+ All Categories
Home > Documents > PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 ›...

PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 ›...

Date post: 25-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
21
Transcript
Page 1: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

PROPINSIGHTA Detailed Property Analysis Report

40,000+Projects

10,000+Builders

1,200+Localities

Report Created On - 7 Oct, 2015

Page 2: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

What isPROPINSIGHT?PROPINSIGHT?

Price Insight

This section aims to show the detailed price of a project andsplit it into its various components including hidden ones.Various price trends are also shown in this section.

Project Insight

This section compares your project with similar projects in thelocality on construction parameters like livability rating, safetyrating, launch date, etc.

Builder Insight

This section delves into the details about the builder and tries to givethe user a perspective about the history of the builder as well as hiscurrent endeavours.

Locality Info

This section aims to showcase various amenities viz. pre-schools,schools, parks, restaurants, hospitals and shopping complexes near aproject.

Page 3: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Project Size4 Towers

Configurations1,2 Bedroom Apartment

Possession StartsDec `16

Damji Hari Constructions Pentagon HeightsDamji Hari Constructions Pentagon HeightsBhiwandi, Mumbai

25.3 Lacs onwards25.3 Lacs onwardsLivability Score

5.4/ 10

Page 4: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

What isPRICE INSIGHT?PRICE INSIGHT?

Pricing Comparison

Comparison of detailed prices with various other similarprojects

Pricing Trends

Price appreciation and trends for the project as well as the locality

Price versus Time to completion

An understanding of how the current project’s prices are performingvis-a-vis other projects in the same locality

Demand Comparison

An understanding of how the strong/weak is the demand of currentproject and the current locality vis-a-vis others

Page 5: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Price Trend Of Damji Hari Constructions Pentagon HeightsP

rice

(Rs

per

sq ft

)

Damji Hari Constructions Pentagon Heights VS Bhiwandi, Mumbai

3,610 3,610 3,610 3,610 3,610 3,610 3,610 3,610 3,610 3,610

3,810 3,810 3,810 3,810 3,810 3,810 3,810 3,810

3,393 3,3923,401

3,447

3,477 3,4833,492 3,499

3,4663,479 3,483

3,510 3,508

3,5323,547 3,545

3,525 3,531

Pentagon Heights Bhiwandi

Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '153350

3400

3450

3500

3550

3600

3650

3700

3750

3800

3850

1BHK+1T

665, 870

2BHK+2T

920

For more information, visit here

Property TypeProperty Type

Area (sq.ft.)Area (sq.ft.)

Page 6: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Price Comparison With Other Projects Similar To Damji Hari Constructions Pentagon Heights

Damji Hari ConstructionsPentagon HeightsBhiwandi, Mumbai

Shri Tirupati HeightsBhiwandi, Mumbai

Patil Associates Shree VastuBhiwandi, Mumbai

Primary Purchase Price 3,810/sq.ft. 3,500/sq.ft. 3,700/sq.ft.

Advance MaintenanceCharges (Month)

Rs. 1 (One time) N.A. N.A.

Car Parking Charges N.A. N.A. N.A.

Power Backup Charges N.A. N.A. N.A.

Club House Charges Rs. 50,000 (One time) N.A. N.A.

*For price mentioned in psf, the total price is calculated as price multiplied by area of property For more information, visit here

Page 7: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Price Versus Time-To-Completion

Damji Hari Constructions Pentagon Heights's current price is Rs. 3810/sq. ft. and it is in Under Construction stage.

In comparison to locality, Damji Hari Constructions Pentagon Heights is overpriced by Rs. 299.95/sq. ft.

Highest price in the locality is for Shree Salasar Mahavir Residency at 4680/sq. ft. and it is in Under Construction stage.

Lowest price in the locality at Archana Tarangan at 3200/sq. ft. and it is in Under Construction stage.

