Page 1: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020 Made in the USA

Page 2: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 2 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

TABLE OF CONTENTS

Getting Started............................................................................................................................................................................................... 3

Introduction to QDuct® .............................................................................................................................................................................. 3 Installation Tools ........................................................................................................................................................................................ 3 Installation Training Support ..................................................................................................................................................................... 3 Production Submittals & Layout Verification............................................................................................................................................. 3 Receiving Delivery ...................................................................................................................................................................................... 4 Handling Material ...................................................................................................................................................................................... 4 Storage ....................................................................................................................................................................................................... 4 Site Conditions & Preparation ................................................................................................................................................................... 5

Installation ..................................................................................................................................................................................................... 6

Supports ..................................................................................................................................................................................................... 6 Horizontal Support Spacing & Clearance ............................................................................................................................................... 6

Vertical Support Spacing ........................................................................................................................................................................ 7

Elbow Support Placement ...................................................................................................................................................................... 7

Support Rail Width ................................................................................................................................................................................. 8

Corner Supports ..................................................................................................................................................................................... 8

Secured Support Attachment ................................................................................................................................................................ 9

Unsecured Support Attachment .......................................................................................................................................................... 10

Installation Order ..................................................................................................................................................................................... 10 Joining & Connection Details ................................................................................................................................................................... 11

Male-Female Interlocking Connection ................................................................................................................................................. 11

Unit & Equipment Connection ............................................................................................................................................................. 14

Unit to Unit Connection ....................................................................................................................................................................... 15

Curb Connection .................................................................................................................................................................................. 16

Wall Connection ................................................................................................................................................................................... 18

PalDuct Connection.............................................................................................................................................................................. 19

TDC/TDF Duct Connection ................................................................................................................................................................... 20

Third Party Equipment Connection ...................................................................................................................................................... 21

Tap Connection .................................................................................................................................................................................... 22

Field Modifications .................................................................................................................................................................................. 24 Post Installation ........................................................................................................................................................................................... 25

Commissioning & Pressure Testing .......................................................................................................................................................... 25 Painting .................................................................................................................................................................................................... 25 Maintenance ............................................................................................................................................................................................ 25

Warranty ...................................................................................................................................................................................................... 26

Page 3: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 3 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

GETTING STARTED

INTRODUCTION TO QDUCT®

Engineered for exterior applications, QDuct® Outdoor Pre-Insulated Duct System is constructed to withstand harsh weather conditions in all climates. QDuct® is fabricated from multiple layers of ridged thermoset phenolic insulation panels that are laminated together to form a composite interlocking duct system with redundant seals for industry leading low leakage & maximum energy efficiency. Each phenolic panel is both internally & externally lined with a thermally bonded embossed aluminum cladding providing sequential layers of fiber-free high-performance insulation and corrosion resistant ingress protection. QDuct®’s exterior can be topped with an optional sloped roof fabricated from impact resistant closed cell tapered insulation panels for prevention of water accumulation & increased thermal energy performance. Finally, QDuct® receives an external layer of an all-weather, low permeability, multi- layered aluminum laminate cladding for enhanced ingress protection from the elements.

INSTALLATION TOOLS

Contractor Provided Tools & Material AQC Provided Tools & Material Circular saw with 3” cut depth QDuct® Sealant Utility knife with 3” minimum extendable blade Foil Mastic Tape Rubber Mallet Tiger Connectors Level Cladding Squeegee Square 12” Exterior Connector cladding Caulk Gun (power operated recommended) Blue Support Plank Safety Glasses Gloves Black permanent marker Cardboard or plywood & tarp (for staging area) Flashing metal Extra Cladding Squeegees Shop-Vac Lifting straps (2” minimum width)

INSTALLATION TRAINING SUPPORT

As a free service, AQC Industries hosts online Installation training webinars. The online Installation training webinar is prerequisite for all new installers prior to beginning the installation process. Registration for Installation training webinar can be found at AQC’s website at the following link. https://www.aqcind.com/qduct/qduct-installation/

PRODUCTION SUBMITTALS & LAYOUT VERIFICATION

As part of the QDuct® system, AQC Industries will generate detailed production submittals including layout drawings, item lists, and item detail shop drawings. Once a production submittal has been received carefully review the layout drawing to ensure accuracy with required dimensions. Report any required changes back to AQC with the corresponding item numbers to be modified. In the event a partial release of the duct system is required, please return the production submittal to AQC as approved with comments, and indicate on the submittal which items are approved for release and which are still on hold.

