Date post: | 14-Dec-2015 |
Category: |
Documents |
Upload: | dulce-raisbeck |
View: | 244 times |
Download: | 1 times |
PT(PERSERO) PELABUHAN INDONESIA I
November 2008
BELAWAN PORT DEVELOPMENT PROJECT
PT(PERSERO) PELABUHAN INDONESIA I
GENERAL CONDITION LOCATION
This port is very strategic This port is very strategic because it is located in the because it is located in the international shipping lane international shipping lane and geographically it’s and geographically it’s position in : 03 – 43’ – 00’ position in : 03 – 43’ – 00’ LU North LatitudeLU North Latitude
98 – 42’ – 08’ BT 98 – 42’ – 08’ BT East LongitudeEast LongitudeBelawan Container Terminal Belawan Container Terminal is located at the mouth of is located at the mouth of Belawan River and Deli Belawan River and Deli River with shipping channel River with shipping channel that measures 13,5 km in that measures 13,5 km in length connecting the port length connecting the port to the sea in Malacca to the sea in Malacca straits. The port is around straits. The port is around 30 km away from Medan, 30 km away from Medan, the capital of North Sumatra the capital of North Sumatra province, with total area province, with total area 300.200 m2300.200 m2
This port is very strategic This port is very strategic because it is located in the because it is located in the international shipping lane international shipping lane and geographically it’s and geographically it’s position in : 03 – 43’ – 00’ position in : 03 – 43’ – 00’ LU North LatitudeLU North Latitude
98 – 42’ – 08’ BT 98 – 42’ – 08’ BT East LongitudeEast LongitudeBelawan Container Terminal Belawan Container Terminal is located at the mouth of is located at the mouth of Belawan River and Deli Belawan River and Deli River with shipping channel River with shipping channel that measures 13,5 km in that measures 13,5 km in length connecting the port length connecting the port to the sea in Malacca to the sea in Malacca straits. The port is around straits. The port is around 30 km away from Medan, 30 km away from Medan, the capital of North Sumatra the capital of North Sumatra province, with total area province, with total area 300.200 m2300.200 m2
Gabion Belawan Container Terminal
Situated at the north east of Sumatera island which located approximately 27 km from the centre of Medan, the provincial capital of North Sumatera facing. Malacca Strait, the port of Belawan has steadily grown and become the largest port in Sumatera and the third largest port in Indonesia after Tanjung Priok port in Jakarta and Tanjung Perak port in Surabaya. The port is an integrated international port handling all types of cargo (general cargo, container, bulk etc).Gabion Belawan Container Terminal is the biggest Container Terminal located at Belawan port. In term of total cargo throughput in 2007 GBCT handled 581.378 TEUS,
PT(PERSERO) PELABUHAN INDONESIA I
ACCESS CHANNEL
GENERAL CONDITION
PT(PERSERO) PELABUHAN INDONESIA I
Container Terminal- Tambatan : 850 M’- Kedalaman : - 10-11 Mlws- C Y : 98.000M2
- Yards : 73.000M2
- C F S : 11.470M2
Belawan Lama - Tambatan : 602
M’- Kedalaman : - 5-7Mlws
Passenger Terminal- Internasional : 700 pax - Domestik : 2.450 pax
Citra - Tambatan : 625 M’ + 150 M’- Kedalaman : - 5- 8Mlws- Gudang : 3 Unit
Ujung Baru - Tambatan : 1,670
M- Kedalaman : - 9.00
Mlws
Pertamina Jettykapasitas : 17.000
DWT
EXISTING
GENERAL CONDITION
PT(PERSERO) PELABUHAN INDONESIA I
SHIP CALL
OPERATION
PT(PERSERO) PELABUHAN INDONESIA I
