Work Order # rk Order Charge Num Work Order Title Program # Requestor Action otal Cost Estima al Costs Incu Date Received Required Date Status 2113 Update a Host Confirmation Packet Template ESMD Betty Grisham Updating a Host Confirmation Packet template for the Exploration Experience exhibit. $0.00 10/05/2010 10/11/2010 On Schedule 2114 0712H.3.M.6.83.2114 USA Science & Engineering Festival – OC travel and staffing support Rev. 1 HQ PAO Jim Hull ################### $3,629.00 10/04/2010 10/06/2010 Completed 2115 Campaign: MSFC honors Native American Heritage Month CS20 Angela Storey Research, write, coord and distribute media products supporting the Nov. 4 event $0.00 09/25/2010 11/11/2010 Completed 2116 0712H.3.M.6.83.2116 ESMD OC Travel to Vermont 3.0 Burlington, VT ESMD Betty Grisham NASA’s ESMD will support the Vermont 3.0 Burlington, VT. This event will be supported with the NASA Exploration $1,580.63 10/05/2010 10/07/2010 Completed 2117 0712H.3.M.6.82.2117 ESMD Home & City monitor converting to touch screen ESMD Betty Grisham The current monitor used in the ESMD NASA Home and City exhibit needs to be shipped to the manufacturer (NEC) to $1,800.00 $1,849.90 10/06/2010 10/31/2010 Completed IDIQ - USSEF 0712H.3.Q.0.08.LPRP U.S. Science & Engineering Festival Rev. 1 Lunar Quest Brian Mitchell Staff Lunar Quest exhibit booth at the U.S. Science & Engineering Festival on $1,330.77 10/07/2010 10/12/2010 On Schedule IDIQ - USSEF Moran U.S. Science and Eng Festival - Moran Rev. 1 Lunar Quest Danielle Moran Staff Robotic Lunar Lander Development Project exhibit area at the U.S. Science and $665.24 10/08/2010 10/08/2010 On Schedule 2118 0712H.3.M.6.90.2118 14th Annual High School Senior Day EMB Madeline Hereford November 20th, 2010. Pencils are needed for participants to complete the Senior Day $212.43 $212.43 09/28/2010 11/15/2010 Completed 2119 ESMD EE work: Graphics for the inside of the Exploration Experience ESMD Betty Grisham ################### $0.00 09/22/2010 11/19/2010 Completed 2120 0712H.3.M.6.82.2120 OSHA 501 Training Rev. 1 CS01 Stuart Mills Attend OSHA 501 training in Tuscaloosa, AL. November 29th – December 2nd, 2010. $1,094.57 10/12/2010 10/20/2010 On Schedule 2121 0712H.3.M.6.83.2121 Von Braun Memorial Symposium CS10 Dennis Boccippio Attend the Von Braun Memorial Symposium to observe sessions related to the current space policy environment. $250.00 10/12/2010 10/25/2010 On Schedule 2122 Challenger Center CS20 Ola Metcalfe Remove 1:5 Hubble model at the Challenger Center in Chattanooga. Replace with the 1:3 Apollo Command module Scheduled date for $0.00 09/01/2010 Completed
Transcript
Page 1: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

Work Order # rk Order Charge Num Work Order Title Program # Requestor Action otal Cost Estimaal Costs IncuDate Received Required Date Status2113 Update a Host Confirmation Packet

TemplateESMD Betty Grisham Updating a Host Confirmation

Packet template for the Exploration Experience exhibit.

$0.00 10/05/2010 10/11/2010 On Schedule

2114 0712H.3.M.6.83.2114 USA Science & Engineering Festival – OC travel and staffing support Rev. 1

HQ PAO Jim Hull ################### $3,629.00 10/04/2010 10/06/2010 Completed

2115 Campaign: MSFC honors Native American Heritage Month

CS20 Angela Storey Research, write, coord and distribute media products supporting the Nov. 4 event

$0.00 09/25/2010 11/11/2010 Completed

2116 0712H.3.M.6.83.2116 ESMD OC Travel to Vermont 3.0 Burlington, VT

ESMD Betty Grisham NASA’s ESMD will support the Vermont 3.0 Burlington, VT. This event will be supported with the NASA Exploration

$1,580.63 10/05/2010 10/07/2010 Completed

2117 0712H.3.M.6.82.2117 ESMD Home & City monitor converting to touch screen

ESMD Betty Grisham The current monitor used in the ESMD NASA Home and City exhibit needs to be shipped to the manufacturer (NEC) to

$1,800.00 $1,849.90 10/06/2010 10/31/2010 Completed

IDIQ - USSEF 0712H.3.Q.0.08.LPRP U.S. Science & Engineering Festival Rev. 1

Lunar Quest Brian Mitchell Staff Lunar Quest exhibit booth at the U.S. Science & Engineering Festival on

$1,330.77 10/07/2010 10/12/2010 On Schedule

IDIQ - USSEF Moran

U.S. Science and Eng Festival - Moran Rev. 1

Lunar Quest Danielle Moran Staff Robotic Lunar Lander Development Project exhibit area at the U.S. Science and

$665.24 10/08/2010 10/08/2010 On Schedule

2118 0712H.3.M.6.90.2118 14th Annual High School Senior Day EMB Madeline Hereford November 20th, 2010. Pencils are needed for participants to complete the Senior Day

$212.43 $212.43 09/28/2010 11/15/2010 Completed

2119 ESMD EE work: Graphics for the inside of the Exploration Experience

ESMD Betty Grisham ################### $0.00 09/22/2010 11/19/2010 Completed

2120 0712H.3.M.6.82.2120 OSHA 501 Training Rev. 1 CS01 Stuart Mills Attend OSHA 501 training in Tuscaloosa, AL. November 29th – December 2nd, 2010.

$1,094.57 10/12/2010 10/20/2010 On Schedule

2121 0712H.3.M.6.83.2121 Von Braun Memorial Symposium CS10 Dennis Boccippio Attend the Von Braun Memorial Symposium to observe sessions related to the current space policy environment.

$250.00 10/12/2010 10/25/2010 On Schedule

2122 Challenger Center CS20 Ola Metcalfe Remove 1:5 Hubble model at the Challenger Center in Chattanooga. Replace with the 1:3 Apollo Command module

Scheduled date for

$0.00 09/01/2010 Completed

Page 2: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2123 0712H.3.M.6.83.2123 ESMD Tour of Smyrna, Delaware Rev. 1

ESMD Betty Grisham NASA’s ESMD will support the 2010 Delaware AeroSpace Education Foundation Family

$1,306.63 10/12/2010 10/19/2010 Completed

2124 0712H.3.M.6.82.2124 50th anniversary photosMatting, Framing and plaques

CS20 Ola Metcalfe CS20 (Exhibits) Please provide 2 engraved plaques ONLY

Matting and framing for (2) 14

$45.36 $45.36 09/30/2010 10/07/2010 Completed

2125 0712H.3.M.6.90.2125 Native American Chairperson EMB Cindy Spidel Native American Heritage Event at Space & Rocket Center. Marshall is responsible

$3,901.20 $3,909.30 10/04/2010 11/04/2010 Completed

2126 0712H.3.M.6.83.2126 International Council of Air Shows HQ AERO Steve Lighthill ################### $1,229.50 10/13/2010 10/20/2010 Completed

2127 0712H.3.M.6.83.2127 HQ PAO USA Science & Engineering Festival: Purchase of rubber stamps / ink and staffer lanyards Rev. 2

HQ PAO Jim Hull ################### $764.64 $764.64 10/12/2010 10/20/2010 Completed

2128 0712H.3.M.6.55.2128 Von Braun Memorial Symposium ED Dan Dumbacher Attend the Von Braun Memorial Symposium to observe sessions related to the current space policy environment. Observe NASA speakers and

$250.00 10/14/2010 10/25/2010 Completed

2129 Dome Tent and Portable Planetarium Skin Graphics

HQ PAO Jim Hull ################### $0.00 10/12/2010 10/26/2010 Completed

2130 0712H.3.M.6.55.2130 Von Braun Memorial Symposium CS10 Laurie Provin Attend the Von Braun Memorial Symposium to support sessions/events featuring MSFC personnel, provide feedback on presentations, and collect measurement metrics &

$250.00 10/20/2010 10/25/2010 Completed

2131 0712H.3.M.6.55.2131 Von Braun Memorial Symposium CS10 Laurie Provin Attend the Von Braun Memorial Symposium to support sessions/events featuring MSFC personnel, provide feedback on presentations, and collect measurement metrics &

$250.00 10/20/2010 10/25/2010 Completed

2132 0712H.3.M.6.90.2132 CFC Kick Off Rally EMB Linda Southworth To purchase 80 table skirt clips to fit new tables in 4316.Total cost is NGT $100.00

$100.00 $77.76 10/20/2010 10/20/2010 Completed

2133 0712H.3.M.6.90.2133 Alabama A&M University Annual High School Senior Day

EMB Madeline Hereford ################### $1,295.00 $1,295.00 09/09/2010 11/15/2010 Completed

Page 3: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2134 Move 1:100 ISS model from HG to MTV and back

CS20 John Dumoulin Move 1;100 ISS model and stand from HG to Marshall TV early Monday morning for afternoon studio shoot; return model and stand to HG the next day.

$0.00 10/15/2010 10/26/2010 Completed

2135 CFC Kickoff CS20 Betty Humphery Provide exhibit for CFC Kickoff at Building 4316 on October 21, 2010. Exhibit hours are 12pm to 3pm.

$0.00 10/19/2010 10/21/2010 Completed

2136 0712H.3.M.6.82.2136 US Science and Engineering Festival – Lunar Globe install

Lunar Quest Brian Mitchell & Ste ################### $1,745.90 10/13/2010 10/15/2010 Completed

2137 Shuttle Pride Social (Live Launch Event)

CS20 Betty Humphery Provide exhibit for Shuttle Pride Social at Building 4316 on November 1, 2010. Exhibit

$0.00 10/19/2010 11/01/2010 Completed

2138 0712H.3.M.6.83.2138 ESMD OC Travel to Greene Middle School Providence, RI Rev. 1

ESMD Betty Grisham NASA’s ESMD will have the Exploration Experience at Nathanael Greene Middle School in Providence, RI

$2,496.85 10/12/2010 10/15/2010 Completed

2139 0712H.3.M.6.82.2139 HQ PAO Mark III suit photo-op – repair visor

HQ PAO Jim Hull ################### $250.00 10/14/2010 10/22/2010 On Schedule

2140 0712H.3.M.6.82.2140 ROCS text, protection, & move to USSRC

CS20 Ola Metcalfe Add text to the ROCS hardware that will be displayed at USSRC; protect access to cutaway sections of the

$75.00 10/13/2010 10/27/2010 On Schedule

2141 0712H.3.M.6.83.2141 FedEx bookmark package to Alice Wesson

HQ PSD Dan Woodard Send book marks to Alice Wesson via FedEx

$68.62 10/22/2010 10/22/2010 Completed

2142 0712H.3.M.6.82.2142 Tire Stand for ESMD Rev. 1 ESMD Betty Grisham Building a stand for the Institutional Lunar tire. This stand and tire will be used in Peoria, AR at the Challenger

$283.99 $283.99 10/07/2010 10/27/2010 Completed

2143 0712H.3.M.6.83.2143 Creative Director Support Outreach at the ESMD trailer in Providence

ESMD Ann Yelle Support Outreach at the ESMD trailer in Providence, RI October 28-29, 2010.$1394.50

$1,394.50 10/21/2010 10/29/2010 On Schedule

2144 0712H.3.M.6.83.2144 Exploration Experience will be visiting the West Caldwell School District in West Caldwell, NJ November 1-4, 2010

ESMD Betty Grisham The Exploration Experience will visit the West Caldwell School District in West Caldwell, NJ November 1-4, 2010. This

$1,901.25 10/21/2010 10/25/2010 Completed

2145 0712H.3.M.6.82.2145 Two Photo Kiosks for Dryden PAO & Education

CS20 John Dumoulin Build and deliver copies of the astronaut photo kiosks to the Education and PAO offices at

