Construction of community toilets for the benefit of SC/ST slum dwellers in ward No.53. 3.00

53 Construction of Anganawadi centres for the benifit of SC/ST slum dwellers in ward No.53. 2.00

18 % works Total 19.00

1.

Provision for acquisition or purchase of land for rehabilitation for SC/ST slum dwellers

18

2.

Construction of community toilets for the benefit of SC/ST slum dwellers 3.5

3.

Construction of Anganawadi centers for the benefit of SC/ST slum dwellers 2.5

4.

Construction of Additional class rooms in existing school building where the population of

3.5

5.

Construction of community halls (Ambedkar Bhavans ) and repairs and Improvements to existing community Halls.

3.5

6. Concreting of narrow lanes in SC/St dwelling in Siddartha Slum 536

18% Grants 1 Purchase of land for rehabilitation for SC / ST slum dwellers. 182 Construction of community toilets for the benefit of SC/ST slum dwellers. 3.53 Construction of Anganawadi centres for the benefit of SC/ST slum dwellers. 2.54 Construction of additional class rooms in existing school building for SC/ST

students 3.5

5 Repairs to community hall 3.56 Concreting narrow lanes in SC/ST dwelling slums in ward No. 55 5

3618% Grants

1 Purchase of land for rehabilitation for SC / ST slum dwellers. 182 Construction of community toilets for the benefit of SC/ST slum dwellers. 3.53 Construction of Anganawadi centres for the benefit of SC/ST slum dwellers. 2.54 Construction of additional class rooms in existing school building for SC/ST

students 3.5

5 Repairs to community hall 3.56 Concreting narrow lanes in SC/ST dwelling slums in ward No. 56 5

36

Total

TOTAL

TOTAL

18% Grants

132

Page 139: Programme_Of_Works_2008-2009

1. Purchase of land of rehabilation for SC / ST slum dwellers. 182. Construction of community toilets for the benefit of SC/ST slum dwellers. 3.5

4. Construction of additional class rooms in existing school building for SC/ST slum dwellers

3.5

5. Repairs to community hall 3.56. Concreting narrow lanes in SC/ST slum dwelling slums in Ward No.55A 5

Total 3618% - GRANT

1 Improvements to drains and culverts , construction of Flagging course, desilting of drains and providing cement concrete to balance lanes including maintenance of building in A.K. colony, Marenahalli, sarakki agrahara in Ward No-57

7.20

18% - GRANT1 Improvements to drain including covering slabs in marenahalli tank bund

road in Jayanagar Ward No-587.20

18% GRANTS 1 Improvements and desilting of drains and providing precast RCC slab in 1st

Main K.R. Road, A.K. colony and surrounding area in ward no-597.20

18% - GRANT 1 Improvements to drain and construction of flagging course and covering slab

at Bhovi colony and kaveri slum in Ward No-607.20

III) 18% GRANT

1 Construction of Additional Class rooms in existing School building at T. Mariyappa road, Siddapura in Ward No. 61 5.20

2 Concreting of narrow lanes in Predominant SC/ST dwelling slums in Mavalli Ward No. 61 2.00

III) 18% GRANT

1 Construction of Community Halls (Ambedkar Bhavans) at Gulbarga Colony and repairs to existing Community Halls in Ward 62 4.00

2 Concreting of narrow lanes in Predominant SC/ST dwelling slums in Ward No. 62 2.00

Sub Total-3 6.00III) 18% GRANT

1 Construction of Anganawadi Centre (1st Floor) in S.R. Nagara Ward No. 63 Lakkasandra 4.00

2 Concreting of narrow lanes in Predominant SC/ST dwelling area in Lakkasandra Ward 63 4.40

Sub Total-3 8.40III) 18% GRANT

Providing Cement Concrete Road in Urasu Colony 7.20

1 Providing concreting to roads in Jaibheemanagar and Old Madiwala area inWard No. 65 Rashtra Kavi Kuvempunagar (BTM layout) 7.20

Sub Total-2 7.20

1 Improvements to road & drains at Handi Jogi colony, Siddarthacolony & slum atVenkatapura Jakkasandra 7.20

Sub Total-3 7.20457.97

18% Grants

3. Construction of Anganawadi centres for the benefit of SC/ST slum dwellers 2.5

18% Grants

18% Grants

133

Page 140: Programme_Of_Works_2008-2009

ELECTRICALSOUTH

Rs. In LakhsSl. No. Name of the work Est cost

2 Providing Mini High Mast Lighiting System at Vijayanagar chord road and Attiguppe signal. 3.50

3 Providing Mini High Mast Lighiting System at 7th Main Subbanagarden main road 3.00

4 Providing Control Wires to the Street lights in Kamakshi Palya Area 2.005 Providing Mini High Mast Lighiting System at 5th Main and 17th Cross Junction

M.c. Layout. 3.006 Providing Mini High Mast Lighiting System at Magadi Main road near Rehaja

Appartments. 3.007 Upgradation of Streetlight Illumination in Magadi main road 7.008 Providing Tubular Poles along with 250 W S. V. Fittings with connected

accessories in Sangoli rayanna Road ward Nos. 37 5.009 Providing Control Wires to the Street lights in Manasa Nagara Area 1.50

10 Providing Control Wires to the Street lights in Panthar Palya Area and GurusarvaBhouma Area 4.00

11 Providing High Mast Lighiting System at Mysore road and Ring road junction. 6.0012 Providing Tubular Poles along with 250 W M.H. Fittings with connected

accessories in Railway parallel Road ward Nos. 40 2.0013 Providing Control Wires to the Street lights in Hanumanthappa Industrial Area

and Patel Puttaiah Area 3.0014 Providing Tubular Poles along with 250 W S. V. Fittings with connected

accessories in Vanivilas Road ward Nos. 49 5.0015 Providing Mini High Mast Lighiting System at Shanimahatma Temple,

Kempegowda Nagra 3.0016 Providing 82.5 KVA D. G. Set to Deer Park, Brindavana Nagara 10.0017 Providing Additional Tree and Bund focusing lights to Deer Park 5.0018 Providing double end bracket along with 250 W S. V. fittings to Nehru road,

Girinagara II Phase 3.0019 Providing Mini High Mast Lighting System at Hosakere halli Main Road and

Giri Nagara Main Road Junction (Near Srinagara Club) 3.0020 Providing Mini High Mast lighting system at East End Main road nad 45th

Cross junction 3.0021 Providing Mini High Mast Lighting System at 11th Main Road 5th Block

Jayanagara (Near Ganesha Temple) 3.0022 Providing Mini High Mast Lighting System at Sangam Circle 3.0023 Providing Mini High Mast lighting system at Armugham Circle, Ward NO.59 3.0024 Providing Mini High Mast Lighting System at Madhavan Park Road junction 3.0025 Providing High Mast Lighting System at Hosur Main Road and St. John

Hospital Main Road Junction 5.0026 Providing High Mast Lighting System at St. John Hospital Main Road and

Market Road (Santhe Maidana) Road junction 5.00

Total 97.00

CAPITAL WORKS SOUTH

134

Page 141: Programme_Of_Works_2008-2009

Rs. In LakhsSl. No. Name of the work Est cost

1 Providing additional fixtures to auditorium at pramila bai mane school, Vidyaranya Nagara 1.00

2 Providing 250 W S. V. Fittings to important main roads in Manjunatha nagar 6th cross, 12th cross, Malligethota mainroad, cholurapalya 1st 'A' , 2nd , 3rd 'B', 4th, 5th, 6th, 7th, 9th, 12th, 13th, 14th cross roads 5.00

3 Providing 250 W S. V. Fittings to important main roads in Hampinagara 7th 'A', 8th, 11th Main road, 4th 'A', 'B',5th, 6th, 6th 'A', 7th , 8th, 9th, 10th, 11th, 12th cross road Hampinagara, Hosahalli 2nd 'A', 3rd,7th, 10th to 17th, 11th 'A' Main and Binnylayout 10.00

4 Providing 250 W S. V. Fittings to important main roads in M.C. Layout 8th to 22,2nd main, Marenahalli 2nd to 6th main, 20th 'A,B,C,D, 1st A,B cross, 2nd cross,21st main, shivanandanagar 1st to 8th Cross, Saraswathinagar, central excise layout, binny layout, 8th to 13th Main, Vinayaka layout 1st to 4th main, P.F. Layout, 1st and 2nd main, 2nd to 5th cross, G.K.W. Layout 1st to 6th cross, 1st to 7th cross, priyadarshinilayout, canarabank colony 1st to 9th main and 1st to 7th cross, Nanjarasappa layout 1st to 6th cross. 10.00

5 Providing 250 W S. V. Fittings to important main roads in M.C. Layout 1st to 14th cross, 1st to 7th main, Govindarajnagar 1st to 7th main, B.C.C. layout 1st to 9th cross, 5th and 6th main, Prashanth nagar1st to 6th main and cross, H.V.R. Layout 1st to 6th MAin, Ranganatha colony 1st to 6th main Providing 250 W S. V. Fittings to important main roads in Kaveripura 1st to 5th main and cross, kamakshipalya 7th to 12th main and cross, Sampige layout 1st to 4th main, kalidasa layout 1st and 2nd main, pete industrial estate 2nd to 4th main, Muneshwara block 1st to 5th cross, B.D.A. Layout 3rd to 5th main 10.00

6 Providing 250 W S. V. Fittings to important main roads in S.V.G. Nagar 1st to 5th main and cross, Amarjothi nagar 1st main and cross, Kanakanagar 2to to 4th main and cross 5.00

7 Providing 250 W S. V. Fittings to important main roads in Kalyananagar 1stmain 2nd to 4th cross, B.D.A. layout Kalyanagar 1st, 5th to 8th main, Adarsha nagar 1st and 4th main, Coconut Garden 8th & 9th Cross, Garden villa 3rd main, 3rd and 4th Cross 5.00

8 Providing 250 W S. V. Fittings to important main roads in Chandralayout2nd to 14th cross, Jothinagar 1st to 7th cross, Income tax layout 1st to 7th cross, Vidyagiri layout 1st to 10th cross, Arundathi nagar 5th main, 9th , 'A to E' cross, 1st to 3rd cross, Gangondanahall 1st to 8th main and cross 20.00

9 Providing 250 W S. V. Fittings to important main roads inWidia layout1st to 3rd main and cross, R.P.C. Layout Service road, Subbannagarden 1to to 7th cross, Basaveswaralayout 1st to 5th main, Bapuji badavane 5th to 9th cross, Dwaraka nagara 1st and 2nd main, Chandra layout 4th to 8th cross 1st to 5th main, Income tax layout 1st to 3rd cross, 2nd & 4th Main, Binny layout 1st to 3rd main,Marutinagar 1st to 5th cross, Attiguppe 1st 'A', 2nd 'B' Main, Weeavers colony, B.C.C. layout, 1st to 4th cross, 3rd, 4th, 10th and 11th main, Gangondanahalli 1st to 13th cross, B.H.E.L. Township 5.00

Maintenance Works

135

Page 142: Programme_Of_Works_2008-2009

10 Providing 250 W S. V. Fittings to important main roads in Girinagara 1st to 3rd, 15 main, 1st to 12th cross, F.C.I. Layout 1st to 3rd main, 1st to 5th cross, Roshannagar 1st to 4th cross, Hanumantappa layout 1t to 3rd main, 1st to 3rd cross, Ranganatha colony 1st to 3rd main, 1st to 9th cross, Kasturibanagarslum 1st 'A to H', to 23cross, Sriranganagar1st to 5th main, Avalahalli 1st to 6th cross, Avalahalli new extn. 1st to 9th main, Muneshwarablock 17thto 21st main, 1st to 13th cross , Batyanapura new extn. 1st to 5th main and cross, Jothinagar 1st to3rd main and cross, Veerabhadranagar 1st to 9th main and 1st to 4th cross, Timberyard layout 1st to 5th cross, 1st to 3rd main, Kasturibanagar, Deepanjalinagar 5.00

11 Providing 250 W S. V. Fittings to important main roads in Gudadahallin A to D street, Main road, Pipe line road crosses,Shamannagarden, Kavika layout, 5.00

12 Providing 250 W S. V. Fittings to important main roads in Padarayana Pura I Cross, II Cross, III Cross, IV Cross, 5.00

13 Annual Electrical Maintenance, House Keeping contract and providing Heating Coil, Body Laying Bricks etc., to Electrical Crematoria at Mysore Road

10.0014 Providing 250 W S. V. Fittings to important main roads in Valmikinagar1st and

2nd main and cross, Kasturbanagar 1st to 7th main 5.0015 Providing Electrical Fixtures to Doctors quarters at Gavipuram Maternity Home,

Kempegowda Nagara 0.3016 Providing Submersible Motor Pump Set to AEE (Hanumantha Nagara) and

MOH Offices at Sunkena Halli Stadium 0.5017 Providing Flood Light Illumination to Centreal Building and Beautificaton of the

building in M. N. Krishna Rao Park, V. V. Puram 4.0018 Annual Electrical Maintenance of Air Condition System at Additional

Commissioner (South) and Meeting Hall at II Block Jayanagara 0.4019 Annual Maintenance Contract of Lift at D.C. Zonal Complex, II Block,

Jayanagara 0.8020 Providing out door panel board to newly installed submersible mono block pump

set at DC Complex, Jaynagara II Block 0.1021 Providing 250 W S. V. Fittings to Gandhi Bazzar Circle to Bull Temple Road

(Bugal Road Park Road) BMS College Hostel Road up to Rama Mandir Mahila Mandali Road From N.R. Colony Main road to Katriguppa Main Road Chennamma Kere Achukattu Road up to C.T. Bed Park Ashok Nagar Post Office Road up to Gangammana Gudi Main Road Katte Balaga to 31 BUS STOP (Thyagaraj Nagar Main Road) Bull Temple Main Road up to 5th Cross 3rd Block Thyagaraj Nagar Nagasandra Circle to Shastri Nagar Main Road

4.0022 Providing garden light fittings to C. T. Bed Park, at C. T. Bed, 1.0023 Replacing of Detoriated Garden Light Fittings at Bugal Rock Park, Basavanagudi

3.0024 Annual Electrical Maintenance Contract of Musical Fountain and other

Fountians at Hari Hara Gudda Park 1.8525 Annual Electrical Maintenance Contract of Sound and Light along with other

fountains at Ramanjaneya Gudda Park 3.0026 Operation and Annual Electrical Maintenance of Deer Park, Brindavana Nagara

8.0027 Annual Electrical Maintenance Contract of Cultural Centre at Mysore Anantha

Swamy Road, Hanumantha Nagara 4.0028 Annual Electrical Maintenance Contract of Rajiv Gandhi Sports Complex,

Brindavana Nagar 3.00

136

Page 143: Programme_Of_Works_2008-2009

29 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

30 Repairs to Electronic Coconut Tree lighting system at Deer Park, Brindavana Nagara 1.00

31 Repairs to Electronic Fire works System at Deer Park, Brindavana Nagara 1.0032 Providing Electrical Fixures to watch man quarters at Hari Hara Gudda Park,

Hanumantha Nagara 0.1033 Repairs to Electrical installation in Rajiv Gandhi Sports complex, Brindavana

Nagara 2.0034 Providing 250 W S.V. Fittings to 50 feet Road up to Girinagr T Block (19th