OPERATIONLOADING / UNLOADING
PT(PERSERO) PELABUHAN INDONESIA I
OPERATION
0
100.000
200.000
300.000
400.000
500.000
600.000
700.000
TO
TA
LS
(T
EU
S)
Domestic 189.754 245.756 238.943 255.904 260.839
Internasional 236.801 274.031 282.074 303.866 320.539
2003 2004 2005 2006 2007
CONTAINER TRAFFIC
PT(PERSERO) PELABUHAN INDONESIA I
PORT DEVELOPMENTCARGO FORECAST
0
5.000.000
10.000.000
15.000.000
20.000.000
25.000.000
30.000.000
35.000.000
To
nn
ag
e
0
500.000
1.000.000
1.500.000
2.000.000
2.500.000
3.000.000
3.500.000
Te
us
Multipurpose(Tonnage) 13.845.800 16.829.820 22.305.400 27.610.200
Container (Teus) 769.861 1.067.289 1.872.526 2.887.820
2008 2012 2022 2032
PT(PERSERO) PELABUHAN INDONESIA I
GABION BELAWAN CONTAINER TERMINAL
3
PT(PERSERO) PELABUHAN INDONESIA I
INTERNATIONALDOMESTIC
Berth 500 m 350 m
REEFER PLUGS : 72 Points
FACILITIES
Basin Area : 382.500 m2
Depth : 8-10 M.L.W.S
SHIP SERVICES FACILITY
CARGO HANDLING FACILITY
INTERNATIONAL DOMESTIC
Container Yard 105.184 m2 81.402 m2
4
PT(PERSERO) PELABUHAN INDONESIA I
PORT DEVELOPMENT
BELAWAN MASTER PLAN
PT(PERSERO) PELABUHAN INDONESIA I
SHORT TERM (2008-2012)
MEDIUM TERM (2013-2022)
LONG TERM (2023-2032)
HUB PORT SCENARIO
PORT DEVELOPMENT PHASE
PT(PERSERO) PELABUHAN INDONESIA I
• Utilizing the Competitive Advantage (Geografic and Hinterland)
• Developing to be the hub port
• Growing of container throughput
• Anticipating the trend of containerization
DEVELOPMENT BACKGROUND
12
PT(PERSERO) PELABUHAN INDONESIA I
PROJECT PROFILE
Name of project : Belawan Port short term Development Project
Project cost : US$ 235.758.513,83 Stage 1 : US$ 125.455.456,09 consisting of Under IDB Financing 82,28% Under GOI Financing 17,89% Stage 2 : US$ 233.331.143,69 consisting of Under IDB Financing 79,27% Under GOI Financing 20,78% Executing agency : Ministry of Transportation Location : Belawan, Nort Sumatera Province Project period : 6 (six) years, comprise of ; Stage 1 : 3 (three) years Stage 2 : 3 (three) yaers
13
PT(PERSERO) PELABUHAN INDONESIA I
PHASE OF GBCT DEVELOPMENT PROGRAM
2008 2009 2010 2011 2012
Reclamation and soil improvementBerth extension of 700 mChannel dredgingAdditional Container yardProcurement of Container handlingEquipment
ActivityY ear
14
PT(PERSERO) PELABUHAN INDONESIA I
GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-I
No Description Amount (US$)
Equipment
1 Gantry crane 18.183.548,39 2 Transtainer 9.096.774,19 3. Trailer 1.667.741,94 4. Chassis 1.364.516,13 5 Reach stacker 1.010.752,69 Civil Work 1. Dredging 3.732.079,84 2. Reclamation 25.394.806,45 3. Revertment 393,709,68 4. Soil improvement 7.965.204,84 5. Container yard 4.239.946,24 6. Container wharf-14 mlws 17.641.129,03 7. Drainage 107.526.88 8. Road 1.799.650,54 9. Utility 322.580,65
Engineering cost 4.646.498,37Contigency 18.585.993,49Value added Tax 9.292.996,75
Total 125.455.456,09 15
PT(PERSERO) PELABUHAN INDONESIA I
GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-II
No Description Amount (US$)
Equipment
1 Gantry crane 18.183.548,39 2 Transtainer 9.096.774,19 3. Trailer 1.667.741,94 4. Chassis 1.364.516,13 5 Reach stacker - Civil Work 1. Dredging 3.732.079,84 2. Reclamation 25.394.806,45 3. Revertment 393,709,68 4. Soil improvement 7.965.204,84 5. Container yard 4.239.946,24 6. Container wharf-14 mlws 17.641.129,03 7. Drainage 107.526.88 8. Road 1.799.650,54 9. Utility 322.580,65
Engineering cost 4.595.960,74Contigency 4.595.960,74Value added Tax 9.191.921,48
Total 110.303.057,74 16
PT(PERSERO) PELABUHAN INDONESIA I