Building Business for our Region
18 th September 2009AMP Technology Centre, Sheffield
P roject Target
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
2/112
Target SME Event 18/09/09Public Sector Opportunities
Brian Barrett Design Consultancy ManagerEDS Asset Management
Rotherham MBC
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
3/112
Public Sector Opportunities
Importance of Integrated Approach to procurement Value for money Local opportunities
Predictability Matching skills availability Needs
local economy aspirations
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
4/112
Public Sector Opportunities
Rotherham MBC working with SMEsGeneral Importance to Members
Procurement Strategy Procurement Plan Buy-Local website
Meet the Buyer events
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
5/112
Public Sector Opportunities
Rotherham MBC working with SMEsConstruction RCP Supply Chain events
RCP Supply Chain management group Forms of contract and fairness KPIs
Local labour Training
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
6/112
Public Sector Opportunities
SME access to Public Sector opportunities SCMS procurement website (22 Y&H Councils) Apply to known supply chains
OJEU award notices
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
7/112
Public Sector Opportunities
Criteria for gaining work Technical ability and capacity Financial standing
Health and Safety Equality and diversity Sustainability
.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
8/112
Public Sector Opportunities
Opportunities Capital programmes Building Schools for the Future
Primary Capital programme Council Housing bids Developer-led projects Yorbuild
..
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
9/112
Public Sector Opportunities
For further information contact Brian Barrett (x 2988, [email protected] )
Buy-Local website www.buy-local.co.uk
Yorbuild website www.yorbuild.com
Any Questions
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
10/112
Building Business For Our Region
18 th Sept 2009, Rotherham
Wendy Ashton
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
11/112
ObjectivesTo brief regional businesses about theTarget initiative its aims & objectivesTo highlight potential Public Sector
opportunities for SME involvement
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
12/112
Todays P resentationSetting the scene.
What is Project Target?
Where are we at?
Next Steps.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
13/112
Setting the SceneUK economic growth lower than forecast in Construction sector. Significant fall in GDP (3.6%) Yorkshire & Humber expected to fare slightly below UK average this year
Sharp decline in private sector works being commissioned
significant proportion of businesses which traditionally operate in the private sector now looking at public sector opportunities as a future source of revenue
Recession hit sector requiring intervention to provide support
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
14/112
Setting the SceneRecognition that support required to strengthen Yorkshire & The Humber businesses to enable them to remain competitive, to find alternative sources of income and to be able to diversify into new markets
Need clearer understanding of buyer requirements what criteria & regulatory requirements?
Acceptance that knowledge and skills needed to bid for contracts
support for skills and standards needed for
SMEs to engage in public sector contracts was not easily accessible Tony Cherry, FSB
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
15/112
Regional Response = Target
To establish an opportunity driven programme aimed at identifying construction
procurement opportunities in both Public (and Private) Sectors
To influence / better understand buyer requirements
Match supply with demand to maximise the involvement of capable businesses from the Yorkshire and the Humber region
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
16/112
Todays P resentationSetting the scene.
What is Project Target?
How will it happen?
Next Steps.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
17/112
Delivered by VEN Management
VEN is a procurement and supply chain business support service for both regional SME's and national buyers
VEN assists companies to win more business and works towards developing integrated supply chains
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
18/112
Targeted SupportAdditional support for suppliers and subcontractors providing construction goods and services in the region during the economic downturn
Improve the visibility, profile and understanding of the YORbuild & other frameworks in the eyes of suppliers and subcontractors providing construction goods and services in the region
Provide a targeted level of support for businesses to improve capacity and competence in dealing effectively with public sector tender opportunities
Engage with other business support agencies to identify how regional support
programmes and
activities
can
further
develop
a high
quality
local
labour
force
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
19/112
Targeted SupportDrive key supplier objectives through the supply chain including targeted employment and skills training, impact upon the environment and carbon reducing solutions
Learn the lessons of earlier construction frameworks to maximise and improve the
connection between
the
framework
and
the
regional
supply
chain.