Main) Kalappa Block 13th Main Road Pipe Line Road up to Kaggis Bakery Pipe line Road (Shanimahathama Temple ) up to Shankar Nag Circle 50 feet road to 80 feet road (PES college road) PES College Main Road to Katriguppa Main Road Katriguppa Main Road (Vidya Peet Circle to Mount Joy Ext. (50feet road)

3.0035 Providing Computer Points and Earthing to newly formed Help Centres in Wards

0.1036 Providing 250 W S. V. Fittings to Seetha Circle to Nehru Road (Vivekananda

Statue Road) Katriguppa Main Road to 80 feet Road (Water Tank Road) 50 feet Road (Ganapath Nagar Main Road to Muneshwara T Block) Girinagara Police station Road up to Ganapathi Nagar Main Road Hosakere halli 2nd Main BUS Root 100 feet Ring Road to Water Tank 5.00

37 Repairs to Electrical installation in Avalahalli BDA Park, Girinagara Srinivasa Nagara Ward 3.00

38 Providing electrical fixtures to Watch man shed at K. S. Narasimha Swamy Park, 0.10

39 Providing sound cable with connected accessories at K. S. Narasimha swamy park 0.10

40 Providing UG cable to pathway light fittings to Water Tank park, Hosakere Halli 0.10

41 Repairs to electrical installation in community hall, C. T. Bed, Srinivasa Nagar 2.8042 Providing 250 W S. V. Fittings to Itmadu Main Road From 100feet Ring Road to

Thimmaiah Garden Layout BHCS Layout Entrance to Devegowda Petrol Bunk (Uttarahalli Main Road) Uttarahalli Main Road to D.G. House Kadirena Halli Main Road (Ring Road to Kadirena Halli Petrol Bunk) K.S. Layout Main Road Ring Road to ISRO Layout Bus Stop 20.00

43 Providing computer points and earthing to help centre at ward 55A 0.1044 Providing 250W S. V. Fittings to Thyagaraj Nagar Main Road (Shanimahathma

Temple to Hirenaiah House) 9th Cross, 13th Main, Iliyas Nagar upto Devegowda Petal Bunk Hunasemara Stop to BSK Temple 3.00

45 Oil Filtering, servicing of HT Installation and providing standby HT Cable at Banashankari Electric Crematorium, BSK II Stage 6.00

46 Annual Electrical Maintenance, House Keeping contract and providing Heating Coil, Body Laying Bricks etc., to Electrical Crematoria at Banashankari II stage

8.0047 Repairs to Fountain at Brindavana Nagara Park, BSK II Stage 0.1048 Providing 250W S. V. Fittings to 9th Cross Sarakki Market to Bannerugatta

Road, 8th Main (45th Cross to Ring Road) 24th Main (Shanthi Sagar, SLV Main Road) up to 45th Cross 5.00

49 Providing Electrical Fixtures open Air theatre / Auditorium at Sarakki 0.5050 Providing 250W S. V. Fittings to 28th Main Road 25th Main 9th Block

Jayanagar 36th Cross 5th Block Jayanagara 40th Cross Jayangara 5th Block 4.00

137

Page 144: Programme_Of_Works_2008-2009

51 Supply and fixing of tubular pole at 18th Main opp. Mosque, 4th T Block, Jayanagara 0.10

52 Arranging Temporary Illumination in connection with immersion of Lord Ganesh at Yediyur Lake, Yediyur Ward 1.70

53 Providing Electrical Fixtures to Junior College at Yediyur 1.0054 Providing Serive Main and Electrical Fixtures to Open Air Theatre at Shasthri

Nagara 0.3555 Replacing of damaged pathway light fittings at Yediyur lake park, Yediyur 4.0056 Replacing of damaged pathway light fittings at yediyur Maternity Hospital park 1.0057 Replacing of damaged pathway light fittings at Yediyur Boule Ward Park,

Yediyur 2.0058 Providing 250 W S. V. Fittings to 4th Block, Jayanagara Shopping Complex

Surrounding 33rd Cross up to 11th Main 10th Main up to Indusland Bank 8th Someshwara Nagar Main Road up to Swagath Slum Road to Wilson Garden Main Road 2.00

59 Annual Maintenance Contract of Lifts at Jayanagara Shopping Complex, IV Block, Jayanagara 10.00

60 Provding Silver enamel paint to Ashoka Pillar Statue at Ashoka Pillar Jayanagara I Block 0.10

61 Providing 250 W S. V. Fittings to Hombe Gowda School to Bannerugatta Road (10th Cross) 12th Cross Wilson Garden (Bus Route) 4.00

62 Oil Filtering and Servicing of HT Installation at Wilson Garden Electric Crematorium, Hosur Main Road 1.00

63 Annual Electrical Maintenance, House Keeping contract and providing Heating Coil, Body Laying Bricks etc., to Electrical Crematoria at Wilson Garden, Hosur Main Road 10.00

64 Providing 250 W S. V. Fittings to Mico Main Road, Mahalingeshwara Nagara Main Road, Dairy Quarters Inside 4.00

65 Providing 250W S. V. Fittings to Sagar Appolo Hospital Road, 28th Main, Corporation Colony Main Road, New Gurappana palya Main Road, 3.00

66 Providing Service Main Cable to High Mast Lighting System at 16th Main, BTM Layout 2.50

67 Providing 250 W S. V. Fittings to 16th Main BTM 2nd Stage 7th Cross to 16th Main 7th Main up to Madiwala Kere N.S. Palya Main Road Santhe Beedi

6.0068 Providing 250 W S. V. Fittings to Police Quarters Road, Sujatha Colony Main

Road, Ayappa Temple Main Road, Venkateshwara Layout Main Road 4.0069 Supply, Install and Commissioning of Automatic Capacitor Panel and servicing

of HT Installation at Bommanahalli Electric Crematorium, Kudlu Gate 4.0070 Annual Electrical Maintenance, House Keeping contract and providing Heating

Coil, Body Laying Bricks etc., to Electrical Crematoria at Bommanahalli,Kudlu Gate Hosur Main Road 8.00

71 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

72 Operation and Maintenance of Street Lights coming under Executive Engineer (Elec) South Division 575.00

73 Providing 250 W S. V. Fittings to important main roads in Magadi road from 8th cross to 15 th cross, Bhuvaneshwarinagara 1st to 3rd Main , 6th main to 20th cross, 7th main to 15th cross, 8th A cross, 25th cross, Telecom layout 1to 9th cross, Gangappa garden 1st to 4th cross 5.00

74 Annual Electrical Maintenance Contract of Buildings etc., coming under Binnypet Constituency Executive Engineer (Elec) South Division 7.00

138

Page 145: Programme_Of_Works_2008-2009

75 Arranging Temporary Illumination of BBMP Buildings coming under Executive Engineer (Elec) South Division in connection with Kempegowda Day 1.00

76 Arranging Temporary Illumination of BBMP Buildings coming under Executive Engineer (Elec) South Division in connection with Bangalore Habba 1.00

77 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

78 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

79 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

80 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

81 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

82 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

83 Annual Electrical Maintenance Contract of Buildings etc., coming under Basavanaguid Constituency Executive Engineer (Elec) South Division 8.00

84 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

85 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

86 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

87 Annual Electrical Maintenance Contract of Buildings etc., coming under Jayanagara Constituency Executive Engineer (Elec) South Division 8.00

88 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

89 Providing Computer Points and Earthing to newly formed Help Centres in Wards0.10

Total 875.00

Rs. In LakhsSl. No. Name of the work Est cost

1 Emergency grants 25.00

Total 25.00

Sub Total 1000Grand Total 4963.75

EMERGENCY GRANTS

139

Page 146: Programme_Of_Works_2008-2009

SL. No. Name of Work Amount in Lakhs(A) General works (I) CAPITAL WORKS

1 Construction of 1st floor on dispensary building for tailoring center andComputer center at Adugodi in ward no. 67 10.00

2 Providing concreting to roads and Construction of culverts at 8th block (NearShiva theater) in ward no. 67 15.00

3 Providing asphalting to roads at Industrial layout 5th block, Koramangala inward no. 67 15.00

4 Providing asphalting to roads at 8th block, Koramangala in ward no. 67 15.00

5 Providing concreting to roads at Koramangala village (Opp. to TPNBP) in wardno. 67 10.00

6 Construction of Gymnasium building at playground 5th block Koramangala inward no 67 10.00

7 Renovation of Kempe gowda Samudaya Bhavan at Adugodi in ward no. 67 10.00(II) Maintenance Works8 Removal of debris and Engaging private labour in ward no. 67 for the year 2008-

09 5.00

9 Desilting of drains at Koramangala in ward no. 67 5.0010 Pot Holes filling in ward no. 67 for the year 2008-09 5.00(B) 18% Grants(I) CAPITAL WORKS11 Construction of masonry drain near Old Doddamma temple and providing

concreting to A.K. colony Koramangala village in ward no. 67 10.00

12 Providing concreting to roads at Rajendra nagar slum in ward no. 67 11.00(II) Maintenance Works

Total Rs. 121.00

SL. No. Name of Work Amount in Lakhs

(A) General works (I) CAPITAL WORKS1 Providing asphalting and Providing drains and culverts at Venkatareddy layout &

surroundings in ward no. 68 40.00

2 Providing asphalting and Improvements to drains at Ejipura (Eastern side ofSrirama temple road) in ward no. 68 25.00

3 Providing concreting to left out roads (adjacent to R.A. road) Ejipura in ward no.68 10.00

4 Providing drains, culverts and asphalting to 7th 'A' main road (Niruguna Mandirroad between 1st main, KML & S.W.D. Bridge) 1st block, Koramangala in wardno. 68

15.00

(II) Maintenance Works5 Removal of debris and Engaging private labour in ward no. 68 for the year 2008-

09 5.00

6 Desilting of drains at Koramangala & Ejipura in ward no. 68 5.00

EAST ZONEDetails of Programme of works for the year 2008-09 (Works proposed for 08-09)

Programme of works for the year 2008-09 in ward No. 67 Koramangala Sub Division, Shanthinagar Division -1

Nil

Programme of works for the year 2008-09 in ward No. 68, Koramangala Sub Division, Shanthinagar Division - 1

140

Page 147: Programme_Of_Works_2008-2009

(B) 18% Grants(I) CAPITAL WORKS7 Providing asphalting to maistry palya main road from 8th main road

Koramangala in ward no. 68 11.00

8 Providing concreting to roads at Srinivagilu in ward no. 68 10.00(II) Maintenance Works -

Total Rs. 121.00

SL. No. Name of Work Amount in Lakhs

(A) General works (I) CAPITAL WORKS1 Providing Cement Concrete to 5th Cross of Bazar street, 2nd cross and 3rd A

cross of Anepalya in ward no. 69 20.00

2 Construction of footpath and Improvements to drains in Cross and Main roads ofAustin Town in ward no. 69 34.00

3 Providing Asphalting to the main and cross roads of Austin town in ward no. 69 18.004 Construction of 1st floor for BBMP school building at Neelasandra main road in

ward no. 69 6.00

5 Emergency grants in ward no 69 for the year of 2008-09 10.00(II) Maintenance Works6 Pothole filling, Removal of debris, depot collection & maintenance of ward by

Engaging private labourers in ward no. 69 for the year 2008-09 5.00

7 Removal of silt in drains in ward no. 69 5.008 Maintenance of School buildings, Hospital buildings and others buildings in

ward no. 69 2.00

(B) 18% Grants(I) CAPITAL WORKS9 Construction of roads & drains (Balance reachs in Laxmanrao nagar &

Ambedkar nagar in ward no. 69 21.00

(II) Maintenance Works

Total Rs. 121.00

Sl. No Name of the Work Estimate Cost (Rs. In Lakhs)

1 Providing Cement Concrete to J.K. Pura Main Road, Balance portion of 1st MainVinayakanagar and surroundings in Ward No. 70

16.00

2 Construction of compound wall and cement concrete lane at Hindu BurialGround in Ward No. 70

12.00

3 Providing drains and Culverts at southern side of Anepalya Main Road in wardNo. 70

8.00

4 Providing Asphalting to Anepalya Main Road, Nanjappa Road, Basappa Roadand Lakshmi Road in ward No. 70

20.00

5 Providing Cement Concrete to Rachappa Garden, Subbanna Garden andsurroundings in ward No. 70

10.00

66.00SUB TOTAL

Programme of works for the year 2008-09 in ward No. 69 Koramangala Sub Division, Shanthinagar Division - 1

Nil

Programme of Works for the Year 2008-09 in Ward no.70 Pertaining to Shanthinagar Sub Division.

CAPITAL WORKS

Nil

141

Page 148: Programme_Of_Works_2008-2009

1 Improvements to Corporation Community Hall at Akkithimmana Hall and Watchand Ward in 70

8.00

2 Repairs to Corporation High School at Burlie street in ward No. 70 4.00

3 Repairs to Existing Ambedkar Bhavan at P.K. Colony and Tailoring Center atAnepalya Main Road in ward No. 70

5.00

4 Improvements to Drain & Culverts at Vinayakanagar, J.K. Pura and surroundingsin ward No. 70

4.00

5 Depot Collection and Engaging Private Labours for the year 2008-09 in wardNo. 70

5.00

6 Improvements to Drain at Shanthinagara area and Debris Clearance in ward No.70

4.00

7 Filling up Pot Holes and Road Cutting in ward No. 70 4.0034.00

1 Providing Cement Concrete to Balance Riches of J.K. Pura and Vinayakanagaraslum in ward No. 70

7.00

7.00

1Improvements to Drains, Culverts and providing Cement Concrete to Balancereaches of J.K. Pura Slum, Vinayakanagar Slum and surroundings in ward No.70

9.00

2 Improvements to Toilets at J.K. Pura, Vinayakanagar and P.K. Colony Slums inward No. 70

5.00

14.00121.00

1 Providing Cement Concrete to Balance Riches of J.K. Pura and Vinayakanagaraslum in ward No. 70

7.00

7.00

1Improvements to Drains, Culverts and providing Cement Concrete to Balancereaches of J.K. Pura Slum, Vinayakanagar Slum and surroundings in ward No.70

9.00

2 Improvements to Toilets at J.K. Pura, Vinayakanagar and P.K. Colony Slums inward No. 70

5.00

14.00

Sl. No Name of the Work Estimate Cost (Rs. In Lakhs)

1 Providing C C & Re- Construction of Damaged masonry drain to East road uptoAshirvadham Apartments in ward No. 71

48.00

2 Providing Borewell to MOH Office and Sub Division Office & Special Repairsto Sub Division Office at Austin Town in ward No. 71

9.00

3 Providing Borewell to IPP Hospital, at Vivekanagar further Extension in wardNo. 71

4.00

4 Asphalting to KBAR Road in Ward No. 71 10.0071.00SUB TOTAL

MAINTENANCE WORKS

SUB TOTAL Programme of Works for the Year 2008-09 in Ward no.71 Pertaining to Shanthinagar Sub Division.

