Enclosure 4 PWR Primary to Secondary Leak Guidelines: Draft Revision 3 Non-Proprietary Version
Transcript
Page 1: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Enclosure 4

PWR Primary to Secondary Leak Guidelines:

Draft Revision 3

Non-Proprietary Version

Page 2: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

PWR Primary-To-Secondary LeakGuidelines - Revision 3

1008219

NON-PROPIETARY DRAFT Report, June 2004

Page 3: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

THIS DOCUMENT WAS PREPARED BY THE ORGANIZATION(S) NAMED BELOW AS AN ACCOUNT OFWORK SPONSORED OR COSPONSORED BY THE ELECTRIC POWER RESEARCH INSTITUTE, INC.(EPRI). NEITHER EPRI, ANY MEMBER OF EPRI, ANY COSPONSOR, THE ORGANIZATION(S) NAMEDBELOW, NOR ANY PERSON ACTING ON BEHALF OF ANY OF THEMK

(A) MAKES ANY WARRANTY OR REPRESENTATION WHIATSOEVER, EXPRESS OR IMPUED, 0) WITHRESPECT TO THE USE OF ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR ITEMDISCLOSED IN THIS PACKAGE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTlCULARPURPOSE, OR (11) THAT SUCH USE DOES NOT INFRINGE ON OR INTERFERE WITH PRIVATELY OWNEDRIGHTS, INCLUDING ANY PARIYS INTELLECTUAL PROPERTY, OR (111) THAT THIS PACKAGE ISSUITABLE TO ANY PARTICULAR USERS CIRCUMSTANCE; OR

(B) ASSUMES RESPONSIBILITY FOR ANY DAMAGES OR OTHER LIABILITY WHATSOEVER (INCLUDINGANY CONSEQUENTIAL DAMAGES, EVEN IF EPRJ OR ANY EPRI REPRESENTATIVE HAS BEEN ADVISEDOF THE POSSIBILlTY OF SUCH DAMAGES) RESULTING FROM YOUR SELECTION OR USE OF THISPACKAGE OR ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR IEM DISCLOSED INTHIS DOCUMENT.

ORGANIZATION(S) THAT PREPARED THIS DOCUMENT

PWR Primary to Secondary Leak Guidelines Revision 3 Committee

ORDERING INFORMATION

Requests for copes of this report should be drtecded to EPRI Orders and Conferences, 1355 Wilow Way, Suite 278,Concord, CA 94520. Tdoee number: 800.313.3774, press 2, or internally x5379; voice: 925.609.1310.

Eledric Power Research Insfitle and EPRI are registered service marks of the Elchic Powver Research Instte, IncEPRI. ELECTRIFY THE WORLD is a service mark of the Electric Power Research Inteate, Inc.

CopyightO 2004 Eledric Power Research Institude, Inc. Anl rights reserved.

Page 4: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

PWR Primary-To-SecondaryLeak Guidelines - Revision 3

Draft Final Report, June 2004

Prepared by:PWR PRIMARY-TO-SECONDARY LEAK GUIDELINES COMMITTEE

Constellation EnergyR. Kreger & E. Eshelman

Duke EnergyL. Wilson & R. Eaker

DominionL. Miller

ExelonM. Andrews

First EnergyS. Slosnerick

Florida Power & LightR. Lieder

Nuclear Management CompanyJoel McElrath

OPPDT. Dukarski

Pacific Gas & ElectricJ. Knemeyer

Public Service Electric & GasS. Harvey & J. Riddle

Southern Nuclear Co.F. Hundley

TXUJ. Stevens & D. Farnsworth

Progress EnergyKelli Voelsing

Southern California EdisonL. McCann

Tennessee Valley AuthorityR. Richie, D. Bodine & S. Tuthill

WCNOCT. Card

EPRIT. GaudreauK. Fruzzetti

Dominion Engineering, Inc.J. Gorman & C. Marks

Page 5: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

REPORT SUMMARY

Primary-to-secondary leakage of steam generator tubes in PWRs can result from mechanismsthat propagate slowly or rapidly. This report represents Revision 3 of industry-wide guidelinesfirst proposed in 1995 to address the issue of leakage.