Page 4: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 4 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

RECEIVING DELIVERY

Installing Contractor is required to inspect all QDuct® products received at time of delivery to ensure there are no damaged or missing products. Damaged or missing products are to be recorded on transportation company’s shipping documentation with delivery driver’s signature. Installing contractor is required to report a written description of the damaged or missing products, the received shipping documentation with “Damaged” Indicated, along with photographic evidence of damaged products to AQC within 24 hours of received shipment.

HANDLING MATERIAL

When handling QDuct® take caution to prevent damage to the duct system & job site. All OSHA safety guidelines should be followed to assure a safe & successful installation. • Ensure adequate manpower is available to carry duct

segments. • Lift, do not slide the duct when transporting. • Support duct from bottom corners when lifting by hand. • Use approved lifting straps to cradle circumference of

duct when hoisting. • Do not drop duct.

STORAGE

The QDuct® system is fully weatherized & rugged outdoor duct system, however unconnected QDuct® segments need additional protection prior to the installation of the system. Indoor storage is recommended for best protection from water and foreign matter.

• Store products in manufacturer’s original packaging until ready for installation.

• Store products off the ground clear of ground water and away from high traffic areas to prevent accidental damage.

• Cover products with weatherproof tarp to protect from wind, UV light, precipitation and other foreign matter.

• Ensure products are firmly secured to prevent damage by wind.

• Ensure Sealant, Foil Tape, & cladding have been stored between 40°-90°F and in a dry location prior to installation.

• If storage for extended period is required, observe expiration date of install material prior to installation.

Page 5: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 5 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

SITE CONDITIONS & PREPARATION

Prior to beginning installation, the staging area and work site need to be properly prepared to assure a safe and successful install. Do not begin installation until roof substrates & supports have been properly prepared. Ensure work site is clear of obstructions to allow for safe handling of material during installation process.

• Lay down protective surfaces (cardboard, plywood, tarp, etc.) in the staging areas prior to removing duct from manufacturer’s original packaging.

• Ensure interior & exterior surfaces of product are clean of dirt, debris and moisture prior to installation.

• Ensure equipment connections, wall penetrations, and curb connections are prepared prior to installation.

• Do not install QDuct® in the rain or snow. • AQC recommends installation between 40° and 90°F.

Contact AQC for special instructions if installation outside of this temperature range is required.

Page 6: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 6 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

INSTALLATION

SUPPORTS

Supports and Hangers are the foundation of any duct system and adequate support is fundamental to ensure the integrity of the QDuct® system. AQC recommends that duct supports be used in compliance with SMACNA guidelines for “Phenolic Duct Construction Standards”, ANSI/SMACNA 022- 2015 as applicable for exterior ducting. Refer to engineer’s specifications & local code requirements for support stand design and roof attachment.

HORIZONTAL SUPPORT SPACING & CLEARANCE

• AQC recommends a minimum support height of 12” between bottom of duct and ground. • AQC recommends at least every 3rd support be secured to the duct. Refer to local municipal codes for exact support spacing

and support anchoring requirements.

Duct ID Width or Depth less than 44” = Maximum Span 72”

Duct ID Width or Depth greater than 44” = Maximum span 48”

Page 7: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 7 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

VERTICAL SUPPORT SPACING

• For vertical “riser” sections with over 6’ of rise, AQC will install Unistrut support attachments to allow for anchoring to the wall.

• QDuct® sections are to be supported a minimum of every 72” of vertical rise.

• AQC recommends a minimum spacing of 12” between walls and the exterior of the duct.

o For ducts with width greater than 60” additional spacing may be required between wall and exterior of duct to ensure proper access for sealing connections.

ELBOW SUPPORT PLACEMENT

• Support is required for all 90° elbows to support the extra weight caused by the turning vanes. • There are multiple support variations that can be used to accomplish supporting elbows. • Bottom of duct elbow support configurations are shown below.

