+ All Categories
Home > Technology > Quality Assurance Program Using Picture Phones

Quality Assurance Program Using Picture Phones

Date post: 18-Nov-2014
Category:
Upload: center-for-energy-and-environments-innovation-exchange
View: 340 times
Download: 1 times
Share this document with a friend
Description:
 
67
In accordance with the Department of Labor and Industry’s statute 326.0981, Subd. 11, “This educational offering is recognized by the Minnesota Department of Labor and Industry as satisfying 1.5 hours of credit toward Building Officials and Residential Contractors continuing education requirements.” For additional continuing education approvals, please see your credit tracking card. 1
Transcript
Page 1: Quality Assurance Program Using Picture Phones

In accordance with the Department of Labor and

Industry’s statute 326.0981, Subd. 11,

“This educational offering is recognized by the

Minnesota Department of Labor and Industry as

satisfying 1.5 hours of credit toward Building Officials

and Residential Contractors continuing education

requirements.”

For additional continuing education approvals, please

see your credit tracking card.

1

Page 2: Quality Assurance Program Using Picture Phones

Center for Energy & Environment

Quality Assurance Program Using

Picture Phones

Duluth Energy Design Conference and Expo

February 25, 2014

Kevin Brauer| Senior Building Analyst

2

Page 3: Quality Assurance Program Using Picture Phones

• Who is the Center for Energy and Environment

• Authorized Insulation Contractor QA Program

• Lessons learned

• Discussion

Session Outline

3

Page 4: Quality Assurance Program Using Picture Phones

CEE is a nonprofit organization that promotes energy efficiency

to strengthen the economy while improving the environment.

• CEE conducts research and develops programs so that:

• Businesses operate more efficiently and profitably;

• Government agencies and nonprofits spend less on facilities

and functions;

• Utilities achieve their energy-efficiency goals at least-cost;

and

• Households save money and improve comfort.

The Center for Energy and Environment

4

Page 5: Quality Assurance Program Using Picture Phones

Collaboration with Minnesota Energy Resources

was key to the development of this QA program

• Supports their Authorized Insulation Contractor

program for residential insulation rebates

• CEE is also applying this QA process in several

MN communities on Home Energy Squad

referred air seal/insulation work rebated by

CenterPoint Energy

CEE QA Program Using Picture Phones

5

Page 6: Quality Assurance Program Using Picture Phones

1. Contractor work requirements

2. Interactive on-line training module

3. Protocols for virtual – phone QA – inspection

4. On-site inspect 10% of jobs & all complaints

A Four Part QA Process Was Designed

6

Page 7: Quality Assurance Program Using Picture Phones

• Crew has blower door, manometer, smoke puffer and

insulation machine capable of dense pack installation

1. Contractor Requirements

7

Page 8: Quality Assurance Program Using Picture Phones

• Crew has blower door, manometer, smoke puffer and

insulation machine capable of dense pack installation

• Crew leader trains for and passes the Building

Performance Institute certification for Residential

Building Envelope-Whole House Air Leakage

Control Installer www.bpi.org/rbewhalci

ID opening, select material, seal, cfm50 smoke test, fix seal

1. Contractor Requirements

8

Page 9: Quality Assurance Program Using Picture Phones

• Crew has blower door, manometer, smoke puffer and

insulation machine capable of dense pack installation

• Crew leader trains and passes BPI RBE-WHALCI cert

• Crew leader passes online combustion safety training

1. Contractor Requirements

9

Page 10: Quality Assurance Program Using Picture Phones

• Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation

• Crew leader trains and passes BPI RBE-WHALCI cert

• Crew leader passes online combustion safety training

• Crew follows program Combustion Safety protocols and Material and Installation standards

o Contractor corrects non-conforming work scope details no customer charge

1. Contractor Requirements

10

Page 11: Quality Assurance Program Using Picture Phones

• Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation

• Crew leader trains and passes BPI RBE-WHALCI cert

• Crew leader passes online combustion safety training

• Crew follows program Combustion Safety protocols and Material and Installation standards

o Correct non-conforming details no customer charge

• Crew leader verifies work performed and test results on Rebate Form

1. Contractor Requirements

11

Page 12: Quality Assurance Program Using Picture Phones

• Successive on-line training and quizzes

assess crew leader knowledge and

understanding of program combustion safety

requirements.

o Follow-up to program orientation training

2. Interactive on-line training module designed

12

Page 13: Quality Assurance Program Using Picture Phones

• Successive on-line training and quizzes assess crew leader knowledge and understanding of program combustion safety requirements.