CAPITAL WORKS

GRAND TOTAL 18 % GRANTS

CAPITAL WORKS

SUB TOTAL

CAPITAL WORKS

SUB TOTAL MAINTENANCE WORKS

SUB TOTAL

MAINTENANCE WORKS

SUB TOTAL 18 % GRANTS

142

Page 149: Programme_Of_Works_2008-2009

1 Special repairs to P.U.C. Junior College O.R.C. Road & Quarters Buildings inWard No. 71

8.00

2 Special repairs B.M.P. Boys school at Yerrappa Garden, in Ward No. 71 8.00Engaging Private Labours and Desilting of drains in ward No. 71 6.00Materials Collection and Filling of Potholes and Road Cuttings in ward No. 71 7.00

29.00

1 Re-grading & Re- Construction of Budda Temple to John Bull street by the sideof Jayarajnagar Slum in ward No. 71

12.00

2 Special Repairs and Maintenance of Toilet Blocks in Slum Area and surroundingArea in ward No. 71

9.00

21.00121.00

Programme of works for the year 2008-09 pertaining to ward No.72. .Jeevanbheemanagar Sub Division

Sl No Name of the WorkEstimate Cost ( In

lakhs)I Capital works

1 Providing metalling, asphalting and non-returned wall to 6th main in Domlur 2nd

stage 1st phase in ward No.72 10

2 Providing Name boards in ward No.72 53 Providing CC to roads in BDA layout 84 Providing CC to roads in Doopanahalli Village limit and Appareddypalya village

limits. 10

5 Improvements to playgrounds in HAL 2nd stage 5II Maintenance works

1 Special repairs to ward office and sub division office at Domlur 32 Asphalting to roads in HAL 2nd stage, Doopanahally & Domlur 303 Regarding of drains and construction of culverts in BDA layout 204 Filling up of potholes in ward No.72 55 Maintenance of ward by Engaging private labours & Removal of debries 4

III 18% GrantsCapital works Nil Maintenance works

1 Asphalting to roads in AK colony 21Total 121

Programme of works for the year 2008-09 pertaining to ward No.73Jeevanbheemanagar Sub Division

Sl No Name of the WorkEstimate Cost ( In

lakhs)I Capital works

1 Construction of school building @ Sriramanagari 52 Providing asphalting to Vinayakanagar B block and Air view colony 153 Providing Asphalting to LIC colony 104 Providing asphalting to Konena Agrahara main road (Near Rajewari theater) 105 Construction of culvert @ Vinayakanagar (Near Theater) and KR Garden 66 Providing CC to 1st A cross of SR layout 8

GRAND TOTAL

CAPITAL WORKS NIL

MAINTENANCE WORKS

SUB TOTAL

MAINTENANCE WORKS

SUB TOTAL 18 % GRANTS

143

Page 150: Programme_Of_Works_2008-2009

7 Providing CC to 5th and 6th cross road of Manjunath layout 12II Maintenance works

1 Providing help line centre in the ward office and payment of BWSSB pendingbill

4

2 Asphalting of N.R colony main road 123 Asphalting of Murugesh palya main roads 7.54 Filling up of potholes in ward NO.73 55 Engaging private labour for maintenance of ward No.73 26 Providing street Name boards in ward No.73 3

III 18% GrantsCapital works

1 Providing CC Sriramanagari slums 102 Providing CC to roads of Sudhamanagari slum and Anandpura slum 11.5

Maintenance works NilTotal 121

Programme of works for the year 2008-09 pertaining to ward No.74. Jeevanbheemanagar Sub Division.

Sl No Name of the WorkEstimate Cost ( In

lakhs)I Capital works

1 Construction of Store room adjacent to ward office in defence colony of wardNo.74

3

2 Providing street name boards in HAL 2nd stage of ward No.74 53 Providing street name boards in HAL 3rd stage of ward No.74 54 Providing cement concrete to lanes of kodihally in ward No.74 7.55 Providing cement concrete to lanes of putttappa layout in ward No.74 56 Improvements to Side Walk on 100 ft road Indranagar 10

II Maintenance works1 Special repairs to ward ARO office and tailoring centre in ward No.74 52 Providing security services to Help centre at ward No.74 23 Providing Asphalting to roads of Defence colony (from 1st main road to 6th main

road) in ward No.7415

4 Providing Asphalting to roads HAL 2nd stage (from 7th main road to 12th mainroad) in ward No.74

15

5 Providing Asphalting to roads from 13th main to 19th main of HAL 2nd stage ofward No.74

15

6 Providing Asphalting to roads of HAL 3rd stage in ward No.74 157 Filling of pothole in ward NO.74 58 Engaging private labour for maintenance of ward No.74 2

III 18% GrantsCapital works NilMaintenance works

1 Providing CC to lanes of AK colony, Kodihally in ward No.74 11.52 Providing CC to lanes in Bhovi colony, Kodihally of ward No.74 10

Total 121

144

Page 151: Programme_Of_Works_2008-2009

Programme of works for the year 2008-09 pertaining to ward No.75. Richmond Town Sub Division.

Sl No Name of the WorkEstimate Cost ( In

lakhs)I Capital works

1 Construction of SSM drains at Balance portion of G street from Someshwara 1st

cross to SWD 10

2 Construction CC roads at Balance portion of Lingiyyana palya & Saraswathipuracrosses

20

II Maintenance works1 Special repairs to Engg ward office & help centre building 2.52 Special repairs to Corporation Girls high school building 43 Special repairs to Corporation Community hall building Jogupalya 7.54 Special repairs to referral hospital building 55 Special repairs to Primary school building Gowthamipura 2.56 Special repairs to Gymnasium building at Gowthamipura 27 Special repairs to Quarter buildings at Referral hospital 48 Filling up of potholes & Engagement of daily labours for ward maintenance. 59 Asphalting of roads at Cambridge layout, JK layout & BDA layout 20

10 Asphalting of Saibaba temple road 1011 Desilting of drains at Jogupalya ward Limits. 6.72

III 18% GrantsCapital works Nil

1 Construction of toilets at Gouthamipura Community hall 2.5Maintenance works

1 Asphalting in at Gowthamipura road 102 Providing CC roads to Gowthamipura cross road 9.28

Total 121Programme of works for the year 2008-09 pertaining to ward No.76.

Richmond Town.

Sl No Name of the WorkEstimate Cost ( In

lakhs)I Capital works

1 Construction of RCC culvert in Rhenius street at Junction of Alexander street 102 Providing CC to Markham road 5th cross and Magrath road 2nd cross 83 Fencing to BBMP property in Hosur road 3.54 Raising up of compound wall fencing, extension of pavilion of Nandan football

ground 9

II Maintenance works1 Annual repairs to school, health office at Ashok nagar 22 Annual maintenance to Nursery school at Richmond town 13 Annual maintenance to 76 A Health ward office 24 Special repairs to Building in Nandan football ground 105 Maintenance of M.G road from queen’s circle to trinity circle, Residency road,

Cubbon road (Kerb stone painting and footpath repairs) 8

6 Asphalting to Clapham street, Laurell lane, Prime street, Walkar lane, AgaAbdullah street, Corn well road and crosses, in Richmond Town area

22

7 Asphalting to Cross roads in Victoria layout 108 Pothole filling and maintenance of roads & Depot collection for the year 2008-09 10

9 Maintenance of Richmond road fly over (Painting, repairing of expansion joints,resurfacing)

4

145

Page 152: Programme_Of_Works_2008-2009

III 18% GrantsCapital works

1 Construction of new ladies toilets in P.K Quarters 5Maintenance works

1 Improvement to road side drains & Concreting to west road in cement lane 11.52 Improvement to road side drains in P.K Quarters 5

Total 121

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Construction of Help line building in ward - 77 8.002 Reconstruction of culvert at V.S.Raju road in Ward - 77 10.00

3 Construction of drain and improvements to footpath in fair field layout in ward -77. 10.00

4 Reconstruction of drain in 4th main, 16th cross, 15th cross, and sourroundingareas of kalyani slum and improvements to footpath in S.R.Nagar in Ward - 77. 19.00

5 Reconstruction of drain and improvements to footpath from Race course road upto Railway parallel road in Ward - 77. 18.00

6 Construction od drain and improvements to footpath in Railway parallel road inWard - 77. 8.00

Sub Total 73.00(II) Maintenance Works1 Reconstruction of compound wall repairs to BBMP Quarters at Mission road in

Ward - 77 10.00

2 Repairs to toilets in Ward - 77 (8 Nos) 2.003 Replacement of damaged gratings over drains and allied works in Ward -77. 5.00

4 Maintanence of roads , Removal of debries , Desilting of drains , Shoulderdrains, Footpath and Painting to Kerb stones in Ward -77 10.00

Sub Total 27.00(B) 18% Grants(I) CAPITAL WORKS Nil

Grand Total 100.00

Shivajinagar Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Construction of RCC Box type drain and footpath at Venkataswamy road &

Meenakshikoil street in Ward - 78 20.00

2 Construction of RCC Box type drian & footpath at Aliaskar road in Ward -78. 20.00

3 Construction of SSM drain & footpath near Jasma bhavan & Gurunanak bhavanroad in Ward -78. 20.00

4 Contruction of SSM drain & footpath in Hospital road in Ward -78. 20.00Sub Total 80.00

Programme of works for the year 2008-09 in ward No. 77 Shivajinagar Sub Division, Shivajinagar Division

Bruhat Bangalore Mahanagara PalikeProgramme of works for the year 2008-09 in ward No. 78,

146

Page 153: Programme_Of_Works_2008-2009

(II) Maintenance Works1 Repairs to Tasker town school building , Shishuvihar , Toilets 6th cross in

vasanthnagar and sub division office building in ward -78. 10.00

2 Maintanence of roads, removal of debries, desilting of drains, shoulder drains,footpaths & paintings to kerb stones in Ward -78. 10.00

Sub Total 20.00(B) 18% Grants(I) CAPITAL WORKS

1 Providing drains & footpaths in approach road to Rajivgandhi colony in Ward -78.asphalting to maistry palya main road from 8th main road Koramangala inward no. 68

21.00

Sub Total 21.00(II) Maintenance Works Nil

Grand Total Rs. 121.00

Shivajinagar Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Construction of Oldage Home at Hafiza School permises in Cickborn Road 22.002 Construction of Help Line Building in Ward -78. 8.003 Reconstruction of drain & Improvements to footpath in Thimmaiah Road in front

of Meenakshi Road in front of KSFC Office 10.00

4 Reconstruction of drain & Improvements to footpath of OPH Road fromHospital Road to Meenkashi Koilm Street 10.00

5 Providing drain to Thimmaiah Road crosses & Cement Concrete to crosses ofBroadway road, Shivaji Road & Sulthan Nagar 10.00

6 Reconstruction of Nursery School Buildings at Kodandarama Nagar in Ward No.79 10.00

Sub Total 70.00(II) Maintenance Works1 Repairs to Nursery School, Hafiza School, Repairs to Cimmunity Hall at T.B.

Hospital in Ward No. 79. 10.00

2 Repairs to Zonal Office Building & Ward Office in Ward No. 79 10.003 Maintenance of Roads, Removal of debrie, Desilting of drains, Repairs to drains,

shoulder drains, Footpaths & painting to kerb stones in Ward No. 79 10.00

Sub Total 30.00(B) 18% Grants(I) CAPITAL WORKS

1 Constrtuction of Tailoring training centre Building at Existing defaunt toiletblock at Thimmaiah Road crosses "F" Street 21.00

Sub Total 21.00(II) Maintenance Works Nil

Grand Total Rs. 121.00

Programme of works for the year 2008-09 in ward No. 79,

147

Page 154: Programme_Of_Works_2008-2009

Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Providing Fencing to BBMP Properties Special repairs to Sindhi Colony

Choultry, Special repairs to Buildings at Robertson Road, Hains Road, WilliamsTown, Sub Division office and Improvements to Playground at SuthanjiguntaRoad and Nethaji Road

10.00

2 Improvements to RSD & Culverts at ITI layouot, S.K. Garden, Williams Townand Harries road 12.00

3 Improvements to RSD and Culverts at Mosque Road, M.M. Road, BourdillonRaod, Wheeler Road and Robertson road 19.00

4 Improvements to RSD and culverts at Cleavelans road, Hains roas, Bamboobazarroads in Ward No. 91 15.00

5 Improvements to RSD and culverts at Asseya Road, Promnade roads Sindhicolony and Veerannagarden in Ward No. 91 12.00

Sub Total 68.00(II) Maintenance Works1 Providing Asphalting to ITI layout S.K. Garden, Bore bank road, Sindhi Colony

Meanee avenue roads, A.M. Road and Bamboobazar road in Ward No. 91 25.00

2 Filling pf potholes, Desilting of drains and debris removal in Ward No. 91 6.00Sub Total 31.00

(B) 18% Grants(I) CAPITAL WORKS

1 Improvements to RSD and Culverts at Gandhigrama S.K. Garden andBaidarahally in Ward No. 91 10.00

2 Providing Asphalting to Gandhi Grama, S.K. Garden and Wahab Garden inWard No. 91 12.00

Sub Total 22.00Grand Total Rs. 121.00

Programme of works for the year 2008-09 in ward No. 92, Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Construction B.S. Slab drain & Culverts from Miller road to myasore bank in

Nandidurga road & 5th main road Jayamahal (western side) 16.00

2 Construction of drains and culverts 7th, 8th & 1st main road of Kempaiah block 16.00

3 Construction of drains and culverts at Marappa block roads and Muniswamapparoad & 8th, 9th cross of Chinappa garden 9.20

4 Providing and laying R.M.C. to Marappa block cross roads & Jayamahalextension cross roads 16.00

Sub Total 57.20(II) Maintenance Works1 Filling of potholes of roads, Engaging private labours & private tractors to desilt

tertiary drains, Desilting of tertiary drains & removal of debris at Borebank road,Kempaiah block, Chinnappa garden, Muddamma garden in Ward No. 92 12.00

Programme of works for the year 2008-09 in ward No. 91,

148

Page 155: Programme_Of_Works_2008-2009

2 Re-surfacing internal roads of Jayamahal extension and Nandidurga Extension,& Benson road in Ward No. 92 30.00

Sub Total 42.00(B) 18% Grants

1 Improvements and regradiation of drains & Providing RMC to A.K. Colony &M.R.S. Palya in Ward No. 92 21.80

Sub Total 21.80Grand Total Rs. 121.00

Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Providing RMC to Urdu School road & Jamiya Asafia School School road 20.002 Providing RMC to road & Improvements to drain concreting from

Srinivasanagar to Thangamalai Nagara & Doddannanagara Cross Roads 15.00

3 Provding RMC to road & Improvements to drain to Shivaji Road, Via Street, OldSoap Factory road & Muneswara Temple Road 25.00

4 Provding RMC to road & Improvements to drain at 11th Cross Road of ModiRoad & Amavase lane in Doddannanagar & Sownside of Vinayaka Theatre 25.00

5 Providing Fencing to survey No. 28 of D.J. Halli 5.00Sub Total 90.00

(II) Maintenance Works1 Desilting of drains & Removal of debries & Engaging tractor & labours 7.002 Special Repairs Ward office & I.P.P. Hospital Building at D.J. Halli 3.00

Sub Total 10.00(B) 18% Grants

CAPITAL WORKS1 Providing RMC to road & Improvements to drain at Thangamalai Nagar &

Doddannanagar "E" Block 17.00

2 Reconstruction of drain of drain at Srinivasanagar 4.00Sub Total 21.00

Grand Total Rs. 121.00

Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs

(I) CAPITAL WORKS1 Providing Chainlink fencing and Widening of road adjacent to SWD in 15th

Cross R.T. Nagar 1st Block, Widening of footpath in Ramath Nagar 3rd Cross 10.00

2 Reconstruction of Culverts & Drains at Matadahalli, Motinagar & A.K. AshramaRoad 10.00

3 Provdiing and laying RMC to cross and Interior Road of A,K, Ashrama,Mothinagar, Matadahalli, Chunchappa Block, Lingappa Block 50.00

