Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands [email protected]
Transcript
Page 1: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

Project ManagementWork Breakdown Structures

Minder Chen, Ph.D.CSU Channel Islands

[email protected]

Page 2: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 2 © Minder Chen, 2012

WBS and Work Packages• Create WBS is the process of subdividing project

deliverables and project work into smaller, more manageable components.

• The work breakdown structure (WBS) is a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables, with each descending level of the WBS representing an increasingly detailed definition of the project work. The WBS organizes and defines the total scope of the project, and represents the work specified in the current approved project scope statement.

• The planned work is contained within the lowest level WBS components, which are called work packages.

• A work package can be scheduled, cost estimated, monitored, and controlled.

Page 3: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 3 © Minder Chen, 2012

Create WBS: Inputs, Tools & Techniques, and Outputs

Page 4: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 4 © Minder Chen, 2012

Page 5: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 5 © Minder Chen, 2012

Sample WBS

Page 6: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 6 © Minder Chen, 2012

Don’t Confusing Effort with Results.

• The WBS was initially defined as a product oriented family tree, however subsequent definitions have introduced more flexibility -- so a WBS can also be deliverable or process oriented.

• Your WBS can be built on nouns or verbs. If the results of your project are primarily verbs, then a verb based or process based WBS may make more sense.

http://www.hyperthot.com/pm_wbs.htm

Page 7: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 7 © Minder Chen, 2012

4–7

Creating the Work Breakdown Structure• An hierarchical outline (map)

that identifies the products and work elements involved in a project.

• Defines the relationship of the final deliverable (the project) to its subdeliverables, and in turn, their relationships to work packages.

• Best suited for design and build projects that have tangible outcomes rather than process-oriented projects.

Page 8: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 8 © Minder Chen, 2012

4–8

How WBS Helps the Project Manager• Facilitates evaluation of cost, time, and technical

performance of the organization on a project.

• Provides management with information appropriate to each organizational level.

• Helps in the development of the organization breakdown structure (OBS). which assigns project responsibilities to organizational units and individuals

• Helps manage plan, schedule, and budget.

• Defines communication channels and assists in coordinating the various project elements.

Page 9: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 9 © Minder Chen, 2012

Process-based WBS Completion Criteria

• Status and completion are measurable

• The activity is bounded

• The activity has a deliverable

• Time and cost are easily estimated

• Activity duration is within acceptable limits

• Work assignments are independent

t

Page 10: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 10 © Minder Chen, 2012

4–10

Work Packages

• A work package is the lowest level of the WBS.

• It is output-oriented in that it:1. Defines work (what).2. Identifies time to complete a work package (how

long).3. Identifies a time-phased budget to complete

a work package (cost).4. Identifies resources needed to complete

a work package (how much).5. Identifies a person responsible for units of work

(who).6. Identifies monitoring points (milestones)

for measuring success.

Page 11: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 11 © Minder Chen, 2012

Sample WBS with Major Deliverables

Page 12: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 12 © Minder Chen, 2012

Integrating the WBS with the Organization• Organizational Breakdown Structure (OBS) depicts how the firm is

organized to allocate its work responsibility for a project.– Provides a framework to summarize organization work unit

performance. Identifies organization units responsible for work packages.

– Ties the organizational units to cost control accounts.

Page 13: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 13 © Minder Chen, 2012

Work Package Estimates

Page 14: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 14 © Minder Chen, 2012

WBS Component in WBS Dictionary

• Code of account identifier,

• Description of work,

• Responsible organization,

• List of schedule milestones,

• Associated schedule activities,

• Resources required,

• Cost estimates,

• Quality requirements,

• Acceptance criteria,

• Technical references, and

• Contract information.

Page 15: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 15 © Minder Chen, 2012

4–15

Coding the WBS for the Information System• Levels and elements of the WBS

• Organization elements

• Work packages

• Budget and cost information

• Allows reports to be consolidated at any level in the organization structure.

Page 16: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 16 © Minder Chen, 2012

Direct Labor Budget Rollup

Page 17: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 17 © Minder Chen, 2012

Sample WBS Organized by Phase

Page 18: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 18 © Minder Chen, 2012

Sample WBS Organized by Phase

Page 19: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 19 © Minder Chen, 2012

Process-Oriented vs. Product-Oriented WBS

http://www.hyperthot.com/pm_wbs.htmhttp://www.hyperthot.com/pm_wbs_concepts.htm

Page 20: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 20 © Minder Chen, 2012

Scope Baseline• The scope baseline is a component of the

project management plan.

• Components of the scope baseline include:– Project scope statement. The project scope

statement includes the product scope description, and the project deliverables, and defines the product user acceptance criteria.

– WBS. The WBS defines each deliverable and the decomposition of the deliverables into work packages.

– WBS dictionary. The WBS dictionary has a detailed description of work and technical documentation for each WBS element.

Page 21: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 21 © Minder Chen, 2012

Verify Scope: ITTO & Data Flow Diagram

Page 22: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 22 © Minder Chen, 2012

Breaking Up Is Hard to Do

• The Story of Cook Ding

• http://www.examiner.com/article/taoism-301-3-story-of-cook-ting-the-dextrous-butcher

Page 23: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 23 © Minder Chen, 2012

General Systems Theory: Level of Abstract

(General Systems Theory) does not seek, of course, to establish a single, self contained 'general theory' of practically everything which will replace the theories of particular disciplines. Such a theory would be almost without content, for we always pay for generality by sacrificing content, and we can say about practically everything is almost nothing. Somewhere however between the specific that has no meaning and the general that has no content there must be, for each purpose and at each level of abstraction, an optimum degree of generality. It is the contention of the General Systems Theorists that this optimum degree of generality is not always reached by the particular sciences."

