+ All Categories
Home > Documents > RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ......

RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ......

Date post: 19-Jul-2018
Category:
Upload: hoangliem
View: 219 times
Download: 0 times
Share this document with a friend
16
Hanson Building Products chimney solutions Uniclass L5211 CI/SfB Ng2 (47) August 2009 rediflow concrete gas flue system RED BANK ®
Transcript
Page 1: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Hanson Building Products chimney solutionsUniclassL5211

CI/SfBNg2(47)August 2009

rediflow concrete gas flue systemRED BANK®

Page 2: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Rediflow Concrete Gas Flue System

2

Rediflow the complete gasflue block system

Hanson Red Bank’s range of

Rediflow pre-cast concrete gas

flue block system manufactured

to BS EN 1858 Chimney -

Components - Concrete flue blocks

(Type B flue blocks).

The innovative tongue and

groove design helps eliminate the

possibility of escaping flue

condensates and ensure the safe

discharge of the flue gases.

Energy Efficiency Rating

Current Potential

Very energy efficient – lower running costs

Not energy efficient – higher running costs

UK 2008 U

AB

CD

EF

G

(93-100)

(81-92)

(66-80)

(51-65)

(36-50)

(21-35)

(1-20)

EU Directive2002/91/EC

55

78

Energy Efficiency Requirements for New Dwellings

The latest 2006 revisions to Building Regulations ApprovedDocument L1A include strict rules on the calculation of carbonemissions from all new dwellings. Under current legislationthese are designed to ensure that carbon emissions arereduced by 20% compared to the 2002 Regulations.

As part of the Standard Assessment Procedures (SAP)secondary heating appliances have to be included in thecalculations. These extend an opportunity to specify highefficiency gas fired appliances that will help meet theGovernments target and gain carbon credits, whilst satisfyingpurchasers requirements for a ‘fireplace’ and focal point withassociated comfort and lifestyle benefits.

Contents

The complete product range 4-7

Detached property - typical flue system 8

Chimney construction & deep recess options 9

Semi-detached property - typical flue system 10

Timber framed property - typical flue system 11

Typical recess installations 12

Termination of flue systems 13

Installation, inspection & testing 14-15

Front and inside cover photo courtesy of:Paragon - Focus III HMVI Brass Antique Wellington Coals

Page 3: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

3

The Benefits of Installing a Chimney

If secondary heating is not specified, the SAPcalculation used to determine carbon emissions‘defaults’ to electric as the secondary heating type.

Electricity is a carbon intensive energy source and by specifying a modern high efficiency gas firesubstantial carbon savings can be achieved. These carbon credits can then be used to offsetcosts of other aspects of the construction such as insulation and glazing.

Choosing the Secondary Heating Applianceat Planning Stage is Vital

To maximise the potential carbon savings andbenefits the correct flue size and secondaryheating appliance must be specified at the designstage. Although this decision has usually been leftuntil after completion of the building, it is essentialthat the most appropriate appliance is specified, if not the SAP calculation will default to carbonintensive electric heating or an inefficient open fire or appliance.

Appliance Choice and Application

Rediflow concrete gas flue blocks are suitable foruse with approved radiant and convector gas firesand appliances with flue outlets up to 125mm dia.These include many Inset Live Fuel Effect gas fireswith a rated imput of up to 7kW, dependent on theappliance manufacturers recommendations andapproval for use with pre-cast flue blocks. Gas FlueBlocks are not suitable for use with Decorative FuelEffect gas fires requiring a minimum 175mm int. da.flue. (see Hanson Red Bank’s range of Concreteand Clay Flue Liners for Multi-Fuel Applications).

Page 4: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

RF1 ConcreteStarter Block

Rediflow Concrete Gas Flue System

The complete product range

142mm

115mm

405mm

325mm

222mm

RF1

400mm

270mm

222mm

490mm

200mm

415mm

142mm

222mm

490mm

115mm

RF2 ConcreteCover Block

RF21 Deep RecessConcrete Starter Block

RF22 Extra WideConcrete Cover Block

RF23 Extra WideConcrete Starter Block

RF24 Extra WideConcrete Cover Block

142mm385mm

222mm

270mm490mm

222mm

RF22

142mm490mm

222mm

RF24

RF2

RF3 222mm high coursing block with nib

142mm359mm

222mm

142mm359mm

147mm

142mm359mm

112mm

142mm359mm

72mm

RF3

RF4 high Plain Block without nib222mm high Coursing Block without Nib

142mm280mm

222mm

RF4

RF5 Concrete Side Offset Block120mm side offset

142mm400mm

222mm

120mm

side

offset

RF5

RF6 Concrete Rear Offset Block70mm rear offset

210mm280mm

222mm

70mmrearoffset

RF6

RF7 Vertical Exit BlockFor connection to twin wall metal flue pipe

181mm280mm

222mm

125mm int. diam.