4 Improvements to drains & Culverts at R.T. Nagar 1st Block, 2nd BlockJayamahal Main Road and 1st "A" Cross Ex-Service man Colony 9.00

Sub Total 79.00

Programme of works for the year 2008-09 in ward No. 93,

Programme of works for the year 2008-09 in ward No. 97,

149

Page 156: Programme_Of_Works_2008-2009

(II) Maintenance Works1 Filling Pothole Engaging Tractors & Labours Desilting of Tertiory drains &

Removal of debries and Special repairs to J.C. Nagar Dasara Ground 10.00

2 Providing Asphalting to Interior roads of Rahamathanagara in Ward No. 97 10.00Sub Total 20.00

(B) 18% GrantsCAPITAL WORKS

1 Improvements to drain & Culverts & Proveing RMC to Cross road ofMuneswara Block 19.00

Sub Total 19.0018% GrantsMaintenance Works

1 Removal of silt in SWD at A.K. Colony in Ward No. 97 3.00Sub Total 3.00

Grand Total Rs. 121.00Programme of works for the year 2008-09 pertaining to ward No.80,

Bharathinagara, Bharathinagara Sub Division. Estimate Cost( Rs. in lakhs)

Capital Works 1 Dismantling the Existing Toilets and Construction of new toilet block in

Bharathinagara E Street and Q No 4th Street 1st Cross (2 Nos) 172 Construction of drain and footpath on E/S of Kamaraj Road from St. Johns

Church Road to SKNP Temple 203

Providing precast RCC Slab and Construction of culverts on E/S of N.P. Street 104 Providing CC road to Thimmaiah Road crosses, Mackan road crosses and near

Mackan compound in Bharathinagara 105 Asphalting to Mackan road from St. Johns Church Road to AM Road 10

Maintenance Works6 Dismantling the Existing Urinals and construction of New urinals block at

Kamaraj Road (SC Garden Junction and Thimmaiah Road Junction 2 Nos) 37 Desilting drains in Mackan Road and Thimmaiah Road in Bharathinagara 108 Providing special repairs to Corporation school & Corporation hospital at

Thimmaiah road 109 Providing Filling of pot holes desilting of shoulder drains and drain clearing of

debris in W-80 1018% Grants Capital Works Nil

10 Construction of RCC culverts at Neharupuram and Shivan Chetty garden 611 Dismantling the existing toilets and construction of new toilet blocks in

Nerhupuram and Broad Shah street in W-80 1518% Grants Maintenance Works Nil

Total 121Programme of works for the year 2008-09 pertaining to ward No.81,

Ulsoor , Bharathinagara Sub Division. Estimate Cost( Rs. in lakhs)

Capital Works 1 Providing New RCC culverts and improvements drains and footpath at St. Johns

Road from Shivan Chetty Garden to SWD 202 Construction of drains and culverts near Nilkatan Circle and improvements to

drains at RBANMS Compound 20

Sl No Name of the Work

Sl No Name of the Work

150

Page 157: Programme_Of_Works_2008-2009

Maintenance Works3 Raising of existing drains and providing RCC covering slab over side drains and

improvements to culverts at Purushotham Road and Dodda katappa road, Car Street and Ankamma Street 15

4 Providing CC to footpath in Gangadhar Chetty road from Gurudwara to RBANMS Circle 10

5 Providing Filling of pot holes desilting of shoulder drains and drain clearing of debris in W-81 10

6 Providing special repairs to Shishuvihar at Sathynarayana Temple Street and Corporation Nursery School at Yellamma Koil Street 10

7 Providing special repairs to Library building, MLA Office, KSFC Office and and Nursery School at Shivan Chetty garden 5

8Providing special repairs to Market at Ulsoor and Toilet behind Ulsoor Market 1018% Grants Capital Works Nil

9 Dismantling the existing toilets and construction of new toilet blocks in MV Garden and Yellamma Koil Street 1518% Grants Maintenance Works

10 Desilting of drains at MV Garden 6Total 121

Programme of works for the year 2008-09 pertaining to ward No.82, Hoysalanagara, Bharathinagara Sub Division.

Estimate Cost( Rs. in lakhs)

Capital Works 1 Providing CC to cross roads and providing drains @ Old Binnamangala 102 Providing RCC Covering slabs to drains and CC to Footpaths around park @

100ft Road and CMH Junction Indiranagara 1st Stage 103 Providing RCC Covering slabs to drains and CC to Footpaths around Basket Ball

Stadium between 6th and 9th cross Indiranagara 1st Stage 104 Construction of office of the Asst. Exe. Engineer, Bharathinagara Sub Division

at 6th cross Indiranagara 1st Stage 105 Providing RCC Covering slabs to drains and CC to Footpaths around park

between 13th and 15th cross Indiranagara 2nd Stage 10Maintenance Works

6 Construction of RSD and covering slabs to drains at 10th and 11th Main road in 2nd stage Indiranagara 10

7 Desilting and Maintenance of Immersion tank (During Ganesh and Durga Festivals ) in Ulsoor Lake and Deweeding, Cleaning and Maintenance of Ulsoor Lake and maintenance of silt traps and Screen barriers 20

8 Providing Filling of pot holes desilting of shoulder drains and drain clearning of debris in W-82 10

9 Construction of RSD and RCC culverts towards W/S of Thamarekannan Road 10Total 100

18% Grants Capital Works10 Construction of Aganawadi Building at Jayarajnagara 5

18% Grants Maintenance Works 11 Construction of road side drains at Jayaraj Nagara 512 Construction of road Side drains at Murphy Town 5

Total 15Grand Total 115

Sl No Name of the Work

151

Page 158: Programme_Of_Works_2008-2009

Programme of works for the year 2008-09 pertaining to ward No.83, C.V. Raman Nagara , Banasawadi Sub Division.

Estimate Cost( Rs. in lakhs)

Capital Works 1 Construction of Road side drain and Culverts and providing metalling to 1st

cross road Kaggadaspura10

2 Construction of Road side drain and Culverts and providing metalling to roadfrom Kaggadaspura Village to Balaji layout

15

3 Providing metalling and asphalting to road from 5th main to National School ofExcellence and Victorian Enclave in Kaggadaspura

20

4 Providing metalling to Anjaneya Temple road in Byrasandra 105 Providing Metalling to 9th main road in Suddaguntepalya 106 Providing Flagging course to drain near park in HAL 3rd Stage 5

Maintenance Works7 Re-surfacing to roads at Yellamma Temple road, Seethappa Colony, and HAL 3rd

Stage Thippasandra 15

8 Procuring materials for pot hole filling to roads and engaging private labours inWard -83

5

9 Reconstruction of road side drain and culverts in 1st cross road Malleshpalya 10Total 100

18% Grants Capital Works10 Providing CC to Muthalamma Devi Temple Road and Cross roads of Anjaneya

Temple road in Nagavarapalya11

18% Grants Maintenance Works 11 Reconstruction of road side drain and culverts in Anjaneya Temple road and

main road in Nagavarapalya 10

Total 21Grand Total 121

Programme of works for the year 2008-09 pertaining to ward No.84, Benniganahalli, Banasawadi Sub Division.

Estimate Cost( Rs. in lakhs)

Capital Works 1 Construction of Sports Complex ( Balance work in OMBR Layout ) 102 Construction of Burial Ground (B. Channasandra) Watchman Shed Compound

and other works5

3 Metalling & Providing OGPS to 1st Cross to 9th Cross and 1st to 4th Main Of B.Channasandra Village

30

4 Cosntruction of Sub division office and ARO office in Ward no 84, 205 Providing Cement Concrete to Roads Lanes B. Channasandra Village Road 206 Providing Asphalting to Bad roads in East of NGEF layout in W-84 8

Maintenance Works7 Annual Repaires to School, Hospital , and Children school 58 Repaires to Ward office Building in Park in Ward No 84 2

Total 10018% Grants Capital Works

9 Proviidng CC road and repairs to toilet in Old Byappanahalli andGajendranagara slum and Amedkar nagara slum

21

Total 21Grand Total 121

Sl No Name of the Work

Sl No Name of the Work

152

Page 159: Programme_Of_Works_2008-2009

Programme of works for the year 2008-09 pertaining to ward No.85, Sarvagnanagara Sub Division. (Sarvagnanagara)

Estimate Cost( Rs. in lakhs)

Capital Works 1 Providing cement concrete to 1st to 4th cross of Kadirainapalya village area &

crosses passing through M.M Road webstar road in ward No.8510

2 Asphalting to M.M Road, Buddavihar road, Bachammal road. 403 Construction of SSM drain and formation of road in between Thimmaiah Garden

and KHB Colony at Coxtown15

Maintenance Works4 Special repairs to Dispensary, ARO Office and Ward Office in Ward No 85 105 Construction of flagging course in crosses of KHB Colony in W-85 56 Construction of drain & Cement concrete to footpath of M.M Road from Frazer

Town Traffic police station to Cox town Circle15

7 Filling up of pot holes and engaging private labour for maintenance of work inW-85

5

18% Grants Capital Works8 Construction of Samudhaya Bavan, Tailoring room and compound wall to

Corporation property in NC Colony11

18% Grants Maintenance Works 9 Construction of Drain and culverts in Indira Seva Slum in New Byappanahalli 10

Total 121Programme of works for the year 2008-09 pertaining to ward No.86,

Maruthi Seva Nagara, Sarvagnanagara Sub Division. Estimate Cost( Rs. in lakhs)

Capital Works 1 Construction of toilets at Sathyanagar-2, Jeevanahally, Nagaiahnapalya, Lazar

road, KR Garden & chettappa garden.15

2 Construction of masonry drains at main road and cross road of Kondappa garden, cross roads of Maruthisevanagar, chettappa garden cross roads.

15

Maintenance Works3 Special Repairs & painting to toilets & library building & Health office building

in ward No.865

4 Asphalting to cross roads at Jaibharathnagar, Vivekanandanagar, MaruthiSevanagar and Jeevanahally surrounding area.

50

5 Filling up of pot holes and engaging private labour for maintenance of work inW-86

15

Total 10018% Grants Capital Works

6 Construction of Residential houses for SC/ST at AK Colony, Jeevanhalli inWard No 86

10

18% Grants Maintenance Works Nil

7Providing CC to Narrow roads in KR Garden and Muthappa Garden AK Colony 11

Total 21Grand Total 121

Sl No Name of the Work

Sl No Name of the Work

153

Page 160: Programme_Of_Works_2008-2009

Programme of works for the year 2008-09 pertaining to ward No.87, Sarvagnanagara Sub Division. (Lingarajapuram)

Estimate Cost ( Rs. in lakhs)

Capital Works 1 Providing CC road to Krishnappa layout main road, VST 2nd cross, F Block, and

5th A cross of Subbaiahanapalya35

2 Providing Chain link fencing to Corporation property at Sakkamma Layout in W-87

10

3 Construction of compound wall and Internal pathway to Lingarajapura, RamaSwamy Palya and Subbaiahnaplaya Burial Ground in W-87

20

4 Asphalting to 1st to 4th Cross of Anantharamiah layout, Church street main roadand 1st to 4th cross Church street

10

5 Asphalting to 1st to 3rd main road and Cross road of KSFC layout, LingajarapuraTank Bund Road, Kanakadhasa Layout Main road

10

6 Asphalting to Katappa road, Garden street, Chikkabanasawadi Main road andAyappa Temple road

10

Maintenance Works7 Providing Filling of pot holes desilting of shoulder drains and drain clearing of

debris in W-87 5Total 100

18% Grants Capital Works8 Construction of BR Ambedkar Samudhaya Bavan in VST road Lingarajapura. 9

18% Grants Maintenance Works 9 Construction of collapsed drains and providing PCC slabs in Janakiram layout

main road and 1st to 4th cross of Janakiram Layout12

Total 21Grand Total 121

Programme of works for the year 2008-09 pertaining to ward No.88, Banasawadi, Banasawadi Sub Division.

Estimate Cost( Rs. in lakhs)

Capital Works 1 Providing widening and asphalting to Horamavu main road 202 Providing Asphalting to 5th A Cross to 6th cross, 2nd Block, HRBR layout 103 Construction of RCC deck slab at 2nd main road OMBR layout 154 Providing drains, culverts and CC to road at Banasawadi village, Aswathappa

layout and PNS Layout20

5 Construction of 1st Floor to building in park at CA Site No. 4, OMBR layout 5Cosntruction of culverts at Lakshmamma layout, Chandramma layout, HRBRLayout 1st Block.

20

6 Providing Asphalting to 1st 'C' Cross 1st Block, HRBR layout 5Maintenance Works

7Filling of pot holes, road cuttings and engaging private labourers for ward maintenance 5

Total 10018% Grants Capital Works

8 Construction of class rooms to Govt. Primary School at Banasawadi Village 2118% Grants Maintenance Works

Total 21Grand Total 121

Sl No Name of the Work

Sl No Name of the Work

154

Page 161: Programme_Of_Works_2008-2009

Programme of works for the year 2008-09 pertaining to ward No.89, Kacharakanahalli , Sarvagnanagara Sub Division.

Estimate Cost( Rs. in lakhs)

Capital Works 1 Metalling and Asphalting at 1st cross HRBR layout 3rd block from CMR road and

Hennur main road to 3rd main road.20

2 Providing asphalting in Ramaiah layout, Kacharkanahalli in ward No.89 203 Providing asphalting in Ajjamallappa layout Kacharkanahalli in ward No.89 154 Providing Asphalting to cross roads at Oil mill road, Kacharkanahalli in ward

No.89 15

5 Construction of culverts at Kammanahalli from 1st to 5th cross (10 culverts)Kacharakanahalli in ward No.89

10

6 Construction of new foot path covering the existing drain with precast coveringslabs from 4th cross to service road of 5th main HRBR Layout Kacharakanahalliin ward No.89

15

7 Providing street name boards Kacharakanahalli in ward No.89 5Total 100

Maintenance Works18% Grants Capital Works

8 Providing CC road to crosses of Kacharakanahalli Slum 109 Construction of Ambedkar bhavan at Kammanahalli AK colony in W-89 11

18% Grants Maintenance Works Total 21

Grand Total 121

ELECTRICALEAST

I ORIGINAL WORKSNEW LINES & POLES

Sl No Name of the work Estimated cost1 Providing 250 W SV/MH Street light fittings along with poles to Sarjapura Main

Road from Hosur Road upto Koramangala water Tank. 6.00

2 Providing 250 W SV/MH Street light fittings along with poles to Sarjapura Main Road from 17th Main upto Koramangala 1st Block.

