1 '! Abbotsford rr #> ; IMission Water & Sewer Services NOTICE Abbotsford/Mission Water & Sewer Commission (WSC) Pursuant to the Community Charier and Abbotsford Council Procedure Bylaw No. 2075-2011, an Abbotsford Mission Water & Sewer Commission meeting will be held Thursday, December 13, 2012 at 9:00 a.m. in Room 530 of Abbotsford City Hall, 32315 South Fraser Way, Abbotsford, B.C. Dated: December 7, 2012 Legislative Services/ City Clerk
Transcript
Page 1: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

1

'! Abbotsford rr #>; IMission Water & Sewer Services

NOTICE

Abbotsford/Mission Water & Sewer Commission (WSC)

Pursuant to the Community Charier and Abbotsford Council Procedure Bylaw No. 2075-2011, an Abbotsford Mission Water & Sewer Commission meeting will be held Thursday, December 13, 2012 at 9:00 a.m. in Room 530 of Abbotsford City Hall, 32315 South Fraser Way, Abbotsford, B.C.

Dated: December 7, 2012

~ ~ Legislative Services/ City Clerk

Page 2: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

ABBOTSFORD MISSION WATER & SEWER COMMISSION MEETING

THURSDAY, DECEMBER 13, 2012 AT 9:00 A.M. ABBOTSFORD CITY HALL - ROOM 530

AGENDA

1. CALL TO ORDER 2. ADOPTION OF MINUTES

.1 Minutes of the Abbotsford Mission Water & Sewer Commission meeting held November 8, 2012 (attached) (attached) (attached)

Page 3

3. DELEGATION 4. BUSINESS OUT OF MINUTES

.1 Verbal report by the Water Planning Engineer, regarding the Metering Synopsis

.2 Monthly Follow-up Report (attached) Page 7

.3 JAMES Plant Monthly Report – November 2012 (WSC 118-2012) Len Stein (attached)

Page 8

.4 Monthly Water Report – November 2012

(WSC 122-2012) Len Stein (attached)

Page 16

.5 Financial Statements – October 2012 (WSC 117-2012) Laura-Lynn Nash (attached)

Page 23

5. REPORTS .1 The National Water and Wastewater Benchmarking Initiative (attached) (WSC 103-2012) Len Stein

- Powerpoint Presentation (attached)

Page 34

Page 36 .2 Industry Extra Strength Rates Review (WSC 119-2012) Stella Chiu (attached)

Page 55

.3 Bevan Wells – 2012 Operations Summary (WSC 120-2012) Brent Schmitt (attached)

Page 62

6. NEW BUSINESS 7. ADJOURNMENT .1 Motion to adjourn the December 13 2012, Abbotsford Mission Water & Sewer

Commission meeting

2

Page 3: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

Minutes of the Abbotsford/Mission Water & Sewer Commission meeting held November 8, 2012, at 9:05 a.m. in Room 530 of Abbotsford City Hall WSC Members Present: Councillor Jewell (Mission) (Vice-Chair); Mayor Adlem (Mission); Mayor Banman (Abbotsford); Councillor Braun (Abbotsford) (part); Councillor Gill (Abbotsford); and Councillor Luck (Mission) UMC Members Present: General Manager Engineering, Regional Utilities – J. Gordon (Abbotsford); General Manager Corporate Services and Finance - P. Soanes (Abbotsford); Director of Engineering and Public Works - R. Bomhof (Mission); and Manager of Finance – K. Boland (Mission) Staff Present: Director of Utility Operations – L. Stein (Abbotsford); Director of Wastewater, Drainage & Asset Management – R. Isaac (Abbotsford); Director of Water and Solid Waste – T. Kyle (Abbotsford); Budget & Payroll Analyst – L. Nash (Abbotsford); City Manager – F. Pizzuto (Abbotsford) (part); Recording Secretary - R Brar (Abbotsford) Public Present: 2 1. CALL TO ORDER The meeting was called to order at 9:05 a.m. ADDITIONS TO THE AGENDA Follow-up Regarding Special Joint Abbotsford Mission Joint Council meeting on October 22, 2012

Moved by Councillor Gill, seconded by Mayor Banman, that a follow-up regarding the Special Joint Abbotsford Mission Joint Council meeting on October 22, 2012; Joint Press Release; Resolutions to refocus the Abbotsford Mission Water and Sewer Commission activities and expenditures related to water project; and public questions related to this matter, be added to this agenda, as item 6.2.

WSC 130-2012 CARRIED.

2. ADOPTION OF MINUTES .1 Minutes of the October 15, 2012 Meeting

Moved by Mayor Adlem, seconded by Councillor Braun, that the minutes of the Abbotsford/Mission Water & Sewer Commission meeting held October 15, 2012, be adopted, as amended, to reflect Resolution WSC 128-2012 to include: the MDD projections should start from the actual 2012 MDD of 96.5 MLD and the chart should also show a peak supply line at 50 MLD above existing capacities, to reflect the ability of Cannell Lake to be used as an extra reserve supply to accommodate MDD for a limited number of days each summer.

WSC 131-2012 CARRIED.

3

Page 4: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

Minutes of the Abbotsford/Mission Water & Sewer Commission meeting held November 8 2012, at 9:05 a.m. in Room 530 of Abbotsford City Hall Page 2 3. DELEGATIONS None 4. BUSINESS OUT OF MINUTES .1 Monthly Follow-up Report

Moved by Councillor Braun, seconded by Mayor Banman, that the monthly follow-up report, be received.

WSC 132-2012 CARRIED.

.2 JAMES Plant Monthly Report – October 2012

Moved by Councillor Luck, seconded by Councillor Braun, that Report No. WSC 106-2012, dated November 1, 2012, from the Director of Utility Operations, regarding JAMES Plant Monthly Report – October 2012, be received.

WSC 133-2012 CARRIED.

