Report run on: March 9, 2010 2:44 PM
RECAPP Facility Evaluation Report
Bishop Lloyd SchoolB3719A
Lloydminster (AB)
Lloydminster Pub Sch #1753
Report run on: March 9, 2010 2:44 PM Page 2 of 39
B3719ABuilding Id:
Bishop Lloyd SchoolBuilding Name:
Lloydminster (AB)Location:5524 - 31 Street Address:
4,246.00Gross Area (sq. m): $14,116,641Replacement Cost:1978Construction Year:
Evaluation Date: June 12 2009
A&E Architectural & Engineering GroupInc.
Evaluation Company:
Vic MaybrodaEvaluator Name:
The original 4246.0 m2 single story facility was constructed in 1978 with two stand alone portable classrooms of 89.7 m2 each added in 2007. The school undertook upgrades/modernization in 2006 and 2007. The original school contains 12 classrooms, 2 science rooms, a visual arts room, a music room, a home economic room, an industrial arts area, a library, a gymnasium with stage, a study/lounge atrium area, administration and support spaces. At the time of the site visit there were 431 enrolled students.
General Summary:
Structural Summary:Foundations consist of cast in place concrete grade beams and piles with concrete slab on grade throughout. Roof structure is composed of metal deck on metal joists supported by load bearing concrete block walls and isolated metal beams and columns. Overall the structural elements appear to be in good condition.
Envelope Summary:Roofing is original built-up asphalt with sloped insulated glazed panels located over the atrium space. Wall finishes consist of precast concrete panels with isolated painted plywood panels, prefinished metal cladding and textured stucco housing sealed fixed and opening aluminum framed windows and curtain walls, painted metal clad doors and frames and an insulated prefinished metal clad overhead door. Overall the enveloped elements appear to be in acceptable condition.
Interior Summary:Flooring consist of VC tile, sheet vinyl, epoxy, porcelain tile, carpeting, painted concrete and wood strip. Concrete block and gypsum wall board partitions are painted with face brick cladding located in the atrium area. Ceilings are painted gypsum wallboard and suspended acoustical tile. Acoustical wall and ceiling panels are located in the music room. Doors and frames are painted. Millwork is finished with plastic laminated counter tops with stained cabinetry. Prefinished metal toilet partitions are located in washrroms with prefinished metal lockers located in corridor areas. Teaching areas contain white, green and tack boards. Overall the interior elements appear to be in acceptable condition.
Mechanical Summary:The mechanical system is comprised of hot water heating with a centralized natural gas fired air distribution system forspecific areas of the school. The school is heated by one sectional hot water boiler. Four air distribution systems ventilate entire school.
17.99%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $2,539,177
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Report run on: March 9, 2010 2:44 PM Page 3 of 39
Heating system for the school consist of perimeter radiations, ceiling radiant panels, re-heat coils, unit heaters and fan coil units. Each classroom have control of the temperature with individual thermostats. Domestic hot water is generated by one gas fired, tank type domestic water heater complete with hot water recirculation system. Conventional plumbing fixtures throughout the facility. The mechanical control system is a direct digital control. Municipal type services to building. Overall mechanical system is in acceptable condition.
Electrical Summary:The facility was originally constructed in 1979 with major modernization completed in 2006. The main service is 347/600V, 3 phase, 4 wire and rated 600A. The service is underground fed from pad mounted transformer. The 16kw 208V emergency generator was used for emergency lighting system. All the light fixtures were either retrofit or replaced, most fluorescent lights are T-8 fixtures. The metal halide fixtures were installed in the gym. All fire alarm, intrusion, Call, PA and telephone systems meet current facility requirements. The overall rating for the facility shall be "Good"
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 9, 2010 2:44 PM Page 4 of 39
A1010 Standard Foundations*
A1030 Slab on Grade*
B1010.01 Floor Structural Frame (Building Frame)*
B1010.02 Structural Interior Walls Supporting Floors (or Roof)*
B1020.01 Roof Structural Frame*
5 - Good
4 - Acceptable
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1978
1978
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
100
100
100
100
100
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Lloydminster (AB) - Bishop Lloyd School (B3719A)S1 STRUCTURAL
Perimeter and interior grade beams bearing on concrete piles. .
Concrete slab on grade throughout.
