Transcript
  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    1/6

    i

  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    2/6

    .INSTITUTION OF SURVEYORS MALAYSIACOST INFORMATION CENTRE

    AL O S TANAL YSIi>,fr- .m 1

    Proposed Jabatan Pengangkutan Jalan Regional Office, Kuching

    Office, Canteen, Waiting Shelters, Weighbridge Control, Guardng infrastructure works. The site is located approximately 11 mile from

    COMPETITIVE

    Contract:JKR with Quantities

    Cost Fluctuation Competitive Tender List

    Open/Selected

    I T ] Competition I T ]

    0 Negotiated [ = : J

    0 Serial [ = : JPeriod Stip. By Client: 18 months

    Yes [ UNo 0

    Government mPrivate 0

    Provisional Sum RM

    Prime Cost Sum RM

    17,015,538.43

    11,652,000.00

    11,300,000.00

    670,000.0011,289,000.00

    11,234,117.00

    Period Offered by Buiders: 18 months RM 296,289.5010,700,000.00

    23 RM 220,000.00

    DesignlShape Information

    Single storey building (Enforcement Office), reinforced concrete framed structure with metal deck roofing on steel pipe trusses and reinforced concrete

    . The building compriseof

    General Office, Public Hall, Enfo rcementiBatchin g Store, Docket Room and tOilets .. /

    Internal Division

    GROSS FLOOR AREA

    Floor Space NOT Enclosed:

    Roof Area:

    (Structural & Plant Rooms)

    Contract Sum RM

    Provisional Sum RM

    RM

    RM

    RM

    Sum less Contingencies

    Functional Unit:

    m2

    904 m2

    - m2 External Wall Area904 m2.,. Gross Floor Area

    643 m 2 /

    176 m 2 /

    70 m 2 ;

    15 m 2 / '

    904 m 2 / . Below Ground Floor

    158 m2,j1

    904 m2 / Above Ground Floor

    643 m2 . /

    656

    904

    0.726 /

    -- m

    3.35 ml '

    -- m

    Percentage of Gross Floor Area:

    a) Below Ground FloorConstruction

    b) Single StoreyConstruction / '

    c) 2-StoreyConstruction

    d) 3-StoreyConstruction

    4-StoreyConstruction

    Brief Cost Information

    818,895.73 . /

    nil

    Functional Unit Cost excl external

    works: (RM/m2) 1,247.37 /

    nil

    22,675.72 being / 2.91 % of remainder "I f

    16,837.11 being /" 2.16% Contract Sum /

    RM 802,058.62 / '

    L

    L

    L

    L

    L

    L

    %

    100%

  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    3/6

    ; ,

    GROSS FLOOR AREA:

    ElementTotal Cost

    of Element

    RM

    SUMMARY OF ELEMENTAL COSTS

    904 m2

    Cost/m2

    GFA

    RM

    77,110.00

    t - - ~ - - . - - . - - - ~ ~ - - ~ - - ~ - . - - . - . - j.. - - . - - - . - - - . ~ - -

    TENDER DATE: 25-Jan-99

    Reinforced Reinforce-

    Concrete ment

    m3

    Formwork

    m2

  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    4/6

    ,NSTITlHION OF S U R V E Y O ~ SMALAYSIA, BUILDING COST INFOR" ' . Ct:"NTRE

    ...

  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    5/6

    ""

    I N S T I ~ ~ T l O NOF SURVEYORS MALAYSIABUILDING COST INFORMIIT ION CENTRE

    . l.' . . . . .,

    ELEMENTAL COST ANALYSIS - Form 3 13-Administrative Buildings

    GROSS FLOOR AREA:

    ELEMENT

    1 Substructure

    1A Piling

    1B Work Below Lowest Floor Finish

    2 Superstructure

    2A Frame

    2B Upper Floors

    2C Roof

    20 Stairs

    2E External Walls2F Windows & External Doors

    2G Internal Walls & Partitions2H Internal Doors

    3 Finishes

    3A Internal Wall Finishes

    3B Internal Floor Finishes

    3C Internal Ceiling Finishes

    3D External Finishes

    4 Fittings and Furnishings

    5 Services

    5A Sanitary Appliances

    5B Plumbing Installation

    5C Refuse Disposal150 Air-Conditioning &

    Ventilation System

    5E Electrical Installation5F Fire Protection Installation

    5G Lift & Conveyor Installation5H Communication Installation5J Special Installation

    5K Builder's Profit & Attendanceon Services

    5L Builder's Wor k In Connection

    with Services .6 External Works

    5A Site Work5B Drainage5C External Services

    50 Ancillary Buildings5E Recreational Facilities

    IA-1 - 904BRIEF SPECIFICATION

    904 m2 TENDER DATE: 25-Jan-99

    SPECIFICATION

    By Others

    Reinforced concrete pile caps, ground beams, stumps, ground floor slab and ramp

    Reinforced concrete column and beam construction

    Pitched roof with Lysaght Colorbond Spandek metal roof sheeting on Lysaght galvanised steel purfins and steelportal roof frames, double sided sisalation, wool insulation, flashings, cappings, rc roof slab and gutters withwaterproofing, U PVC rainwater downpipe