o Follow-up to program orientation training

• Crew leader must pass to be considered eligible to lead rebate program work

o Convenient “as-needed” refresher instruction

2. Interactive on-line training module designed

13

Page 14: Quality Assurance Program Using Picture Phones

• Contractor sends work scope to CEE before job

o CEE ID’s typical photos, sends list for crew

leader

3. Protocols for virtual inspection developed

14

Page 15: Quality Assurance Program Using Picture Phones

• Contractor sends work scope to CEE before job

o CEE ID’s typical photos, sends list for crew leader

• After job test-in: CL sends photo of house, comb appliances & cfm50 reading; makes 1st call to confirm:

Photos rec’d, combustion safety, work scope, photo list: Job is a Go

Air seal and insulation prep-work can start

3. Protocols for virtual inspection developed

15

Page 16: Quality Assurance Program Using Picture Phones

• Contractor sends work scope to CEE before job

o CEE ID’s typical photos, sends list for crew leader

• After job test-in: CL sends photos, 1st call to confirm:

o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go

o Air seal and insulation prep-work can start – When Completed:

• CL sends air seal/ insulation prep photos and makes 2nd call to confirm:

Photos rec’d, prep-work complete, ready to insulate.

3. Protocols for virtual inspection developed

16

Page 17: Quality Assurance Program Using Picture Phones

• Contractor sends work scope to CEE before job

o CEE ID’s typical photos, sends list for crew leader

• After job test-in: CL sends photos, makes 1st call to confirm:

o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go

• CL sends air seal/ insul. prep photos, makes 2nd call to confirm:

o Photos rec’d, prep complete, ready to insulate – When completed:

• CL test out: cfm50 & comb safety; sends insul. & cfm50 photos makes 3rd call to confirm:

Combustion Safety, Photos rec’d, Job finished

3. Protocols for virtual inspection developed

17

Page 18: Quality Assurance Program Using Picture Phones

• Scoring guide for 35 typical work scope tasks

defines Pass, Cond. Pass , Fail 70% of score

o Also scored:

• Documentation & Testing 20% of score

• Customer Service (home owner survey)10%

4. On-site inspect 10% of jobs & all complaints

18

Page 19: Quality Assurance Program Using Picture Phones

• Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail

o Also: Documentation & Testing, Customer Service (homeowner survey)

• At site visit custom iPad software calculates the crew leader job score, syncs with program data base, emails contractor a job report with crew leader score and any call back issues w/ photos

4. On-site inspect 10% of jobs & all complaints

19

Page 20: Quality Assurance Program Using Picture Phones

• Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail

o Also: Documentation & Testing, Customer Service (homeowner survey)

• At site visit custom iPad software calculates the crew leader job score, syncs with program data base, emails contractor a job report with crew leader score and any call back issues w/ photos

• Crew leader to maintain > 80% avg score for site QA’s

o Under 80% avg. score can require crew leader to

• Resume picture phone QA, and/or

• More QA site visits, or

• Program suspension

4. On-site inspect 10% of jobs & all complaints

20

Page 21: Quality Assurance Program Using Picture Phones

• BPI RBE–WHALCI certification verifies knowledge, skills, abilities

Identify opening,

Select material,

Seal opening,

Test seal with smoke at cfm50,

Fix seal as needed.

Benefits of this QA Approach

21

Page 22: Quality Assurance Program Using Picture Phones

• BPI RBE-WHALCI cert verifies knowledge, skills, abilities

• Online combustion safety training verifies crew leader knowledge of program protocols

Follow up to program orientation, successive on-line training and quizzes assess crew leader knowledge and understanding of program combustion safety requirements.

Crew leader must pass to be considered eligible to lead rebate program work.

Convenient “as-needed” refresher instruction.

Benefits of this QA Approach

22

Page 23: Quality Assurance Program Using Picture Phones

• BPI RBE-WHALCI cert verifies knowledge, skills, abilities

• Online comb. safety trng. verifies crew leader knowledge

• Material & Installation standards and Scoring Guide establishes work installation expectations

Benefits of this QA Approach

23

Page 24: Quality Assurance Program Using Picture Phones

• BPI RBE-WHALCI cert verifies knowledge, skills, abilities

• Online comb. safety trng. verifies crew leader knowledge

• M&I standards & scoring guide establishes expectations.

• Picture phone QA simplifies scheduling

o CAN be at more than one job in a day,

o Jobs can be 100s of miles apart

Benefits of this QA Approach

24

Page 25: Quality Assurance Program Using Picture Phones

• BPI RBE-WHALCI cert verifies knowledge, skills, abilities

• Online comb. safety trng. verifies crew leader knowledge

• M&I standards & scoring guide establishes expectations.

• Picture phone QA simplifies scheduling – CAN be at more than one job in a day, jobs can be 100s of miles apart.

• Picture phone provides real time feedback and promotes continuous improvement

o Issues quickly become training opportunities

o Crew leader has a picture phone “shout-out” anytime

Benefits of this QA Approach

25

Page 26: Quality Assurance Program Using Picture Phones

• BPI RBE-WHALCI cert verifies knowledge, skills, abilities

• Online comb. safety trng. verifies crew leader knowledge

• M&I standards & scoring guide establishes expectations.