Background

The original recommendations, PWR Primary-to-Secondary Leak Guidelines (TR-104788) datedMay 1995, were developed by a committee of industry experts from a variety of disciplinesunder the auspices of EPRI. The Guidelines were updated by a similar committee in 1997,resulting in the issue of Revision 1 in November 1997. The Guidelines were again revised(Revision 2) in April 2000.

The PWR Primary-to-Secondary Leak Guidelines can be credited with providing defense-in-depth to ensure that operation with primary-to-secondary leakage has a low probability ofescalating to a tube rupture.

Objectives

* To present a complete, technically justified program that can be used to develop station-specific operating programs.

* To revise the Guidelines to reflect recent field experience, and to reflect the current status ofthe NEI 97-06 initiative.

* To ensure that the Guideliles continue to help utility personnel to manage small leaks and toensure that the likelihood of'propagation of flaws to tube rupture is minimized under bothnormal and faulted conditions.

Approach

A committee of industry experts from a number of disciplines reviewed the operating experiencewith Revision 2 to the PWR Primary-to-Secondary Leak Guidelines. Industry experience withimplementing the guidelines was also extensively reviewed. From this information, thecommittee developed recommended changes to the program designed to ensure propermonitoring of and responses to leakage. The recommended changes to the guidelines areintended to clarify implementation of the guidelines, and to ensure that the likelihood of

v

Page 6: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

propagation of flaws to tube rupture is minimized under both normal and faulted conditions andshould help utilities manage small primary-to-secondary leakage.

Results

The committee generated a revision to the guideline document following the format of Revision2. Additionally, this revision of the guidelines delineates Mandatory and Shall requirements.These guidelines include six operating conditions with respect to primary-to-secondary leakage.Two of these conditions contain recommended actions that can result in rapid, controlled plantshutdown if primary-to-secondary leakage displays evidence of undesirable propagation.

EPRI Perspective

This document provides a series of industry-wide recommendations for station management ofprimary-to-secondary leakage, including detailed description of leak characteristics whichwarrant rapid, controlled plant shutdown to minimize the likelihood of propagation of flaws totube rupture under both normal and faulted conditions. The Guidelines also provide technicalinformation on standardized approaches for calculation of primary-to-secondary leak rates fromvarious secondary system radiochemical data. They should serve as a pattern for developmentand review of station-specific programs for primary-to-secondary leakage.

TR-1 04788-R3

Interest Categories

Steam GeneratorsCorrosion ControlPlant maintenance assistance

vi

Page 7: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Key Words

PWRSteam GeneratorsLeakageTubes

v.i

Page 8: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

ABSTRACT

Primary-to-secondary leakage can result from mechanisms that propagate slowly or rapidly. Thewillingness of the industry to prescribe and implement operational responses to primary-to-secondary leakage, as described in the PWR Primary-to-Secondary Leak Guidelines, hascontributed to the successful minimization of tube ruptures since 1995. The committeereconvened in 1997 and again in 1999 and 2003 to review industry experience and newlaboratory data to update the guidelines. As before, these revised guidelines provide an effectivestation program for monitoring primary-to-secondary leakage to ensure necessary operationalactions are taken and to ensure the likelihood of propagation of flaws to tube rupture isminimized under both normal and faulted conditions. These guidelines contain recommendedoperating actions in response to primary-to-secondary leakage of varying magnitudes,appropriate methods of calculating leak rates from various secondary system sample points, andvarious methods of monitoring leakage once detected. These guidelines emphasize the need forusing continuous on-line radiation monitors to provide for rapid detection and response toleakage, rather than relying on grab samples. These guidelines should serve as a pattern fordevelopment and review of station-specific programs for primary-to-secondary leakage.

ix

Page 9: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

EPRI FORWARD

Under the auspices of EPRI, the electric power industry has developed operating guidelines forvarious station activities, including secondary cycle chemistry control and steam generatorinspection. Industry-wide guidelines were developed in 1995 to help utilities develop andimplement station-specific primary-to-secondary leak monitoring and action plans. Theguidelines were updated in 1997 and 2000 to reflect additional industry experience andlaboratory results. The guidelines have contributed to the successful industry defense againsttube ruptures.