161mm min. ext. diam.

RF7

210mm280mm

222mm

25mmrearoffset

RF12

RF21

RF23

Also available as a coursing block inthe following sizes:

72mm high Plain Coursing Block without nib112mm high Plain Coursing Block without nib147mm high Plain Coursing Block without nib

Also available: RF12 25mm Concrete Rear Offset BlockTo be used in conjunction with starterblocks in party wall situations

Also available as a coursing block inthe following sizes:

72mm high Coursing Block with Nib112mm high Coursing Block with Nib147mm high Coursing Block with Nib

142mm280mm

147mm

142mm280mm

112mm

142mm

72mm

280mm

4

Page 5: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

5

RF8 Angled Exit BlockFor connection to twin wall metal flue pipe. May be used as angled entry block in conjunction with RF9

181mm280mm

230mm

111mm

125mm min. int. diam.

RF8

RF10 Concrete Corbel Block For extended corbel blocks see RF61, RF62 and RF63

RF11 Gas Lintel BlockMay be used to carry single skin of brickwork in front of flue

142mm280mm

222mm

76mm

100mm555mm

65mm

RF9 Reverse Rebate BlockTo be used in conjunction with inverted RF8

142mm280mm

222mm

RF9

RF11

RF10

RF61 Extended Corbel Block552mm wide Extended Corbel Block

Also available:

RF62 665mm wide ExtendedCorbel Block

RF63 778mm wide ExtendedCorbel Block

Also available:

RF66 625mm wide StainlessSteel Bed Reinforcement

RF67 737mm wide StainlessSteel Bed Reinforcement

RF64 Stainless Steel Strap UnitTo be used in conjunction with Extended Corbel Block andStainless Steel Bed Reinforcement

RF65 Stainless Steel Bed Reinforcement515mm wide Stainless Steel Bed Reinforcement

114 ContemporaryCanon Head ChimneyPot 300mm, 450mm and 600mm high

625 GC5 Insert Terminal125mm int. dia.

242mm552mm

140mm

242mm665mm

140mm

242mm778mm

140mm

RF29 High Density BlockTo be used in conjunction with starter blocks in party wall situations

100mm540mm

215mm

RF29

RF61

RF62 RF63

300mm515mm

60mm

300mm

625mm

60mm

m

300mm

737mm

60mm

1045mm

50mm

80mm

RF64

RF65

RF66 RF67

Page 6: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

6

Rediflow Concrete Gas Flue System

RF34 Flue Block ConnectorTo be used in conjunction with RF7 and RF8

B = 125mm

113mm

B

RF35 - RF39 Twin Wall Pipe150mm to 1500mm

RF 35 1500mm length Twin Wall Flue PipeRF 36 900mm length Twin Wall Flue PipeRF 37 450mm length Twin Wall Flue PipeRF 38 300mm length Twin Wall Flue PipeRF 39 150mm length Twin Wall Flue Pipe

Int Ø 125mm

A

Int Ø

Timber frame products

FB1 150mm wide Flanking BlockTo be used in conjunction with RF1 Starter Blocks

FB1

FB2 163mm wide Flanking BlockTo be used in conjunction with RF2 Cover Blocks FB2

FB3 136mm wide Flanking BlockTo be used in conjunction with RF3 Bonded Blocks FB3

FB4 215mm wide Flanking BlockTo be used in conjunction with RF3 Bonded Blocks and RF8 Exit Block

FB4

FB6 Clay Flanking BlockTo be used in conjunction with RF21, RF22, RF23 and RF24 Deep Recess and Extra Wide Starter and Cover Blocks

FB6

FBL Top Lintel BlockFBL

FBZ Galvanised Steel ‘Z’ Section

FBZ

Add on range

RF28 RediflowFireproof Mortar580gm Tube Rediflow Fireproof Mortar

RF30 Rediflow Damp ProofInsulation Mat600mm (W) x 900mm (H) x 25mm (D)

To be inserted behind flue blocks inexternal wall situations

RF31 Rediflow Damp ProofInsulation Mat600mm (W) x 900mm (H) x 50mm (D)

