145.14
144.88
144.86
144.87
145.49
145.25
144.96
144.85
144.78
145.31
145.46
145.50
145.31
144.89
144.84
144.75
144.98
145.17
144.78
144.80
144.61
144.56
144.38
144.43
145.28
145.29
145.09
144.86
144.71
144.57
144.55
145.20
145.01144.76
145.19
145.38
145.37
145.10
144.98
144.84
144.69
144.60
145.32
145.12
144.88
144.66
144.82
144.96
144.82
144.95
145.09
144.83
144.84
145.13
145.15
145.19
144.70
144.63
144.68
144.61144.61
144.61
TWL145.58
S.CH
High Street West
Cro
ss S
tre
et
FFL145.12
F/FC2.48
FFL145.12
S.CH
F/FC2.49
FFL145.12
Conc
Ht1.8m
144.84
P
P
P
F/FC2.61
FFL145.10
F/FC2.56
FFL145.11
F/C3.76
145.18
145.62
Dp
Riser
Shop Signage
Shop S
ignage
145.20
RS
Kerb
Kerb
ACU
F/H
2.0
0
F/H
2.02
144.85
RS
Tarmac
Paving
Paving
Paving
Tac
Ledge
Ht0.52
Racking
F/S
0.52
F/H
2.32
Col
F/S0.51
F/H2.36
F/H1.94
F/H
2.15
F/C 2.86
BT
THL144.87
Timber Decking area
Conc
Wood
C
Desk
Conc
Carpet
Carpet
Carpet
Ledge
Carpet
F/C2.62
Elevation 3
Ele
va
tio
n 2
Elevation 1
C
Se
ctio
n 1
Section 2 Section 2
P
Desk
C
F/H
1.92
144.73
F/FC2.48
FFL145.12
Wood
145.12
145.23
145.19
145.06
ST
ST
IC
CL145.25
145.17
145.34
Stone wall
P/R Ht1.4m
P/R
Ht1.4m
Paving
TP
145.18
Entrance
mat
Cladded wall line surveyed inSuperDrug
ADJACENT PROPERTY
CURRENTLY SUPERDRUG
Surface change
Surface change
Understair Room
Sloping ceiling
Roller shutterF/H 2.06
F/FC2.54
T
T
L
T
T
L
T
T
L
FIRE
EXIT
UP
UP
UP
Surface change
F/H 1.98 F/H 1.97
Se
ctio
n 1
EXISTING GROUND FLOOR PLAN
148.21
148.25
Cro
ss S
tre
et
Kerb
Kerb
WSL149.33
WHL150.21
Parapet148.63
Parapet148.60
TWL148.46
FFL148.33
F/S0.38
F/H1.78
F/S0.38
F/H1.82
FFL148.15
Carpet
FFL148.15
Carpet
F/S0.94
F/H1.68
F/S0.78
F/H1.50
F/H
2.02
F/C2.30
F/U1.90
F/C2.11
F/C2.90
F/C3.51
P
P
P
P
P
F/U3.00
F/C3.53
Worktop
Wall Ht2.5m
F/C2.30
F/C2.30
F/C3.53
F/C3.49
F/C3.49
TWL148.46
Section 2
Section 2
Se
ctio
n 1
Se
ctio
n 1
High Street West
Vinyl
Vinyl
P
Elevation 3
Ele
va
tio
n 2
Elevation 1
Ledge
148.28
drainer
FLAT ROOF AREA
(Limited access)
FLAT ROOF AREA
(Limited access)
F/H2.02
F/H2.00
F/H2.00
UP
DOWN
FFL148.15
SCL151.47
SCL150.58
SCL150.46
EXISTING FIRST FLOOR PLAN
Shown for context purposesonly
Flat ceiling
F/C2.91
Flat ceiling
Ceiling
trap
Sloping
ceiling
Sloping ceiling
Notes:
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street West
Glossop
Derbyshire
SK13 8AZ
Existing Ground & First
Floor Plans
JS 1:50
1:100@A3
13/07/2016
1485/1010 -
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
-- - -
Frame Numbers
Retail Area
Total Areas
Schedules:
0
High Street
REAR YARD
Shop Entrance
Datum 143.000m
Datum 143.000m
153.00
150.52
150.44
P P
P
RECEPTION AREA
CORRIDOR
KITCHEN
signage
Shop
FCL147.60
150.45
FCL147.67 FCL147.67
148.25
148.60
FFL145.12 FFL145.12 FFL145.12
FFL145.12
145.06
145.22
FFL148.15
Window
Window
144.61
SECTION 1
Datum 143.000mDatum 143.000m
RECEPTION AREA
Cross Street
SUPERDRUG STORE
FFL148.15
FFL145.12
FCL147.60
145.13
153.00
SECTION 2
Notes:
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street West
Glossop
Derbyshire
SK13 8AZ
Existing Sections
JS 1:50@A1
1:100@A3
13/07/2016
1485/1011 -
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
-- - -
Fire Alarm System
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Emergency lighting
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Frame Numbers