.3 Monthly Water Report – October 2012

Moved by Councillor Braun, seconded by Mayor Adlem, that Report No. WSC 109-2012, dated November 1, 2012, from the Director of Utility Operations, regarding Monthly Water Report – October 2012, be received.

WSC 134-2012 CARRIED.

.4 Financial Statements – September 2012

Moved by Councillor Luck, seconded by Mayor Banman, that Report No. WSC 107-2012, dated October 23, 2012, from the Budget & Payroll Analyst, regarding Financial Statements – September 2012, be received.

WSC 135-2012 CARRIED.

5. REPORTS .1 Request for Boundary Extension to Sumas Wastewater Agreement

Moved by Mayor Adlem, seconded by Councillor Braun, that Report No. WSC 112-2012, dated October 29, 2012, from the Senior Drainage and Wastewater Engineer, regarding the Request for Boundary Extension to Sumas Wastewater Agreement, be received; and staff review the Sumas Wastewater Agreement to extend the boundary to include Nooksack Valley High School.

WSC 136-2012 CARRIED

4

Page 5: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

Minutes of the Abbotsford/Mission Water & Sewer Commission meeting held November 8 2012, at 9:05 a.m. in Room 530 of Abbotsford City Hall Page 3 .2 AMWSC Water Operation Budget Fixed vs. Variable Cost

Moved by Mayor Adlem, seconded by Councillor Luck, that Report No. WSC 110-2012, dated October 25, 2012, from the Water Planning and Process Engineer, regarding the AMWSC Water Operation Budget Fixed vs. Variable Cost, be received.

WSC 137-2012 CARRIED

.3 Comparison of Canadian Municipalities Water Use Councillor Braun was excused from the meeting at 9:58 a.m. during the discussion of the current item and rejoined the meeting at 10:00 a.m.

Moved by Councillor Braun, seconded by Councillor Gill, that Report No. WSC 111-2012, dated October 26, 2012, from the Water Conservation Program Coordinator, regarding the Comparison of Canadian Municipalities Water Use, be received.

WSC 138-2012 CARRIED

6. NEW BUSINESS .1 Proposed 2013 Abbotsford Mission Water and Sewer Commission Meeting Schedule

Moved by Mayor Banman, seconded by Mayor Adlem, that the Proposed 2013 Abbotsford Mission Water and Sewer Commission Meeting Schedule, be approved.

WSC 139-2012 CARRIED

.2 Follow-up Regarding Special Joint Abbotsford Mission Joint Council meeting on October 22, 2012

Moved by Mayor Banman, seconded by Mayor Adlem, that the Joint News Release, be released.

WSC 140-2012 CARRIED

5

Page 6: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

Minutes of the Abbotsford/Mission Water & Sewer Commission meeting held November 8 2012, at 9:05 a.m. in Room 530 of Abbotsford City Hall Page 4

Moved by Councillor Luck, seconded by Mayor Banman, that staff consider including the following items on the work plan: 1) to finalize any and all ongoing Abbotsford Mission water source studies as soon as possible; (2) to continue with the annual monitoring of water supply, demand and growth projections; (3) to defer further considerations of a new water source until a clear need within 5-7 years is identified; this might be determined to occur when actual consumption exceeds a specified level, such as ADD above 120 MLD or 70 percent of available capacity; (4) to commit to ongoing and continual improvement of water conservation programs and water system optimization (explore options to maximize the potential of Maclure reservoir and Cannell Lake related to peak demand management; and (5) staff develop a cost estimate for the long term water source for the purpose of including it in updated DCC programs, and that it be considered solely for the purpose of meeting growth demands and that any redundancy gained from the project is considered ancillary to the project.

WSC 141-2012 CARRIED

Public questions related to this matter: Has the commission looked at the DCC fees? (Current users should not subsidise developers). Why is there not any representation from the Planning department present at the meeting regarding future water consumption? 7. ADJOURNMENT

Moved by Mayor Adlem, seconded by Councillor Braun, that the November 8, 2012, WSC meeting, be adjourned. (10:20 a.m.).

WSC 142-2012 CARRIED.

Certified Correct: WSC Chair UMC Chair Patricia Ross Pat Soanes

6

Page 7: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

WSC (OPEN) FOLLOW UP REPORT TO DECEMBER 8, 2012 # WSC

MEETING DATE

ISSUE AND ACTION REQUESTED STAFF PERSON RESPONSIBLE FOR FOLLOW UP

& CURRENT STATUS

DUE DATE

1 November 10, 2011

Biogas Utilization at JAMES Plant Staff to report back after the greenhouse gas (GHG) emission baseline has been established for the JAMES Plant in 2012

January 2013

2 Biosolids study Staff to prepare a report January 2013

3 Review of Industrial Extra Strength Rates Staff to update extra strength rates to incorporate capital component Completed (December 2012)

December 2012

7

Page 8: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

8

-=Abbo~sf<?rd rr>' I/~flSSlOn

\Vater & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Len Stein, Director of Utility Operations

Date: November 26,2012

Subject: JAMES Plant Monthly Report - November 2012

File: 5500-90

Report No.: WSC 118-2012

UTILITY MANAGEMENT COMMITTEE (UMC) RECOMMENDATION

THAT Report No. WSC 118-2012, dated November 26,2012, from Len Stein, Director of Utility Operations, regarding JAMES Plant Monthly Report - November 2012, be received.

DISCUSSION

The plant effluent quality met all regulatory parameters for effluent discharge during the month of November 2012 and was well within the regulated limits. The key plant measurement parameters discussed below are defined and tabulated in appendices A-E. Al l results are forwa rded to MoE on a quarterly and yearly basis. All non-compliance parameters are listed in the reports to MoE.

InfluenVEffluent Data (Appendix A)

This shows the daily flows and influent and effluent quality on each day of the month. The fecal coliform test gives an indication that bacteria originating from the intestines of warm blooded an imals may be present in the wastewater.