• Picture phone QA simplifies scheduling – CAN be at more than one job in a day,

jobs can be 100s of miles apart.

• Picture phone provides real time feedback and promotes continuous improvement

o Issues quickly become training opportunities

o Crew leader has a picture phone “shout-out” anytime

• Picture phones can lower training and administration costs of QA program delivery.

Benefits of this QA Approach

26

Page 27: Quality Assurance Program Using Picture Phones

1. Verify no pre-existing combustion safety conditions

Perform “Fans-Off” combustion safety test:

• Air handler and all exhaust fans off,

• All interior doors open (house set up for BD test)

• All appliances pass smoke test or no work till fixed

o“Fans Off” Fail = Written homeowner notice

2. CFM50 blower door test

Contractor Requirements Pre-Work

27

Page 28: Quality Assurance Program Using Picture Phones

1. CFM50 blower door test

2. If pre-work combustion safety test done • Install a VentRite spill alarm or perform • “Fans On” Combustion Safety Test

o Air handler, dryer, kitchen fan, fans >150cfm o Last door into CAZ positioned with smoke

• All appliances pass smoke test, if not: retest “Fans Off” o “Fans On” Fail = Written home owner notice

3. Crew leader verifies tests and work on Rebate Form

Contractor Requirements Post-Work

28

Page 29: Quality Assurance Program Using Picture Phones

Vent-Rite Spill Alarm

29

1 of 2 temperature sensors

Page 30: Quality Assurance Program Using Picture Phones

Example of typical picture phone QA process

• Contractor is sent a 4-6 photos/page crew leader job report

o photo # is followed by typical job report captions

CEE QA Program Using Picture Phones

30

Page 31: Quality Assurance Program Using Picture Phones

Step 1: CEE Picture Phone QA Process

1. Contractor sends work

scope for CEE review

2. CEE sends list

of likely photos,

confirmed at job

31

Bill’s Insulation

Homeowner

Page 32: Quality Assurance Program Using Picture Phones

(Photo 1) Job Address, Work: Attic air seal & insulate

28 Phone QA photo details (confirmed at job site)

CEE Picture Phone QA Process

32

Page 33: Quality Assurance Program Using Picture Phones

(Photos 2,3) Nat Draft Water Heater, ID Furnace

Both Pass: “Fans OFF” test-in

(& Pass “Fans ON” test-out)

CEE Picture Phone QA Process

33

Page 34: Quality Assurance Program Using Picture Phones

(Photo 4) Water heater common vent connection

CEE Picture Phone QA Process

34

Page 35: Quality Assurance Program Using Picture Phones

(Photo 5) Before work CFM50: 1916

Now: 1st call – crew leader confirms Combustion safety Work scope details Photos to send from list Work OK to start

CEE Picture Phone QA Process

35

Page 36: Quality Assurance Program Using Picture Phones

(Photo 6) Plumbing vent sealed

CEE Picture Phone QA Process

36

Page 37: Quality Assurance Program Using Picture Phones

(Photo 7) Electrical wiring sealed

CEE Picture Phone QA Process

37

Page 38: Quality Assurance Program Using Picture Phones

(Photo 8) Bath fan sealed

CEE Picture Phone QA Process

38

Page 39: Quality Assurance Program Using Picture Phones

(Photo 9) Bath fan termination connection sealed

CEE Picture Phone QA Process

39

Page 40: Quality Assurance Program Using Picture Phones

(Photo 10) Drop soffit sealed

CEE Picture Phone QA Process

40

Page 41: Quality Assurance Program Using Picture Phones

(Photo 11) Chimney bypass sealed

CEE Picture Phone QA Process

41

proper material

Page 42: Quality Assurance Program Using Picture Phones

(Photo 12) Chimney insulation dam installed

CEE Picture Phone QA Process

42

proper clearance

Page 43: Quality Assurance Program Using Picture Phones

(Photos 13,14,15) Vent chute, wind block & top plate seal

CEE Picture Phone QA Process

43

Page 44: Quality Assurance Program Using Picture Phones

(Photo 16) Depth markers – 15” install depth circled

CEE Picture Phone QA Process

15”

44

1 marker

per 100

SF of

attic

Page 45: Quality Assurance Program Using Picture Phones

(Photo 17) Non-IC can light boxed and sealed

CEE Picture Phone QA Process

45

Page 46: Quality Assurance Program Using Picture Phones

Crew has completed attic prep work,

Now:

2nd call – crew leader confirms

All photos sent and received

Prep work done, ready to insulate

CEE Picture Phone QA Process

46

Page 47: Quality Assurance Program Using Picture Phones

Crew has completed attic prep work,

Now:

