ADJUSTED COMMON BOUNDARY 4.93 HACT. FOREST LAND PAYMENT HAS BEEN MADE LETTER No.GM(ENV-LAND) /94/878-89 DT. 24.3.94 NOTIFIED FOREST LAND ALREADY RELEASED SHOWN THUS:- QUARRIABLE AREA TOP EDGE BOUNDARY SHOWN THUS:- FOREST LAND 8.59 HACT. SHOWN THUS:- FOREST LAND PROCESSED FOR RELEASED FOR LUGP UNDER 78.59 HACT:- UTILISED FOREST LAND FOR REGULARISATION:- PLATE-IV LAND USE PLAN OF 261.84 Ha C HUT U A RIVER CENTRAL COALFIELDS LIMITED HAZARIBAGH AREA JHARKHAND O/C PROJECT REVENUE PLAN SCALE:- 1"=330' INDEX SAFETY ZONE LINE THUS:- QRY. TOP EDGE PRESENT QUARRY ACQUIRED UNDER CBA ACT SO NO.-1754 DT.15.05.1996 96.28 HACT. AWARDED OUT SOURCING PATCH ACQUIRED UNDER CBA ACT SO NO. 5157 DT.24.10.85 PROCESSED FROM LAIYO U/G PROJECT. PROCESSED FROM LAIYO U/G PROJECT FOR RELEASE OF FOREST LAND UNDER 78.59 HACT STAGE-1 ALREADY OBTAINED O.B.DUMP O.B.DUMP ACQUIRED UNDER CBA ACT SO NO.-3687 DT.13.9.83 6.59 HACT. PROPOSED OUT SOURCING PATCH. 57.94HACT. PROP.QUARRIABLE TOP EDGE AS PER P.R NF NF NF NF NF N.F N.F N.F N.F NOTIFIED FOREST LAND ALREADY RELEASED SHOWN THUS:- FOREST LAND 8.59 HACT. SHOWN THUS:- FOREST LAND PROCESSED FOR RELEASED FOR LUGP UNDER 78.59 HACT:- UTILISED FOREST LAND FOR REGULARISATION:- Project Area as per this EIA & EMP
Transcript
Page 1: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

AD

JU

ST

ED

C

OM

MO

NB

OU

ND

AR

Y

4.93 H

ACT.

FOREST L

AND

PAYMENT H

AS BEEN

MADE L

ETTER

No.GM

(ENV-L

AND)

/94/8

78-89

DT.

24.3.9

4

NOTIFIED FOREST LAND ALREADY RELEASED SHOWN THUS:-

QUARRIABLE AREA TOP EDGE BOUNDARY SHOWN THUS:-

FOREST LAND 8.59 HACT. SHOWN THUS:-

FOREST LAND PROCESSED FOR RELEASED FOR LUGP

UNDER 78.59 HACT:-

UTILISED FOREST LAND FOR REGULARISATION:-

PLATE-IV LAND USE PLAN OF 261.84 Ha

C HUT U A RIVER

CENTRAL COALFIELDS LIMITED

HAZARIBAGH AREA

JHARKHAND O/C PROJECT

REVENUE PLAN

SCALE:- 1"=330'

INDEX

SAFETY ZONE LINE THUS:-

QRY. TOP EDGE

PRESENT QUARRY

ACQUIRED UNDER CBAACT SO NO.-1754 DT.15.05.1996

96.28 HACT.

AWARDED OUT SOURCING PATCH

ACQUIRED U

NDER CBA

ACT SO N

O. 5157 D

T.24.10.85

PROCESSED FROM

LAIYO U/G

PROJECT.

PROCESSED FROM

LAIYO U/G PROJECT

FOR RELEASE OF FOREST

LAND UNDER 78.59 HACT

STAGE-1 ALREADY OBTAINEDO.B.DUMP

O.B.DUMP

ACQUIRED UNDER

CBA ACT SO NO.-3687 DT.13.9.83

6.59 HACT.

PROPOSED OUT SOURCING PATCH.

57.94HACT.