All the required fecal coliform testing for the month of November 2012 were within acceptable limits. The limit for coliforms is 200 counts per 100 ml outside the initial dilution zone. The counts recorded are end of pipe prior to dilution from the Fraser River.

Biochemical Oxygen Demand (BOD) (Appendix B)

BOD is the rate at which oxygen in wastewater is used for the decomposition of organic matter in the waste water. High BOD rates reflect high organic content in the wastewater. Treatment plant processes reduce BOD levels before discharge to the environment.

The following chart compares monthly average BODs in mg/I.

Page 9: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

9

WSC Report No. 118-2012 Page 2 of 3

Nov. Oct. Sept. Nov. Nov. 2011/2012 2011/2012 2011/2012

Parameter Re(lulation 2012 2011 Variance Variance Variance BOD Influent mg/l n/a 295.6 309.1 -13.5 +95.1 +140.1 BOD Effluent mg/l 45.0 4.9 9.3 -4 .3 -1.9

The average BOD strength in the plant effluent for the three months listed was well below the regulated limit of 45 mg/!. BOD on the influent has increased due to industrial loading and increased concentration (not being diluted from the domestic sewage from Langley).

Total Suspended Solids (TSS) (Appendix C)

Total suspended solids are the total amount of solids that remain in suspension in the water. The higher the suspended solids concentration the harder the effluent is to disinfect and the higher the Biochemical oxygen demand will be.

The following chart compares monthly averages TSS in mg/!.

Nov. Oct. Sept.

-1 .6

Nov. Nov. 2011/2012 201112012 2011/2012 Parameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0 7.5 13.0 -5.5 -4.0 -6.0

The above compares the average of TSS influent and TSS effluent strength over the same time period one year previous, for three consecutive months and is well below the regulated limit of 45 mg/!. For the month of November influent TSS are still higher than last year but are returning to a more normal level over the two prev,ious months.

Ammonia (NH3l (Appendix D)

Nov. Oct. Sept. Nov. Nov. 2011/2012 2011/2012 2011/2012

Parameter Regulation 2012 2011 Variance Variance Variance NH3 Influent mg/l n/a 24.2 23.8 +0.4 +3.8 +1 .2 NH3 Effluent mg/l ** 12.6 11 .1 +1.4 +6.3 +10.7

** Acute ToxIcity threshold chart Appendix E

All tests done for the month of November were well below the toxicity curve. In recent months Ammonia has increase over the same time period last year. Ph in the effluent has also increased slightly increasing towards the toxicity curve. This can be seen in appendix E.

Biosolids Utilization

2012 Biosolids Utilization Program (total to end of October. 2012) Highland Valley Mine 2,763 tonnes Biosolids to Val-E-Gro 2,729 tonnes Val-E-Gro sales 13,748 yards

Page 10: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

10

WSC Report No. 118-2012 Page 3 of 3

SUMMARY

The plant effluent quality throughout the month of November 2012 met all regulatory parameters for effluent discharge.

Jim Gor on, P.Eng. Gener Manager of Engineering and Regional Utilities

---~-

Len Stein, A.Sc.T. Director of Utility Operations

Page 11: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

11

CITY OF ABBOTSFORD J.A.M.E.S POLLUTION CONTROL CENTRE INFLUENT/EFFLUENT DATA FOR THE MONTH OF NOVEMBER 2012

Influent Effluent Influent Effluent Effluent

Date Weather Flow

cBOD cBOD Suspended Suspended Total

(m3/d ay) Solids Solids Ammonia (mg/L) (mg/L)

(mg/Ll (mg/Ll (mg/L)

1 L' ht rain . 62,60(1.0 408.0 4.0 657.0 " 11.3

2 Cloud 55.100.0 267.0 5.0 340.0 7.8 11.4

3 Rain. 57,460.0 265.0 4.0 394.0 8.2 11.2

4 Overcast 55.070.0 192.0 4.0 356.0 8.6 11 .5

5 Partl cloudv 57,930.0 260.0 40 341.0 8.0 9.1

6 Overcast. 56,690.0 274.0 30 400.0 9.6 12.1

7 A few clouds. 55,920.0 247.0 40 346.0 7.0 16.7

8 A few clouds. 52 ,660.0 304.0 50 427.0 8.8 15.4

9 A few clouds. 49,580.0 364,0 5.0 473.0 4.0 10.9

10 A few clouds 47,350.0 358.0 5.0 4440 8.8 15.6

11 Overcast. 45.850,0 272.0 50 344 .0 8.2 13,7

12 Rain showers. 55.360.0 > > 501 .0 8A 154

13 Overcast 54.590.0 270.0 G 425.0 7.8 16.7

14 Overcast 55.260.0 331 .0 10.0 525.0 8A 14.7

15 >0 . 51 .950.0 G G 630.0 6.6 11.4

16 A few clouds. 51.970.0 H H 600.0 78 14.0

17 Overcast. 55,410.0 H H 465.0 6.0 15.9

18 Cloud . 52,510.0 318.0 6.0 477.0 6.0 12.3

19 Heavy ra in 68,140.0 304.0 5.0 459.0 9A 9.2

20 Overcast 64,840,0 559.0 7A 7.7

21 Cloud . 60.2700 523.0 8.2 11.6

22 Overcast 55,000.0 344.0 A A

23 Rain. 59.570.0 379.0 5.8 10,5

24 >0 . 54.500.0 346.0 5.8 116

25 Cloud. 51 .390.0 565.0 6A 12.3

26 eo" cloud

27

28

" 30

Min 45,850.0 192.0 30 340.0 40 7.7

M" 68,140.0 408.0 10.0 657.0 9.6 16.7

Avo 55,478.8 295.6 4.9 452.8 7.51 12.6

Total 1,386.970.0

Municipal Wastewater Regulations Parameters

Maximum Flow • 122,SOO cubic meters/day BOD Average Reduction: BOD - 45 mgtl Suspended Solids • 4S mg/l Suspended Solids Ave. Reduction: Fecal Coliform, max - 200 coioniesf100 ml sample Note: Fecal coliform testing is done once per week. Weather is obtained at 8:00 am daily from : TheWeatherNetwork.com (Location : Abbotsford, BC)

Appendix A

Effluent Fecal

Coliforms (CoI/100mL)

00

10.0

00

0.0

10~ 3.31

98%

98%

DEFINITIONS

BOD (Biochemical Oxygen Demand) is defined as the

rate at which microorganisms use the oxygen in waste­water while stablizing decomposable organic matter under

aerobic conditions.