2nd call – crew leader confirms

• All photos sent and received

• Prep work done, ready to insulate

Finding: Not ready to insulate

! Insulating cover above Non-IC can lights Not Allowed

! Remove & replace covers with drywall or equal

CEE Picture Phone QA Process

47

Page 48: Quality Assurance Program Using Picture Phones

(Photo 17) Non-IC can light boxed and sealed

CEE Picture Phone QA Process

48

Insulating cover

NOT ALLOWED

above

Non-IC lights

per NEC 410-66

Page 49: Quality Assurance Program Using Picture Phones

Crew leader corrects issue,

texts photos confirming correction

NOW OK to insulate

CEE Picture Phone QA Process

49

Page 50: Quality Assurance Program Using Picture Phones

Photos 18,19 Non-IC can light correction completed

CEE Picture Phone QA Process

Foam covers off non-IC can lights Sealed drywall cover on

50

NOW OK to insulate

Page 51: Quality Assurance Program Using Picture Phones

(Photo 20) Insulation added over 15”, > R-50 on bid

CEE Picture Phone QA Process

51

Page 52: Quality Assurance Program Using Picture Phones

(Photo 21) IC-can box tops above insulation level

CEE Picture Phone QA Process

52

proper clearance

Page 53: Quality Assurance Program Using Picture Phones

(Photo 22) Chimney dam above insulation level

CEE Picture Phone QA Process

53

Page 54: Quality Assurance Program Using Picture Phones

(Photos 23,24,25,26,27) Access dam, Panel 10” >R25,

W/S, Signed Insulation Card and Mfg Coverage Chart

CEE Picture Phone QA Process

54

Page 55: Quality Assurance Program Using Picture Phones

Crew has completed work scope, (Photo 28) Post CFM50 followed by comb safety test

Now:

3nd call – crew leader confirms Combustion safety Photos rec’d Job done

(CFM50 pre: 1916 Post: 1282 Reduction: 643 = 33%

CEE Picture Phone QA Process

55

Page 56: Quality Assurance Program Using Picture Phones

• Job score

• Monthly status

• Training updates

Typical QA report with score and crew leader next steps

56

Page 57: Quality Assurance Program Using Picture Phones

Lesson Learned

CEE QA Program Using Picture Phones

57

Page 58: Quality Assurance Program Using Picture Phones

Lesson Learned o Building Performance Institute Residential Building Envelope – Whole House Air Leakage Control Installer certification verifies knowledge, skills and abilities, and defines job quality norm:

Identify opening, Select material, Seal opening, Test seal with smoke at cfm50, Fix seal as needed.

CEE QA Program Using Picture Phones

58

Page 59: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o Materials & Installation Standards and Scoring

Guides set expectations

CEE QA Program Using Picture Phones

59

Page 60: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o M&I Standards and Scoring Guides set expectations

o Photo take-off from work scope; Crew Leader

site confirms photo list to maximize utility with

minimum # photos and job progress check-in.

CEE QA Program Using Picture Phones

60

Page 61: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o M&I Standards, Scoring Guides set expectations

o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in

o Photos can identify training opportunities

CEE QA Program Using Picture Phones

61

Page 62: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o M&I Standards, Scoring Guides set expectations

o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in

o Photos can identify training opportunities

o Able to photo QA more than one site/day -

no travel time, start when crew starts.

CEE QA Program Using Picture Phones

62

Page 63: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o M&I Standards, Scoring Guides set expectations

o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in

o Photos can identify training opportunities

o Able to photo QA more than one site/day – no travel

o Photo date/time-stamp aid multiple QA jobs/day

CEE QA Program Using Picture Phones

63

Page 64: Quality Assurance Program Using Picture Phones

Lesson Learned

o BPI RBE-WHALCI cert defines job quality norm

o M&I Standards, Scoring Guides set expectations

o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in

o Photos can identify training opportunities

o Able to photo QA more than one site/day

o Photo date/time-stamp aid multiple QA jobs/day

o Texting photos expands coverage, less sender cost

CEE QA Program Using Picture Phones

64

Page 65: Quality Assurance Program Using Picture Phones

Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day o Photo date/time-stamp aid multiple QA jobs/day o Texting photos expands coverage, less sender cost o Provides crew leader a job “shout-out” anytime

CEE QA Program Using Picture Phones

65

Page 66: Quality Assurance Program Using Picture Phones

Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site

confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day o Photo date/time-stamp aid multiple QA jobs/day o Texting photos expands coverage, less sender cost o Provides crew leader a job “shout-out” anytime o Phones, software, on-line trng. aid QA, cut costs

CEE QA Program Using Picture Phones

66

Page 67: Quality Assurance Program Using Picture Phones

Kevin Brauer

[email protected]

612-804-0369

www.mncee.org


Recommended