Option 1 (Recommended) Option 2 Option 3

Page 8: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 8 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

SUPPORT RAIL WIDTH

• Supports rails must be wide enough to adequately support the ducts weight without causing indentation into the external panel of the duct.

• Ensure flat side of Unistrut or C-Channel support is facing upwards to provide adequate surface area to support the duct.

CORNER SUPPORTS

• 3”x3” L Profile (22 GA Angle Iron) are to be used to protect the duct at the lower corners that rest on the support beam.

Page 9: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 9 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

SECURED SUPPORT ATTACHMENT OPTIONS Secured support stands shall be anchored to the roof structure & secured directly to the QDuct® Unistrut support mounts, or supports should fully enclose (bottom, sides, and top) around the external walls of the duct.

• Supports should never be secured to the QDuct® system using screws, pins or other methods that would penetrate the external jacket of the QDuct® system.

• By default Unistrut support mounts are applied to all straight items that have a depth greater than 24” ID, & a length greater than 24” ID. As an option Unistrut support mounts can be factory installed on all straight ducts regardless of size. Contact AQC for pricing.

UNISTRUT SECURED SUPPORT ATTACHMENT

FULLY ENCLOSED SECURED SUPPORT ATTACHMENT

Page 10: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 10 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

UNSECURED SUPPORT ATTACHMENT Unsecured support stands do not require mechanical attachment to QDuct®, and are only used to support vertical loads. Follow local code requirements for anchoring supports to roof.

INSTALLATION ORDER

AQC recommends starting installation from the Unit onward. This allows for installation of the largest items first and smallest items last.

Recommended Installation Order

1. Joining QDuct® to Unit 2. Joining QDuct® sections 3. Joining tap connections 4. Joining End of Run connections

a. Equipment Connections b. Curb Connections c. Wall Connections

To aid the installation process, each QDuct® system is shipped with a layout drawing and an item list. • The layout drawing is numbered for each item. Each item receives a label on the interior of the duct displaying its

corresponding size and item number. • Reference the item number on the interior of the duct with the numbered layout drawing.

Once an installation order has been determined begin unpackaging and placing duct into the staging area. • Sort items by determined installation order in the staging area. • Only remove items from manufacturer’s original packaging that can be installed during the same day. • If installation is not completed by end of work day, cover ends of installed duct to prevent intrusion of water or foreign matter

into system.

Page 11: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 11 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

Internal

External

JOINING & CONNECTION DETAILS

MALE-FEMALE INTERLOCKING CONNECTION

1. Prep the edges to be joined by rounding down the edges of the Male and Female connections to provide a slight bevel on joining connector faces. This will help guide the pieces together.

2. Apply sealant to both the Male and Female joints. Sealant shall be applied to both the internal duct layer and the external duct layer. Additional beads of sealant must be applied around the entire circumference of both internal 3” overlapping surfaces. Ensure sealant maintains a continuous bead width of at least 3/8”.

FEMALE END

MALE END

AQC Provided Material • Tiger Clip • Foil Tape • Sealant • Cladding

Page 12: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 12 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

3. Firmly press and hold the interlocking Male-Female connection together. A properly sealed joint will ooze a small amount of

sealant around the entire circumference on both the internal and external walls of the duct. Apply additional sealant to fill any observed voids at the connection. Continue to apply pressure until all tiger clips have been firmly seated into the connection.

4. Smooth additional sealant that has oozed out of the joint with a finger or sealant tool, pushing the sealant into the connection seam as it is being smoothed. With a rubber mallet, tap the tiger clips into the duct to join the two sections. Ensure to align the tiger connector clip so that the center of the clip evenly straddles the connection seam. Tiger clip spacing shall be a maximum of 12” between clips on each seam and within 3” of every corner.

5. Apply the foil mastic tape over the tiger clips and exterior of the duct joint. Ensure the tape is centered over the connection joint and fully covers the inserted tiger clips. Use a squeegee to smooth and seat the foil mastic tape.

