Date post: | 30-Mar-2016 |
Category: |
Documents |
Upload: | ron-mcfadden |
View: | 224 times |
Download: | 2 times |
ronmcfadden 46 6 7 E Lav end er Lan e
Phoenix , AZ 8 50 44
48 0- 52 5- 0 80 3
48 0- 43 0- 3 00 4 c e l l
r lb mc f@g mai l . co m
experience:
lead designer:
project architect:
manager / service:
education: masters degree:
bachelors of science:
associates degree:
accolades:
Registered Architect in six states. AIA Member. NCARB Certified. Architect of Record. Lead
Designer. Supervisor over Design. Proposals and Presentation. Project Architect. Project
Manager. Budget Management. Quality Assurance. Code Research and Compliance.
Environmental Aspects. Design-Build. Bid Analysis and Award. Marketing Materials. Engineering
Coordination. Planning. Master Planning. Feasibility Studies. Yield Studies. Development
Documents. Pro-Forma Analysis. Programming. Schematic Design. Design Development.
Construction Documents. Construction Administration. Staff and Resources. BOMA Analysis. Cost
Control & Contract Negotiations. Project Acceptance & Close Out. Renderings. Interiors. Team
Leader. Interviewing. Space Plans. Tenant Improvements. Shell Buildings. Organized. Meeting
Deadlines. Interpersonal Skills. Customer Service. Drafting. Travel Agent. Artist. Award Winning.
Technical Skills: AutoCAD 2012, SketchUP, Photoshop, Word, Excel, Acrobat Professional.
Architectural Project Types: Class A Commercial, Educational, Health Care, Religious,
Residential, Laboratory, Justice, Industrial, Hospitality, and Retail. Over 15 years experience.
Coaction GROUP, Chandler, AZ 2011 – 2012
OPUS - A & E, Phoenix, Arizona 2006 – 2010
Directed design in two fast paced Design-Build & Development Firms. Architect of Record.
■ Worked closely with company directors developing design concepts, site plans and feasibility
studies. Directed projects through all schematics and the design development process.
■ Established procedures, delegated responsibilities, evaluated direction and performance per
the pro-forma. Worked with governing planning departments and reported to management.
■ Conducted meetings and monitored project budgets and schedules. Was responsible for
project image, identity, branding and aesthetics. Worked closely with CD production staff.
■ Evaluated and insured quality in design. Insured code compliance & environmental targets.
■ Assessed BOMA minimums. Participated in value engineering, product research and
contract negotiations. Worked with project architects during construction administration.
■ Helped with marketing material and presentations. Helped in government competitions.
■ Monitored projects through construction, punch list and close out.
DLR Group - Educational, Phoenix, Arizona 2004 – 2005
Ellermann, Schick & Bruno, Phoenix, Arizona 2003 – 2004
DMJM + HN Architecture, Salt Lake City, Utah 1998 – 2003
Denis W. Butler & Associates, Salt Lake City, Utah 1994 – 1998
Oversaw all stages of architectural services from Design to Construction Administration.
■ Worked with clients in developing design concepts and schematic design that met
programming. Directed programming. Directed projects through schematics, design
development, construction documents and construction administration & close out.
■ Established procedures, delegated responsibilities and met company budgets, schedule and
profit targets. Worked with governing building departments and reported to management.
■ Reviewed construction documents for progress and quality. Insured code and ADA
compliance and established drafting standards. Coordinated with engineers during CDs.
■ Participated in value engineering, product research and contract negotiations.
■ Conducted meetings and tracked all aspects of projects for upper management.
In the 1980s and early 90s worked as a Manager, Agent or Artist for various service companies
such as: America West Airlines, Morris Airlines, ASI Sign Systems, Kinko’s, Mervyns, Trolley Theaters
and United Artist. Did various freelance design and CDs for private home construction.
■ 1994, University of Utah, Graduate School of Architecture, Salt Lake City, Utah
■ 1992, Architectural Studies, University of Utah, Salt Lake City, Utah
■ 1985, Business Management, Mountain West College, Salt Lake City, Utah
■ The Betty H. Fairfax High School project received a Citation of Excellence award in 2008, with
the Learning by Design acknowledgments, hosted by the American School Board Journal. I
was one of the Project Architects and helped with design and construction documents.
■ Maintained a 3.8 GPA while enrolled in school full time, working part time and caring for a
family of four. Was able to finished my undergraduate degree two semesters early.
■ Received two awards for my designs and presentations at the 1992 American Institute of
Architecture Student’s Exhibition at the University of Utah Graduate School of Architecture.
