20
By Muhammad Sufyan Khan K K Muhammad Sufyan Khan K.K. (UEP19P) 1 st January, 2013
Transcript
Page 1: Quicker Approach to Staggered Blowdown Presentation Final

By

Muhammad Sufyan Khan K KMuhammad Sufyan Khan K.K.(UEP19P)

1st January, 2013

Page 2: Quicker Approach to Staggered Blowdown Presentation Final

C t tContentsWhat is Blowdown/DepressurizationpWhen Staggered Blowdown is Required Conventional Approach to Staggered Blowdown Case Study Case StudyMethodology of Quicker ApproachConclusion

2

Page 3: Quicker Approach to Staggered Blowdown Presentation Final

Wh t i Bl dWhat is BlowdownWhat is Blowdown/Depressurizationp

Blowdown is to depressurize a high pressure system, containing hydrocarbon/toxic gases, to a low pressure level to reduce the risk of rupture/burst in case of fire or any other emergency.p / y g y

How Blowdown is carried outTh   bj ti   f Bl d  i  t  d i  th   t  f  it  d i  The objective of Blowdown is to depressurize the system from its design pressure to 700 kPa(g) or 50% of the system design pressure, whichever is lower, in 15 minutes.

How Blowdown is ActivatedUpon detection of Fire/Gas or any other demand scenario the blowdown valve is opened either automatically or by a push button by operator to activate the blowdown.

When Blowdown is RequiredBlowdown is required when operating pressure   > 1700 kPa(g). 3

Page 4: Quicker Approach to Staggered Blowdown Presentation Final

Wh t i Bl dWhat is Blowdown

4

Page 5: Quicker Approach to Staggered Blowdown Presentation Final

Wh t i Bl dWhat is Blowdown

5

Page 6: Quicker Approach to Staggered Blowdown Presentation Final

Wh St d Bl d i R i d Staggered Blowdown is required:

When Staggered Blowdown is Requiredgg q

Simultaneous Blowdown load >> largest relief load Design of flare system for simultaneous blowdown is impractical/uneconomical.

Staggered blowdown system shall be designed to restrict the flare system design capacity (green fields)

For brown field projects staggered blowdown is an essential requirement when the relief/blowdown load is added into existing flare system.

6

Page 7: Quicker Approach to Staggered Blowdown Presentation Final

C ti l A h t St d Bl d Zonal Blowdown Approach

Conventional Approach to Staggered Blowdownpp

The conventional approach is to divide the blowdown loads into zones and carryout the blowdown zone by zone. 

Zones can be made: based on physical separation of units.

b   bi i  th  bl d  l d   f  dj t  it  t   k  th  t t l  l  by combining the blowdown loads of adjacent units to make the total zonal blowdown load equal to flare capacity.

Z  b  Ph i l S i Zones by Physical SeparationMake zones by physical segregation based on allowable radiation criteria from one zone to another.M   ffi i     f  d bl dMore efficient way of staggered blowdown.

Effective for relatively smaller facilities.

7

Page 8: Quicker Approach to Staggered Blowdown Presentation Final

C ti l A h t St d Bl d Zones By Blowdown Load

Conventional Approach to Staggered Blowdowny

Zones can be made on blowdown loads analysis.

Adjacent units loads shall be combined to make a reasonable total which will be the jflare capacity.

Flare capacity shall be carefully selected taking into account the relief valve p y y gcapacities for largest individual relief and simultaneous relief.

8

Page 9: Quicker Approach to Staggered Blowdown Presentation Final

C St d Project: Rabab Harweel Integrated Project (High Sour. H2S 6% ‐ 20%)

Case Studyj g j ( g )

Simultaneous Blowdown Load: 90 MMSCMD (million standard cubic meters/day)

Flare Capacity: 16.55 MMSCMD

3.13 MMSCMD is reserved for relief valve from trunk lines.

Effective Flare Capacity: 13 42 MMSCMDEffective Flare Capacity: 13.42 MMSCMD

Combined Blowdown load is about 6 times the flare capacity.

Developing an effective staggered blowdown sequence is a challenge due to very large combined blowdown load compared to the flare capacity.

9

Page 10: Quicker Approach to Staggered Blowdown Presentation Final

C St d C ti l A hMaking zones based on physical segregation of the units yield numerous 

Case Study: Conventional Approachg p y g g y

zones and each zone capacity was significantly less than the effective flare system capacity.

Therefore, zones were made based on blowdown loads analysis.

      d   h t t li  t   l    MMSCMD 7 zones were made each totaling to nearly 13.42 MMSCMD.

Adding relief valve load of trunkline to each zone’s blowdown load make each zone’s total load equal to flare system capacity.

Then under a plant wide blowdown situation, such as instrument air failure or p ,power failure, all the zones shall blowdown one by one.

Last zone start to blowdown at 84 minutes Last zone start to blowdown at 84 minutes.

