+ All Categories
Home > Documents > PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Date post: 18-Jan-2016
Category:
Upload: hofos474
View: 11 times
Download: 0 times
Share this document with a friend
Description:
Part II - Cost Proposala. Dun and Bradstreet Numbers (DUNS) for Subcontractorsb. Required Standard Forms(1) SF-424 Supplemental Key Contacts Information(2) SF-424 Application for Federal Assistance (filled in directly into the submissionpackage)(3) SF-424A Budget Information (filled in directly into the submission package)c. Outputs-Based Budget (pdf version in the Cost Proposal and excel version uploadedseparately into the submission package)d. Budget Narrative (uploaded separately into the submission package)e. Indirect Cost Information(1) Indirect Cost Form for the Applicant (including one for each proposedsubcontractor)(2) Indirect Cost Supporting Documentation (including one for each proposedsubcontractor)f. Survey on Ensuring Equal Opportunity for Applicants (filled in directly into thesubmission package)
Popular Tags:
29
Submitted by: Constance Thomas, Director International Programme on the Elimination of Child Labour International Labour Organization 4, Route des Morillons – 1211 Geneva 22 Switzerland Submitted to: Brenda White and James Kinslow Grant Officers US Department of Labor Procurement Services Center 200 Constitution Avenue NW Washington, DC 20210 Room S-4307 Proposal submitted by ILO (DUNS 020301941) in response to SGA 12-12 PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work Part II: Cost Proposal
Transcript
Page 1: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Submitted by:

Constance Thomas, Director

International Programme on the Elimination of Child Labour

International Labour Organization

4, Route des Morillons – 1211 Geneva 22

Switzerland

Submitted to:

Brenda White and James Kinslow

Grant Officers

US Department of Labor

Procurement Services Center

200 Constitution Avenue NW

Washington, DC 20210

Room S-4307

Proposal submitted by ILO (DUNS 020301941) in response to SGA 12-12

PROMOTE: Decent Work for Domestic Workers

to End Child Domestic Work

Part II: Cost Proposal

Page 2: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

USDOL SGA 12-12

Part II - Cost Proposal

a. Dun and Bradstreet Numbers (DUNS) for Subcontractors

b. Required Standard Forms

(1) SF-424 Supplemental Key Contacts Information

(2) SF-424 Application for Federal Assistance (filled in directly into the submission

package)

(3) SF-424A Budget Information (filled in directly into the submission package)

c. Outputs-Based Budget (pdf version in the Cost Proposal and excel version uploaded

separately into the submission package)

d. Budget Narrative (uploaded separately into the submission package)

e. Indirect Cost Information

(1) Indirect Cost Form for the Applicant (including one for each proposed

subcontractor)

(2) Indirect Cost Supporting Documentation (including one for each proposed

subcontractor)

f. Survey on Ensuring Equal Opportunity for Applicants (filled in directly into the

submission package)

Page 2 of 29

Page 3: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

USDOL SGA 12-12

Part II - Cost Proposal

Dun and Bradstreet Numbers (DUNS) for Subcontractors

• Letter with DUNS number from IDWN, dated 11.05.2012

• Letter with DUNS number from JALA PRT, dated 11.01.2012

• Letter with DUNS number from JARAK, dated 11.04.2012

• Letter with DUNS number from KAPPRT & BM, dated 11.01.2012

Page 3 of 29

Page 4: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

International Domestic Workers Network (IDWN) c/o International Union of Food, Agricultural, Restaurant, Catering, Tobacco and Allied Workers' Associations (IUF) Rampe du Point Rouge 8 CH-1213 Petit Lancy, Geneva, Switzerland

www.idwn.info email : [email protected]

Ms. Brenda White

Grant Officer USDOL/Office of Procurement Services

200 Constitution Avenue NW, Room S-4307 Washington, DC 20210

Reference: SGA 12-12

5 November 2012 Dear Ms. White, This is to certify that International Domestic Workers' NetWork (IDWN)’s DUNS Number is 486526812. Sincerely, IDWN

Elizabeth Tang International Coordinator

Page 4 of 29

Page 5: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Ms. Brenda White

Grant Officer

USDOL/Office of Procurement Services

200 Constitution Avenue NW, Room S-4307

Washington, DC 20210

Reference: SGA 12-12

1 November 2012

Dear Ms. White,

This is to certify that Jala PRT (National Network for Domestic Workers Advocacy)’s DUNS

Number is 726971083.

Sincerely,

Lita Anggraini Chairperson JALA PRT Address: Jl. Kalibata Utara I/32 Jakarta Selatan, Indonesia Phone and Facs.: +62-21-7997036 Email: [email protected], [email protected]

Page 5 of 29

Page 6: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 6 of 29

Page 7: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

JARI

PPTKILN

Komite Aksi Perlindungan Pekerja Rumah Tangga & Buruh Migran (KAPPRT & BM)

========================================================================

Ms. Brenda White

Grant Officer

USDOL/Office of Procurement Services

200 Constitution Avenue NW, Room S-4307

Washington, DC 20210

Reference: SGA 12-12

1 November 2012

Dear Ms. White,

This is to certify that the KAPPRT &BM (Komite Aksi Perlindungan Pekerja Rumah Tangga &

Buruh Migran)’s DUNS Number is 727198934.

Sincerely,

Muhamad Hakim

General Secretary

KAPPRT & BM Address: KSPI: Jl. Raya Condet No. 9 Cililitan Jakarta Timur, Indonesia

Phone. & Facs.: +62-21 – 80877277

Email: [email protected]; [email protected]

Page 7 of 29

Page 8: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

International Labour Organization

Director, Partnerships and Development Department Cooperation

Jürgen

Schwettmann

1808 EYE ST NEW STE 900

WASHINGTON

DC; District of Columbia

20006-5445

+ 41 22 799 6934

[email protected]

Page 8 of 29

Page 9: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

USDOL SGA 12-12

Part II: Outputs-Based Budget

Heading Input specification Responsible Agency

Rate Units Amount in US$ Rate Units Amount

in US$ Rate Units Amount in US$ Rate Units Amount

in US$ Units Amount in US$

1. Direct Labor Costs

National Program Director 1 Officer, NO-C step 6, 42 months, Jakarta ILO 7,750 12 93,000 7,750 12 93,000 7,750 12 93,000 7,750 6 46,500 42 325,500

National Advocacy Specialist and National Capacity Building Specialist 2 Officers, NO-A step 5, 40 months each, Jakarta ILO 4,200 22 92,400 4,200 24 100,800 4,200 24 100,800 4,200 10 42,000 80 336,000

Local Provincial Coordinator 2 Officers, GS-7 step 5, 40 months each, Makassar and Surabaya ILO 3,700 22 81,400 3,700 24 88,800 3,700 24 88,800 3,700 10 37,000 80 296,000

Finance & Admin Assistant 1 Assistant, GS-5 step 5, 42 months, Jakarta ILO 2,100 12 25,200 2,100 12 25,200 2,100 12 25,200 2,100 6 12,600 42 88,200

Reporting oversights and donor relations 6 work months P-3 ILO 16,000 2 32,000 16,000 2 32,000 16,000 1 16,000 16,000 1 16,000 6 96,000

1. Total Direct Labor Costs 324,000 339,800 323,800 154,100 1,141,700

2. Equipment Costs

Computer & Software - desktops 2 desktop computers and softwares for project office ILO 1,500 2 3,000 2 3,000

