ENGINEERING OFFICE, GROUND FLOOR, NEW MUNICIPAL BLDG., MARILAO, BULACAN CONTACT NO. 0943-701-5764/(044) 896-2931 LOCAL 1130 OR 1131 PROVINCE OF BULACAN | MUNICIPALITY OF MARILAO MUNICIPAL ENGINEERING OFFICE ISSUANCE OF BUILDING, PLUMBING/SANITARY AND ELECTRICAL PERMITS 1 Submit Duly accomplish Application forms along with the all Requirement Receive and Review Application Form along with the submitted Requirements 10 Minutes Engineering Staff None Building Permit Form, Plumbing Permit Form (NBC FRM No. A-06) and Electrical Permit Form (DPWH ANCILLARY FORM NO. 96-001-E 2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Building Permit Form, Plumbing Permit Form (NBC FRM No. A-06), and Electrical Permit Form (DPWH ANCILLARY FORM NO. 96-001-E) 3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Assessment Form for Building Permit 4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment Process payment and issue Official Receipt. Inform the client to return engineering office for the processing and approval 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment 5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve business permit 10 Minutes Engineering Staff None Official Receipt and Building Permit Form STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS END OF TRANSACTION SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon break DURATION: 3 Days and 50 minutes (Under normal circumstances) What are the requirements: 1. 2 xerox copies of Transfer Certificate of Title (T.C.T.) 2. 2 xerox copies of Tax declaration 3. 2 xerox copies Current Tax Receipt 4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans 5. 5 Sets of Specification signed and sealed by the Architect or Civil Engineer 6. 5 Sets of Structural Design Computation signed and sealed by the Civil Engineer 7. Fire Station (For Approval of Plan) 8. 5 Sets of Bill of Materials signed and sealed by the Civil Engineer or Architect 9. Zoning Permit (To be secured from the Municipal Planning and Development Office) 10. Logbook 11. Barangay Clearance 12. Xerox copy of Valid PRC ID (PTR 2016) VISION The office who embraces the responsibilities in making and handling engineering decisions consistent with the safety and welfare of the people, paving the way for a better and progressive town of Marilao. MISSION Ÿ To handle the processing and issuances of the building permit and other ancillary permits or certificates pertaining to structures owned by the government or private entities; Ÿ To follow a well established set of procedures for design and safety calculation; Ÿ To seek, accept, and offer honest criticism of technical work, to acknowledge and correct errors and to credit properly the contributions of others. OBJECTIVES Ÿ To promote safe and sound structures in the municipality. Ÿ To sustain a clean and healthy Marilao environment. FUNCTION Ÿ To assess fair building permit fees. Ÿ To evaluate building permit documents. Ÿ To coordinate in the planning and development of municipal infrastructure projects. Ÿ To help maintain the cleanliness of municipal structures. ISSUANCE OF FENCING PERMIT 1 Submit Duly accomplish Application forms along with the all Requirements Receive and Review Application Form along with the submitted Requirements 10 Minutes Engineering Staff None Fencing Permit Form 2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Fencing Permit Form 3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Assessment Form for Building Permit 4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt 5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permit Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Fencing permit 10 Minutes Engineering Staff None Official Receipt and Building Permit Form STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS END OF TRANSACTION SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon break DURATION: 3 Days and 50 minutes (Under normal circumstances) What are the requirements: 1. 2 xerox copies of Transfer Certificate of Title (T.C.T.) 2. 2 xerox copies of Tax declaration 3. 2 xerox copies Current Tax Receipt 4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer 5. 5 Sets of Bill of Materials signed and sealed by the Civil Engineer or Architect 6. Zoning Permit (To be secured from the Municipal Planning and Development Office) 7. Barangay Clearance 8. Xerox copy of Valid PRC ID (PTR 2016) ISSUANCE OF SIGNAGE PERMIT 1 Submit Duly accomplish Application forms along with the all Requirements Receive and Review Application Form along with the submitted Requirements 10 Minutes Engineering Staff None Signage Permit Form 2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Signage Permit Form 3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Assessment Form for Building Permit 4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt 5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permit Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Signage permit 10 Minutes Engineering Staff None Official Receipt and Building Permit Form STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS END OF TRANSACTION SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon break DURATION: 3 Days and 50 minutes (Under normal circumstances) What are the requirements: 1. 2 xerox copies of Transfer Certificate of Title (T.C.T.) 2. 2 xerox copies of Tax declaration 3. 2 xerox copies Current Tax Receipt 4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer 5. Zoning Permit (To be secured from the Municipal Planning and Development Office) 6. Barangay Clearance 7. Xerox copy of Valid PRC ID (PTR 2016) ISSUANCE OF CERTIFICATE OF OCCUPANCY 1 Submit Duly accomplish Application forms along with the all Requirements Receive and Review Application Form along with the submitted Requirements 10 Minutes Engineering Staff None Certificate of Completion Form (DPWTC NO. 77-094-B) 2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Certificate of Completion Form (DPWTC NO. 77-094-B) 3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Assessment Form for Certificate of Completion 4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt 5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Certificate of Occupancy (COC) 10 Minutes Engineering Staff None Official Receipt, Certificate of Completion Form (DPWTC No. 77-094-B) STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS END OF TRANSACTION SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon break DURATION: 3 Days and 50 minutes (Under normal circumstances) What are the requirements: 1. Approved Building Permit 2. A copy of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans 3. Approved Fire Safety Inspection Certificate 4. Picture of Finished House 5. Xerox copy of Valid PRC ID (PTR 2016) ISSUANCE OF CERTIFICATE OF ELECTRICAL INSPECTION (CEI) 1 Submit Duly accomplish Application forms along with the all Requirements Review Application Form and submitted Requirements 10 Minutes Engineering Staff None Certificate of Electrical Inspection Form 2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Certificate of Electrical Inspection Form 3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment 10 Minutes Municipal Engineer / Assistant Munucipal Engineer None Assessment Form for Certificate of Completion 4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt 5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Certificate of Electrical Inspection (CEI) 10 Minutes Engineering Staff None Certificate of Electrical Inspection Form STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS END OF TRANSACTION SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon break DURATION: 3 Days and 50 minutes (Under normal circumstances) What are the requirements: 1. Approved Building/Electrical Permit 2. Approved Certificate of Occupancy (If New) 3. A copy of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans 4. Picture of Finished House
Transcript
Page 1: PROVINCE OF BULACAN | MUNICIPALITY OF MARILAO … · PROVINCE OF BULACAN | MUNICIPALITY OF MARILAO MUNICIPAL ENGINEERING OFFICE ISSUANCE OF BUILDING, PLUMBING/SANITARY AND ELECTRICAL