PROP.QUARRIABLE TOP EDGE AS PER P.R

NF

NF

NFNF

NF

N.F

N.F

N.F

N.F

NOTIFIED FOREST LAND ALREADY RELEASED SHOWN THUS:-

FOREST LAND 8.59 HACT. SHOWN THUS:-

FOREST LAND PROCESSED FOR RELEASED FOR LUGP

UNDER 78.59 HACT:-

UTILISED FOREST LAND FOR REGULARISATION:-

Project Area as per this EIA & EMP

Page 2: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

Plate-VIII Core Zone & Buffer Zone on Toposheet

Page 3: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

Plate-X Location od sampling stations

Page 4: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

Pundi

JamundahaHorwe

Chutua Nadi

Bokaro N

adi

Kedla

Barslam

Lugu Pahar

Behero

Tirla

Chagri

Rahaun

Tilaiya

Jharna nallah

Kundriya

Kunda

Kurkuniya Pahar

Baridari

Parsabera

Jhumra Pahar

Jamnijara

Jhumra

Purnapani

Edla Rola Nawadih

Dense Jungle

Gose

976m

938m

624m

470m

Bokaro N

adi

Katel Nala

Pachmo

Basantpur

Ulhara

Parej

Phakodih Banji

Rahun

Loiyo

Gose

Sondiha

Chagri

Chainpur

Sirka

Atna

Ara

Sarubera

Duni

Jagesar

Mukundaberatoli

Parsabera

Jharnatoli

Ichkadih

Daniya

Kotre

Rauta

Pachmo

280.70WB-32

WB-84364.90

WB-39WB-40

348.48352.25WB-21

411.14

WB-57

380.78

WB-80428.50

WB-18394.11

WB-45323.40

WB-6321.11

WB-5324.20

WB-1349.71

WB-7

325.32

WB-9309.91

409.73

WB-20

394.13

WB-19

WB-25399.13

WB-81

342.50

WB-83391.75

WB-78393.05

WB-69384.86

WB-73370.27WB-70

389.47

WB-71387.91

WB-64410.08

304.05WB-44

364.55WB-42

341.80

WB-68

335.85

WB-41

393.56 WB-66

334.64WB-16

7.30

6.80 8.98

3.45

8.30

6.55

10.248.95

9.67

5.05

6.98

9.30

6.635.45

4.15

5.45

10.95

6.60

9.22

6.28

6.44

8.33

5.53

7.09

9.73

6.95

1.50

7.50

8.25

5.10

Murpa

WB-63

319.2510.75

Khakhanda

WB-121

330.509.50

350370

390400

310

290

290

310

85O39'0"E85O33'30"E85O28'0"E

23O45'30"N

23O40'0"N

23O50'0"N

85O44'30"E

CENTRAL COALFIELDS LIMITED

WATER TABLE CONTOUR MAP

HYDROGEOLOGICAL STUDIES FOR EMP JHARKHAND (EXPANSION) OCP

Copyright in this drawing is vested in CMPDI

Unauthorised copying or use is not permitted.

PLATE NO- XI

CMPDIREV. No.ISO 9001 Company H Q XX X XXX X XX

Sheet 1 OF 1

0

0

Subj ec t

Job Tit le

C us t om er

Signa t ure

Drg .No.

Ac t ivit y

Approved by

C H. MANAGERC hec ked by

Sc ale

Prepared by

Proc essed by

Des igna t ionNam e

Job No.

Da t e

500 500 1500 M

3 1 1 4 1 0

A ALAM

A ALAM

S PANJA

AMITAB H DAS

Dy. MANAGER

GM

Dy. MANAGER

WEST BOKARO COALFIELD

METAMORPHIC TERRAIN

PROJECT AREA

SEDIMENTARY TERRAIN

BOUNDARY BETWEEN

METAMORPHIC AND SEDIMENTARY

INDEX

WATER TABLE CONTOUR310

CMPDI WELLWB-81

WATER LEVELS ARE IN METER

(APRIL,2015)

CONTOUR MAP SHOWING DRAINAGE

350

390

400420

NALA/RIVER

Bokaro

Riv

er

Choth

a R

iver

TISCO WEST

BOKARO

Bargaon

Bargaon

Nowadih

Kusamda

Jharkhand OCP

Page 5: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

PLATE-XVI WATER USAGE DIAGRAM OF JHARKHAND EXPANSION OCP, CCL

(All Values are in m3 / day)

370 m3/day 730 m3/day 170 m3/day 158 m3/day 220 m3/day 182 m3/day

6

25% loss

Land reclamation and Green Belt Development (38) Fire Service (120)

needs 158 m3/day

HAUL road watering/Dust Suppression 182 m3/day

Sedimentation Tank

730 m3/day

MINE DISCHARGE 1100 m3/day

Filter Plant (370 m3/day)

HEMM Washing (90) and CHP/ Workshop needs (80)

170 m3/day

Domestic water need of Mine Colony

370 m3/day

Soak Pit

Pond/ Tank/Old

quarry 220 m3/day

Irrigation & Other uses in peripheral

villages /Artificial Recharge

220 m3/day

Page 6: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

KEDLA NALA

CHUTUANALA

KEDLA OCP

OLD DUMP

EXISTING QUARRY

EXIST. QURY.

OFFICE

S/S CANTEEN

STORE

WORK SHOP

NF

REC.PIT.