Computer & Software - laptops 5 Laptop computers and softwares for project staff in Jakarta ILO 2,100 5 10,500 5 10,500

Printers 3 printers for project offices ILO 700 3 2,100 3 2,100

Other Equipment (as applicable) Computer accessories, Digital Camera, Scanners, and other equipment ILO 2,000 1 2,000 1.00 2,000

Office furniture 6 sets of office desks, chairs (for project office) ILO 275 6 1,650 6 1,650

2. Total Equipment Costs 19,250 - - - 19,250

3. Other Office Expenses

Office rent Office rent in Jakarta, Makassar, and Surabaya ILO 3,000 12 36,000 3,000 12 36,000 3,000 12 36,000 3,000 6 18,000 42 126,000

Security Cost Security and safety related expenditures for operations in Jakarta, Makassar, and Surabaya ILO 600 12 7,200 600 12 7,200 600 12 7,200 600 6 3,600 42 25,200

Vehicle rent Provision for car rental for project businesses when needed. ILO 1,500 12 18,000 1,500 12 18,000 1,500 12 18,000 1,500 6 9,000 42 63,000

Communication Cost, including postage, internet connection, telephone connection and charges

Communication cost in Jakarta, Makassar and Surabaya ILO 500 12 6,000 500 12 6,000 500 12 6,000 500 6 3,000 42 21,000

General operating expenses, including office supplies, computer supplies, stationery, electricity, insurance, other office insurance and sundries

General operating expenses in Jakarta, Makassar and Surabaya ILO 1,800 12 21,600 1,800 12 21,600 1,800 12 21,600 1,800 6 10,800 42 75,600

Operational and maintenance of Equipment Provision for equipment maintenance ILO 200 12 2,400 200 12 2,400 200 12 2,400 200 6 1,200 42 8,400

3. Total Other Office Expenses 91,200 91,200 91,200 45,600 319,200

4. Output-Based Activities

Activity 1.1.1: Adapt existing ILO methodology Staff time ILO

Activity 1.1.2: Undertake needs assessment, and finalize report with recommendation for action plan

Consultancy - national consultant USD 300 x 30 days ILO 300 30 9,000 30 9,000

Sub-total Output 1.1 9,000 - - - 9,000

Activity 1.2.1: Based on outcomes of needs assessment, prepare a draft action plan Staff time ILO

Activity 1.2.2: Hold a two day workshop to finalize action plan and agree on monitoring and evaluation mechanisms with all DWOs

Workshop - 2 days, 20 participants, Jakarta, inclusive of meeting cost, travels and resource persons

ILO 9,000 1 9,000 1.00 9,000

Activity 1.2.3: Develop individual action plans for targeted action by each DWOs Staff time ILO

Sub-total Output 1.2 9,000 - - - 9,000

Activity 1.3.1: Develop a training program and manual (see Component 3) Cost included in activity 3.1.1 ILO

Activity 1.3.2: Undertake training for DWOs and other key stakeholders at national level

Workshop - One 5-day national training in Jakarta, 25 participants from Jakarta and provinces, cost inclusive of travels, meeting costs and other related expenditures

ILO 14,000 1 14,000 1.00 14,000

Activity 1.3.3: Undertake training for DWOs and other key stakeholders at provincial level

Workshop - One 5-day training in 4 Provinces, approximately 25 participants, cost inclusive of travels, resources persons and meeting related expenditures

ILO 7,200 4 28,800 4 28,800

Output 1.3 Technical inputs Technical inputs ILO 18,000 1 9,000 0.50 9,000

Sub-total Output 1.3 51,800 - - - 51,800

TotalYear 1 Year 2 Year 3 Year 4

OUTCOME 1: Strengthened capacity of DWOs’ Organizations to more effectively address CDW and promote DWDWand promote decent work for domestic workers in Indonesia (component 1)

Output 1.1 Needs Assessment Conducted

Output 1.2: Action plan for reducing CDW and promoting DWDW finalized

Output 1.3: Comprehensive training on reducing CDW and promotion of DWDWs for DWO trainers and organizers carried out

Output 1.i.1: National and provincial DWO advocacy plans developed and implemented

i) Advocate for increased legal protection for domestic workers and effective enforcement of relevant laws

Page 9 of 29

Page 10: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 1.i.1.1: Conduct a 4 day Workshop resulting in national and provincial DWO advocacy plans

Workshop - National Workshop with participation from the 4 provinces, inclusive of technical inputs from ASI

ILO 40,000 0.75 30,000 0.75 30,000

Activity 1.i.1.2: Conduct ongoing monitoring and evaluation Staff time and travel costs budgeted in monitoring section ILO

Activity 1.i.1.3: Conduct a second meeting to sharpen the strategy Workshop - National Workshop with participation from the 4 provinces, inclusive of technical inputs from ASI

ILO 30,000 1 30,000 30,000

Output 1.i.1 Technical inputs Technical inputs ILO 18,000 0 4,500 0 4,500

Sub-total Output 1.i.1 30,000 - 34,500 - 64,500

Staff time ILO

National consultancies : USD 300 x 25 days, inclusive fees ILO 300 25 7,500 25 7,500

Activity 1.i.2.2: Develop a joint DWO position statement on hazards for DWs and for the 15-17 year age group in particular Staff time ILO

National consultancies : USD 300 x 5 days ILO 300 5 1,500 5 1,500

Workshops - Consultation with workers, employers and government authorities (USD 1000 each) ILO 1,000 3 3,000 3,000

Output 1.i.2 Technical inputs Technical inputs ILO 14,000 1 7,000 0.50 7,000

Sub-total Output 1.i.2 19,000 - - - 19,000

Activity 1.ii.1.1: Conduct a 2 day training for DWOs on challenges and opportunities of organizing DWs in unions

Implementation Agreement with workers' organizations ILO 7,500 1 7,500 7,500 1 7,500 2 15,000

Consultancy - translation into local languages ILO 1,200 1 1,200 1.00 1,200

Consultancy - adaptation ILO 5,000 1 5,000 5,000

Printing - 500 copies ILO 10 500 5,000 5,000

Activity 1.ii.1.3: Conduct training on innovative ways to organize domestic workers Implementation Agreement with ACILS - costed in Activity 1.ii.1.1 ILO

Implementation Agreement with national trade unions to work with DWOs ILO 1,500 4 6,000 1,500 4 6,000 1,500 4 6,000 1,500 4 6,000 16 24,000

Implementation agreement with DWOS - in support of outreach activity to target 20,000 DWs and CDWs ILO 7,500 4 30,000 7,500 4 30,000 7,500 4 30,000 5,000 4 20,000 16 110,000

Sub-total Output 1.ii.1 54,700 43,500 36,000 26,000 160,200

Activity 1.ii.2.1: Assess the needs and gaps in the Domestic Workers School Model developed by JALA PRT in Yogyakarta province

Implementation agreement with JALA PRT - ILO staff travel costs is budgeted in monitoring travels ILO 1,000 1 1,000 1.00 1,000

Activity 1.ii.2.2: Establish the schools in four provinces Implementation agreement with JALA PRT (for procurement of equipment and furniture and securing school premises, as needed)

ILO 15,000 4 60,000 60,000

Activity 1.ii.2.3 Provide ongoing support to the four domestic workers schools to serve domestic workers needs

Implementation agreement with JALA PRT (staff time, costs of service delivery, and operational costs) ILO 7,500 4 30,000 7,500 4 30,000 7,500 4 30,000 7,500 4 30,000 16 120,000