$16,160.00 $6,340.03 04/01/2010 10/31/2010 On Schedule

2146 Native American Heritage Month CS20 Betty Humphery Provide exhibit support for Native American Heritage Month at Building 4200 lobby

$0.00 10/22/2010 11/01/2010 Completed

Page 4: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2147 Pop-up for 4203 CS20 Deliver a pop –up to the lobby $0.00 10/19/2010 10/20/2010 Completed2148 MA – ISS 10th anniversary

symposiumCS20 Steve Roy ################### $0.00 10/12/2010 10/22/2010 Completed

2149 ISS Science – BXF MABE experiment overview for ISS science Website

CS20 Steve Roy ################### $0.00 10/21/2010 10/29/2010 Completed

2150 0712H.3.M.6.55.2150 Koshut - Von Braun Memorial Symposium

CS30 Sharon Cobb Attend the Von Braun Memorial Symposium to support sessions/events featuring MSFC Director Robert Lightfoot, provide feedback on presentations, and collect

$250.00 $250.00 10/14/2010 10/29/2010 Completed

2154 0712H.3.M.6.83.2154 International Observe the Moon Night

Lunar Quest Brian Mitchell & Ste Sci-Quest will provide a hands-on activity and set up there planetarium dome at the

$892.50 $892.50 10/13/2010 10/29/2010 Completed

2151 0712H.3.M.6.90.2151 Equal Employment Manager EMB Allan Day ################### $5,000.00 $5,000.00 10/05/2010 10/29/2010 Completed2152 2010 Veterans Day Parade CS20 Betty Humphery 2010 Veterans Day Parade

scheduled for November 11, 2010, downtown Huntsville, Alabama. Arrive by 9am in the parking lot on Clinton

$0.00 10/19/2010 11/11/2010 Completed

2153 0712H.3.M.6.82.2153 Lunar Exploration Island Benson’s Image Display in Dulles/United corridor Part 2 Rev. 1

HQ PSD Ann Mix ################### $20,341.00 $20,341.00 08/10/2010 10/30/2010 On Schedule

2155 0712H.3.M.6.83.2155 NASA Benefits Car Modifications Rev. 1

ESMD Betty Grisham ESMD has requested modifications be made to the current NASA Benefits Car exhibit. Total estimated cost

$9,208.00 $9,311.02 10/27/2010 11/30/2010 On Schedule

2156 10/18 All hands article CS20 Dom Amatore Write an article for the 10/21 Marshall Star recapping the 10/18 All hands meeting with

$0.00 10/14/2010 10/20/2010 Completed

2157 Chief Technologist interview for TTP CS20 Dom Amatore Write an article interviewing Andrew Keys, Marshall chief

$0.00 09/10/2010 09/30/2010 Completed

2158 Green purchasing article for TTP CS20 Dom Amatore Write an article on green purchasing initiatives at

$0.00 09/10/2010 09/30/2010 Completed

2159 Center Director perspective on center initiatives for TTP

CS20 Dom Amatore Write an article interviewing Center Director Robert Lightfoot on his perspective of Marshall's safety, collaboration

$0.00 09/10/2010 09/30/2010 Completed

2160 Update on center initiatives for TTP CS20 Dom Amatore Write an article updating Marshall's safety, collaboration and inclusion initiatives for To

$0.00 09/10/2010 09/30/2010 Completed

2161 Interview with OSAC Director Bobby Watkins for TTP article

CS20 Dom Amatore Write an interview article with Bobby Watkins, new OSAC

$0.00 10/08/2010 11/12/2010 Completed

Page 5: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2162 IPA TTP article CS20 Dom Amatore Write an article on the Intergovernmental Personnel Act program at Marshall for To

$0.00 10/08/2010 11/12/2010 Completed

2163 Incident- and Injury-free workplace article for TTP

CS20 Dom Amatore Write an article on Marshall's Incident- and Injury-free

$0.00 10/08/2010 11/12/2010 Completed

2164 How to write winning proposals TTP article

CS20 Dom Amatore Write an article on proposal writing tips for To the Point

$0.00 10/08/2010 11/12/2010 Completed

2165 Campaign: Veterans Day observations at Marshall Nov. 10-11

CS20 Angela Storey Write products, conduct media callouts & escort to support Veterans Day events at

$0.00 10/27/2010 11/18/2010 Completed

2166 11/18 Star: Marshall developing Foreign Object Debris Control Program

CS20 Angela Storey Write a Star story for the 11/18 issue about development at Marshall of a comprehensive Foreign Object

$0.00 10/26/2010 11/18/2010 Completed

2167 11/18 Star: Ares 1-X Roll Control System becomes Space & Rocket Center exhibit

CS20 Jennifer Stanfield Write a Star story for the 11/18 issue about the Ares 1-X roll control system engineering

$0.00 10/28/2010 11/18/2010 Completed

2168 0712H.4.M.6.82.2168 Space Shuttle Legacy Traveling Exhibit

Shuttle John Dumoulin ################### $18,000.00 $11,747.81 09/07/2010 06/30/2011 On Schedule

2170 0712H.4.M.6.83.2170 FY11 Open Ended Trailer Maintenance

ESMD Betty Grisham ################### $0.00 $14,907.68 11/03/2009 09/30/2011 On Schedule

2171 0712H.4.M.6.83.2171 FY11 Open Ended Institutional Shop Supplies

Institutional Betty Grisham Open work order for general use shop supplies and other institutional items required for

$0.00 $9,452.01 11/03/2010 09/30/2011 On Schedule

2169 0712H.3.M.6.83.2169 Girls in Science and Eng Festival Rev. 1

RLLDP Danielle Moran Purchase supplies for Lunar Robotics workshop at Girls in Science and Engineering Day

$144.59 11/01/2010 11/04/2010 On Schedule

2172 Girls in Science Engineering Day at the University of Alabama in Huntsville (UAH)

CS20 Betty Humphery ################### $0.00 10/13/2010 11/06/2010 Completed

2173 Canyon Fest (DeKalb County) CS20 Betty Humphery ################### $0.00 10/29/2010 11/06/2010 Completed2174 0712H.3.M.6.83.2174 STS-133 Space Flight Awareness

Honorees StaffingCS30 Gena Cox Travel and Staff the Space

Flight Awareness Honorees Group for STS-133:

$2,069.51 10/29/2010 11/12/2010 On Schedule

2175 Marshall Star: Silver Snoopy honorees

CS20 Angela Storey Research, write and coordinate Marshall Star story with photo on Silver Snoopy recipients.

$0.00 11/03/2010 11/18/2010 Completed

2176 Marshall’s Jeff Spencer coordinates a program called Young Eagles.

CS20 Angela Storey ################### $0.00 10/01/2010 11/18/2010 Completed

2177 Marshall Star: Redstone Scientific Information Center

CS20 Angela Storey Write, edit and coordinate Nov. 18 Star story on the services offered at the Redstone Scientific Information Center,

$0.00 10/25/2010 11/12/2010 Completed

Page 6: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2178 Marshall Star: Marlon Walker – 50 years of Service

CS20 Angela Storey Write, edit and coordinate Nov. 19 Star story on Marlon Walker, an EG&G employee in Marshall’s Office of Center Operations who will be

$0.00 10/25/2010 11/12/2010 Completed

2179 Marshall Star: Willie Love community service feature

CS20 Angela Storey Write, edit and coordinate Dec. 2 Star story on Marshall’s Willie Love and his community

$0.00 11/04/2010 11/26/2010 Completed

2180 0712H.3.M.6.55.2180 Travel to Kennedy Space Center, Fla., Nov. 15-18, 2010

ED Steve Roy & Lybrea Attend ISS utilization conference at Kennedy Space Center, Fla., as requested by

$1,375.00 11/08/2010 11/18/2010 Completed

2181 0712H.3.M.6.83.2181 Travel to Kennedy Space Center, Fla., Nov. 15-18, 2010 Rev. 1

ESMD Betty Grisham NASA’s ESMD will support the Veterans Day events at the Coca-Cola Science Center in Columbus, GA, November 11-13, 2010. This event will be supported with the NASA Exploration Experience and an

$762.50 11/02/2010 11/05/2010 Completed

2182 0712H.3.M.6.83.2182 ESMD Columbus, GA:EE trailer staffing Todd travelColumbus, GANovember 11-13, 2010

ESMD Betty Grisham ################### $583.00 11/08/2010 11/08/2010 Completed

2183 0712H.3.M.6.90.2183 Federal Women’s Program EMB Abbie Johnson Presentation by Jill Tietjen to Marshall Space Flight Center Women Engineers on October

$4,006.73 $4,006.73 10/28/2010 11/30/2010 Completed

2184 0712H.3.M.6.90.2184 Transcription Service – Administrator’s All-Hands Presentation Rev. 1

EMB Dom Amatore & Sh Procure transcription service for Administrator’s address to MSFC on 11/16/10. Cost

$171.75 $171.75 11/10/2010 11/16/2010 Completed

2185 0712H.3.M.6.90.2185 MSFC Holiday Reception Rev. 2 EMB Sandra Turner Request approval for $1488.03 for purchase of black drapes for 4316. To be used for Holiday Reception Décor and ever after. Event date is Dec 7,

$1,457.55 $1,566.66 11/12/2010 11/24/2010 Completed

2186 Small Von Braun Bust CS20 Ola Metcalfe Display the VB bust at various locations around the Center.

$0.00 11/09/2010 11/15/2010 On Schedule

2187 Small Von Braun Bust CS20 Betty Humphery Administrator Charles Bolden will conduct an All Hands meeting in building 4316 on

$0.00 11/12/2010 11/16/2010 Completed

2188 0712H.3.M.6.82.2188 2010 Alabama A&M University High School Senior Day

EMB Betty Humphery Saturday, November 20, 2010 Alabama A&M University is hosting a High School Senior Day with NASA MSFC participating. The event will

$109.00 10/13/2010 11/20/2010 On Schedule

Page 7: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2189 0712H.3.M.6.83.2189 FedEx shipment to Napoleonville, LA for Eyes On Scavenger Hunt

HQ PSD Kim Larock FedEx shipment to Napoleonville, LA for Eyes On Scavenger Hunt

$75.00 11/09/2010 11/30/2010 On Schedule

2190 0712H.3.M.6.83.2190 Social Media for Government conference

CS20 Dom Amatore Travel to Las Vegas Dec 5-9 for Social Media for Government Conference

$3,555.10 11/02/2010 12/04/2010 On Schedule

2191 2010 Tennessee Valley Corridor Fall Partnership Event

CS30 Betty Humphery ################### $0.00 11/17/2010 11/22/2010 Completed

2192 Campaign: Marshall to hold holiday "rocket" lighting Dec. 2, annual holiday reception Dec. 7

CS20 Angela Storey Write internal announcements and a post-event Star caption spotlighting the upcoming Tennessee School for the Blind

$0.00 11/17/2010 12/10/2010 Completed

2193 0712H.3.M.6.83.2193 Travel to Kennedy Space Center, Fla., Nov. 2-Nov. 6, 2010

Shuttle Steve Roy ################### $1,411.53 11/02/2010 11/30/2010 On Schedule

2194 Star story: 2010 MARS Softball Club season champions

CS20 Angela Storey Research, write and coordinate Marshall Star article with photos on the 2010 MARS Softball Club season

$0.00 11/18/2010 12/02/2010 Completed

2195 0712H.3.M.6.83.2195 HQ PAO 27th National Space Symposium – booth space orderApril 11-14, 2010Colorado Springs, CO

HQ PAO Jim Hull HQ PAO plans to exhibit at the 2011 27th Size of exhibit space sought is 20 x 40. Rate is $51 /sq foot. Contract is a separate document and must

$40,800.00 $40,800.00 11/09/2010 11/19/2010 Completed

2196 0712H.3.M.6.83.2196 NASA ESMD Exploration Trailer to Columbus, GA

ESMD Betty Grisham Supporting the Exploration Trailer, conducting surveys, answering questions, communicating with public travel dates are Wednesday,

$594.60 11/09/2010 11/30/2010 On Schedule

2197 0712H.3.M.6.83.2197 HQ PAO OC Iphone case purchase HQ PAO Jim Hull HQ PAO OC has an Apple Iphone 4. This phone requires a suitable case for travel use.