Bui

lder

Pri

ce (

Per

Uni

t Are

a )

Current status of projects in 5 km vicinity of Damji Hari Constructions Pentagon Heights

Damji Hari Constructions Pentagon Heights Shree Salasar Mahavir Residency Srushti Group Siddhi Mangal Murti Complex Squarefeet Regal SquareShri Aadinath Realty Royal Flora Shri Tirupati Heights Sai Balaji Developers Atlanta Edenworld Laabh Pehla Ghar Krishna Space Krishn Vihar Archana TaranganArihant Enterprises City Patil Associates Shree Vastu

Lauching soon New launch >2 yrs to completion 1-2 yrs to completion <1 yrs to completion Ready to move in3000

3500

4000

4500

5000

For more information, visit here

Page 8: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Demand Comparison With Other Projects Similar To Damji Hari Constructions Pentagon Heights

AnalysisAnalysis

Pentagon Heights has 0.00 % demand amongst all projectsin Mumbai.

The highest demand 63.58% in Mumbai is for Siddhi MangalMurti Complex.

The lowest demand 0.00% in Mumbai is for PentagonHeights

Dem

and

Demand of projects in 5 km vicinity of Damji Hari Constructions Pentagon

Heights

63.58%

36.42%

Pentagon Heights

Siddhi Mangal Murti

Complex

Royal Flora Mahavir Residency

Regal Square

0%

50%

100%

Dem

and

Demand in popular localities of Mumbai

0.25%

26.48%

16.97%

6.94%

2.69% 2.57%

Bhiwandi Dombivali Thane West

Panvel Andheri East

Kanjurmarg0%

10%

20%

30%AnalysisAnalysis

Bhiwandi has 0.25 % demand amongst all projects inMumbai.

The highest demand 26.48% in Mumbai is for Dombivali.

The lowest demand 0.25% in Mumbai is for Bhiwandi

For more information, visit here

Page 9: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

PROJECT INSIGHTPROJECT INSIGHTFavorite project vis-a-vis similar others

Basic Details Comparison

A comparison of various basic details of the project likelivability rating, project land area, loading percentage, delayetc. with other similar projects

Amenities Comparison

A comparison of various amenities of the project like SwimmingPool, Gymnasium, Intercom, 24X7 Security etc with other similarprojects

Page 10: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Damji Hari Constructions Pentagon Heights Comparison With Other Similar Projects

Damji Hari ConstructionsPentagon HeightsBhiwandi, Mumbai

Shri Tirupati HeightsBhiwandi, Mumbai

Patil Associates Shree VastuBhiwandi, Mumbai

Livability Rating* 5.4/10 5.3/10 6.1/10

Safety Rating* N.A. N.A. N.A.

Builder Damji Hari Constructions Shri Tirupati Patil Associates

Locality Bhiwandi, Mumbai Bhiwandi, Mumbai Bhiwandi, Mumbai

Number of Towers 4 2 5

Project Land Area 2.25 Acres N.A. N.A.

*Livability rating is calculated on the basis of Proptiger's proprietary rating algorithms, Know more

*Safety rating is provided on the basis of safety pin data

For more information, visit here

Page 11: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Damji Hari Constructions Pentagon Heights Comparison With Other Similar Projects (Continued ...)

Damji Hari ConstructionsPentagon HeightsBhiwandi, Mumbai

Shri Tirupati HeightsBhiwandi, Mumbai

Patil Associates Shree VastuBhiwandi, Mumbai

Part of Township No No No

Average Flats Per Floor 7.36 4 5.69

Loading Percentage N.A. N.A. N.A.

Launch Date Mar `13 Sep `11 Aug `14

Possession Date Dec `16 Dec `15 Dec `16

Delay 23 month(s) 9 month(s) 2 month(s)

For more information, visit here

Page 12: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Common Amenities Swimming Pool

Amenities not available in anyproject

24 X 7 Security Sports Facility Indoor Games Cafeteria Multipurpose Room Rain Water Harvesting

Golf Course Maintenance Staff

Amenities Comparison Of Damji Hari Constructions Pentagon Heights With Other Similar Projects

Damji Hari ConstructionsPentagon HeightsBhiwandi, Mumbai

Shri Tirupati HeightsBhiwandi, Mumbai

Patil Associates Shree VastuBhiwandi, Mumbai

Children's play area m

Indoor games room h

Pool Table, Carrom & TableTennis h

Jogging Track

Gymnasium

For more information, visit here

Page 13: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

BUILDER INSIGHTBUILDER INSIGHTCredentials of the builder

Builder Profile

A detailed overview of builder including his past track record,number of years of operation, number of projects deliveredetc.