Concrete slab bearing on concrete blocks under gymnasium stage. Wood framed stair/platform located in music room.
Load bearing concrete block supporting roof structure.
Metal deck and joists bearing on concrete block and steel beams/columns.
Report run on: March 9, 2010 2:44 PM Page 5 of 39
B2010.01.01 Precast Concrete: Exterior Wall Skin*
B2010.01.06.03 Metal Siding**
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
1978
1978
Installed
Installed
Installed
Installed
75
40
75
20
Design Life
Design Life
Design Life
Design Life
NOV-05
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 775 sq. M Metal Siding
Replace 1680 M Joint Sealers (caulking): Ext. Wall
Lifecycle Replacement
Lifecycle Replacement
2018
2013
$263,500
$58,800
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)S2 ENVELOPE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Precast concrete panels as outer wythe of cavity walls.
Prefinished metal cladding on gymnasium and north school walls.
Located around main entry area.
Caulked joints between precast concrete panels and around all exterior openings.
Report run on: March 9, 2010 2:44 PM Page 6 of 39
B2010.01.13 Paints (& Stains): Exterior Wall**
B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall*
B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2006
1978
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
15
100
100
50
35
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 32 sq. M Paints (& Stains): Exterior Wall
Replace 68 Aluminum Windows (Glass & Frame)
Lifecycle Replacement
Lifecycle Replacement
2021
2013
$1,600
$102,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Painted utility doors and frames and plywood entry area soffits.
Metal studs located on exterior of classroom walls.
Not viewable. No concerns reported.
Painted plywood.
Sealed fixed and opening units.
Report run on: March 9, 2010 2:44 PM Page 7 of 39
B2020.02 Storefronts: Windows**
B2030.01.01 Aluminum-Framed Storefronts: Doors**
B2030.01.02 Steel-Framed Storefronts: Doors**
B2030.02 Exterior Utility Doors**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
1978
1978
Installed
Installed
Installed
Installed
40
30
30
40
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 10 Storefronts: Windows
Replace 2 Aluminum-Framed Storefronts: Doors
Replace 10 Steel-Framed Storefronts: Doors
Replace 9 Exterior Utility Doors
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2018
2013
2013
2018
$14,000
$4,000
$27,000
$9,000
Unassigned
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
FEB-10
Sealed fixed sidelight and transom units located at entry areas.
Located at main entry.
Located at secondary entry areas.
Painted metal clad doors and frames.
Report run on: March 9, 2010 2:44 PM Page 8 of 39
B2030.03 Large Exterior Special Doors*
B3010.01 Deck Vapor Retarder and Insulation*
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
B3010.09 Roof Specialties and Accessories*
5 - Good
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
2006
1978
1978
1978
Installed
Installed
Installed
Installed
30
25
25
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 4080 Sq. M Built-up Asphalt Roofing
Failure Replacement 2010 $918,000 Medium
Granular material worn with indications of ponding water. Low parapets with no scuppers.
Concern:
Replace BUR membrane complete with sloped insulation and rebuilt parapets.
Recommendation:
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Prefinished metal clad insulated overhead door.
Not viewable. No concerns expressed.
Original BUR membrane.
Metal ships ladder from mechanical room to roof. Metal ladder from lower to gym roof.
Consequences of Deferral:Continued deterioration and threat of failure
Report run on: March 9, 2010 2:44 PM Page 9 of 39
B3020.01 Skylights**
B3020.02 Other Roofing Openings (Hatch,Vent, etc)*
5 - Good
4 - Acceptable
Rating
Rating
2006
1978
Installed
Installed
25
25
Design Life
Design Life
FEB-10
FEB-10
Updated
Updated
Replace 84 sq. M Skylights
Lifecycle Replacement 2031 $226,800 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Insulated KALWALL panels over atrium area.
Air handling units, plumbing and exhaust vents and roof drains.
Report run on: March 9, 2010 2:44 PM Page 10 of 39
C1010.01 Interior Fixed Partitions*
C1010.02 Interior Demountable Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.05 Interior Windows*
C1010.06 Interior Glazed Partitions and Storefronts*
C1020.01 Interior Swinging Doors (& Hardware)*
5 - Good
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1978
2002
2006
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
Installed
0
50
30
80
80
40
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Updated
Replace 25 sq. M Interior Operable Folding Panel Partitions
Lifecycle Replacement 2036 $37,500 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)S3 INTERIOR
Event:
Type Year Cost Priority
Updated: FEB-10
Concrete block and metal stud.