10.00

16.00

II MAINTENANCE WORK

M & R TO STREET LIGHTS – REPLACEMENT OF BURNT BULBS ETC., (PACKAGE)

Sl No Name of the work Estimated cost 1 Operation & Maintenance of street lights 582.20

PROVIDING STREET LIGHT FITTINGS

Sl No Name of the work Estimated cost1 Providing SV/MH/Control switches to 8th Block 2nd 3rd 4th & 5th Cross 10th Main

13th Main 16th Main 5th Block 1st Cross 2nd Cross 5th Cross 6th CrossKoramangala

5.25

Sl No Name of the Work

TOTAL

155

Page 162: Programme_Of_Works_2008-2009

2 Providing SV/MH/Control switches to Ejipura Village 2nd Cross to 23rd CrossSD Bed Main Road & 3rd Cross 5th Cross 6th Cross 7th Cross 1st Block 2nd Cross3rd Cross 4th Cross 9th Cross 11th Cross 3rd Block Post Office Road Behind BDAComplex Road 4th Main 5th Main & 6th Main Koramangala

5.50

3 Providing SV/MH/Control switches to Rose Garden EWS Quarters, SamathaNagara,L.R.Nagara, 1st Cross to 17th Cross BDA Complex 1st Main to 5th Main

4.20

4 Providing SV/MH/Control switches to Lakshmi Road, 1st Cross 2nd Cross, 3rd

Cross, 4th Cross, Nanjappa Road, Basappa Road, A.T.Halli Village5.20

5 Providing SV/MH/Control switches to Sonnenahalli 1st Main 1st Cross to 10th

Cross Vivekanagara further extension 1st Main to 9th Main Maya Bazzar SlumInterior Bajaj Street Ayyappa Temple Road 4th Square, 5th Square, 6th Square,

4.60

6 Providing SV/MH/Control switches to Domlur 3rd Main, 1st Cross, 3rd Cross, 4th

Cross,5th Cross, 8th Cross, Domlur Layout ,Nala Road, 2nd Main Road, BDAQuarters Dhoppanahalli Village, Appareddy Palya, Mottappana palya,Indiranagara Double Road, 4th Main to 10th Main

5.50

7 Providing SV/MH/Control switches to KPWD Quarters 1st Cross to 10th CrossAnandanagar Slum Sudhamanagar Slum BDA Layout 1st Main to 9th Main Nanjareddy colony 1st Main to 7th Main by the side of Air Port wall Behind RajeshwariTheatre Rustham Bagh Main Road and Crosses Behind Kempfort all smallcrosses

5.00

8 Providing SV/MH/Control switches to HAL 2nd Stage, 2nd Main,3rd Main 4th

Main up to 17th Main 2nd Cross to 10th Cross Thippasandra 2nd Main 3rd Main 4th

Main Kodihalli Main Road 1st Cross to 12th Cross Hanumanagar Slum

6.50

9 Providing SV/MH/Control switches to Jogupalya Bajaj Street G No 1st Street to12th Street Cambridge 1st Main to 5th Main Jeevana Kendra Layout 1st Main to 3rd

Main Saraswathinagar 1st Main to 9th Main Deenabandhu Nagar SlumGowthampura Slum

6.20

10 Providing SV/MH/Control switche to Richmond town 1st Main to 6th Main behind Johnson Market Surrounding Richmond Park Barton Street AshoknagarK no 1st Street to 9th Street Vinayaka Temple Street Rest House Road & CrossesVictoria Layout 1st Main to 4th Main Ellagoddana Palya 1st Cross to 5th Cross

6.00

11 Providing SV/MH/Control switches to S.R.Nagara 1st Main Road 1st Cross upto24th Cross 2nd Main Road 1st Cross to 12th Cross, Kumarakrupa West 6th Cross to10th Cross Kumarakrupa North Park Road, Crescent Road, Annayappa BlockKempamma Block , Sri puram 1st main to 4th Main Kargappa Garden 1st A,B,Cross Cubbon Pet 4th Cross to 10th Cross

6.00

12 Providing SV/MH/Control switches to old cement Road 2nd Cross PayyappaGarden Rajiv Gandhi Colony HKP Road New Korachi palya Vasanthanagara 1st

Main to 16th Main Chinnaswamy Mudaliar Munniswamy Main Venkatappa RoadKaryappa Layout Railway Quarters Road Das Pet Lady Curzan Road UnionStreet, Ali Oscar Road Chakravarthy Road, Shivaji Road 1st to 8th Cross

7.00

156

Page 163: Programme_Of_Works_2008-2009

13 Providing SV/MH/Control switches to Vockbund Road Dispensary RoadSulthannagar 1st Cross to 3rd Cross Kodandaramnagar MKP Road SultanjiGuntha Road Meenakshi Coridor 1st Cross to 7th Cross Jain Temple Road 1st to8th Cross Charminar Masjid Road 5th 6th Cross Dharmaraj Coil Street SabhapathiLayout Ibrahim Saheeb Street Muruga Pillai Street Seppings Road DhanakothiLayout Slater House A to D Street Bamboo Bazar Layout Lal Masjid Street

8.00

14 Providing SV/MH/Control switches to Kamaraj Road 3rd Cross 4th CrossSeppings Road 2nd Main 3rd Main 4th Main Thimmaiah Road 4th 6th and 7th CrossArmstrong Road 1to 6th Cross Road Bharathinagar K No 1st Cross to 7th Cross

5.00

15 Providing SV/MH/Control switches to Ulsoor Road Bazaar Street M.V.Garden1st Main to 4th Main Nala Road Arunachalam Mudaliar Road Kensingtown RoadAga Abdulla Street Dikenson Road Ulssor Lake Surrounding & Guptha Layout1st Cross to 6th Cross

5.20

16 Providing SV/MH/Control switches to Lakshmipura 1st Cross to 24th Cross JayrajNagar 1st Cross to 5th Cross Morphy town 1st Main Road 6th Cross 8th Cross 9th

Cross & 10th Cross Indiranangar 2nd Stage 1st Main Road 2nd Main 4th Main 5th

Main LB Shastri Nagar 1st Cross to 7th cross

6.00

17 Providing SV/MH/Control switches to New Thippasandra from 1st Cross to 5th

Cross 2nd Main to 9th Main Geethanjali Layout 1st Cross to 5th Cross ByrasandraVillage C.V. Ramangar Main Road Kagadasanpura Main Road 1st Main to 9th

Main Suddaganthe Palya Village Byrasandra main Road Maruthinagara 1st Crossto 10th Cross Mallesh Palya 1st Cross to 8th Cross GM Palya 1st Cross to 10th

Cross Shastrinagra Krishanppalayout Interior

8.00

18 Providing SV/MH/Control switches to OMBR Layout 1st Main to 12th MainKasthuri nagar 1st Main to 9th Main Krishnianpalya Village NGF Layout 2nd

Main to 7th Main chikkabannaswadi Village Bennaganahalli Village

8.00

19 Providing SV/MH/Control switches to Doddiguntha Slum Ashraya BuildingSlum Ashraya Building Main Road Kallahalli Village Burial Ground InsideBurial Main Ground New Byappanahalli Slum Kallahalli Interior

6.00

20 Providing SV/MH/Control switches to Cockstown 1st Main to 5th MainBanaswadi Main Road ITC Colony 1st Cross to 5th Cross Jeevanahalli 1st Crossto 10th Cross Jai Bharathnagar 1st Cross to 28th Cross Davis Road 2nd Cross to 7th

Cross

7.00

21 Providing SV/MH/Control switches to Ramaswamy Palya Main Road 1st Crossto 20th Cross Lingarajpura Main Road 1st Cross to 10th Cross Janakiram LayoutSlum from 1st Cross to 30th Cross Ashraya Building surroundin area

8.00

22 Providing SV/MH/Control switches to Banaswadi Village Interior OMBRLayout 1st Main to 4th Main Banaswadi Main Road 1st Main to 6th Main BehindShanthisagar Hotel Surrounding Area Ring Road Service Road

8.40

157

Page 164: Programme_Of_Works_2008-2009

23 Providing SV/MH/Control switches to Kacharakanahalli Village interior RamayaLayout 1st Cross to 10th Cross Chikkamuniyappa Reddy Main Road KSFCLayout 1st Cross to 8th Cross Oil Mill Road 1st Cross to 7th Cross Sait Palya 1st

Cross to 9th Cross Hennur Main Road BDA Layout 1st Main to 7th Main & 1st

Cross to 10th Cross

8.80

24 Providing SV/MH/Control switches to Pillannagarden , Gospal Street OldBagalur Layout New Bagalur Layout Hall Road Cockson Road Clock RoadP.K.Colony Giddappa Block CoConut Garden Kandaswamy mudaliar RoadRogers Road Doddi Basappa Main Lazer Road Hennur Main Road Davis RoadAlphans School Road John Armstrong Road

8.00

25 Providing SV/MH/Control switches to Pulakeshinagar Tulasi Ramdas RoadVeena Garden Asia Road Cleavland Road Sanders Road Coles Park Kemp RoadHaries Road Williams town Boore Bank Road Hains Road M.K.PalyaDhanakothi Lane Robertson Road Jermaiah Road New Patty town N.C ColonyPapanna Garden Wahab Garden Chinnapa Garden

8.00

26 Providing SV/MH/Control switches to Jayamahal Jayamahal 1st Main to 5th MainNandhi Durga Extension MRS Palya Pemmegowda Road M.V.R.Block PetalGundappa Block Krishnaamma Garden Rammakka Block Muddamma Garden

8.00

27 Providing SV/MH/Control switches to Devarjeevanhalli SrinivasnagarChakramandi Chikkanna Lane Hussain Road Old Madras Road Perriar NagarSannappa Block Rajjppa Road T.P Kuppanna Street Mariyamma Coil Street

8.00

28 Providing SV/MH/Control switches to Kadugondanahalli Narasimha LayoutMukthinagar 1st Cross to 8th Cross Kidayat nagar 1st Main to 3rd Main 1st Cross to25th Cross Lingarajpuram 1st to 8th Cross Basavanagar 2nd Main 3rd Cross to 5th

Cross Ambedkar College Road Balaji Nagar 1st 3rd Main Pillanna Garden 1st to5th Main Arogyamma Layout 2nd Main 3rd Cross to 5th Cross Sannappa BlockBharathimatha Layout 1st Main to 5th Main 1st Cross to 12th Cross AmbedkarNagar 1st 2nd Cross Venkateshpura vinobnagar upto 32 Cross Sampangiramanlayout 1st Cross to 32 Cross

8.00

29 Providing SV/MH/Control switches to MM Layout 4th to 10th Cross Ratan SinghLayout Chinnappa Layout Nagamma Layout Siddaratha Layout Kavalbyrasandra1st to 8th Cross Muninaggappa Layout Modigarden layout Chinnamma layoutSakkamma Hanumanthappa Layout Brundavana Layout KavalbyrasandExtension Ranka Nagara Adarashanagara Kaverinagara Ananda Gokul layout

8.00

30 Providing SV/MH/Control switches to Anandanagar ChollanagarAmarjyothinagar Shivanna layout vinayaka layout Ayyappa Block HMT LayoutMSH Layout Chindananda Reddy Kuppaswamy Garden Gundappa ReddyChowdaiah Block Manjunatha Layout Bhuvaneshwari Nagara Tulasamma layoutAnandagiri Layout Hebbal Vnagennahalli Kannakanagar Shivashankar Block

8.00

31 Providing SV/MH/Control switches to J.C.Nagar Matadhalli MothinagarMuneshwar Block RTNagar P and T Colony Dinnur Main Road Lingappa BlockAnandappa Block Chunchappa Block Rahamatnagar R.T nagar upto 14th Main1st to 18th Cross

8.00

158

Page 165: Programme_Of_Works_2008-2009

Providing SV/MH/Control switche to Gangenahalli AmbedkarnagarLakshmidevamma Block Anjanappa Block Akkamma Block Kousar NagarKrishanppa Block Vasanthappa Block CBI Block Judges Colony KHM Block

Giddappa Block TPV Layout V.V Nagar Jayamahal KER Mardal Halli BEMLRBI Colony HMT Layout

33 Providing SV/MH/Control switches to RMV Extension SadashivanagarVasanthappa Block Vyalikaval Sankey Tankey Aramanenagar 1st to 7th crossLower Palace Arcade 1st to 6th Cross V.R.Puram Munirappa Block PoojariLayout Dollars Layout Jabbar Block Palace Guttahalli 1st to 10th Main RammaiahHospital upto 4th Cross Ashwathanagar

8.00

225.35

II MAINTENANCE WORK

AMC OF BUILDINGS & CREMATORIUMSl No Name of the work Estimated cost

1 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Koramangala Adugodi

0.10

2 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Adugodi 6th 7th & 8th Block

0.10

3 Providing lightings to Park at Police Quarters Adugodi 3.004 Repairs to Electrical installations to Health centres at Adugodi 0.105 Repairs to Electrical installations to Community Hall at Adugodi 1.006 Providing Under water pump set to Commmunity Hall Adugodi 0.507 Repairs to Existing PumpSet to Community Hall Adugodi 0.50

Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

Egipura Village9 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,1st 2nd 3rd Block 0.10

10 Providing Park Lightings SD Bed Koramangal 3.0011 Providing Yard Lightings and Repairs to Electrical installations to Hot Mix plant

at Koramangala2.00

12 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,Neelasandra

0.10

13 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Rose Garden

0.10

14 Repairs to Electrical Installation to Health Centre at L.R.Nagar 0.4015 Providing Submersible pump set and Electrical Accessories to A.T. Hally

community Hall0.10

16 Repairs to Submersible pump at to A.T. Hally community Hall 0.1017 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,Shanthinagar0.10

18 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., A.T.Halli

0.10

19 Annual Maintenance of DG Set and electrical installation at Maternity home at Shanthinagara for the year 2007-08

0.10

20 Repairs to existing DG Set and electrical installation at Maternity home at Shanthinagara

0.10

21 Providing Distribution Panel Board to Maternity Home Shanthi Nagar 0.10

8

32 8.00

TOTAL

159

Page 166: Programme_Of_Works_2008-2009

22 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

23 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

24 Annual maintenance contract of D.G. Set and Electrical Installation at Maternity home Austin Town for the year 2007-08

0.50

25 Repairs to Electrical Installations at Maternity Home Austin Town 0.1026 Repairs to Submersible pump at Maternity home at Austin Town 0.1027 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

28 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

29 Repairs to Submersible Pump at Doopana Halli 0.1030 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

31 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

32 Repairs to Electrical Installations at Health Centre Kodihalli 0.1033 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

34 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

35 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

36 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

37 Annual Maintenance contract of D.G. Set and Electrical Installation at Maternity home Jogupalya for the year 2007-08

0.50

38 Repairs to Existing DG set andElectrical Installations at Maternity Home Ulsoor 0.40

39 Supplying AH Batteries to DG Set at Maternity Home Ulsoor 0.1040 Repairs to Electrical installation Jogu Palya Community hall 1.0041 Providing Submersible pump set and Electrical Accessories at Jogu Palya

Community hall0.50

42 Repairs to Submersible Pumps at Jogu Palya Community hall 0.1043 Repairs to Submersible pump at Maternity home at Jogu Palya 0.1044 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

45 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

46 Annual Maintenance contract of 180KVA D.G. Set at Public Utility Building for the year 2008-09

0.60

47 Annual Maintenance contract of Air-condition Equipment at D.C. East office for the year 2008-09

0.10

48 Annual Maintenance contract of lifts M/c No ME 1911 at Public Utility Building for the year 2008-09

3.00

49 Annual Maintenance contract of lifts M/c No ME 1912 at Public Utility Building for the year 2008-09

3.00

50 Annual Maintenance contract of lifts M/c No ME 1913 at Public Utility Building for the year 2008-09

3.00

51 Annual Maintenance contract of lifts M/c No ME 1914 at Public Utility Building for the year 2008-09

3.00

160

Page 167: Programme_Of_Works_2008-2009

52 Annual Maintenance contract of lifts M/c No ME 1915 at Public Utility Building for the year 2008-09

3.00

50 Annual Maintenance Contract of Electrical Installation to Public Utility Buildingand Mayohall Office Complex for the Year 2008-09

