Recommissioning Workshop September 12, 2013 Dave Moser, PE Senior Engineer PECI 1 © PECI 2013
Transcript
Page 1: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Recommissioning Workshop

September 12, 2013 Dave Moser, PE Senior Engineer PECI

1

© PECI 2013

Page 2: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Preview for the Day

2

Topic Start time What is existing building commissioning (EBCx)? Costs / benefits Case studies EBCx process

Break 9:15 EBCx team Benchmarking / utility analysis LEED-EBOM Xcel Energy Recommissioning program

Break 10:30 Common findings Persistence of benefits Resources Wrap-up 11:45

Class dismissed! 12:00

8:30

9:30

10:45

Page 3: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

The Gist of Energy-Focused EBCx

Going from this…. to this!

3

Page 4: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

But Seriously, EBCx is…

A systematic process for improving an existing building’s performance

Includes a rigorous investigation to identify problems, especially integration issues

Primary focus is on identifying low cost operational improvements

May be done alone or with a retrofit project

Page 5: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Other Terminology You May Hear

Retrocommissioning (RCx)

Recommissioning (ReCx)

Ongoing Commissioning (OCx)

Monitoring-Based Commissioning (MBCx)

5

Note: Xcel Energy’s program covers both RCx and ReCx

Existing Building Commissioning (EBCx)

Page 6: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

6

Ongoing commissioning

Persistence

Existing building commissioning

New construction commissioning

Tuned, optimized, and documented systems with

training for O&M staff

Tuned, optimized, and documented systems with

training for O&M staff

Performance tracking Updated documentation Ongoing training

Page 7: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Is EBCx Needed After Cx?

No, it’s not.* *As long as: No changes are ever made

to the building Cx included system

optimization The building operates

exactly the same as after construction.

7

Page 8: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Ch-ch-ch-ch-changes

What changes typically occur over time in a commercial building?

______________________________ ______________________________ ______________________________ ______________________________

8 Your Turn!

Page 9: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

How Does EBCx Differ From a Tune-up? Tune-up Maintenance Components and

equipment Capacity Physical Savings Opportunities

EBCx Operation Systems and

Integration Performance Mental More Savings

Opportunities

9

EBCx includes and moves beyond tune-up procedures.

Page 10: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Revisiting O&M Maintenance = Capacity

Caring, cleaning, lubing, repairing

Primarily physical

Operation = Performance Scheduling,

implementing efficient control strategies, sequencing of equipment

Primarily mental

10

Page 11: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Maintenance Issue Example

Upper set of dampers should be open.

Linkage has come loose from actuator.

11

Page 12: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Operational Issue Example

Heaters should be off at OATs above 40°F.

12

Page 13: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

13 Source: Mills 2009

#1

#2

#3

#4

Why EBCx?

Page 14: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

What’s All the Fuss About Energy?

U.S. Energy Usage U.S. Electricity Sales

14 Source: EIA Annual Energy Review 2011

Page 15: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

EBCx Costs & Savings

15

CxA cost = ~45% of total cost

Source: Mills 2009

Page 16: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Factors Influencing Total Cost

Goals of project Systems to include in project

Number of systems, zones System complexity

Ease of obtaining trend data through BAS More costly if data loggers are needed

Owner / operator involvement

16

Page 17: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Help Reduce the Cost of EBCx

17

EBCx Phase Owner / Operator Action

Planning Compile a list of known problems and possible improvements.

Gather up-to-date building documentation. Investigation Perform appropriate preventive maintenance tasks early.

Perform simple repairs as the project progresses. Assist with diagnostic monitoring and functional testing.

Implementation Assist with implementing the selected improvements.

Hand-Off and Post-EBCx Help facilitate training. Maintain improved performance of systems.

Page 18: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Local Case Study – Grace Church

343,000 sf megachurch Eden Prairie, MN Five EBCx measures

AHU runtime reduction Supply air temperature reset Control VAV boxes from occupancy sensors Demand-controlled ventilation Reduce VAV box airflow to match zone needs

18

Page 19: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

19

Local Case Study – Grace Church

Financials Total utility cost savings: $108,000 / yr Project cost: $182,000 Xcel Energy incentives: $39,000 Net simple payback: 1.3 years

Page 20: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

20

Local Case Study – North Memorial

Ambulatory care center and medical office

200,000 sf facility just northwest of Minneapolis

EBCx Measures Reduce outside air to surgical suites

during unoccupied hours Reduce runtime of clinic area HVAC Supply air temperature reset Unoccupied temperature setback