Activity 1.ii.2.4: Conduct training and information sessions on rights of domestic workers, financial literacy, entrepreneurship and life skills

Implementation agreement with JALA PRT (USD 25 x 4,000 participants) ILO 25 1,000 25,000 25 1,000 25,000 25 1,000 25,000 25 1,000 25,000 4,000 100,000

Activity 1.ii.2.5: Adapt existing IPEC tool for self-monitoring of working conditions for domestic workers and CDWs by adding elements of living conditions

Implementation agreement with JALA PRT (staff time and printing costs) ILO 3 5,000 15,000 5,000 15,000

Activity 1.ii.2.6: Facilitate discussion on alternative model of collective action through support group formation of DWs

Implementation agreement with DWOs for conduct of activities in support of service delivery and mobilization

ILO 3,000 4 12,000 3,000 4 12,000 3,000 4 12,000 3,000 4 12,000 48,000

Consultancy - national consultant ILO 300 30 9,000 9,000

Implementation agreements with DWOs (staff time, workshops and operational costs) ILO 10,000 4 40,000 40,000

Output 1.ii.2 Technical inputs Technical inputs ILO 18,000 1 18,000 1.00 18,000

Sub-total Output 1.ii.2 128,000 149,000 67,000 67,000 411,000

Consultancy - international and national experts and translation ILO 1,000 20 20,000 20 20,000

Output 1.ii.2: DWs outreach centers established

Output 1.ii.3: DW skills recognized and upgraded

Activity 1.ii.2.7: Develop indigenous model of collective actions through group formation, including approaches to increase DWOs self-sufficiency

Activity 1.ii.3.1: With technical support from ILO DWT, adapt the Regional Model C t St d d t i i i l t th d f 15 17 ld d d lt

ii) Empower domestic workers to improve their working and living conditions

Output 1.i.2: Hazardous work conditions identified and joint DWO position statement developed

Activity 1.i.2.1: Conduct an assessment on working conditions, exploitative practicesworkplace violence, and health and safety risks in domestic work, particularly to those15 -17 years, completed

Activity 1.i.2.3: Draft code of conduct and model employment contract for domestic workers

Activity 1.ii.1.2: Adapt and translate APWLD manual on Action and organizing with mobile phones

Activity 1.ii.1.4: Ongoing mobilization by DWOs

Output 1.ii.1: DWOs trained on organization, mobilization and group formation

Page 10 of 29

Page 11: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Workshop - consultations with workers, employers and government authorities at the national and provincial levels

ILO 5,000 6 30,000 6 30,000

Activity 1.ii.3.2: Conduct a pilot exercise in JALA PRT schools Implementation agreement with JALA PRT (staff time and teacher fees) ILO 5,000 3 15,000 5,000 3 15,000 5,000 3 15,000 9 45,000

Activity 1.ii.3.3: Experience sharing on model with KKNI (Indonesian qualification framework) Study tour ILO 7,500 1 7,500 1.00 7,500

Output 1.ii.3 - Technical inputs Technical inputs ILO 14,000 1 7,000 0.50 7,000

Sub-total Output 1.ii.3 - 72,000 15,000 22,500 109,500

Activity 1.iii.1.1: Assess the utility of existing hotlines in the four provinces with recommendations for their improvement Consultancy - USD 300 x 15 days ILO 300 15 4,500 15 4,500

Activity 1.iii.1.2: Based on recommendations, work with relevant actors to improve responsiveness of selected hotline

Implementation agreements with selected DWOs to implement the recommendations ILO 4,000 4 16,000 4,000 4 16,000 8 32,000

Sub-total Output 1.ii.1 - 4,500 16,000 16,000 36,500

Activity 1.iii.2.1: Conduct a 2 day workshop in each province (4) for the Police on the legal framework on domestic work and child labor including CDW.

Workshop - meeting costs, travels, staff time and resources persons costs ILO 7,000 4 28,000 4 28,000

Activity 1.iii.2.2: Develop a module for Police training curricula on the legal framework related to CDW and domestic workers exploitation, including gender and child sensitive case management and investigation techniques.

Consultancy - national consultant USD 300 x 20 days ILO 300 20 6,000 20 6,000

Workshop - consultative validation workshops a ILO 9,000 1 9,000 1.00 9,000

Implementation agreement covering cost for pilot exercises in the 4 provinces ILO 3,000 4 12,000 4 12,000

Sub-total Output 1.iii.2 - 34,000 21,000 - 55,000

Activity 1.iii.3.1: Carry out training for DWOs on how to receive and refer cases to Jakarta Legal Aid, LBH APIK and their sister/partner legal aid organizations in targeted provinces (half day meeting)

Implementation agreement with organizations providing legal services to DWOs - formal and informal coaching sessions

ILO 600 4 2,400 600 4 2,400 600 4 2,400 300 4 1,200 16 8,400

Activity 1.iii.3.2: Provide ongoing support to Jakarta Legal Aid, LBH APIK and their sister/partner legal aid organizations in targeted provinces

Implementation agreement with organizations providing legal services to DWOs ILO 2,500 4 10,000 2,500 4 10,000 1,000 4 4,000 12 24,000

Activity 1.iii.3.3: Draft a step-by-step guide and a compendium of the legal cases Implementation agreement with selected organizations (development costs and printing) ILO 10,000 1 10,000 1.00 10,000

Activity 1.iii.3.4: Organize a validation meeting and finalize the step-by-step guide Implementation agreement with selected organizations ILO 14,000 1 14,000 1.00 14,000

Output 1.iii.3 - Technical inputs Technical inputs ILO 14,000 1 7,000 14,000 1 7,000 14,000 1 7,000 14,000 1 7,000 2 28,000

Sub-total Output 1.iii.3 9,400 43,400 19,400 12,200 84,400

Activity 1.iv.1.1: Conduct initial mapping of services and their providers in each targeprovince

Consultancy - national expert USD 300 x 15 days, alinclusive fee ILO 300 15 4,500 15 4,500

Activity 1.iv.1.2: Verify the identified resources through visits to service providers Costed in Activity.1.iv.1.1 ILO

Activity 1.iv.1.3: Organize a 1 day workshop with key service providers to discuss linkages between services, referral mechanisms and other issues

Implementation agreements with JALA PRT, JARAK, KAPRT & BM ILO 2,500 4 10,000 4 10,000

Activity 1.iv.1.4: Develop a resource list in the form of a user friendly catalog

Implementation agreements with JALA PRT, JARAK, KAPRT & BM - staff time, internet connectivity and production and dissemination of the catalogue

ILO 2,500 4 10,000 4 10,000

Activity 1.iv.1.5: Establish an informal network of social services providers at the provincial and district level

Implementation agreements with JALA PRT, JARAK, KAPRT & BM - staff time ILO

Activity 1.iv.1.6: Update Resource list and conduct ongoing monitoring Implementation agreement with JALA PRT, JARAK, and KAPRT & BM (staff time and connectivity) ILO 3,000 4 12,000 3,000 4 12,000 3,000 4 12,000 12 36,000

Sub-total Output 1.iv.1 24,500 12,000 12,000 12,000 60,500

Activity 1.v.1.1: Identify agencies to conduct KAB studies Staff time ILO

Output 1.v.1: Reports of the findings of the Knowledge Attitude and Behavior (KAB) surveys used to craft improved awareness raising action

Output 1.iii.1: Hotlines strengthened

v) Raise public awareness on the exploitation of domestic workers

Competency Standard training curriculum to the needs of 15-17 year old and adultdomestic workers