After two years of experience with Revision 2 of the guidelines, EPRI reconvened a committeeof multi-disciplinary experts, including several members of the original committee, to addressinformation developed since publication of Revision 2.

xi

Page 10: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

GLOSSARY AND ACRONYMS

ABB/CEActivity

AEALALARAANOASAPAVBBATB&WCECFRCPMFaulted ConditionFOSARGDCGMHOHICEIGAIGA/SCCLLDMCAMSRNDEODSCCOTSGPbPORVPSLBPWRPWSCCRCPBRCS

ABB Combustion EngineeringConcentration of radioactivity in liquid (plCi/g or liCi/ml, asappropriate) or gas (pCi/cc)Air ejectorAction levelAs low as reasonably achievableArkansas Nuclear OneAs soon as possibleAntivibration barBoric acid treatmentBabcock & WilcoxCombustion EngineeringCode of Federal RegulationsCounts per minuteDesign basis accident condition such as a steam line breakForeign object search and recoveryGeneral design criteria, in Appendix A of IOCFR50Geiger-MullerHydrogen ion - hydroxyl ion form resinIon exclusion chromatographyIntergranular attackIntergranular attack/stress corrosion crackingLower limit of detectionMultipl channel analyzerMoisture separator reheaterNon-destructive examinationOuter diameter stress corrosion crackingOnce-through steam generatorBurst differential pressurePressure operated relief valveDifferential pressure for steam line breakPressurized water reactorPrimary water stress corrosion crackingReactor coolant pressure boundaryReactor coolant system

xiii

Page 11: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

RMS Radiation monitoring systemRPC Rotating pancake coilRSG Recirculating steam generatorSCC Stress corrosion crackingSG or S/G Steam generatorSGBD Steam generator blowdownSGTR Steam generator tube ruptureSLB Steam line breakTBAOH Tetrabutylammnonium. hydroxideTTS Top of tube sheetUFSAR Updated final safety analysis reportWE Westinghouse ElectricAPNO Differential pressure under normal operation at 100% powerAPSLB Differential pressure for steam line break

xiv

Page 12: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

CONTENTS

I INTRODUCTION AND MANAGEMENT RESPONSIBILITIES .............................................. 1-1

2 TECHNICAL BASES FOR PRIMARY-TO-SECONDARY LEAKAGE LIMITS ...................... 2-1

xv

Page 13: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

3 OPERATING GUIDELINES FOR PRIMARY-TO-SECONDARY LEAKAGE ......................... 3-1

4 CONTINUOUS RADIATION MONITORING ................................. 4-1

xvi

Page 14: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5 LEAK RATE CALCULATIONS ....................... 5-1

xvii

Page 15: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

APPENDICES

A DATA INTERPRETATION ................................ A-1

B CONDENSER OFF GAS CORRECTIONS ................................ B-1

xviii

Page 16: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

C PRIMARY-TO-SECONDARY LEAKAGE QUANTIFICATION DURING NON-OPERATING CONDITIONS ........................................ C-1

D EXAMPLE OF COMPUTER CALCULATED PRIMARY-TO-SECONDARY LEAKRATE FROM CONDENSER AIR EJECTOR MONITOR.......................................................... D-1

xix

Page 17: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

LIST OF FIGURES

xxi

Page 18: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

LIST OF TABLES

xxiii

Page 19: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6
Page 20: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1

INTRODUCTION AND MANAGEMENT

RESPONSIBILITIES

1.1 BackgroundHistorically, steam generator tubes in pressurized water reactors (PWRs) haveexperienced various types of degradation from both the primary and secondary sides ofthe tubes. Corrosion mechanisms of concern include wastage, pitting, secondary sidestress corrosion cracking (ODSCC), intergranular attack (IGA) and primary water stresscorrosion cracking (PWSCC). Mechanical damage from fretting, fatigue and loose partshas also resulted in tube degradation.

Utility inspection and diagnostic programs are designed to detect incipient conditionsbefore steam generator tube corrosion or mechanical damage lead to through-wall failure.In most cases, tube degradation mechanisms that result in primary-to-secondary leakagepropagate slowly and lead to operational difficulties, but do not diminish any safetymargins. However, some damage mechanisms can progress rapidly and can result in atube rupture, resulting in significant secondary system contamination and potentialactuation of reactor safety systems.