Improve the business profile of local construction companies and create an effective supply chain network
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
20/112
Enhanced marketintelligence
In formation platform
to effectivelycommunicate
Netw ork of Stakeholders,
Clients, Contractorsand SMEs
Opportunity
P roject Target
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
21/112
Civic / Public Estate
Emergency Services
Education Estate
National Parks
Private Sector and Renewable Projects
P roject Target Scope
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
22/112
Todays P resentationSetting the scene.
What is Project Target?
Where are we at?
Next Steps.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
23/112
Approach
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
24/112
Making it HappenOpportunities cascaded directly via industry Partners and Targete newsletter
New website launched:www.constructiontarget.com
Referral process to provide support for businesses to improve capacity and competence in dealing with opportunities effectively
Engagement with industry partners to support & add value for Yorkshire & Humber based businesses.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
25/112
Sharing OpportunitiesApproximately 1.2bn per annum is spent on construction services, representing 30% of the regional local authorities external expenditure
Alignment with YORbuild therefore of high importance in relation to supply chain opportunities
Over the longer term, Target will continue to raise awareness of construction sector opportunities of interest to the Yorkshire and Humber supply chain
In the immediate future Project Target will focus upon the YORbuild Framework but will work with other frameworks
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
26/112
Opportunities (VEN)
PrivatePlanning submitted
100mLogistics & ports facility
Able UK
PublicPre tender10.7mSchoolKingston Upon
Hull City Council
PublicExpression of
Interest4mSchool AlterationDoncaster MBC
PublicContract Awarded1mSheffield Teaching
HospitalsDepartment of
Health
PublicITT650mProCure21 National
Framework
Department of Health
FUNDSTAGEVALUEPROJECTCLIENT
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
27/112
Opportunity Process
Opportunity identified
Send to SMEs
Direct vianewsletter/website Via Partners
Go towww.constructiontarget.com
Interested in opportunity?
Register details includingability to meet criteria for
contract
VEN refers to partnersany gaps or missing skills
SME get full accessto details on opportunity
Sign up to use VENsservices for bidding
support and collaboration
SME wants further helpwith the opportunity
.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
28/112
Todays P resentationSetting the scene.
What is Project Target?
Where are
we
at?
Next Steps.
..
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
29/112
Next StepsForthcoming events:
Oct 21 st BridlingtonNov 16 th York Nov 27 th Leeds
Partner EngagementLiaison with Industry partners for business support
Buyer EngagementMeetings with Buyers / Main contractors / SMEs for identification of opportunitiesEngaging with Local Authorities, Emergency Services, Education Estates
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
30/112
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
31/112
This Presentation
Background
YORbuild
How it works
Benefits
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
32/112
The Journey So Far
The YORbuild Project has been in development
for last
2
years
and
originates
from
a Regional
Construction Collaboration Project funded by the Yorkshire and Humber Centre of Excellence.
During the Regional Construction Collaboration Project it was clear that the Yorkshire and Humber regions Local Authorities, Public Sector Bodies and Third Sector Organisations did not have open access to regionally focused Construction Frameworks.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
33/112
The Opportunity
Local Authorities within Yorkshire and Humber
region spend
approximately
1.2
billion
per
annum on Construction Services.
In Local Government Construction is the largest spend category representing 30% of total spend.
Collectively Local Authorities are the largest single Construction Client Body spending approximately 14 billion per annum on Construction Services.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
34/112
Project Development
Following a regional consultation event in
October 2007
a Project
Team
was
formed
to
develop the concept of a Construction Framework aimed at the regions Local Authorities, Public Sector Bodies and Third
Sector Organisations.