$54.25 $53.99 11/14/2010 11/27/2010 Completed

2198 0712H.3.M.6.82.2198 Moonbuggy Exhibit Repairs at USSRC

CS20 John Dumoulin As soon as possible, please order the parts and repair the moonbuggy exhibit.

$100.00 $145.04 11/10/2010 11/30/2010 On Schedule

2199 0712H.3.M.6.55.2199 Travel to Kennedy Space Center, Fla., for STS-133 launch support Nov. 30- Dec. 6, 2010

Shuttle Steve Roy ################### $1,788.50 11/22/2010 12/06/2010 Completed

2200 ISS Science – Sesame Street experiment overview for ISS science Web

CS20 Steve Roy ################### $0.00 10/26/2010 12/10/2010 Completed

Page 8: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2201 Moon buggy Education Ola Metcalfe Under repair signage for moon buggy exhibit

Signs announcing upcoming moon buggy activities

$0.00 11/23/2010 12/31/2010 Completed

2202 0712H.3.M.6.83.2202 HQ PAO International Astronautical Congress: booth space purchase - Cape Town, South Africa Oct. 3 – 7, 2011

HQ PAO Jim Hull ################### $53,327.17 $53,327.17 11/30/2010 12/13/2010 Completed

2203 0712H.3.M.6.90.2203 2010 MSFC Holiday Reception EMB Betty Humphery Plan and execute exhibit support for the 2010 MSFC Holiday Reception, December 7, 2010 in Activities building 4316 from 1-3pm. This year’s

$6.41 $6.16 11/30/2010 12/10/2010 Completed

2204 Marshall Star: OSAC Christmas Angels photo

CS20 Angela Storey Research and write Marshall Star photo cutline on the 2010 Office of Strategic Analysis & Communications Christmas

$0.00 12/07/2010 12/16/2010 Completed

2205 0712H.3.M.6.83.2205 HQ PAO Display Case for Shuttle Tiles Purchase

HQ PAO Jim Hull Support HQ PAO in coordination of development /purchase of award cases that house shuttle tiles. This will

$5,377.48 $5,377.48 12/06/2010 12/14/2010 Completed

2206 0712H.4.M.6.82.2206 ET models and hardware displays Shuttle John Dumoulin ################### $4,030.00 $4,333.79 11/29/2010 03/31/2011 On Schedule2207 Change out crew presentations CS20 John Dumoulin Put four of the most current

ISS & Shuttle crew presentations to MSFC into existing matching frames and

$0.00 12/02/2010 12/15/2010 Completed

2208 0712H.3.M.6.83.2208 South Florida FairESMD staffer Travel to West Palm Beach, Florida1st round: January 13-20, 2011

ESMD Betty Grisham NASA’s ESMD will support the South Florida State Fair in West Palm Beach, Florida. This event will be supported with the NASA Exploration

$740.50 12/14/2010 01/13/2011 Completed

2209 Inst Loan of 1:3 Mercury Model to Smithsonian Jan 2011

CS20 John Dumoulin Make arrangements to loan 1:3 Mercury model to Smithsonian. Update loan agreement, pull & prep model for shipment, add model into internal inventory

$0.00 12/15/2010 01/05/2011 Completed

2210 0712H.3.M.6.90.2210 50th anniversary Medallion/Coins EMB Edwin Jones Pay for 50 of the MSFC 50th Anniversary Coins50 Coins @ $3.65 = $182.5050 Capsules @ $0.35 = $17.50

$216.00 $216.00 09/02/2010 12/31/2010 Completed

2211 0712H.4.M.6.90.2211 MSBA Meeting for CY11 EMB Fran Thompson ################### $3,883.65 $2,676.60 12/22/2010 12/31/2011 Completed

Page 9: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2212 0712H.3.M.6.83.2212 South Florida Stat FairESMD OC Travel to West Palm Beach, Florida1st round: January 13-20, 2011

ESMD Betty Grisham ################### $912.64 12/14/2010 01/13/2011 Completed

2213 0712H.3.M.6.83.2213 HQ PAO Travel cases (two) for 40” lcd monitors (4)

HQ PAO Jim Hull PAO in coordination of purchase of travel cases suitable for four 40” lcd monitors in the HQ PAO inventory. Cases must be

$3,824.50 $3,824.50 12/16/2010 12/23/2010 Completed

2214 0712H.3.M.6.83.2214 South Florida FairESMD Technician Install Travel to West Palm Beach, FloridaInstall: January 11-16, 2011

ESMD Betty Grisham ################### $667.50 $139.11 12/21/2010 01/11/2011 Completed

2215 NR: Marshall research paper to be published Jan. 6 in Science Magazine

CS20 Janet Anderson Deliver a news release announcing the publication in Science magazine of Marshall researcher Renee Weber's

$0.00 12/22/2010 12/30/2010 Completed

2216 Jan. 20 Star: Marshall personnel help rewrite Alabama's 4th grade social studies textbooks

CS20 Angela Storey Write a Star photo caption about the Jan. 7 visit of Pearson Education (textbook publisher) to shoot supplemental DVD footage of

$0.00 01/04/2011 01/14/2011 Completed

2217 0712H.3.M.6.55.2217 Utah News Clips Service annual report

CS20 Dom Amatore Annual report, summarization, analysis of Utah News Clips Service results for Marshall

$189.00 $189.00 12/28/2010 12/31/2011 Completed

2218 Marshall Star photo: Marshall supports Jackson County Student Career Fair

CS20 Angela Storey Research, write and coordinate Marshall Star stand-alone photo about the center’s support for the Jackson County

$0.00 12/29/2010 01/20/2011 Completed

2219 Marshall Star story: 7th annual Weigh to Win competition begins Jan. 24

CS20 Angela Storey Research, write and coordinate Marshall Star story on the seventh annual Weigh to Win competition, which begins Jan.

$0.00 01/07/2011 01/13/2011 Completed

2220 0712H.3.M.6.82.2220 Metal Stands CS20 Ola Metcalfe Purchase 2 light weight metal stands that can display text

$280.00 $259.72 01/05/2011 01/14/2011 On Schedule

2221 0712H.3.M.6.83.2221 San Diego Centennial Kickoff Celebration

HQ AERO Steve Lighthill ################### $848.90 01/12/2011 01/14/2011 Completed

2222 0712H.3.M.6.83.2222 ESMD support of South Fl Fair: Sherri travel2nd round: January 19-25, 2011

ESMD Betty Grisham ################### $908.93 01/13/2011 01/19/2011 Completed

Page 10: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2223 0712H.3.M.6.83.2223 ESMD South FL FairOC Travel to West Palm Beach, Florida - KirkRev. 1

ESMD Betty Grisham NASA’s ESMD will support the South Florida State Fair in West Palm Beach, Florida. This event will be supported with the NASA Exploration

$1,238.51 01/12/2011 01/19/2011 Completed

2224 0712H.3.M.6.83.2224 ESMD South FL FairOC Travel to West Palm Beach Florida – Keyke Reed Rev. 1

ESMD Betty Grisham NASA’s ESMD will support the South Florida State Fair in West Palm Beach, Florida. This event will be supported with the NASA Exploration

$1,032.50 01/15/2011 01/19/2011 Completed

2225 Endeavor Elementary School CS20 Betty Humphery Provide exhibits for Space Week for children 1st thru 5th grade at Endeavor Elementary School at 1997 Old Railroad

$0.00 01/18/2011 01/28/2011 Completed

2226 0712H.4.M.6.55.2226 Michoud Industry Day support: Travel to MAF, New Orleans, Jan. 26-28

CS20 Angela Storey Provide media escort duties on-site at Michoud Assembly Facility, New Orleans,

$481.05 01/18/2011 01/28/2011 Completed

2227 0712H.3.M.6.82.2227 HQ PAO -Magic Planet Training and Install for Education Cart development

CS20 Jim Hull ################### $1,247.00 01/14/2011 01/19/2011 Completed

2228 0712H.3.M.6.90.2228 Day of Remembrance EMB Sandra Turner Request approval for $ 218 for 2011 Day of Remembrance Activity in Morris Auditorium--

$218.00 $167.00 01/21/2011 01/26/2011 Completed

2229 Space shuttle crews, graphic artists tell mission story through special patches

CS20 Steve Roy Write, coordinate and edit feature on space shuttle mission patches for April 14

$0.00 12/28/2010 04/08/2011 Completed

2230 Huntsville Madison County Annual Chamber Meeting

CS20 Betty Humphery ################### $0.00 01/24/2011 01/27/2011 Completed

2231 0712H.3.M.6.83.2231 HQ PAO 2011 Exhibits Consortium Meeting; OC Travel – Ames Research Center; Feb. 7 – 11, 2011 Rev. 1

HQ PAO Jim Hull HQ PAO 2011 Exhibit Consortium Meeting at Ames Research Center. OC will travel. Document is for travel

$2,465.00 01/24/2011 01/25/2011 Completed

2232 Update text and images in VIC entrance and “New Beginnings” exhibits

CANCELLED

HQ PAO John Dumoulin ################### $0.00 01/26/2011 03/15/2011 On Schedule

2233 0712H.3.M.6.82.2233 Update text and images in VIC entrance and “New Beginnings” exhibits

CS20 John Dumoulin ################### $585.00 $72.22 01/26/2011 03/15/2011 On Schedule

2234 Day of Remembrance CS20 Betty Humphery ################### $0.00 01/24/2011 01/27/2011 Completed2235 0712H.4.M.6.82.2235 HQ PAO 27th National Space

Symposium – Exhibit GRAPHICS AND LAYOUT DESIGNApril 11-14, 2010Colorado Springs, CO

HQ PAO Jim Hull ################### $2,500.00 $4,072.57 01/21/2011 01/28/2011 On Schedule

Page 11: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2236 0712H.3.M.6.83.2236 HQ PAO 2011 GeoDome Delivery Costs for Set-up & Training; Feb. 2 - 3

HQ PAO Jim Hull The GeoDome portable planetarium is completed and ready to be delivered. The Eluminati firm is arranging shipping that we are required

$450.00 01/26/2011 01/27/2011 On Schedule

2237 0712H.4.Q.0.15.INS2 Oral History Interview Transcripts CS20 Tracy McMahan & M ################### $6,390.00 $6,390.00 05/18/2011 06/01/2011 Completed2238 0712H.3.M.6.83.2238 ESMD support of South Fl Fair: Fed

Ex shipment of Projectors and Student Giveaways

ESMD Betty Grisham ################### $1,382.00 01/21/2011 01/22/2011 Completed

2239 0712H.3.M.6.51.2239 Travel to Glenn Research Center, Cleveland, Ohio Feb. 8-10, 2011

ED Steve Roy ################### $1,270.00 01/28/2011 02/08/2011 Completed

2240 0712H.3.M.6.83.2240 Footprint Pins ESMD Betty Grisham ################### $9,070.00 $9,070.00 01/27/2011 04/15/2011 On Schedule2241 0712H.3.M.6.83.2241 HQ PAO 2011 Exhibits Consortium

Meeting; California Academy of Sciences Function

HQ PAO Jim Hull ################### $2,500.00 $2,482.36 02/02/2011 02/04/2011 Completed

2242 Exploration Experience Pavilion at Sci Quest Feb 11-27, 2011

ESMD Betty Grisham ESMD will be supporting Sci Quest in Huntsville, AL with the Exploration Experience Pavilion February 11th- 27th, 2011. Set up dates will be

$0.00 02/01/2011 02/09/2011 Completed

2243 0712H.3.M.6.90.2243 Black History Month Lunch & Learn EMB Linda Southworth Request approval for $ 80-$150 to tune piano in Morris Auditorium for musical

$90.00 $90.00 02/04/2011 02/09/2011 Completed

2244 0712H.4.M.6.90.2244 Student Launch Initiative (SLI) EMB Linda Southworth Request approval for $ 2246.00 in support of outside services for the 2011 SLI rocket launch event at Bragg Farms (Tony Al) on April 16th