1-1

Page 21: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1.2 Guidelines Objectives

1-2

Page 22: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

t Draft -

1.3 Primary-to-Secondary Leak Program Considerations

This section discusses the considerations common to most utilities, including theelements of organizations that are needed to effectively carry out the primary-to-secondary leak monitoring program.

1-3

Page 23: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

UL-

Draft -

1-4

Page 24: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1-5

Page 25: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1.4 Training

1-6

Page 26: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1.5 General Guidelines for Development of a Primary-to-SecondaryLeak Administrative Program

1.6 Summary

1-7

Page 27: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft -

1.7 References

1-8

Page 28: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2TECHNICAL BASES FOR PRIMARY-TO-

SECONDARY LEAKAGE LIMITS

2.1 PurposeThis section provides the technical bases for the operating leak rate limits given inSection 3.

2-1

Page 29: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2.2 Normal Operation Leak Rate Limit for Any One Steam Generator

2-2

Page 30: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-3

Page 31: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-4

Page 32: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-5

Page 33: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-6

Page 34: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

r DRAFT

2-7

Page 35: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-8

Page 36: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

t

2-9

Page 37: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-10

Page 38: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-11

Page 39: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

U-

* DRAFT

Page 40: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-13

Page 41: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-14

Page 42: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-15

Page 43: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

~~ m-

DRAFT

2-16

Page 44: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-17

Page 45: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2.3 Rate of Increase in Leak Rate

2-18

Page 46: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-19

Page 47: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-20

Page 48: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-21

Page 49: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

-

DRAFT

2-22

Page 50: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-23

Page 51: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

- - -

v DRAFT

2-24

Page 52: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2-25

Page 53: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

-

DRAFT

2-26

Page 54: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

2.4 References

2-27

Page 55: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3

OPERATING GUIDELINES FOR PRIMARY-TO-

SECONDARY LEAKAGE

3.1 PurposeThe guidance contained in this section is designed so that appropriate actions can betaken early enough to preclude most through-wall tube defects from propagating torupture. The guidance is presented in a series of defined operating conditions that reflectincreasing primary-to-secondary leakage. Accordingly, the plant actions become morestringent as leak rates increase. Immediate power reduction and plant shutdown ismandatory if leakage trends suggest that a tube defect is rapidly propagating.

3-1

Page 56: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3.2 Action Level Criteria and Recommendations

3-2

Page 57: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

t--

Draft

3-3

Page 58: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-4

Page 59: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

-

Draft

3-5

Page 60: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-6

Page 61: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-7

Page 62: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-8

Page 63: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-9

Page 64: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DraftP

3-10

Page 65: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3.3 Leak Rate Monitoring During Modes 3 and 4

3-11

Page 66: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-12

Page 67: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-13

Page 68: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3-14

Page 69: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

Draft

3;4 Leak Rate Monitoring During Startup in Modes I and 2

3-15

Page 70: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4CONTINUOUS RADIATION MONITORING

4.1 Monitoring Program and Methods

4-1

Page 71: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-2

Page 72: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4.2 Evaluation of Monitoring MethodsWhen selecting which monitoring method to use or evaluating the best way to use themethod, two key elements that should be considered are detection capability andmeasurement uncertainty.

4-3

Page 73: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-4

Page 74: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

r DRAFT

4-5

Page 75: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

p DRAFT

4-6

Page 76: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4.3 Radiation Monitoring Programs

4-7

Page 77: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

- -

DRAFT

4-8

Page 78: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-9

Page 79: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-10

Page 80: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT11

4-11

Page 81: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-12

Page 82: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4-13

Page 83: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4.4 References

4-14

Page 84: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

5

LEAK RATE CALCULATIONS

5.1 Introduction

The recommended operational responses to primary-to-secondary leakage discussed in Section 3rely on accurate assessments of the leak rates. This section identifies how to calculate leak ratesbased on isotopic analyses of various secondary system samples.