The YORbuild Project Team consisted of Officers from 10 of the regions 22 Local Authorities with additional resources provided by the Yorkshire and Humber Centre of Excellence and developed the Project through
its first 2 stages.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
35/112
YORbuild Project
Development
Stage 1 PID
development &
Regional
Engagement
Stage 2 Business Plan development &
Stakeholder Communication
Stage 3 Framework Procurement
Stage 4 Framework Launch & Operation
J a n 0 8
D e c 0 7
S e p t 0 8
J u n 0 8
Construction Collaboration Project
Complete
O c t 0 7
Project PhaseO c t 0
8
O c t 0 9
Funding Approval from LGYH
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
36/112
Project Approval and
Funding The Regional Improvement and Efficiency
Partnership (RIEP)
hosted
by
Local
Government
Yorkshire and Humber recognised the potential of the YORbuild Project in March 2008.
The YORbuild Project forms an integral part of the Regional Improvement and Efficiency Strategy for Yorkshire and Humber.
In September 2008 Funding to take the YORbuild Project through stage 3 (Framework Procurement) was approved by the RIEP.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
37/112
This Presentation
Background
YORbuild
How it works
Benefits
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
38/112
YORbuild Framework
Procurement This YORbuild Framework Procurement
provides Construction Works:
New Build Refurbishment Design and Build
Projects subsequently procured via the YORbuild Framework will be awarded under the NEC3 Form of Contract and its various options.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
39/112
YORbuild Framework
Procurement Team The procurement of the YORbuild Framework
is delivered by a collaborative cross Local Authority team.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
40/112
YORbuild Framework
StructureNorth Sub
regionEast Sub
regionSouth Sub
regionWest Sub
region
W o r k s V a l u e B a n d s
Lot 1Up to 100k
Lot 2 Above 100k up
to 500k
Lot 6Above 10000k
Lot 4Above 1000k up to 3500k
Lot 5Above 3500k up to 10000k
Lot 3Above 500k up
to 1000k
Lot 1Up to 100k
Lot 2 Above 100k up
to 500k
Lot 6Above 10000k
Lot 4Above 1000k up to 3500k
Lot 5Above 3500k up to 10000k
Lot 3Above 500k up
to 1000k
Lot 1Up to 100k
Lot 2 Above 100k up
to 500k
Lot 6Above 10000k
Lot 4Above 1000k up to 3500k
Lot 5Above 3500k up to 10000k
Lot 3Above 500k up
to 1000k
Lot 1Up to 100k
Lot 2 Above 100k up
to 500k
Lot 6Above 10000k
Lot 4Above 1000k up to 3500k
Lot 5Above 3500k up to 10000k
Lot 3Above 500k up
to 1000k
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
41/112
This Presentation
Background
YORbuild
How it works
Benefits
b ld k
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
42/112
YORbuild Framework
Management The YORbuild Framework is managed by a
team of individuals from the four Contracting Local Authorities and other external resources.
The YORbuild Framework Management Team provide a procurement service desk to the regions Local Authorities, Public Sector Bodies and Third Sector Organisations.
Framework Management activities including performance management, initiative development and communications are also
handled by the Framework Management
YORb ild F k
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
43/112
YORbuild Framework
Management
Framework Board Joint Committee
Special interest Group
Steering Group
Board Member Board Member Board Member
Board Member Chair Founder
Member Local Authority
Board Member
Board Member Board Member Board Member
Board Member Board Member Board Member
Framework Manager
Framework Management TeamLead Member Local
Authority
Special interest Group
M o n t h l y
W e e k l y
Quarterly
Quarterly
u ramewor
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
44/112
Management Core Services
Feasibility / compatibility.
Procurement Mini
ITT
@
2
12
weeks.
Facilitation of contract administration. Mobilisation, pre contract meeting.
Initiative and development.
Supply chain management. Standardisation. Performance Measurement and Management
YORb ild F k
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
45/112
YORbuildFramework
Management Team
Project performance
monitored and fed back into the
framework.
Service Level Agreement
SLA Governs the performance levels
offered to the Authorities and the
terms of engagement.
Service
Charge
Individual Authorities
Requirements
Award Protocol.