BOD Test is a procedure that measures the rate of oxygen use under controlled conditions of time and temperature.

Standard test conditions include dark incubation at 20 C

for a period of 5 days.

Suspended Solids (s.s.) are solids that either float on the surface and/or are suspended in water, wastewater, or other

liquids, and which are largely removable by laboratory

filtering.

Ammonia N (Ammonia Nitrogen) is tested as an indicator of

toxicity in the ptant effluent. General rule of thumb is that toxicity is being approached when the Ammonia N is in

the 20 - 25 mg/l range if the PH is above 7.S. At that range

or beyond, there is a good possibility of failing the required 96 hour LCSO Bioassay Test as outlined by Environment Canada

Fecal Coliform Test is an indicator for the presence of bacteria originating from the intestines of warm-blooded animals and their

presence may be indicative of the presence of disease producing

organisms that may be found with them. Zero or counts below the

maximum level of 200 cotonies/100 ml sample indicates that sufficient ch torine has been used for disinfection purposes.

Coliform counts are end of pipe, the regulation is oul side the initial

dilution zone

LEGEND (NOTES):

A· No "''''pIe dUll to PO""'" 001"(10

e _ No .. mple du~ to plu9JOld SlImplo r r.,o$.

C· No samp'" due to frn~en .. mple< lubi"ll

O · No ""mp'" d U<l to sample r error

E · 00 ' .... di"ll _. be/owaccoptobi< ",,,.,.. R.""lto di""arded

F· No l. bo.-atory technicOa n In, Tuting noldon •.

G ·Oth~, (Equipmenl error)

H · 800 IN analysis past holding time .

Page 12: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

12

JAMES Pollution Control Centre Three Month BOD Data Comparision 2011 vs . 2012

Biochemical Oxygen Demand Municipal Wastewater Regulation Parameter

Effluent BOD - 45mgll maximum

1 252.C 458.0 6.0 6.0 323.0 353.0 ~ ~.3~.Q ~ -.1Q,Q ~

2 203. ~~ ____ ~_~4 .. ~_~7'~ .. 0 ____ ~2~6C~_5~;;2~5; .. ~0 __ ~r-_~81 .. ~0_~11~:7. ____ ~~3~'2~3. ~2~6;;7~' .. 0~ __ -f __ ~~~~~~~~S~~ __ ~ 3 21 ~ 6.' 5.0 402. 6.0 302. 265.0 5 4 204.0 272.0 4.0 5.0 332.0 415.0 7.0 5.1 43' . 192.U 5 242.0 335.0 4.0 5.0 363.0 439.0 ~ .. ~ 366.0 ~

6 ~~'.~0_7.22:7~,. +-__ -t __ ~D~ __ ~2'r-__ -+_~288~. _~44~.40).0~ __ ~r-_~7'~ .. 0 __ ~5"+-__ -f~3~')~·7. ~2~~;7~41..~0 ____ +--,~~ __ ~~~~~ __ ~ ~ 403. 9.' 6. 318. 432.0 9.0 5 .1 334. 247.0 9.0 4.

8 259.0 179.0 7.0 4.0 340.0 361 .0 8.0 4.0 339.' -"""'" lJ.l 5.1 9 E 279. 4. 4. 286. 383.0 7.0 12. ~ ~ ....:!.Qil...!U! 10 303.0 334. 6. 11. 296. 3: ).0 9.0 4. 448. 358.0 1 5. 11 161.0 372.C 6 .0 5.0 303. 299.0 6.0 6. 274. 272.0 5. 12 206.0 295.C 5.( 6.0 305.0 462.0 M. 5.C 210.C.£ 13 333.0 356. 7. A 301 . 301 .0 7.0 3. 280. 270.0 6.0 14 558. 6. 7. 35( 693.0 8.0 293. 331 .0 8.0 10.' 15 474.0 450. 6.( 7.0 313.0 681.0 .LQ...QJ: ~ --" ...!U!-" 16 328. 8. 4. 235. 751 .0 6.0 6. 371. H 12.0 H 17 289. 4. 3. 313 . 4' 1.0 9.0 15. 373. H H

18 227.0 320.( 7.0 3.0 272.0 655.0 9.0 8.C 246..1.1]lJ.l ~2.J1.'

19 277.0 719.( 6.0 6.0 259.C 409.0 .LQ ~ ~ ..lQ1,Q .LQ...!U! 2C 313.0 484. 15. 4. 351 . 451 .0 8.0 5. 212. 7.0 21 312.0 92 . 6. 3. 340. 369.0 1.0 4. 265. l.U 22 E 615.( E 4.0 (367.( .J... 2 ~ ....:!.Qil 23 248.0 287. '.0 3. 338. 371 7. 7. i 22.0 24 2' ).0 293. 6 .5 3. 290. 318. 8. 7·~----t----t--~7~'. '0';t---~------1 25 243.0 489.0 6 .0 4.0 347.C 8. '5. .JlJ.l 26 223.0 604.( 8.0 4.0 275.( 265.0 ...!U! ~ ~ ~

27 233.0 467 5.0 5. 275. 292.0 8.0 4. 246. 3.0 28 326.0 491 .0 6.0 5.( 359.( 239.0 9.G 5. 276. .JlJ.l 29 313.0 542.( 7.0 4.( 337.( 250.0 ~ ~ ~ .LQ

IM IN 161 .0 179. 18.0 IMAX 474.0 921 .C 447.0 1 34' _,12.0 IAVG 267.3 407.' 140.