Page 21: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

21

Local Case Study – North Memorial

Financials Total utility cost savings: $96,000 / yr Project cost: $250,000 Xcel Energy incentives: $51,000 Federal stimulus funding: $100,000 Net simple payback: 1.0 year

Page 22: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

EBCx Process Overview

22 From the EPA’s “A Retrocommissioning Guide For Building Owners”.

Page 23: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

23

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 24: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Screening Select good building candidates for EBCx Ideal building characteristics:

Proactive management philosophy, motivated building operators

Commercial or institutional facility with complex HVAC and lighting systems

Direct digital control (DDC) down to zone level High energy consumption Mechanical equipment in relatively good condition and

not at end-of-life Sensor calibration part of preventive maintenance

24

Planning

Page 25: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Most systems are in need of replacement

High energy usage Motivated operators Major system design problems Catastrophic problems (e.g.,

asbestos) Complex HVAC and lighting systems Excessive comfort complaints

Is EBCx Appropriate?

25

Probably Probably not

Planning

Your Turn!

Page 26: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Selecting a Provider

RFQ (Request for Qualifications) process Request experience for similar projects Request example work products Ask if EBCx is a core business service

RFP (Request for Proposal) process

Sample RFP available from California Commissioning Collaborative

26

Planning

Page 27: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Sources of EBCx Providers

Xcel Energy www.xcelenergy.com/recomm

Building Commissioning Association

www.bcxa.org

California Commissioning Collaborative www.cacx.org/resources/provider_list.html

27

Planning

Page 28: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Planning Phase - Scoping Analyze the building’s energy consumption Assess potential with a site walk through

Review building documentation Understand the current operational requirements Interview the operating staff Identify opportunities

Analyze results Develop a scope of work to complete EBCx process

28

Planning

Page 29: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Useful Documentation Utility data – at least 12

months Control drawings with full

points list Sequences of operation Full set of as-built

drawings/shop drawings Mechanical Electrical Plumbing Architectural drawings

TAB report(s) Past energy conservation

reports Original equipment

submittals

29

Planning

Page 30: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Building Walk-Through: HVAC

30

Planning

Your Turn!

Page 31: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Building Walk-Through: BAS

31

Planning

Your Turn!

Page 32: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Building Walk-Through: Lighting

32

Planning

Your Turn!

Page 33: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Building Walk-Through: Plug Loads

33

Planning

Your Turn!

Page 34: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Building Walk-Through: Envelope

34

Planning

Your Turn!

Page 35: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

35

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 36: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Investigation Phase Summary

Conduct detailed document review Interview occupants and operating staff Evaluate facility performance Analyze identified measures Develop Master List of Findings

36

Investigation

Page 37: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate Facility Performance

Purpose: Determine if current facility requirements are met Identify facility improvement measures

Methods: Analyze energy usage Review interview results Review service requests and complaints Compare actual conditions to CFR Perform diagnostic monitoring Conduct site investigation and testing

37

Investigation

Page 38: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

38

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 39: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Implementation Phase Summary

Select measures for implementation Prepare implementation plan Implement measures Verify successful measure implementation

39

Implementation

Page 40: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

40

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 41: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Hand-Off Phase Summary

Update documentation Develop persistence strategies Conduct training Develop Final Report

41

Hand-off

Page 42: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

42

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 43: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Up Next:

15 minute break When we come back: EBCx team roles and

responsibilities Discuss LEED-EB Xcel Energy RCx

program overview

43

Page 44: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Owner and designated representatives

Commissioning Authority (CxA)

Utility program representative

The EBCx Team

44

Facility Manager, O&M personnel Specialty

subcontractors and consultants

Page 45: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Owner / Staff Role

Management Level Be open to the

process as a learning and improvement process

Coordinate funding Select EBCx provider

Facilities/Ops Level Assist the EBCx team Embrace suggestions

for change and improvement

45

Page 46: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

EBCx Service Provider’s Role Integrate and coordinate

the team’s effort Lead the investigation

and hand-off phases of the project

Work with management and operations team

46

Page 47: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Supplier’s and Contractor’s Role Support investigation as

needed Implement EBCx measures Integrate EBCx

recommendations into ongoing contractual work

47

Page 48: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Energy Benchmarking

Comparison to other buildings Similar types Similar size Similar climate

Big picture indicator of efficiency (or lack of it)

Can use to prioritize projects within portfolio

48

Page 49: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Benchmarking with ENERGY STAR®

How does it work? Building performance assessment

Scale of 1-100 1 = least efficient, 100 = most efficient, 50 = average

Similar buildings nationwide

49

Page 50: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Benchmarking with ENERGY STAR®

