Report run on: March 18, 2013 10:22 AM RECAPP Facility Evaluation Report Health Unit B4480A St. Paul Alberta Health Services-North
Transcript
Page 1: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM

RECAPP Facility Evaluation Report

Health Unit B4480ASt. Paul

Alberta Health Services-North

Page 2: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 2 of 24

B4480ABuilding Id:

Health Unit Building Name:

St. PaulLocation:5610 - 50 Avenue Address:

1,333.00Gross Area (sq. m): $4,893,504Replacement Cost:0Construction Year:

Evaluation Date: September 4 2012

MAYCON Architectural andEngineering Services

Evaluation Company:

Vic MaybrodaEvaluator Name:

The single storey general purpose office building contains 1333 sq. M in area constructed in 1981. In addition to health care offices the unit contains sound proof rooms to measure hearing impairment and generalpurpose medical research labs.

General Summary:

Structural Summary:Roof is composed of metal deck on OWS joists supported by exterior concrete block walls with concrete foundation wallsand concrete slab on grade. Elements appear to be in acceptable condition.

Envelope Summary:Exterior walls consist of painted concrete block, face brick and prefinished metal siding housing aluminum framedstorefronts, aluminum and steell framed sealed fixed window units and painted utility doors. Overall elements appear to be in acceptable condition.

Interior Summary:Flooring consists of sealed concrete, ceramic tile, sheet vinyl, vinyl asbestos tile and carpeting. Walls are painted gypsum wallboard and ceramic tile with ceilings of acoustical tile and gypsum wallboard with afolding partition located between two offices. Casework consist of painted wood cabinetry with chemical resistant laminated counter tops, plastic laminated vanitycounter tops and wood and plastic laminated finished reception desk. Wash rooms contain prefinished metal toilet partitions. Doors are stained solid core wood with institutional grade hardware. Roller blinds cover aluminum framed window units. Elements appear to be in acceptable condition.

Mechanical Summary:One story strip mall style building with roof top units providing heating and cooling. With ceiling mount exhaust fans inthe washrooms. There is one hot water tank supplying hot water to the washrooms and exam rooms. Buildings mechanical equipment is acceptable.

Electrical Summary:The building has a 600 Amp, 120/208 volt service fed overhead from three pole mounted single phase transformers. The T-12 lamp fluorescent fixtures provide lighting for entire interior; Exterior lighting is provided by HPS pack at eachentrance of the building; Emergency lighting in the building is provided by battery pack emergency lighting fixtures. Exitlighting in the building is provided by LED. The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems are "Acceptable".

7.25%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $354,600

St. Paul - Health Unit (B4480A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 3: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 3 of 24

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.05 Mezzanine Construction*

B1020.01 Roof Structural Frame*

B1020.03 Roof Decks, Slabs, and Sheathing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

St. Paul - Health Unit (B4480A)S1 STRUCTURAL

Concrete foundation walls on strip footings.

Concrete slab on grade throughout.

Wood framed mezzanine located in mechanical/electrical/ storage area accessed by wood stairs.

Metal deck on OWS joists.

Metal deck.

Page 4: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 4 of 24

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

B2010.01.06.03 Metal Siding**

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

0

0

40

20

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Replace 140 sq. M Metal Siding

Replace 160 Lin M Caulking

Lifecycle Replacement

Lifecycle Replacement

2021

2016

$43,500

$4,800

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

Face brick located on south side (main facade) of the building with brick returns of the west and east sides of the building.

Painted concrete block on three side of the facility.

Prefinished horizontal metal siding is located above window head level on front elevation.

Applied around exterior wall openings.

Page 5: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 5 of 24

B2010.01.13 Paints (& Stains): Ext. Wall**

B2010.02.03 Masonry Units: Ext. Wall Const.*

B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

B2010.05 Parapets*

B2010.09 Exterior Soffits*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

15

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace 580 sq. M Painted Surfaces

Lifecycle Replacement 2016 $17,500 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

Painted concrete block and utility doors.

Concrete block.

Not viewable. No concerns observed or reported.

Perimeter roof parapets are low in height and contain isolated scuppers.

Prefinished metal over front facade.