$2,246.00 $2,161.00 01/31/2011 04/15/2011 Completed

2245 0712H.3.M.6.83.2245 Sherri Smith HeadrickAttendance at 2011 HQ Exhibits/SB Consortium meeting, Ames Research Center, Feb 7-11

CS20 John Dumoulin Send Sherri Smith-Headrick, ASRI team lead in CS20, to attend the 2011 HQ Exhibits/Speakers Bureau Consortium meeting, Ames

$818.41 01/31/2011 02/02/2011 Completed

2246 0712H.3.M.6.83.2245 Sherri Smith HeadrickAttendance at 2011 HQ Exhibits/SB Consortium meeting, Ames Research Center, Feb 7-11

ESMD John Dumoulin Send Sherri Smith-Headrick, ASRI team lead in CS20, to attend the 2011 HQ Exhibits/Speakers Bureau Consortium meeting, Ames

$818.41 01/31/2011 02/02/2011 Completed

2247 0712H.3.M.6.90.2247 Booth Space at 2011 TVC National Summit

EMB Sherri Stroud Purchase booth space 2011 Tennessee Valley Corridor (TVC) Summit as Silver

$20,000.00 $20,000.00 02/02/2011 05/15/2011 Completed

2248 ISS Science – Marangoni experiment overview for ISS science Website

CS20 Steve Roy ################### $0.00 02/01/2011 02/24/2011 Completed

2249 Focus on Marshall – promotion and production

CS20 Dom Amatore ################### $0.00 01/03/2011 12/30/2011 Completed

Page 12: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2250 ExplorNet promotional video CS20 Dom Amatore Write a story board for a 60-second promotional video for

$0.00 12/08/2010 01/31/2011 Completed

2251 Marshall Star article on MSFC Happenings page on ExplorNet

CS20 Dom Amatore Write a Marshall Star article about the MSFC Happenings page on Marshall's new

$0.00 01/25/2011 02/03/2011 Completed

2252 Question of the Week maintenance on ExplorNet's MSFC Happening page

CS20 Dom Amatore Develop list of questions for the Question of the Week section on the MSFC Happenings page on ExplorNet. Get approval from OSAC

$0.00 01/09/2011 12/31/2011 Completed

2253 Marshall Star article on ExplorNet launch

CS20 Dom Amatore Write an Marshall Star article on launch of Marshall's new internal social media tool,

$0.00 01/01/2011 01/27/2011 Completed

2254 Marshall Star article on MSFC Happenings page on ExplorNet

CS20 Dom Amatore Write a Marshall Star article about the MSFC Happenings page on Marshall's new

$0.00 01/25/2011 02/03/2011 Completed

2255 Marshall Star article on the workforce transition tool

CS20 Dom Amatore Write a Marshall Star article on the Feb. 22 launch of the workforce transition tool.

$0.00 01/17/2011 02/10/2011 Completed

2256 Emergency Notification System article for TTP

CS20 Dom Amatore Write an article on the new agency-wide Emergency

$0.00 01/01/2011 01/30/2011 Completed

2257 ExplorNet launch article for TTP CS20 Dom Amatore Write an article announcing the launch of Marshall's new social media tool, ExplorNet, for To

$0.00 01/01/2011 01/31/2011 Completed

2258 To the Point CS20 Dom Amatore Write, coordinate and distribute monthly editions of the Marshall supervisor

$0.00 02/14/2011 12/31/2012 Completed

2259 Green Team article for TTP CS20 Dom Amatore Write an article on Marshall's Green Team for TTP.

$0.00 02/01/2011 02/28/2011 Completed

2260 Lean Six Sigma article for TTP CS20 Dom Amatore Write an article explaining Marshall's Lean Six Sigma

$0.00 02/01/2011 01/30/2011 Completed

2261 Tapping strengths while managing uncertainty article for TTP

CS20 Dom Amatore Write an article on tapping strengths while managing

$0.00 01/01/2011 01/30/2011 Completed

2262 workforce transition tool launch for TTP

CS20 Dom Amatore Write an article on the Feb. 22 launch of the workforce

$0.00 02/01/2011 02/28/2011 Completed

2263 Employee Comm Plan for ExplorNet CS20 Dom Amatore Write an employee communications plan for the

$0.00 12/17/2010 01/31/2011 Completed

2264 0712H.3.M.6.82.2264 Alyssa BermeaAttendance at 2011 HQ Exhibits/SB Consortium meeting, Ames Research Center, Feb 7-11

CS20 John Dumoulin Send Sherri Smith-Headrick, ASRI team lead in CS20, to attend the 2011 HQ Exhibits/Speakers Bureau Consortium meeting, Ames

$996.61 02/02/2011 02/04/2011 Completed

Page 13: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2265 0712H.3.M.6.82.2265 Alyssa BermeaAttendance at 2011 HQ Exhibits/SB Consortium meeting, Ames Research Center, Feb 7-11

HQ PAO John Dumoulin Send Sherri Smith-Headrick, ASRI team lead in CS20, to attend the 2011 HQ Exhibits/Speakers Bureau Consortium meeting, Ames

$996.60 02/02/2011 02/04/2011 Completed

2266 0712H.3.M.6.82.2266 Daniel McFallAttendance at 2011 HQ Exhibits/SB Consortium meeting, Ames Research Center, Feb 7-11

CS20 John Dumoulin Send Daniel McFall to attend the 2011 HQ Exhibits/Speakers Bureau Consortium meeting, Ames Research Center, Feb 7-11. Travel dates for Daniel are

$1,807.32 01/31/2011 02/28/2011 Completed

2267 Star Features/Fact Sheets: Communicating the work of the Academic Affairs Office

CS20 Angela Storey ################### $0.00 02/14/2011 03/01/2011 Completed

2268 Star: Face of mission success features

CS20 Dom Amatore Interview and write features on people across the center from different directorates/organizations, highlighting their jobs and how it pertains to Marshall’s

$0.00 02/01/2011 12/31/2011 Completed

IDIQ - NSS 2011

National Space Symposium Lunar Quest Danielle Moran Staff Robotic Lunar Lander Development Project exhibit area at the National Space

$1,578.22 02/15/2011 02/25/2011 On Schedule

2269 0712H.3.M.6.83.2269 ESMD NASA Home and City exhibit: new wrap Feb 2011

ESMD Betty Grisham ESMD’s NASA Home and City exhibit will be updated with new wrap for the outside of the

$400.00 02/03/2011 02/25/2011 On Schedule

2270 0712H.4.M.6.83.2270 2011 ESMD Giveaway ESMD Betty Grisham ESMD customer approved the ordering various items to be used as a giveaway for tradeshows and traveling

$55,432.00 $54,636.16 02/16/2011 02/22/2011 On Schedule

2271 0712H.3.M.6.83.2271 Southeastern Conference 2011 Women’s Basketball Tournament (Logistics & OC Travel Cost) Kirk Rev. 1

ESMD Betty Grisham ################### $1,045.80 02/22/2011 02/25/2011 Completed

2272 0712H.3.M.6.83.2272 ESMD Southeastern Conference 2011 Women’s Basketball Tournament (OC Travel Cost) Mark

ESMD Betty Grisham ################### $998.25 02/22/2011 02/25/2011 Completed

2273 National Space Symposium –Colorado Springs, CO

Shuttle Shannon Raleigh & The Shuttle Propulsion Office will take part in the One NASA booth at the National Space Symposium in Colorado Springs, CO that is being held at the Broadmoor Hotel from April 10-15, 2011.

$0.00 02/02/2011 04/15/2011 Completed

Page 14: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

IDIQ - NSS 2011 Wilson

National Space Symposium 2011 for Stephanie Wilson Rev. 1

Lunar Quest Stephanie Wilson & Staff Lunar Quest/ Robotic Lunar Lander exhibit booth at the National Space Symposium

$1,148.40 02/24/2011 03/03/2011 On Schedule

2274 0712H.3.M.6.83.2274 HQ Aero Punta Gorda, FL Air Show March 26-27, 2011 Rev. 1

HQ AERO Steve Lighthill ################### $688.70 02/22/2011 02/25/2011 Completed

2275 0712H.3.M.6.83.2275 ESMD EE 5 screen stand and video ESMD Betty Grisham Exploration Experience video 5 screen stand - 5 monitors and stand that will be used at National Space Symposium 2011 to be able to show the

$1,850.00 $1,928.13 02/17/2011 02/25/2011 On Schedule

2276 Marshall Star: Two civil service employees awarded with Government Technical Achievement Award

CS20 Angela Storey Research, write and coordinate Marshall Star story with photos on Mark McElyea and Leigh Ann McMahon receiving the Government Technical Achievement Award during the

$0.00 02/23/2011 03/03/2011 Completed

2277 Marshall Star photo cutline: Marshall hosts Federal Personnel and Payroll System meeting

CS20 Angela Storey Research, write and coordinate Marshall Star photo cutline about the Federal Personnel and Payroll System meeting

$0.00 02/18/2011 03/03/2011 Completed

2278 0712H.3.M.6.83.2278 OSHA Training CS01 John Dumoulin Attend OSHA training in Tuscaloosa, AL. March 28th – March 31st, 2011. This is for my prerequisite class to obtain my OSHA 500 Certification.

$461.00 02/16/2011 02/28/2011 On Schedule

2279 0712H.3.M.6.83.2279 ESMD National Space Symposium 2011 (Colorado Springs, April 11-14, 2011): Funds Transfer & OC Travel Cost Rev. 1

ESMD Betty Grisham ################### $2,449.06 02/22/2011 03/11/2011 Completed

2280 0712H.3.M.6.83.2280 ESMD National Space Symposium April 11-14, 2011OC Travel Cost for staffing support

ESMD Betty Grisham ################### $2,172.68 02/22/2011 03/11/2011 Completed

2281 0712H.3.M.6.83.2281 Exploring Team Dynamics - NASA Resident Office Team Building Offsite

ED Steve Hilliard ################### $8,049.75 $10,199.88 02/07/2011 03/10/2011 On Schedule

2282 0712H.3.M.6.83.2282 Lapel Pins for SBKF Test CS30 Twila Schneider ################### $874.80 $874.80 02/24/2011 02/25/2011 On Schedule2283 0712H.3.M.6.83.2283 HQ PAO mounting brackets (four)

for 40” lcd monitors (4)HQ PAO Jim Hull ################### $1,407.78 $1,407.78 03/01/2011 03/07/2011 Completed

2284 0712H.4.M.6.83.2284 ESMD Exhibitor’s Conference 2011Las Vegas, NVMarch 27-31, 2011 Rev. 1

ESMD Betty Grisham ################### $984.00 $650.00 03/01/2011 03/04/2011 Completed

Page 15: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2285 0712H.3.M.6.83.2285 HQ PAO 2011 50’ and 60’ Dome Tents. Install vents and fans. Domes for use at Goddard Community Days on May 14

HQ PAO Jim Hull ################### $8,200.00 $8,856.00 02/15/2011 03/31/2011 Completed

2286 Star photo cutline: Contractor Excellence Award judges were presented with Center Director Award on March 3

CS20 Angela Storey Research, write and coordinate a Marshall Star photo cutline on 13 Contractor Excellence Award judges receiving the

$0.00 03/03/2011 03/10/2011 Completed

2288 0712H.3.M.6.83.2288 ESMD MARK III Photo Op Suit-prep & handle labor costs – payment to Capitol

ESMD Betty Grisham Invoice from Capitol exhibits for the prep and handling of the ESMD Mark III suit. Cost: $271.38

$271.38 $271.38 03/07/2011 03/11/2011 Completed

2287 0712H.3.M.6.83.2287 NASA’s EVM Capability Project Conference Room Rental

CS01 Jerald Kerby NASA’s EVM Capability Project Conference Room Rental

$1,590.00 $2,074.95 02/17/2011 03/21/2011 On Schedule

2289 0712H.3.M.6.82.2289 Model & Technician Tool Box ESMD Betty Grisham & Jo Model & Technician Tool Box: This is to put together a complete set of Technician tools and modeling tools for each technician for their every