3.00

51 Repairs to Submersible Pumps at PU Building 0.1052 Providing Oil Filtering for transformer –1 at PUB 0.1053 Providing Oil Filtering for transformer –2 at PUB 0.1054 Providing Distribution Panel Boards to Tower Block at PU Building 20.0055 Providing Oil Filtering for transformer at BBMP Head office 0.1056 Providing Oil Filtering for transformer at Modern Council hall 0.1057 Providing UG cable and park lightings to swimming pool park at head office

premises1.50

58 Providing UG cable to Kempegowda park opposite Head office building 1.0059 Improvements to Electrical installation to health center at Hebbal 0.1060 Annual Maintenance Contract of Internal Telephone Exchange at Head office

Building for the year 2008-091.00

61 Construction of Generator Room at Modern Council Hall 6.5062 Annual Maintenance Contract of Head Office Building for the year 2008-09 3.0063 Annual Maintenance Contract of Air Condition equipments at Head Office

Building for the year 2008-092.00

64 Annual Maintenance Contract of Air Condition equipments at Modern Council Hall for the year 2008-09

1.00

65 Annual Maintenance Contract of VHF Wireless equipments Installed at BMP Officers Vehicles Payable to M/s Keonics for the year 2008-09

3.50

66 Annual Maintenance Contract of Public Under systems at Modern Council Hall for the year 2008-09

0.50

67 Annual Maintenance Contract of Lifts at Modern Council hall for the year 2008-09

0.80

68 Annual Maintenance Contract of lift at Head office Building for the year 2008-09

0.50

69 Annual Maintenance Contract of 125 KVA D.G. Set Including Operator Charges at Head office Building for the year 2008-09

0.50

70 Annual Maintenance Contract of 180KVA D.G. Set at Modern Council hall Building for the year 2008-

0.70

71 Annual Maintenance Contract of Electrical Installation at Modern Council Hall for the year 2008-09

3.60

72 Annual Maintenance Contract of BBMP Quarters at S.R. Nagar 0.5073 Providing Submersible pump set and Electrical Accessories to 7th Cross Pump

house S.R.Nagar0.50

74 Providing Submersible pump set and Electrical Accessories to 11th Cross Pump house S.R.Nagar

0.50

75 Providing Submersible pump set and Electrical Accessories to Head office Building

5.00

76 Providing Submersible pump set and Electrical Accessories to Modern Council Hall

5.00

77 Providing Acoustic enclosure to Modern council hall DG set 2.2578 Repairs to Electrical Installation in Various Chambers BBMP Head office

building Ground Floor0.10

79 Repairs to Electrical Installation in Various Chambers BBMP Head office building First Floor

0.10

80 Repairs to Electrical Installation in Various Chambers BBMP Annex building Ground Floor

0.10

161

Page 168: Programme_Of_Works_2008-2009

81 Repairs to Electrical Installation in Various Chambers BBMP Annex building First Floor

0.10

82 Repairs to Electrical Installation in Various Chambers BBMP Annex building Second Floor

0.10

83 Repairs to Electrical Installation in Various Chambers Modern Council Hall Ground Floor

0.10

84 Repairs to Electrical Installation in Various Chambers Modern Council Hall First Floor

0.10

85 Repairs to Electrical Installation in Various Chambers Modern Council Hall Second Floor

0.10

86 Repairs to Electrical Installation in Various Chambers Modern Council Hall Third Floor

0.10

87 Electrical Repairs and Installations to Lift Room Modern Council Hall 0.1088 Electrical Repairs and Installations to Union Office 0.1089 Electrical Repairs and Installations to Lift Room BBMP Head office 0.1090 Providing Electrical Fixtures to Basement Floor at Modern Council Hall 2.0091 Repairs to Air Condition Equipment at Telephone exchange Room 0.3092 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc., at S.R.Nagar 0.10

93 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., at Kumara Krupa East

0.10

94 Providing Yard Lighting at BBMP Head Office 5.0095 Providing Submersible pump set and Electrical Accessories to Mission road

BBMP Quarters 0.50

96 Repairs to Submersible pump at Mission road BBMP Quarters 0.1097 Annual Maintenance Contract of Electrical Installations at North East office 1.0098 Providing Electrification and Electrical Accessories to North East Office 2.00

Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

Vasanthanagar 3rd Main, 8th cross, Mount Carmel Road100 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,at Vasanthanagar 1st Main, 2nd Main, 6th Main,0.10

101 Providing Electrical accessories to madammatemple Rajivgandhi colony 0.10102 Providing Submersible pump set and Electrical Accessories to Vasanth Nagar

Dobhi ghat 0.50

103 Repairs to Submersible pump at vasanth nagar Dobhi ghat 0.10104 Providing Submersible pump set and Electrical Accessories to North-East Office 0.50

105 Repairs to Submersible pump at North-East Office 0.10106 Providing Electrical accessories to Nursery school Central bazaar street 0.10107 Providing Electrification to Dispensary Road Girls High School 1.00108 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc., Central Street, Commercial Street, Narayan Pillai Street

0.10

109 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Broadway Road, Slater ‘A’ Street, Slater ‘E’

0.10

110 Providing Submersible pump set and Electrical Accessories to Russel market 0.50111 Repairs to Submersible pump at Russel Market 0.10112 Repairs to Submersible pump at Dispensary Road Girls high school 0.10113 Repairs to Electrical installation at Thimmaiaha Road Maternity Home 0.10114 Repairs to Submersible pump at Thimmaiaha Road Maternity Home 0.10

99

162

Page 169: Programme_Of_Works_2008-2009

115 Supply and fixing street light wooden switch box with 0.10necessary fixing items such as clamps, bolts, nuts etc.,

116 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

117 Annual Maintenance Contract of Electrical installation & D.G.set at Thimmaiah Maternity Home

0.50

118 Providing Electrical Installation to Girls High School at thimmaiaha Road 0.10119 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

120 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

121 Repairs to Electrical installation to Coir Centre at Ulsoor 0.10122 Repairs to Electrical installation to Community Hall at Ulsoor 0.10123 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

124 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

125 Repairs to Electrical installation at Health Centre at Murphy Town 0.10126 Repairs to Electrical installation at Ward Office at Murphy Town 0.10127 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

128 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

129 Repairs to Electrical installation to Health Center C.V.Raman nagar 0.10130 Repairs to Submersible pump at to Health Center C.V.Raman nagar 0.10131 Repairs to Electrical installation to Health Center BenaganaHally 0.10132 Repairs to Submersible pump at to Health Center BenaganaHally 0.10133 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

134 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

135 Repairs to Electrical installation to Maternity home Sarwagna Nagara 0.10136 Repairs to Submersible pump at Maternity home Sarwagna Nagara 0.10137 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

138 Repairs to Electrical installation at ARO office Building Sarwagna nagar 0.10139 Repairs to Electrical installation at health office Sarwagna Nagara 0.10140 Repairs to Electrical installation to Community hall Sarwagna Nagara 0.10141 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

142 Providing Distribution Panel Board, New Wirings and repairs to DG Set to Maternity home Sarwagna nagar

3.50

143 Annual Maintenance Contract Electrical installation & Engaging with wiremen, Helpers, Sweepers, Security to Electrical Crematorium & Maintenance of 180 KVA DG Set & Furnace, Furnace Panel & Scrubbers at Kallahalli Crematorium

10.00

144 Repairs to pumpset to Dhobi ghat at Lazzer Road Maruthi Sevanagar 0.10145 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

146 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

163

Page 170: Programme_Of_Works_2008-2009

147 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

148 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

149 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

150 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

151 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

152 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

153 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., A.K. Colony, Pillanna Garden

0.10

154 Providing Electrical Accessories to Sagayapuram dispensary 0.10155 Providing Electrical Accessories to Sagayapuram Health Centre 0.10156 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc., Old Bagalur Road0.10

157 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Pulikeshinagar.

0.10

158 Providing Electrical accessories to Nursery school Williams town 0.10159 Providing Electrical accessories to Nursery school Gandhigrama 0.10160 Providing Electrification and electrical accessories to Community hall Ward no-

912.00

161 Providing Electrical accessories to Cleave Land town Girls High school 0.10162 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,Cook town road0.10

163 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc., Rayaapa Road, MRS Palya

0.10

Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

Maraapa Thota, Sannappa Block, Munni Reddy Palya165 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc., Srinivasnagar, Bacchappa Lane, Goa Garden Maddina

0.10

166 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

167 Annual Maintenance Contract of Electrical installation & D.G.set at P.G. Halli Maternity Home

0.50

168 Providing Panel & Electrical Accessories to D.J. Halli Maternity Home 2.50169 Repairs to Submersible pump at Maternity home DJ hally 0.10170 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

171 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

172 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

173 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

174 Shifting of Tubular poles at Dinnur Main Road due to Traffic Bottle Neck 0.10175 Shifting of Tubular Pole at AMC Road Sulthana Palya Near Govt. School 0.10

164

164

Page 171: Programme_Of_Works_2008-2009

176 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

Anandnagar, Cholanagar,177 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,Hebbal, V Nagennahalli0.10

178 Providing Panel Board at Nagennahalli Main Road 0.10179 Annual Maintenance Contract Electrical installation & Engaging with wiremen,

Helpers, Sweepers, Security to Electrical Crematorium & Maintenance of 180 KVA DG Set & Furnace, Furnace Panel & Scrubbers at Hebbal Crematorium

10.00

180 Providing Park lightings to Near Adarsha School 1.00181 Providing park lightings Park at 14th Cross R.T.Nagar 1.00182 Providing Shamiyana fittings to Ward Office Park 0.10183 Providing park lightings 5th main R.T.Nagar 0.10184 Repairs to Submersible pump at Maternity home JC Nagara 0.10185 Annual Maintenance Contract of Electrical installation & D.G.set at J.C Nagar

Maternity Home0.50

186 Providing Panel & Electrical Accessories to J.C Nagar Maternity Home 2.50187 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

188 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

189 Providing Panel Board to Devegowda Road High Mast 0.10190 Providing ACSR Control Wire to 1st Main 1st Block R.T Nagar 0.10191 Providing ACSR Control Wire to P & T Colony 0.10192 Providing ACSR Control Wire to 1st A Cross Dinnur Main Road Ex-Service

Man Colony0.10

193 Shifting of Tubular pole and providing fluid lights play ground nearLakshmidevamma Park to Ganganagar

2.00

194 Providing Park lights to Lakshmidevamma Park to Ganganagar 2.00195 Repairs to Submersible pump at Maternity home ganga Nagara 0.10196 Annual Maintenance Contract of Electrical installation & D.G.set at Ganganagar

Maternity Home0.50

197 Providing Panel Board to Ganganagar Maternity Home 2.30198 Providing Electrical Wiring to Ganganagar Maternity Home 0.10199 Providing Electrical accessories to Ganganagar Maternity Home 0.10200 Providing ACSR Control Wire to Lakshammaiah Block 11th Cross R.T.Nagar 0.10

201 Providing ACSR Control Wire to 12th Cross RBI Colony R.T.Nagar 0.10202 Providing ACSR Control Wire to 6th Main HMT Layout R.T. Nagar 0.10203 Providing ACSR Control Wire to Muninajappa Block 8th Cross 0.10204 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc.,0.10

205 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

206 Providing ug cable & fittings to HMT l/o park 1.50207 Providing Shamiyana fittings to Aramane Nagara Park 0.10208 Providing Park lightings to Kempe Gowda Tower Park 5.00209 Repairs to Submersible pump at Maternity home PG Hally 0.10210 Supply and fixing street light wooden switch box with necessary fixing items

such as clamps, bolts, nuts etc., Aramanenagara, Sadashivanagara0.10

165

Page 172: Programme_Of_Works_2008-2009

211 Supply and fixing street light wooden switch box with necessary fixing items such as clamps, bolts, nuts etc.,

0.10

212 Providing Panel Board Opp CPRI BEML Road 0.10213 Providing Panel Board in Mekhri Circle 0.10214 Providing Panel Board to High Mast at 180 Bus Stop Ganganagar 0.10215 Providing ACSR Control Wire to 18th Cross Sadashivanagar 0.10216 Providing ACSR Control Wire to 2nd Main Sadashivanagar 0.10217 Providing Passage lighting to P.G.Halli Maternity Home 0.10218 Providing Panel, Electrical Wiring & Electrical Accessories P.G Halli Maternity

Home3.50

219 Annual Maintenance Contract of Electrical installation & D.G.set at P.G. Halli Maternity Home

0.50

TOTAL 172.15

TEMPORARY ILLUMINATION ON SPECIAL OCCASSIONS

Sl No Name of the work Estimated cost1 Providing Temporary Illumination in Connection with Disposing of Ganesha

Prathima in Ulsoor lake During Ganesh chathurthi 1.29

2 Providing Temporary Illumination of BBMP buildings of East Division in connection with Various Festivals

1.00

3 Providing Temporary Illumination of BBMP buildings of East Division in connection with Various Festivals

2.00

4 Providing Temporary Illumination in connection with Maha Shivrathri at Shanthi nagar Burrial Ground

0.20

5 Providing Temporary Illumination in connection with Maha Shivrathri at Austin Town Burrial Ground

0.10

6 Arrranging Temporary illumination connection with Sale of Crackers at Ashokanagar Play Ground

0.10

7 Arrranging Temporary illumination connection with Sale of Crackers at Tasker Town Play Ground

0.10

8 Arrranging Temporary illumination connection with Sale of Crackers at Indiranagar Play Ground

0.10

9 Arrranging Temporary illumination connection with Sale of Crackers at Jaymahal Play Ground

0.10

10 Arrranging Temporary illumination connection with Sale of Crackers at Vyali Kaval Play Ground

0.10

TOTAL 5.09Grand Total 4997.50

166

Page 173: Programme_Of_Works_2008-2009

Sl.No Name of Road Amount in Lakhs

1 Widening and Improvements to Palace Road 497.002 Widening and Improvements to Race Course Road 391.003 Widening and Improvements to Sheshadri Road 344.004 Providing utility cable ducts and chambers for BESCOM and

other utility cables in Palace Road on East side from 0.00km to 1.35km in B’lore

98.00

5 Providing utility cable ducts and chambers for BESCOM and other utility cables in Palace Road on West side from 0.00km to 1.35km in B’lore

98.00

6 Providing utility cable ducts and chambers for BESCOM and other utility cables in Palace Road from 1.35km to 1.75km in B’lore (Drugs control office to High Ground Police Station)

58.00

7 Providing utility cable ducts and chambers for BESCOM and other utility cables in Sheshadri Road from Anand Rao Circle Fly over to K.R.Circle to on LHS in B’lore

76.00

8 Providing utility cable ducts and chambers for BESCOM and other utility cables in Sheshadri Road from Anand Rao Circle Fly over to K.R.Circle to on RHS in B’lore

76.00

9 Providing utility cable ducts and chambers for BESCOM and other utility cables in Kasturaba Road from Siddalingaiah Circle to Queen’s Statue on RHS in B’lore

49.00

10 Providing utility cable ducts and chambers for BESCOM and other utility cables in Kasturaba Road from Siddalingaiah Circle to Queen’s Statue on LHS in B’lore

49.00

11 Dismantling existing compound in front of turf club from Km 0.35 to Km 1.00

7.00

12 Widening and Improvements to Hosur-Luskar Road 500.0013 Widening and Improvements to Kasturba Road. 171.0014 Widening and Improvements to Airport Road. 300.0015 Widening and Improvements to Jayamahal Road. 250.0016 Widening and Improvements to Nruptatunga Road. 200.0017 Widening and Improvements to Hosur Road from Lalbagh Main