Page 6: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 6 of 24

B2020.01.01.01 Steel Windows (Glass & Frame)**

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

B2020.02 Storefronts: Windows**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

40

40

40

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Replace 20 sq. M Steel Framed Windows

Replace 46 sq.M Aluminum Windows

Replace 12 sq. M Storefront Windows

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2021

2021

2021

$15,000

$46,000

$12,000

Unassigned

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-13

MAR-13

MAR-13

Sealed fixed glazing units in steel frames with georgian wire located on rear elevation. Sealed fixed glazing units in steel frames located on east elevation.

Sealed fixed glazing in aluminum frames.

Sealed fixed glazing units in aluminum frames at front entry.

Page 7: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 7 of 24

B2030.01.01 Aluminum-Framed Storefronts: Doors**

B2030.01.06 Automatic Entrance Doors**

B2030.02 Exterior Utility Doors**

B3010.01 Deck Vapour Retarder and Insulation*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

30

30

40

0

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Replace 1 Storefront Door

Replace 2 Double Automatic Entry Doors

Replace 3 Utillity Doors

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2016

2021

$2,500

$27,000

$3,000

Unassigned

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-13

MAR-13

MAR-13

Fully glazed aluminum framed entry door.

Fully glazed powered entry doors located at main entry.

Painted insulated metal clad doors.

No viewable. No concerns observed or reported.

Page 8: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 8 of 24

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

4 - Acceptable

4 - Acceptable

Rating

Rating

2007

1981

Installed

Installed

25

0

Design Life

Design Life

MAR-13

MAR-13

Updated

Updated

Replace 133 sq. M SBS Roofing

Lifecycle Replacement 2032 $22,610 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

SBS membrane over roof area. Minor islolated ridging viewed.

Roof hatch, roof drains, plumbing and exhaust vents.

Page 9: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 9 of 24

C1010.01 Interior Fixed Partitions*

C1010.03 Interior Operable Folding Panel Partitions**

C1010.05 Interior Windows*

C1010.08 Other Partitions*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

Installed

0

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Updated

Replace 12 sq. M Folding Partition

Lifecycle Replacement 2016 $13,200 Unassigned

St. Paul - Health Unit (B4480A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: MAR-13

Metal stud.

Operable folding partition located between two offices.

Opaque glazing units in metal frames between corridors and office spaces.

Sound proof partitions in an area devoted to test hearing impairment.

Stained solid core wood in metal frames with institutional hardware.

Rated door and frame to mechanical/electrical/storage area.

Page 10: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 10 of 24

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

C2020.08 Stair Railings and Balustrades*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace 6 Fabricated Toilet Compartments

Lifecycle Replacement 2016 $7,500 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

Prefinished metal toilet partitions located in wash rooms.

Painted and stained wood.

Toilet paper holders, grab bars, soap and towel dispensers, waste containers and mirrors

Wood stair to mezzanine.

Wood railing and balustrades.

Page 11: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 11 of 24

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

C3020.01.02 Painted Concrete Floor Finishes*

C3020.02 Tile Floor Finishes**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

40

0

0

50

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Replace 32 sq M Wall Tile

Replace 32 sq. M Floor Tile

Lifecycle Replacement

Lifecycle Replacement

2021

2031

$7,680

$5,500

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

1.5 M high ceramic tile to walls in wash rooms.

Painted gypsum wallboard.

Located in mechanical/electrical/storage room.

Ceramic tile located in wash rooms.

Page 12: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 12 of 24

C3020.07 Resilient Flooring** - Sheet Flooring

C3020.07 Resilient Flooring** - Tile

C3020.08 Carpet Flooring**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

2010

1981

2010

Installed

Installed

Installed

20

20

15

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Replace 430 sq. M Resilient Flooring

Replace 40 sq. Resilient Tile Flooring

Replace 730 sq. M Carpeting.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2030

2016

2025

$38,700

$3,600

$48,000

Unassigned

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-13

MAR-13

MAR-13

Sheet vinyl flooring is located in entry lobby area, corridors and various office areas.

Vinyl Asbestos Tile (VAT) is located in 3 Lab/Offices. Replacement should be undertaken by encapsulation (new sheet flooring applied directly over VAT). Vinyl Composite Tile (VCT) is located in a storage room.