Max Spacing 12”

Page 13: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 13 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

6. Run a finger or squeegee across the joint on the interior of the duct joint to seal and smooth the excess sealant. Add more sealant as necessary to fill the joint. If it is necessary to crawl inside the duct utilize the blue plastic board to disperse weight and prevent the interior of the duct from becoming damaged. Ensure the duct is properly supported underneath before placing any weight on the duct. On inaccessible interior joints, use extra sealant before making the connection to ensure a sufficient seal is achieved.

7. Apply the exterior cladding over the tape, tiger connectors, and duct joint. Ensure the cladding strip is centered over the connection seam and provide at least 6” of overlap onto the adjacent sides of the duct. Apply cladding strips in the order of bottom, sides, top. Ensure all overlapping seems are facing down to maximize water shedding. Do not have overlapping cladding seems on top of duct. With a squeegee, apply heavy pressure to smooth and adhere the cladding to the exterior of the duct. Run the squeegee along every seam to ensure the edges are tightly adhered.

Page 14: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 14 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

UNIT & EQUIPMENT CONNECTION

INSTRUCTIONS:

Step 1) Place and screw provide L-Profile onto unit opening, forming a collar that will slip into the interior of the connecting QDuct. (Figure 1.2) Step 2) Apply foam gasket around unit opening, making sure that it covers the screw heads. (Figure 1.3) Step 3) Apply 3/8” bead of sealant around the perimeter of unit opening on both sides of foam gasket. (Figure 1.4) Step 4) Place and secure duct onto unit opening by screwing the L-Profile to the QDuct®’s U-Profile. Direct screws from interior to exterior as seen in image. (Figure 1.4) Step 5) Wrap 12” wide exterior jacketing around base of connection. The jacketing should be laid so 6” are on both sides of the connection center line. (Figure 1.5) Step 6) Use squeegee to secure exterior cladding to both the duct and unit. Be sure to get rid of all air pockets.

Figure 1.1

Figure 1.2

Figure 1.3

AQC Provided Material • Foam Gasket • L Profile • Sealant • Cladding

Figure 1.4

Figure 1.5

Page 15: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 15 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

UNIT TO UNIT CONNECTION

INSTRUCTIONS:

Step 1) Apply 3/8” bead of sealant to both connection faces. (Figure 2.1) Step 2) Push connection faces together. (Figure 2.2) Step 3) Place another bead of sealant around the exterior perimeter of each joining duct. (Figure 2.2) Step 4) Secure the connection together by screwing metal flashing to each exterior side. Screws should start 3” from any unit edge and be evenly spaced with a max spacing of 8”. (Figure 2.3) Step 5) Use foil tape to wrap around perimeter of connection. Overlapping the edges of the metal flashing and the duct. (Figure 2.4) Step 6) Wrap 12 inch wide exterior jacketing around connection. The jacketing should be laid so 6 inches are on both sides of the connection center line. (Figure 2.5) Step 7) Use provided squeegee to secure exterior jacketing. Be sure to get rid of all air pockets.

Figure 2.1

Figure 2.2

Figure 2.4

Figure 2.5

AQC Provided Material • Sealant • Foil Tape • Cladding

Figure 2.3

Page 16: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 16 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

CURB CONNECTION

INSTRUCTIONS:

Step 1) Install roof curb. (Figure 3.1) Step 2) Install z-flashing to roof curb forming a collar. (Figure 3.2) Step 3) (OPTIONAL) Apply foam gasket on z-flashing around perimeter of curb opening. (Figure 3.3) Step 4) Apply two 3/8” beads of sealant around perimeter of z-flashing. One on either side of optional foam gasket. (Figure 3.3) Step 5) Slide connecting QDuct onto z-flashing collar on curb. (Figure 3.4) Step 6) Screw z-flashing to the QDuct®’s u-profile from the inside of the duct. Screws should have a max spacing of 8 inches. (Figure 3.4) Step 7) Wrap 12 inch wide exterior jacketing around connection. The jacketing should be laid so 6 inches are on both sides of the connection center line. (Figure 3.6) Step 8) Use provided squeegee to secure exterior jacketing to the roof curb and the connecting duct. Be sure to get rid of all air pockets.