Demountable partitions provided between classrooms.
Located in stage area to provide additional teaching area.
Safety glass set in pressed steel frame in windows and sidelights.
Safety glass set in pressed steel frames located in library and industrial arts areas.
Painted wood doors in metal frames.
Report run on: March 9, 2010 2:44 PM Page 11 of 39
C1020.03 Interior Fire Doors*
C1020.05 Interior Large Doors*
C1020.07 Other Interior Doors*
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments(Toilets/Showers)**
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1978
2006
2006
1978
1978
Installed
Installed
Installed
Installed
Installed
50
40
0
20
30
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 64 Visual Display Boards
Replace 21 Fabricated Compartments(Toilets/Showers
Lifecycle Replacement
Lifecycle Replacement
2013
2013
$48,000
$31,500
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Rated doors and frames located to music and service rooms.
Overhead mounted prefinished metal coiling shutter door located between atrium and library.
Sound rated wood doors complete with weather stripping located in music room.
White, green and tack boards located in teaching areas.
Prefinished metal toilet partitions.
Report run on: March 9, 2010 2:44 PM Page 12 of 39
C1030.03 Interior Louvers and Vents*
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
C1030.10 Lockers**
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
5 - Good
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1978
1978
1978
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
Installed
0
40
20
30
30
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
NOV-05
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Updated
Replace 461 Lockers
Lifecycle Replacement 2013 $301,955 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Mill finished grills located in gymnasium.
Stained wood located to stage access. Painted metal to roof access stair.
Cast aluminum signage mounted on doors.
Prefinished metal lockers located in corridors and change rooms.
Metal standards with painted and stained plywood shelving.
Mirrors, soap dispensers, toilet tissue and paper towel dispensers and paper towel receptacles throughout.
Report run on: March 9, 2010 2:44 PM Page 13 of 39
C2010 Stair Construction*
C2020.05 Resilient Stair Finishes**
C2020.06 Carpet Stair Finishes**
C2020.08 Stair Railings and Balustrades*
C2020.11 Other Stair Finishes*
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1978
1978
2007
1978
1978
Installed
Installed
Installed
Installed
Installed
100
20
10
40
0
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 2 sq. M Resilient Stair Finishes
Replace 36 sq. M Carpet Stair Finishes
Lifecycle Replacement
Lifecycle Replacement
2013
2017
$1,000
$3,420
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Cast concrete stairs to gym stage and metal stair to roof access.
Vinyl tile risers and rubber treads on stairs to gymnasium stage from gymnasium.
Carpeted stair to upper platform located in music room.
Painted metal balustrades.
Epoxy at stair to gymnasium stage from corridor.
Report run on: March 9, 2010 2:44 PM Page 14 of 39
C3010.02 Wall Paneling**
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment**
C3010.11 Interior Wall Painting*
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1978
1978
2006
1978
Installed
Installed
Installed
Installed
30
40
20
10
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 22 sq. M Wall Paneling
Replace 10 sq. M Tile Wall Finishes
Replace 30 sq. M Acoustical Wall Treatment
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2018
2026
$2,750
$3,000
$7,200
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Wood paneling on south wall of gym around stage.
Ceramic tile wall finishes around urinals in boys washrooms.
Acoustic wall panels located in music room.
Concrete block and gypsum wallboard.
Report run on: March 9, 2010 2:44 PM Page 15 of 39
C3010.12 Wall Coverings*
C3020.01.01 Epoxy Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
C3020.04 Wood Flooring**
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
2006
1978
Installed
Installed
Installed
Installed
15
0
50
30
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 112 sq. M Tile Floor Finishes
Replace 445 sq. M Wood Flooring
Lifecycle Replacement
Lifecycle Replacement
2056
2013
$21,280
$126,825
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Vinyl wall coverings used on gypsum wallboard exterior walls and miscellaneous interior partitions.
Located in corridors, wash and shower rooms.
Porcelain tile located in atrium space.
Sprung hardwood flooring in gymnasium.
