+ All Categories
Home > Documents > Project 15 DS413: Design Studio 413 May 9, 2012.

Project 15 DS413: Design Studio 413 May 9, 2012.

Date post: 19-Jan-2016
Category:
Upload: gwendolyn-douglas
View: 216 times
Download: 0 times
Share this document with a friend
Popular Tags:
14
Sustainable Residential Design Project Project 15 DS413: Design Studio 413 May 9, 2012
Transcript
Page 1: Project 15 DS413: Design Studio 413 May 9, 2012.

Sustainable Residential Design Project

Project 15DS413: Design Studio 413May 9, 2012

Page 2: Project 15 DS413: Design Studio 413 May 9, 2012.

Site Plan

Page 3: Project 15 DS413: Design Studio 413 May 9, 2012.

Coded Site Plan

Page 4: Project 15 DS413: Design Studio 413 May 9, 2012.

Coded Floor Plan

Page 5: Project 15 DS413: Design Studio 413 May 9, 2012.

3D View

Page 6: Project 15 DS413: Design Studio 413 May 9, 2012.

3D View

Page 7: Project 15 DS413: Design Studio 413 May 9, 2012.

Roofline Model

Animation

Page 8: Project 15 DS413: Design Studio 413 May 9, 2012.

1: Sustainable Site

• 1A: Prerequisite 1 Construction Activity Pollution Prevention

• 1B: Credit 1 Site Selection• The site is in an already developed area

• 1C: Credit 2 Development of Density and Community Density

• Densely populated and within a half mile of 10 basic services• Pedestrian access

• 1D: Credit 5.2 Site Development: Maximize Open Space

• 1E: Credit 7.1 Heat Island Effect: Non-Roof• Light colored pavers and roof material

Page 9: Project 15 DS413: Design Studio 413 May 9, 2012.

2: Water Efficiency

2A: Credit 1.1 Water Efficient Landscaping: Reduce by 50%

▪ Native Plants

2B: Credit 1.2 Water Efficient Landscaping: No Potable Water Use or No Irrigation

▪ Rain Harvesting System

2C: Credit 2: Innovative Wastewater Technologies▪ Low Flow Toilets

2D: Credit 3.1 Water Use Reduction 30 Percent▪ Rain Harvesting System with waterfall▪ Low flow sinks, toilets

2E: Credit 3.2 Water Use Reduction 30 Percent

Page 10: Project 15 DS413: Design Studio 413 May 9, 2012.

3: Energy and Atmosphere

• 3A: Prerequisite 1 Fundamental Commissioning of the

Building Energy Systems

• 3B: Prerequisite 2 Minimum Energy Performance

• 3C Prerequisite 3 Fundamental Refrigerant Management

• 3D: Credit 4 Enhanced Refrigerant Management

• 3E: Credit 5 Measurement & Verification

Page 11: Project 15 DS413: Design Studio 413 May 9, 2012.

4: Materials & Resources

• 4A: Credit 2.1 Construction Waste Management

• 4B: Credit 2.2 Construction Waste Management

• 4C: Credit 4.1 Recycled Content 10%

• 4D: Credit 4.2 Recycled Content 20%

• 4E: Credit 5.1 Regional Materials 10%

• 4F: Credit 5.2 Regional Materials 20%

Page 12: Project 15 DS413: Design Studio 413 May 9, 2012.

5: Indoor Environmental Quality

• 5A: Prerequisite 1 Minimum IAQ Performance

• 5B: Prerequisite 2 Environmental Tobacco Smoke Control

• 5C: Credit 1 Outdoor Air Delivery Monitoring

• 5D: Credit 2 Increased Ventilation • Clear story

• 5E: Credit 4.1 Low Emitting Materials– Adhesives and Sealants

• 5F: Credit 4.2 Low Emitting Materials –Paints

5G: Credit 4.4 Low Emitting Materials –Composite Wood and

Agrifiber Products

5H: Credit 7.1 Thermal Comfort –Design

5I: Credit 8.1 Daylight and Views –Daylight 75%

Page 13: Project 15 DS413: Design Studio 413 May 9, 2012.

6: Innovation & Design Process

• 6A: Credit 1.1 Innovation in Design –Ice Storage/Reduce Peak Electrical Usage

• 6B: Credit 1.2 Innovation in Design –Educational Building

• Handbook for the home

• 6C: Credit 1.3 Innovation in Design –Water Use Reduction

• 6D: Credit 1.4 Innovation in Design –Heat Island

• 6E: Credit 2 LEED Accredited Professional

Page 14: Project 15 DS413: Design Studio 413 May 9, 2012.

Recommended