Retail Area
Total Areas
Schedules:
0
Cro
ss S
tre
et
Fire
Exit
Fire
Exit
5339
Accessories
5340
700V
1200V LED
10000
CL teach
Till
ST
FIELDS
PRE-TEST/FUNDUS
CL Sign
Collections sign
ST
Tr
Tr
Tr
Acc
HC Sign
pa
tte
rn
ed
w
allp
ap
er
TEST ROOM 1
TEST ROOM 2
700V 700V
144.88
144.86
145.31
145.31
144.89
144.84
144.75
144.98
145.17
144.78
144.80
144.61
144.56
145.28
145.29
145.09
144.57
144.55
145.20
145.01
144.76
145.19
145.38
145.37
145.10
144.69
144.60
145.32
145.12
144.88
144.66
144.82
144.96
144.84
145.13
145.15
145.19
144.70
144.63
144.68
144.61144.61
144.61
TWL145.58
S.CH
S.CH
Conc
Ht1.8m
144.84
145.18
Dp
145.20
Kerb
144.85
RS
Tarmac
Paving
Paving
Paving
Tac
BT
THL144.87
Timber Decking area
145.12
145.23
145.19
145.06
ST
ST
IC
CL145.25
145.17
145.34
Stone wall
P/R Ht1.4m
P/R
Ht1.4m
Paving
TP
144.73
UP
144.71144.84
144.86 144.98
145.09
Riser
Kerb
RS
144.82
144.95
High Street West
PROPOSED GROUND FLOOR PLAN
Se
ctio
n 1
Elevation 3
Elevation 1
Se
ctio
n 1
F/S
0.52
F/H
2.32
Mirror could be a bespoke wider mirror
UP
Col
DG01
DG02
DG03
DG04
DG05
DG06
DG07
2400 (T
ES
T R
OO
M 2)
Service rear roller shutter andcheck for full operation
3300 (TEST ROOM 2)
3300 (T
ES
T R
OO
M 1)
2400(TEST ROOM 1 )
1500 (F
IE
LD
S)
1400
(P
RE
- T
ES
T
/F
UN
DU
S)
1850 (FIELDS)
HALF
HEIGHT
WALL
HALF
HEIGHT
WALL
(New entrance mat)
D
ipad x 2
binned
printer
D
C
D
C
D
C
D
C
D
D
standing
height ibars
Adj.
cup'd
600
(hard flooring - Expona Commercial)
(carpet - Tessera
TCT4760 prism)
C
D
C
C
D D
CHAIR
PROTECT
RAIL
Gravity
(carpet - Thai - colour
9900074)
C
D
C
C
D
D
CHAIR
PROTECT
RAIL
Gravity
(carpet - Thai - colour
9900074)
D
C
Pumped
Adj.
cup'd
1200
C
D
C
D
CHAIR
PROTECT
RAIL
CHAIR
PROTECT RAIL
CHAIR
PROTECT RAIL
CHAIR PROTECT RAIL
C
D
C
D
CHAIR
PROTECT
RAIL
CHAIR
PROTECT
RAIL
CHAIR
PROTECT
RAIL
CHAIR
PROTECT
RAIL
O/D HEATER
and change locks. Five keys required. Install externallighting to fire exit to the rear on a PIR sensor
(Existing floor finish
to be retained)
Install external lighting to fire exit tonew side door on a PIR sensor
GF access to electrics to the front ofthe store is to be enclosed in a firerated cupboard, fit a hazard sign to thenew door and ensure the door is firerated. The distribution board is to beretained as per the initial site meetingreport.
Engage structural engineer toinvestigate external L/H flank wallwhere new door is proposed. Installlintel and new door as per strucutraldesings.
Engage structural engineer toinvestigate external L/H flank wallwhere new door is proposed. Installlintel and new door as per strucutraldesings.
The measured survey has not
identified which areas of
perimeter are lined and which
are solid. Therefore the line of
new dry lining is shown
indicatively on the same
perimeter line.
Note: An access hatch in this
face of the pier may need to be
retained
If possible the new dry lining to
this pier should allow for the
footprint to be reduced in size
Wifi
D
Wifi
D
Install new data point above
suspended ceiling for for new
wireless access routers
Install new data point above
suspended ceiling for for new
wireless access routers
H
Allow for 2no water heaters to
feed the store. Locations to be
agreed at PCM. 1no to provide
hot water to all test rooms, CLT
and 1no to service staffroom
and WC's.