Report run on: March 9, 2010 2:44 PM Page 16 of 39
C3020.07 Resilient Flooring**
C3020.08 Carpet Flooring**
C3020.11 Floor Painting*
C3020.14 Other Floor Finishes*
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2006
2006
2006
1978
Installed
Installed
Installed
Installed
20
15
5
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 1355 sq. M Resilient Flooring
Replace 432 sq. M Carpet Flooring
Lifecycle Replacement
Lifecycle Replacement
2026
2021
$81,300
$23,760
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
VC tile located in classrooms, home economics room, industrial arts, science rooms and music room.
Located in administration and library areas.
Painted floors in mechanical and electrical rooms.
Epoxy floor finishes in washrooms and corridors.
Report run on: March 9, 2010 2:44 PM Page 17 of 39
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)**
C3030.07 Interior Ceiling Painting*
4 - Acceptable
4 - Acceptable
Rating
Rating
2008
1978
Installed
Installed
25
20
Design Life
Design Life
FEB-10
FEB-10
Updated
Updated
Replace 2266 sq. M Acoustic Ceiling Treatment (Susp.T-Bar)
Lifecycle Replacement 2033 $124,630 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Suspended acoustic tiles located in corridors, classrooms and offices.
Gypsum wallboard ceilings located in wash/shower/change and service rooms.
Report run on: March 9, 2010 2:44 PM Page 18 of 39
D2010.04 Sinks**
D2010.05 Showers**
D2010.08 Drinking Fountains / Coolers**
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2001
1978
1978
Installed
Installed
Installed
30
30
35
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Replace 24 Sinks
Replace 2 Showers
Replace 9 Drinking Fountains
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2031
2013
2013
$60,000
$8,000
$17,000
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Stainless steel counter sinks with swing spout. Molded stone mop sinks in Janitor Rooms.
Institutional head. On/off brass.
Wall hung, fiberglass and plastic, non refrigerated.
Report run on: March 9, 2010 2:44 PM Page 19 of 39
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1978
1978
1978
Installed
Installed
Installed
35
40
40
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Replace 57 Washroom Fixtures (WC, Lav, Urnl)
Replace Domestic Water Valves
Lifecycle Replacement
Lifecycle Replacement
2013
2018
$142,000
$55,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Floor mounted, open front seat, flush valve water closets. Typical of 26. Stall urinals, flush valve. Typical of 7. Vitreous china lavatories. Spring loaded brass. Mix valve for hot water. 24.
Copper piping and fittings.
All fixtures are complete with isolation valves.
Report run on: March 9, 2010 2:44 PM Page 20 of 39
D2020.01.03 Piping Specialties (Backflow Preventors)**
D2020.02.02 Plumbing Pumps: Domestic Water**
3 - Marginal
4 - Acceptable
Rating
Rating
1978
1978
Installed
Installed
20
20
Design Life
Design Life
FEB-10
FEB-10
Updated
Updated
Install backflow preventors.
Replace Backflow Preventors
Replace Domestic Water Recirculation Pump
Code Repair
Lifecycle Replacement
Lifecycle Replacement
2010
2013
2013
$20,000
$10,000
$4,000
Low
Unassigned
Unassigned
Fire protection backflow preventors isolation valves not supervised. Backflow preventors not installed on lawn irrigation system.
Concern:
Install supervised valves on fire protection backflow. Install backflow preventors on lawn irrigation system, heating systemand water softener make up. Install vacuum breaker on exterior hose bibbs.
Recommendation:
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Installed on water supply to wet fire protection system.
Inline domestic hot water recirculation pump.
Report run on: March 9, 2010 2:44 PM Page 21 of 39
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1997
1978
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
20
40
50
50
40
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 1 Domestic Water Heater
Lifecycle Replacement 2017 $9,000 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Gas fired tank type domestic water heater complete with hot water recirculation system. A.O.Smith, 66 kW heating output, 300l storage capacity.
All domestic cold and hot water lines are insulated with 25mm fiberglass thermal insulation inside a general insulation jacket.
Cast iron and PVC sanitary piping throughout the school. All fixtures are vented through the roof.
Rain water leaders connected to underground storm. Cast iron.
Cast iron domes, controlled flow.