Gate to Yankey factory(via Diary circle).150.00

18 Widening and Improvements to Mysore Road from Sirsi Circle to Ring Road.

200.00

Executive EngineerRoads Widening Division

Programme Of Works (2008-09)

I Capital work

MAJOR ROADSDetails of Programme of works for the year 2008-09

(Works proposed for 08-09)

167

Page 174: Programme_Of_Works_2008-2009

19 Widening and Improvements to Vedhana Veedhi from Goplagowda circle to K.R Circle.

100.00

20 Widening and Improvements to Lower Agaram Road from Hosmat hospital to National games Kormangala.

100.00

21 Widening and Improvements to Sarjapura Road from Kendriya Sadana Road to Ring Road Cross.

94.00

22 Widening and Improvements to Hennur Road from Pottery Road to Ring Road.

100.00

23 Widening and Improvements to Banaswadi Road and Wheeler Road (via Banaswadi) from St John Road to Ring Road.

92.00

Total 4000.00

Sl No. Name of the Work Est. Cost I

1) Preperation of DPR for Constuction of Underpass at HOSMAT Hospital Junction near FootBall Stadium 1.00

2) Preperation of DPR for Improvements to the Various Junctions in BBMP Limits 7.00

SUB TOTAL- I 8.00II

A. INFRASTRUCTURES, ROAD RELATED WORKS 1) Barricading to Footpath

1) Providing Barricading in East Zone 15.002) Providing Barricading in West Zone 10.003) Providing Barricading in South Zone 10.00

2)Installation, improvements, Central line & Kerbs Signage for Road Junctions / Painting 1) Providing Signages under the Juridiction of DCP ( East) 10.002) Providing Signages under the Juridiction of DCP ( West ) 10.00

3) Other Structures 1) East Zone 20.002) West Zone 15.003) South Zone 15.00

4) Providing Concerete medians & Kerbs 1)Providing & fixing Pre-cast concrete Road Divider for the Identified Road & Junctions in East Zone 5.002) Providing & fixing Pre-cast concrete Road Divider for the Identified Road & Junctions in West Zone 5.003)Providing & fixing Pre-cast concrete Road Divider for the Identified Road & Junctions in South Zone 5.004)Providing & fixing Pre-cast concrete Road Divider for the Identified Road & Junctions in New Zones 10.00

Traffic Engineering Cell Programme Of Works - 2008-09 Amount in Lakhs

CONSULTANCY SERVICES FOR PREPERATION OF DPR

CAPITAL WORKS

168

Page 175: Programme_Of_Works_2008-2009

5) Widening of Roads & Development Works 1) Widening of Jayamahal Road from Mekhri Circle to Doordarshan 40.002) Widening of Junctions in Bruhat Bangalore Mahanagara Palike Limits 25.00

6) Improvements to Junctions & Intersectionsidentified. 1000.00B) ROAD SAFETY MEASURES

7) High Raised Medians & other safety equipments 40.008) Blinkers & Safety Equipments 20.009) One - Way Traffic

1) Improvements to Nanjappa Circle 10.002) Improvements to Mathikere Circle 7.003) Improvements to Devegowda Road Junction 5.004) Police requirements Works 15.00

10) Removal fo Road Constructions 1) As per Police requirements 15.002) Rectification & removal of unauthorised Humps 35.00

11) Road Humps1) Construction of Road Humps in BBMP Limits 20.00

12) Raised Pedestrian Crossings1) Forming Raised Pedestrian Crossing under Jurisdiction of DCP ( East) 20.002) Forming Raised Pedestrian Crossing under Jurisdiction of DCP ( West) 20.003)) Forming Raised Pedestrian Crossing New Zones. 10.00

SUB TOTAL-II 1412.00III

1) Barricading 1) Painting & Repairs to the Existing Damaged Barricading in Bruhath Bangalore Mahanagara Palike Limits 10.00

2) Medians & Kerbs1) Providing & Repairing the Existing Median & Kerbs including Painting 10.00

3) Road Marking1) Providing Lane marking with Thermo-Plastic Painting 5.002)Providing Retro-Reflective Painting to the Existing Medians. 5.00

SUB TOTAL-III 30.00GRAND TOTAL 1450.00

MAINTENANCE WORKS

169

Page 176: Programme_Of_Works_2008-2009

Sl.No Name of the work Estimated Amount

1Strengthening and Rehabilitation works of 7 Roads in Bangalorecity under KMRP World Bank Loan Assistance KMRP Package -1 1000

2Strengthening and Rehabilitation works of 14 Roads inBangalore city under KMRP World Bank Loan AssistanceKMRP Package -2 2000

3Strengthening and Rehabilitation works of 6 Roads in Bangalorecity under KMRP World Bank Loan Assistance KMRP Package -3 1000

4Strengthening and Rehabilitation works of 13 Roads inBangalore city under KMRP World Bank Loan AssistanceKMRP Package -4 1700

TOTAL 5700.00

Sl.No Name of the workI - CAPITAL WORKS

A Consultancy Services

1 Investigation ,Preparation of documents, vediographic and preparation of DPR 10.00

Total Amount 10.00B Construction Works

1 Lowering the segments, Preparation of bed other allied works for surface pass near B.D.A Junction. 21.00

2 Construction of approach ramps to the surface pass at B.D.A Office junction using pre cast RCC box segments 72.00

3 Lowering the segments, Preparation of bed allied works for underpass in front of K.A.I.C on Bellary Road

3 Lowering the segments for pedestrian subway at Hebbal Police Station 25.50

4 Lowering the segments, Preparation of bed allied works for pedestrian underpass near Anandanagar Junction 12.50

5 Widening of foothpath along Sankey Road and Cunningham road junction 16.00

6 Providng Trenchless cutting to lay 300mm dia PVC drainage pipe at Windsor Manor, Sanjayanagar and Cunningham Junction 21.50

7 Ring Road and Vidhya Peeta Road Junction 80.00

KMRPProgramme Of Works (2008-09)

(Rs. In Lakhs)

I - CAPITAL WORKS

Special Cell for Underpass Programme Of Works (2008-09)

170

Page 177: Programme_Of_Works_2008-2009

8 Ring Road near Food World Junction 80.009 Ring Road near Kamaya Theatre Junction 80.00

10 Ring Road near Kanakapura Road Junction 80.0011 Ring Road near Bannergatta Road Junction 72.0012 Ring Road near J.P Nagar 6th Phase Junction 75.0013 NH4 and Hesargatta Road Junction 70.0014 G.P.O Junction 75.0015 Coffee Board Junction 75.0016 Balekundri Circle Junction 73.0017 Shivananda Stores Junction 75.0018 Race course road Junction 71.0019 Near Town Hall Junction 75.0020 Hudson Circle Junction 75.0021 Forum junction on Hosur Road 75.0022 Near Housing Board Bus Stop on Magadi road 75.0023 On Mysore Road near Timber Yard layout 75.0024 Near Rajajinagar Underpass 75.0025 Lalbagh Road and Siddaiaha Road Junction near Urvashi theatre 75.0026 On West of Chord near fire Station 75.0027 ACS Centre near India Garage 75.0028 Airport Road Junction and Road to M G Road 75.0029 Town Hall Junction 75.0030 Near Vidhyardhavaka Sangha, Rajajinagar 75.0031 Near Kannada Bhavan on J C road 75.0032 Jaimuni Rao Circle on Magadi Road 85.0033 On Dickenson road near Manipal Centre 67.5034 Near Nayandhahalli Bus Stop on Mysore Road 75.0035 Shankara Math (Kurabarahalli) 75.0036 Kumble Circle on M.G road 75.0037 Siddiahalingaiah Circle 75.0038 On Jayamahal Road near Doordarshan 69.0039 Ramakrishna Ashrama Circle 80.0040 Subbaiah Circle on Mission road 75.00

41 Bannerghatta Road and Thilak Nagar Road Junction near Sagar Apollo Hospital 82.00

42 Kodigehalli Cross on NH-7 75.0043 Near Mico Factory gate on Banerghatta Road 81.00

Total Amount 2964.00

C PROJECT MANAGEMENT CONSULTANCY CHARGES

Total Amount 5.00

D UTILITY SHIFTING CHARGESTotal Amount 1.00

171

Page 178: Programme_Of_Works_2008-2009

II - MAINTENANCE WORKS

1 For the junctions mentioned in capital works in the spill over statement 20.00

Total Amount 20.00GRAND TOTAL 3000.00

Sl. No. Name of work Estimated cost

1 Conducting B.B.D ,Traffic studies and necessary investigations 51.95Sub Total -I 51.95

1 Rehabilitation and Strengthening of South End Road from SouthEnd Circle to Netkalappa Circle Ch: 0 to 1.0km .

99.00

2 Rehabilitation and Strengthening of South End Road from SouthEnd Circle to Netkalappa Circle Ch: 1.0 to 2.0km .

98.00

3 Rehabilitation and Strengthening of South End Road from SouthEnd Circle to Netkalappa Circle Ch: 2.0 to 3.0km .

99.00

4 Rehabilitation and Strengthening of 40" Road Munneshwarablock to Hosakerehalli road

99.50

5 Rehabilitation and Strengthening of road from Hosakerehalli roadto ring road.

99.80

6 Rehabilitation and Strengthening of 40 feet road AvalahalliMuneshwara block from 50 feet road to 1st main road Timberyard Ch. 0.0 to 1.0km.

98.50

7 Rehabilitation and Strengthening of 40 feet road AvalahalliMuneshwara block from 50 feet road to 1st main road Timberyard Ch. 1.0 to 2.1km.

99.00

8 Rehabilitation and Strengthening of 40 feet road AvalahalliMuneshwara block from 50 feet road to 1st main road Timberyard Ch. 2.1 to 3.1km.

99.50

9 Rehabilitation and Strengthening of 22nd Main Road from 45thCross to Swagath theatre Ch: 0 to 1.0km.

98.00

10 Rehabilitation and Strengthening of 22nd Main Road from 45thCross to Swagath theatre Ch: 1.0 to 2.1km.

98.00

11 Rehabilitation and Strengthening of 22nd Main Road from 45thCross to Swagath theatre Ch: 2.1 to 3.3km.

99.00

12 Rehabilitation and Strengthening of Sangolli Rayanna Road fromNagarbhavi Main Road junction to Vrishabhavathi valley.

99.20

Major Roads DivisionProgramme Of Works (2008-09)

(Amount in lakhs)

I - CAPITAL WORKS

172

Page 179: Programme_Of_Works_2008-2009

13 Rehabilitation and Strengthening of Nagarbhavi Main Road fromShoba hospital to Nagarbhavi Circle.

99.60

14 Rehabilitation and Strengthening of Service Road (W.O.C)Vijayanagar from pipeline road to 5th Main RPC layout.

99.50

15 Rehabilitation and Strengthening of Service Road (Magadi Road)From Prashanth Nagar Main Road to 1st Cross Govindraj nagar.

99.70

16 Rehabilitation and Strengthening of 1st Cross Road MC layoutfrom Magadi Road to Chord Road

98.80

17 Rehabilitation and Strengthening of Mathikere Main Road fromC.V.Raman road to B.E.L Circle Ch: 0 to 0.9km.

98.00

18 Rehabilitation and Strengthening of Mathikere Main Road fromC.V.Raman road to B.E.L Circle Ch: 0.9 to 2.0km.

99.00

19 Rehabilitation and Strengthening of Mathikere Main Road fromC.V.Raman road to B.E.L Circle Ch:2.0 to 3.0km.

98.00

20 Rehabilitation and Strengthening of Mathikere Main Road fromC.V.Raman road to B.E.L Circle Ch:3.0 to 4.2km.

99.00

21 Rehabilitation and Strengthening of Jallahalli Road (West) MainRoad from Ayappa temple to Gangamma Circle Ch: 0 to0.9km..

98.50

22 Rehabilitation and Strengthening of Jallahalli Road (West) MainRoad from Ayappa temple to Gangamma Circle Ch: 0.9 to1.10km..

98.75

23 Rehabilitation and Strengthening of Jallahalli Road (West) MainRoad from Ayappa temple to Gangamma Circle Ch: 1.10 to3.0km.

99.00

24 Rehabilitation and Strengthening of Jallahalli Road (East) MainRoad from Jallahalli Circle Gangamma Circle Ch : 0 to1.20km .

98.50

25 Rehabilitation and Strengthening of Jallahalli Road (East) MainRoad from Jallahalli Circle Gangamma Circle Ch : 1.20 to2.20 km .

98.00

26 Rehabilitation and Strengthening of Jallahalli Road (East) MainRoad from Jallahalli Circle Gangamma Circle Ch : 2.20to 3.30 km .

99.00

27 Rehabilitation and Strengthening of HMT Main Road from SBIbank to HMT factory Ch: 0 to 0.9km

98.50

28 Rehabilitation and Strengthening of HMT Main Road from SBIbank to HMT factory Ch: 0.9 to 2.1km

98.00

29 Rehabilitation and Strengthening of HMT Main Road from SBIbank to HMT factory Ch: 2.1 to 3.2km

99.00

30 Rehabilitation and Strengthening of Buddha Vihar Road &M.M.Road from Asay Road to M.M.Road Ch: 0 to 0.9km

98.00

173

Page 180: Programme_Of_Works_2008-2009

31 Rehabilitation and Strengthening of Buddha Vihar Road &M.M.Road from Asay Road to M.M.Road Ch: 0.9 to 1.9km

98.00

32 Rehabilitation and Strengthening of Buddha Vihar Road &M.M.Road from Asay Road to M.M.Road Ch: 1.9 to 3.1km

99.00

33 Rehabilitation and Strengthening of Lingarajapurum Main Roadfrom Pottery Road to Flyover Ch: 0 to 0.9km.

98.00

34 Rehabilitation and Strengthening of Lingarajapurum Main Roadfrom Pottery Road to Flyover Ch: 0.9 to 1.8km.

98.00

35 Rehabilitation and Strengthening of Lingarajapurum Main Roadfrom Pottery Road to Flyover Ch: 1.80 to 2.60km.

99.00

36 Rehabilitation and Strengthening of Alexander Road inRichmond Town area Ch: 0 to 0.9km.

98.00

37 Rehabilitation and Strengthening of Alexander Road inRichmond Town area Ch: 0.9 to 1.90km.

98.50

38 Rehabilitation and Strengthening of Alexander Road inRichmond Town area Ch: 1.90 to 3.0km.

99.00

39 Rehabilitation and Strengthening of selected reaches kadugodanahalli main road from tannery road junction to ring road Ch:0 to 1.0km

98.50

40 Rehabilitation and Strengthening of selected reaches kadugodanahalli main road from tannery road junction to ring road Ch:1.0 to 1.9km

98.70

Sub Total -II 3948.05Grand Total (I+II) 4000.00

Sl. No. Name of the Work Estimated Cost

A. Consultancy Charges for preparation of DPR1 Providing Consultancy service for preparation of DPR for

improvements to Major Road Special (High Density corridors) 50.00

B.Construction WorksPackage - 1Improvements to Chowdaiah Road Road from Basaveshwara circle to Minsk Square to M.G. Road

Cubbon Road From Minsk square to M.G Road L.H. Road:- Basaveshwara Circle to L.H. Road