■ In the mid 80’s selected as a leader of over 150 volunteers for my church, while serving an
assignment out of the country for two years.
ppaarrttiiaall pprroojjeecctt lliisstt
EEdduuccaattiioonnaall
Project: BBeettttyy HH FFaaiirrffaaxx HHiigghh SScchhooooll (Citation of Excellence Award)
Location: 8225 S. 59th Ave. Laveen, AZ
Owner: Phoenix Union High School District
Position: Design Development
Project: MMoouunntt TTiimmppaannooggooss SSeemmiinnaarryy
(New 10 Room Seminary)
Location: 50 East 1400 North, Orem, Utah
Owner: LDS Church
Position: Designer/Project Manager
Project: HHiigghhllaanndd UUttaahh SSrr.. SSeemmiinnaarryy
(New 8 Room Seminary)
Location: Highland, Utah
Owner: LDS Church
Position: Designer/Project Manager
NNeeww CCoorrppoorraattee OOffffiiccee SSppaaccee Project: SSaannddyy CCiittyy CCeennttrree (3 New Class A Office Buildings)
Location: Centennial Parkway, Sandy Utah
Owner: OHM L. C. California Office
Size: 451,000 s.f. – Office w/ Retail
Parking Structure: Two Levels with
a Landscaped Plaza on the top
Position: Designer/Project Architect
Project: EEnneerrggyy CCrroossssiinngg
Location: I-10 & Highway 6 North, Houston TX
Owner: OPUS West Corporation
Size: 474,000 s.f. Two 6 Story Buildings
Position: Designer
Project: OOPPUUSS PPooiinntt SSttaannffoorrdd RRaanncchh
Location: HW 65 & I-80, Rocklin, California
Owner: OPUS West Corporation
Size: 365,989 s.f. (3) Class „A‟ Buildings
Position: Designer
TTeennaanntt IImmpprroovveemmeennttss
Project: AAxxiioomm FFiinnaanncciiaall Location: Sandy City Centre, Sandy
Size: 5,400 s.f. Office Space
Position: Designer/Project Manager
Project: MMaarrrriiootttt VVaaccaattiioonn CClluubb
Location: 545 Main Street, Park City
Size: 1,200 s.f., Retail Sales Floor
Position: Designer/Project Manager
Project: SSoouutthhwweesstt KKiiddnneeyy -- CClliinniicc
Location: 7362 West Thunderbird Rd. Peoria, AZ
Owner: Southwest Kidney Institute, PLC.
Size: 8,600 s.f., Clinic at Sweetwater Ridge
Position: Project Architect / Designer
RReelliiggiioouuss BBuuiillddiinnggss
Project: SSiisstteerrss ooff CChhaarriittyy CCoonnvveenntt Location: 311 E Highland Ave, Phoenix AZ
Owner: Sisters of Charity, Xavier
Position: Design Development
Project: TTiimmppaannooggooss 11sstt,, 33rrdd && 66tthh WWaarrddss
Location: 544 North 400 East, Pleasant Grove
Stake: Pleasant Grove Timpanogos Stake
Position: Design
Project: CCoouunnttrryy OOaakkss
Location: 2580 East Cherry Lane, Layton
Stake: Layton Utah Kays Creek Stake
Position: Designer/Project Manager
HHeeaalltthh CCaarree && SSppeecciiaall PPrroojjeeccttss
Project: WWeellffaarree SSqquuaarree MMaasstteerr PPllaann
Location: 800 South 800 West, Salt Lake City
Owner: The LDS Church
Size: 8 Building Master Plan
Position: Designer/Master Planner
Project: SSwweeeettwwaatteerr RRiiddggee –– HHeeaalltthh CCaarree
Location: 7362 West Thunderbird Rd. Peoria, AZ
Owner: Thunderbird Ventures LLC.
Size: 21,492 s.f., DaVita Dialysis, Research
Clinic & General Health Care
Position: Programming, Design & Arch. Record
Project: 554455 MMaaiinn SSttrreeeett –– MMiixxeedd UUssee
Location: 545 Main Street, “Historic” Park City
Owner: Bamberger Inc.
Size: 6,000 s.f. Retail & 12,000 s.f. Nightly
Apartment Rental Units.
Position: Project Manager
AAddddiittiioonnss && RReemmooddeellss
Project: DDeesseerreett IInndduussttrriieess
Location: 700 South 800 West, Salt Lake City,
Owner: LDS Church
Size: 30,000 s.f., Department Store
Position: Designer/Programming
Project: DDeenniiss BBuuttlleerr && AAssssoocciiaatteess
Location: 2061 E. Murray-Holladay Rd, SLC
Size: 2,000 s.f. Home remodeled into a
Business Office
Position: Designer
Project: VVaalllleeyy VViieeww 33rrdd && 99tthh WWaarrddss Location: 2350 South 2100 East, Salt lake City
Stake: Salt Lake Halladay North Stake
Position: Chapel Designer
Project: MMoorrggaann UUttaahh SSrr.. SSeemmiinnaarryy
Location: 30 North 200 East, Morgan
Owner: LDS Church
Position: Designer/Project Manager
rroonnmmccffaaddddeenn AIA NCARB 448800--552255--00880033 .. 448800--443300--33000044 .. rrllbbmmccff@@ggmmaaiill..ccoomm
RReessiiddeenncceess
Project: TTiittttllee HHoommee Location: Logan, Utah
Size: 2,500 s.f. Two Story
Position: Designer
Project: WWiinntteerr HHoommee Location: Centerville, Utah
Size: 3,500 s.f. Two Story
Position: Designer
Project: PPoouullsseenn HHoommee
Location: North Salt Lake, Utah
Size: 4,300 s.f. Two Story
Position: Design Help
Project: SSoorreennssoonn BBeeaacchh HHoouussee
Location: Dana Point, California
Size: 3,000 s.f. Two Story
Position: Designer