$1,354.76 $1,354.76 03/09/2011 03/31/2011 Completed

2290 0712H.3.M.6.82.2290 Model & Technician Tool Box CS20 Betty Grisham & Jo Model & Technician Tool Box: This is to put together a complete set of Technician tools and modeling tools for each technician for their every

$1,354.77 $1,354.77 03/09/2011 03/31/2011 Completed

2291 0712H.3.M.6.82.2291 Model & Technician Tool Box HQ PAO Betty Grisham & Jo Model & Technician Tool Box: This is to put together a complete set of Technician tools and modeling tools for each technician for their every

$1,354.76 $1,354.76 03/09/2011 03/31/2011 Completed

2292 0712H.3.M.6.82.2292 HQ PAO 27th National Space Symposium – tech travel April 11-14, 2010Colorado Springs, CO

HQ PAO Jim Hull ################### $2,631.00 02/28/2011 03/18/2011 On Schedule

2293 0712H.3.M.6.83.2293 ESMD Build Pedestals stands for SEV models

ESMD Betty Grisham ################### $300.00 $115.59 03/01/2011 03/25/2011 On Schedule

2294 MA: NASA Small Business Alliance meeting in Huntsville 3/24

CS20 Angela Storey Write, coordinate and distribute a media advisory inviting members of the media to cover a NASA Small

$0.00 03/09/2011 03/31/2011 Completed

2295 Payload Operations Center 10th anniversary campaign

CS20 Steve Roy ################### $0.00 02/07/2011 03/08/2011 Completed

Page 16: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2296 Marshall receives Administrator's Cup for NASA's Best Small Business Program on 3/24

CS20 Angela Storey Write, coordinate and distribute a news release announcing that Marshall received the Administrator's Cup honoring the center for

$0.00 03/16/2011 03/24/2011 Completed

2297 0712H.3.M.6.83.2297 HQ PAO 30th Int’l Space Development Conference (ISDC): Booth Space Purchase May 18 -22, 2011; Von Braun Civic Center; Huntsville, AL

HQ PAO Jim Hull ################### $4,500.00 03/09/2011 03/16/2011 Completed

2298 0712H.3.M.6.83.2298 HQ PAO 30th Int’l Space Development Conference (ISDC): logistics and exhibitor services Rev. 1

HQ PAO Jim Hull Work order is for logistics support (graphics development, technician I&D of SCAN structure and other exhibit material) and for payment of exhibitor services.

$6,550.00 $6,784.13 03/11/2011 03/16/2011 On Schedule

2299 Team Redstone Women History Month

CS20 Betty Humphery Plan and execute exhibit support for Team Redstone Women History Month at building 3435 on Snooper

$0.00 03/17/2011 03/21/2011 Completed

2300 0712H.3.M.6.82.2300 Footprint of Fred Haise EMB Ola Metcalfe Apollo astronaut footprint

Charge code O-TE

$10.36 $10.36 03/16/2011 03/17/2011 Completed

2301 Robert Lightfoot Speaking at American Village in Montevallo, AL

CS20 Betty Humphery Provide exhibit support for Robert Lightfoot at The American Village in Montevallo, AL on March 29, 2011. Mr.

$0.00 03/18/2011 03/28/2011 Completed

2302 0712H.3.M.6.55.2302 Travel to Kennedy Space Center, Fla., for STS-134 launch support April 14 - 21, 2011

Shuttle Steve Roy ################### $1,982.50 03/15/2011 04/14/2011 Completed

2303 0712H.3.M.6.83.2303 ESMD NSS ESMD Betty Grisham ################### $1,223.00 03/24/2011 03/28/2011 Completed2304 0712H.3.M.6.82.2304 HQ PAO 27th National Space

Symposium – ABermea travel April 7-14, 2011Colorado Springs, CO

CS20 John Dumoulin ################### $821.07 02/28/2011 03/18/2011 Completed

2305 0712H.3.M.6.82.2305 HQ PAO 27th National Space Symposium – ABermea travel April 7-14, 2011Colorado Springs, CO

HQ PAO John Dumoulin ################### $1,000.00 02/28/2011 03/18/2011 Completed

2306 0712H.3.M.6.82.2306 FedX to HQ CS20 John Dumoulin Send via FedX return shipment of Shuttle Tile in plex case to

$80.00 03/10/2011 03/25/2011 On Schedule

Page 17: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2307 0712H.3.M.6.83.2307 HQ PAO National Space Symposium – exhibit services order and OC / travel April 11-14, 2010Colorado Springs, CO

HQ PAO Jim Hull ################### $31,155.00 $28,015.84 03/10/2011 03/22/2011 On Schedule

2308 HQ PAO UN COPUOS: additional models and graphic requirements

HQ PAO Jim Hull ################### $0.00 03/28/2011 04/29/2011 Completed

2309 ISS Science – Weekly Status Reports for ISS science Website

CS20 Steve Roy Research, write and coordinate weekly experiment status reports for the ISS science

$0.00 03/03/2011 12/30/2011 Completed

2310 ISS Science – STS-134 science experiment overview

CS20 Steve Roy Research, write and coordinate an overview of science experiments on the STS-134

$0.00 03/22/2011 04/19/2011 Completed

2311 Marshall Resident Office feature for Star Shuttle anniversary edition

CS20 Steve Roy Research, write and coordinate a story on the Marshall Resident Office at Kennedy

$0.00 03/17/2011 04/14/2011 Completed

2312 HOSC feature for Star Shuttle anniversary edition

CS20 Steve Roy Research, write and coordinate a story on the Huntsville Operations Support Center for

$0.00 03/17/2011 04/14/2011 Completed

2313 Stanchions for moon buggy CS20 Ola Metcalfe 12 stanchios $0.00 03/28/2011 03/30/2011 Completed2314 0712H.3.M.6.90.2314 Women's History Month Speaker

Fee for Anna KeyEMB Abbie Johnson Women's History Month

Speaker Fee for Anna Key$100.00 $100.00 03/02/2011 03/30/2011 Completed

2315 0712H.4.M.6.83.2315 Purchase two ISS EVA space suit photo op exhibits for HQ SOMD SCaN visitor centers

HQ SMD John Dumoulin Purchase (or cause to have made and purchase) two ISS EVA space suit photo opportunity exhibits based on specs provided by NASA. The

$30,000.00 $29,905.41 03/28/2011 05/01/2011 On Schedule

2316 0712H.4.M.6.90.2316 Center Directors Coins EMB Sandra Turner Purchase 26 Center Director's Coins to replenish stock

$967.02 $967.02 02/28/2011 04/30/2011 Completed

2317 0712H.4.M.6.82.2317 RLL model repair work Lunar Quest Danielle Moran Stabilize two of the three Robotic Lunar Lander models (replace missing/loose screws, bolts, etc.) Chris Owens knows

$35.00 $23.52 03/18/2011 03/31/2011 On Schedule

2318 0712H.4.M.6.83.2318 STS 134 Launch Exploration Experience visit – OC travel Mark Rev. 1

ESMD Betty Grisham NASA KSC Visitor Complex will be hosting ESMD’s Exploration Experience exhibit for the STS-134 launch. The EE exhibit will be open April 18,19 & 20. This

$1,930.30 03/31/2011 04/05/2011 Completed

2319 0712H.4.M.6.83.2319 STS 134 Launch Exploration Experience visit – Keyke Reed Rev. 1

ESMD Betty Grisham NASA KSC Visitor Complex will be hosting ESMD’s Exploration Experience exhibit for the STS-134 launch. The EE exhibit will be open April 18,19 & 20. This

$1,249.50 03/31/2011 04/05/2011 Completed

2320 0712H.4.M.6.82.2320 Footprint of Harrison Schmidt CS20 Ola Metcalfe Apollo astronaut footprint and $15.50 $12.86 03/28/2011 04/01/2011 On Schedule

Page 18: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2321 0712H.4.M.6.83.2321 STS 134 Launch Exploration Experience visitRev. 1

ESMD Betty Grisham NASA KSC Visitor Complex will be hosting ESMD’s Exploration Experience exhibit for the STS-134 launch. The EE exhibit will be open April 18,19, & 20. This

$1,287.30 03/31/2011 04/07/2011 Completed

2322 0712H.4.M.6.83.2322 2011 ESMD Photo Opportunity Exhibit: design and build April 2011

CANCELLED

ESMD Betty Grisham ESMD customer approved the development of two ESMD Photo Opportunity Exhibits to travel in conjunction with the ESMD EE travel exhibits (trailer & pavilion). Project not to

$5,000.00 03/31/2011 05/05/2011 CANCELLED

2323 0712H.4.M.6.83.2323 2011 ESMD NASA Tablecloth ESMD Betty Grisham ESMD customer approved the ordering four (4) NASA Tablecloths to be purchased for use at industry shows and

$858.32 $857.52 04/04/2011 04/22/2011 Completed

2324 0712H.4.M.6.83.2324 Pilot wing pins for RLLDP Rev. 1 RLLDP Danielle Moran The RLLD Project needs to order 100 pins for outreach activities. A proof and quote

$375.30 $375.30 04/06/2011 04/22/2011 On Schedule

2325 SLI Rocket Fair &I Launch Event Shuttle Betty Humphery Provide blue Mobile Shuttle for SLI Rocket Fair at Building 4316 on April 15, 2011 and Launch event at Bragg Farms on April 16-17, 2011. April 17

$0.00 04/04/2011 04/15/2011 Completed

2326 Shuttle support of Columbia Elementary School Space Week April 18-22, 2011

Shuttle Betty Humphery Provide Mobile Shuttle for Space Week for school age students at Columbia Elementary at 667 Balch Road, Madison, AL on April 18-22,

$0.00 04/08/2011 04/18/2011 Completed

2327 ESMD Laurel Public SchoolsLaurel Aviation and Technology Week: photo kiosk support

ESMD Betty Grisham ################### $0.00 04/11/2011 05/07/2011 Completed

2328 0712H.4.M.6.55.2328 Lightfoot Presentation: Montevallo CS10 Dennis Boccippio Center Director presentation to students at American Village in Montevallo, AL, March 29,

$132.60 03/24/2011 04/30/2011 Completed

2329 Star story: Marshall Star goes online only beginning June 2

CS20 June Malone Write and coordinate a Marshall Star story about the Star only being available online beginning June 2. The last

$0.00 04/12/2011 04/21/2011 Completed

2330 Michoud Institutional support CS20 Angela Storey Provide editing support to the Michoud Public Affairs Office for various external products.Provide editing support to the Michoud Public Affairs Office for various external products

$0.00 01/11/2010 12/31/2011 Completed

Page 19: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2331 Editing monthly editions of Michoud Messenger

CS20 Angela Storey Edit monthly editions of the Michoud employee newsletter,

$0.00 01/11/2010 12/31/2011 Completed

2332 Institutional Relocate Man Maneuvering Units (MMU’S)

CS20 Ola Metcalfe Pull identified MMU’s from 7214 and deliver to locations in 4601 and 4705. Relocate 2 units from building 7214.Charge Time to - O

$0.00 04/13/2011 04/14/2011 On Schedule

2333 Loan of exhibit hardware for Ala Council for Technology Education N. Alabama competition

CS20 John Dumoulin Loan of popup hardware and other exhibit support equipment for off-center

$0.00 04/06/2011 04/15/2011 Completed

2334 0712H.4.M.6.83.2334 HQ Aero Andrews AFB Joint Services Open House5/20-5/22, 2011

HQ AERO Steve Lighthill ################### $780.90 04/14/2011 05/23/2011 Completed

2335 0712H.4.M.6.82.2335 Exploration Experience Quick Response (QR) Code

ESMD Betty Grisham ################### $500.00 04/13/2011 05/06/2011 On Schedule

2336 0712H.4.M.6.83.2336 HQ PAO Saturn Ring Purchase to accompany 50’ Dome tent

HQ PAO Jim Hull ################### $29,170.50 04/13/2011 04/19/2011 On Schedule

2337 0712H.4.M.6.82.2337 STS 134 Launch Exploration Experience visit – Tech travel Russ

ESMD Betty Grisham NASA KSC Visitor Complex will be hosting ESMD’s Exploration Experience exhibit for the STS-134 launch. The EE exhibit will be open April 26-May 2, 2011.