How does it work? Assessment takes

into account: Weather Size Location Operating

characteristics 75 or higher may

qualify for an Energy Star® plaque

Why do it? Quick reality check

for scoping Tracking tool for

persistence

50

Page 51: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Analyze Monthly Utility Data

51

Page 52: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

More Useful Utility Data

Interval utility data (e.g., 15 minute data) Identify base load during unoccupied conditions Identify operational problems during normal

building operating hours Available through your Xcel Account Manager

52

Page 53: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Using Interval Meter Data

53

‘Good’ profile

Page 54: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Using Interval Meter Data

54

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

12:0

0 AM

2:00

AM

4:00

AM

6:00

AM

8:00

AM

10:0

0 AM

12:0

0 PM

2:00

PM

4:00

PM

6:00

PM

8:00

PM

10:0

0 PM

Bui

ldin

g po

wer

dra

w, k

W

Weekday

Saturday

Sunday

Holiday

Your Turn!

Page 55: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

55

LEED-EB

Page 56: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

LEED and Commissioning Leadership in Energy and Environmental Design for

Existing Buildings: Operations and Maintenance Or, “LEED-EBOM”

Certifies the sustainability of ongoing operations of

existing commercial and institutional buildings Addresses similar categories as LEED-NC

Current version is LEED 2009, updated in July of 2013

56

Page 57: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

When do you use LEED-EBOM?

Initial certification of existing buildings Ongoing re-certification of existing

buildings first certified under LEED-EBOM (within five years)

Ongoing re-certification of existing buildings first certified under LEED-NC (within five years)

www.usgbc.org

57

Page 58: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Where Does EBCx Fit In? Energy & Atmosphere

Prerequisite 1: Level 1 energy audit “Walk-through” audit Document systems, PM plan, identify savings opportunities

Prerequisite 2: Minimum E* score of 69

Related credits: Credit 1: Optimize Energy Performance

Based on Energy Star score Possible 18 points

Compare to 40 minimum points required for LEED-EBOM certification

58

Page 59: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Where Does EBCx Fit In?

Credit 2: Existing Building Commissioning 2.1 Investigation (2 points) ASHRAE Level 2 audit also allowed

2.2 Implementation (2 points) 2.3 Ongoing Commissioning (2 points) Develop a plan, and complete some of the

work

59

Page 60: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

60

Xcel Energy’s Recommissioning Program

Page 61: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Topics

Eligibility Rebates Process Resources

61

Page 62: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

62

Who is Eligible?

Xcel Energy electric and/or natural gas business customers in Colorado or Minnesota.

Any age building In Colorado, buildings must be greater than 50,000

square feet or have high-energy use to qualify.

Page 63: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

63

Study Rebates

We’ll provide up to 75% of the cost of the study, not to exceed $25,000

Page 64: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Implementation Rebates Electric rebates

Up to $400/kW or $0.045/kWh You earn the higher of the two

Natural gas rebates (for our retail gas customers) Up to $5/Dth

Maximum rebate is 60% of measure cost

Payback must be between 9 months and 15 years to earn a rebate

64

Page 65: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Implementation Bonus

On all qualifying recommissioning measures submitted within nine months of the study approval date. An additional $0.03/kWh and/or $3/Dth

That’s in addition to the $0.045/kWh and/or $5/Dth already earned for implementing measures with a 9 month – 15 year payback.

65

Page 66: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

66

Process 1. Obtain preapproval before beginning

Submit application with proposal Proposal should identify building issues, concerns and

what the study provider will review 2. Complete the study

Study will contain a list of measures you can implement Xcel Energy needs to approve the final study before

issuing study rebate 3. Implement measures

You choose what to implement Some measures may require measurement and

verification (M&V) Rebate is paid after M&V is complete (if needed)

Page 67: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

67

Study Providers

You choose your own provider Provider must submit their qualifications if they

haven’t worked with our program Look at our list of providers who have

participated in the past if you need an idea It’s included in your handout

Page 68: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

68

Fast Track Recommissioning Options

Fast track study Implementation rebates available for customers who have

completed a RCx study on their own (without funding from Xcel Energy)

Fast track proposal Implementation rebates available for RCx measures that

may be identified in a vendor’s proposal

Requires preapproval and energy savings

calculations must be included with application

Page 69: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

69

Resources

www.xcelenergy.com/recomm Xcel Energy case studies

Office, school, hospital, hotel, medical and research center

Recommissioning guidebook Provider list Applications

Page 70: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

70

How Do I Get Started?

