ProLiant Solutions Tour 2007 ProLiant Virtualisation
Stan GrantIndustry Standard Servers Marketing, Hewlett Packard
Technology advances…• Faster processors, more cores, more memory
capacity• Faster, high capacity hard drives and shared
storage• Faster networking: 10Mbps 100Mbps 1Gbps 10 Gbps
…but costs keep rising, too• Power and cooling• Systems management• Downtime costs
IT budget allocation
Innovation
Performance enhancement
20%
Maintenance & Operations
71%
9%
The Challenge:IT Creating Better Business Outcomes
With Virtualisation…
More workloads on fewer servers for higher
utilisation
Fewer physical servers save power and reduce management time
Workloads can be moved between servers to optimise performance and
reduce downtime
100%
80%
60%
40%
20%
0%
Utilisation Consolidation Efficiency
FlexibilityIsolation
Server Administrator
SAN
LANA
B
C
Spare
Blade Enclosure
Storage Administrator
Network Administrator
HP
Virtu
al C
onne
ct M
odul
es
Server Administrator
SAN
LANLANA
B
C
Spare
Blade Enclosure
Storage Administrator
Network Administrator
HP
Virtu
al C
onne
ct M
odul
es
Reduce hard dependencies between infrastructure
domains
X
Virtualisation Usage Model:Server consolidationServer consolidation with virtualisation allows more applications to be combined on a single server than physical consolidation alone, while increasing service levels to the business and reducing hardware, power, cooling, and floor space costs by up to 50%-70%.
Application Consolidation
Run 10+ on a single server
CPU Utilisation Increase up to 500%
Lower Costs Reduce power & cooling
Provision in minutes, not days
Expansion Dynamic addition of new virtual server for business needs
Legacy Applications
Extend the lifecycle if running on older operating systems
Server Consolidation Customer ExampleConsolidation Results
• Servers: 1000 80 92%• HBAs: 500 160 68%• SAN Switches: 22 8 63%• Network Switches: 84 10 88%• Computing Power (kW): 407 52 87%• Cooling Power (kW): 509 64 87%• Real Estate (sq ft): 2053 257 88%
Per Workload Savings Over 3 Years• Server Hardware: 39,529 SEK • SAN Components: 1,971 SEK • Network: 2,011 SEK • Computing Power: 5,158 SEK • Cooling Power: 6,449 SEK • Real Estate: 2,929 SEK
TOTAL: 58,046 SEK per workload Converted from USD to local currency
Virtualisation Usage Model:Virtual Desktop Initiative (VDI)Desktop virtualisation centrally hosts and delivers a cost-efficient desktop environment from within the datacenter by consolidating many physical desktops onto a single server.
Desktop
Thin Client Laptop
PDA
RDPRDPRDP RDP
HP BladeSystem
Virtualisation Layerwith Virtual Desktops
Optional Connection Mgr.
See www.hp.com/go/vdi for more information
High Availability To the desktop environment
Lower Costs Efficient desktop configuration & management
Reduced power and cooling
Better Resource Utilisation
Dynamic reallocation of desktop connections
Industry standard everything
Leveraging familiar hardware, management and virtualisation tools
Security Application and data centrally located, complete user isolation
VDI Customer ExampleDistrict School Board of Collier County, Florida
Background• Fast growing county in
Southwest Florida− Naples is largest city (315K)
• 43,000 students and 5,000 staff− 2,000 new students each
year
• 44 schools
• 21,000 desktop computers− Initially virtualising about
7,000− Graphics-intensive
applications
• Concerned with costs of supporting multiple images across multiple sites
Implementation• 500 ProLiant BL35p servers
− 4 GB memory per server
• SAN-based storage
• HP clients
• HP RGS Protocol
• VMware Infrastructure (VI3)
• Softricity SoftGrid
Virtualisation Usage Model:Disaster Recovery/High AvailabilityVirtualisation offers customers a cost-effective solution to quickly recover operations in the event of a disaster.