ENGINEERING OFFICE, GROUND FLOOR, NEW MUNICIPAL BLDG., MARILAO, BULACANCONTACT NO. 0943-701-5764/(044) 896-2931 LOCAL 1130 OR 1131

PROVINCE OF BULACAN | MUNICIPALITY OF MARILAO

MUNICIPAL ENGINEERING OFFICE

ISSUANCE OF BUILDING, PLUMBING/SANITARY AND ELECTRICAL PERMITS

1 Submit Duly accomplish Application forms along with the all Requirement

Receive and Review Application Form along with the submitted Requirements

10 Minutes Engineering Staff None Building Permit Form, Plumbing Permit Form (NBC FRM No. A-06) and

Electrical Permit Form (DPWH ANCILLARY FORM NO. 96-001-E

2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Building Permit Form, Plumbing Permit Form (NBC FRM No. A-06), and

Electrical Permit Form (DPWH ANCILLARY FORM NO. 96-001-E)

3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment

10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Assessment Form for Building Permit

4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment

Process payment and issue Official Receipt. Inform the client to return engineering office for the processing and approval

10 Minutes Treasurer's Office Staff As per Assessed Order of Payment

5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits

Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve business permit

10 Minutes Engineering Staff None Official Receipt and Building Permit Form

STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS

END OF TRANSACTION

SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon breakDURATION: 3 Days and 50 minutes (Under normal circumstances)What are the requirements:1. 2 xerox copies of Transfer Certificate of Title (T.C.T.)2. 2 xerox copies of Tax declaration3. 2 xerox copies Current Tax Receipt4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans5. 5 Sets of Specification signed and sealed by the Architect or Civil Engineer

6. 5 Sets of Structural Design Computation signed and sealed by the Civil Engineer7. Fire Station (For Approval of Plan)8. 5 Sets of Bill of Materials signed and sealed by the Civil Engineer or Architect9. Zoning Permit (To be secured from the Municipal Planning and Development Office)10. Logbook11. Barangay Clearance12. Xerox copy of Valid PRC ID (PTR 2016)

VISIONThe office who embraces the responsibilities in making and handling engineering decisions consistent with the safety and welfare of the people, paving the way for a better and

progressive town of Marilao.MISSION

Ÿ To handle the processing and issuances of the building permit and other ancillary permits or certificates pertaining to structures owned by the government or private entities;Ÿ To follow a well established set of procedures for design and safety calculation;

Ÿ To seek, accept, and offer honest criticism of technical work, to acknowledge and correct errors and to credit properly the contributions of others.OBJECTIVES

Ÿ To promote safe and sound structures in the municipality.Ÿ To sustain a clean and healthy Marilao environment.

FUNCTIONŸ To assess fair building permit fees.

Ÿ To evaluate building permit documents.Ÿ To coordinate in the planning and development of municipal infrastructure projects.

Ÿ To help maintain the cleanliness of municipal structures.