Figure 3.1

Figure 3.2

Figure 3.3

Figure 3.4

AQC Provided Material • Sealant • Cladding

Page 17: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 17 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

CURB CONNECTION CONTINUED

Figure 3.5

Figure 3.6

Page 18: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 18 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

AQC Provided Material • Sealant • Cladding

WALL CONNECTION

INSTRUCTIONS:

Step 1) Install wall flashing so that the connecting QDuct may slide through opening. (Figure 4.2) Step 2) Slide the connecting QDuct through the opening of the wall. (Figure 4.3) Step 3) Place a bead of sealant around connection, filling in the gap between the flashing and the duct. (Figure 4.4) Step 4) Wrap exterior jacketing around connection while having the sealant serve as the center line for the cladding. Ensure 6” of cladding overlap onto QDuct®. (Figure 4.5) Step 5) Use squeegee to secure exterior cladding to both the wall flashing & QDuct®. Be sure to get rid of all air pockets.

Figure 4.1

Figure 4.2

Figure 4.3

Figure 4.4

Figure 4.5

Page 19: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 19 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

PALDUCT CONNECTION

INSTRUCTIONS:

Step 1) Apply 3/8” bead of sealant around perimeter of QDuct connection. (Figure 5.2) Step 2) Join QDuct to Palduct. (Figure 5.3) Step 3) Use tiger clips to secure connection. Tiger clips shall be placed 3” from every corner and then evenly distributed along remaining length. Tiger clip max spacing is 8”. (Figure 5.4) Step 4) Use foil tape to wrap around external perimeter of connection, covering all tiger clips. Then use squeegee to press tape down around connection. Be sure to get rid of all air pockets. (Figure 5.5)

Figure 5.1

Figure 5.2

Figure 5.3

Figure 5.4

Figure 5.5

AQC Provided Material • Tiger Clip • Foil Tape • Sealant • Cladding

Page 20: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 20 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

AQC Provided Material • Sealant • Foil Tape • Cladding • L Profile

(required if metal duct is non-

TDC/TDF DUCT CONNECTION

INSTRUCTIONS:

Step 1) Apply 3/8” bead of sealant around perimeter of QDuct connection. (Figure 6.2) Step 2) Join QDuct to metal duct. (Figure 6.3) Step 3) Secure connection by screwing the metal duct to the U-Profile of the QDuct. Screws shall be placed 3” from every corner and then evenly distributed along remaining length. Screw max spacing is 8”. (Figure 6.2 & 6.3)

Figure 6.1

Figure 6.2

Figure 6.3

Page 21: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 21 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

THIRD PARTY EQUIPMENT CONNECTION

INSTRUCTIONS:

Step 1) Apply 3/8” bead of sealant along the perimeter of the connection. (Figure 7.2) Step 2) Join third party equipment onto QDuct. (Figure 7.3) Step 3) Secure connection by screwing the third-party equipment to the U-Profile connection of QDuct. Screws shall be placed 3” from every corner and then evenly distributed along remaining space. Screw max spacing is 8”. (Figure 7.3) Step 4) Repeat steps 1-3 for the other connection of the third-party equipment. (Figure 7.4) Step 5) Apply contractor supplied insulation and cladding around the third-party equipment. (Figure 7.5) Step 6) Wrap provided foil tape around perimeter of connection seam. Then use squeegee to firmly seat tape around connection. (Figure 7.6) Step 7) Wrap 12” wide exterior cladding around connection. The cladding shall be laid so 6” are on both sides of the connection. (Figure 7.7) Step 8) Use squeegee to secure exterior cladding to the third-party insulation and the connecting QDuct® to ensure a water tight seal. Be sure to get rid of all air pockets.

Figure 7.1

Figure 7.2

Figure 7.3

Figure 7.4

Figure 7.5

Figure 7.6

Figure 7.7

AQC Provided Material • Sealant • Foil Tape • Cladding • L Profile (required if 3rd party

equipment is non-flanged)

Page 22: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 22 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

TAP CONNECTION

INSTRUCTIONS:

Step 1) Cut tap opening into branch duct. Opening size needs to be cut 2.5” larger than the ID dimensions for the tap connection. (Figure 8.1) Step 2) Line U-Profile around interior perimeter of cutout section. (Figure 8.2) Step 3) Use foil tape to cover edges of U-Profile on both the interior and exterior of the cut duct. (Figure 8.3) Step 4) Apply three 3/8” beads of sealant around perimeter of cutout. 1st bead goes around exterior perimeter offset 1” out from cutout. 2nd bead goes on the exterior lip of opening perimeter. 3rd bead on the interior lip of the opening perimeter. (Figure 8.4 & 8.5) Step 5) Place the tap duct into the cutout section. (Figure 8.6) Step 6) Secure the tapping duct by screwing the F-Profile to the U-Profile. Screws shall be located 3” from every corner and then spaced out over the remaining F-Profile. Screw max spacing is 12”. (Figure 8.6 & 8.7) Step 7) Wrap 12” wide exterior jacketing around base of connection. The jacketing shall be laid so 6” are on both sides of the tap connection. (Figure 8.8) Step 8) Use squeegee to secure exterior jacketing to both the tap duct and the branch duct to ensure a water tight seal. Be sure to get rid of all air pockets.

Figure 8.1

Figure 8.2

Figure 8.3

Figure 8.4

Figure 8.5 (Interior Lip View)

AQC Provided Material • Foil Tape • U Profile • Sealant • Cladding

Page 23: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 23 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

TAP CONNECTION CONTINUED

Figure 8.6

Figure 8.7

Figure 8.8

Page 24: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 24 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

FIELD MODIFICATIONS

MODIFYING QDUCT® LENGTHS

INSTRUCTIONS:

Step 1) Measure required length on the interior from the female end. Add 3” to measured length and mark cut line on the exterior of the duct. (Figure 9.1) Step 2) Set circular saw blade depth to 2-1/2”, cut and remove male end along marked cut line. (Figure 9.1) Step 3) Mark a cut line, 3” back from the new end. (Figure 9.2) Step 4) Set circular saw blade depth to 1-1/8”, cut through the external panel layer along marked cut line. (Figure 9.2) Step 5) Slide a long thin blade between the panels to loosen the adhesive attaching the panels together. Step 6) Carefully peel off the outer layer to make a new male end. Apply sealant to any cuts or punctures into the internal insulation. (Figure 9.3) Step 7) Apply foil mastic tape to all exposed internal insulation faces and the cut edges. Apply a small bead of sealant along the joint between the outer and inner panel layers. (Figure 9.3)

Figure 9.1

Figure 9.2

Figure 9.3

Page 25: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 25 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

POST INSTALLATION

COMMISSIONING & PRESSURE TESTING

If pressure testing is required by the specifying engineer, test QDuct® system in accordance with SMACNA HVAC Air Duct Leakage Test Manual on at least 10% of the total installed duct area. A properly installed QDuct® system is capable of exceeding SMACNA Air leakage Class 1. Do not test QDuct® system above design pressure class. Over pressurization may cause damage to the duct system and will void the warranty. After a minimum of 24 hours has passed since the last sealed connection was made, the system can be tested to 1” static pressure for 5 minutes. The QDuct® Sealant must fully cure (requires 3 days) if a higher static pressure is required. AQC recommends to wait a minimum of 72 hours from making the last sealed connection to start up the HVAC unit. Never exceed the design static pressure classification while testing.

PAINTING

The QDuct® system can be custom field painted. Please consult with the project Architect and your preferred painting professional for color selection and paint recommendations. For best energy performance AQC Industries does not recommend painting the exterior cladding of QDuct®. This is due to the standard color, polar white, is already optimized to maximize thermal reflectivity and reduce thermal absorption.

MAINTENANCE

All mechanical system require maintenance to ensure the performance and longevity of the system. AQC recommends a visual inspection of the system at least once annually. Inspect the unit connections, wall connections, and curb connections for leaks into the QDuct® system. Inspect the QDuct® system exterior for punctures, air pockets, or damaged caused by vandalism or severe weather. The QDuct® system is specifically designed for quick and easy repairs in the event of damage. For small punctures & dents, clean the cladding around the damaged area with isopropyl alcohol. Apply QDuct® sealant into the puncture or dent and allow 5 minutes to cure. Cover the sealant with a foil mastic tape and use a squeegee to firmly apply pressure to the tape. Cut to size a patch of cladding, (ensure patch is at least 6”x6”) and apply over top of the foil mastic tape. Use a squeegee to firmly apply pressure to the cladding and run squeegee along seams to ensure the cladding is properly adhered. For repairing punctures in sloped roof, fill void with Loctite Powergrab construction adhesive. Do not use QDuct® sealant to repair sloped roof punctures.

