RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
COVERCONTENTS: A1. BELOW GRADE A2. FIRST FLOOR PLAN A3. LOFT FLOOR PLAN A4. ROOF PLAN D1. WALL ASSEMBLY
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A1
1’-6” CONCRETE FOOTING
5’-6
”5’
-6”
11’-8
”
NOTE: 1. CONCRETE FOOTINGS TO BE POURED BELOW FROST LINE (APPROX. 3’-1”) 2. FOOTINGS, AND FIRST FLOOR SLAB TO BE POURED SIMULTANEOUSLY
0’-1/2”STEEL REBARO.C.
0’-41/2”CONCRETE FLOOR SLABON GRADE
11’-5” 11’-5”11’-10”
SCALE: 1/2" = 1'-0"BELOW GRADE
0 1' 2' 4'
RION by design1687 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A2SCALE: 1/2" = 1'-0"FIRST FLOOR
0 1' 2' 4'
2”X4” STUDS16” O.C.
6’-8
”11
’-0”
6’-8
”3’
-2”
24’-4
”
NOTE: 1. STEEL REBAR PUNCTURES FLOOR SLAB BY 0’-6” 2. STEEL REBAR: COLUMN PIN
8” WOOD COLUMN(ASH)
0’-41/2” CONCRETE FLOOR SLABON GRADE
24’-5”3’-2” 10’-10” 1’-3”
36’-6”
OPEN ABOVE
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A3
OPEN TO BELOW
SCALE: 1/2" = 1'-0"LOFT
0 1' 2' 4'
1”X1 1/2” BATTEN8’
-3”
7’-1
0”8’
-3”
24’-4
”
1”X7 1/2” BOARD
1/2” EXPANSION JOINT
6’-4”2’-6” 17’-4” 12’-10” 2’-6”
36’-6”
NOTE: 1. SEE D1 FOR WALL ASSEMBLY
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A4SCALE: 1/2" = 1'-0"ROOF PLAN
0 1' 2' 4'NOTE: 1. 32 - 36”X192” CORRUGATED METAL ROOF PANELS (36” ROOF OVERHANG INCLUDED) 2. ROOF SLOPE = 1:6
21’-5
1/2
”7’
-9”
1’-4
”
30’-7
1/2
”
ROOF BELOW
OVERHANG
42’-0”
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
D1NOT TO A MEASURABLE SCALEWALL ASSEMBLY
4 1/2” POURED IN PLACE CONCRETE SLAB
1”X7 1/2” BOARD
1/2” EXPANSION JOINT
1”X1 1/2” BATTEN
2”X4” SILL PLATE
5 5/8”X24” CMU BLOCK WALL
1”X4” LINTEL
3/4”X9”X16” GLASS PANE
3”X4” LINTEL
1”X2” SPACER
6”X12” ASH BEAM
3/4” PLYWOOD SHEATHING