Carpeting is located in administration area, offices and conference rooms.

Page 13: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 13 of 24

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

C3030.07 Interior Ceiling Painting*

4 - Acceptable

4 - Acceptable

Rating

Rating

1981

1981

Installed

Installed

25

0

Design Life

Design Life

MAR-13

MAR-13

Updated

Updated

Replace 1150 sq. M Acoustical Ceilings

Lifecycle Replacement 2016 $57,500 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

Located in corridors and office spaces.

Painted gypsum wallboard located in wash rooms and storage areas.

Page 14: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 14 of 24

D2010.04 Sinks**

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

30

35

0

40

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Replace 4 sinks

Replace 8 WC, 6 Lav, 2 Urni

Replace 10 vaalves

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2016

2021

$3,200

$15,000

$1,000

Unassigned

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-13

MAR-13

MAR-13

Single bowl SS sinks with a two handle tap set with handicap handles

Standard tank type WC, Standard Lav with infrared sensors, wall hung flush valve urinals

Copper piping through out the building

Shut off valves at the meter and HW tank, and main branches

Page 15: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 15 of 24

D2020.02.06 Domestic Water Heaters**

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

2009

1981

1981

1981

1981

2009

Installed

Installed

Installed

Installed

Installed

Installed

20

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Updated

Replace hot water tank

Lifecycle Replacement 2029 $1,500 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

40 gal, 40 MBH hot water taank

Cast iron and PVC piping through out the building.

Standard 4" floor drain by the hot water tank

PVC RWL from roof drains to a storm system in the road.

Standard 4" rood drains on the roof

Sch 40 black steel piping on the roof suppyling the roof top units and dropping into the building for the HWT and unitheater

Page 16: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 16 of 24

D3020.04.03 Fuel-Fired Unit Heaters**

D3020.04.04 Chimney (& Comb. Air): Fuel-Fired Heater*

D3040.01.04 Ducts: Air Distribution*

D3040.01.07 Air Outlets & Inlets: Air Distribution*

D3040.04.01 Fans: Exhaust**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

30

0

0

0

30

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace 1 unit heater

Replace 6 fans

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$4,000

$4,000

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

An Olson unit heater in the storage room.

Class 'B' chimney run up through the roof

Insulated galvanized steel ductwork throughout the Health center from the air handling units.

Square ceiling diffusers in the open areas, double deflections grilles in the side wall installation and in small rooms, eggcrate return grilles throughout the hospital

Washroom exhaust fans

Page 17: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 17 of 24

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**

D3060.02.01 Electric and Electronic Controls**

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

2009

2009

1981

Installed

Installed

Installed

Installed

Installed

0

0

30

30

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace 7 roof top units

Replace 8 thermostats

Lifecycle Replacement

Lifecycle Replacement

2039

2039

$110,000

$1,500

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

Galvinized steel exhaust ducts running up through the roof with a weather hood.

Egg crate style grilles.

7 roof top units with economizers, serving various areas.

Low voltage thermostats controlling the roof top units and unit heater.

Fire extinquisher by the entrances

Page 18: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 18 of 24

D5010.01.02 Main Electrical Transformers (Utility Owned)*

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

D5010.07.02 Motor Starters and Accessories**

5 - Good

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2012

2012

1981

1981

Installed

Installed

Installed

Installed

0

40

30

30

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Replace Main Electrical Switchboards (MainDistribution)

Replace 4 Electrical Branch Circuit Panelboards

Replace 8 Motor Starters and Accessories

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2052

2016

2016

$32,000

$20,000

$4,000

Unassigned

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-13

MAR-13

MAR-13

Three single phase pole mounted transformers are used to provide power to the building.

The main service to the building is 120/208V, 3 phase, 4 wire and rated 600A and is fed overhead from pole mountedtransformers. The main distribution consists 600A main disconnect, CT cabinet, utility meter and 600A main distributionsection.

All the panels were installed with original building and are in full capacity.