Delivered Projects

Info about top projects that have been delivered by builder in thepast, their date of delivery etc.

Under-Construction Projects

Info about top under-construction projects of the builder along withtheir price appreciation trends

Page 14: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Experience N.A

Project Delivered 3

Ongoing Projects 2

Overview Of Developer (Damji Hari Constructions)

Welcome! Damji Hari Constructions is a brand devoted towards creating offerings that appeal to customers' senses, imagination and

lifestyle.And,by doing this, we strive to be the most desired realty brand and ensure ultimate customer delight in whatever we do. We achieve

this by using the best industry practices, excellent management systems, latest construction technology and offering innovative, and world-

class realty solutions.

Page 15: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Top Projects Delivered By Damji Hari Constructions

Damji Hari Constructions Hiramani EnclaveDamji Hari Constructions Hiramani EnclaveKandivali East, Mumbai

Livability Score

Project was delivered on Nov, 2013

For more information, visit here

6.9

Page 16: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Projects Under Construction By Damji Hari Constructions

Damji Hari Constructions Mahavir EnclaveDamji Hari Constructions Mahavir EnclaveVille Parle East, Mumbai

Livability Score

Project is expected to be delivered on Dec, 2015

Damji Hari Constructions Pentagon HeightsDamji Hari Constructions Pentagon HeightsBhiwandi, Mumbai

Livability Score

Project is expected to be delivered on Dec, 2016

after a delay of 23 month(s).

Has seen a price appreciation of 5.5 % 5.5 % over last 2929

month(s)month(s)

For more information, visit here

7.0 5.4

Page 17: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

LOCALITY INSIGHTLOCALITY INSIGHTEverything you want to know about the locality

Page 18: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Schools Near Damji Hari Constructions Pentagon Heights, Mumbai

SchoolsSchools

11 Balak Mandir 3.18Km3.18Km

22 GM Momin College 3.68Km3.68Km

33 K M E S English mediumprimary and high school 3.71Km3.71Km

44 Peli School 3.37Km3.37Km

55 N.E.S.'s English Medium School(Old Building) 3.11Km3.11Km

Top 5 Schools (within 5 kms)Top 5 Schools (within 5 kms)

PP Represents the location ofDamji Hari ConstructionsPentagon Heights

For more information, visit here

Page 19: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Restaurants Near Damji Hari Constructions Pentagon Heights, Mumbai

RestaurantsRestaurants

11 Food Inn 2.48Km2.48Km

22 Ekveera Dhaba 2.98Km2.98Km

33 Rizwan 3.55Km3.55Km

44 Megha's Misal 3.12Km3.12Km

55 Zaika 3.50Km3.50Km

Top 5 Restaurants (within 5 kms)Top 5 Restaurants (within 5 kms)

PP Represents the location ofDamji Hari ConstructionsPentagon Heights

For more information, visit here

Page 20: PropInsight - A detailed property analysis report of Damji ... › 2 › 1 › 642461 › 105 › 253296.pdf · Lauching soon New launch >2 yrs to completion 1-2 yrs to completion

Hospitals Near Damji Hari Constructions Pentagon Heights, Mumbai

HospitalsHospitals

11 Life Line Hospital 4.05Km4.05Km

22 Khatoonbi Kazi NursuringHome 3.53Km3.53Km

33 Leela Joshi Hospital 3.25Km3.25Km

44 Jeevanti Hospital Bhiwandi 3.61Km3.61Km

55 Old Government Hospital 3.22Km3.22Km

Top 5 Hospitals (within 5 kms)Top 5 Hospitals (within 5 kms)

PP Represents the location ofDamji Hari ConstructionsPentagon Heights

For more information, visit here


Recommended