+ All Categories
Home > Documents > Proposed Water Infrastructure - SanDiegoCounty.gov On-site Sewer System VALIANO Figure 1-20...

Proposed Water Infrastructure - SanDiegoCounty.gov On-site Sewer System VALIANO Figure 1-20...

Date post: 08-Apr-2018
Category:
Upload: haxuyen
View: 214 times
Download: 1 times
Share this document with a friend
3
Proposed Water Infrastructure VALIANO Figure 1-19 I:\PROJECTS\I\IPQ\IPQ-08_Valiano\Map\ENV\EIR\Fig1-19_WaterInfrastructure.indd IPQ-11 03/11/15 -RK Source: Atkins 2014 G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . G ! . K T K T K T K T Existing R-1 A/B [ Z [ Z [ Z [ Z To be replaced by Project [ Ú Proposed Onsite Booster Station [ Z K T Future R7 Rincon Tank Project Boundary Potable Water Proposed 959 PZ Proposed Boosted 1030 PZ Harmony Grove Village & , Connection to Existing G ! . Proposed Fire Hydrant K T Existing Tank K T Future Tank ¯ (Include Fire Pump) 16" 16" 12" 12" 16" 16" 16" EXISTING RINCON 959 ZONE 12" 12" (HWL=959 feet) Harmony Grove Villages (Under Construction) Mt. Whitney Road Country Club Drive Eden Valley Lane Hill Valley Drive
Transcript

Proposed Water InfrastructureVALIANO

Figure 1-19

I:\P

RO

JEC

TS

\I\I

PQ

\IP

Q-0

8_V

alia

no\M

ap\E

NV

\EIR

\Fig

1-19

_Wat

erIn

fras

truc

ture

.indd

I

PQ

-11

03/

11/1

5 -

RK

Source: Atkins 2014

3/3/2015 LH SD \\SDOFS01\Data\Clients\Integral Communities\100033736_Valiano\GIS\mxd\Valiano_Potable_revise_11-2014.mxd

ConceptualOnsite Water System

Valiano Potable WaterFebruary 2015

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!.

G!. G!.

G!.

G!.

G!.

G!.

G!.G!.

G!.

G!.

G!.

G!.

G!.

G!.

KT

KT

KTKT

Existing R-1 A/B

[Z

[Z

[Z

[Z

To be replaced by Project

[Ú Proposed OnsiteBooster Station

[Z

KT

Future R7Rincon Tank

Project Boundary

Potable Water

Proposed 959 PZ

Proposed Boosted 1030 PZ

Harmony Grove Village

&, Connection to Existing

G!. Proposed Fire Hydrant

KT Existing Tank

KT Future Tank

Note: All Pipeline 8-inch Unless Otherwise Noted

9̄00

Feet

(Include Fire Pump)

16"

16"

12"

12"

16"

16"

16"

EXISTING RINCON 959 ZONE

12"

12"

(HWL=959 feet)

Harmony Grove Villages(Under Construction)

Mt. Whitney Road

Co

un

try

Clu

b D

rive

Eden Valley Lane

Hill Valley Drive

Proposed On-site Sewer SystemVALIANO

Figure 1-20

I:\P

RO

JEC

TS

\I\I

PQ

\IP

Q-0

8_V

alia

no\M

ap\E

NV

\EIR

\Fig

1-20

_Sew

er.in

dd

IP

Q-1

1 0

3/11

/15

-RK

CountyWTWRF

Private 1-1/4" Force Main640 LF

6" Force Main2,400 LF

Private 1-1/4" Force Main680 LF

Wet WeatherStorage (6.4 MG)

LS 1 (Private)

LS 3 (Private)

LS 2 (County)

Valiano Boundary

Rincon Recycle Waterline

Proposed County Sewer

Force Mains

MH! Manholes

Private SPS Sub-basin

¯

NOTE: All sewer pipe diameter is 8 inches.

Source: Atkins 2015

Reclaimed Water AreasVALIANO

Figure 1-21

I:\P

RO

JEC

TS

\I\I

PQ

\IP

Q-0

8_V

alia

no\M

ap\E

NV

\EIR

\Fig

1-21

_Rec

laim

edW

ater

s.in

dd

IP

Q-1

1 03

/20/

15 -

RK

Source: Fuscoe Engineering 2015


Recommended