+ All Categories
Home > Technology > Rft ginn tuesday_930

Rft ginn tuesday_930

Date post: 18-Dec-2014
Category:
Upload: gene-ginn
View: 47 times
Download: 3 times
Share this document with a friend
Description:
 
20
Measuring Collection Operations; Planning, Optimization and Performance
Transcript
Page 1: Rft ginn tuesday_930

Measuring Collection

Operations;Planning,

Optimization and Performance

Page 2: Rft ginn tuesday_930

PLANNING

● What do “WE” want to know ?● Trucks● People

● Set Out Rate● Participation Rate

Operations need to know baseline estimates for Planning...

Page 3: Rft ginn tuesday_930

PLANNING

● Trucks - AVL– How many

– What type

– Route Performance

● Set Out Rate RFID– By Route

– By Day

– By Neighborhood

● Participation Rate RFID

– Overall Program Performance and Utilization.

● People - Optimization– How many

– Abilities

– Driver Input is Needed

Page 4: Rft ginn tuesday_930

PLANNING

Trucks

Determine what information you want from your routes...

Location of Vehicle

Live and Historical

Route on In-cab Display

Driver can give on route

Feedback

Tip Data

Page 5: Rft ginn tuesday_930

Creating Balance

Page 6: Rft ginn tuesday_930

The Tale of Two Systems

● Route Planning ● Route Optimization

● Captured RFID Data

Page 7: Rft ginn tuesday_930

Routing and Optimization

Page 8: Rft ginn tuesday_930

Optimized Front Loader Route

Page 9: Rft ginn tuesday_930

In-Cab Driver Interface

Page 10: Rft ginn tuesday_930

Recycling Routes Overview

Page 11: Rft ginn tuesday_930
Page 12: Rft ginn tuesday_930

RFID Technology

● The Power to Measure Success

Page 13: Rft ginn tuesday_930

RFID Technology

Asset Management➢ In Service➢ In Inventory➢ Warranty➢ Work Orders➢ Cart Migration

Utilization Rates➢ Weekly ➢ Monthly➢ Annual➢ Since Inception➢ Developing Targets

Page 14: Rft ginn tuesday_930

Asset Management

Page 15: Rft ginn tuesday_930

Asset Management (non-use)

Page 16: Rft ginn tuesday_930

Utilization Rates

Data Data Data

Without data how dowe measure our success?

Page 17: Rft ginn tuesday_930

Overview of Daily CollectionRFID Equipment Status

Good Data is Valuable

Page 18: Rft ginn tuesday_930

Utilization Rates

Page 19: Rft ginn tuesday_930

Flow of Data

Page 20: Rft ginn tuesday_930

Questions ??

Gene Ginn, Assistant Solid Waste ManagerEmail: [email protected]: 727-587-6760

Thank you!


Recommended