Package - 2Improvements to Airport Road Trinity Circle to Domlore

Programme Of Works - 2008-09

1

100.00

2100.00

174

Page 181: Programme_Of_Works_2008-2009

Package - 3Improvements to Airport Road Domlore to H.A.L main factory

Package - 4Improvements to Dr. Ambedkar Road Post office road i.e Mysore bank circle to Balekundri Nrupathunga Road - K.R. circle to police corner

Package - 5Improvements toQueen's Road Mahathma Gandhi Circle Minsk Square - Balekundri circle to join Miller roadMiller road - Basaveshwara circle to contonment railway station

Package - 6Improvements to Palace Road Mysore Bank Circle to Choudaih Road (High Grounds Police Station)

Package - 7Improvements to Chowdaih Road Basaveshwara circle to Cauvery JunctionRamana Maharshi Main RoadBellary Main Road - Mekri Circle to upto Hebbal Fly over

Package - 8Improvements to Kumara Krupa Road Race Cource road to Sankey Road Race Course Road - ananda Rao Circle to Basaveshwara Circle

Package - 9Improvements to Kasturaba Main road Hudson Circle to Mahatma Gandhi circleMahatma Gandhi road - Mahathma Gandhi circle to Trinity circlePackage - 10Improvements toRoad from palace road to Legislative House Brigade Road - M.G. Road to Shooley Circle

Museum Road Saint mark's Road

3100.00

4

100.00

5

100.00

6

20.00

7

20.00

8

100.00

9

20.00

10

20.00

175

Page 182: Programme_Of_Works_2008-2009

Package - 11Improvements to Hosur Main Road Hosur Main Road shooley circle to Madivala Police Station

Package- 12Construction of Major Road zoneOffice building (I&II floor) in the premises of BBMP

Package-13Providing interiors and furnishing to the Ground, Ist and Iindfloor of Major Road zone office building

Sub-Total I 950.00

1 Annual maintenance for up keeping of Major roads Special (High Density Corridors) for year 2008-09 -East Zone 25.00

2 Annual maintenance for up keeping of Major roads Special (High Density Corridors) for year 2008-09 -West Zone 25.00

Sub-Total II 50.00GRAND TOTAL (I+II) 1000.00

1 Approach Roads to Villages in each Zone 1500.002 Approach Roads to Banasavadi to Bileshivale Cross 500.00

CE PROJECTS - 1Details of Programme of works for the year 2008-09

(Works proposed for 08-09)

Sl.no Desription of work Estimated Cost

1 For preparation of feasibility and DPR for construction of ROBs and RUBs 50.00

2 Preparation of feasibility report and construction of elevated roads 50.00

3 Development of Lakkasandra Quarry pit to sports complex 3.00

4 Construction of sports complex at MICO layout 8th Main BTM 2 nd stage 3.00

5 Construction of Multipurpose complex at Krumbiegal Road. 1.00

6Grade Separator at Pedestrian subway using RCC precast elements at Commiserate road and Magrath road (At Garudamahal)

3.00

7 For Elevated road from Yeshwanthpur to NHAI corridor on Tumkur road 5.00

8 Grade Seperator at Ring Road and BEL Road Junction 5.00

1120.00

12100.00

13100.00

Programme of works for the year 2008-09Capital Works

Rupees in Lakhs

CONSULTANCY SERVICES FOR PREPARATION OF DPR

176

Page 183: Programme_Of_Works_2008-2009

9 Grade separator at Junction of Ring Road and Kanakpura roadintegrating Banashankari Temple Junction 5.00

10 Grade separator at Junction of Ring Road and 16th Main BTMLayout 5.00

11 Sub way at 45th cross near Ragigudda Temple in 9th BlockJayanagar in Ward No 58 5.00

12 RCC pre- cast Element under pass at 24th Main and 15th cross atDollars Colony J P Nagar in ward No 58 3.00

13 RCC pre- cast Element under pass at 28th Main and 45th Crossin 9th Block Jayanagar ward 58 1.00

14 RCC pre- cast Element under pass at 29th main in B T M IIStage 3.00

15RCC pre- cast Element under pass at 11th Main Road and 45thcross in 5th Block Jayanagar near Raghavendraswamy temple 3.00

16 RCC pre- cast Element under pass at Kamakya junction in wardNo 55 A 3.00

17 RCC pre- cast Element under pass at Junction of Ring Road andKathriguppe Circle in ward No 55 A 3.00

18 RCC pre- cast Element under pass at Junction of Ring Road andBank Colony Road in ward No 55 A 3.00

19RCC pre- cast Element under pass at the junction of West ofChord road and Road leading to Chandra Layout (Near PetrolBunk)

3.00

20 RCC pre- cast Element under pass at the junction of 10th CrossWilson Garden and Hosur Road 1.00

21 RCC pre- cast Element under pass at the junction of B D AComplex and Nagarabhavi Main road 3.00

22 RCC pre- cast Element under pass at the junction of Hosur roadand Koramangala main road opposite to Forum Mall 3.00

23 RCC pre- cast Element under pass at the junction ofSadhashivanagar police station . 1.50

24 RCC pre- cast Element under pass at the junction of M SRamaiah hospital. New BEL road 1.50

Total 167.00CONSTRUCTION WORK

25 Development of Lakkasandra Quarry pit to Sports Complex Phase II 100.00

26 Construction of RCC Retaining wall in Lakkasandra Quarry Pit 100.00

27 Construction of sports complex at MICO layout 8th Main BTM 2 nd stage 100.00

28 Construction of RCC road side drain in front of National collage Ground 75.00

29 Construction of Multipurpose complexat Krumbigal Road. 75.00

177

Page 184: Programme_Of_Works_2008-2009

30Grade Separator at Pedestrian subway using precast RCC elements at Commiserate road and Magrath road (At Garudamaal)

100.00

31 Elevated road from Yeshwanthpur to NHAI corridor on Tumkur road 100.00

32 Grade separator at Junction of Ring Road and Kanakpura roadintegrating Banashankari Temple Junction 50.00

33 Grade Separator/ Underpass or combination of both at Khoday circle 50.00

34 Mysore Elevated Road from Sirsi Circle to Kengeri on Outer ring road -10.2 KM 50.00

35 Underpass/ Grade Separator at Chennamma Circle 50.00

36 Underpass/ Grade Separator at Koramangala- Sarjapura (Kendriya Sadhana Junction) 50.00

37 Underpass/ Grade Separator Kalyanagar and Outer Ring Road junction 50.00

38 Underpass/ Grade Separator Lingarajpuram Road junction 50.00

39 Underpass/ Grade Separator Bannerghatta road and Outer Ring Road junction 50.00

40 Connecting Two Loop to existing Flyover near Central Silk board junction 50.00

41 Construction of Grade Separator at Koramangala 100 ft road and Inner ring road 50.00

42 Construction of Element under pass at 11th Main Road and 45thcross in 5th Block Jayanagar near Raghavendra swamy temple 50.00

43 Construction of Element under pass at Kamakya junction in wardNo 55 A 50.00

44 Construction of Element under pass at Junction of Ring Road andKathriguppe Circle in ward No 55 A 50.00

45 Construction of Element under pass at Junction of Ring Road andBank Colony Road in ward No 55 A 50.00

46Construction of Element under pass at the junction of West ofChord road and Road leading to Chandra Layout (Near PetrolBunk)

50.00

47 Construction of Element under pass at the junction of 10th CrossWilson Garden and Hosur Road 50.00

48 Construction of Element under pass at the junction of B D AComplex and Nagarabhavi Main road 50.00

49 Construction of Element under pass at the junction of Hosur roadand Koramangala main road opposite to Forum Mall 50.00

50 Construction of Element under pass at the junction ofSadhashivanagar police station . 50.00

178

Page 185: Programme_Of_Works_2008-2009

51 Construction of Element under pass at the junction of M SRamaiah hospital. New BEL road 50.00

52 Construction of open burning platform and additional works atconstruction of electric crematorium in chamrajapet near TR Mill 150.00

53 Construction of underpass using RCC precast elements atShivananda circle 50.00

54 Construction of underpass using RCC precast elements atjunction of Harekrishna road and Racecourse road junction 50.00

55 Construction of underpass using RCC precast elements atBannerghatta road and sagar appolo hospital road junction 50.00

56Construction of underpass using RCC precast elements at thejunction of ring road and road towards kumaraswamy layout(Dayananda Sagar engineering college road)

50.00

57 Elevated road in Town hall junction to south end circle 100.0058 Elevated road in Maharanis circle 55.0059 Elevated road in K.R.circle 55.0060 Elevated road in Hudson circle 55.00

61 Construction of road from 29th cross to Hosur Road alongMadivala tank bund to decongest traffic at Silk Board Junvtion 500.00

62 Construction of underpass using RCC precast elements atMarenahally Road and ring road junction near Lumbini Gardens 50.00

63 Construction of underpass using RCC precast elements atBanasawadi Police station Road and ring road junction 50.00

64 Elevated Road Using Structural Steel along JC Road 2000.00

65Formation and Widening of Link Road from Malleswaram toSeshadripuram 200.00

66Formation of Road behind Mantri Greens to link MalleswaramRailway Parallel Road 200.00

67 Elevated Road From Yeswantpur Circle to Rajajinagar 5000.00Total 10265.00

68Development of Lakkasandra Quarry pit to Sports Complex Phase II 10.00

69Construction of Sports complexl at MICO layout 8th Main BTM 2nd stage 8.00

70 Construction of Multipurpose complexat Krumbigal Road. 1.00

71Construction of Grade separator at Junction of Ring Road andKanakpura road integrating Banashankari Temple Junction 5.00

72Construction of Underpass/ Grade Separator at Maharani’s College Junction 5.00

73 Construction of Underpass/ Grade Separator at K.R.Circle 5.0074 Construction of Grade Separator/ Underpass or combination of

both at Khoday circle 5.0075 Construction of Mysore Elevated Road from Sirsi Circle to

Kengeri on Outer ring road 10 2 KM 5.0076 Construction of Underpass/ Grade Separator at Chennamma

Circle 5.00

Consultancy Services For Project Management

179

Page 186: Programme_Of_Works_2008-2009

77 Construction of Underpass/ Grade Separator at Hudson Circle 5.0078 Construction of Underpass/ Grade Separator at Koramangala-

Sarjapura (Kendriya Sadhana Junction) 5.00

79Construction of Underpass/ Grade Separator Kalyanagar and Outer Ring Road junction 5.00

80 Construction of Underpass/ Grade Separator Lingarajpuram Road junction 5.00

81 Construction of Underpass/ Grade Separator Bannerghatta road and Outer Ring Road junction 5.00

82 Construction of Connecting Two Loop to existing Flyover in Silk board junction 5.00

83 Construction of Grade Separator at Koramangala 100 ft road and Inner ring road 5.00

Total 84.00

84 ROB Nagavara 25.0085 ROB supply depo MES road, Jalahalli. 25.0086 ROB-RUB Kasturinagar 25.0087 RUB Bapujinagar -LC 5 25.0088 Construction of ROB - RUB at Allalsandra. 25.0089 Construction of ROB - RUB at Kodigehalli, Virupakshapura 25.0090 RUB Gangappa garden and Narasimiah compound 25.0091 RUB J.J. Nagar Shamanna garden.- LC 4 25.0094 RUB K.R.Puram near cable stayed bridge 25.00

95Construction of ROB at L.C.No-133, Jollarpet, Chennai. Railway line - Hoodi Devasandra road. 25.00

96 Construction of ROB at L.C.No-136 B, K.R.Pura. 25.0097 Improvements to existing ROB near IOC gate at Banasavadi 8.00

Total 283.00Grand total 10799.00

Sl.no Desription of work Estimated CostCONSULTANCY SERVICES FOR PREPARATION OF

DPR1 Engaging consultants for conducting BBD Test for preparation of

estimates for Ring road 1.00

TOTAL 1.00CONSTRUCTION WORK

2 Maintenance of Sirsi circle Flyover 100.00

3 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 0.00 to 1000.00 mts

100.00

4 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 1000.00 to 2000.00 mts

100.00

DEPOSIT CONTRIBITION WORKS WITH RAILWAYS

Maintanence WorksRupees in Lakhs

180

Page 187: Programme_Of_Works_2008-2009

5 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 2000.00 to 3000.00 mts

100.00

6 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 3000.00 to 4000.00 mts

100.00

7 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 4000.00 to 5000.00 mts

100.00

8 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 5000.00 to 6000.00 mts

100.00

9 Asphalting to Road fromRajarajeswarinagar Arch to Halagevadera hally (Uttarahally road) Chainage 6000.00 to 7000.00 mts

100.00

10 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 0.00 to 1000.00 mts

100.00

11 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 1000.00 to 2000.00 mts

100.00

12 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 2000.00 to 3000.00 mts

100.00

13 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 3000.00 to 4000.00 mts

100.00

14 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 4000.00 to 5000.00 mts

100.00

15 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 5000.00 to 6000.00 mts

100.00

16 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 6000.00 to 7000.00 mts

100.00

17 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 7000.00 to 8000.00 mts

100.00

18 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 8000.00 to 9000.00 mts

100.00

19 Asphalting to White field Road from K. R. Puram Hanging bridge to Hope farm Junction via Hudi Junction Chainage 9000.00 to 10000.00 mts

100.00

181

Page 188: Programme_Of_Works_2008-2009

20 Asphalting to BTS road from Double road to Bannergatta road. 99.90

21 Asphalting to Kruimbigal road from Lal bagh main gate to Lal bagh west gate 99.00

22Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout Ch: 7.40 to 9.80 KmLeft side carriage way ( Northern side)

99.50

23Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout Ch: 11.30 to 13.25Km Left side carriage way ( Northern side)

99.50

24Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout Ch: 13.25 to 14.00Km Left side carriage way (Northern side)

60.00

25Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout from Ch: 7.10 km to8.80 Km Right side carriage way (Southern side)

99.50

26

Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout from Ch: 8.80 km to10.00 Km & 11.30 to 11.80 km. Right side carriage way(Southern side)

99.50

27Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout from Ch: 11.80 kmto 13.50 Km Right side carriage way (Southern side)

99.50

28Asphalting to Ring Road from Mysore Road junction to SilkBoard junction via J.P.Nagar, B.T.M.layout from Ch: 13.50 kmto 14.00 Km Right side carriage way (Southern side)

50.00

TOTAL 2606.40

22 Construction, supervision, and project management of asphalting works 20.00

TOTAL 20.00GRAND TOTAL 2627.40

CONSULTANCY SERVICES FOR PROJECT MANAGEMENT

182

Page 189: Programme_Of_Works_2008-2009

Sl.no Desription of work Estimated Cost1 Back ward class packages ward No-93 Devarajeevanahalli 40.002 Back ward class packages ward No-96 Hebbal 40.003 Back ward class packages ward No-95 Kaval Byrasandra 40.004 Back ward class packages ward No-94 Kadugondanahalli 40.00

5 Back ward class packages ward No-84 ,83 Benniganahalli & C.V.Raman nagar 40.00

6 Construction of Dr. B.R. Ambedkar Bhavans in Zones 500.007 Construction of Pourakarmika Bhavana 100.00

Total 800.00Total

18% ProgrammeEnhanced Allocation to Reserved MLA Constituencies Under BBMP Jurisdiction(C.V.Raman Nagar, Anekal, Pulikeshi Nagar,MahadevaPura)

Grand Total of BBMP POW 72778.54

1 400.00

18 % GRANT WORKSRupees in Lakhs

183


Recommended