5-1

Page 85: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.2 Leak Rate Calculations Via Condenser Off-Gas Analysis

Dissolved radiogases in the RCS pass into the secondary side of a steam generator when aprimary-to-secondary leak exists. These radiogases are quickly transported out of the steamgenerators with the main steam and are removed from the condensing steam by the condenser airremoval system. Quantification of the primary-to-secondary leak can be made by comparing theradiogas activity removed through the condenser off-gas system (neglecting the solubility of theradiogases in condensate) to the radiogas in the reactor coolant.

5-2

Page 86: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

t

5-3

Page 87: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-4

Page 88: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-5

Page 89: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.3 Leak Rate Calculations Via Blowdown Analysis

Radionuclides from the reactor coolant system enter the steam generator bulk water when aprimary-to-secondary leak exists. Due to their low solubility, radiogases are quickly transportedout of the steam generator bulk water into the steam. Dissolved solids and very lowconcentrations of radiogases remain in the steam generator bulk water. These radionuclides canbe quantified in the steam generator blowdown and used to estimate primary-to-secondary leakrate and determine which steam generator is leaking.

5-6

Page 90: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-7

Page 91: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-8

Page 92: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

p

5-9

Page 93: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-10

Page 94: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.4- Leak Rate Calculations Via Tritium

5.4.1 Introduction

Tritium from the reactor coolant enters the SGs and secondary system when a primary-to-secondary leak exists.

5-11

Page 95: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

p

5-12

Page 96: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-13

Page 97: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-14

Page 98: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.5 Leak Rate Evaluation Via Other Methods

There are other qualitative and quantitative methods to detect and determine primary-to-secondary leaks and leak rates. Qualitative methods can be used for a rapid determination of thepresence of a leak and identification of the leaking steam generator.

5-15

Page 99: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-16

Page 100: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

p

5-17

Page 101: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5-18

Page 102: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.6 Leak Rate Calculations in Non-Operating Modes

Section 3.3 discusses the need to monitor leakage in non-operating modes and provides adiscussion of the methods used for such monitoring.

5-19

Page 103: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

5.6 References

5-20

Page 104: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

A

DATA INTERPRETATION

1.0 IntroductionThis appendix provides information for use by plant personnel attempting to categorize aprimary-to-secondary leak.

2.0 Background

A-1

Page 105: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

3.0 Characteristics of Primary-to-Secondary Leakage

A-2

Page 106: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-3

Page 107: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-4

Page 108: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-5

Page 109: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-6

Page 110: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-7

Page 111: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-8

Page 112: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

A-9

Page 113: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

p

A-10

Page 114: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

P

BCONDENSER OFF GAS CORRECTIONS

1.0 Condenser Off Gas Transport Decay Effects

B-1

Page 115: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

2.0 Parent/Daughter Relationship Effects

B-2

Page 116: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

- w

-/ I- -

..x

C-1

Page 117: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

I U

PRIMARY-TO-SECONDARY LEAKAGE

QUANTIFICATION DURING NON-OPERATING

CONDITIONS

1.0 Need for Determining Leakage During Shutdown Periods

2.0 Leak Rate Monitoring Prior to Power Operation .. .

C-1

Page 118: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT ,

C-2

Page 119: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

IP

C-3

Page 120: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

Page 121: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

Page 122: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

I

DRAFT

C-5

Page 123: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

C-6

Page 124: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

C-7

Page 125: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

C-8

Page 126: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

C-9

Page 127: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

3.0. Conclusions

C-10

Page 128: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

DEXAMPLE OF COMPUTER CALCULATED PRIMARY-

TO-SECONDARY LEAK RATE FROM CONDENSER AIR

EJECTOR MONITOR

1.0 Overview

This appendix provides an example method for determining primary-to-secondary leak rate usinga computer with continuous input from one or more air ejector (AE) process monitors.

2.0 Assumptions

D-1

Page 129: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

3.0 Example AE Radiation Monitor Isotopic Efficiency Factors

D-2

Page 130: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

4.0. Calculation

5.0 Calculation Steps

D-3

Page 131: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

6.0 Isotopic Considerations

7.0 Conclusion

D4

Page 132: PWR Primary to Secondary Leak Guidelines: Draft …Section 3. 2-1 DRAFT 2.2 Normal Operation Leak Rate Limit for Any One Steam Generator 2-2 DRAFT 2-3 DRAFT 2-4 DRAFT 2-5 DRAFT 2-6

DRAFT

D-5