YORbuild Framework
Project Procurement
YORb ild F k
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
46/112
Framework Contracting Authority
Framework Contractor Client Authority
Framework Agreement
Service Agreement
Construction Contract
YORbuild Framework
Project Procurement
YORbuild Framework
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
47/112
YORbuild Framework
Current Opportunities
The aforementioned projects have potential to be procured via the YORbuild Framework.
City of Bradford Metropolitan District Council YMCA 9,000,000Doncaster Metropolitan Borough Council LSC College, Doncaster 6,000,000East Riding of Yorkshire Council Leisure World, Bridlington 14,000,000East Riding of Yorkshire Council Multiservice Centres, Various 6,000,000East Riding of Yorkshire Council Floral Hall, Hornsea 4,000,000East Riding of Yorkshire Council New Housing, Various 17,000,000East Riding of Yorkshire Council Humberside Police HQ, Hull 25,000,000Harrogate Borough Council Toilets, Knaresborough 150,000North Lincolnshire Council Baths Hall, Scunthorpe 13,000,000North Lincolnshire Council PCP Project # 1 6,500,000North Lincolnshire Council PCP Project # 2 6,500,000Rotherham Metropolitan Borough Council CSC, Rawmarsh 4,000,000Sheffield City Council New Housing, Various 4,000,000
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
48/112
This Presentation
Background
YORbuild
How it works
Benefits
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
49/112
Efficiency
The YORbuild Framework offers significant efficiencies on two levels:
Procurement. As the Framework has been procured under the OJEU Process all projects
procured via the framework are called off through a mini competition taking 2 12 weeks.
Cost. Collaborative frameworks are proven to reduce the whole cost of construction projects and as the framework brings together regional
demand Contractor fees are very competitive.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
50/112
Performance Improvement
Forming the YORbuild Framework presents a unified intelligent Client approach to construction procurement.
It enables Local Authorities, Public Sector
Bodies and Third Sector organisations to collaborate and share information in a joined up way.
Framework Contractors understand very clearly that performance measurement is key to long term success and the eyes of the regionare on them through the delivery of projects.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
51/112
Employment and Skills
The YORbuild Framework has developed a trailblazing approach to the enhancement of employment and skills in partnership with Construction Skills.
Every project procured via the YORbuildFramework will have an employment and skills plan which will bind Contractors to the delivery of employment and skills output i.e. Numbers of apprentices.
The model is seen as an exemplar for other
regions to replicate.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
52/112
Sustainability
The YORbuild Framework driven the waste management and carbon efficiency agenda through the procurement process.
Detailed management information has been
obtained to assess the performance of bidding contractors in the reduction of waste to landfill.
The credentials of bidding contractors to reduce carbon impact in the build process together with the selection of solutions to
improve the carbon efficiency of the building
.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
53/112
Economic Regeneration
The YORbuild Framework driven the economic regeneration agenda through its procurement and sets out very clearly the challenge to framework contractors.
Targeted local sourcing through the framework for materials and subcontracts will be high on the framework management agenda.
YORbuild is working closely with Yorkshire Forward to promote project opportunities to the supply chain in order to ensure the very
best opportunity to the regional supply chain.
YORbuild Framework ..
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
54/112
YORbuild Framework
Benefits Access to a first class construction framework
for the regions Local Authorities, Public Sector Bodies and Third Sector Organisations .
Cashable efficiencies. Process efficiencies. Performance improvement. Platform for SME development. Capacity built across the region.
Access to shared resources in the procurement of Construction Services.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
55/112
Contact
Lee Parkinson
YORbuild Project Manager
07800 962449www.yorbuild.com
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
56/112
KIER SHEFFIELD LLP
Target SME Event
18 th September
Dan MaherJed Turner
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
57/112
Kier Sheffield LLP
Joint Venture between SCC and Kier Over 1,100 directly employed staff Defined geographical boundary Two major contracts with SCC Jobs Compact Agreement Additional SCC and 3 rd party work
Added value and key achievements
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
58/112
Some Key Partnership Objectives
A partnership that will share the Councils core values, inparticular its commitment to equal opportunities, social
justice and regeneration. Securing employment, making a positive contribution to
training and providing a platform to develop increasedmarket opportunities.