B

A

F

EXIST.DUMP

N F

F

N F

+310

+280

250260

+270

+280

+290

300

310

320

330

34

0

350

350

N F

+310

+340

+280

F

190

+3

90

+3

40

+3

10

+3

15

+3

23

+323

+340

+370

+395

+388

+382

N F

+395

F

N F

N F

+370

+415

+412

+406

+400

+415

93

+3

70

5

+4

00

+3

94

+3

88

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

147

TO KEDLA O.C.P

160

198

DUMP

194

143

162

206

N F

153

202

156

155

+362+368+370

+372

+376

+382

+385

26

81

94

240

250

260270

REFERENCE

DRAWINGS:-SL.NO. NAME OF THE DRAWINGS DRG.NO..

1. FINAL STAGE DUMP PLAN RI-3/OCM/634

2. QUARRY CROSS-SECTION ALONG AA', BB' ,CC' ,DD' RI-3OCM/626,627

EE' ,& FF'

3. TOPOGRAPHICAL MAP RI-3OCM/2398.

4. CALENDAR PLAN RI-3/OCM/633

LEGEND:-

SL.NO. PARTICULARS SYMBOLS

1. BORE HOLE DRILLED BY :-

(A) C M P D I

(B) N C D C

2. FLOOR CONTOUR OF SEAM-III

3. FLOOR BOUNDARY OF THE PROPOSED QUARRY

4. SURFACE BOUNDARY OF THE PROPOSED QUARRY.

5. ULTIMATE AREA OF THE EXTERNAL DUMP.

6. FOREST / NON FOREST OF DEMARCATION LINE.

7. DUMP BENCH.

NOTE:-1. ALL DIMENSIONS ARE IN METRE.

2. THE COAL & O.B REMOVED TILL THIS STAGE ARE AS FOLLOWS :-

COAL= 21.50 M Tes. O.B.= 47.0 MM2 S.R = 2.19 M3 / Tes.

3. THE CAPACITY OF O.B. DUMPS :-

LOATION R.L. OF BENCHES IN METRE CAPACITY IN MM3

LOOSE SOLID

EXTERNAL 'A'

SURFACE TO + 370

+370 TO + 400

+ 400 TO + 415

7.68 6.40

4 .75 3.96

1.07 0.89

TOTAL EXTERNAL 'A' 13.50 11.25

INTERNAL ' B'

FLOOR TO + 280

+ 280 TO + 310

+ 310 TO + 340

+ 340 TO + 370

+ 370 TO + 395

5.17 4.31

10.22 8.52

12.53 10.44

9. 70 8.08

5.28 4.40

TOTAL INTERNAL-'B' 42.90 35.75

TOTAL CAPACITY OF DUMP A+B = 47.00 MM3

AREA OF EXTERNAL DUMP -'A' = 0.35 SQ.M.

REGIONAL INSTITUTE NO.-IIICENTRAL MINE PLANNING & DESIGN INSTITUTE LTD.

RANCHI-834001

PROJECT:-

SUBJECT:-

JHARKHAND O.C.P

FINAL STAGE DUMP PLAN

CODE:-

AREA:-

HAZARIBAGH

CUSTOMER:-

C.C.L

SCALE:- 1:4000DATE:- 14.12.90

REGIONAL DIRECTOR

DRG.NO.-RI-3/OCM/634

X

176

30

N F

F

192

89

332

330

328326314

322

320

326

316

314

312

310

308

308

310

312

314

316

318

320

324

308

310

312

314

316

318

320

322324

326328334

332

POND

330

332

128

326

326

197344

342

340338

336

354

332

356

352

320

324

328332

338

-2000

+2400

-1600

-1200

-800

-400

000

-400000

+400+800

F

+1200+1600

318

316

314

312310

+370

+376

+370

+364

+358

346

340

335

360

350

354

350

340

348

350354

181

+37

0

+34

0

A

A

B

B

C

C

D

D

E

E

F

F

324

322

320

318

316

314

164

322

311

312

320318

320

322

320

318

316

318

310

322324

326

326

340

318

320

328

320

320 324322

320

320

322

326

322

326

328

330

332334

342

344

346348

350

320

332

334338

338

340342

344340

338

340

336

332

332

334

342

350

356

352 350348

354

+400

+370

382

380

378

376

370 360

362

360

354

360

364

376

PLATE-XVIII POST MINING LAND USE PLAN

GREEN BELT

PLANTATION

PLANTATION

WATER BODY

240

Page 7: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 8: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 9: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 10: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 11: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 12: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 13: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar
Page 14: Project Area as per this EIA & EMPenvironmentclearance.nic.in/writereaddata/online/EC/...Lugu Pahar Behero Tirla Chagri Rahaun Tilaiya Jharna nallah Kundriya Kunda Kurkuniya Pahar

Recommended