Redevelopment of Kilimani Police Station INVESTING IN COMMUNITY SECURITY AND WELFARE National Police Service PARTNERS Embassy of the Peoples’ Republic of China Nairobi City County Government Kenya Private Sector Alliance Foundation PROJECT MANAGER: State Department of Public Works Kilimani Project Foundation
Transcript

Redevelopment ofKilimani Police Station

INVESTING IN COMMUNITY SECURITY AND WELFARE National Police Service

PARTNERS

Embassy of the Peoples’ Republic of China

Nairobi City County Government

Kenya Private Sector Alliance Foundation

PROJECT MANAGER:State Department of

Public Works

KilimaniProject Foundation

I respectfully confirm that the Kilimani Police Division Redevelopment Project is an initiative of the Kenya Private Sector Alliance (KEPSA) Foundation in partnership with the Embassy of the People’s Republic of China, Nairobi City County government, Kilimani Project Foundation and the National Police Service (NPS).

This undertaking is one of its kind, which is consistent with corporate social responsibility (CSR) philosophy and the spirit of good neighborliness by the Kilimani Community for the welfare of the men and women in Police Service.

The uniqueness of this project underscores the unlimited possibilities

Foreword Project Conceptof what can be achieved where there is cooperation, understanding and appreciation of the belief and practice that security is everybody’s responsibility. It further exemplifies our commitment as NPS to build collaborative partnership with communities we serve, hence we look forward to witnessing similar initiatives in other parts of the Country.

As the Inspector General of the National Police Service, I acknowledge your sacrifice and contribution towards the project irrespective of the amount. It is our pledge every shilling counts and must be accounted for to you. It is therefore with humility and confidence I affirm that this special project heralds a new era in the transformation of the Police Service for the common good of the people of Kenya and citizens of the world.

Yours Faithfully

Mr Joseph K Boinnet, MGH, NSC (AU)

THE INSPECTOR GENERAL

Modern Police StationThe police station will be designed as a model public police station for Nairobi City County and the East Africa region. The project shall be developed in order to invest in community security and welfare. The jurisdiction is the Kilimani area.

Conducive Work and Living EnvironmentCurrently the police station is in dire need of redevelopment in order to provide a conducive environment for the police officers to undertake their duties and to live. The police station has been master-planned on the existing 5 acre parcel of land where the modern facilities shall be developed in two phases.

2

The project is located on Jabavu Road in Kilimani area.

Project Location Existing facilities

3

The project was conceived and is being implemented through a partnership between five key partners. This was after after a series of project development meetings that led to the signing of a memorandum of understanding that outlines the terms of engagement.

Project Partnership and signing of MOUThe following are the project partners:1. National Police Service2. The Embassy of the People’s Republic of China3. Nairobi City County government4. KEPSA Foundation5. Kilimani Project Foundation.

H. E. Dr Evans Kidero, Governor, Nairobi City County

Irungu Houghton, Chairman, Kilimani Project Foundation

Amb Dennis Awori, KEPSA Chairman

“Good security is a major component towards providing an enabling business environment.”

Carol Kariuki, KEPSA CEO

“KEPSA has prioritised improved security as a major factor

towards growing our economy.”

