Date post: | 27-Mar-2015 |
Category: |
Documents |
Upload: | diego-clark |
View: | 212 times |
Download: | 0 times |
Regional Radiocommunication ConferenceRegional Radiocommunication ConferenceDigital Terrestrial BroadcastingDigital Terrestrial Broadcasting
THE MONDAY REPORT
ON SUNDAY!
Pham Nhu HaiRadiocommunication Bureau
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
The Fourth IterationThe Fourth Iteration
Input dataResultsComplementary analysisSome concluding thoughts
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Requirements: I4 – I3Requirements: I4 – I3
-1200
-1000
-800
-600
-400
-200
0
Diff
Diff -1004 -290 -631 -10
DT1 DT2 DS1 DS2
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Input requirementsInput requirements
-500
-400
-300
-200
-100
0
CPV MLI SVK BFA ISR MRC SEN I AZE IRN MDG TUN
Total reduction of 1935
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
0
50
100
150
200
ALG MLT F
Input requirementsInput requirements
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band III requirementsBand III requirements
-1000
-500
0
500
T-DAB -309 -988 -641
DVB-T 61 -545 -446
I2-I1 I3-I2 I4-I3
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band IV&V requirementsBand IV&V requirements
-3000
-2000
-1000
0
1000
DVB-T
DVB-T -2465 -2846 -848
I2-I1 I3-I2 I4-I3
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Other primary servicesOther primary services
0
1000
2000
3000
4000
5000
6000
Included
ARS
AZE
BEL
CTI
EGY
F
G
GEO
IRN
ISR
JOR
KAZ
KGZ
MRC
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Administrative declarationsAdministrative declarations
010000002000000300000040000005000000
TotalUsedEffective
Total 4220211 1046582 410320
Used 3728540 1007278 392267
Effective 1900000 900000 350000
I2 I3 I4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
ALL to ALLALL to ALL
0
200
400
600
800
1000
Total
Total 992 67
A-A (G) A-A (S)
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
ONE to ALLONE to ALL
0
20000
40000
60000
80000
100000
Total
Total 77256 3756
1-A (G) 1-A (S)
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Acceptable margin!Acceptable margin!
3 dB on behalf on the administrations not present.
4 or 5 dB between many administrations
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Results = Results = Planning SoftwarePlanning Software (Inputs) (Inputs)
Digital requirements
OPS
Administrativedeclarations
Acceptable margins
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
The Great Results!The Great Results!
94%98%
VHF UHF
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
The Great Results!The Great Results!
94%98%
VHF UHF
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
The Great Results!The Great Results!
94%98%
VHF UHF
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band III Band III
0
2000
4000
6000
8000
10000
I1I2I3-dzI4
I1 7502 4831
I2 8151 5599
I3-dz 8037 5745
I4 8379 6703
T-DAB DVB-T
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band III - In %Band III - In %
0
20
40
60
80
100
I1I2I3-dzI4
I1 69.8 57.9
I2 78 66.6
I3-dz 88.7 78.6
I4 95 90.4
T-DAB DVB-T (V)
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band IV and VBand IV and V
0
20000
40000
60000
80000
I1I2I3-dzI4
I1 62692 46333
I2 60227 51222
I3-dz 55876 52229
I4 56533 55409
Total Assigned
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band IV & V - In %Band IV & V - In %
0
20
40
60
80
100
I1I2I3-dzI4
I1 73.9
I2 85
I3-dz 93.5
I4 98
DVB-T (U)
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band III by % satisfiedBand III by % satisfied
0
20
40
60
80
100
120
140
>60 >70 >80 >90
% requirements satisfied
No
of a
dm
I1I2I3I4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band IV/V by % satisfiedBand IV/V by % satisfied
0
20
40
60
80
100
120
>60 >70 >80 >90
% requirements satisfied
No
of a
dm
Iter 1Iter 2Iter 3Iter 4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
A Confession!A Confession!
Apologies to EGY and SOMTwo omissions by CCPU– Application of acceptable margin to
EGY requirements– Application of 3 dB acceptable margin
to SOM (not present) requirements
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Improved results!Improved results!
EGY: – FOUR more requirement satisfied
SOM: – ONE more for SOM– ONE more for YEM
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
T-DAB challenged areasT-DAB challenged areas
0%
20%
40%
60%
80%
100%
CYP ISR PSE BEN MWI ETH SEN COM GNB
I3I4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band III DVB-T challenged areasBand III DVB-T challenged areas
0%
20%
40%
60%
80%
100%
SYR TGO KWT BEN COMMDG CPV MCO ISR PSE GNB
I3I4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Band IV&V challenged areasBand IV&V challenged areas
0%
20%
40%
60%
80%
100%
ISR GNB CPV AZE QAT CYP COMMCO BHR
I3I4
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Remarks in the PlanRemarks in the Plan
Three important remarks– R1 : Digital to Analogue– R2 : Digital to Digital– R3 : Digital to OPS
Only relevant declarations apply
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Complementary analysisComplementary analysis
R1 : Digital to AnalogueRRC Planning Software– Digital viewpoint– Analogue viewpoint
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Some concluding thoughtsSome concluding thoughts
Just the beginningContinue working relationshipAppreciation and thanks– Administrations– Leaders– Colleagues
RRC-06 Monday Report 11 June 2006 Geneva Switzerland
Signing off!Signing off!
You are the Champions!