Existing Hardware
Redeployed as heterogeneous failover server
No More 1:1 Ratio
Ratio can be 1:Many
Quick Recovery
Software/virtual vs. hardware
Disaster Tolerance
Via SAN instead of asynchronous data “snapshots”
Security Application and data centrally located, complete user isolation
Virtualisation Usage Model:Test and DevelopmentVirtualisation provides a wide range of test platforms with minimal hardware, while allowing developers to create a specific environment to more quickly and easily capture and reproduce software defects.
Lower Costs For capital equipment and operating budgets
Ease of Creation
Test beds created & stored with multiple OSes & older versions
Easier Defect Management across Multiple Sites
Software defects can be captured in situ for easier analysis and replicated to other locations, even outsourced developers
Virtualisation Challenges• Impact Danger! –
Single Server Failure• Virtual and Physical
servers – Must manage both!
• People Skills Sets – 2 kinds required (physical & virtual)
• Experience needed! Consolidation can be hard work
• Business resistance to changes in processes
HP x86 Virtualisation with HP ProLiant
Server Administrator
SAN
LANA
B
C
Spare
Blade Enclosure
Storage Administrator
Network Administrator
HP
Virtu
al C
onne
ct M
odul
es
Server Administrator
SAN
LANLANA
B
C
Spare
Blade Enclosure
Storage Administrator
Network Administrator
HP
Virtu
al C
onne
ct M
odul
es
Hypervisor
VM1 VM2 VM3
• Design with V in Mind−Servers and Storage
• Collaborate with Partners
• Simplify with Virtual Connect innovation
• One management suite for physical AND virtual servers
• Tools (sizers, white papers) and services to help you
HP ProLiant….Designed for Virtualisation
Memory (design for per Core scalability) • 128GB (32sockets)
I/O Bandwidth (design for per instance scalability)
•9 slots x4, x8 x16
Network ports (design for multiple network paths)
Power and Cooling
Reliability (for single server failure issues)
•Redundancy throughout
•Memory Protection and Resilience
•Automated Monitoring
Management for Virtual Environments
•HP SIM virtual-enabled•Virtual Machine Management Pack• iLO (Lights Out is fundamental)
•Power management and capping at rack, data center
HP confidential
Cost of 64GB memory on
DL580 G4Cost of 64GB memory on
DL580 G4
$19,192Using 16 – 4GB DIMMs
Cost of 64GB memory on
DL580 G5Cost of 64GB memory on
DL580 G5
$11,984Using 32 – 2GB DIMMs
DL580 G4 DL580 G5
Cost of 2 dual core
processors on DL580 G4Cost of 2 dual core
processors on DL580 G4Cost of 1 quad core
processor on DL580 G5Cost of 1 quad core
processor on DL580 G5
Cost of 2 2P VMware ESX
on DL580 G4Cost of 2 2P VMware ESX
on DL580 G4Cost of 1 2P VMware ESX
on DL580 G5Cost of 1 2P VMware ESX
on DL580 G5$7,187Using 1 2P License for 4 cores
$14,374Using 2 2P License for 4 cores
Servers for Best in Class for Virtualisation Similar Performance….Significantly Reduced Costs
Why Not Server Virtualisation for Databases?