To be inserted behind flue blocks inexternal wall situations

RF32 Rediflow Smoke Pellets6 13gm pellets per tube

NP1 Notice Plate andChecklist Pack

RF28

RF34

RF35

RF30

RF31

RF32

NP1

150mm

100mm

215mm

163mm

100mm

215mm

136mm

100mm

215mm

730mm

50mm

100mm

215mm

100mm

215mm

110mm

100mm

215mm

12

50

mm

125mm int. dia. Twin wall metal gas vent

Page 7: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

7

125mm int. dia. Twin wall metal gas vent

RF40 450mm LengthAdjustable PipeC = 50 - 380mm

Dimension C is theamount another pipe canslide inside the adjuster

Low Resistance Ridge Tiles

450mm

C

Int Ø

RF70 300mm lengthadjustable pipeC = 50 - 230mmInt Ø 125mm

300mm

C

Int Ø

RF41 Adjustable Bend

290mm

17

5m

m

165mm90º

RF48 Firestop Plate

460mm

RF44 Adjustable Wallband

RF47 Support Assembly

275mm

up to

RF45 Roof PlateTwo piece

460mm

191mm

50mm

460mm

RF46 Angled Flashing Kit 5° - 30°Complete with Storm Collar and Sealant

610mm

610mm

RF49 Angled Flashing Kit 5° - 45°Complete with Storm Collar and Sealant

RF53 Flat Roof Flashing KitComplete with Storm Collar and Sealant

610mm

150mm

610mm

460mm

250mm

460mm

RF50 GCI Terminal

RF42 Ridge Tile Adaptor

RF73 Ridge Tile AdaptorExtension BoxTo fit apex of steeply pitched roofs

640- 646 Clay Low ResistanceRidge TileAvailable in Half Round, Angle andPan Sections

Concrete Low ResistanceRidge TileAvailable in Half Round, Curved Angleand Segmental Sections

78mm

182mm

356mm

250mm

RF73

RF50

RF42

RF43

RF44

RF45

RF47

RF48

RF46

RF49

RF53

RF40

RF70

RF41

RF43 WallbandØ 125mm

Ø 125mm

Page 8: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Detached property – typical flue construction

Rediflow Concrete Gas Flue System

Damp ProofInsulation Mat

147mm high

RF3

641

RF2

RF44 Adjustable WallbandAlso available with 50mm extenson

RF41 Adjustable Bend0 - 90° Bend

RF30 Rediflow Damp Proof Insulation MatAlso available with 50mm deep insulation mat

RF8 Angled Exit Block

RF2 Cover BlockAlso available Deep Recess and Extra Wide cover blocks

RF1 Starter BlockIt is recommended that 3 starterblocks are used to form recess witha minimum 610mm high opening.

RF34 Flue Block Connector

RF5 Side Offset Block120mm side offset

641 Low Resistance TerminalAvailable in Half Round, Angle and Pan Sections

RF42 Ridge Tile Adaptor

RF3 147mm high BondedCoursing Block with nib Also available in 112 and 72mm high.

RF3 222mm high BondedBlock with nibMinimum of 2 straightblocks recommendedabove cover block beforeany offset blocks

8

RF35 1500mm length TwinAdjustable Flue PipeAlso available in 900, 450,300 and 150mm lengths

RF30

RF5

RF5

RF3

147mm highRF3

RF1

RF8

RF41

RF34

RF43

RF35

RF42

Page 9: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Detached property - masonry chimney termination

Damp ProofInsulation Mat

RF22 Deep Recess Cover BlockAlso available Standard and Extra Wide cover blocks

RF21 Deep Recess Starter BlockAlso available Standard andExtra Wide starter blocks

RF31 RediflowDamp Proof Insulation MatAlso available with 25mm thick insulation mat

RF21

RF61 552mm wide Extended Corbel BlockAlso available in 665 and 778mm wide

RF64 Stainless Steel Strap Unit

RF3 72mm high Coursing Block with nibAlso available in 147 and 112mm high

RF3 147mm high Bonded Coursing Block with nibAlso available in 112 and 72mm high

RF3 222mm high Bonded Block with nib

RF4 222mm high Plain Block without nibAlso available 147, 112 and 72mm highPlain Coursing Blocks without nib

RF7 Vertical Exit Block

RF65 515mm wide Stainless Steel Bed ReinforcementsAlso available in 625 and 725mm wide

RF22

RF3

RF3

RF30

RF64

RF61

RF4

RF65

RF4

RF7

114114 Contemporary Cannon Head Chimney Pot300mm, 450mm and 600mm high

625C GC5 Insert Terminal125mm int. dia.