Activity 1.iii.2.3: Advocate for module to be incorporated into national curricula of the police academy

Output 1.iii.2: Capacity of the Police to respond to reported cases of child and adult DW exploitation built

Output 1.iii.3: Legal support to cases provided

Output 1.iv.1: Resource list developed, and referral mechanisms established and implemented in each target province

Output 1.iii.3: Legal support to cases provided

iv) Develop a "Resource List" and refer cases of CDW to the appropriate authorities and social service providers

Page 11 of 29

Page 12: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 1.v.1.2: Conduct KAB studies (at the beginning and end of project) covering respondents from each of the four provinces Service contact - national organization ILO 30,000 1 30,000 30,000 1 30,000 2 60,000

Activity 1.v.1.3: Prepare report of findings of KAB and disseminate to stakeholders. Other - printing and postages ILO 5,000 1 5,000 5,000 1 5,000 2 10,000

Output 1.v.1 - Technical inputs Technical inputs ILO 18,000 0 4,500 18,000 0 4,500 0.50 9,000

Sub-total Output 1.v.1 39,500 - - 39,500 79,000

Activity 1.v.2.1: Conduct a 3 day workshop for all DWOs on how to interact with media, identify and create opportunities for ‘news’, as well as on how to use social media and ICT.

Implementation agreements with DWOs- workshop costs, transport and resource persons ILO 10,000 1 10,000 1.00 10,000

Activity 1.v.2.2: DWOs to monitor and interact with media Implementation agreement with DWOs - staff time, cost included in Activity 1.4.2.1 ILO 2,500 4 10,000 2,500 4 10,000 8 20,000

Sub-total Output 1.v.2 10,000 10,000 10,000 - 30,000

Activity 1.v.3.1: Identify suitable PR consultant/ firm Staff time ILO

Activity 1.v.3.2: Conceive strategies for comprehensive awareness raising campaigns for each province and at national level Service contract ILO 20,000 1 20,000 1.00 20,000

Activity 1.v.3.3: Undertake targeted awareness raising campaigns Implementation agreement with JALA PRT, JARAK, and KAPPRT & BM ILO

Activity 1.v.3.4: Commemorate 'special days' including World Day against Child Labor; Indonesian Domestic Workers Day; National Children's Day; National Women's Day; Human Rights Day

Implementation Agreement with DWOs ILO 3,000 4 12,000 3,000 4 12,000 3,000 4 12,000 3,000 4 12,000 16 48,000

Sub-total Output 1.v.1 32,000 12,000 12,000 12,000 68,000

Activity 1.vi.1: Provide ongoing technical support, as needed Implementation Agreement with DWOs, inclusive of Activities 1.vi.1,1, 1vi.1.2, 1.vi.i.3 ILO 8,000 1 8,000 8,000 1 8,000 8,000 1 8,000 8,000 1 8,000 4 32,000

Activity 1.vi.1.2: Conduct training on results-based management Implementation Agreement with DWOs ILO

Activity 1.vi.1.3: Provide training on financial and technical reporting to the ILO Implementation Agreement with DWOs ILO

Sub-total Output 1.vi.1 8,000 8,000 8,000 8,000 32,000

Subtotal outcome 1 424,900 388,400 250,900 215,200 1,279,400

Implementation agreement with APPSI - cost inclusive of activities 2.1.1, consultation printing and other operational costs

ILO 3,000 1 3,000 1.00 3,000

Consultancy - national expert USD 300 x 15 days, alinclusive fee ILO 300 15 4,500 4,500

Activity 2.1.2: Hold a half day meeting with recruitment agencies affiliated with APPSI to mobilize commitment to the code of conduct. Implementation agreement with APPSI ILO 2,500 1 2,500 1.00 2,500

Activity 2.1.3: Establish recognition awards for compliant recruitment agencies Implementation agreement with APPSI ILO 2,000 1 2,000 2,000 1 2,000 2,000 1 2,000 3 6,000

Output 2.1 Technical inputs Technical inputs ILO 14,000 1 7,000 0.50 7,000

Sub-total Output 2.1 17,000 2,000 2,000 2,000 23,000

Activity 2.2.1: Information sessions to teachers on the prevention of CDW and social services for children at risk so that they can mainstream messages in their day-to-dayteaching

Implementation agreement with PGRI - targeting 100 sessions with teachers in the selected provinces ILO 150 100 15,000 100 15,000

Activity 2.2.2: Sensitize teachers on reporting mechanisms and social service providers Cost included in Activity 2.2.1 ILO

Sub-total Output 2.2 - 15,000 - - 15,000

Activity 2.3.1: Conduct a 1 day sensitization and training for AJI members on DWs, including CDWs, and on how to report cases of exploitation Implementation agreement with AJI ILO 7,500 1 7,500 1.00 7,500

Activity 2.3.2: Conduct continuous post-training follow-up to ensure the issues remain a priority among journalists Implementation agreement with AJI ILO - -

Activity 2.3.3: Establish recognition award for the most effective or influential investigative story on CDW and DWDW

Implementation agreement with AJI - 10 awards per year ILO 500 10 5,000 500 10 5,000 500 10 5,000 500 10 5,000 40 20,000

Sub-total Output 2.3 12,500 5,000 5,000 5,000 27,500

OUTCOME 2: Innovative partnerships with business and civil society entities built to reduce the prevalence of child domestic work and promote decent work for domestic workers in Indonesia (component 2)

vi. Other Capacity Building Needs

Activity 2.1.1: Together with APPSI, develop the code of conduct together with a mechanism for follow-up with DWs after their deployment, either through unannounced monitoring visits or phone, text message or email contact

Output 2.4: Media and telecommunication firms, including prominent public figures, mobilized to promote DWDW and reduce CDW

Output 2.2: Teachers, students and parents mobilized to prevent Child Domestic Worker exploitation through Teachers Union (PGRI)

Output 2.3: Journalists mobilized to report on the protection of domestic workers, including CDW

Output 1.v.2: Media training program developed for DWOs and implemented

Output 1.v.3: Comprehensive awareness raising campaign designed and implemented

Output 1.vi.1: DWOs trained on organizational, administrative, budget and management issues

Output 2.1: Recruitment agencies mobilized to implement a code of conduct ensuring DWDW and absent of CDW

Page 12 of 29

Page 13: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 2.4.1: Identify and gain commitment from major Media and telecommunication firms to champion the cause of DWDW and elimination of CDW staff time ILO

Activity 2.4.2: Prepare key themes or messages to be included in mini-dramas (sinetron) and talk-shows (Mama Dedeh) content of stand-up comedy staff time ILO

Activity 2.4.3: Identify and gain commitment from well-known Twitter users to champion the cause of DWDW and elimination of CDW , including serving as Goodwill Ambassador

Staff time ILO

Activity 2.4.4: Conduct briefings with the Goodwill Ambassador to ensure they are informed of the issues Staff time ILO

Activity 2.4.5: Ensure the active participation of the goodwill ambassador at events and on Twitter and other social media

Others - provision for travel costs of the goodwill ambassador, if needed. ILO 2,000 1 2,000 2,000 1 2,000 2,000 1 2,000 2,000 1 2,000 4 8,000

Sub-total Output 2.4 2,000 2,000 2,000 2,000 8,000

Activity 2.5.1: Explore partnership and design targeted campaigns Implementation agreement with national trade unions - costs inclusive of Activity 2.5.1, 2.5.2, 2.5.3 ILO 15,000 1 15,000 1.00 15,000

