Presentation by UPPCL: 10 September’2014 Restructured Accelerated Power Development and Reform Program Part A
Transcript
Page 1: Restructured Accelerated Power Development and Reform ...

Presentation by

UPPCL: 10 September’2014

Restructured Accelerated Power Development and Reform

Program Part A

Page 2: Restructured Accelerated Power Development and Reform ...

About UPPCL

The creation of Uttar Pradesh Power Corporation Ltd. (UPPCL) on January 14,2000 is the result of power sector reforms and restructuring in UP (India)which is the focal point of the Power Sector, responsible for planning andmanaging the sector through its transmission, distribution and supply ofelectricity.

UPPCL is having 5 Discom (s) in Uttar Pradesh.

1. Purvanchal Vidyut Vitran Nigam Ltd.

2. Paschimanchal Vidyut Vitran Nigam Ltd.

3. Dakshinanchal Vidyut Vitran Nigam Ltd.

4. Madhyanchal Vidyut Vitran Nigam Ltd.

5. KESCo(Kanpur Electricity Corporation)

Page 3: Restructured Accelerated Power Development and Reform ...

UPSEB NPCL

KESCO UPJVUNL UPRVUNL UPPCL

DVVNL PuVVNLPVVNL

UPPTCL

MVVNL

1993

1st Transfer Scheme , Year 2000

2nd Transfer Scheme, Year 2003

3rd Transfer Scheme ,Year 2006Covered under RAPDRP Project

About UPPCL-A brief History

Page 4: Restructured Accelerated Power Development and Reform ...
Page 5: Restructured Accelerated Power Development and Reform ...

Capacity Augmentation & Strengthening of the system

GenerationSource 2014-15 2015-16 2016-17 Total

State Sector(In MW) 1000 - - 1000

Combined (In MW)- - 916

916

Central Sector(In MW)623 182 250

1055

Private Sector(In MW)1430 1794 660 3884

Case -1 Bidding(In MW) - - 21752175

Total(In MW)3053 1976 4001 9030

Page 6: Restructured Accelerated Power Development and Reform ...

Transmission

Capacity Augmentation & Strengthening of the system

Sr. No DescriptionPresent Count

2014-15 2015-16 2016-17

1765 KV Substation 1 3 4 5

765 KV Capacity 2000 5500 11000 14000

2400 KV Substation 14 21 29 35

400 KV Capacity 9195 13620 22950 28950

3220 KV Substation 75 89 106 116

220 KV Capacity 8183 9358 10848 11690

4132 KV Substation 286 318 350 400

132 KV Capacity 29003 32363 35723 40523

Page 7: Restructured Accelerated Power Development and Reform ...

Distribution

Capacity Augmentation & Strengthening of the system

Sr. No. Description MVVNL PVVNL PuVVNL DVVNL Total

Requirement of 33/11 KV New Substation

Numbers 214 328 148 153 843

Capacity(KVA) 1515 3335 1100 1224 7174

Augmentation of Present 33/11 KV substation

Numbers 181 267 300 484 1233

Capacity(KVA) 758 1410 1393 1085 4646

Page 8: Restructured Accelerated Power Development and Reform ...

Revenue figures of UPPCL throughout the years

Sr. No. Year Energy Receipt (MU) Realization(In Cr.)Realization

Rate(Rs/Unit)

1 2011-12 67313.6 14404 2.14

2 2012-13 70457.2 17091.2 2.43

3 2013-14 75479.7 21995.8 2.91

• Revenue of FY 2013-14 increased by 28% vis-à-vis FY 2012-13whereas Energy Receipt for FY 2013-14 increased by 7.12% vis-à-visFY 2013-12

Page 9: Restructured Accelerated Power Development and Reform ...

Objective

To make UPPCL/Discoms as one of the best managed utilities in power sector

and to provide access to electricity to everyone in the State.

Consumer Satisfaction and Consumer Empowerment

Loss Reduction

Business Process Improvement

Page 10: Restructured Accelerated Power Development and Reform ...

UP-RAPDRP –At a Glance

No of towns -168

No of Discoms-4

No of Consumers-5251457

HT Line covered-17012

LT Line covered-31239.3

No. of 11kV Substation-811

No of 11 KV feeder-3880

No of Distribution Transformer-68200

Page 11: Restructured Accelerated Power Development and Reform ...

UP-RAPDRP –At a Glance

Eligible towns

Earlier Sanctioned Cost

Towns (Rs. Cr)

Additional Sanction Cost (Rs. Cr)

Revised Sanctioned Cost (Rs. Cr)

Part-A (IT) 168 650.68 124.42 775.10

ITC : Infosys (Mar. 2009)

ITIA : HCL Technologies (Feb. 2010)

SDC : NDPL (May. 2010)

SIA : Siemens Limited

TPIEA-EA : WAPCOS (Nov. 2010)

DC/DR : Lucknow/Noida

Pilot Towns : Lucknow, Meerut, Aligarh, Varanasi

Ring Fencing : 168/168Towns verified by TPIEA-EA.