LEGEND (NOTES): A - No sample due to power outage. B - No sample due to plugged sampler lines. C - No sample due to frozen sampler tubing. o - No sample due to sampler error. E - DO reading was below acceptable level - Results discarded. F - No laboratory technician in. Testing not done. G - Other (Equipment malfunction). H - BOD Analysis past holding time.

7.9 6.C -1.9 309. 295.6 -13.! 9.3 4.9 -4.3

Appendix B

Page 13: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

13

JAMES Pollution Control Centre Three Month TSS Data Comparision 201 1 vs. 2012

DATE

1

2

3

4

5

6

7

8

9

10

11

12 13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MIN. MAX. AVG.

II~;'P~~~ I~;'P~~~ v"'ance :;P~~~ Inf.

332. 649.1 6.6 321 .0 491.0 12.0 287.0 362.0 13 . 291 .0 457. 13.8 414.0 587. 10. 436.0 590.0 C 466.0 697. '5. 451.0 603. 15.

G 695.' 345.0 570.0 14.4 132.0 654. 13.0 304.0 367. 16. 31 0.0 685.0 13.8

C 604.0 16.0 368.0 ~

12. 7: . 13.0 551 13.

243.0 538. 12 .8 338. 1,351 14.6 339.0 932.0 13.6 322. 1.113.0 13. 302 . 1.068. 307.0 652.0 12.0 295. 480.0 1').6 278. 666.0 11 . 298. 1.191 .0 15. 326.0 779.0 12.8 373.0 825.0 14. 349.1 642.0 13. 431 . 516.0 [

132.0 362.0 230.0 6.6 466.0 1.351 .0 885.0 25.8 333.0 689.8 356.8 13.4

LEGEND (NOTES): A - No sample due to power outage . 8 - No sample due to plugged sampler lines. C - No sample due to frozen sampler tubing. o - No sample due to sampler error.

I :;p~~ va~~~ce

9.8 9.6 6. 9 .1 5.6 5. 8. 6.·

10.Q 7. 6.1

A 4. 7. 8.8 7. 4. 9. 5.4 5. 6. 7.2 6.8 4.6 9. 5.8

11 'A

10.2

4.2 -2.4 10.2 -15.6

7.4 -6.0

E - DO reading was below acceptable level - Results discarded . F - No laboratory technician in. Testing not done. G - Other (Equipment malfunction).

Total Suspended Solids

ll~f~~~~ I~f~~~~ va;~tce E'::.~~~ E'::.~~ZS 322.0 775.' 14. 8.6 280.0 662.0 l 1L4 12.4 449.0 0 11 . 319.0 748.' 6 3' ' .0 535.' 5 393.0 845 .0 13.2 10.0

)7. 5, 1 14. 61 19.

61 18.' 352.0 700.5 1"'.6 15.6 360.0 1.040. 14.4 12. 431 .0 ,220. 15. 11. 355.0 1.21 3.0 13.6 13.2 356.0 1.021 13.0 311 . 1.485. 12.4 9.1 301 .0 1.628.0 13.8 8.2 466. 1.382. 11.0 13. 344. 1.721.0 19.6 10.: 350.0 771.0 15.4 9.0 446.0 680.0 12 .6 10.6 384. 576.0 9. 10.1

752 .0 12.0 10.1 .8.0 750. 12 .0 9.6

442. 12. 604 . 13.6 9.

5.1 525. 19.0 5.0 410.0 428.0 11 .8 9.0

~ 397.0 1').0 12.' 521.0 12. 8.

389.0 443.0 14.4 4.2 0 392 .0 12. 9.

280.0 392.0 112.0 9.2 4.2 475.0 1.721 .0 1,246.0 19.6 15.6 368.6 802.9 434.3 14.0 10.0

Appendix C

I va~~~ce I~~';~~ I~~v~~~ 657.

4:11 .0 340.0 14. ;6. 11 .0

LO

' .0 477.0 444. 363.0 344. 276.0 501 . 403.0 425.0 637 .0 525. 627.0 630.1 334.0 600.0 367.0 465. 272.0 477. 372.0 459.0 252.0 559! 334.0 523. 405.0 344. 322.0 379.0 317.0 346.' 379.0 565 . 369.0 325.0 197.0 383.0 330.0

-5.0 197.0 340.0 -4.0 637.0 657.0 -4.0 382. 452.8

Municipal Wastewater Regulation Parameter Eff TSS - 45mgll maximum

I va;~tce I ;;v~~~ ;;v~~~ , va~~~ce

G 7.4 15.2 7.E 11. 8 .

8. [ 8.C [ 9, '

16. lC 8. 17.6 4 .0

9.· 8.8 10. 8.

9.: 8.4 10.0 7.8 15. 8.4 12. 6.6 16.8 7.8 11 . 6.0 22. 6 .0 21.8 9.4 11. 7. 14. 8. 13. A 13.' 5.

2.' 5. 10. 6 .4 13.4

8.' 13.6 7. ......

143.0 7.0 4.0 -3.0 20.0 22.8 9 .6 -1 3. 70. 13.0 7.5 -5.5

Page 14: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

14

JAMES Pollution Control Centre Three Month Ammonia Data Comparision 2011 vs. 2012

Date

1 18.5 25.9 7. 17.8 2 16.0 27. 6. 21.8 3 17.e 26.2 4

5 6

5. 8 19.5 9 3.8 18.4 10 22.7 25.4 5.1 20. 11 23.8 22.0 4.2 20.4 12 22. 23. 13 11 14 18 15 24 11 . 16 C 20.5 9.6 16.4 17 C 19.8 i.4 14.5 18 24.7 20.6 19 28.8 17.9 20

21

22 23 13.5 24 22. 20.0 7.2 11 . 25 23. 24.4 8.4 15. 26 23. 22.7 11.3 15. 27 23. 23.3 8.3 16.5 28 22. 21 .8 7. 15. 29 21 .6 21.6 9. 15.'