ISSUANCE OF FENCING PERMIT

1 Submit Duly accomplish Application forms along with the all Requirements

Receive and Review Application Form along with the submitted Requirements

10 Minutes Engineering Staff None Fencing Permit Form

2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Fencing Permit Form

3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment

10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Assessment Form for Building Permit

4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment

Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt

5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permit

Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Fencing permit

10 Minutes Engineering Staff None Official Receipt and Building Permit Form

STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS

END OF TRANSACTION

SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon breakDURATION: 3 Days and 50 minutes (Under normal circumstances)What are the requirements:1. 2 xerox copies of Transfer Certificate of Title (T.C.T.)2. 2 xerox copies of Tax declaration3. 2 xerox copies Current Tax Receipt4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer

5. 5 Sets of Bill of Materials signed and sealed by the Civil Engineer or Architect6. Zoning Permit (To be secured from the Municipal Planning and Development Office)7. Barangay Clearance8. Xerox copy of Valid PRC ID (PTR 2016)

ISSUANCE OF SIGNAGE PERMIT

1 Submit Duly accomplish Application forms along with the all Requirements

Receive and Review Application Form along with the submitted Requirements

10 Minutes Engineering Staff None Signage Permit Form

2 Proceed to Municipal Engineer / Assistant Municipal Engineer Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Signage Permit Form

3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment

10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Assessment Form for Building Permit

4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment

Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt

5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permit

Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Signage permit

10 Minutes Engineering Staff None Official Receipt and Building Permit Form

STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS

END OF TRANSACTION

SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon breakDURATION: 3 Days and 50 minutes (Under normal circumstances)What are the requirements:1. 2 xerox copies of Transfer Certificate of Title (T.C.T.)2. 2 xerox copies of Tax declaration3. 2 xerox copies Current Tax Receipt4. 5 Sets of Plans signed and sealed by a duly licensed Architect or Civil Engineer

5. Zoning Permit (To be secured from the Municipal Planning and Development Office)6. Barangay Clearance7. Xerox copy of Valid PRC ID (PTR 2016)

ISSUANCE OF CERTIFICATE OF OCCUPANCY

1 Submit Duly accomplish Application forms along with the all Requirements

Receive and Review Application Form along with the submitted Requirements

10 Minutes Engineering Staff None Certificate of Completion Form (DPWTC NO. 77-094-B)

2 Proceed to Municipal Engineer / Assistant Municipal Engineer

Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Certificate of Completion Form (DPWTC NO. 77-094-B)

3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment

10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Assessment Form for Certificate of Completion

4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment

Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment

Official Receipt

5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits

Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Certificate of Occupancy (COC)

10 Minutes Engineering Staff None Official Receipt, Certificate of Completion Form (DPWTC No. 77-094-B)

STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS

END OF TRANSACTION

SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon breakDURATION: 3 Days and 50 minutes (Under normal circumstances)What are the requirements:1. Approved Building Permit 2. A copy of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans

3. Approved Fire Safety Inspection Certificate4. Picture of Finished House5. Xerox copy of Valid PRC ID (PTR 2016)

ISSUANCE OF CERTIFICATE OF ELECTRICAL INSPECTION (CEI)

1 Submit Duly accomplish Application forms along with the all Requirements

Review Application Form and submitted Requirements 10 Minutes Engineering Staff None Certificate of Electrical Inspection Form

2 Proceed to Municipal Engineer / Assistant Municipal Engineer

Conduct Initial Interview 10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Certificate of Electrical Inspection Form

3 Wait and Get Assessed Form for Payment Assess Order of Payment Advise the client to proceed Treasurer's Office for payment

10 Minutes Municipal Engineer / Assistant Munucipal Engineer

None Assessment Form for Certificate of Completion

4 Proceed to Municipal Treasurer's Office and Pay the amount indicated in assessed order of Payment

Process payment and issue Official Receipt 10 Minutes Treasurer's Office Staff As per Assessed Order of Payment Official Receipt

5 Submit Proof of Payment in Engineering Office and wait for the Approval of the Permits

Receive Official Receipt and Process and approve the Permits. Advise the client to return after 3 working days for releasing the approve Certificate of Electrical Inspection (CEI)

10 Minutes Engineering Staff None Certificate of Electrical Inspection Form

STEPS APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES & CHARGES FORMS

END OF TRANSACTION

SCHEDULE OF AVAILABILITY OF SERVICE: Monday to Friday; 8:00 AM - 5:00 PM without noon breakDURATION: 3 Days and 50 minutes (Under normal circumstances)What are the requirements:1. Approved Building/Electrical Permit 2. Approved Certificate of Occupancy (If New)3. A copy of Plans signed and sealed by a duly licensed Architect or Civil Engineer in case of

Architectural and Structural Plan , a Electrical Engineer or Master Electrician in case of electrical plans and a Sanitary Engineer or Master Plumber in case of Sanitary and Plumbing Plans4. Picture of Finished House

Recommended