Baseline AT&C : 168 towns accepted

Page 12: Restructured Accelerated Power Development and Reform ...

Consumer Profile for RAPDRP Project

84%

15%0%0%0%1%0%0%0%0%0%0%0%0%

Categorywise consumers%

Domestic

Non-Domestic

Public Lamps

Public Institutions

Small Power for Private Tubewells

Small Power for PTW

Public Water Works

State Tube Wells

Temporary Supply

Departmental Consumer

HT Consumers

Large and Heavy Power

Railways

Sr. No Category Type No.

1 Domestic 4391304

2 Non-Domestic 772434

3 Public Lamps 29

4 Public Institutions 16933

5Small Power for Private

Tube wells 4945

6 Small Power for PTW 60298

7 Public Water Works 854

8 State Tube Wells 4

9 Temporary Supply 0

10 Departmental Consumer 66

11 HT Consumers 1340

12 Large and Heavy Power 3248

13 Railways 1

14 Lift Irrigation works 1

Grand Total 5251457

Page 13: Restructured Accelerated Power Development and Reform ...

Scale of operation

Total Consumers : 63 Lakh

SBM Extracts for 100% Spot Billing : ~52 Lakh

Upload of SBM Bills : ~1.8 to 2 Lac on Daily basis

Online Counter Payments : ~1.25 to 1.5 Lakh on Daily basis

Revenue Collection : Rs. 750+ Cr. (Monthly)

Revenue Collection through Web Portal : Rs. 47Cr.(Monthly)

Modem/MRI Based Billing : ~8K

Customers Total ~5500 Users out which ~1500 are Concurrent Users during the Business Hours.

Field Infrastructure Roll at ~2100 Sites across the State.

Scale of operation being enormous , Uttar Pradesh has unique set of challenges and complications incomparable to other states.

Page 14: Restructured Accelerated Power Development and Reform ...

Improvement in Revenue figures post RAPDRP Implementation

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

Reve

nu

e(C

r)

Revenue from UP-RAPDRP System

Aug-14 Jul-14 Jun-14 May-14 Apr-14 Mar-14

Page 15: Restructured Accelerated Power Development and Reform ...

Initiatives by UPPCL/Discoms

To achieve the objective of UPPCL, different initiatives were taken by organisation post establishment of RAPDRP platform, some of the key initiatives are given below:

– Vidyut Chori Roko Abhiyan (VICRA)

– Web Portal based services

– SMS services

– 72 hours transformers replacement

– Best Practices in GIS , MDAS and Network management

– Immediate future plans

Page 16: Restructured Accelerated Power Development and Reform ...

Vidyut Chori Roko Abhiyan (VICRA)

Part A

– Relaxation of BL form in New Connection process– Target of 25 lakh New Connection– Load Enhancement & theft control

Outcome :

VICRA with the support of Govt. Administration has been a grand success. A total no. of 23.95 lacs New

Service Connection (NSC) have been added and we are very near to achieving the target of 25 lacs New

Service Connection by the end of Aug 14

DISCOM

New Service ConnectionExpected

revenue (Rs.

Lacs)

Load enhancement

TargetAchievement

in Nos.in % Nos. Load

Expected

revenue * Rs.

in Lacs

PVVNL 359934 211014 58.63% 3515 23390 45247 384

MVVNL 871616 736567 84.51% 9403 54001 70460 613

DVVNL 496491 525838 105.91% 8597 41673 58107 494

PuVVNL 744300 900409 120.97% 13317 39320 67792 772

KESCO 23246 21750 93.56% 423 4262 6883 72

TOTAL 2495586 2395578 95.99% 35262 162646 248740 2335

Page 17: Restructured Accelerated Power Development and Reform ...

VICRA Part B

Part B

– Each Sub Division Officer assigned with 2 feeders ( High Loss )

– Target is to bring the losses up to 15 % in these feeders

Methodology :

– To Fix/Replace all the Modems & DCUs

– To Identify the Unidentified/Unmetered/Unledgerised consumers

– Migrate these consumers into the billing database

– Update the GIS

– Check Load and Meter condition of all Identified consumers

– Load enhancement wherever required

– Replacement of Meters where meters are faulty.

– Permanent Disconnection to untraceable/non existing consumers

Page 18: Restructured Accelerated Power Development and Reform ...