Activity 2.5.2: Adapt and/or produce campaign materials Implementation agreement with national trade unions ILO

Activity 2.5.3: Disseminate campaign materials at opportune time Implementation agreement with national trade unions ILO

Sub-total Output 2.5 15,000 - - - 15,000

Activity 2.6.1: Identify and gain commitment from religious leaders to champion the cause of DWDW and elimination of CDW

Implementation agreement with JALA PRT, JARAK, and KKPRT ILO 1,500 4 6,000 4 6,000

Activity 2.6.2: Conduct briefings with the religious leaders to ensure they are informed of the issues

Implementation agreement with JALA PRT, JARAK, and KKPRT ILO 1,500 4 6,000 4 6,000

Sub-total Output 2.6 6,000 6,000 - - 12,000

Activity 2.7.1: Identify neighborhood associations and village groups and gain commitment to take on monitoring abuse of DWs and CDWs

Implementation agreement with JALA PRT, JARAK, and KKPRT ILO

Activity 2.7.2: Train neighborhood associations and village groups representatives to act as informal monitoring and referral agents organizations

Implementation agreement with JALA PRT, JARAK, and KKPRT ILO 3,000 4 12,000 3,000 4 12,000 8 24,000

Sub-total Output 2.7 - 12,000 12,000 - 24,000

Activity 2.8.1: Design a youth-centered campaign Implementation agreement with Kampung Halaman ILO 6,000 1 6,000 1.00 6,000

Activity 2.8.2: Produce audio-visual campaign materials Implementation agreement with Kampung Halaman ILO 20,000 1 20,000 20,000

Activity 2.8.3: Develop campaign materials to create awareness through youth events in schools, youth groups, local communities, markets etc. Implementation agreement with Kampung Halaman ILO 10,000 1 10,000 1.00 10,000

Sub-total Output 2.8 36,000 - - - 36,000

Sub-total Outcome 2 88,500 42,000 21,000 9,000 160,500

Activity 3.1.1: Alongside the first regional workshop, conduct a visioning and technical planning meeting for DWOs on training needs and potential promising practices

Implementation agreement with IDWN ILO 20,000 1 20,000 1.00 20,000

Activity 3.1.2: Carry out inventory and analysis through a desk review and country coaching visits Implementation agreement with IDWN ILO 750 15 11,250 750 35 26,250 50 37,500

Activity 3.1.3: Draft the training manual Implementation agreement with IDWN ILO

Activity 3.1.4: Verify and finalize the draft training manual in Indonesia Implementation agreement with IDWN ILO 10,000 1 10,000 1.00 10,000

Activity 3.1.5:Promote the use of the training manual in the region Implementation agreement with IDWN ILO

Activity 3.1.6: Upload reports and campaign materials to the Knowledge Sharing Platform and organize discussion in CoP Implementation agreement with IDWN ILO

Activity 3.1.6: Upload reports and campaign materials to the Knowledge Sharing Platform and organize discussion in CoP Implementation agreement with IDWN ILO

Output 3.1 Technical inputs Technical inputs ILO 18,000 1 9,000 18,000 1 9,000 1.00 18,000

Sub-total Output 3.1 40,250 26,250 19,000 - 85,500

Activity 3.2.1: Commission the CoP Survey Service contract ILO 20,000 1 20,000 1.00 20,000

OUTCOME 3: Systems to transfer knowledge and practical tools on the promotion of DWDW as a vehicle for reducing CDW exist in Indonesia and other countries in Asia (Component 3)

Output 2.8: Youth are sensitized to the plight of CDW through a targeted campaign

Output 3.1: Training manual to guide DWOs and other organizations concerned with promoting DWDW and reducing CDW developed

Output 2.5: Targeted campaign developed with a variety of societal actors, including Bank Workers and Hotel Workers Trade Unions, Market Associations and Diplomatic Mission

Output 2.6: Religious leaders mobilized to campaign for the promotion of DWDW and against CDW

Output 2.7: Neighborhood associations and village groups mobilized to take active role in promoting DWDW and against CDW

Output 3.2: Community of Practice (CoP) established and operational on promoting DWDW as a means of reducing CDW

Page 13 of 29

Page 14: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 3.2.2: Review results from CoP Survey & develop CoP Concept Note Staff time ILO

Activity 3.2.3: Identify and contact prospective CoP members (founding members & substantive champions) Implementation with DWOs and advocate groups ILO

Activity 3.2.4: Execute 3 days kick-off visioning event (undertaken as part of Activity 3.1.1 above) Implementation with DWOs and advocate groups ILO 10,000 1 10,000 1.00 10,000

Activity 3.2.5: Design and customize CoP portal (responding to member user requirements) Implementation with DWOs and advocate groups ILO 5,000 1 5,000 5,000 1 5,000 5,000 1 5,000 5,000 1 5,000 4 20,000

Activity 3.2.6: Recruit CoP facilitator Implementation with DWOs and advocate groups ILO 15,000 1 15,000 15,000 1 15,000 2 30,000

Activity 3.2.7: Implement CoP web based sessions and web-seminars on various thematic areas pertaining to the promotion of DWDW Implementation with DWOs and advocate groups ILO

Activity 3.2.8: Consolidate good practices, lessons and statistical reports (consultant and/or CoP member & printing of output) Implementation with DWOs and advocate groups ILO 700 7 4,900 700 8 5,600 700 5 3,500 20 14,000

Sub-total Output 3.2 35,000 24,900 25,600 8,500 94,000

Activity 3.3.1: Following the Activity 3.1.1, identify and agree on promising practices to be featured and methodology for evaluating and documenting these Staff time - follow-up to Activity 3.1.1 ILO

Activity 3.3.2: Prepare a draft of the promising practices report Consultancy - international consultants USD 700 x 20 days ILO 700 20 14,000 20 14,000

Activity 3.3.3: Validate the draft report in the second regional workshop (see Output 4.2) Cost included in Activity 3.3.2 ILO 10,000 1 10,000 10,000

Activity 3.3.4: Finalize report Cost included in Activity 3.3.2 ILO

Activity 3.3.5: Translate the report into relevant Asian languages Consultancy - translation contracts ILO 4,000 4 16,000 16,000

Activity 3.3.7 Regional promotion strategy (detailed to be finalized post-award with USDOL) Other - printing and postages, including e-pub. ILO 10,000 1 10,000 1.00 10,000

Activity 3.3.7 Regional promotion strategy (detailed to be finalized post-award with USDOL) Implementation Agreement with IDWN ILO 70,000 1 70,000 1.00 70,000

Sub-total Output 3.6 - - 70,000 50,000 120,000

Sub-total Outcome 3 75,250 51,150 114,600 58,500 299,500

Activity 4.1.1: Identify participants and select venue Staff time

Activity 4.1.2: Discuss and compile the materials for the workshop Consultancy - preparation of workshop materials andbackground papers 700 30 21,000 30 21,000

Activity 4.1.3: Agree on workshop agenda, including key resource persons Staff time

Activity 4.1.4: Conduct workshop Workshop - regional workshop, 30 people, Jakarta, covering meeting costs, travels and resources persons and reports. Cost include Activity 4.1.5

55,000 1 55,000 1.00 55,000

Activity 4.1.5: Finalize and distribute workshop report Staff time

Output 4.1 Technical inputs Technical inputs ILO 18,000 1 18,000 1.00 18,000

Sub-total Output 4.1 - 94,000 - - 94,000

Activity 4.2.1: Identify participants and select venue Staff time ILO

Activity 4.2.2: Discuss and compile the materials for the workshop Consultancy - international consultant USD 700 x 30 days, all inclusive fee for preparation of workshop materials and background papers