Efl.

Ammonia

20. 25.2 16. 25.4 24.6 8.4 22.5 16

22.5 11 .8 21.9 23.6 C 12. 24.5 31 .3 7. 16. 23.6 25. 14.6 16. 21.4 36.0 6. 16.2 23. 27.6 16.0 15.4 24.5 32.0 6.5 15. 24.5 24. 14. l ' 20.2 28.5 i.6

30.

15. 25.9 19. 23.2 6. 13.0 25.6 22. 12. 14.0 21 .5 28.6 1: 1

26. 19.6 12. 11 .6 [ 16. 22. 27. 6.9 A

22. 21 .5 4.6 14.4 19.1 24.5 7. 10.5 18. 26.3 6.6 0 23.9 19.8 11 . 21. 23.6 7.6 15 .6 22.8 20. 19.5 22.8 8 . 12.

30 31 ~---~===+~j[~~118~.6==~=1~00.4=~1~~. 3~== .... 21 .. 7"lIIt==~.1i6i .. 2 .... t=~

IMIN

i'AAx [AVG

1. 1.4 1 .•

LEGEND (NOTES): A • No sample due to power outage. e . No sample due to plugged sampler lines. C • No sample due to frozen sampler tubing. o . No sample due to sampler error. E • DO reading was below acceptable level - Results discarded. F - No laboratory techniciabn in. Testing not done. G - Other (Equipment malfunction).

'1 .

16. -0 . 17. 36.0 11 .J . 3 1.4 29.0 -' 25. 3.1 1.8 24. 1 .

Appendix D

Page 15: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

15

November 2012 Effluent Ammonia vs pH

200

180

160

140

_ 120 ...J 0,

E-n> 100 ·c 0 E E <{ 80

60

40

20

" \ \ \ \ -+-Acute Toxicity Threshold

\ • Effluent Data

\

" ~ J¥t* ~ • .1&

0 6 6.4 6.8 7.2 7.6 8 8.4 8.8 9.2 9.6

pH

Appendix E

Page 16: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

16

!! Abbotsford rr tLl /NIission Water & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Len Stein, Director of Utility Operations

Date: December 3,2012

Subject: Monthly Water Report - November 2012

File: 5650-30

Report No.: WSC 122-2012

WATER & SEWER COMMISSION (WSC) RECOMMENDATION

THAT Report No. WSC 122-2012, dated December 3, 2012, from Len Stein, Director of Utility Operations, regarding the Monthly Water Report - November 2012, be received.

DISCUSSION

Dickson Lake reservoir is at 638.4 meters (100%) of gravity and pumping. Cannell Lake reservoir is at 278.8 meters (100%) of gravity.

Attached are comparisons between November 2011 and 2012 flow percentages between Mission, Abbotsford and FVRD connection for the Cedar Mill. The flow percentage to Mission averaged 22.55% this month.

On Friday, November 30, 2012, above average chlorinated water was inadvertently allowed to enter into the potable water system at the water treatment plant. Although there was no health concerns, staff notified the health Department and the Mission Engineering department. Operations staff monitored different sites as the "slug" of chlorinated water moved through the system. Staff received no customer calls. An investigation is being conducted into how this happened.

SUMMARY

Staff are conduc' g a review to determine how a "slug" of above average chlorinated water entered the p e water system.

, P.Eng. General anager, Engineering and Regional Utilities

Len Stel, . c .. Director of Utility _

Page 17: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

17

WSC Report No. 122-2012 Page 2 of 2

Monthly Report for November 2012 Water Storage

Reservoir Max. Storage Storage % Storage Days of Storage % Storage capacity remaining 2012 remaining storage remaining 2011 remaining

(Mega liters) (Mega liters) 2012 remaining (Mega liters) 2011 2012

Dickson 15,906 15,906 100.0% 212 15,906 100.0% Cannell 1,850 1,850 100.0% 123 1,650 89.0%

Total 17,756 17,756 17,556

Storage remaining in days is based on 75 ML flow rate from Norrish and 15 ML flow rate from Cannell.

Water C onsumJtion Mission Date Abbotsford Date FVRD Date

Total ML 407.82 1402.78 0.00 Max. Day 16.53 18 Nov. 49.90 30 Nov. 0.00 Min. Day 12.65 27 Nov. 41.97 18 Nov. 0.00 Average daily 13.59 46.76 0.00

Abbotsford flow includes all wells. Mission flow includes flow from both Norrish and Cannell

Wt Q rt a er ua Ity Total Coliform E.Coli Giardia Cryptosporidium

Treated Treated Raw Raw Number of 42 42 4 4 samples collected Number of 0 0 0 0 positive results

14 samples are taken each week 7 of which are from the Joint system and 7 for the Mission distribution system.

Days of storage

remaining 2011

212 110

Page 18: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

18

The Joint water supply system encountered ammonia spill incidents, one at Marshal and one at Townline Wells. The Townline well incident was first reported to Abbotsford Fire Rescue Service (AFRS) Saturday Nov. 10 at 0800 as they received a 911 call from a nearby resident who thought they smelled chlorine. When AFRS was on scene they called the operations Standby who responded to the site and found that the Ammonia Vat had become pressurized and overflowed with an ammonia/water solution. Staff proceeded to check other locations where ammonia is used and found that Marshall Wells had the same incident occur. The chorine/ammonia systems were installed and commissioned in 2012.

Ammonia is used in the chloramination process as an additive, so the chlorine has a longer life, thus preventing the installation of chlorine injection points in the distribution system. The ammonia used is a 29% solution and one (1) tote (approx. 50 gallons) is on site at each well location as very little ammonia is used in this process. The vat has the ability to hold 7 totes, so the ammonia spill was diluted at about a 7 to 1 ratio prior to spilling over and flowing to a rock pit drainage system.

