*Sources: DMS Projects EP: Engineering & Procurement Project Facility Budget Status Amiral Petrochemical Complex - Acrylonitrile Plant Acrylic Acid 665,000,000 FEED Amiral Petrochemical Complex - Linear Alpha Olefin (LAO) Plant Alpha Olefins 665,000,000 FEED Amiral Petrochemical Complex - Overview Petrochemical Plant 9,000,000,000 FEED Annual Onshore Maintain Potential Programme - (Program) Maintenance 5,000,000,000 Construction Berri Oilfield Expansion - Gas Oil Separation Plant Expansion GOSP 1,700,000,000 EP Dammam Oilfield Redevelopment Oil Production 1,000,000,000 Announced Ethylene Oxide/Ethylene Glycol (EO/EG) Plant III Ethylene Oxide 700,000,000 Construction Fadhili Gas Plant - Overview Gas Treatment Plant 6,600,000,000 Construction Gas Storage Facilities Gas Storage Tanks 1,000,000,000 Announced Haradh Gas Increment Program - North Haradh Field Gas Compression Facilities Gas Compression 1,200,000,000 Construction Haradh Gas Increment Program - Overview Gas Compression 1,200,000,000 Construction Haradh Gas Increment Program - Satellite Gas Compression Facilities Gas Compression 1,200,000,000 Construction Haradh Gas Increment Program - South Haradh Field Gas Compression Facilities Gas Compression 1,200,000,000 Construction Hawiyah Gas Plant Expansion Gas Processing 1,200,000,000 Construction Hawiyah Unayzah Gas Reservoir Storage Gas Storage Tanks 1,700,000,000 EP Jizan Export Refinery - Overview Petroleum Oil Refinery 2,100,000,000 Construction Jubail GAS Phase 9 Industrial Gas Production 900,000,000 Construction Jubail Synthetic Rubber Plant Synthetic Rubber 1,100,000,000 Announced King Salman International Complex for Maritime Industries & Services - Overview Ship Yard 5,300,000,000 Construction Marjan Field Expansion - Overview Oil & Gas Field 16,000,000,000 Construction Marjan Field Expansion - Package 1 GOSP 5,000,000,000 Construction Marjan Field Expansion - Package 10 Gas Treatment Plant 1,200,000,000 EP Marjan Field Expansion - Package 11 Natural Gas Liquefaction (NGL) 1,000,000,000 EP Marjan Field Expansion - Package 3 Water Injection 5,000,000,000 Construction Marjan Field Expansion - Package 4 Gas Field Development 1,500,000,000 Construction Marjan Field Expansion - Package 6 Gas Compression 1,500,000,000 Construction Marjan Field Expansion - Package 9 Gas Compression 1,000,000,000 EP Marjan, Berri, Zuluf and Safaniyah Expansion - Overview Oil & Gas Field 7,000,000,000 Construction Master Gas System Expansion (MGSE) - Overview Non Associated Gas 4,050,000,000 Construction MGSE - Phase 2 - Package 1 - Western Region Pipeline Gas 830,000,000 Construction Offshore Maintain Potential Programme Oil & Gas Field 7,000,000,000 Construction Petrochemical & Chemical Fiber Integrated Project Petrochemical Plant 3,800,000,000 EP Ras Al Khair - SmeltCo Copper 2,800,000,000 Announced Ras Tanura Refinery - Clean Fuels Project Petroleum Oil Refinery 2,000,000,000 Construction Safaniya Debottleneck Onshore Plant Oil Production 800,000,000 EP Unconventional Gas Program Gas Field Development 7,000,000,000 EPC ITB Unconventional Gas Program - Jafurah Gas Plant - Overview Gas Processing 2,500,000,000 EP Unconventional Gas Program - South Ghawar Development - Gas Separation Plant Gas Treatment Plant 700,000,000 EP Unconventional Gas Program - South Ghawar Field Development - Overview Gas Field Development 2,200,000,000 EP Unconventional Gas Program - Tight Gas Production Systems A and B - Overview Gas Field Development 3,500,000,000 Construction Unconventional Gas Program - Tight Gas Production Systems B Gas Field Development 1,000,000,000 Construction PROJECT WATCH – SAUDI ARABIA*
Transcript
Page 1: PROJECT WATCH – SAUDI ARABIA* Amiral Petrochemical … · Project Status As of June 2020, Aramco has decided to delay the ex-ecution work of Mcdermott and COOEC on the GOSP. Project