Developing and strengthening the diversity of thebuilding industry in Sheffield and supportingregeneration.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
59/112
The Main Contracts
Construction and Building Services to2013
All Council owned homes
Corporate buildings schools, libraries Exclusivity and Jobs Compact
Decent Homes to 2010 and beyond 1 of 5 contractors
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
60/112
106m Business p/a
3rd Par ty 15m
Shar r ow Industr i es (Manuf acture)16m
Cor por ate Building Repair s andMaintenance 6m
Decent Homes 26.9m
Constuction Projects 12.5m
Housing Repai r s and Maintenance30m
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
61/112
Added Value
Corporate Social Responsibility
Economic Social Environmental
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
62/112
Economic
Commitment to keeping the within Sheffield and SouthYorkshire
Commitment to maximising local jobs for local people Commitment to growing the business
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
63/112
Commitment to education, training and employmentprogrammes, examples of which are:-
Work Experience 10 per dayCity Stewardship 120 at any one timeApprentices 51 on the booksSharrow IndustriesLooked After ChildrenDirect Labour 1,100 staff
Commitment to equality and diversity
Social
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
64/112
Environmental
Yorkshire and Humber Index(http://www.bitc.org.uk/yorkshire_and_humber/programmes/environment/yh_index.html )
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
65/112
SME our approach to inclusion
85% of materials procured with organisations withSheffield postcode during the last 12 months, with avalue of circa 29M
Specialist Sub Contractors Balance between national and local purchasing
opportunities
.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
66/112
Becoming a supply chain partner of Kier
The following forms are part of our sub- contractor gatewaydocumentation to enable us to add a company to Kier SupportServices approved sub- contractor list:
General Questionnaire (around business activity) Health and Safety Questionnaire Equal Opportunity and Diversity Questionnaire Environmental Questionnaire Financial Questionnaire Insurance Questionnaire Trades List Geographical areas
..
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
67/112
For further information, please contact:
Angela Johnson Telephone: 0114 2735221
Email: [email protected]
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
68/112
Questions
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
69/112
Refreshments
P roject Target
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
70/112
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
71/112
An Introduction to the NEC Suite of Contracts
Anne ChamberlainPrincipal Quantity Surveyor
East Riding
of
Yorkshire
Council
Introduction
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
72/112
Introduction
The NEC Engineering and Construction Contract (ECC) was developed as an improvement to the failure of the traditional forms of contract to Deliver certainty of outcome for
all parties Reduce adversarial relationships
Endorsed by
key
figures
in
industry inc OGC and NAO
Used on significant and high
profile projects
Family of contract
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
73/112
documentsThe NEC family includes
ECC 3rd Edition AF
ECC Subcontract ECC Short Contract ECC Short Subcontract The Professional Services
Contract (PSC) The Adjudicators
Contract The Term Service
Contract (TSC)
The Framework ContractGuidance notes & flowcharts
Why the NEC?
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
74/112
W y ?
Common approach (both
Engineering &
Construction).
Suite of contracts (for professionals/ short Form for
minor works). Supports partnering.
Supports Project
Management.
Project Management procedures
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
75/112
now part
of
the
contract!
Contractualised
ProjectManagement
Contract conditions Separate Project Managementprocedures
Key aims of the NEC
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
76/112
y
The NEC is different from
traditional forms
in
a number
of
ways. Drafted with objectives to make improvements in 3 main
areas:1.Flexibility2.Clarity & simplicity3.Stimulus to good management
Flexibility
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
77/112
y
Multi disciplinary
Design 100% Employer or 100% by Contractor
or combination
Options
Clarity & simplicity
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
78/112
y p y
Plain English
Present tense
Simple structure
Short sentences
Procedures are not open ended and
conflicting
No reference to law
Set of common clauses (irrespective of the
main contract chosen)
Stimulus to good management
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
79/112
Proactive management of projects: Early Warning procedure for
dealing with problems Focus on the programme Defined change control process
(referred to as Compensation Events )
Period for reply
Describes actions to be taken by parties
It is a document of procedures
NEC structure
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
80/112
Core Clauses (common to ALL main options)1) General2) The Contractors main responsibilities
3) Time4) Testing & Defects5) Payment6) Compensation events7) Title8) Risks & insurance
9) Disputes & termination
Main Options A to F
Secondary Options
Terms not used in the
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
81/112
ECCExtension of timeVariationsClaimsDelay & disruptionLoss & expenseTraditional roles (Architect/QS/Engineer)Subjective measurementsPrelims (added back!)