Report run on: March 9, 2010 2:44 PM Page 22 of 39
D2090.01 Compressed Air Systems (Non Controls)**
D3010.02 Gas Supply Systems*
D3020.01.01 Heating Boilers & Accessories: Steam**
D3020.01.03 Chimneys (&Comb. Air) : Steam Boilers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
1978
1978
Installed
Installed
Installed
Installed
0
60
35
35
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace IA Compressed Air System
Replace 1 Boiler and Accessories
Replace Chimney
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2013
2013
$5,000
$50,000
$8,000
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Portable air compressor in Industrial Arts.
Gas distribution piping to heating boilers, domestic hot water heater rooftop units. Gas service to mechanical room. Black steel schedule 40. Gas isolation provided to each appliance.
Low pressure steam boiler for humidifiers, 308 kW input.
Class A chimney shared with hot water heater and heating boiler.
Report run on: March 9, 2010 2:44 PM Page 23 of 39
D3020.01.04 Water Treatment: Steam Boilers*
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
1978
1978
Installed
Installed
Installed
Installed
35
35
30
30
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace Heating Boilers and Accessories
Replace Chimneys &Comb. Air
Lifecycle Replacement
Lifecycle Replacement
2013
2013
$200,000
$25,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Water softener, brine tank, chemical injector.
Seven section hydrotherm boiler, Standing pilot. Complete with low water cut off, relief valve, flow switch, 616 kW heating input.
Class A chimney. Insulated combustion air duct. Complete with wood baffle.
Side stream filter and chemical pot feeder.
Report run on: March 9, 2010 2:44 PM Page 24 of 39
D3030.06.02 Refrigerant Condensing Units**
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.03 Air Cleaning Devices:Air Distribution*
D3040.01.04 Ducts: Air Distribution*
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
2002
2006
2006
1978
Installed
Installed
Installed
Installed
25
30
30
50
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 20 Condensing Units
Replace 4 Air Handling Units
Lifecycle Replacement
Lifecycle Replacement
2027
2036
$70,000
$450,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Condensing units provided for duct installed cooling coils. Lennox CX21 with 2 stage scroll compressor, direct drive condensing fan, low ambient cut out, R-410A refrigerant. Capacities varies from 2 to 5T.
Four gas fired packaged rooftop units and two gas fired packaged indoor units. Components similar for air systems consisting of motorized fresh air, return air, exhaust dampers, prefilter, after filter, supply fan, return fan, stainless steel heat exchanger, indirect fired natural gas burner, air blender. AS-1: Engineered Air DJE-60, 4050 l/s S/A, 3540 l/s R/A, 162 kw output. AS-2: Engineered Air DJE-60, 3450 l/s S/A, 2800 l/s R/A, 133 kw output. AS-3: Engineered Air DJE-60, 4200 l/s S/A, 2800 l/s R/A, 162 kw output. AS-4: Engineered Air DJE-60, 4200 l/s S/A, 2800 l/s R/A, 162 kw output.
Air systems filter section complete with 50 mm throw away filters.
Low velocity supply air ductwork. Ceiling space utilized as return air plenum.
Report run on: March 9, 2010 2:44 PM Page 25 of 39
D3040.01.07 Air Outlets & Inlets:Air Distribution*
D3040.02 Steam Distribution Systems: Piping/Pumps**
D3040.03.01 Hot Water Distribution Systems**
D3040.04 Special Exhaust Systems
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
1978
1978
1978
Installed
Installed
Installed
Installed
30
30
40
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace Steam Distribution System
Replace Hot Water Distribution System
Lifecycle Replacement
Lifecycle Replacement
2013
2018
$85,000
$450,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Air outlets very as to type. Diffusers, adjustable grilles egg crate return.
Black iron piping to humidifiers. Condensate piped to drain.
Two inline circulation pumps circulate hot water via black iron piping to radiation, unit heaters, entrance heaters, reheat coils, radiant panels.
Fume hood in Science room.
Report run on: March 9, 2010 2:44 PM Page 26 of 39
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
D3040.04.04 Ducts Accessories: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.02 Air Coils**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1978
1978
1978
1978
1978
Installed
Installed
Installed
Installed
Installed
30
50
0
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 15 Exhaust
Replace 6 hot water heating coils.