700 30 21,000 30 21,000

Activity 4.2.3: Agree on workshop agenda, including key resource persons Staff time

Activity 4.2.4: Conduct workshop Workshop - regional workshop, 30 people, Jakarta, covering meeting costs, travels and resources persons and reports. Cost include Activity 4.1.5

55,000 1 55,000 1.00 55,000

Activity 4.2.5: Finalize and distribute workshop report Staff time ILO

Output 4.2 Technical inputs Technical inputs ILO 18,000 1 18,000 1.00 18,000

Sub-total Output 4.2 - - - 94,000 94,000

Sub-total outcome 4 - 94,000 - - 94,000 188,000

Activity 5.1.1: Develop questionnaires and research methodology Consultancy - national consultant USD 300 x 9 days,cost inclusive of Activity 5.1.2 and 5.1.3 ILO 300 9 2,700 9 2,700

Output 5.1: Report of the rapid assessment finalized

OUTCOME 4: Regional alliances become catalysts for far reaching change in perceptions and action against CDW and recognition of DWDW

OUTCOME 5: Domestic workers including CDWs linked to a communication system enabling them to have ready access to information and support services

Output 3.3: Promising practices and lessons learned identified and report published

Output 4.1.: First Regional knowledge sharing Workshop conducted

Output 4.2: Second Regional knowledge sharing Workshop conducted

Page 14 of 29

Page 15: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 5.1.2: Carry out interviews to understand how people use and access ICT including mobile phone use and internet behaviors of CDWs and adult domestic workers

Consultancy - cost included in Activity 5.1.1 ILO

Activity 5.1.3: Based on the data and information gathered through activities 5.1.1. and 5.1.2, finalize a report Consultancy - cost included in Activity 5.1.1 ILO

Sub-total Output 5.1 2,700 - - - 2,700

Activity 5.2.1: Develop a pilot model in collaboration with the IT Advisor Consultancy - international consutlant USD 700 x 12 days cost inclusive of Activity 5.2.1, 5.2.2, 5.2.3 and 5.2.4

ILO 700 12 8,400 12 8,400

Activity 5.2.2: Test the model with a group of child and domestic workers and employers. Consultancy - national consultant USD 300 x 5 days ILO 300 5 1,500 5 1,500

Activity 5.2.3: After the pilot, consolidate good practices and lessons Implementation agreement with DWOs, cost included therein ILO

Activity 5.2.4: Finalize the model and launch at a larger scale. Implementation agreement with DWOs, cost included therein ILO

Sub-total Output 5.2 9,900 - - - 9,900

Activity 5.3.1: Conduct technical training for DWOs on how to use SMS and other required software, for different channels of communication, access to internet etc., including customizing and tailor-making messages based on the identified needs, optimized timing and frequency of the messages.

Consultancy - IT expert USD 300 x 10 days, all inclusive fees. Coverage: 4 provinces ILO 300 10 3,000 10 3,000

Activity 5.3.2: Conduct mobile phone usage training of members of DWOs and CDWs (for communication and information gathering, including as tool for campaigning, awareness raising, reporting on cases of exploitation etc.)

Consultancy - cost included in Activity 5.3.1 ILO

Activity 5.3.3: Conduct ICT training for DWO staff on how to conduct awareness raising and advocacy campaigns Consultancy - cost included in Activity 5.3.1 ILO

Sub-total Output 5.3 3,000 - - - 3,000

Activity 5.4.1: Conduct an assessment of the ICT model Consultancy - international consultant USD 700 x 15 days, cost inclusive of Activity 5.4.2 and 5.4.3 ILO 700 15 10,500 15 10,500

Activity 5.4.2: Recommend any adaptation to the ICT model based on the findings of the assessment Consultancy ILO

Activity 5.4.3: Conduct an end-line study to measure changes in behavior and usage of ICT Consultancy ILO

Sub-total Output 5.4 10,500 - - - 10,500

Sub-total Outcome 5 26,100 - - - 26,100

Activity 6.1.1: Develop alternative methodologies to estimate the numbers of domestic workers and CDW Technical inputs ILO 18,000 0.75 13,500 0.75 13,500

Activity 6.1.2: Undertake quantitative research to gather up to date and reliable data on the number of domestic workers, including CDWs in each province further allowing for national level estimations of prevalence conducted

Implementation agreement with BPS or a national research institution ILO 90,000 0.50 45,000 90,000 0.50 45,000 1.00 90,000

Activity 6.1.3: Conduct research on working conditions to inform the identification of hazards and violence in the working and living conditions of DWs

Implementation agreement with BPS or a national research institution ILO 40,000 1 40,000 1.00 40,000

Activity 6.1.4: Conduct research on wages from different groups of domestic workers Implementation agreement with BPS or a national research institution ILO 20,000 1 20,000 1.00 20,000

Activity 6.1.5: Conduct research on alternative job referral mechanisms Implementation agreement with a national research institution ILO 20,000 1 20,000 1.00 20,000

Activity 6.1.6: Documentation and outcome based research, including gender analysis, on the project's capacity building efforts of DWOs, pre- and post KAB surveys; documentation of PPs; and national and provincial level policy changes

Staff time to consolidate research findings and studies commissioned through the project funds ILO

Output 6.1 Technical inputs Technical inputs ILO 18,000 1 18,000 1.00 18,000

Sub-total Output 6.1 156,500 45,000 - - 201,500

Activity 6.2.1: Develop the monitoring and evaluation plan in collaboration with USDOL's external monitoring and evaluation expert. Technical inputs ILO 18,000 1 18,000 1.00 18,000

Activity 6.2.2: Collect Baseline information on indicators regularly Implementation agreement with a national research institution ILO 50,000 1 50,000 1.00 50,000

Activity 6.2.3: Develop a sustainability strategy Staff time ILO

Output 6.2: Comprehensive Monitoring and Evaluation Plan developed and utilized

Output 5.2: Model Communications Plan using Mobile and Web Based Technologies developed and piloted

Output 5.4: Report on the assessment of the model finalized

Output 6.1: Data collection and outcome based research conducted

OUTCOME 6: An Enhanced Knowledge base to promote DWDW and reduce CDW

Output 5.3: Training of DWOs and their members conducted

Page 15 of 29

Page 16: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Heading Input specification Responsible Agency TotalYear 1 Year 2 Year 3 Year 4

Activity 6.2.4: Develop annual work plans Staff time ILO

Activity 6.2.5: External mid-term and final evaluations (based on consultation with USDOL) Service Contract ILO 30,000 1 30,000 40,000 1 40,000 2 70,000

Activity 6.2.6: Conduct Independent evaluation Service Contract ILO 30,000 1 30,000 1.00 30,000

Activity 6.2.7: Submit six-monthly progress reports including GPRA data Staff time ILO

Output 6.2 Technical inputs Technical inputs ILO 18,000 1 9,000 18,000 1 9,000 1.00 18,000

Sub-total Output 6.2 68,000 39,000 - 79,000 186,000

Subtotal component 6 224,500 84,000 - - 79,000 387,500

Activity 7.1.1: Create and establish a project steering committee Staff time ILO

Activity 7.1.2: Conduct regular meetings of project advisory committee (PAC) to guide project implementation and share achievements