9

147mm high

147mm high

222mm high

222mm high

Note: Brickwork used toshow the additional singleskin on face of flue blocks,but in practise this wouldalways be blockwork)

625C

Page 10: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Rediflow Concrete Gas Flue System

10

Semi-detached property – typical flue system

RF34 Flue Block Connector

RF3 147mm high Bonded Coursing Block with nibAlso available in 112 and 72mm high

RF3 222mm high Bonded Block with nib

RF2 Cover BlockAlso available Deep Recess and Extra Wide cover blocks

RF29 High Density Block

RF1 Starter BlockIt is recommended that 3 starter blocksare used to form recess with a minimum610mm high opening

RF8 Angled Exit Block

RF41 Adjustable Bend0º to 90º

RF44 Adjustable Wallband Also available with 50mm extension

RF36 900mm length Twin Wall Flue PipeAlso available in 1500mm, 450mm,300mm and 150mm lengths

RF 40 450mm length adjustable pipe

641 Low Resistance TerminalAvailable in Half Round,Angle and Pan Sections

RF42 Ridge Tile Adaptor

RF70 300mm length Adjustable PipeAlso available in 450mm length

147mm high

641

RF3

RF3

147mm highRF3

RF1

RF8

RF41

RF34

RF43

RF35

RF42

RF2

RF29

RF5RF3

RF3

RF40

RF29

Page 11: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

11

Timber framed property - typical flue system

FBZ Galvanised Steel ‘Z’ Section

RF8 Angled Exit Block

RF2 Cover BlockAlso available Deep Recess and ExtraWide cover blocks used in conjunctionwith FB6 131mm wide flanking blocks

RF1 Starter BlockAlso available Deep Recess and ExtraWide starter blocks used in conjunctionwith FB6 131mm wide flanking blocks

RF3 222mm high Bonded Block with nib

FB3 136mm wide Flanking BlockFB1 150mm wide Flanking BlockFB2 163mm wide Flanking BlockFB4 215mm wide Flanking Block

RF43 Wallband Also available with 275mm extension

RF34 Flue Block Connector

FBL Top Lintel Block

RF41 Adjustable Bend0º to 90º

RF40 450mm length Adjustable PipeAlso available in 300mm length

RF35 1500mm length Twin Wall Flue PipeAlso available in 900mm, 450mm, 300mm and 150mm lengths

RF3

RF1

RF8

RF41

RF34

RF43

RF40

RF35

RF42

RF2

RF3

RF3

641

Page 12: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Rediflow Concrete Gas Flue System

Typical recess installations

RF1 Starter Blocks in external wall with 65mm cavityand 25mm thick damp proof insulation mat

RF1

RF30 DPM

275

Brickwork

12.5mmplasterboardon dabs

8mm renderscratch finish

RF21 Deep Recess Starter Blocks in external wall with100mm cavity and 50mm thick damp proof insulation mat

RF23 Extra Wide Starter Blocks on first floor ofexternal wall.

12.5mmplasterboardon dabs

8mm renderscratch finish

RF1 Starter Blocks in party wall situation with highdensity blocks, flues offset at 550mm centres

12.5mmplasterboardon dabs

8mm renderscratch finish

RF21

RF31 DPM

300

Brickwork

RF23

RF31 DPM

300

Brickwork

275mm min

12.5mm plasterboard(min 8kg/m2) on dabs

8mm render, scratch finish

Plaster fillet must be continuous around fire opening

RF29 High Density Block

RF1 Starter Block

12

Page 13: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Termination of flue systems

Metal Twin Wall Flue Pipe for Angled Exit Block

Low resistance ridge terminals offer a discrete exitpoint for the flue. Eliminating the need for achimney stack or external metal flue pipe.

Masonry Chimney

A traditional masonry chimney stack can beconstructed on top of a cavity wall using HansonRed Bank’s structural reinforcing kit. The Bedreinforcement and stainless steel straps securelyanchor the stack into the masonry below.

Metal Twin Wall Flue Pipe for Vertical Exit Block

If desired or where it is not possible for the flue toreach the ridge line, the twin wall metal flue pipe canpenetrate through the roof slope using an angledflashing kit and terminating at a GC1 terminal.

Prefabricated Chimney on ridge

A range of prefabricated chimney stacks with orwithout flue terminations are available. The stacksare available, finished with brick slips, preparedblock slips or prepared for render.

13

Page 14: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Rediflow Concrete Gas Flue System

Installation, inspection and testing

measurements for Tongue and Groove are in mm unless stated otherwise

612.5

8

R3

R3

12.5

R3

12

5

60o

60oFlue

3mm

8mm

3mm

Note:An 8mm bead offireproof mortar shouldbe laid into the rebate(see opposite).

• blocks to be laid rebate up with an 8mm fireproofmortar bead to be applied into the rebate (as shown).

• joints should be pointed and any surplus mortarremoved from the flueway during constructionleaving a smooth uniform surface.

• ensure joints are completely sealed with jointing compound.