$1,975.50 04/13/2011 04/20/2011 Completed

2338 0712H.4.M.6.55.2338 Pass the Torch Lecture HQ PSD Dan Woodard Alabama ETV to film the PSD lecture at the US Space & Rocket Center (Dr. Jim Green,

$150.00 $150.00 04/19/2011 04/20/2011 Completed

2339 0712H.4.M.6.55.2339 Travel to Johnson Space Center for Innovation Day with ISS Program Science Office 5/3-5/6

EO Dan Kanigan Travel to Johnson Space Center Houston to meet with ISS Program Scientist Julie

$1,433.00 04/18/2011 05/03/2011 Completed

2340 0712H.4.M.6.83.2340 HQ PAO Goddard Community Day Exhibit /Outreach Support: inflatable domes/flooring Greenbelt, MD May 14, 2011

HQ PAO Jim Hull ################### $1,341.00 04/19/2011 04/22/2011 Completed

2341 0712H.4.M.6.83.2341 HQ PAO 50th UN COPUOS: Exposale exhibit build and install Vienna International Center – Vienna Austria. June 1 – 30, 2011

HQ PAO Jim Hull Requirement for exhibit support (build and install) will be fulfilled by Exposale in Czech Republic per HQ PAO.

$19,189.44 $18,993.46 04/19/2011 04/26/2011 On Schedule

2342 Knowledge management at Marshall article for TTP

CS20 June Malone Write an article on Knowledge Management at Marshall.

$0.00 04/01/2011 05/31/2011 Completed

2343 Effects of incivility in the workplace article for TTP

CS20 June Malone Write an article on effects of incivility in the workplace.

$0.00 04/01/2011 05/31/2011 Completed

2344 Idealab launch article for TTP CS20 June Malone Write an article on the launch of Idealab collaboration tool.

$0.00 04/01/2011 05/31/2011 Completed

Page 20: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2345 Marshall budget reduction implementation article for TTP

CS20 June Malone Write an article on Marshall's implementation of budget

$0.00 04/01/2011 05/31/2011 Completed

2346 Remove 7th Floor Ares Model Set CS20 John Dumoulin As time permits, but before April 30, 2011, please remove the Ares 1 & 5 model set and

$0.00 04/13/2011 04/30/2011 Completed

2347 Facilities Engineering and Real Property Conference

CS20 May Wales ################### $0.00 04/19/2011 12/11/2011 Completed

2348 0712H.4.M.6.90.2348 Systems Software Engineering Forum Rev. 2

EMB Bennie Jacks Request approval for $ 255 to purchase magnets (giveaways) for 2011 Systems Engineering Software Forum at UAH on May 10-11th.

$415.02 $415.02 03/29/2011 05/20/2011 Completed

2349 Gulf Coast Exploreum CS20 Ola Metcalfe ################### $0.00 04/28/2011 05/16/2011 Completed2350 Embrace Space Days at the

McWane CenterCS20 Ola Metcalfe Embrace Space Day

May 6-7, 2011Prepare photo kiosk and speaker kit items for pick up on May 2, 2011

$0.00 04/18/2011 05/02/2011 Completed

2349 Gulf Coast Exploreum CS20 Ola Metcalfe ################### $0.00 04/28/2011 05/16/2011 On Schedule2351 0712H.4.M.6.82.2351 STS-134 Shuttle Pride Social Shuttle Betty Humphery Provide exhibit for STS-134

Shuttle Pride Social at Building 4316 on April 29, 2011. Exhibit hours are 5pm to 7pm. Estimate attendance 2000.

$0.00 04/26/2011 04/28/2011 Completed

2352 0712H.4.M.6.90.2352 NASA Annual Legal Team Meeting Embassy Suites Room Rental Rev. 1

EMB Kathy Shelton & Ro ################### $2,498.68 $2,498.68 04/27/2011 05/06/2011 Completed

2353 0712H.4.M.6.82.2353 Create new exhibits for HQ SOMD SCaN visitor centers

HQ SMD John Dumoulin ################### $3,450.00 $1,247.89 04/27/2011 05/31/2011 On Schedule

2354 RLL model set up Lunar Quest Danielle Moran ################### $0.00 05/09/2011 05/10/2011 Completed2355 0712H.4.M.6.83.2355 HQ PAO Goddard Community Day

Exhibit /Outreach Support: inflatable domes/flooring Greenbelt, MD May 14, 2011

HQ PAO Jim Hull ################### $1,259.00 04/19/2011 05/22/2011 Completed

2356 0712H.4.M.6.83.2356 Team American Rocketry Contest Rev. 1

Shuttle Shannon Raleigh & The Shuttle Propulsion Office will take part at the Team American Rocketry Contest in The Plains, VA. Items will need to be shipped to Capitol

$2,450.00 $2,448.46 05/09/2011 05/13/2011 On Schedule

Page 21: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2357 0712H.4.M.6.83.2357 HQ PAO United Nations Committee on the Peaceful Uses of Outer Space & the 50th Anniversary of Human Spaceflight Activities; Staffing travel support (OC) - ;Vienna Austria – UN offices

HQ PAO Jim Hull ################### $13,371.50 05/09/2011 05/13/2011 On Schedule

2358 0712H.4.M.6.83.2358 ESMD Exhibit Repair-Robonaut 2 ESMD Betty Grisham NASA ESMD requests the repair of the traveling Robonaut 2 static exhibit. The exhibit will be required for use

$500.00 05/10/2011 05/13/2011 On Schedule

2359 Employee Communications Functional Plan for the SLS Integrated Strategic Comm. Plan

CS20 June Malone ################### $0.00 04/26/2011 05/13/2011 Completed

2360 Star/News release/Bio: Chris Singer named director of Marshall’s Engineering Directorate

CS20 Angela Storey Write, coordinate and edit Star story, news release and bio on Chris Singer, who was recently named director of Marshall’s

$0.00 04/27/2011 05/05/2011 Completed

2361 Star story/MA/Star photo captions: Earth Day 2011

CS20 Angela Storey Write, coordinate and edit April 14 Star story, media advisory and April 28 Star photo and

$0.00 04/05/2011 04/28/2011 Completed

2362 2011 TN Valley Corridor CS20 May Wales ################### $0.00 05/10/2011 05/16/2011 Completed2363 0712H.4.M.6.55.2363 Travel to Kennedy Space Center,

Fla., for STS-134 launch support May 13-17, 2011

Shuttle Dan Kanigan ################### $2,278.50 05/09/2011 05/13/2011 Completed

2364 Star: Center director's all-hands CS10 Jennifer Stanfield Research, write and coordinate Marshall Star article about center director's all-hands, scheduled Thursday, 5/19. Story required to be submitted NLT Monday morning, 5/23 for

$0.00 05/13/2011 05/23/2011 Completed

2365 0712H.4.M.6.83.2365 Exploration Experience exhibit at The Detroit Science Center June Rev. 1

ESMD Betty Grisham ESMD’s Exploration Experience exhibit will be at The Detroit Science Center June 10-12, 2011. Work Order is for OC

$1,427.20 05/13/2011 05/17/2011 On Schedule

2366 0712H.4.M.6.83.2366 ESMD- Odysseys of the Mind Final: Logistics and OC travelMay 26-31, 2011College Park, Maryland

ESMD Betty Grisham ################### $2,207.30 05/10/2011 05/20/2011 Completed

2367 0712H.4.M.6.83.2367 HQ PAO Goddard Community Day – Dome Tent (50 – 60-foot)Training /support Greenbelt MD – May 14, 2011Rev. 1

HQ PAO Jim Hull Work order is for Creatable Inflatable technician to travel & train on install / Use / Dismantle of new dome tents. These will be at 2011 Goddard

$3,127.76 $3,127.76 05/12/2011 05/16/2011 On Schedule

Page 22: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2368 0712H.4.M.6.83.2368 Exploration Experience exhibit at the Troy Strawberry Festival Rev. 1

ESMD Betty Grisham ESMD’s Exploration Experience exhibit will be attending the Troy Strawberry Festival in Troy, Ohio June 4 & 5, 2011.

$962.17 05/13/2011 05/17/2011 On Schedule

2369 Chris Crumbly bio for Inside Marshall

CS20 Angela Storey Write an internal bio for Chris Crumbly, deputy director of the Michoud Assembly Facility for

$0.00 05/10/2011 05/20/2011 Completed

2370 Alabama Tourism Day(Ardmore Welcome Center on I-65)

CS20 May Wales ################### $0.00 05/11/2011 05/19/2011 Completed

2371 0712H.4.M.6.83.2371 ESMD- Odysseys of the Mind Final: Technician travelMay 26-31, 2011College Park, Maryland rev. 1

ESMD Betty Grisham ################### $963.80 05/18/2011 05/20/2011 Completed

2372 Voyager assessment and repair for SCaN

HQ SMD John Dumoulin ################### $0.00 05/20/2011 06/06/2011 On Schedule

2373 0712H.4.M.6.83.2373 HQ PAO 30th Int’l Space Development Conference (ISDC): Gold Sponsor application & payment

HQ PAO Jim Hull Work order is for payment of Gold level sponsorship at 2011 ISDC event.

$10,000.00 $10,000.00 05/11/2011 06/01/2011 Completed

2374 0712H.4.M.6.82.2374 HQ PAO Inflatable Dome Tent (50 – 60-foot) Return / maintenance & repairMay 21, 2011

HQ PAO Jim Hull ################### $225.00 $47.61 05/18/2011 05/31/2011 On Schedule

2375 0712H.4.M.6.83.2375 HQ PAO NASA Day on the Hill; Support from Capitol Exhibits @ Rayburn House Office Building; Washington DC; June 15, 2011 Rev. 1

HQ PAO Jim Hull ################### $35,600.00 $35,597.30 05/25/2011 05/30/2011 On Schedule

2376 0712H.4.M.6.83.2376 HQ PAO Goddard Community Day Exhibit / labor support from Capitol Exhibit Services Inc.Greenbelt, MD May 14, 2011

HQ PAO Jim Hull ################### $13,508.72 $13,508.72 05/25/2011 05/27/2011 On Schedule

2377 0712H.4.M.6.83.2377 Exploration Experience exhibit Troy Strawberry Festival (Support OC Travel) 6/2-6/6, 2011

ESMD Betty Grisham ESMD’s Exploration Experience exhibit will be attending the Troy Strawberry Festival in Troy, Ohio June 4 & 5, 2011.