RE
PA
IR
A
ND
M
AK
E G
OO
D A
NY
D
AM
AG
E T
O W
ALLS
AN
D S
OF
FIT
S A
ND
D
EC
OR
AT
E A
LL R
ET
AIL A
RE
AS
IN
CLU
DIN
G T
ES
T R
OO
MS
1 &
2, D
IS
PE
NS
IN
G A
RE
A,
FIE
LD
S/F
UN
DU
S &
P
RE
-T
ES
T A
RE
A, W
AIT
IN
G A
RE
A,
CU
ST
OM
ER
C
OR
RID
OR
S, IN
S
PE
CA
VE
RS
S
TA
ND
AR
D
SP
EC
IF
IC
AT
IO
N (W
ALLS
IN
G
RE
EN
T
IM
BE
R W
OR
K IN
SILV
ER
)
MECHANICAL VENTILATION TO BE
INSTALLED BY SPECIALIST A/C
CONTRACTOR REFER TO A/C
CONTRACTORS DRAWINGS FOR DETAILS
AIR CONDITIONING & VENTILATION
STRUCTURAL ALTERATIONS
ELECTRICAL INSTALLATIONS
PLUMBING REQUIREMENTS
EMERGENCY PROVISIONS
WORKS APPLICABLE TO GROUND FLOOR
TEST ROOMS 1& 2 & CL TEACH & TO FIRST
FLOOR W.C. & STAFF ROOM
- ALL FIRE EXIT SIGNAGE TO BE IN
ACCORDANCE WITH B.S 5499 PART 1.
- ALL EMERGENCY LIGHTING TO BE IN
ACCORDANCE WITH B.S 5266 PART 1.
- ALL AUTOMATIC FIRE DETECTION TO BE
IN ACCORDANCE WITH B.S 5839 PART 1
(2013).
- ALL SAFETY GLAZING TO COMPLY WITH
B.S 6206 AND B.S 6262.
- ALL WORK TO COMPLY IN ACCORDANCE
WITH THE APPLICABLE LOCAL
REGULATIONS, STANDARDS AND
PUBLICATIONS.
ANY STRUCTURAL ALTERATIONS, NEW
LOAD BEARING ELEMENTS AND REMOVAL
OF WALLS ETC., TO BE CARRIED OUT IN
STRICT ACCORDANCE WITH STRUCTURAL
ENGINEERS DETAILS AND CALCULATION
SHEETS.
DEMOLITION & STRIP-OUT
REMOVE ALL WALLS WHERE NECESSARY
AS INDICATED ON PLAN AND CART AWAY
DEBRIS FROM SITE.
CONTRACTOR TO ALLOW FOR MAKING
GOOD OF ALL AREAS PRIOR TO
REDECORATION.
NOTES - SPECSAVERS DRAWINGS TO BE READ IN CONJUNCTION WITH THE SCHEDULE OF WORKS
PROVIDE AND INSTALL ALL NEW
ELECTRICAL FITTINGS AS SPECIFIED ON
LEGEND, AND TO COMPLY WITH THE '17TH
EDITION OF THE INSTITUTE OF
ELECTRICAL ENGINEERS REGULATIONS',
THE LOCAL ELECTRICITY BOARD
REQUIREMENTS AND ALL RELEVANT
BRITISH STANDARDS,CODES OF
PRACTICE,CIBSE PUBLICATION'S AND
APPROVED DOCUMENT L2B.
CONTRACTOR TO PROVIDE THE
RELEVANT CERTIFICATION UPON
COMPLETION. ALLOW FOR FINAL
LOCATION OF MULTIPOINT HEATERS TO
BE DIRECTED ON SITE.
UNSWITCHED FUSED SPUR WITH
INDICATOR LIGHT SHOULD ONLY BE
INSTALLED IF SANIFLOW PUMP IS
REQUIRED.