10

Page 11: Quicker Approach to Staggered Blowdown Presentation Final

C St d C ti l A hCase Study: Conventional Approach

11

Page 12: Quicker Approach to Staggered Blowdown Presentation Final

C St d C ti l A h Long depressuring time           Increased Risk 

Case Study: Conventional Approachg p g

Exceeds UPS backup timefacility cannot be safely blowdown

Possible Solution            Increase flare capacity            More cost ($$$)

12

Page 13: Quicker Approach to Staggered Blowdown Presentation Final

C St d Q i k A h The idea of the quicker approach lies in the fact that the peak depressuring

Case Study: Quicker Approachq pp p p g

rate occurs in the beginning of the blowdown and then depletes exponentially.

Depressuring rate drops to half of the peak rate in less than four (4) minutes.

13

Page 14: Quicker Approach to Staggered Blowdown Presentation Final

C St d Q i k A h This method utilizes the maximum use of flare header capacity.

Case Study: Quicker Approachp y

Units to blowdown are prioritize.

Preferential units blowdown first, followed by other units in order of priority.

The moment the capacity becomes available in the header, next blowdown is kicked in.

The last unit starts to blowdown at 45 minutes.

About half of the blowdown time calculated by conventional zonal blowdown  About half of the blowdown time calculated by conventional zonal blowdown approach (84 minutes).

14

Page 15: Quicker Approach to Staggered Blowdown Presentation Final

C St d Q i k A hCase Study: Quicker Approach

15

Page 16: Quicker Approach to Staggered Blowdown Presentation Final

M th d l f Q i k A h Blowdown load of each processing unit in the facility is listed below:

Methodology of Quicker Approachp g y

Unit Name Peak Depressring Rate (MMSCMD) Unit Name Peak Depressring 

Rate (MMSCMD)

Inlet Separator A 5 48 Dehydration Unit‐2 1 09Inlet Separator A 5.48 Dehydration Unit 2 1.09Inlet Separator B 5.48 HP Acid Gas Compressor‐1 0.54Inlet Separator C 1.23 HP Acid Gas Compressor‐2 0.54Test Separator 0.53 LP Acid Gas Compressor‐1 0.11Condensate Stabilizer Unit 2.21 LP Acid Gas Compressor‐2 0.11Flash Gas Compressor 1 Piping segment‐1 10.46Trunk Line 3.13 Piping segment‐2 2.51Sweetening Unit‐1 5.42 Piping segment‐3 3.02Sweetening Unit‐2 5.42 Piping segment‐4 1.24Export Gas Compressors 2.48 Piping segment‐5 2.95Dew Point Control Unit 7 31 Piping segment 6 3 18Dew Point Control Unit 7.31 Piping segment‐6 3.18Reinjection Compressor‐1 5.67 Seal Gas Compressor 0.18Reinjection Compressor‐2 5.67 Seal Gas Buffer Vessel 6.53Reinjection Compressor‐3 5.72 Fuel Gas Unit 1.71Reinjection Compressor 3 5.72 Fuel Gas Unit 1.71Dehydration Unit‐1 2.15 Total 93.06

16

Page 17: Quicker Approach to Staggered Blowdown Presentation Final

M th d l f Q i k A h At zero time, when the plant wide depressurization is activated by ESD system, the first set of 

Methodology of Quicker Approach

units, summing up to flare capacity, will starts to blowdown (peak‐1). after 2.17 minutes the blowdown load has dropped to 10.18 MMSCMD. Table‐01 shows that blowdown load of Reinjection compressor‐1 and HP Acid Gas Compressor 2 is 6 21 MMSCMD which can be safely started to blowdownCompressor‐2 is 6.21 MMSCMD which can be safely started to blowdown.

At 2.17 minutes, blowdown of Reinjection compressor‐1of Reinjection compressor‐1and HP Acid Gas Comp.‐2 is started which raise the total blowdown load to total blowdown load to 16.4 MMSCMD (peak‐2).

Similarly, after 4.5 minutes, y, 4 5 ,the blowdown rate falls to 10.81 MMSCMD and from table‐01, Inlet Separator‐A can be started to blowdown safely (peak‐3).

17

Page 18: Quicker Approach to Staggered Blowdown Presentation Final

ESD S t D i f Q i k A h Several Staggered Blowdown Sequences may need to be developed.

ESD System Design for Quicker Approachgg q y p

Fire detection in each area of the facility will need a separate staggered blowdown sequence as the area under fire shall be the first unit in the sequence blowdown sequence as the area under fire shall be the first unit in the sequence to blowdown.

I     f    d  f il   i  i  i t t  i  f il     l t  In case of common mode failure scenarios i.e. instrument air failure or plant wide power failure, set of preferential units shall blowdown first.

Thus, the ESD system shall be provided with several staggered blowdown sequences to deal with different emergency situations.

18

Page 19: Quicker Approach to Staggered Blowdown Presentation Final

C l i Quicker approach reduces the total blowdown time by about 50%.

ConclusionQ pp y 5

Reduced risk & hazard to personal and environment. Do not need flare capacity enhancement. Save capital cost ($$$). Total blowdown time is within the UPS backup time Total blowdown time is within the UPS backup time Facility can be safely blowdown.