Lifecycle Replacement
Lifecycle Replacement
2013
2013
$45,000
$18,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
A variety of fans provided throughout the building to exhaust air from washrooms, locker rooms, prep room, home economics, industrial arts, storage rooms, server and staff room. Recirculation dust collector with related overhead ductwork and hoods.
Low velocity ductwork to exhaust air outlets and fans.
Balancing dampers provided in branch ducts. Fire dampers installed at duct rated wall penetrations.
Egg crate exhaust air grilles.
Hot water duct coils installed in ductwork serving interior rooms with no auxiliary heat.
Report run on: March 9, 2010 2:44 PM Page 27 of 39
D3050.02 Air Coils**
D3050.05.02 Fan Coil Units**
D3050.05.03 Finned Tube Radiation**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2001
1978
1978
Installed
Installed
Installed
30
30
40
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Replace 20 DX cooling coils.
Replace 10 Fan Coil Units
Replace Finned Tube Radiation
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2031
2013
2018
$55,000
$40,000
$145,000
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Dx cooling coils installed in branch line serving classrooms and computer rooms.
Ceiling hot water fan coils units installed in main and secondary entrances, shower and locker rooms, Boys and Girls washrooms.
Perimeter wall fin radiation complete with various type enclosure cabinets.
Report run on: March 9, 2010 2:44 PM Page 28 of 39
D3050.05.06 Unit Heaters**
D3050.05.08 Radiant Heating (Ceiling & Floor)**
D3060.02.02 Pneumatic Controls**
D3060.02.03 Pneumatic and Electric Controls*
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1978
2001
1978
1998
Installed
Installed
Installed
Installed
30
30
40
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace 1 Unit Heater
Replace Ceiling Radiant Panels
Replace Pneumatic Controls
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2031
2018
$4,000
$95,000
$50,000
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Horizontal unit heater in mechanical room.
Ceiling radiant panels installed in several rooms.
Simplex air compressor, refrigerated air dryer. Pneumatic room thermostats, control valves, damper motors.
Transducers to integrate pneumatic components with BMCS.
Report run on: March 9, 2010 2:44 PM Page 29 of 39
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D3090 Other Special HVAC Systems and Equipment*
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1998
1978
1978
1978
Installed
Installed
Installed
Installed
25
0
60
30
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace BMCS
Lifecycle Replacement 2023 $150,000 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
Johnson Controls BMCS system controls equipment activation and assists in maintaining building environment.
Gas fired emergency generator complete with motorized fresh, return, exhaust dampers.
Fire hose cabinets complete with 65 mm angle valve, 40 mm hose valve, fire extinguisher.
ABC fire extinguishers installed in cabinets and on wall brackets.
Report run on: March 9, 2010 2:44 PM Page 30 of 39
D5010.02 Secondary Electrical Transformers (Interior)**
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
1978
1978
1978
Installed
Installed
Installed
40
40
30
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Replace 5 Secondary Electrical Transformers (Interior)
Replace Main Electrical Switchboards (Main Distribution)
Replace 9 Electrical Branch Circuit Panelboards (Secondary Distribution)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2018
2018
2013
$45,000
$17,000
$45,000
Unassigned
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
FEB-10
FEB-10
FEB-10
Dry type, 600-120/208V/3PH step down transformers located throughout the building. The sizes are varies between 45 to 75 KVA
General Electrical main distribution switchboard, 600/347V/3PH/4W, 600 amp rated with 600 ampere main circuit breaker. The system is fed underground from site pad mounted transformer.
600/347V/3PH/4W and 120/208V/3PH/4W branch circuit panelboards as manufactured by General Electric. 600 volt panelboards used for service to building lighting. Most of panels had 10% space for future uses
Report run on: March 9, 2010 2:44 PM Page 31 of 39
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories (Lighting Controls)*
D5020.02.02.02 Interior Florescent Fixtures**
D5020.02.02.03 Interior Metal Halide Fixture*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1978
1979
1979
2003
2003
Installed
Installed
Installed
Installed
Installed
30
50
30
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace 16 Motor Starters and Accessories
Replace 850 Interior Florescent Fixtures
Lifecycle Replacement
Lifecycle Replacement
2013
2033
$8,000
$170,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Allen Bradley magnetic motor starters were used for major mechanical ventilation equipment and water pump controls..