Provisional Sums
(added
back!)Prime Cost Sums
Interim valuations
Comparison with other
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
82/112
Forms of ContractJCT ICE ECC
ArchitectSupervisin g OfficerContract
Administrator
Engineer Project Manager
Quantity Surveyor
Clerk of Works EngineersRepresentative
Supervisor
Adjudicator Engineer (cl.66
decisions) Adjudicator/Conciliator
Adjudicator
Arbitrator Arbitrator Arbitrator / Courts
MAIN OPTIONS
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
83/112
Option A Priced Contract With Activity Schedule (Plan and Spec)
Option B Priced Contract With Bill of Quantities (Bill of Quantities)
Option C Target Contract With Activity Schedule
(GMP then open book)
Option D Target Contract With Bill of Quantities (Bill of Quantities then open book)
Option E Cost Reimbursable Contract (Cost Plus)
Option F Management Contract
Financial risk
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
84/112
E m p l o y e r
Contractor
Financial risk ofmain options
AB
CD
EF
CORE CLAUSE
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
85/112
10.1 The Employer, the Contractor, the Project Manager and the Supervisor shall act as stated in
this contract and in a spirit of mutual trust and co operation.
Early warnings
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
86/112
Key trigger to good management within the contract
About the management of risk
to the project Not about risk ownership
Early Warning process:PM records
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
87/112
87
ProjectManager
Joint
ContractorNotifyProject
Manager
NotifyContractor
Question .Could it impact on?:- Time- Quality- Cost
??
Question .Could it impact on?:- Time- Quality- Cost
??
EitherPartyMay
identify
EventOccurs!
If yes
If yes
Late delivery - impact on existing service1 5 Note
Not affordable - re-design, impacting on programme3 5 Manage
Effect on programme 2 4 Be Aware
Temporary strucure - cost & programme2 4 Be Aware
O pe ra ti on al i mp ac t on r es t of s it e 3 5 Manage
Delay in programme 2 5 Be Aware
Delay in programme & cost 2 3 Note
Impact on services 3 5 Manage
outcome in aRisk Register
Meeting to agree:- How to avoid..- Seek solutions- Decide action plan
If reqd.
If reqd.
Early Warning clauses
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
88/112
Clause Description
16.1 Both parties give an early warning as soon as theybecome aware of any event that could effect: Time Quality Cost Key Date (NEC3)
- Contractor can raise if his cost may increase (NEC3)- PM enters into a Risk Register (NEC3)
16.2 Either party may instruct the other to attend a riskreduction meeting.
Each may instruct other people to attend e.g.
subcontractors, client stakeholders.
Early Warning clauses
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
89/112
(continued):Clause Description16.3 At the risk reduction (NEC3) meeting those who
attend co-operate in:1. Considering how the matter can be avoided
or reduced2. Seeking solutions that will bring advantage
to all those effected3. Decide upon actions to take
16.4 The PM records the outcome and gives a recordof this to the contractor.
NEC3 requires this record to be in the form of aRisk Register.
Programming under
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
90/112
NEC3 NEC brought programming to the
forefront
Detailed programme from the outset Regular updates to the programme
which gives clear visibility as to where a programme is going
No more claims programme at the end of the project
Intends to remove the confrontational aspects of other forms of contract.