$1,402.14 05/24/2011 05/26/2011 On Schedule

2378 0712H.4.M.6.82.2378 The Space Shuttle: An Engineering Milestone – GA Tech

Shuttle Shannon Raleigh & ################### $515.07 $515.07 05/09/2011 06/08/2011 On Schedule

2379 0712H.4.M.6.82.2379 The Space Shuttle: An Engineering Milestone – GA Tech – ABermea travel

Shuttle Shannon Raleigh & ################### $872.72 05/26/2011 06/09/2011 On Schedule

Page 23: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2380 0712H.4.M.6.82.2380 The Space Shuttle: An Engineering Milestone – GA Tech – COwens travel

Shuttle Shannon Raleigh & ################### $832.72 05/26/2011 06/09/2011 On Schedule

2381 0712H.4.M.6.82.2381 The Space Shuttle: An Engineering Milestone – GA Tech – JSpurgin travel

Shuttle Shannon Raleigh & ################### $832.72 05/26/2011 06/09/2011 On Schedule

2382 Feature campaign: Marshall's Lunar Robotic Lander team profiles

CS20 Kim Newton ################### $0.00 05/25/2011 06/27/2011 Completed

2383 MSFC Picnic Shuttle Ann Towry Set up mobile Shuttle trailer and side tent at 4316/walking trail area per diagram for annual picnic on 6/4/11. Diagram to be provided NLT Friday, 5/27/11. Exhibits to be

$0.00 06/03/2011 06/04/2011 Completed

2384 0712H.4.M.6.83.2384 Exploration Experience exhibit at the Troy Strawberry Festival – Technician Travel

ESMD Betty Grisham ESMD’s Exploration Experience exhibit will be attending the Troy Strawberry Festival in Troy, Ohio June 4 & 5, 2011. Work Order is for technician

$1,931.00 06/01/2011 06/02/2011 On Schedule

2385 0712H.4.M.6.83.2385 ESMD NASA Day on the Hill June 15: OC travel

ESMD Betty Grisham ################### $1,131.79 06/01/2011 06/08/2011 On Schedule

2386 ESMD Odyssey of Mind: Capitol pick up of material to support follow on event

ESMD Betty Grisham Make payment to Capitol for pick up our materials from College Park, MD, store at

$775.00 $0.00 06/02/2011 06/06/2011 On Schedule

2387 0712H.4.M.6.83.2387 HQ PAO LaRC Education Outreach with NASA Education Assoc. Admin. Leyland Melvin: payment for Capitol services

HQ PAO Jim Hull ################### $521.00 $521.00 05/31/2011 06/06/2011 On Schedule

2388 0712H.4.M.6.83.2388 HQ Aero support: Andrews AFB Joint ServicesAcademy of Model Aeronautics (AMA) Rev. 1

HQ AERO Steve Lighthill ################### $2,033.31 06/02/2011 06/07/2011 On Schedule

2389 0712H.4.M.6.83.2399 Inst Great Nations Dare carpet purchase

CS20 Ola Metcalfe Purchase carpet for Great Nations Dare exhibit. Exhibit

$2,000.00 $1,994.40 06/06/2011 06/20/2011 On Schedule

2390 0712H.4.M.6.83.2390 Exploration Experience exhibit at The Detroit Science Center June – Technician travel

ESMD Betty Grisham Exploration Experience exhibit will be at The Detroit Science Center June 10-12, 2011. Work Order is for Technician

$1,500.40 06/01/2011 06/03/2011 On Schedule

2391 0712H.4.M.6.83.2391 HQ PAO Earth Globe purchase HQ PAO Jim Hull Order a 1m earth globe from Orbis. Have vendor ship globe directly to Capitol Exhibits in

$135.00 $154.76 06/06/2011 06/08/2011 On Schedule

2392 0712H4.M.6.83.2392 Travel to Kennedy Space Center, Fla., July 5-9, 2011

Shuttle Steve Roy ################### $1,287.90 06/06/2011 07/05/2011 On Schedule

Page 24: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2393 Armed Forces Celebration Week CS20 May Wales Armed Forces Celebration Week’s Concert in the Park, Big

$0.00 06/03/2011 06/10/2011 On Schedule

2394 0712H.4.M.6.83.2394 HQ PSD Capitol Exhibits 50th Anniversary 1st Nuclear

HQ PSD Kim Larock Work with Capitol Exhibits to fund the 50th Anniversary of 1st Nuclear Space Flight. Current estimate is $5,150.48

$5,150.48 $5,150.48 06/09/2011 06/20/2011 On Schedule

2395 0712H.4.M.6.83.2395 The Michigan Challenge Balloon Festival (Howell, MI)June 24-26, 2011

ESMD Betty Grisham ################### $3,098.00 06/13/2011 06/17/2011 On Schedule

2396 0712H.4.M.6.82.2396 Display Cases for Tiles Shuttle Shannon Raleigh & Display cases for Space Shuttle tiles and plaques to go on

$500.00 $467.04 05/17/2011 06/30/2011 On Schedule

2397 0712H.4.M.6.83.2397 HQ PAO NASA Day on the Hill – Lit Pod support from SOMD via G.E.S.

HQ PAO Jim Hull Work order is for payment of Lit Pod use at NASA Day on the Hill. Event is June 15 at Rayburn House building. Supplier is G.E.S. and

$1,409.37 06/01/2011 06/10/2011 On Schedule

2398 0712H.4.M.6.83.2398 ESMD Purchase Computer parts and Build Computers for EE Pavilion

ESMD Betty Grisham Build computers for the Dome. These will replace the original Dome computers now being used for the Exploration 5 screen exhibit. There will be

$9,698.40 $9,719.90 06/17/2011 07/20/2011 On Schedule

2399 0712H.4.M.6.82.2399 ESMD EE support at2011 Battle Creek, MI Balloon Festival & Air Show Battlecreek, MIJuly 1-4, 2011

ESMD Betty Grisham ESMD’s EE Traveling Exhibit will be at 2011 Battle Creek, MI Balloon Festival & Air Show July 1-4. This work order is for ASRI Outreach Coordinator Kirk Pierce and ASRI technician

$4,296.00 06/22/2011 06/29/2011 On Schedule

2400 0712H.4.M.6.83.2400 ESMD EE support atAssociation of Model Aeronautics 75th Anniversary in Muncie, IN 7/14-7/17/11

ESMD Betty Grisham ESMD’s EE Traveling Exhibit will be at Association of Model Aeronautics 75th Anniversary in Muncie, IN 7/14-7/17/11.This work order is for ASRI Outreach Coordinator Kirk Pierce and ASRI technician

$4,005.26 06/20/2011 06/28/2011 On Schedule

2401 0712H.4.M.6.83.2401 ESMD National Council of La Raza (NCLR) Conference July 22-26, 2011Washington DC

ESMD Betty Grisham ################### $14,107.62 $7,977.62 06/24/2011 06/28/2011 On Schedule

IDIQ - Snow Support OSAC Director’s communication services meeting with Dan Dumbacher

CS01 Bobby Watkins Support OSAC Director’s communication services meeting with Dan Dumbacher, Human Exploration Capabilities Program Director, at NASA Headquarters.

$2,017.00 06/13/2011 06/20/2011 On Schedule

Page 25: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2402 0712H.4.M.6.82.2402 Planetary Science Pay It Forward Award

HQ PSD Dan Woodard ################### $87.48 $91.73 06/02/2011 07/08/2011 On Schedule

2403 Shuttle Legacy" exhibit for STS-135 Shuttle Ann Towry Set up the "Conquering LEO" Shuttle Legacy exhibit in the Morris Auditorium; remove NET the day after landing and end of STS-135 mission. Check with John Dumoulin, who will coordinate with Protocol and

$0.00 06/23/2011 06/30/2011 On Schedule

2404 0712H.4.M.6.90.2404 FY11 Open Inscription Work Order EMB Pat Fuller & Sandra his is an open ended budget work order for inscription services through the rest of Fiscal Year 2011.

$355.96 06/29/2011 09/30/2011 On Schedule

2405 0712H.4.M.6.83.2405 HQ PAO 2nd USA Science & Engineering Festival application & exhibit space payment

HQ PAO Jim Hull Work order is for payment of exhibit space for 30 (10 x 10) display spaces at the 2nd USA Science & Engineering Festival to be held on the National Mall

$30,000.00 $30,000.00 06/22/2011 07/13/2011 On Schedule

2406 0712H.4.M.6.83.2406 ESMD EE Wausau (WI)Ballon Rally July 7-10, 2011

ESMD Betty Grisham ################### $4,580.00 06/30/2011 07/06/2011 On Schedule

2407 0712H.4.M.6.83.2407 Coasters for NESC CS30 Twila Schneider ################### $1,149.37 $1,139.40 06/30/2011 07/07/2011 On Schedule2408 0712H.4.M.6.83.2408 HQ PAO UNCOPUOS - preparation

shipping Rev. 1HQ PAO Jim Hull ork order is for preparation &

shipping overseas only. We will move to pay immediately upon

$14,061.31 $14,061.31 06/30/2011 07/05/2011 On Schedule

2409 0712H.4.M.6.83.2409 HQ Aero Kansas City Air Show Rev. 1

HQ AERO Steve Lighthill ################### $690.70 07/01/2011 07/08/2011 On Schedule

2410 0712H.4.M.6.83.2410 HQ PAO TYCW at HQ: staffer supportCANCELLED

HQ PAO Jim Hull rovide exhibit and staffer support at NASA Headquarters Take Your Children to Work

$2,382.00 07/15/2011 07/19/2011 On Schedule

2411 0712H.4.M.6.83.2411 Scott Pace - Support MSFC CS10 Dennis Boccippio ################### $6,914.86 $6,595.00 07/15/2011 08/31/2011 On Schedule2412 0712H.4.M.6.83.2412 ESMD EE Columbus OH July 21-24,

2011 ESMD Betty Grisham ################### $3,630.00 07/11/2011 07/19/2011 On Schedule

2413 0712H.4.M.6.83.2413 Fund Leadership Alabama Class XXII

CS01 Fred Harrington Provide check with funding for Leadership Alabama Class XXII

$2,500.00 $2,500.00 07/12/2011 07/14/2011 On Schedule

2414 System Software Engineering Forum Shuttle May Wales ################### $0.00 07/19/2011 07/25/2011 On Schedule

2415 Shuttle Awards Shuttle May Wales Shuttle Awards Ceremony in 4316 which is scheduled for 7/25/11.

$0.00 07/18/2011 07/19/2011 On Schedule

Page 26: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2416 0712H.4.M.6.82.2416 Construction of Six 1:72 ET & carrier models

Shuttle John Dumoulin Build six more 1:72 ET on carrier scale models for MP (John Rector). Delivery date is firm.

$600.00 $584.11 07/10/2011 08/15/2011 On Schedule

2417 0712H.4.M.6.82.2417 Two hardware /engine stands and text for PRDL

PRDL John Dumoulin By matching the styles of past PRDL engine component stands or based on drawings provided by MSFC's PRDL, make custom-

$2,000.00 $1,071.71 04/21/2011 08/15/2011 On Schedule

2418 0712H.4.M.6.83.2418 Q Aero Kirksville, MO Air Show - Sept 11, 2011 Rev. 1

HQ AERO Steve Lighthill ################### $622.34 07/26/2011 08/01/2011 On Schedule

2419 2011 MSFC Reorg / New Leadership Campaign

CS20 Steve Roy & Jennife ################### $0.00 07/12/2011 09/16/2011 Completed

2420 0712H.4.M.6.83.2420 ESMD EE at Joliet Historical Museum (Joliet, IL)

ESMD Betty Grisham ################### $4,374.00 07/27/2011 08/11/2011 On Schedule

2421 0712H.4.M.6.83.2421 ESMD EE at Sci Tech (Aurora, IL) 8/16-18, 2011Rev. 1

ESMD Betty Grisham ################### $4,189.00 08/01/2011 08/05/2011 On Schedule

2422 0712H.4.M.6.83.2422 EE at Chicago Air & Water Show Aug 20-21, 2011

ESMD Betty Grisham ################### $3,318.00 08/01/2011 08/09/2011 On Schedule

2423 0712H.4.M.6.83.2423 2011 Congressional Black Caucus / 41st Annual Legislative ConferenceRev. 1

HQ PAO Jim Hull ################### $8,400.00 $8,800.00 08/02/2011 08/03/2011 On Schedule

2424 0712H.4.M.6.83.2424 HQPAO NASA Day on the Hill - payment for Lit Pods

HQ PAO Jim Hull ################### $1,409.37 $1,409.37 08/04/2011 08/09/2011 On Schedule

2425 0712H.4.M.6.83.2425 ESMD LLWS Aug 18-28, 2011 Rev. 1

ESMD Betty Grisham ################### $5,957.94 08/05/2011 08/15/2011 On Schedule

2426 0712H.4.M.6.83.2426 IAC 2011 - Theater design HQ PAO Jim Hull ################### $15,000.00 $15,000.00 08/11/2011 08/16/2011 On Schedule2427 0712H.4.M.6.83.2427 HQ PAO IAC Oct 2011: shipping,

exhibitor services Rev. 1HQ PAO Jim Hull ################### $125,300.70 ####### 08/09/2011 10/08/2011 On Schedule

2428 0712H.4.M.6.82.2428 1:15 Red Mobile Shuttle Refurbishment

Shuttle John Dumoulin As time permits, please refurbish the Red Mobile

$5,200.00 $1,666.01 11/10/2010 08/20/2011 On Schedule

2429 0712H.4.M.6.83.2429 HQ PAO- Goddard Community Day A/V - CESI

HQ PAO Jim Hull ################### $5,455.03 $5,455.03 08/11/2011 08/31/2011 On Schedule

