+ All Categories
Home > Documents > R-5878 ANSON COUNTY BREAKDOWN WADESBORO BYPASS MAP · 1711 74 1250 1248 205 1251 1246 r - 5 87 a...

R-5878 ANSON COUNTY BREAKDOWN WADESBORO BYPASS MAP · 1711 74 1250 1248 205 1251 1246 r - 5 87 a...

Date post: 12-Jul-2020
Category:
Upload: others
View: 41 times
Download: 0 times
Share this document with a friend
1
Polkton Lilesville Wadesboro Anson 1857 1663 1672 1469 1739 1734 1414 1152 1751 1729 1769 1429 1845 1852 1205 1131 1667 1674 1404 1462 1738 1472 1240 1649 1246 1846 1403 1863 1862 1642 1418 1805 1704 1660 1139 1850 1809 1655 1140 1461 1141 1138 1808 1803 1130 1245 1715 1121 1821 1417 1820 1728 1806 1839 1423 1727 1207 1733 1252 1713 1710 1210 1730 1656 1745 1121 1714 1807 1420 1740 1734 1415 1731 1742 1810 1250 1249 1645 1730 1744 1627 1641 1726 1812 1259 1703 1416 1801 1646 1247 1704 1422 1208 1428 1240 1244 1711 1741 1250 1248 1205 1251 1246 R-5878A R-5878B U V 109 U V 218 U V 109 U V 742 U V 742 £ ¤ 74 £ ¤ 52 £ ¤ 74 £ ¤ 74 £ ¤ 74 £ ¤ 74 £ ¤ 52 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community PROJECT BREAKDOWN MAP PROJECTS SCHEDULES AND COSTS ARE ACCURATE AS OF DATE SHOWN R-5878 ANSON COUNTY WADESBORO BYPASS UPDATED - 5/6/2020 μ STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST R-5878A US 74 WEST OF WADESBORO TO US 52 NORTH OF WADESBORO. CONSTRUCT FREEWAY ON NEW LOCATION. 10 5.1 UNFUNDED UNFUNDED $4,000,000 $500,000 $87,000,000 R-5878B US 52 NORTH OF WADESBORO TO US 74 EAST OF WADESBORO. CONSTRUCT FREEWAY ON NEW LOCATION. 10 6.4 FY 2024 FY 2027 $4,000,000 $500,000 $87,000,000
Transcript
Page 1: R-5878 ANSON COUNTY BREAKDOWN WADESBORO BYPASS MAP · 1711 74 1250 1248 205 1251 1246 r - 5 87 a r-5 8 7 8 b uv 109 uv 218 uv 109 uv 742 uv 742 ... stip description division length

Polkton

Lilesville

Wadesboro

Anson

1857

16631672

1469

17391734

1414

1152

1751

1729

1769

1429

1845

1852

1205

1131

16671674

1404

1462

1738

1472

1240

1649

1246

1846

1403

18631862

16421418

1805

1704

1660

1139 1850

1809

1655

1140

1461

1141

11381808

1803

11301245

1715

1121 1821

1417

1820

1728

1806

1839

1423

1727

1207

1733

1252

1713

1710

1210

1730

1656

1745

11211714

1807

1420

1740

1734

1415

1731

1742

1810

1250 1249

1645

1730

1744

16271641

1726

1812

1259

17031416

1801

1646

1247

1704

1422

1208

1428

1240

1244

1711

1741

1250

1248

1205

1251

1246

R-5878AR-5878B

UV109

UV218

UV109

UV742

UV742

£¤74

£¤52

£¤74

£¤74 £¤74

£¤74

£¤52

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), EsriKorea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

PROJECTBREAKDOWN

MAPPR

OJEC

TS S

CHED

ULES

AND

COST

S ARE

ACCU

RATE

AS O

F DAT

E SHO

WNR-5878 ANSON COUNTY

WADESBORO BYPASSUPDATED - 5/6/2020

µ

STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST

R-5878AUS 74 WEST OF WADESBORO TO US 52 NORTH OF

WADESBORO. CONSTRUCT FREEWAY ON NEW LOCATION.

10 5.1 UNFUNDED UNFUNDED $4,000,000 $500,000 $87,000,000

R-5878BUS 52 NORTH OF WADESBORO TO US 74 EAST OF WADESBORO. CONSTRUCT FREEWAY ON NEW

LOCATION.10 6.4 FY 2024 FY 2027 $4,000,000 $500,000 $87,000,000