• if the blocks and surrounding courses of masonryfail to meet exactly on no account attempt to cutthe blocks but trim the surrounding masonry to suit.

• a minimum air gap of 50mm must exist between theoutside of the flue and any combustible material.

• it is essential that during construction andappliance installation the commissioningrequirements laid down in BS 5440 : Part 1are strictly followed. This should include visualchecks, smoke and spillage checks.

• for further details refer to the “Installation,Inspection and Smoke Testing Procedures”included in the Checklist and NoticePlate Pack.

Approved Document ‘J’ (ADJ)2002 Edition of the Building Regulations 2000

A flue system correctly constructed and installed inaccordance with Building Regulations and ourrecommendations, using these components will meetall current statutory requirements. For each flue system it is a requirement that theinstaller completes a ‘Checklist’ and Notice Plate’

The Checklist should ensure that the construction ofthe flue has been completed in accordance withregulatory requirements and copies should beoffered to the Client, Building Control Body and/orMain Contractor.

The Notice Plate contains information essential tothe correct application and use of the flue andshould be robust, indelibly marked and securely fixedin a permanent position within the building.

A ‘Checklist and Notice Plate Pack’ List No. NP1 isavailable. This contains a checklist, notice plate andself-sealing laminate cover together with guidancenotes on completion. It also includes detailedrecommendations on the installation of flue products,inspection and smoke testing procedures.

It is essential that the building of a flue block system is carried out correctly.

- to provide a flueway that is structurally sound

- to ensure the safe operation of the gas appliance installed

- the maximum overall height of the flue must not exceed 12 metres

- flue blocks can be terminated in the roof space and ducted to a lowresistance terminal at the ridge, or to a chimney stack.

Construction Guidelines (not appliance installation):

14

Page 15: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

It is important to follow a safetyprocedure programme i.e.

• check for damage to products

- follow installation instructions of systemand appliance

- comply with health and safety - British Standards

• decide on termination site and consideroptions available. It is recommended that the flue is installedinternally with a minimum length exposedexternally. All external runs should notexceed 3 metres in length.

• recess size to be considered dependent on appliance to be installed.

• height of flue should be assessed usingAnnex B of BS 5440-1: 2008, to amaximum height of 12 metres.

• whenever possible avoid offsets; a verticalflue is the preferred choice.

• flues should be smoke tested duringconstruction, at each floor level andfollowing installation of outlet block.The smoke test procedure is detailed inthe notice plate pack.

• a gas installer registered with theGas Safe Register must be used toconnect the appliance.

• if a hearth is required its height must betaken into consideration when calculatingthe finished height of the recess opening.

405mm Opening

3mm

3mm

3mm

3mm

3mm

3mm

67

8m

m O

peni

ng

Mortar Joint

Brick/Blockwork

10mm

215mm

215mm

10mm359mm

3mm

Hearth Level

3mm

10mm

RF1

RF2

RF3

RF3

RF1

RF1

Jo

intin

gd

eta

il

222mm

222mm

222mm

222mm

222mm

222mm

15

P

P From a structureon the roof

Above the highestpoint of intersectionwith the roof

1500mm if aridge terminal. Forany other terminal,as given inBS 5440-1:2000

Site inaccordance withBS 5440-1:2000

Q

Q

Q

Q

1500

1500

45°

700

25°

ADJ terminal location

Twin-wall metal pipe height against roof pitch

Page 16: RED BANK rediflow concrete gas flue system - TTFC Essex · (81-92) (66-80) (51-65) (36-50) ... Fireproof Mortar 580gm Tube Rediflow Fireproof Mortar RF30 Rediflow Damp Proof ... Hanson

Hanson Red BankAtherstone Road, MeashamSwadlincote, Derbyshire DE12 7ELTel: 01530 270333Fax: 01530 270542

Email: [email protected]/uk

Quality Assured

Q5001

Hanson UKHanson is one of the UK’s largest suppliers of construction materials. Our products includeaggregates, asphalt, ready-mixed concrete,bricks, blocks and cement. We are part of theHeidelbergCement Group, which employs63,000 people across five continents and is the global leader in aggregates and hasleading positions in cement, concrete andheavy building products.

This brochure is printed on Satimat Silk, an FSC certified product.Contains ECF pulp sourced from well managed and sustainable forests.

All dimensions are in mm, drawings not to scale and all sizes nominal.The colours in this brochure are as true as can be obtained by the normalprinting process. Hanson Red Bank is committed to a program ofcontinuous product development and reserve the right to alterspecifications without prior notification. For further product information orassistance please telephone our freephone sales line: (0800) 3285243.


Recommended