Page 26: Rev 6.12 - Pal Duct | BlueDuct Duct System

Rev 6.12.2020

Page | 26 AQC Industries, LLC | 2920 Centre Pointe Drive, Roseville, MN 55113 | www.aqcind.com | [email protected] | T 1.877.783.1520

WARRANTY

AQC INDUSTRIES LIMITED WARRANTY IN GENERAL

AQC Industries (AQC) warrants QDuct® Products sold either directly or through its resellers (representatives and distributors) in accordance with the limited warranty set forth in this document (the Limited Warranty). Except as expressly provided in the Limited Warranty, AQC makes no representation or warranty of any kind, express or implied, with respect to QDuct® Product, whether as to merchantability, fitness for a particular purpose, warranties arising from course of dealing or usage or trade or any other matter. AQC does not install QDuct® Products and has no responsibility or obligation with respect to installation. AQC DISCLAIMS ALL WARRANTIES RELATED TO INSTALLATION OF QDuct® PRODUCTS. AQC offers webinar based QDuct® Installation Training Certification to installing contractors at no charge and recommends this training prior to installing the QDuct® Product.

AQC INDUSTRIES LIMITED WARRANTY

AQC Industries (AQC) warrants that in normal and contemplated use and service, QDuct® Products shall be free from defects in manufacturing materials and workmanship for a period of ten (10) years from the date of manufacture set forth on each of QDuct® Products (the Limited Warranty). The Limited Warranty shall only be applicable if AQC is given prompt written notice specifying the nature of the warranty claim within the applicable warranty period. Upon confirmation by AQC that a QDuct® Product proves to be defective in manufacturing, materials or workmanship, the exclusive remedy shall be for AQC to, at its option, repair or replace the defective QDuct® Product or issue a credit or refund. The Limited Warranty does not extend to any QDuct® product subjected to misuse, accident, or alteration. This Limited Warranty does not extend to improper installation. This Limited Warranty does not cover any loss caused by accidents or careless handling of a QDuct® Product. This Limited Warranty does not apply to any QDuct® Product which has been damaged in transit, abused, altered, modified, used in a manner not originally intended, or used. This Limited Warranty does not cover any QDuct® Product that has been installed in a manner not consistent with the QDuct® Product instructions. The Limited Warranty set forth above is the only warranty AQC makes for QDuct® Products and is in lieu of all warranties express, implied or statutory, including, without limitation, warranties of merchantability, fitness for a particular purpose and infringement, and warranties arising from course of dealing, usage of trade or otherwise. THE REMEDIES SET FORTH IN THIS LIMITED WARRANTY ARE THE ONLY REMEDIES AVAILABLE TO ANY PERSON CLAIMING FOR BREACH OF WARRANTY OR FOR ANY DAMAGES OF ANY KIND OR NATURE. AQC SHALL NOT HAVE ANY OTHER LIABILITY OF ANY DESCRIPTION, WHETHER ARISING OUT OF WARRANTY (INCLUDING ANY IMPLIED WARRANTIES) OR ANY OTHER CONTRACT, NEGLIGENCE, TORT OR OTHERWISE, INCLUDING, BUT NOT LIMITED TO, COST FOR REMOVAL OF DEFECTIVE PRODUCT, COST FOR INSTALLATION OF ANY REPLACEMENT PRODUCT, COMMERCIAL LOSS FROM ANY CAUSE, BUSINESS INTERRUPTION OF ANY NATURE, LOSS OF PROFITS OR ANY OTHER CONSEQUENTIAL LOSS OR DAMAGE, EVEN IF AQC SHALL HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH LOSS OR DAMAGE. In the event any implied warranties (including, but not limited to the implied warranties of merchantability and fitness for a particular purpose) are found to exist, such warranties are limited (i) in duration to the period of the limited warranties set forth in this Limited Warranty, and (ii) in amount to the total amount paid to AQC for the product in question.