Although Ammonia has a very pungent odour and is a severe respiratory tract irritant, the solution was contained within the well buildings and there was no public risk . A private company dealing with spills was contracted to dispose of the ammonia/water solution at an approximate cost of 8 to 9 thousand dollars.

Staff has taken all the wells offline and started an investigation into: How the system failed-which parts did not work properly Why they failed-was the right material used for the right application Was proper emergency procedure followed? Can costs be recovered from the designer/supplier/installer? What can we learn from this-did we do it right or can we improve

Page 19: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

19

~

E ~

c 0

:;:::; co > Q)

w

Dickson Lake Level - 2012 640 ,------------------------------------------------------------------------,

1 635

630

625

620

Top Water Level 638.4

--------------------------------------------------------------------

Summary of Water Licenses Annual withdrawal - 33,600 MUyr (92.1 MLO)

Maximum daily withdrawal-141.5 MLO Storage -15,900 MUyr

No Licensed Water Use 615 +-----~----r_----r_----r_----r_--~----~----~----~----~----~-----J

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

--_. Gravity Drawdown (632 m) ~Iake level ---- Operations Drawdown Curve

Page 20: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

20

Cannell Lake Level - 2012 280 ,--------------------------------------------------------------,

279

278

I: o :;; III 276 > Q)

w 275

274

273

272

Top Water Level 278.8 m

Maximum daily withdrawal - 9.1 MLD Average daily

withdrawal - 11 .8 MLD

Maximum daily withdrawal - 69.1 MLD

--------------------- --------------------- "

---~,---------

No Licensed Water Use

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

----Gravity Drawdown (274.0 m) ~Iakelevel --- Operations Drawdown Curve

Page 21: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

21

November 2012 Flow

70.00

60.00 - - """'---- --- ;--- ..--" /

"- ..-- "- - ..-- -,~ , / ........ ...,/ 'J - ,..--'...- ...-

'if /

50.00 .-- . "-..-- . - .- . ...... -. - ...-

"- ,,- - ;-"- -,

' - ' - . ~

"- / I' .- -, / / - , ,,- ,;-, . I ~

./ , 40.00

~ :!:::

- - - Total Daily Flow

- . - . Abbotsford Daily Flow

iii

'" --Mission Daily Flow

Q)

::;;30.00 --FVRD

20.00

- ~

10.00

0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Date

Page 22: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

22

4

7

26

30

otal

~~

2012 2012 2012 2012 2012 MI" lon 2012 Abby 2012 FVRI 2011 201' 2011

62.34

59."

59.61

57,

59."

57,

60. 59.

6262

1510.6C

13.49

lHi 13.61

D.7C

13"

14.

13." 13."

14.37

13 10 13.14

13 13.56

1305 12.65

1~ 12."

407S:

,l~

48,85

44,7

48.91

47,"

45."

46

43.97 46,21

49.90

1402.

46.

Annual average daily now for 2011 was 68.49 ML Average daily flow for Nov. 2012 was 60.35 ML Average daily flow for Nov. 2011 was 61.25 ML

0.00

0.'

o.

o.

O. O.

0.00 D.

0.00

D.DC 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00

0.00

'.60'{,

21.

20.:

".36%

76.56% 74.88%

".13%

"0,*

7609% 76.40%

"."', 78.29%

76.3()%

77.~ 77.86%

77.7'" 76.62%

".32% 78.77%

78.58% 79.69%

0.00% 01 0.00%

0.00%

64.40

60.25

60.45

62.19

5960

t; J:04

62.28

62 .72

59.20

6123 60.62

1837.38

61.25

lA6

13.'

-'~.

429,88

14.33

47."

46.51

46.43 46 .

:.~ 46.

4658 49.10

4811 _47."

45.51

49.01 47.39

1407.50

469:

2011 I 2011 Mission 2011 Abby 2011 FVRI

FVRD Flow % oftotal % oftotal % ofT otal

o ~

D.

0.0

28.58%

23.06%

23.13'1 22.55'1

21.

73.'

:~ ~=I~'~IO~% 76 . O. 77.45 O.

78,12%

~~, 77.

10%

.10%

0.00'1 0 .00'1

1.00' ).00'1

,lmE=~:i=:=i~~~

23.37% 76.63% 0.00% 0.00%

Page 23: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

23

n: Abbotsford rr > 1/i\lission Water & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Laura-Lynn Nash, Budget & Payroll Analyst (Abbotsford)

Date: November 26, 2012

Subject: Financial Statements - October 2012

File : 1830-01

Report No. : WSC 117-2012

WATER & SEWER COMMISSION (WSC) RECOMMENDATION

THAT Report No. WSC 117-2012, dated November 26,2012 from the Budget & Payroll Analyst (Abbotsford), regarding Financial Statements - October 2012, be received.

DISCUSSION

The attached statements present the operating and capital financial activities for the ten-month period ended October 31,2012 , along with projections to the end of the year.

Water Operating

Water Operating expenditures overall are projected to end the year slightly under budget.

Lease revenue for Water Operations is higher than planned due to an increase in the contract with Telus for their infrastructure on the Mt. Mary Ann Reservoir.

Water conservation is projected to end the year $100,000 over the original WSC approved budget due to the continued popularity of the toilet and washer rebate programs. The $100,000 expenditure increase was approved at the August WSC meeting and will be offset by savings in mai ntenance and utilities. The toilet and washer rebate programs each had an initial budget of $100,000 for 2012.

Spending in 2012 on the toilet and washer rebates has seen a consistent increase over prior year ($268,000 vs. $168,000). To date, $143,000 has been spent on toilet rebates and $125,000 on washer rebates. ICI audits and rebates have seen a decrease in expenditures ($30,000 vs. $101,000) which corresponds to a decreased 2012 budget for that area ($80,000 vs. $200,000).