4

Peter Kattam (OCPD) and Phyllis Kanina (DCIO) with Chinese guest

Joseph Boinett, Inspector General,

National Police Service

Karanja Kabage, Chair, Project Steering Committee

Lee Karuri, Chair, KEPSA Foundation

H. E. Dr Liu Xianfa, Ambassador,

Peoples’ Republic of China

Dr Robert Ayisi, Secretary, Nairobi City

County

H. E. Dr Liu Xianfa and Inspector General Boinett meet the press

5

16.6

7 %

16.6

7 %

123456789011121314151

12345678910111213141516

1234567891011121314151617181920212223242526272829

123456789101112131415

12

34

5

1 2 3 4 5 6 7 8 9 01 11 21 31 41 51

1 2 3 4 5 6 7 8 9 01 11 21 31 41 51 61

12

34

56

78

910

1112

1314

1516

1718

1920

2122

2324

2526

2728

2930

12

34

5

1234567

03 x 0. 851 = 4. 057

03 x 0. 351 = 4. 006

8 x 0.150 = 1.200

8 x 0.150 = 1.200

8.33 %8.33 %

8.33 % 8.33 %

8 x 0. 051 = 1. 002

WW

RDRD

8.33 % 8.33 %

8 x 0. 051 = 1. 002 2

5 x

0.15

0 =

3.75

0

BLOCK C

BLOCK GBLOCK E

BLOCK H

BLOCK D BLOCK F

New Block New Block

New Block

Staff car park

Staff car park

gnineercSmooR

lareneGseiriuqnEstneG

seidaL

CleaningerotS

eciffOkaolC

remrofsnarTmooR

rotareneGmooR

hctiwSmooR

nI - egrahcyruomrA /Line yruomrA

DPCOOICD

stropeReciffO

gnitiaWaerA

emirCeciffO O.C

emirCO.C

ytteP

evihcrA

tibihxEerotS

sdroceReciffO

oidaRmooR

ytupeDOCS

eciffO

aterceSyr

OCSeciffO

nehctiKlareneG

looP eciffO

gnitnirPnoitatS

renaelC 'serots

noitpeceR

SCOTNEMTRAPED

klaW - nitesolC

kaolC

klaW - nitesolC

kaolC

DTOeciffO

ytupeDDTO

eciffO

aterceSyr

OCN 's/ puSsrosivre

eciffOsdroceR

eciffOerotS

stneG

seidaL

seidaLstneG

FAMILYPROTECTION UNITnoitpeceR

lareneGeciffO

draytruoC

tluassAyralgruBedicimoH

elaMstnediseR

elameFstnediseR

weivretnImooR

weivretnImooR

kaolCkaolC

ecarreT

stropeReciffOrollesnuoC 's

eciffO

yrdnuaLnehctiK

CommonmooR /TV

klaW - nitesolC

klaW - nitesolC

Washrooms

Soiled Linen

Cleaning

Clean Linen

Washrooms

Kitchen

Store

Isolation Violent

Isolation

Store

IsolationViolent

Isolation

V.I.P

V.I.P

Courtyard Courtyard

SearchRoom

VisitationRoom

V.I.P

V.I.P

HoldingCell

HoldingCell

HoldingCell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5Cell

Bed

1

Bed

2

Bed

3

Bed

4

Bed

5C

ell

Bed

1

Bed

2

Bed

3

Bed

4

Bed

5C

ell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5 Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5 Cell

Bed 1

Bed 2

Bed 3

Bed 4

Bed 5 Cell

Bed

1

Bed

2

Bed

3

Bed

4

Bed

5C

ell

Bed

1

Bed

2

Bed

3

Bed

4

Bed

5C

ell

SeriousCrime

Bed 2

Bed 1

Bed 3

Bed 2

Bed 1

Bed 3

SeriousCrime

SeriousCrime

Bed 2

Bed 1

Bed 3

Bed 2

Bed 1

Bed 3

SeriousCrime

Surgery Room

Washroom EntryRoom

ExitRoom

Sterile Goods

Waste Lobby Doctor NurseWashroom

Ward

ExaminaRoom

Wai o Pharmacy

PharmacyStorage

Wai o

CounsellorCounsellor

Counsellor

GoodsReciept

Manager'so

ChilledStorage

Waste

DryGoods/Food

Store

Washroomsand Changing

Rooms

KitchenServery/Waiters'

Equipment

Dishwasher

Sea

GentsLadies

M-Pesa

VegetableStoreDisabled

Games

DairySupplies

CIFFARTTNEMTRAPED

BLOCK H

Child ProtectionUnit

New block

Main Block

Garage

Impounded Vehicles

Car Park

Second Entrance

Jabavu Road

Medical Centre

Officers’ mess andRecreation centre

Screening & generalinquiries

Gatehouse

Master PlanThe modern police station shall include the following facilities:1. Gate house and boundary wall

2. Reception, screening and general enquiries centre

3. Car parking for staff, visitors and impounded vehicles.

4. Modern building, housing various police departments

5. A medical centre

6. A nursery and children’s playground

7. Recreational amenities

8. Library/resource - research centre and archives

9. Improved residential facilities

10. Standby generator

11. Borehole

12. ICT connectivity

13. Community security liaison office

14. Future residential facilities for police officers

15. Furniture and furnishings

Project Facilities

6

Artist Impression: front view

7

Officers’ mess and medical centre

Main building: rear viewScreening room and gatehouse

Officers’ mess and medical centre

Artist Impressions

Garage8

Officers’mess

Modern officesMeeting rooms

Artist Impression

Reception and waiting area Gymnasium 9

Nursery school and playground

Training and resource centre Medical centre

Improved residential facilities

Retail CentreRecreation Centre

Interior Concepts

10

Design and resource mobilisation period: 6 monthsThe first phase of the development includes the construction of the new modern buildings that have been planned. The design development phase and resource mobilization is from 1st October 2016.

Construction PhaseThe first phase of the project shall be constructed over a period of 2 years from January 2017 to December 2018.

Phase 2: New residential facilitiesThe new residential facilities shall be constructed within the same area where existing facilities are located.

Phase 1: Kshs 300 millionThe budget for phase 1 of the project is estimated at a cost of Kshs 300 million to be raised through the effort of the project partners.

Phase 2: Kshs 200 millionThe second phase of the project shall entail the development of new residential police faciities at an estimated cost of Kshs 200 million.

Project Budget: Kshs 500 million

Project AuditorThe project auditors are PriceWaterhouse Coopers (PWC) who shall audit and ensure that the project funds are properly utilised and accounted for.

Timelines 2016 - 2018

SEPTEMBER 2016 - MARCH 2017 RESOURCE

MOBILIZATION

JANUARY 2017 GROUND BREAKING

PHASE 1 CONSTRUCTION

JANUARY 2017 - DECEMBER 2018 (24 MONTHS)

Project Programme

11

Project advisors and consultantsArchitectsDesign ARTitude Ltd

Quantity SurveyorsTower Cost Consultants

Civil and Structural EngineersMetrix Integrated Consultancy

Mechanical Engineers & Electrical EngineersUrban Renewed Ltd

AuditorsPriceWaterhouse Coopers (PWC)

Project SecretariatKEPSA Foundation2nd Floor Shelter Afrique building Tel: +254 20 2730371/2, +254 735 999979 Email: [email protected], www.kepsa.or.ke

INVESTING IN COMMUNITY SECURITY AND WELFARERedevelopment of Kilimani Police Station

Computer generated images and interior concepts are for illustrative purposes only

National Police Service

PARTNERS

Embassy of the Peoples’ Republic of China

Nairobi City County Government

Kenya Private Sector Alliance Foundation

PROJECT MANAGER:State Department of

Public Works

KilimaniProject Foundation

Project Account Details Payments to KEPSA Foundation, NIC Bank, City Centre Branch AC No. 1004231208; Paybill No. 488700, A/C KEPSA

No Cash PaymentsPayments to be made by • Cheque • Bank Transfer • Paybill Number