    Generally 115mm thick common brickwalls

    Natural anodised finish aluminium frame windows glazed with 6mm thick tinted float glass, solid core and hollowcore plywood flush doo r and one hour fire rated door with timber door frames and Win khau s and Yankironmongeries

    Generally 115mm thic k common brickwalls constructionHollow core plywood flush door, one hour fire rated door to service rooms, timber door frames and Winkhaus andYank ironmongery

    Plastering and Jotun paint to walls and columns, full height Kim Hin ceramic wall tiles to Toilet and Kitchen areas.

    Kin Hin homogeneous floor tiles and cement and sand screeded floor to service rooms

    Armstrong RH90 Second Look" mineral fibre board suspended ceiling system to Office & Hall areas, UACSuperflex ceiling on timber ceiling framing to Toilets, store rooms and service rooms.

    Included in Internal Finishes

    Timber benches

    Sime Inax range sanitary wares and fittings

    Cold water services a nd sanitary plumbing

    Electrical cabling, wiring and fight fittings.

    Telephone wiring and PABX system

    Reinfo rced concrete '/anity and counter top and squatting toilet plinth finished with Kim Hin homogeneous tiles

    -

  • 7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching

    6/6

    -..

    ~

    I ~ ~ T I T U T I O N~ R SMALAYSIABUILDING COST INFORMATION CENTRE

    ELEMENTAL COST ANALYSIS - Form 3 13 - Administrative Buildings

    GROSS FLOOR AREA:

    ELEMENT

    1 Substructure

    1A Piling1B Work Below Lowest Floor Finish

    2 Superstructure

    2A Frame

    2B Upper Floors

    2C Roof

    20 Stairs

    2E E x t ~ f r i a lWalls

    2F Windows & External Doors

    2G Internal Walls & Partitions

    2H Internal Doors

    3 Finishes

    3A Internal Wall Finishes

    3B Internal Floor Finishes

    3C Internal Ceiling Finishes

    3D External Finishes

    4 Fittings and Furnishings

    5 Services

    5A Sanitary Appliances5B Plumbing Installation

    5C Refuse Disposal

    50 Air-Conditioning &

    Ventilation System

    5E Electrical Installation

    5F Fire Protection Installation

    5G Lift & Conveyor Installation5H Communication Installation

    5J Special Installation

    5K Builder's Profit & Attendanceon Services

    5L Builder's Work In Connection

    with Services

    6 External Works

    6A Site Work6B Drainage

    6C External Services

    60 Ancillary Buildings

    6E Recreational Facilities

    IA- 1 - 904BRIEF SPECIFICATION

    904 m2 TENDER DATE: 25-Jan-99

    SPECIFICATION

    By Others

    Reinforced concrete pile caps, ground beams, stumps, ground floor slab and ramp

    Reinforced concrete column and beam construction

    Pitched roof with Lysaght Colorbond Spandek metal roof sheeting on Lysaght galvanised steel purlins and steelportal roof frames, double sided sisalation, wool insulation, flashings, cappings , rc roof slab and gutters withwaterproofing, UPVC rainwater downpipe

    Generally 115mm thick common brickwalls

    Natural anodised finish aluminium frame windows glazed with 6mm thick tinted float glass, solid core and hollowcore plywood flush door and one hour fire rated door with timber door frames and Winkhaus and Yank

    ironmongeries

    Generally 115mm thick common brickwalls construction

    Hollow core plywood flush door, one hour fire rated door to service rooms, timber door frames and Winkhaus andYank ironmongery

    Plastering and Jotun paint to walls and columns, full height Kim Hin ceramic wall tiles to Toilet and Kitchen areas.

    Kin Hin homogeneous floor tiles and cement and sand screeded floor to service rooms

    Armstrong RH90 Second Look II mineral fibre board suspended ceiling system to Office & Hall areas, UACSuperflex ceiling on timber ceiling framing to Toilets, store rooms and service rooms.

    Included in Internal Finishes

    Timber benches

    Sime Inax range sanitary wares and fittings

    Cold water services and sanitary plumbing

    Electrical cabling, wiring and light fittings.

    Telephone wiring and PABX system

    Reinforced concrete vanity and counter top and squatting toilet plinth finished with Kim Hin homogeneous tiles

    Site clearing, earthfilling, road & carpark, Fencing & Gate, landscaping & turfingSurface water drainage and foul drainage

    External water supply

    Refuse centre and substation

    Parade Ground


Recommended