VICRA Part B…

Name of

DISCOM

No of

Feeder

selected

No. of

consumers in

feeder as per

present GIS

Additional No.

of Consumers

after Survey

TOTAL Direct

Supply

Un

meter

ed

Unledge

rised

Meter

Slow/

Def.

Meter

OKTotal

No % No % No

PVVNL 111 261943 91.90 23078 8.10 285021 914 1434 1838 11518 136609 152313

MVVNL 66 146380 91.71 13227 8.29 159607 531 1330 1203 10306 51763 65133

DVVNL 65 89622 88.84 11261 11.16 100883 275 1127 351 9468 57989 69210

PuVVNL 33 56943 93.14 4194 6.86 61137 400 771 829 2278 19863 24141

KESCO 20 NA NA NA NA NA 600 57 23 1417 -- 2097

Total 295 554888 91.47 51760 8.53 606648 2720 4719 4244 34987 266224 312894

Page 19: Restructured Accelerated Power Development and Reform ...

Web Portal for Consumers

To facilitate electricity consumer, Web portal http://www.uppclonline.com/was initiated.

The major facility which were applicable on web portal were

– View and Pay Bills

– Register complaints

– Check their Billing History

– Consumption calculator

– Print Duplicate Bills

– Submit New connection form

Page 20: Restructured Accelerated Power Development and Reform ...

UP-RAPDRP Web Portal

Page 21: Restructured Accelerated Power Development and Reform ...

Features of Payment Modes

The uniqueness of Payment mode in uppclonline.com is that no charges are levied on consumers who are using online payment options as Banks gateways are directly integrated with the system.

The payment Gateway which are integrated with the RAPDRP system are

– Techprocess Solutions ltd.

– Punjab National Bank

– ICICI Bank

– Axis Bank

The online payment operations is fully secured. With minimal failure rate the total number of successful transactions through web portal since its inception is 20.3 lacs amounting to Rs.455.47 Crores.

Page 22: Restructured Accelerated Power Development and Reform ...

Different Mode of Payments

Page 23: Restructured Accelerated Power Development and Reform ...

Benefits to Customer

Diversified Payment Options

Long queues

A special day off for bill payment

Only option for payment :

Cash\Cheque

Enabling customer to pay bill for almost all

payment avenues like Credit Card, online

Banking etc.

Customer can pay their bills through collection

Kiosk. Which are available at all key cities like

Varanasi/Noida/Lucknow/Meerut/Aligarh etc.

Be

fore

RA

PD

RP

Aft

er

RA

PD

RP

Page 24: Restructured Accelerated Power Development and Reform ...

Online Payment till its Initiation

Total online Registration till date of UPPCL customer across UP is

2,75,790 which is expected to rise exponentially in the coming

months.

Page 25: Restructured Accelerated Power Development and Reform ...

Sharing Information about web portal

Many initiatives are takento educate and informconsumers about thebenefits of online webportal through differentmedia like Newspaper ,advertisement via Radio,Flex Boards display acrossthe cities etc.

Page 26: Restructured Accelerated Power Development and Reform ...

SMS facility to Consumers

SMS are sent to consumers on various events such as:

– Generation of Bills

– Payment confirmation

– Disconnection Notice

– Scheduled Outages

Page 27: Restructured Accelerated Power Development and Reform ...

SMS facility to Consumer

Pull facility was introduced in RAPDRP system so that consumer can extract Bill Information/Supply position/Transformer burnt/Meter faulty information through SMS.

Integrated Customer care system was introduced where an intermediate server was installed where SMS from consumers lands and are directed to customer care center executive. Customer Care executive gather or decimate the information and an SMS is sent to consumer to update him/her. Facility offered by Pull SMS feature

1. Transformer Burnt

2. Supply Position

3. No Meter reading

4. Meter faulty

5. Wrong Bill

Page 28: Restructured Accelerated Power Development and Reform ...

SMS Pull Services

Page 29: Restructured Accelerated Power Development and Reform ...

Transformer Breakdown Information

Call Center

Gram Pradhan

Automated calls to Gram Pradhan for reporting Transformer Breakdown

ICC System

Dear Customer, We have registered your

complaint of "Transf. Break Down". Your

case ID is MV110220140044. Your

complaint has been forwarded to JE AP

singh, mobile no 9650066788. Thank You

Dear Sir,

Following complaint has been received

Type- Transformer breakdown

Village- XXX

Name- XXXX

Contact no.- 9818000000

Gram Pradhan

Gram PradhanAutomated calls

Real time

response

capture

Consumer

SMS to 5616195

PVVNL TFBD

Call back to consumer/gram pradhan

Complaint registration in System

SMS to JE SMS to consumer

Page 30: Restructured Accelerated Power Development and Reform ...