PARTITION OR WALL REMOVED
EXISTING PARTITION OR WALL
PROPOSED PARTITIONING
PROPOSED PARTITIONING WITH
COMPLIANT SOUND INSULATION
PROPOSED HALF HEIGHT
PARTITIONING (1450mm HIGH)
HALF
HEIGHT
WALL
WALL LEGEND
PROPOSED PARTITIONING WITH
HEARCARE COMPLIANT SOUND
INSULATION
DOOR REF. NUMBER
INDICATED ON DOOR SCHEDULE
OTHER SYMBOLS
DR:
SUSPENDED CEILING HEIGHT
INDICATED ON CEILING LAYOUT
2400mm
D F T
D F T
F T
D F T
D F T
D
COMMUNICATION SOCKET Mounted slightly above plinth (105mm AFFL)
COMMUNICATION SOCKET Mounted at low level (400mm AFFL)
COMMUNICATION SOCKET Mounted below worktop level (600mm AFFL)
COMMUNICATION SOCKET Mounted in trunking (1290mm AFFL)
COMMUNICATION SOCKET Mounted at high level (1840mm AFFL)
COMMUNICATION FITTINGS
DATA TELFAX
HEATER
O/D HEATER
H
SWITCHED SOCKET Mounted slightly above plinth
(105mm AFFL)
SWITCHED SOCKET Mounted at low level (400mm AFFL)
SWITCHED SOCKET Mounted in trunking below worktop
level (600mm AFFL)
SWITCHED SOCKET Mounted in trunking (1290mm AFFL)
SWITCHED SOCKET Mounted at high level (1840mm
AFFL)
POWER FITTINGS
SINGLE DESCRIPTIONDOUBLE
CLEAN SWITCHED SOCKET Mounted slightly above plinth
(105mm AFFL)
CLEAN SWITCHED SOCKET Mounted at low level
(400mm AFFL)
CLEAN SWITCHED SOCKET Mounted below worktop level
(600mm AFFL)
CLEAN SWITCHED SOCKET Mounted in trunking
(1290mm AFFL)
CLEAN SWITCHED SOCKET Mounted at high level
(1840mm AFFL)
C
C
C
C
C
C
CLEAN SWITCHED SOCKET Mounted in trunking
(1290mm AFFL)
CLEAN SWITCHED SOCKET Mounted at high level
(1840mm AFFL)
TT
HIGH LEVEL MULTI-POINT WATER HEATER
WALL HEATER
OVER DOOR HEATER
SWITCHED FUSED SPUR WITH INDICATOR LIGHT
UN-SWITCHED FUSED SPUR WITH INDICATOR LIGHT
KLICK SOCKET MOUNTED ON CEILING
SWITCHED SOCKET Mounted at ceiling level
C
C
C
SWITCHED SOCKET Mounted below worktop level
(600mm AFFL)
CLEAN SWITCHED SOCKET Mounted in trunking below
worktop level (600mm AFFL)
CC
ELECTROMAGNETIC DOOR HOLD OPEN DEVISE
FLOOR BOX
Mounted within 400mm of serviced fitting
Mounted within 400mm of serviced fitting
CO-AXIAL/ SCART
CABLE/SOCKET
Cro
ss S
tre
et
Ke
rb
Kerb
F/S0.94
F/H1.68
F/S0.78
F/H1.50
Worktop
Worktop
148.21
148.25
TWL148.46
TWL148.46
Parapet148.63
Parapet148.60
UP
WS
L149.33
WH
L150.21
DOWN
SCL151.47
Ledge
148.28
PROPOSED FIRST FLOOR PLAN
F/S0.38
F/H1.78
F/S0.38
F/H1.82
DF01
DF02
DF03 DF04
HE
AT
ER
HE
AT
ER
(vinyl)
(vinyl)(vinyl)
(Existing floor finish
to be retained)
Gravity
Gravity
Re-laminate vanity unit top as per initialsite visit report
Retain existing first floor WC's, deepclean, replace WC seats and sealaround base of sanitary ware withsilicone
Retain existing kitchen and deep clean,test all servies and replace siliconesealant
D
D
CC
HU
B
D
D
T
15u data
cabinet
iharmony
cube
Note: positions of cabinets to beagreed with PM
H
Allow for 2no water heaters to feed thestore. Locations to be agreed at PCM. 1noto provide hot water to all test rooms, CLTand 1no to service staffroom and WC's.
RE
PA
IR
A
ND
M
AK
E G
OO
D A
NY
D
AM
AG
E T
O W
ALLS
AN
D S
OF
FIT
S A
ND
D
EC
OR
AT
E A
LL A
NC
ILLA
RY
AR
EA
S IN
CLU
DIN
G T
HE
S
TA
IR
S T
O T
HE
F
IR
ST
FLO
OR
S
TA
FF
R
OO
M A
ND
W
.C
, IN
S
PE
CA
VE
RS
ST
AN
DA
RD
S
PE
CIF
IC
AT
IO
N (W
ALLS
IN
M
AG
NO
LIA
TIM
BE
R W
OR
K IN
W
HIT
E)
Notes:
Access Statement
These layouts have been drawn in accordance with the agreedAccessibility Statement Version 9.