Contact your Xcel Energy Account Manager Call an Energy Efficiency Specialist at 1-800-481-4700

Page 71: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

71

Questions?

Thank you!

Page 72: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Up Next:

72

Up Next:

15 minute break When we come back: Common findings and

case studies Persistence of benefits Available resources

Page 73: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

EBCx Results from the Field

73

122 EBCx projects, most in CA.

Source: PECI, 2009

Page 74: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Common Low-cost Opportunities

Technical Issues and Case Studies Airside Economizer Schedules Setpoints / Reset Schedules Pumping Ventilation

74

Page 75: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Economizer dampers

During cool outside air conditions, more outside air can be brought in to help cool the building ‘Free’ cooling

75

Page 76: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

General Economizer Issue Categories Damper system design (sizing / arrangement)

E.g., oversized dampers Controls sequences and sensor arrangement

E.g., low economizer damper lockout temperature Maintenance

E.g., disconnected pneumatic actuator Both energy and non-energy benefits can be realized

76

Page 77: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate Airside Economizers

Inspect economizer maintenance Blade and jamb seals

installed, in good condition?

Actuators adjusted for full closure?

Actuators connected to dampers?

77

Page 78: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Schedules – Overview

Scheduling Issues Often modified for specific, short-term needs Schedule modifications can be forgotten Improper system installation can lead to

occupant request for modified schedule How to identify

Trend data Interval utility data After hours walk-through if possible

78

Page 79: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Schedules Example – Heat Pumps As-found situation

Schedules were modified for short-term requests Heat pumps were operating when building was

unoccupied Water loop circulation pumps ran continuously Fluid cooler spray pump and fan ran while building

was unoccupied Identified during investigation via system trends and

data loggers on the equipment

79

Page 80: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Setpoint Example – As-found Condition

What is wrong with this picture?

80

Heating AHUs design:

180 EWT 105 LAT

P6

P7

P8

B5 B4 B3

P3 P4 P5

B1

B2

Hot deck DAT reset 150°F above 60°F OA 180°F below 48°F OA P2

P1

95% 95% 95%

Hot deck reset calls for a higher DAT than the available EWT, resulting in 100% hot water valve position and excess pumping.

Hot water reset 140°F above 60°F OA 180°F below 48°F OA

3-5ºF ∆T

Mild spring day in Portland, OR.

Your Turn!

Page 81: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Setpoint Example

Physically impossible for the system to achieve what it’s being asked to do But it’ll try anyway, which is why

all the pumps are on and operating at near 100% speed

81

Page 82: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Setpoint Example – Proper Operation

82

Heating AHUs design:

180 EWT 105 LAT

P6

P7

P8

B5 B4 B3

P3 P4 P5

B1

B2

Hot deck DAT reset 70°F above 60°F OA 110°F below 48°F OA P2

P1

0-50%

0-50%

One pump is OFF and the other two operate between 0-50% speed to meet load. Delta-T across the loop is about 30F.

Hot water reset 140°F above 60°F OA 180°F below 48°F OA

0%

30F

Was 150ºF Was 180ºF

Page 83: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Setpoint Example – Past Project

Savings opportunity Energy savings: 29,000 kWh/yr and

4,200 therms/yr Annual cost savings: $4,800 total

83

Page 84: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Pumping Opportunities – Overview

Pumping Issues Many pumps are oversized

Safety factor Future expansion

How to identify

Throttled discharge valve Both parallel pumps on Low temperature differential across a loop

84

Page 85: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Throttled discharge valve

Sometimes it’s easy to spot a throttled valve …

85

Closed

Open

Page 86: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Throttled discharge valve

86

… othertimes, not so much.

Page 87: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Implementation Options

Option 1 - Trim the existing impeller Open pump, trim impeller, reassemble

Option 2 – Replace the impeller with a smaller one Option 3 – Add a VFD

Then dial in speed to match flow May be more costly, but allows for future capacity

87

Page 88: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate HVAC Pumps

Parallel pumps – shut one off? Level of savings depends on pump curve.

88

Shallow curve – less flow increase

Page 89: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate Ventilation

Ventilation control – typical issues: Actual occupant load less than design Space usage changed

Common opportunities:

Add demand-controlled ventilation (DCV) Reduce OA flow rate Reduce VAV box min flow rates Reset VAV box min flow rates

89

Page 90: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate Ventilation - Clues Cold complaints in zones with no reheat Low measured CO2 values High summertime boiler usage

90

Page 91: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Evaluate Ventilation Ventilation case study 800,000 sf building. Issues:

Design occupancy: 6,000 people. Actual occupancy: 1,850 people.