Programme clauses: 31.2
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
91/112
Each programme (which requires acceptance by thePM) should include:
starting date, access dates , Key Dates andCompletion Date planned Completion order & timing of operations (includesstatement of how & resource utilised) planned Completion provisions for:
FloatTime risk allowance
other information which the WI requires
Programme clauses: 31.3
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
92/112
Reasons for not accepting theprogramme include:
the Contractors plans are not practical the programme does not show the
required information It does not represent the Contractors plans realistically or It does not comply with the WI
Programme clauses: 32.2
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
93/112
The Contractor submits a revisedprogramme for acceptance:
within the period for reply afterinstructed by the PM when the Contractor choosesand, in any case;
at no longer than the intervalstated in the Contract Data
Programme clauses: 32.1
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
94/112
Each revised programme needs toinclude:
actual progress on each operation effects of implemented CEs
how the Contractor plans to deal withdelays & notified Defects any other changes the Contractor proposes to the Accepted Programme
Compensation events
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
95/112
Events which if they do not arise from Contractors fault entitle the Contractor to be recompensed for the affect on
Prices, Key
Dates
and
Completion Date.
Under the NEC there are no
prolongation or loss and expanse claims
What are compensation
t ?
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
96/112
events? It has to be listed as such in the
contract 19 are stated in clause 60.1 3 in options B and D
Also in secondary option clauses Z clauses
Compensation Event
E l
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
97/112
Examples Clause 60.1
(1) PM gives instruction changing WI
(2) Employer does not allow access to and use part of the site
(12) Contractor encounters certain conditions
(13) A weather measurement is recorded less frequently than once in 10 years
Compensation Events
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
98/112
Assessment of change is radically different a quick procedure to value change during the period of the contract
Based upon
the
pre
assessment
of
change based on forecast costs not tendered rates and prices
A Contractor should be neither better
nor worse off for an Employer driven change event occurring
Any extension of time & associated costs must be included in each CE
Compensation events
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
99/112
4 stage process:
1. Notifying
2. Quoting
3. Assessing
4. Implementing
Each step is required to becarried out within definedtimescales
Schedule of cost components
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
100/112
Compensation events priced in accordance with SCC
Full schedule used for options C,D & E
Shorter schedule for options A&B
SCC sets out what can be included e.g.
People costs Materials Equipment
Contract data
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
101/112
Similar to appendix entries for JCT
CD part 1 completed by employer
CD part 2 completed by contractor
Example of completed CD within guidance notes (brown book)
NEC3 Caution.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
102/112
Not a contract for the bottom drawer
E.g. time barring on CEs..forContractor & PM
Main contractor can be at risk if the dont go back to back with sub contractors
Use of the NEC be prepared for more admin during the project!!
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
103/112
EFFORT/
EXPENSE
TI ME
T r a d
i t i o n a
lCompletion
1-2 months
NEC
Professional Services contract
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
104/112
May be used to appoint a supplier to provide design services (mainly
L46) A priced contract with activity
schedule
C target contract E time based contract
G term contract
Term Service Contract
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
105/112
May be used to appoint a supplier over a period of time to provide a
service A priced contract with price list C target contract with price list E cost reimbursable contract
Adjudicators contract
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
106/112
May be used to appoint an Adjudicator to decide disputes under the NEC
Framework contract.
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
107/112
Used to appoint suppliers to carry out works or services on an as
instructed basis over a set term YORbuild ITT documents are based
on this contract & structured
around it. Uses the term supplier, rather than
contractor
Framework is preferred by LAsrather than contracts more flexible/ no commitment
Further information..
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
108/112
Managing Reality Series of books written by NEC
experts well versed in using the NEC at the coal face
Practical tips e.g. How to calculate people overheads
& working area overheads Examples of hourly rate build up
using SCC vs working rule agreements
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
109/112
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
110/112
Environmental
Management in the Construction Industry
P roject Target
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
111/112
Summary
P roject Target
P roject Target
8/14/2019 Project Target Event Building Business for Our Region 18 Sep 09 Presentation
112/112
Thank you for listening!