Figures of SMS Facility from its inception

Consumers who are registered

for SMS facility (no.)

SMS which are send to

consumer (no.)

SMS which are delivered to

consumer (no.)

8,10,011 18,75,200 18,40,003

• More and more consumers are registering their mobiles number so as to take advantage of SMS facility offered by UPPCL which is evident from the figures given below

• Monthly target has been set to collect mobile no. of all the electricity consumer.

Discomwise Target for Consumers Mobile Number Collection

DISCOM AUG SEP OCT NOV DEC TOTAL UPTO DEC

PVVNL 285043 320673 213782 213782 213782 1425214

DVVNL 135350 152268 101512 101512 101512 676749

MVVNL 218556 245876 163917 163917 163917 1092782

PuVVNL 161051 181183 120788 120788 120788 805256

TOTAL 800000 900000 600000 600000 600000 4000000

Page 31: Restructured Accelerated Power Development and Reform ...

Replacement of Faulty transformers in 72 hours

Due to various reasons Faulty transformer were getting rectified and replaced in more then 72 hours in towns as well as rural areas which were causing huge consumer dissatisfaction, administrative failure and commercial loss to discoms.

To improve the Business process and consumer satisfaction , it was decided to replace all faulty or burnt transformer with 72 hours timeframe. Various initiative were taken to ensure the same:

Mobile trolleys with installed transformers to provide makeshift arrangement for faulty transformers.

500+ mobile vans were engaged for all over UP to ensure that faulty transformers are bought to workshops without any waste of time

SMS facility started for consumer to inform Discom officials about faulty or burnt transformers.

Page 32: Restructured Accelerated Power Development and Reform ...

Replacement of Faulty transformers in 72 hours

DiscomTotal Damaged

DT DTs with Replaced in 72 hrs.

DTs Pending

>72 hrs

No. %

PVVNL 4488 4106 91.49 382

MVVNL 3562 3547 99.58 15

DVVNL 2831 2655 93.78 176

PuVVNL 6586 6119 92.91 467

Total 17467 16427 94.05 1040

Page 33: Restructured Accelerated Power Development and Reform ...

Deriving benefits of MDAS

With MIS reports of MDAS, Discoms have taken various steps to increase the system reliability of Electrical network like reduction of unbalancing and load augmentation of Distribution Transformer.

Figures of Distribution Transformer which were balanced

Capacity of

Transformer(KVA) 400 250100

No.30 25

61

*Unbalance Full load current is below 10% in the above DTs.

Old Capacity(KVA) New Capacity(KVA) No. of Distribution

Transformer

400 630 8

250 400 36

160 250 88

*Now these DTs are running below 80% of their capacity.

Page 34: Restructured Accelerated Power Development and Reform ...

Load unbalancing Screen

Page 35: Restructured Accelerated Power Development and Reform ...

Reliable Wide Area Network

With an objective to make wide area network(2000+ end locations) reliable three Bandwidth network providers are engaged

Unreliable network connectivity directly impacts to loss of revenue

To mitigate the Network bandwidth downtime, Backup Network Service provider was introduced in RAPDRP project.

For the first time a unique WAN architecture was built comprising of Primary connectivity at Ethernet port and Backup Network Secondary connectivity at serial port ,operated in failover mode which gives a seamless changeover of Network bandwidth at the time of Primary bandwidth failure and uninterrupted network bandwidth to the end user.

Page 36: Restructured Accelerated Power Development and Reform ...

Initiative to Increase the reliability of Network Bandwidth

To manage the upkeep of these 2000 + end locations a team of dedicated resources is deployed to monitor the status of network bandwidth links at 8:00 am each day.

This team monitor and raise the Fault tickets with ITIA ( in case of hardware failure) and NBSP after First level testing of each bandwidth link.

The link status testing is targeted to be completed by 10:00 am so that remedial work on faulty links is started early in the day.

AE(IT) monitor the progress on faulty links

The status of faulty links is reviewed and compiled at UPPCL level by 4:00 PM each day

Page 37: Restructured Accelerated Power Development and Reform ...

Immediate future plans

Management consultant

– Tender to be opened on 16 September 2014

Online billing of rural consumers

– Web based billing through VLEs , Pilot towns allotted , Tender to be floated very soon

USSD based billing and collection services

– Consumer can avail bill & payment related services by using Airtel Money , M paisa etc

Group payment

Electronic bill payment and presentment

AMR based billing for all mobile towers

Purchase of more then 500 VPN licenses

Page 38: Restructured Accelerated Power Development and Reform ...

THANK YOU

“The greatest difficulty in the world is not for people to accept

New ideas, but to make them forget the old ones!!!”

John M.Kenyo