Source: http://cimru.nuigalway.ie/david/pdf/SE/Slides/Theory.PDF

Page 24: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 24 © Minder Chen, 2012

Design: Cohesion and Coupling

• Divide and Conquer

• Software Design Criteria, plus Reusability

• Modularization: Simple, stable, and clearly defined interface for each module, no need to understand the internal structure or design of a module to use it (i.e., treat it as a black box).

• Low coupling between modules and high cohesiveness within modules

Page 25: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 25 © Minder Chen, 2012

Type of Coupling

Tightness of Coupling

Goodness of Design

Normal Coupling

Data Coupling (Sending simple parameters) Stamp Coupling (sending complex data structures)

Control Coupling (sending flags)

Common Coupling (Sharing global data)

Content Coupling (Changing code)

Loose

Tight

Good

Bad

Coupling

Less interdependenceLess coordinationLess information flow

Page 26: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 26 © Minder Chen, 2012

A Functionally Cohesive Module Very High in a Structure Chart

Satellite Trajectory

Elevation

Ranges

AzimuthsTimes

GET RANGES

GET TIMES

GET AZIMUTHS

GET ELEVATION

GET SATELLITE

TRAJECTORY

Functional Cohesion • Complex, yes; Cohesive, Yes.

Page 27: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 27 © Minder Chen, 2012

Types of Cohesion

Visibility Strength of Cohesion

Maintainability

Functional Black box

Functional Black box SequentialSequential

CommunicationalCommunicational

ProceduralProcedural

TemporalTemporal

Logical Logical

Coincidental Coincidental

StrongStrong

WeakWeak

GoodGood

BadBad

Scale of Cohesion

Not-quite so black box

Gray box

Transparent or white box

Closely related activities that make sense to group them together.

Page 28: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 28 © Minder Chen, 2012

Inte

rmodule

Effe

cts (

Coupling)

Cost Due to

Cost Due toIntramodule Effects (Cohesion)

High

Low

Co

st

Number of ModulesSmall Large

The Impact of Module Numbers on Cost

Page 29: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 29 © Minder Chen, 2012

Decomposition and Integration• Decomposition (factoring) refers to the process by which a

complex problem or system is broken down into parts that are easier to conceive, understand, program, and maintain.

Page 30: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 30 © Minder Chen, 2012

Source: Developing Web Applications with Microsoft Visual Basic .NET and Microsoft Visual C# .NET

Testing

• Test plan objectives – Is thoroughly tested– Meets requirements– Does not contain defects

• Test plan covers– Tools– Who– Schedule– Test result analysis– What is being tested?

• Test cases• Automated testing

– Reproducible – Measurable

Page 31: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 31 © Minder Chen, 2012

Test type Objectives

Unit testEach independent piece of code works

correctly

Integration test

All units work together without errors

Regression test

Newly added features do not introduce errors to other features that are already working

Load test (also called stress test)

The product continues to work under extreme usage

Platform testThe product works on all of the target

hardware and software platforms

Types of Tests

Page 32: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 32 © Minder Chen, 2012

Regression and Regression Test

• Regression testing is the process of validating modified parts of the software and ensuring that no new errors are introduced into previously tested code.

• Unit and integration tests form the basis of regression testing. As each test is written and passed, it gets checked into the test library for a regularly scheduled testing run. If a new component or a change to an existing component breaks one of the existing unit or integration tests, the error is called a regression.the error is called a regression.

Page 33: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 33 © Minder Chen, 2012

Stubs and Drivers

Driver

Module 1 Module 2

Module M

Stub Module 2

• Stubs Stubs are non-functional components that provide the class, property, or method definition used by the other component. Stubs are a kind of outline of the code you will create later.

• To test two components that need to work together through a third component that has not been written yet, you create a driver. Drivers Drivers are simply test components that make sure two or more components work together. Later in the project, testing performed by the driver can be performed by the actual component.

The most common build problem occurs when one component tries to use another component that has not yet been written. This occurs with modular design because the components are often created out of sequence.

Page 34: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 34 © Minder Chen, 2012

The Myth in The Mythical Man-Month• Using the man-month as a unit for measuring the size of a

job is a dangerous and deceptive myth. It implies that men and months are interchangeable. Men and months are interchangeable commodities only when a task can be partitioned among many workers with no communication among them.

http://www.cs.drexel.edu/~yfcai/CS451/RequiredReadings/MythicalManMonth.pdf

Time versus number of workers—perfectly partitionable task

Page 35: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 35 © Minder Chen, 2012

Partitionability

Time versus number of workers—unpartitionable task

Time versus number of workers—partitionable task requiringcommunication

Page 36: Project Management Work Breakdown Structures Minder Chen, Ph.D. CSU Channel Islands Minder.chen@csuci.edu.

PM: WBS - 36 © Minder Chen, 2012

Task with Complex Interrelationships

• If each part of the task must be separately coordinated with each other part/ the effort increases as n(n-1)/2, where n is the number of parts.

Time versus number of workers—task with complex interrelationships