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street West
Glossop
Derbyshire
SK13 8AZ
Proposed Ground & First Floor Plans -
General Arrangement, Power
& Communications
JS 1:50@A1
1:100@A3
13/07/2016
1485/1012 -
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
-- - -
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
Fire Alarm System
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Emergency lighting
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Frame Numbers
Retail Area
Total Areas
Schedules:
1080
DOOR SPECIFICATION HARDWARE
DOOR SCHEDULE - TO BE READ IN CONJUNCTION WITH SPEC. MANUAL
Existing entrance doors - to be redecorated in basalt grey
DG02
WHITE
DOOR
FINISH
NO. 826 mm 926 mm 30 min 60 min SNGL DBLE
DOOR
WIDTH
FIRE
RATING
VISION
PANELS
DIGI
LOCK
DOOR
CLOSE
FIRE
DOOR
HOLD
OPEN
GREY SILVERBEECH
NOTES
DOOR SPECIFICATION HARDWARE
WHITE
DOOR
FINISH
NO. 826 mm 926 mm 30 min 60 min SNGL DBLE
DOOR
WIDTH
FIRE
RATING
VISION
PANELS
DIGI
LOCK
DOOR
CLOSE
FIRE
DOOR
HOLD
OPEN
GREY SILVERBEECH
NOTES
DG01
DG03
DF02
DG04
DG05
DF01
DF03
DF04
New door size to suit - decorated in silver to Specsavers standard specification.
Install new SSA ironmongery to Specsavers standard specification including
mortice lock.
New door - decorated in white to Specsavers standard specification. Install
standard fire escape push bar fire escape ironmongery to Specsavers standard
specification. No external locking devices, external steel plate. . As the door is
external the frame and door are to be paint grade hardwood. Finish in grey.
Existing door - to be retained and decorated in silver to Specsavers standard
specification. Check existing ironmongery and change locks - note: 5 No. keys
will be required.
Existing door - to be redecorated in white to Specsavers standard specification.
Install new vision panel and ancillary ironmongery to Specsavers standard
specification.
Existing door - to be redecorated in white to Specsavers standard specification.
Install new ancillary ironmongery to Specsavers standard specification.
DG06
Existing door - to be redecorated in white to Specsavers standard ancillary
specification. Install new vision panels if required. Install magnetic hold open
devise linked to fire alarm to automatically release on activation of alarm and
new ancillary ironmongery to Specsavers standard specification.
BASALT
GREY
New door - decorated in silver to Specsavers standard specification. Install new
SSA ironmongery to Specsavers standard specification including digi lock.
Install spur above ceiling for future hold open device as per the initial site
meeting report
DG07
New doors - decorated in silver to Specsavers standard specification. Install
new SSA ironmongery to Specsavers standard specification.
Existing door - to be redecorated in white to Specsavers standard specification.
Install new ancillary ironmongery to Specsavers standard specification including
indicator bolt.
BASALT
GREY
Cro
ss S
tre
et
Fire
Exit
Fire
Exit
Accessories
700V
1200V LED
CL teach
Till
ST
FIELDS
PRE-TEST/FUNDUS
CL Sign
Collections sign
ST
Tr
Tr
Tr
Acc
HC Sign
pa
tte
rn
ed
w
allp
ap
er
TEST ROOM 1
TEST ROOM 2
700V 700V
UP
High Street West
PROPOSED GROUND FLOOR PLAN
Se
ctio
n 1
Elevation 3
Elevation 1
Se
ctio
n 1
UP
DG01
DG02
DG03
DG04
DG05
DG06
DG07
HALF
HEIGHT
WALL
HALF
HEIGHT
WALL
D
2400
D
2400
D
D
Install bagged insulation on top