2430 Von Braun Bust and Case Shuttle Ola Metcalfe USSRCVon Braun Bust and caseTransport exhibit and setup August 12, 2011

$0.00 08/10/2011 08/12/2011 On Schedule

2431 0712H.4.M.6.83.2431 Pilot wing pins for RLDP ED Clara Keyes ################### $1,552.75 $1,554.93 08/16/2011 08/31/2011 On Schedule

Page 27: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2432 0712H.4.M.6.83.2432 Albuquerque Balloon Fiesta HQ AERO Steve Lighthill Provide exhibit planning and staffing support at the ABQ Balloon Fiesta. Provide end of event report for OSAC customer. Travel to event will be 9/29/11; set up 9/30/11;

$2,174.40 08/17/2011 08/22/2011 On Schedule

2433 HQ PAO IAC 2011 Photo Kiosk to Cape Town

HQ PAO Jim Hull ################### $0.00 08/12/2011 08/19/2011 On Schedule

2434 0712H.M.4.6.82.2434 LQ Exhibit Support Lunar Quest Stephanie Wilson & ################### $0.00 08/15/2011 08/15/2011 On ScheduleIDIQ-Grail

Launch-Wilson0712H.4.Q.0.08.LPRP Exhibit Support at GRAIL launch Lunar Quest Stephanie Wilson ################### $1,294.17 08/22/2011 09/16/2011 On Schedule

2435 0712H.M.4.6.83.2435 HQ PAO - GRAIL Launch - OC travel HQ PAO Jim Hull ################### $1,265.00 08/22/2011 09/01/2011 On Schedule

2437 0712H.4.M.6.82.2437 Robotic Lander exhbit at Ala Robotic Tech Park

ED Clara Keyes ################### $0.00 08/23/2011 09/01/2011 On Schedule

2438 0712H.4.M.6.82.2438 ESMD photo kiosks update - August 2011 Rev. 1

ESMD Betty Grisham ################### $1,619.20 $1,619.20 08/22/2011 08/24/2011 On Schedule

2439 0712H.4.M.6.58.2439 Renew Congressional Quarterly Subscription

CS30 Kevin McGhaw Renew Congressional Quarterly subscription

Renew Congressional Quarterly Subscription for the Office of External Affairs (CS30). Contact David Stevens at 202-

$34,900.00 $34,900.00 08/26/2011 08/29/2011 On Schedule

2440 0712H.4.M.6.82.2440 Engravings for Intern Cup trophy Education John Dumoulin ################### $30.00 $14.96 08/25/2011 09/16/2011 On Schedule2436 0712H.4.M.6.83.2436 ESMD ASTC Oct 2011: booth,

exhibitor servicesESMD Betty Grisham ################### $4,556.39 $4,694.39 08/25/2011 08/26/2011 On Schedule

2441 0712H.4.M.6.83.2441 2011 HQ PAO Congr. Black Cauc. -GEM KioskDUPLICATE - CANCEL

HQ PAO Jim Hull ################### $8,880.46 08/25/2011 09/02/2011 On Schedule

2442 0712H.4.M.6.83.2442 HQ PAO - GRAIL Launch - OC travel Rev. 1

HQ PAO Jim Hull ################### $1,159.50 08/16/2011 08/19/2011 On Schedule

2443 Bldg 8023 Content Removal CS20 Ola Metcalfe Assess and/or remove "exhibit items" from Warehouse 8023.

Charge time to A-TE

$0.00 08/25/2011 10/01/2011 On Schedule

2444 0712H.4.M.6.83.2444 ESDM EE at Atlanta Motor Speedway

ESMD Betty Grisham ################### $2,970.00 $79.63 08/24/2011 08/29/2011 On Schedule

2445 0712H.4.M.6.82.2445 Repairs for moonbuggy exhibit at USSRC.

CS20 Ola Metcalfe Repairs for moonbuggy exhibit at USSRC.

$160.00 $145.37 08/29/2011 09/01/2011 On Schedule

2446 0712H.4.M.6.82.2446 Two hardware /engine stands and text for PRDL

PRDL John Dumoulin By matching the styles of past PRDL engine component stands or based on drawings provided by MSFC's PRDL, make custom-built display stands and graphics as specified below.

$15,000.00 04/21/2011 09/30/2011 On Schedule

Page 28: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2447 0712H.4.M.6.83.2447 PSD-Erikson Grail Launch support Sept 2011

HQ PSD Kristin Erikson & Br ################### $2,860.00 $31.16 08/22/2011 08/26/2011 On Schedule

2448 Gwinnett Environment & Heritage Center ( WR)

CS20 Ola Metcalfe Gwinnett Environment & Heritage Center (Buford, GA)Grand Opening of the Living in Space

$0.00 08/25/2011 09/02/2011 On Schedule

2449 HQ PAO Congressional Black Caucus Exhibit Design

CS20 HQ PAO ################### $0.00 08/31/2011 09/06/2011 On Schedule

2450 0712H.4.M.6.82.2450 Develop new banner stand graphic Lunar Quest Stephanie Wilson & Please design a new banner stand graphic for the Robotic Missions Program Office to replace a current graphic.

$175.00 08/30/2011 10/10/2011 On Schedule

2451 0712H.3.M.6.83.2027 OSAC Offsite – Union Station CS01 Shelley Marshall & OSAC will be having a management off-site in Nashville, TN at the Union Station Hotel. OSAC requires

$300.00 $760.47 08/31/2011 09/13/2010 On Schedule

2452 0712H.4.M.6.83.2452 HQ PAO CBC Sept 2011 Exhibit Services

HQ PAO Jim Hull ################### $13,442.90 $2,864.00 08/31/2011 09/09/2011 On Schedule

2453 0712H.4.M.6.58.2453 Subscription to Leadership Library CS30 Kevin McGhaw Subscribe to the Online Leadership Library from Leadership Directories, Inc. for the Office of External Affairs (CS30). Contact Tom Fiffer at 212-433-1406 or email

$5,000.00 $5,000.00 09/12/2011 09/30/2011 On Schedule

2454 0712H.4.M.6.83.2454 HQ PAO-IAC Travel for contractor staffers Rev. 1

HQ PAO Jim Hull ################### $26,641.11 $26,641.11 09/13/2011 09/15/2011 On Schedule

2455 0712H.4.M.6.83.2455 Shuttle Space 2011- Education Alley Shuttle Ann Towry ################### $3,486.19 $1,666.19 09/01/2011 09/22/2011 On Schedule

2456 0712H.4.M.6.83.2456 2011 Int'l Council of Air Shows HQ AERO Steve Lighthill ################### $1,713.90 09/07/2011 09/12/2011 On Schedule2457 0712H.4.M.6.83.2457 ESMD Fed EX R2R lithos_Chicago

NASCAR eventESMD Betty Grisham ################### $80.00 09/06/2011 09/09/2011 On Schedule

2458 0712H.4.M.6.83.2458 HQ PAO (IAC) Int'l Astronautical Congress-travel -OC

HQ PAO Jim Hull ################### $5,704.26 09/12/2011 09/14/2011 On Schedule

2459 0712H.4.M.6.83.2459 2011 HQ PAO Congr. Black Cauc. -GEM Kiosk support

HQ PAO Jim Hull ################### $8,880.46 $9,906.44 08/25/2011 09/24/2011 On Schedule

2460 0712H.4.M.6.83.2460 ESMD CBC 2011:OC and 1/2 tech travel

ESMD Betty Grisham Work order is for travel costs for one OC to staff and one technician to support exhibit install at Congressional Black

$2,949.00 09/13/2011 09/21/2011 On Schedule

2461 0712H.4.M.6.83.2461 HQ PAO CBC Sept 2011: half travel costs for tech

HQ PAO Jim Hull Work order is for payment of 50% of travel costs for one technician to support exhibit

$534.00 09/14/2011 09/21/2011 On Schedule

Page 29: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2462 0712H.4.M.6.90.2462 NASA Meatball Triangle Paperweight Memento Restock

EMB Sandra Turner NASA Meatball Triangle Paperweight Memento Restock

50 @ $15.50 = $775Shipping Est. = $15Tax = $63.20Total Cost = $853.20

$853.20 $853.20 09/20/2011 09/23/2011 Completed

2463 0712H.4.M.6.55.2463 Flicker Renewal CS20 Brooke Boen Renew Marshall's Flickr Pro account for another two-year

$47.99 09/12/2011 09/17/2011 On Schedule

2464 ISS Photo Op to Geneva CS20 John Dumoulin Purchase, build and deliver enhanced ISS space suit photo op and ISS model exhibits to Geneva, Italy , for conference and long-term display

$0.00 07/14/2011 09/15/2011 On Schedule

2465 0712H.4.M.6.55.2465 Communications Workshop Rev. 1 SLS Dan Kanigan ################### $6,540.00 $6,540.00 09/20/2011 09/23/2011 On Schedule2466 0712H.4.M.6.83.2466 Acrylic Frames SLS Gloria Ayers Kimberly Robinson has asked

me to purchase 20 5x7 acrylic frames for displaying SLS

$21.60 09/21/2011 09/23/2011 On Schedule

2467 Gemini model shipped to HQ Historian

HQ PAO John Dumoulin Ship 1:8 Gemini model to NASA HQ for use at Gemini 45th Anniversary event.. Contact: William P. Barry,

$0.00 09/16/2011 09/19/2011 On Schedule

2468 Centennial Challenge - Green Flight event, CA

CS20 Centennial ################### $0.00 07/22/2011 09/15/2011 On Schedule

2469 0712H.4.M.6.83.2469 Garver popup backdrop CS20 John Dumoulin ################### $500.00 09/19/2011 09/20/20112470 0712H.4.M.6.82.2470 1:100 Ares V model converted to

prelim SLS conceptCS20 John Dumoulin ################### $75.00 09/16/2011 09/28/2011 On Schedule

2471 0712H.4.M.6.83.2471 ESMD kiosk build for suvey tablets_Oct 2011

ESMD Betty Grisham ################### $500.00 $158.68 09/14/2011 10/07/2011 On Schedule

2472 Garver popup backdrop & Model to/from USSRC

CS20 John Dumoulin Popup graphic (and stand in case needed) for media activities during SLS Industry Day in the Davidson Center, as well as SLS 1:100 model if complete in time. Call Dumoulin for description of

$0.00 09/27/2011 09/30/2011 On Schedule

2473 Lunar Quest Exhibit Support CS30 Stephanie Wilson & ################### $0.00 09/28/2011 10/07/2011 On Schedule2474 0712H.4.M.6.55.2474 Lori Garver All Hands Transcript EMB Dom Amatore Lori Garver All Hands $175.05 $175.05 09/29/2011 10/31/2011 On Schedule2475 0712H.4.M.6.83.2475 OCT/Cent Challenges_ Fed Ex

package to AmesChief Tech John Dumoulin for ################### $90.00 09/19/2011 09/22/2011 On Schedule

2476 0712H.4.M.6.83.2476 CentChallenge - Trailer exhibit design & research

Chief Tech John Dumoulin ################### $10,000.00 09/24/2011 10/06/2011 On Schedule

2477 0712H.4.M.6.83.2477 Blumrich Drawings CS20 Molly Porter ################### $100.00 $100.00 10/04/2011 11/30/2011 On Schedule

Page 30: Required Date Status 10/05/2010 10/11/2010 On Schedule · 2119 ESMD EE work: Graphics for the inside of the Exploration Experience; ESMD Betty Grisham ##### $0.00; 09/22/2010 11/19/2010;

2478 0712H.4.M.6.83.2478 ESMD ASTC Oct 2011_cost and work requirements

ESMD Betty Grisham ESMD will support Association of Science and Technology Centers in Baltimore, MD (October 14-16, 2011) with the ESMD 5 screen exhibit, collapsible literature rack, and

$3,307.00 09/28/2011 10/13/2011 On Schedule

2497 0712H.4.M.6.90.2497 Shuttle Celebration at USSRC EMB Linda Gomez Shuttle Celebration at USSRC:Facility, Technical Support, Custodial & Security Fees:

$10,156.06 $10,156.06 08/20/2011 11/30/2011 On Schedule