Workshop - bi-annually meeting, 20 participants, Jakarta, ILO 2,500 2 5,000 2,500 2 5,000 2,500 2 2,500 3,000 2 6,000 8 18,500

Activity 7.1.3: Project staff attend and report on project strategies and achievements as and when appropriate Staff time ILO

Activity 7.1.4: Conduct a one day workshop with all key partners to develop the sustainability plan

Workshop - national level meeting, 30 participants, Jakarta ILO 14,000 1 14,000 1.00 14,000

Activity 7.1.5: Implement the sustainability plan Staff time ILO

Activity 7.1.6: Identify all concerned actors and relevant social media and create appropriate communication channels, including a twitter and Facebook account Staff time and implementing agent ILO

Activity 7.1.7: Create and update twitter and Facebook account regularly with project news, information and achievements Staff time ILO

Sub-total Output 7.1 19,000 5,000 2,500 6,000 32,500

Subtotal Outcome 7 19,000 5,000 2,500 6,000 32,500

4. Total Outputs- Based Activities (excluding travels) 858,250 664,550 389,000 461,700 461,700 2,373,500 2,373,500

5. Monitoring and Travels -

Monitoring mission cost - Project Staff (Jakarta based) Travels - Jakarta-based for project businesses ILO 1,200 18 21,600 1,200 18 21,600 1,200 18 21,600 1,200 18 21,600 72 86,400

Monitoring mission cost - Project Staff (Field based) Travels - provincial staff for project businesses ILO 1,500 12 18,000 1,500 12 18,000 1,500 12 18,000 1,500 12 18,000 48 72,000

Monitoring mission cost - Non-project staff (international travel from Bangkok to Jakarta) Travels - technical missions for project businesses ILO 2,000 4 8,000 2,000 4 8,000 2,000 4 8,000 2,000 4 8,000 16 32,000

Travel Cost - Annual Meeting to Washington DC Travels - Cost inclusive of airfare, DSA and other travel expenses ILO 8,000 1 8,000 8,000 1 8,000 8,000 1 8,000 8,000 1 8,000 4 32,000

Travel Cost - Post award meeting to Washington DC Travels - Cost inclusive of airfare, DSA and other travel expenses ILO 8,000 1 8,000 1.00 8,000

5. Total Project Monitoring and Evaluation 63,600 55,600 55,600 55,600 230,400

6. Audit

Audit cost Service contract ILO 130,000 1 130,000 1.00 130,000

6. Total Audit cost - - 130,000 - - 130,000

7. TOTAL DIRECT COST 7. Sub-total = (1+2+3+4+5+6) 1,356,300 1,151,150 989,600 717,000 4,214,050

8. Provision for cost increase (5%) 5% on all Budget lines from Direct Cost ILO 67,815 57,558 49,480 35,850 210,703

9. Sub-total= 8 67,815 57,558 49,480 35,850 210,703

10. INDIRECT COST Program support cost @13% on all budget lines ILO 185,135 157,132 135,080 97,871 575,218

11. Sub-total= 10 185,135 157,132 135,080 97,871 575,218

11. PROJECT GRAND TOTAL = (9+10) 1,609,250 1,365,839 1,174,160 850,721 4,999,970

Output 7.1: Regular project steering committee meetings held

Outcome 7: Robust and Accessible Knowledge sharing systems on CDW and the promotion of DWDW in place to improve transparency and accountability

Page 16 of 29

Page 17: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

USDOL SGA 12-12

Part II - Cost Proposal

Indirect Cost Information

(1) Indirect Cost Form for the Applicant (including one for each proposed

subcontractor)

(2) Indirect Cost Supporting Documentation (including one for each proposed

subcontractor)

• Indirect Cost Form for the ILO

• Indirect Cost Supporting Documentation for the ILO

• Indirect Cost Form for IDWN

• Certificate of Direct Costs for IDWN

• Indirect Cost Form for JALA PRT

• Certificate of Direct Costs for JALA PRT

• Indirect Cost Form for JARAK

• Certificate of Direct Costs for JARAK

• Indirect Cost Form for KAPPRT & BM

• Certificate of Direct Costs for KAPPRT & BM

Page 17 of 29

Page 18: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 18 of 29

Page 19: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 19 of 29

Page 20: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 20 of 29

Page 21: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 21 of 29

Page 22: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 22 of 29

Page 23: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 23 of 29

Page 24: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Prepared by the Division of Cost Determination./OAMS/BOC/OASAM/US DOL Updated on November 18, 2009

INDIRECT COST FORM (ICF)

Instructions: This form must be completed by all organizations (non-profit, commercial organizations, educational institutions, international organizations, State and local organizations, etc.) applying to receive Federal cost reimbursable contracts, cooperative agreements and grants under U.S. Department of Labor Solicitations.

Note: Prior to marking A., B., or C., below, please review the attached document labelled ”Indirect Cost Form - Frequently Asked Questions”(FAQs).

---- Indirect cost charges should be considered allowable, allocable, and reasonable costs using the applicable cost principles1. Based on the cost principles, mark the appropriate clause below (A, B, or C) for the organization, as appropriate, and provide contact information:

____A. A current, Federally approved Negotiated Indirect Cost Rate Agreement (NICRA) has been provided - (Copy Attached).

____B. (1)______Latest NICRA approved by the Federal Cognizant Agency2 (FCA) is not current, or (2)______No NICRA has ever been approved by an FCA.

See further below for information regarding “temporary billing rates”(TBR). Also, applicable FAQs # 3 and # 4 for required documentation to establish a TBR.

X C. The Organization elected to exclude its fair share of indirect cost from their proposed budget. Only direct costs, as defined by the applicable cost principles, will be charged. Audit disallowances may occur if indirect costs are misclassified as direct. Please review FAQ # 10 in the attached form.

Name of Authorized Official from organization: Lita Anggraini - Jala PRT (National Network for Domestic Workers Advocacy) Title: Chairperson Phone number and email address: +62 21 7997036 ([email protected]) Date: 05 November 2012

To be filled by Grant Officer upon award:

Temporary Billing Rates -Applicableto answer“B” above only Based on the contract/grant officer review or representative, the following “temporary billing rate” (TBR) is establish for 90 days:______% using_________________________________as the allocation base (direct salaries and wages, total direct costs, total direct costs less subcontractor costs, etc.) See FAQs #3 and #4.

“Ceiling” Indirect Cost Rate s In light of the above, an Indirect Cost rate ceiling of __________%, based on __________________________, (describe the allocation base)3, has been applied under this agreement based on the Grantee’s budget and written documentation received. If a ceiling indirect cost amount was established, instead, indicate ceiling amount here: $_____________. See FAQs #8 and #9.

Administrative Costs This contract/grant or cooperative agreement is subject to___________% of total costs (direct and indirect costs) for administrative costs (as define by the program office). If a total amount for administrative costs was established, instead, indicate the amount here $_____________. 1 OMB Circular A-122 for non-profit organizations, OMB Circular A-87 for State and local organizations, OMB Circular A-21 for Educational Institutions. These cost principles are available at: http://www.whitehouse.gov/omb/circulars/index.html.The “for-profit”cost principles are available in the Federal Acquisition Regulations, 48 CFR Part 31.2: http://www.arnet.gov/far/. 2 The Federal agency providing the organization the preponderance of direct Federal funds. 3 For example: direct salaries, direct salaries and fringes, total direct costs, total grant/contract award, etc.

