+ All Categories
Home > Documents > Re-Implementing ERM

Re-Implementing ERM

Date post: 24-Feb-2016
Category:
Upload: birch
View: 27 times
Download: 0 times
Share this document with a friend
Description:
Re-Implementing ERM. MENA-IUG 5 th Annual Conference 1-2 November 2010. What is it ?. Record Structure. What does it do ? – Back Office. Inventory and describe electronic resources – names, descriptions, urls , usage info Store administrative and statistical links/usernames/passwords - PowerPoint PPT Presentation
Popular Tags:
29
Re-Implementing ERM MENA-IUG 5 th Annual Conference 1-2 November 2010
Transcript
Page 1: Re-Implementing ERM

Re-Implementing ERM

MENA-IUG 5th Annual Conference1-2 November 2010

Page 2: Re-Implementing ERM

What is it ?

Page 3: Re-Implementing ERM

Record Structure

Page 4: Re-Implementing ERM

What does it do ? – Back Office• Inventory and describe electronic resources –

names, descriptions, urls, usage info• Store administrative and statistical

links/usernames/passwords• Track problems and changes• Send renewal, trial end reminders• Track orders & budget• Statistics – download, generate reports

Page 5: Re-Implementing ERM

What does it do - Public Displays

• Data can be used to create public interfaces

• OPAC Displays – resource, e-journals, e-books

• Encore Integration

Page 6: Re-Implementing ERM

Principles• Maintain a thing in one place – e.g. URL’s• Re-use metadata rather than re-create it• Consistency of presentation – names, subject

groupings, etc.• Make resource data broadly available to

enable staff to work together• Provide different paths – lists, searches,

contextual documents (e.g. subject pages) for different users

Page 7: Re-Implementing ERM

Initial Implementation

Page 8: Re-Implementing ERM

Implementation Milestones• Data model & implementation plan – 12/07• Resource, license, contact records – 12/07-

01/08• Generation of web pages – 02/08• Tracking renewal dates and ticklers – 02/08• Generate/load e-journal records & coverage –

03/08• OPAC Displays public ready – 03/08

Page 9: Re-Implementing ERM

Successes• Description – uniform names and

descriptions, links• Linked records – eJournal MARC• Administration – URL and password

storage, remembering miscellany• Renewals – more consistency• Access improvements – OPAC

searchable, database pages

Page 10: Re-Implementing ERM

AUS Database Pages

Page 11: Re-Implementing ERM

Problems• Consistent Maintenance• Record Quality• eJournal/Coverage – need to delete

every time• Incomplete data for reports, e.g. Cost

per Use

Page 12: Re-Implementing ERM

More Implementation

Page 13: Re-Implementing ERM

Implementation Milestones• Begin order record creation – 09/08• Scanning, uploading, linking licenses – 09/08• First effort at incrementally loading e-journal

records & coverage – 12/08

Page 14: Re-Implementing ERM

Order Record Creation• Fund Created• Order Records Created• Receiving - ticklers

Page 15: Re-Implementing ERM

License Scanning• Licenses Scanned• Uploaded to internal web server• Linked to License records

Page 16: Re-Implementing ERM

Incremental Coverage/MARC Load I

Page 17: Re-Implementing ERM

Getting Real

Page 18: Re-Implementing ERM

Reality• Hire ERM Librarian – 03/10• Reassess/reallocate staff

responsibilities• Revisit/improve existing procedures,

practice and data model

Page 19: Re-Implementing ERM

Activities• Lots of checking, updating, verifying• Example – Resource Type• Update contacts and role delineation• Continue scanning, uploading, linking

licenses• Continue order record creation, fund

tracking

Page 20: Re-Implementing ERM

Milestones• WebBridge and Research Pro

maintenance and updates – 04/10• Add records, links, holdings for public

access databases – PubMed, Google Scholar, DOAJ – 05/10

• Incremental Serials Holdings Load– 06/10

Page 21: Re-Implementing ERM

Incremental Coverage/MARC Load II

Page 22: Re-Implementing ERM

Journal Finder

Page 23: Re-Implementing ERM

Encore

Page 24: Re-Implementing ERM

Future Tasks

Page 25: Re-Implementing ERM

Ongoing• Revisit/improve existing procedures,

practice and data model• Continue scanning, uploading, linking

licenses• Update contacts and role delineation• Continue order record creation, fund

tracking• Monitor WebBridge and Research Pro

Page 26: Re-Implementing ERM

To Do• Statistics importing, SUSHI setup• Serials control integration – tracking

electronic registration, miscellaneous titles, Serials Solutions, etc.

• EZProxy configuration generation• Management Support – “The

Spreadsheet” and “Periodicity”

Page 27: Re-Implementing ERM

Conclusions• ERM is not a static thing, it needs to be

consistently maintained• ERM Module needs an owner who uses

it just like Cataloging or Circulation• Implementation is more about your

organization and procedures than the actual module

Page 28: Re-Implementing ERM

Thank you

Questions?

Page 29: Re-Implementing ERM

Outline• What is ?• Record Structure• What Does Staff ?• What Does Public ?• Principles• Initial Milestones• Successes• Database Pages• Initial Problems• More Milestones• Order Records• License Scanning• Incremental Coverage

• Reality• Activities• Reality Milestones• Incremental Coverage II• Ongoing• To Do• Conclusions


Recommended