19Egypt Review 2020

AUGUST 2020

19Business

*Sources: DMS ProjectsEP: Engineering & Procurement

INDUSTRY NEWS

Fertilizer

IndustrialInfrastructure

MiningConstruction

Gas

Refining

Oil

Pipeline

Petrochemicals

Renewables

Power

Offshore

Water

SECTORS COVERED

SUBSCRIBE TODAY

• Tel: +973 1740 5590 • [email protected]• www.dmsprojects.net

Contact us for further information A Division of

REGIONS COVERED

• China• Europe

• India• Asia Pacific

• Latin America• Middle East

• East Africa• North Africa• West Africa

• Central America• North America

• Russia & CIS

resized advert OGN.pdf 1 8/31/2016 10:36:54 AM

Marjan Field Expansion - Package 1

Name of Client : Saudi AramcoEstimated Budget : $5,000,000,000Facility Type : Gas oil separation plant (GOSP)Sector : OilStatus : ConstructionLocation : MarjanFEED : WorleyMain Contractor : McDermott International; China Offshore Oil Engineering Corporation (COOEC)Award Date : Q1-2019

BackgroundAs a part of the Marjan oilfield expansion, Saudi Ara-mco plans to build a gas oil separation plant (GOSP). Marjan oil field delivers a high volume of associated gas, and the new oil capacity will replace in time de-clines in oil capacity from other fields elsewhere. Mar-jan is estimated to have the capacity to produce about 500,000 bpd of crude based on existing production fa-cilities. Aramco’s extensive operations, both offshore and onshore are expected to maintain production on the mature gulf fields over the next decade as hundreds of new wells will be required to be drilled to support other operations in nearby oil fields.

Project StatusAs of June 2020, Aramco has decided to delay the ex-ecution work of Mcdermott and COOEC on the GOSP.

Project ScopeThe project scope involves the development of a GOSP for Marjan oilfield expansion. The GOSP-4 complex will be designed to handle 475,000 bpd of oil, 813,000 bpd of liquids and almost 750 million cu ft per day of gas. The EPC contract will feature the following: Re-moval and salvage of existing gas turbine generators; installation of two 115-kv subsea power and commu-nication cables; replacement of two platform decks; various facilities and platforms, including a new ac-commodation platform, gas compression platform, tie-in platform, etc. It will also include one 36-inch subsea oil trunk line totaling 100 km, and two subsea cables to connect the offshore facilities to the Marjan field’s existing onshore facilities. McDermott’s contract is part of the power system development and features the engineering, procurement, fabrication and load out of the platforms and cable.

Project FinanceThe project client is Saudi Aramco.

Project SchedulesProject Announced 4Q-2014FEED 3Q-2017EPC ITB 1Q-2019Engineering & Procurement 1Q-2019Construction 3Q-2019Completion 4Q-2022

MAMMOET, a global heavy lifting and transport specialist, has been contracted by Ever-sendai Offshore for the loadout of the jacket foundation and ac-companying piles from its fab-rication yard at Ras Al Khaim-ah (RAK) in the UAE.

Covering an area of 235.8 sq km, TenneT’s Hollandse Kust (zuid) Wind Farm Zone (HKZ) is a des-ignated wind farm zone located in the North Sea off the Dutch province of Zuid-Holland.

Mammoet’s scope consisted of weighing, land transport and load-out of the jacket and pile sections at Eversendai Offshore’s fabrication yard.

Following operations to weigh the jacket and determine its centre of gravity, the six-legged structure – weighing 3,200 tonnes and measur-ing 40 m long, 47 m wide and 48 m high - was safely transported from the fabrication yard to the quayside. It was then successfully loaded out, using 128 axle lines of SPMT and six power pack units (PPU).

Separately, three 220-tonne long piles measuring 75 m long, and three 184-tonne short piles measuring 65 m were loaded out and positioned on the deck of the sea-going vessel. Detailed engineering calculations, thorough planning, and comprehensive risk assessments of the loadout operations and procedures ensured safe handling of the jacket and piles. They are now ready to depart the UAE bound for the Dutch North Sea.

The 1.4-GW Hollandse Kust Zuid zone comprises four offshore wind farms that will be connected to the HKZ Alpha and Beta substations. Petrofac is responsible for the engineering, procurement, construction and installation of both substations. Eversendai Offshore is in charge of the engineering and fabrication of the jackets and accompanying piles for the substation platforms at its fabrication yard in RAK Maritime City, Ras Al Khaimah in UAE.