The wires were installed in conduits for electrical panels to local junction boxes and BX wires were used between junctionboxes to lighting fixtures and power outlets.
Low voltage switching provided to 347 volt lights as installed in classrooms. Motion sensors for lighting installed in washrooms.
All the Fixtures were either retrofited or replaced with T8 lamps and electronic ballasts.
Pendant hung metal halide light fixtures installed to gymnasium.
Report run on: March 9, 2010 2:44 PM Page 32 of 39
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
2003
2003
1978
2006
2001
Installed
Installed
Installed
Installed
Installed
30
30
30
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace Detection and Fire Alarm
Replace Intrusion Detection
Lifecycle Replacement
Lifecycle Replacement
2031
2026
$90,000
$64,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
All the Exit signs are LED lamp type fixtures.
Wall mounted high pressure sodium light fixtures installed along building perimeter.
Exterior lighting is photocell controlled.
Fully addressable Notifier AFP-200 panel is used for fire alarm system.
ADT security system with alarm keypad and motion sensors installed throughout school.
Report run on: March 9, 2010 2:44 PM Page 33 of 39
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
D5030.04.03 Call Systems**
D5030.04.04 Data Systems*
D5030.04.05 Local Area Network Systems*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
2001
2001
2001
2001
2001
Installed
Installed
Installed
Installed
Installed
25
25
25
25
15
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace Call Systems
Lifecycle Replacement 2026 $65,000 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type Year Cost Priority
Updated: FEB-10
The Bogen Multicom -2000 call system was used for Clock and program system
The Panasonic 8 EXT Super Hybird System was used for telephone system.
Bogen Multicom-2000 panel is used for call system and ties with telephone system to perform entire school paging and PA functions
There were two servers set up for data system and through Suppernet to regional school board.
The data outlets were installed through all the classrooms and offices; the wireless network can be access through entire school.
Report run on: March 9, 2010 2:44 PM Page 34 of 39
D5030.05 Public Address and Music Systems**
D5030.06 Television Systems*
D5090.02 Packaged Engine Generator Systems (Emergency Power System)**
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
2001
2002
1978
Installed
Installed
Installed
25
20
35
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Replace Public Address and Music Systems
Replace Packaged Engine Generator Systems (Emergency Power System)
Lifecycle Replacement
Lifecycle Replacement
2026
2013
$33,000
$25,000
Low
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Bogen Multicom-2000 panel is used for call system and ties with telephone system to perform entire school paging and PA functions
Cable TV outlets were installed in each classroom and corridors through entire facility .
Natural gas fuelled emergency generator, 22.5 KVA rated generator, 120/208V/3PH.4W with a Westinghouse Robonic transfer switch.
Report run on: March 9, 2010 2:44 PM Page 35 of 39
E1020.07 Laboratory Equipment*
E1090.04 Residential Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework** - 1978
E2010.02 Fixed Casework** - 2001
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1978
1978
1978
1978
2001
Installed
Installed
Installed
Installed
Installed
25
10
15
35
35
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Updated
Replace Fixed Casework
Replace Science Room Fixed Casework
Lifecycle Replacement
Lifecycle Replacement
2013
2036
$106,400
$27,900
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Fume hood in science rooms.
Electric ranges, refrigerators and microwaves located in home economic room, servery, and staff lounge.
Four wall and two ceiling suspended plywood basketball backboards and electronic scoreboard. Badminton and hockey nets.
Plastic laminated counter tops and painted millwork in classrooms, home economic room, servery, wash rooms and storage rooms. Replacement cost @ $100/sq.M=$106,400.00
Plastic laminated counter tops and stained wood cabinetry located in science rooms. Replacement cost @ $150/sq. M = $27,900.00
Report run on: March 9, 2010 2:44 PM Page 36 of 39
E2010.02 Fixed Casework** - 2006
E2010.03.01 Blinds**
E2010.03.02 Interior Shutters*
E2020.05 Moveable Interior Landscaping*
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2006
1978
2006
2006
Installed
Installed
Installed
Installed
35
30
0
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Replace Casework - Administration & Library
Replace Blinds
Lifecycle Replacement
Lifecycle Replacement
2041
2013
$18,850
$51,947
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
Plastic laminated counter tops and stained cabinetry located in administration areas and library. Replacement cost @ $50/sq. M = $18,850.00
All exterior windows contain operable blinds between glazing units.
