.INSTITUTION OF SURVEYORS MALAYSIACOST INFORMATION CENTRE
AL O S TANAL YSIi>,fr- .m 1
Proposed Jabatan Pengangkutan Jalan Regional Office, Kuching
Office, Canteen, Waiting Shelters, Weighbridge Control, Guardng infrastructure works. The site is located approximately 11 mile from
COMPETITIVE
Contract:JKR with Quantities
Cost Fluctuation Competitive Tender List
Open/Selected
I T ] Competition I T ]
0 Negotiated [ = : J
0 Serial [ = : JPeriod Stip. By Client: 18 months
Yes [ UNo 0
Government mPrivate 0
Provisional Sum RM
Prime Cost Sum RM
17,015,538.43
11,652,000.00
11,300,000.00
670,000.0011,289,000.00
11,234,117.00
Period Offered by Buiders: 18 months RM 296,289.5010,700,000.00
23 RM 220,000.00
DesignlShape Information
Single storey building (Enforcement Office), reinforced concrete framed structure with metal deck roofing on steel pipe trusses and reinforced concrete
. The building compriseof
General Office, Public Hall, Enfo rcementiBatchin g Store, Docket Room and tOilets .. /
Internal Division
GROSS FLOOR AREA
Floor Space NOT Enclosed:
Roof Area:
(Structural & Plant Rooms)
Contract Sum RM
Provisional Sum RM
RM
RM
RM
Sum less Contingencies
Functional Unit:
m2
904 m2
- m2 External Wall Area904 m2.,. Gross Floor Area
643 m 2 /
176 m 2 /
70 m 2 ;
15 m 2 / '
904 m 2 / . Below Ground Floor
158 m2,j1
904 m2 / Above Ground Floor
643 m2 . /
656
904
0.726 /
-- m
3.35 ml '
-- m
Percentage of Gross Floor Area:
a) Below Ground FloorConstruction
b) Single StoreyConstruction / '
c) 2-StoreyConstruction
d) 3-StoreyConstruction
4-StoreyConstruction
Brief Cost Information
818,895.73 . /
nil
Functional Unit Cost excl external
works: (RM/m2) 1,247.37 /
nil
22,675.72 being / 2.91 % of remainder "I f
16,837.11 being /" 2.16% Contract Sum /
RM 802,058.62 / '
L
L
L
L
L
L
%
100%
7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching
3/6
; ,
GROSS FLOOR AREA:
ElementTotal Cost
of Element
RM
SUMMARY OF ELEMENTAL COSTS
904 m2
Cost/m2
GFA
RM
77,110.00
t - - ~ - - . - - . - - - ~ ~ - - ~ - - ~ - . - - . - . - j.. - - . - - - . - - - . ~ - -
TENDER DATE: 25-Jan-99
Reinforced Reinforce-
Concrete ment
m3
Formwork
m2
7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching
4/6
,NSTITlHION OF S U R V E Y O ~ SMALAYSIA, BUILDING COST INFOR" ' . Ct:"NTRE
...
7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching
5/6
""
I N S T I ~ ~ T l O NOF SURVEYORS MALAYSIABUILDING COST INFORMIIT ION CENTRE
. l.' . . . . .,
ELEMENTAL COST ANALYSIS - Form 3 13-Administrative Buildings
GROSS FLOOR AREA:
ELEMENT
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish
2 Superstructure
2A Frame
2B Upper Floors
2C Roof
20 Stairs
2E External Walls2F Windows & External Doors
2G Internal Walls & Partitions2H Internal Doors
3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings
5 Services
5A Sanitary Appliances
5B Plumbing Installation
5C Refuse Disposal150 Air-Conditioning &
Ventilation System
5E Electrical Installation5F Fire Protection Installation
5G Lift & Conveyor Installation5H Communication Installation5J Special Installation
5K Builder's Profit & Attendanceon Services
5L Builder's Wor k In Connection
with Services .6 External Works
5A Site Work5B Drainage5C External Services
50 Ancillary Buildings5E Recreational Facilities
IA-1 - 904BRIEF SPECIFICATION
904 m2 TENDER DATE: 25-Jan-99
SPECIFICATION
By Others
Reinforced concrete pile caps, ground beams, stumps, ground floor slab and ramp
Reinforced concrete column and beam construction
Pitched roof with Lysaght Colorbond Spandek metal roof sheeting on Lysaght galvanised steel purfins and steelportal roof frames, double sided sisalation, wool insulation, flashings, cappings, rc roof slab and gutters withwaterproofing, U PVC rainwater downpipe
Generally 115mm thick common brickwalls
Natural anodised finish aluminium frame windows glazed with 6mm thick tinted float glass, solid core and hollowcore plywood flush doo r and one hour fire rated door with timber door frames and Win khau s and Yankironmongeries
Generally 115mm thic k common brickwalls constructionHollow core plywood flush door, one hour fire rated door to service rooms, timber door frames and Winkhaus andYank ironmongery
Plastering and Jotun paint to walls and columns, full height Kim Hin ceramic wall tiles to Toilet and Kitchen areas.