Mammoet lifts 3,200tjacket from RAK yard

Project Facility Budget StatusAmiral Petrochemical Complex - Acrylonitrile Plant Acrylic Acid 665,000,000 FEEDAmiral Petrochemical Complex - Linear Alpha Olefin (LAO) Plant Alpha Olefins 665,000,000 FEEDAmiral Petrochemical Complex - Overview Petrochemical Plant 9,000,000,000 FEEDAnnual Onshore Maintain Potential Programme - (Program) Maintenance 5,000,000,000 ConstructionBerri Oilfield Expansion - Gas Oil Separation Plant Expansion GOSP 1,700,000,000 EPDammam Oilfield Redevelopment Oil Production 1,000,000,000 AnnouncedEthylene Oxide/Ethylene Glycol (EO/EG) Plant III Ethylene Oxide 700,000,000 ConstructionFadhili Gas Plant - Overview Gas Treatment Plant 6,600,000,000 ConstructionGas Storage Facilities Gas Storage Tanks 1,000,000,000 AnnouncedHaradh Gas Increment Program - North Haradh Field Gas Compression Facilities Gas Compression 1,200,000,000 ConstructionHaradh Gas Increment Program - Overview Gas Compression 1,200,000,000 ConstructionHaradh Gas Increment Program - Satellite Gas Compression Facilities Gas Compression 1,200,000,000 ConstructionHaradh Gas Increment Program - South Haradh Field Gas Compression Facilities Gas Compression 1,200,000,000 ConstructionHawiyah Gas Plant Expansion Gas Processing 1,200,000,000 ConstructionHawiyah Unayzah Gas Reservoir Storage Gas Storage Tanks 1,700,000,000 EPJizan Export Refinery - Overview Petroleum Oil Refinery 2,100,000,000 ConstructionJubail GAS Phase 9 Industrial Gas Production 900,000,000 ConstructionJubail Synthetic Rubber Plant Synthetic Rubber 1,100,000,000 AnnouncedKing Salman International Complex for Maritime Industries & Services - Overview Ship Yard 5,300,000,000 ConstructionMarjan Field Expansion - Overview Oil & Gas Field 16,000,000,000 ConstructionMarjan Field Expansion - Package 1 GOSP 5,000,000,000 ConstructionMarjan Field Expansion - Package 10 Gas Treatment Plant 1,200,000,000 EPMarjan Field Expansion - Package 11 Natural Gas Liquefaction (NGL) 1,000,000,000 EPMarjan Field Expansion - Package 3 Water Injection 5,000,000,000 ConstructionMarjan Field Expansion - Package 4 Gas Field Development 1,500,000,000 ConstructionMarjan Field Expansion - Package 6 Gas Compression 1,500,000,000 ConstructionMarjan Field Expansion - Package 9 Gas Compression 1,000,000,000 EPMarjan, Berri, Zuluf and Safaniyah Expansion - Overview Oil & Gas Field 7,000,000,000 ConstructionMaster Gas System Expansion (MGSE) - Overview Non Associated Gas 4,050,000,000 ConstructionMGSE - Phase 2 - Package 1 - Western Region Pipeline Gas 830,000,000 ConstructionOffshore Maintain Potential Programme Oil & Gas Field 7,000,000,000 ConstructionPetrochemical & Chemical Fiber Integrated Project Petrochemical Plant 3,800,000,000 EPRas Al Khair - SmeltCo Copper 2,800,000,000 AnnouncedRas Tanura Refinery - Clean Fuels Project Petroleum Oil Refinery 2,000,000,000 ConstructionSafaniya Debottleneck Onshore Plant Oil Production 800,000,000 EPUnconventional Gas Program Gas Field Development 7,000,000,000 EPC ITBUnconventional Gas Program - Jafurah Gas Plant - Overview Gas Processing 2,500,000,000 EPUnconventional Gas Program - South Ghawar Development - Gas Separation Plant Gas Treatment Plant 700,000,000 EPUnconventional Gas Program - South Ghawar Field Development - Overview Gas Field Development 2,200,000,000 EPUnconventional Gas Program - Tight Gas Production Systems A and B - Overview Gas Field Development 3,500,000,000 ConstructionUnconventional Gas Program - Tight Gas Production Systems B Gas Field Development 1,000,000,000 Construction

*