Overhead mounted coiling counter shutter doors located in administration and servery area.
Potted plants located in the atrium space.
Report run on: March 9, 2010 2:44 PM Page 37 of 39
F1010.02.04 Portable and Mobile Buildings* - 2007
5 - GoodRating
2007Installed
30Design Life
FEB-10Updated
Architectural Replacement Cost
Electrical Replacement Cost
Lifecycle Replacement 2037 $155,200 Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Event:
Type Year Cost Priority
Updated: FEB-10
Two stand alone wood framed portable classroom buildings constructed in 2007set on metal screw piles with stained perimeter plywood siding. Exterior consists of SBS membrane roofing on wood deck on wood joists with prefinished metalfascia and siding housing sealed fixed and opening vinyl window units and painted metal clad doors with sealed glazing inmetal frames, with painted metal railing located on one side of stain wood stair units. Grades around the portables provide positive site drainage. Interiors consists of VCT flooring on wood sheathed flooring on wood joists, suspended acoustical tile ceilings, white and tack boards, plastic laminated counter tops and painted millwork and fabric louvered blinds. Roofing replacement cost - $17,940.00 Siding replacement cost - $36,850.00 Window replacement cost - $3,000.00 Door replacement cost - $1.000.00 VCT replacement cost - $5,380,00 Ceiling replacement cost - $4.930.00 Millwork replacement cost - $4,500.00 Visual Display Boards replacement cost - $3,000.00 Blinds replacement cost - $1000.00 Total Structural/Architectural replacement cost of each unit = $77,600.00 Mechanical elements consist of 2 natural gas floor mounted classroom furnaces complete with ductwork and ceiling diffusers. Furnaces have capacity of 44W and airflow of 944 l/s. Each furnace is complete with DX cooling coil - 2T. Total mechanical replacement cost for the 2 portables = $20,000.00. Electrical elements consist of 3 phase, 4wire 120/208V 225A rated branch circuit panels installed in 2007 with a replacement cost of $10,000.00. Motor starters and accessories: load switches for the furnaces with a replacement cost of $1,200.00. Interior fluorescent fixtures are T-8 lamped with a replacement cost of $8,000.00. HPS wall packs are installed around the buildings perimeter. The fire alarm system devices are connected to Notifier AFP-200 fire alarm panel. The intrusion system devices are connected to ADT Focus D50 security panel. The call system devices are wired to Bogen Multicom-2000 panels. Total electrical replacement cost for the 2 portables = $19,200.00
View of a typical portable classroom unit.
Report run on: March 9, 2010 2:44 PM Page 38 of 39
F2020.01 Asbestos*
F2020.04 Mould*
F2020.09 Other Hazardous Materials*
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
1978
1978
1978
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Mechanical Replacement Cost
Lifecycle Replacement
Lifecycle Replacement
2037
2032
$19,200
$20,000
Unassigned
Unassigned
Lloydminster (AB) - Bishop Lloyd School (B3719A)
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-10
FEB-10
No asbestos material observed or reported.
No mould conditions observed or reported.
No other hazardous materials observed or reported.
Report run on: March 9, 2010 2:44 PM Page 39 of 39
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
4 - Acceptable
5 - Good
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
1978
2008
2006
1978
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
FEB-10
FEB-10
FEB-10
FEB-10
Updated
Updated
Updated
Updated
Modify Access to BFA Washrooms
Barrier Free Access Upgrade 2010 $6,000 Medium
Corridor width and width between door latch and adjacent walldoes not meet BFA requirements. One grab bar in toilet cubicles where two are required. .
Concern:
Increase width of access corridors to BFA requirements and provide additional grab bars in toilet cubicles in both washrooms.
Recommendation:
Lloydminster (AB) - Bishop Lloyd School (B3719A)S8 FUNCTIONAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: FEB-10
Level hard surface access provided from parking lot and east drop off area to main entrance
Power operated doors meeting BFA requirements.
Teaching area doors equipped with lever handled hardware.
Access to BFA washrooms by internal corridor.
Consequences of Deferral:Diminished access to washrooms.