of the suspended ceiling
Install bagged insulation on top
of the suspended ceiling
Install a water cut off
solenoid valve to last man
out switch. Location of
switch to be agreed with the
store Director
last person
out switch on
fish key
F
BG
BG
BG
S
S
Note: Install relay to fire alarm
system that will shut down the
AC in case of fire
2400
S
S
S
S
RE
PA
IR
A
ND
M
AK
E G
OO
D A
NY
D
AM
AG
E T
O W
ALLS
AN
D S
OF
FIT
S A
ND
D
EC
OR
AT
E A
LL R
ET
AIL A
RE
AS
IN
CLU
DIN
G T
ES
T R
OO
MS
1 &
2, D
IS
PE
NS
IN
G A
RE
A,
FIE
LD
S/F
UN
DU
S &
P
RE
-T
ES
T A
RE
A, W
AIT
IN
G A
RE
A,
CU
ST
OM
ER
C
OR
RID
OR
S, IN
S
PE
CA
VE
RS
S
TA
ND
AR
D
SP
EC
IF
IC
AT
IO
N (W
ALLS
IN
G
RE
EN
T
IM
BE
R W
OR
K IN
SILV
ER
)
AC 1
AC 2
AC 3
AC 4
Ø100
Ø100
CU 4
CU 3CU 2
CU 1
100mm in-line extract
mounted fan
PARTITION OR WALL REMOVED
EXISTING PARTITION OR WALL
PROPOSED PARTITIONING
PROPOSED PARTITIONING WITH
COMPLIANT SOUND INSULATION
PROPOSED HALF HEIGHT
PARTITIONING (1450mm HIGH)
HALF
HEIGHT
WALL
WALL LEGEND
PROPOSED PARTITIONING WITH
HEARCARE COMPLIANT SOUND
INSULATION
S RIS
H
F
BG
A
ILLUMINATED DIRECTIONAL
EXIT SIGNAGE
EXIT SIGNAGE
DIRECTIONAL EXIT SIGNAGE
ILLUMINATED EXIT SIGNAGE
DISABLED WC ALARM PULL CORD
Also provide visual alarm indicator to
reception area
MAINS LINKED & OPERATED
SMOKE DETECTOR
SMOKE DETECTOR WITH VOID
PROTECTION
MAINS LINKED & OPERATED
HEAT DETECTOR
VISUAL FLASHING ALERT LINKED
TO FIRE ALARM
FIRE ALARM PANEL
EMERGENCY BREAK GLASS
POINT
FIRE/EMERGENCY FITTINGS
FIRE ALARM SOUNDER
VISUAL ALARM INDICATOR FOR
EMERGENCY PULL CORD
DOOR REF. NUMBER
INDICATED ON DOOR SCHEDULE
OTHER SYMBOLS
DR:
SUSPENDED CEILING HEIGHT
INDICATED ON CEILING LAYOUT
2400mm
MECHANICAL VENTILATION TO BE
INSTALLED BY SPECIALIST A/C
CONTRACTOR REFER TO A/C
CONTRACTORS DRAWINGS FOR DETAILS
AIR CONDITIONING & VENTILATION
STRUCTURAL ALTERATIONS
ELECTRICAL INSTALLATIONS
PLUMBING REQUIREMENTS
EMERGENCY PROVISIONS
WORKS APPLICABLE TO GROUND FLOOR
TEST ROOMS 1& 2 & CL TEACH & TO FIRST
FLOOR W.C. & STAFF ROOM
- ALL FIRE EXIT SIGNAGE TO BE IN
ACCORDANCE WITH B.S 5499 PART 1.
- ALL EMERGENCY LIGHTING TO BE IN
ACCORDANCE WITH B.S 5266 PART 1.
- ALL AUTOMATIC FIRE DETECTION TO BE
IN ACCORDANCE WITH B.S 5839 PART 1
(2013).
- ALL SAFETY GLAZING TO COMPLY WITH
B.S 6206 AND B.S 6262.
- ALL WORK TO COMPLY IN ACCORDANCE
WITH THE APPLICABLE LOCAL
REGULATIONS, STANDARDS AND
PUBLICATIONS.
ANY STRUCTURAL ALTERATIONS, NEW
LOAD BEARING ELEMENTS AND REMOVAL
OF WALLS ETC., TO BE CARRIED OUT IN
STRICT ACCORDANCE WITH STRUCTURAL
ENGINEERS DETAILS AND CALCULATION
SHEETS.
DEMOLITION & STRIP-OUT
REMOVE ALL WALLS WHERE NECESSARY
AS INDICATED ON PLAN AND CART AWAY
DEBRIS FROM SITE.
CONTRACTOR TO ALLOW FOR MAKING
GOOD OF ALL AREAS PRIOR TO
REDECORATION.
NOTES - SPECSAVERS DRAWINGS TO BE READ IN CONJUNCTION WITH THE SCHEDULE OF WORKS
PROVIDE AND INSTALL ALL NEW
ELECTRICAL FITTINGS AS SPECIFIED ON
LEGEND, AND TO COMPLY WITH THE '17TH
EDITION OF THE INSTITUTE OF
ELECTRICAL ENGINEERS REGULATIONS',
THE LOCAL ELECTRICITY BOARD
REQUIREMENTS AND ALL RELEVANT
BRITISH STANDARDS,CODES OF
PRACTICE,CIBSE PUBLICATION'S AND
APPROVED DOCUMENT L2B.
CONTRACTOR TO PROVIDE THE
RELEVANT CERTIFICATION UPON
COMPLETION. ALLOW FOR FINAL
LOCATION OF MULTIPOINT HEATERS TO
BE DIRECTED ON SITE.
UNSWITCHED FUSED SPUR WITH
INDICATOR LIGHT SHOULD ONLY BE
INSTALLED IF SANIFLOW PUMP IS
REQUIRED.