Page 24 of 29

Page 25: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Prepared by the Division of Cost Determination./OAMS/BOC/OASAM/US DOL Updated on November 18, 2009

CERTIFICATE OF DIRECT COSTS The following must be filled in for organizations that are proposing only direct costs, shared/allocated direct costs; no indirect costs are being charged (See Option C in the Indirect Cost Form -See also question/answer #8 of the Indirect Cost Form - Frequently Asked Questions).

This is to certify that:

1. All costs budgeted and to be claimed under this proposal supporting the period_2013__________ , through __2016___________ are allowable direct costs in accordance with the requirements of grants/contracts to which they apply and with the Federal cost principles; i.e., (please check those applicable cost principles):

_________ OMB Circular A-87, Cost Principles for State, Local and Federally recognized Indian Tribal Governments.

_____X OMB Circular A-122, Cost Principles for Non-Profit Organizations _________ Federal Acquisition Regulation (FAR), Subpart 31.2, Cost Principles for Commercial Organizations.

2. Claimed costs do not include any costs which are unallowable under applicable Federal cost principles.

For example:

advertising, contributions and donations, bad debts, entertainment costs, fines and penalties, general government expenses, and defense of fraud proceedings;

3. The requirements standards on lobbying costs for non-profit (A-122) and commercial (FAR) organizations have been complied with and,

4. All costs included in the proposal are properly allocable to U.S. Department of Labor grants/contracts on the basis of a beneficial or casual relationship between the expenses incurred and the agreements to which they are allocated in accordance with applicable Federal cost principles.

Subject to the provisions of the Program Fraud Civil Remedies Act of 1986, (31 USC 3801 et seq.), and the Department of Labor's implementing regulations, (29 CFR Part 22), the False Claims Act (18 USC 287 and 31 USC 3729); and the False Statements Act (18 USC 1001), I declare to the best of my knowledge the foregoing is true and correct. Grantee/Contractor: Jala PRT (National Network for Domestic Workers Advocacy)

Signature:

Name of Authorized Official: Lita Anggraini

Title: Chairperson

Date: 05 November 2012

Page 25 of 29

Page 26: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 26 of 29

Page 27: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Page 27 of 29

Page 28: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Prepared by the Division of Cost Determination./OAMS/BOC/OASAM/US DOL Updated on November 18, 2009

INDIRECT COST FORM (ICF)

Instructions: This form must be completed by all organizations (non-profit, commercial organizations, educational institutions, international organizations, State and local organizations, etc.) applying to receive Federal cost reimbursable contracts, cooperative agreements and grants under U.S. Department of Labor Solicitations.

Note: Prior to marking A., B., or C., below, please review the attached document labelled ”Indirect Cost Form - Frequently Asked Questions”(FAQs).

---- Indirect cost charges should be considered allowable, allocable, and reasonable costs using the applicable cost principles1. Based on the cost principles, mark the appropriate clause below (A, B, or C) for the organization, as appropriate, and provide contact information:

____A. A current, Federally approved Negotiated Indirect Cost Rate Agreement (NICRA) has been provided - (Copy Attached).

____B. (1)______Latest NICRA approved by the Federal Cognizant Agency2 (FCA) is not current, or (2)______No NICRA has ever been approved by an FCA.

See further below for information regarding “temporary billing rates”(TBR). Also, applicable FAQs # 3 and # 4 for required documentation to establish a TBR.

X C. The Organization elected to exclude its fair share of indirect cost from their proposed budget. Only direct costs, as defined by the applicable cost principles, will be charged. Audit disallowances may occur if indirect costs are misclassified as direct. Please review FAQ # 10 in the attached form.

Name of Authorized Official from organization: Muhamad Hakim - KAPPRT & BM (Komite Aksi Perlindungan Pekerja Rumah Tangga & Buruh Migran) Title: General Secretary Phone number and email address: +62 21 808772776 ([email protected]) Date: 05 November 2012

To be filled by Grant Officer upon award:

Temporary Billing Rates –Applicable to answer“B” above only Based on the contract/grant officer review or representative, the following “temporary billing rate” (TBR) is establish for 90 days:______% using_________________________________as the allocation base (direct salaries and wages, total direct costs, total direct costs less subcontractor costs, etc.) See FAQs #3 and #4.

“Ceiling” Indirect Cost Rate s In light of the above, an Indirect Cost rate ceiling of __________%, based on __________________________, (describe the allocation base)3, has been applied under this agreement based on the Grantee’s budget and written documentation received. If a ceiling indirect cost amount was established, instead, indicate ceiling amount here: $_____________. See FAQs #8 and #9.

Administrative Costs This contract/grant or cooperative agreement is subject to___________% of total costs (direct and indirect costs) for administrative costs (as define by the program office). If a total amount for administrative costs was established, instead, indicate the amount here $_____________. 1 OMB Circular A-122 for non-profit organizations, OMB Circular A-87 for State and local organizations, OMB Circular A-21 for Educational Institutions. These cost principles are available at: http://www.whitehouse.gov/omb/circulars/index.html.The “for-profit”cost principles are available in the Federal Acquisition Regulations, 48 CFR Part 31.2: http://www.arnet.gov/far/. 2 The Federal agency providing the organization the preponderance of direct Federal funds. 3 For example: direct salaries, direct salaries and fringes, total direct costs, total grant/contract award, etc.

Page 28 of 29

Page 29: PROMOTE: Decent Work for Domestic Workers to End Child Domestic Work - Part II Cost Proposal

Prepared by the Division of Cost Determination./OAMS/BOC/OASAM/US DOL Updated on November 18, 2009

CERTIFICATE OF DIRECT COSTS The following must be filled in for organizations that are proposing only direct costs, shared/allocated direct costs; no indirect costs are being charged (See Option C in the Indirect Cost Form -See also question/answer #8 of the Indirect Cost Form - Frequently Asked Questions).

This is to certify that:

1. All costs budgeted and to be claimed under this proposal supporting the period____2013__________ , through ____2016____________ are allowable direct costs in accordance with the requirements of grants/contracts to which they apply and with the Federal cost principles; i.e., (please check those applicable cost principles):

_________ OMB Circular A-87, Cost Principles for State, Local and Federally recognized Indian Tribal Governments.

___ X __ OMB Circular A-122, Cost Principles for Non-Profit Organizations _________ Federal Acquisition Regulation (FAR), Subpart 31.2, Cost Principles for Commercial Organizations.

2. Claimed costs do not include any costs which are unallowable under applicable Federal cost principles.

For example:

advertising, contributions and donations, bad debts, entertainment costs, fines and penalties, general government expenses, and defense of fraud proceedings;

3. The requirements standards on lobbying costs for non-profit (A-122) and commercial (FAR) organizations have been complied with and,

4. All costs included in the proposal are properly allocable to U.S. Department of Labor grants/contracts on the basis of a beneficial or casual relationship between the expenses incurred and the agreements to which they are allocated in accordance with applicable Federal cost principles.

Subject to the provisions of the Program Fraud Civil Remedies Act of 1986, (31 USC 3801 et seq.), and the Department of Labor's implementing regulations, (29 CFR Part 22), the False Claims Act (18 USC 287 and 31 USC 3729); and the False Statements Act (18 USC 1001), I declare to the best of my knowledge the foregoing is true and correct. Grantee/Contractor: KAPPRT & BM (Komite Aksi Perlindungan Pekerja Rumah Tangga & Buruh Migran)

Signature:

Name of Authorized Official: Muhamad Hakim

Title: General Secretary

Date: 05 November 2012

Page 29 of 29