HP delivers the complete Virtualisation/Consolidation platform
VMware PolyServe Database Utility for SQL Server
AVAILABILITY
PER
FOR
MA
NC
E
HP PolyServe Database Utilityfor SQL Server
Dynamic Re-Hosting™ for Optimisation
− Stack multiple instances− Buy only what you need− React in 30 seconds
Guaranteed High Availability for All
− All servers are active− Guaranteed, mixed failovers –
Fan out
One-Click Maintenance− Dynamic Re-Hosting™ for
offload and upgrades− Hot insertion of mixed servers
and storage − One Windows install per server− Push installs and hot fixes
MATRIX MANAGER
SHARED DATA
SQL 7 SQL 8 SQL 10SQL 9
SQL 12 SQL 13 SQL 14
SQL 1
SQL 6
SQL 2 SQL 3
SQL 5
SQL 4 SQL 5
SQL 12SQL 11 X
HP’s virtualisationSoftware Partners
VMware – ESX Server/Virtual Infrastructure and VMware Server*• Significant majority of x86 virtualisation market• Well established product with strong ecosystem• Enterprise-class virtualisation management tools for Virtual
Infrastructure• ESX Server/Virtual Infrastructure does not require base OS
Microsoft – Virtual Server* (future Windows Server Virtualisation)
• Provides true Windows experience backed by Microsoft• Windows Server 2008 (Longhorn) built with Windows Server
Virtualisation (Veridian)• Systems Center VMM (2H07) provides good management
platformXenSource – XenExpress*/XenEnterprise, Virtual Iron,
SWsoft – Virtuozzo, Red Hat Enterprise Linux 5/SUSE Linux Enterprise Server 10
• Based on open source Xen virtualisation (except Virtuozzo)• Single-OS virtualisation with Virtuozzo
*Free product
Virtual Connect + Virtual Machines….better virtualisation through simplicity
A
B
C
NI
CH
BA
NI
CH
BA
NI
CH
BA
NI
CH
BA
SAN
LAN
D
Live move network (internal)
Service console
VM server farm• Simplify networks:
Reduce cables without adding switches
• Simplify server connections: separate servers from LAN/SAN
• – Simplify operations: Add, subtract, replace servers in minutes…with less people
Monitor
Performance
Management Pack*
Control
Integrated Lights-Out
Remote Manageme
nt
Deploy
Rapid Deploymen
t Pack
Server Migration
Pack
Integrate
HPEnterprise Manageme
nt Integration Solutions
Protect
Vulnerability and Patch Manageme
nt Pack*
Optimise
Virtualisation
Management Software
HP Systems Insight Manager – discovery, identification, security, fault management
Virtual platforms
Physical platforms
Insight Control Management
integrated management software that addresses your monitoring, deploying, and controlling needs from almost anywhere –
and simplified in a single package for easier deployment/installation.
HP Integrated Virtualisation Management
*As of 7/9/07 available only with Insight Control Environment suites; not sold standalone
Leverage VMware, MSVS, and Xen management tools through HP SIM
HP Software Portfolio – Application, IT Service, Business Process Mgmt.
Virtualisation Implementation best practices
• White papers−Planning
−Deploying guides
−Managing
• ProLiant Sizer for VMware ESX *
• ProLiant Sizer forMicrosoft Virtual Server **
Free HP white papers and tools
* http:://www.hp.com/go/vmware
** http://h71019.www7.hp.com/ActiveAnswers/cache/281742-0-0-225-121.html
http:://www.hp.com/go/activeanswers
Expertise, services and support• Support and subscription services
− HP support personnel work closely with VMware and other vendors to resolve issues
• Pre- and post-sales services offered by HP and channel partners− Consulting, assessments, implementation
• HP Consulting and Integration delivers complete solutions, including analysis, consolidation and migration
• HP Education Services – provides VMware and other software training
• HP Factory Express – can fully integrate server, storage, and virtualisation software
• HP Financial Services – trade-in services improve economics around consolidation
Always Evolving:Virtualisation Technology
• Integrated hypervisors− Allows servers to boot up with virtualisation
available
• Virtual Appliances− Primarily open source and/or limited time
installed directly on virtualisation layer− Minimal OS components integrated, updated
with application
• Microsoft Windows Server Virtualisation− Production version 180 days after Microsoft
Windows Server 2008 (limited features)− Reduced attacks because of minimal OS
components as bare-metal hypervisor
• Virtual I/O− Allows I/O (LAN/SAN) to be implemented with
independent virtual channels for each virtual machine
− Reduces I/O overhead, increasing virtual machine performance
Better business outcomesBusiness optimisation with HP ProLiant and BladeSystem
Accelerate Growth• Speed time to develop
and introduce new apps• Faster time to market
with faster deployment times
• Modular and easy to expand
Lower Costs• 10-43% lower HW
costs• Lower power and
cooling costs up to 40%
• Increase admin productivity 10-fold
Mitigate Risk• Improved service levels
with faster response times and less downtime
• Central control of resources inside the data center
Key enablers
AutomationVirtualisationSecurityIT Systems& Services
Power &Cooling Management
B u s i n e s s O u t c o m e s