FR WALL LEGEND
30min fire rated partition
60min fire rated partition
90min fire rated partition
Cro
ss S
tre
et
Ke
rb
Worktop
Worktop
UP
DOWN
Ceiling
trap
Sloping ceiling
PROPOSED FIRST FLOOR PLAN
DF01
DF02
DF03 DF04
(vinyl)
(vinyl)(vinyl)
H
S
S
S
RE
PA
IR
A
ND
M
AK
E G
OO
D A
NY
D
AM
AG
E T
O W
ALLS
AN
D S
OF
FIT
S A
ND
D
EC
OR
AT
E A
LL A
NC
ILLA
RY
AR
EA
S IN
CLU
DIN
G T
HE
S
TA
IR
S T
O T
HE
F
IR
ST
FLO
OR
S
TA
FF
R
OO
M A
ND
W
.C
, IN
S
PE
CA
VE
RS
ST
AN
DA
RD
S
PE
CIF
IC
AT
IO
N (W
ALLS
IN
M
AG
NO
LIA
TIM
BE
R W
OR
K IN
W
HIT
E)
Notes:
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street West
Glossop
Derbyshire
SK13 8AZ
Proposed Ground & First Floor Plans -
Ceiling, Lighting & Fire Layout
JS 1:50@A1
1:100@A3
13/07/2016
1485/1013 A
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
Air conditioning and ventilation added to the drawingsA J.S. 22.07.16
Fire Alarm System
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Emergency lighting
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Sales Area
Other Areas
42
SPKR
T
3000 Lumen Square ACELED LED Colour 3000K
White
D0270JA-W-XSS27
1000 Lumen Pendant MiniCombo LED LED Colour3000K Remote gear (2m
lead) Clear refractor /Silverfinish
S1600JA-XSS28
2x36W 1200MDIFFUSED BATTENE4604J
2x36W 1200M DIFFUSEDBATTEN + EM LIGHTEE4604J
38W 2D WALLMOUNTED MAXI DOT
E59903J:XSS14
38W 2D WALL MOUNTEDMAXI DOT EMERGENCY
EE59903J:XSS14
MIDI DOT16W 2D
E59900J:XSS14
DIMMABLE SWITCHA7609
3000 Lumen F3 LED LEDColour 3000K 3hEmergency White
DE0270JA-W-XSS27
3000 Lumen F3 LED LEDColour 3000K Dimmable
(Switch-Dim) WhiteD0270GA-W-XSS27
2000 Lumen F3 LED LEDColour 3000K 3hEmergency White
DE0270JA-W-XSS32
D
2000 Lumen F3 LEDLED Colour 3000K
White
D0270JA-W-XSS32
Recessed Illuminated (Non-maintained) ExitSign (LED) Double sided arrow down legend
For store front entranceE2150J
W9021JA-W-XSS26
3000 Lumen F3 LEDLED Colour 3000K
White
EE59900J:XSS14
MIDI DOT16W 2D
EMERGENCY
26W TC-T DIMMABLEWALL MOUNTED
UPLIGHTER
U3743/XSI03
ILLUMINATEDNON-MAINTAINED
EXIT SIGNAGE 8W T5E2013/D
Frame Numbers
Retail Area
Total Areas
Schedules:
1080
Datum 144.000m Datum 144.000m
Stone
Stone
Cross Street
outline of removed signage
V
145.20
153.00
gutter
gutter
Acu
148.63
150.53
148.47
148.60
145.19
145.07
144.84
149.18
147.48
150.52
150.44
148.25
149.63
148.56
148.53
cladding
EXISTING ELEVATION 2
Glazing
Glazing
Glazing
Datum 144.000m
Datum 144.000m
Stone
Stone
outline of removed signage
Superdrug
Bracket
Bracket
Weatherboard
gutter
Rwp
Sign
145.20
144.98
144.85
148.25
147.48
153.00
Riser
Door
Door Door
148.47
150.41
150.38
148.30
149.93
conc
conc
conc
147.41
149.93
150.17
145.12
152.96
cladding
cladding
EXISTING ELEVATION 1
Glazing
Glazing
Glazing
GlazingGlazing
Glazing
Glazing
Glazing Glazing
Datum 143.000m Datum 143.000m
Adjacent property (restricted visibility)
StoneStone
Stone Stone
144.65
144.68
144.43
144.45144.44
147.11
150.31
150.35
148.60
153.01
152.94
150.44
147.52
145.07
144.84
145.58
147.20
144.84
145.19
146.66
148.52
149.08
148.56
Door
Door
Door
Stone wall
Stone wall
Alarm
Light
Sign
Acu
Rwp
Svp
gutter
gutter
AcuAcu
Alarm
Alarm
Light
149.11
150.09
Wood decking area
147.18
146.95
conc
conc
conc
conc
146.53
147.70
P/R Ht1.40m
EXISTING ELEVATION 3
Roller shutter housing
Step up
Notes:
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street West
Glossop
Derbyshire
SK13 8AZ
Existing Elevations
JS 1:50@A1
1:100@A3
13/07/2016
1485/1014 -
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
-- - -
Fire Alarm System
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Emergency lighting
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Frame Numbers
Retail Area
Total Areas
Schedules:
1080
Stone
Stone
Cross Street
V
145.20
153.00
gutter
gutter
Acu
148.63
150.53
148.47
148.60
145.19
145.07
144.84
149.18
147.48
150.52
150.44
148.25
149.63
148.56
148.53
cladding
Glazing
Remove existing fasciaboards over shopfrontand re-line in new plyand decorate greenready for new signageby Hawes. Note exitingfascia boards appearfibreous so refer toasbestos report beforeworks commence
Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report
PROPOSED SIGNAGE & SIDE ELEVATION 2
specsavers.com specsavers.com specsavers.com specsavers.com specsaver
specsavers.com specsavers.com specsavers.com specsavers.com specsaver
Two rows of
manifestation
stickers
Install bomb blast filmto all front elevationwindows inc first floor.Install barrier internallyto first floor windows toas they are at low level.All as per the initial sitevisit report
New opening
Stone
Stone
Superdrug
Bracket
Weatherboard
gutter
Rwp
Sign
145.20
144.98
144.85
148.25
147.48
153.00
Riser
Door
Door Door
148.47
150.41
150.38
148.30
149.93
conc
conc
conc
147.41
149.93
150.17
145.12
152.96
cladding
cladding
Glazing
Glazing
GlazingGlazing
Glazing
New specification overheadilluminated conservation styleprojecting sign fixed to masonry.Allow for fused spur to the frontof the store for the projection sign
600mm high non illuminated newspecification conservation stylelogo set on standard new greenfascia with non illuminatedlettering to the latest specification
Remove existing fascia boards overshopfront and re-line in new ply anddecorate green ready for new signageby Hawes. Note exiting fascia boardsappear fibreous so refer to asbestosreport before works commence
Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report
Retain and make good existingshopfront, re-spray in basaltgrey. Decorate rendered onpilasters in grey also
PROPOSED ELEVATION 1
Make good existing stallriserand repair / replace anydamaged tiles. Investigatepossibility of spraying tiles greyto match shopfront and discusswith PM before undertaking
specsavers.com specsavers.com specsavers.co
specsavers.com specsavers.com specsavers.co
specsavers.com specsave
specsavers.com specsave
specsavers.com specsavers.com specsavers.com specsavers.com specs
specsavers.com specsavers.com specsavers.com specsavers.com specs
Two rows of manifestation
stickers
Install bomb blast film to all frontelevation windows inc first floor. Installbarrier internally to first floor windowsto as they are at low level. All as perthe initial site visit report
Adjacent property (restricted visibility)
StoneStone
Stone Stone
144.65
144.68
144.43
144.45144.44
147.11
150.31
150.35
148.60
153.01
152.94
150.44
147.52
145.07
144.84
145.58
147.20
144.84
145.19
146.66
148.52
149.08
148.56
Door
Door
Door
Stone wall
Stone wall
Alarm
LightSign
Acu
Rwp
Svp
gutter
gutter
AcuAcu
Alarm
Alarm
Light
149.11
150.09
Wood decking area
147.18
146.95
conc
conc
conc
conc
146.53
147.70
P/R Ht1.40m
Roller shutter housing
Step up
Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report
Investigate rear yard for possibledrainage access and advise PM as perinitial site visit report. No costs for anyworks relating to this are to be allowedin tender returns
PROPOSED ELEVATION 3
CU 2CU 3
CU 4
CU 1
Notes:
PRODUCTION DRAWINGS
Drawn By:
Do not scale from this drawing. Dimensions to be checked on site
Drawing Number:
Scale: Date:
Revision:
On Behalf Of:
Optical Superstores
Drawn By:
Title:
Project:
Amendments:
Rev Init. Date Description
latypus LimitedDesign & Project Management Services
PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL
Tel: 07899 896 934 Fax: (01629) 581374
+44 (0) 115 933 0800
+44 (0) 115 982 6071
CAD Department,
Business Development,
Cirrus House,
10 Experian Way,
Nottingham
NOTTS NG2 1EP
GLOSSOP
New Store
Specsavers Opticians
41 High Street
Glossop
Derbyshire
SK13 8AZ
Proposed Elevations
JS 1:50@A1
1:100@A3
13/07/2016
1485/1015 A
0
s c a l e i n m e t r e s (for floor plans, sections and elevations)
541 2 3
© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission
Rear elevation showing position of proposed air
conditioning condensers added to the drawing. Light on
rear wall relocated to suit
A J.S. 22.07.16
Fire Alarm System
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Emergency lighting
Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.
Frame Numbers
Retail Area
Total Areas
Schedules:
1080