The stand alone magnetic starters and load switches are used for major mechanical pump controls

Page 19: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 19 of 24

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.02 Interior Fluorescent Fixtures**

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

5 - Good

4 - Acceptable

4 - Acceptable

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

2011

2011

Installed

Installed

Installed

Installed

Installed

0

0

30

20

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace 200 Interior Fluorescent Fixtures

Replace 15 Emergency Lighting Battery Packs

Lifecycle Replacement

Lifecycle Replacement

2016

2031

$80,000

$18,000

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

All the wires are copper and installed in the conduits. The BX wires are used for field wiring

The entire building lighting is controlled by local line voltage switches

All the fixtures are T-12 lamp fluorescents

Fixtures installed in corridors and strategic locations.

All the Exit signs are LED type

Page 20: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 20 of 24

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.01 Detection and Fire Alarm**

D5030.04.01 Telephone Systems*

D5030.04.04 Data Systems*

D5030.04.05 Local Area Network Systems*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

2003

2003

Installed

Installed

Installed

Installed

Installed

Installed

0

0

25

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Updated

Replace Detection and Fire Alarm

Lifecycle Replacement 2016 $40,000 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

The fixtures are installed under the canopy at building entrances

The outdoor lights are controlled by manual switch

The single zone hardwired Edwards 6601 panel is used for building fire alarm system

The Avaya machine is used for building telephone system and have hand sets installed in all the office.

The data system is tied to local health board through Supernet.

The data outlets are installed through all the offices.

Page 21: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 21 of 24

D5090.01 Uninterruptible Power Supply Systems**

5 - GoodRating

2008Installed

30Design Life

MAR-13Updated

Replace 5 Uninterruptible Power Supply units

Lifecycle Replacement 2038 $20,000 Unassigned

St. Paul - Health Unit (B4480A)

Event:

Type Year Cost Priority

Updated: MAR-13

The Eaton UPS units are used for vaccine coolers

Page 22: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 22 of 24

E1020.08 Medical Equipment*

E1090.04 Residential Equipment*

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

F1040.06 Other Special Facilities*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

0

0

35

30

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Replace Casework

Replace 78 sq. M Roller Blinds

Lifecycle Replacement

Lifecycle Replacement

2016

2016

$43,000

$7,800

Unassigned

Unassigned

St. Paul - Health Unit (B4480A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-13

MAR-13

Freezer and coolers with miscellaneous counter mounted testing equipment. Hearing impairment area contains testing equipment.

Coffee maker, microwave and dishwasher.

2 Lin M low level cabinetry with plastic laminated counter top located in lobby area. 10 Lin M painted upper and lower cabinetry with acid resistant counter tops located in lab/office areas. 6 Lin M plastic laminated vanity counter tops located in wash rooms. 10 Lin M wood finished reception desk with plastic laminated finish.

Roller blinds applied to window units.

Two sound proof rooms and related testing area for testing hearing impairment.

Page 23: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 23 of 24

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.04 Mould*

K4030.09 Other Hazardous Materials*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

MAR-13

Updated

Updated

Updated

Updated

Updated

Updated

St. Paul - Health Unit (B4480A)S8 SPECIAL ASSESSMENT

Hard surface with concrete ramp.

Power actuated sliding doors at main entry.

BFA equipped wash rooms.

Except for VAT no asbestos observed or reported.

No mould observed or reported.

No other hazardous materials observed or reported.

Page 24: RECAPP Facility Evaluation Report - Alberta...The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems

Report run on: March 18, 2013 10:22 AM Page 24 of 24

K5010.01 Site Documentation*

K5010.02 Building Documentation*

4 - Acceptable

4 - Acceptable

Rating

Rating

2012

2012

Installed

Installed

0

0

Design Life

Design Life

MAR-13

MAR-13

Updated

Updated

St. Paul - Health Unit (B4480A)

Site plan.

On 04 September 2012, Vic Maybroda of MAYCON Architectural and Engineering Services supported by Kevin Smith ofBacz Engineering and Bozka Malanik of Acuity Engineering accompanied by Mr. Les Eldridge of the St. Paul HealthAuthority undertook an onsite review of existing building and site conditions of the St. Paul Health Centre. The single storey general purpose office building contains 1333 sq. M in area constructed in 1981. In addition to health care offices the unit contains sound proof rooms to measure hearing impairment and generalpurpose medical research labs.