Kin Hin homogeneous floor tiles and cement and sand screeded floor to service rooms
Armstrong RH90 Second Look" mineral fibre board suspended ceiling system to Office & Hall areas, UACSuperflex ceiling on timber ceiling framing to Toilets, store rooms and service rooms.
Included in Internal Finishes
Timber benches
Sime Inax range sanitary wares and fittings
Cold water services a nd sanitary plumbing
Electrical cabling, wiring and fight fittings.
Telephone wiring and PABX system
Reinfo rced concrete '/anity and counter top and squatting toilet plinth finished with Kim Hin homogeneous tiles
-
7/28/2019 Proposed Jabatan Pengangkutan Jalan Regional Office , Kuching
6/6
-..
~
I ~ ~ T I T U T I O N~ R SMALAYSIABUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 3 13 - Administrative Buildings
GROSS FLOOR AREA:
ELEMENT
1 Substructure
1A Piling1B Work Below Lowest Floor Finish
2 Superstructure
2A Frame
2B Upper Floors
2C Roof
20 Stairs
2E E x t ~ f r i a lWalls
2F Windows & External Doors
2G Internal Walls & Partitions
2H Internal Doors
3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings
5 Services
5A Sanitary Appliances5B Plumbing Installation
5C Refuse Disposal
50 Air-Conditioning &
Ventilation System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation5H Communication Installation
5J Special Installation
5K Builder's Profit & Attendanceon Services
5L Builder's Work In Connection
with Services
6 External Works
6A Site Work6B Drainage
6C External Services
60 Ancillary Buildings
6E Recreational Facilities
IA- 1 - 904BRIEF SPECIFICATION
904 m2 TENDER DATE: 25-Jan-99
SPECIFICATION
By Others
Reinforced concrete pile caps, ground beams, stumps, ground floor slab and ramp
Reinforced concrete column and beam construction
Pitched roof with Lysaght Colorbond Spandek metal roof sheeting on Lysaght galvanised steel purlins and steelportal roof frames, double sided sisalation, wool insulation, flashings, cappings , rc roof slab and gutters withwaterproofing, UPVC rainwater downpipe
Generally 115mm thick common brickwalls
Natural anodised finish aluminium frame windows glazed with 6mm thick tinted float glass, solid core and hollowcore plywood flush door and one hour fire rated door with timber door frames and Winkhaus and Yank
ironmongeries
Generally 115mm thick common brickwalls construction
Hollow core plywood flush door, one hour fire rated door to service rooms, timber door frames and Winkhaus andYank ironmongery
Plastering and Jotun paint to walls and columns, full height Kim Hin ceramic wall tiles to Toilet and Kitchen areas.
Kin Hin homogeneous floor tiles and cement and sand screeded floor to service rooms
Armstrong RH90 Second Look II mineral fibre board suspended ceiling system to Office & Hall areas, UACSuperflex ceiling on timber ceiling framing to Toilets, store rooms and service rooms.
Included in Internal Finishes
Timber benches
Sime Inax range sanitary wares and fittings
Cold water services and sanitary plumbing
Electrical cabling, wiring and light fittings.
Telephone wiring and PABX system
Reinforced concrete vanity and counter top and squatting toilet plinth finished with Kim Hin homogeneous tiles
Site clearing, earthfilling, road & carpark, Fencing & Gate, landscaping & turfingSurface water drainage and foul drainage
External water supply
Refuse centre and substation
Parade Ground