Implemented measures: Lower VAV box min flow setpoints Close VAV boxes during unoccupied times

Financials: Cost: $10,000 Annual savings: $30,000

91

Page 92: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

92

Persistence of Benefits

Page 93: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Making Energy Benefits Last Persistence is an issue with EBCx measures

Operational measures can easily be undone

Various methods for ensuring persistence: Owner / operator training (key!) Updated building documentation / systems manuals Performance tracking

Building benchmarking (Energy Star) Utility bill / energy use tracking (whole building level) Trending of key metrics (systems level)

93

Page 94: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Performance Monitoring Tools

Whole-building level Monitor energy consumption, identify anomalies.

94

Page 95: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Performance Monitoring Tools

System-level Monitors data from a BAS to continuously

identify EBCx opportunities

95

Page 96: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Systems Level Tracking

Fan Speed variation measure AH serving public areas. 24/7/365, 60 HP fan. Baseline: VFD had failed, operating in bypass.

Excessive reheat due to overcooling. Measure: Replace failed VFD. $18,000 annual savings,

$5,600 implementation cost. Tracked during 2007, quarterly reports sent to Owner

96

Page 97: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Systems Level Example

97

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/30

/200

7

7/7/

2007

7/14

/200

7

7/21

/200

7

7/28

/200

7

8/4/

2007

8/11

/200

7

8/18

/200

7

8/25

/200

7

9/1/

2007

9/8/

2007

9/15

/200

7

9/22

/200

7

Date

OA

Tem

p (º

F), F

an S

peed

(% m

ax.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Duc

t Sta

tic P

ress

ure

("H

2O)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

Duct static pressure is stable

Fan speed is less than pre-EBCx

Summary: System is operating as expected

Page 98: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Systems Level Example

98

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/30

/200

7

7/7/

2007

7/14

/200

7

7/21

/200

7

7/28

/200

7

8/4/

2007

8/11

/200

7

8/18

/200

7

8/25

/200

7

9/1/

2007

9/8/

2007

9/15

/200

7

9/22

/200

7

Date

OA

Tem

p (º

F), F

an S

peed

(% m

ax.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Duc

t Sta

tic P

ress

ure

("H

2O)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

Fan reverts to pre-EBCx condition. VFD programming was lost as part of a controls migration project.

Duct static pressure is now high and unstable.

Problem identified on 9/10/07.

Page 99: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

System Level Example

99

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/30

/200

7

7/7/

2007

7/14

/200

7

7/21

/200

7

7/28

/200

7

8/4/

2007

8/11

/200

7

8/18

/200

7

8/25

/200

7

9/1/

2007

9/8/

2007

9/15

/200

7

9/22

/200

7

Date

OA

Tem

p (º

F), F

an S

peed

(% m

ax.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Duc

t Sta

tic P

ress

ure

("H

2O)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

VFD programming restored on 9/20/07, returned to ‘auto’ operation. Fan speed reduced, duct pressure is now normal and stable.

Page 100: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

100

Resources

Page 101: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Resources

Xcel Energy: www.xcelenergy.com/recomm

101

Page 102: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Resources Mills study (2009): “Building Commissioning: A Golden Opportunity for

Reducing Energy Costs and Greenhouse-gas Emissions.”. Meta-study of Cx and EBCx projects.

PECI (2009): “A Study on Energy Savings and Measure Cost Effectiveness of Existing Building Commissioning.” Measure-level study.

EPA’s “A Retrocommissioning Guide for Building Owners.” EBCx desk reference.

Building Commissioning Association (BCA), “Best Practices in Commissioning Existing Buildings.” A summary of the EBCx process.

102

Page 103: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Resources Additional EBCx training:

PECI AABC Commissioning Group Association of Energy Engineers Building Commissioning Association National Environmental Balancing Bureau Testing Adjusting and Balancing Bureau University of Wisconsin-Madison

CCC’s “Building Performance Tracking Handbook.”

Guide for performance tracking.

103

Page 104: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Resources California Commissioning Collaborative (www.cacx.org)

Case studies Tools and templates Guidelines

Commercial Building Energy Consumption Survey (CBECS)

Consumption and expenditure data (country-wide) Energy Star is based on CBECS data http://www.eia.gov/consumption/commercial/

104

Page 105: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of

Questions / Discussion

Thank you! Dave Moser, PE Senior Engineer [email protected] 503-961-6103