Both maintenance and utilities are projected to end the year under budget which will offset the extra funding needed in water conservation . Maintenance and utility costs will continue to be monitored monthly and, should the need arise, a budget increase may be required at a later

Page 24: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

24

WSC Report No. 117-2012 Page 2 of 3

date. Treatment and disinfection is projected to end the year $30,000 under budget; the soda ash facility is temporarily offline pending resolution of an equipment warral')ty issue. The facility is anticipated to resume operations by the end of December.

Sewer Operating

Sewer Operating expenditures are projected to end the year below budget.

Sewer revenue is projected to be $314,000 higher than planned. The variance relates to increased revenue from Industrial Extra Strength charges, and decreased revenue in the area of Biosolids Fabricated Soils.

Industrial Extra Strength charges are 25% ($204,000) higher than 2011 year-to-date (associated with higher BOD and TSS levels). The increase in Industrial Extra Strength charges for one company in particular accounts for 60% of the increase in revenue. The main impact of heightened BOD and TSS is on the capacity of the secondary part of the plant. Capital upgrades may be required sooner than planned if this trend continues. Industrial Extra Strength revenue is billed on a quarterly basis.

Biosolids fabricated soils revenue (Val-E-Gro) is lower than prior year due a wet spring that has resulted in slower than planned sales.

Hydro costs for the JAMES plant (accounted for under Wastewater Treatment Operations) continue to be higher than prior year; the Nitrification blower was not used for the majority of 2011 but is being used this year. Savings related to a vacant operator position are anticipated to more than offset the increased hydro costs. Maintenance costs are projected to end the year lower than planned as a millwright position was vacant for half of 2012 (savings of $45,000). Wastewater Treatment overall is projected to be under budget for the year.

Water Capital

Overall expenditures are currently within budget for the year. $0.7 million was spent in October, bringing the current year-to-date total to $11.2 million. Current projections indicate that $14.1 million of the $16.6 million budget is expected to be spent this year.

Sewer Capital

Overall expenditures are currently within budget for the year. $31 ,000 was spent in October, bringing the current year-to-date total to $2.5 million. Current projections indicate that $4.2 million of the $20.7 million budget is expected to be spent this year. Project delays due to pending grant funding accounts for the majority of the variance between projected capital spending and plan. Specifically with respect to the Stage VII upgrades at the JAMES plant, $9.8 million is projected to not be spent due to delays in grant funding. The funding for Stage VII has now been received and projects have gone out to tender. With respect to the JAMES Outfall Restoration of Pipe Cover, $2.6 million is currently projected as not being spent and will be re­budgeted in 2013 per WSC 96-2012. Current assessments indicate that this capital expenditure will not be required in 2012.

SUMMARY

MuniCipal contributions for operations are projected to end the year $43,000 below budget for the water system and $425,000 below budget for the JAMES plant. Capital expenditures are

Page 25: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

25

WSC Report No. 117-2012

projected to be below budget for the year.

SiiriTiaflAza m Director of Finance, Abbotsford

Jim Go on, P.Eng. Gen al Manager of Engineering and egional Utilities, Abbotsford

Page 3 of 3

Laura- ynn Nash, CGA Budget & Payroll Analyst, Abbotsford

Page 26: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

26

ABBOTSFORD / MISSION WATER OPERATING Statement of Financial Activities For the Period ended October 31st, 2012 In thousands

WSC

Approved 2012 2012 2011 2011 Plan YTD Projection YTD Actual

REVENUE Leases $ 16 $ 23 $ 23 $ 16 $ 16

Other revenue 15 22 26

Recoveries 10 10

31 33 33 38 42

EXPENDITURE

General services 1,501 1,122 1,501 977 1,191

Water conservation 634 517 734 569 839

Lab supplies, sampling and analysis 116 75 116 92 116

Inspections 205 172 205 169 205

Maintenance 800 460 725 545 706

Treatment and disinfection 145 83 115 89 110

Uti lities 256 146 220 167 230

3,657 2,575 3,616 2,608 3,397

Municipal Contribution Required (3,626) (2,542) (3,583) (2,570) (3,355)

Abbotsford (2011 Actual ~ 73 .53%) (2,651 ) (1,869) (2,635) (1,879) (2,456)

Mission (2011 Actual ~ 26.47%) (975) (673) (948) (69 1 ) (899)

$ (3,626) $ (2,542) $ (3,583) $ (2,570) $ (3,355)

Notes: J) Abbotsford and Mission cost share regional water and sewer expenditures. Operational cost sharing is based on the percentage of flows attributed to each community, with 2011 flows used to allocate 2012 funds.

2) The 2012 WSC Approved Plan was based on cost sharing percentages of73.10% Abbotsford and 26.90% Mission.

Page 27: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

27

ABBOTSFORD / MISSION JAMES PLANT OPERATING Statement of Financial Activities For the Period ended October 31st, 2012 In thousands

WSC

Approved 2012 2012 2011 Plan YTD Projection YTD

REVENUE Industrial Extra Strength $ 950 $ 1,0 18 $ 1,300 $ 814

Disposal Fees 70 52 60 49

Biosolids Fabricated Soils 160 126 128 133

Recoveries 54 57 60 37

Sumas System Contribution 102 \02 102 104

1,33 6 1,355 1,650 1,137

EXPENDITURE

General

General services 1,368 1,024 1,368 949

General plant maintenance 175 151 175 123

1,543 1,175 1,543 1,072

Wastewater Treatment

Operations 1,425 1,017 1,395 1,037

Maintenance 915 59 1 870 582

2,340 1,608 2,265 1,619

Environmental Management

Wastewater testing and analysis 536 415 527 369

Biosolids management 454 318 427 362

990 733 954 73 1

4,873 3,516 4,762 3,422

Municipal Contribution Required (3,537) (2,161) (3,1\2) (2,285)

Abbotsford (2011 Actual = 80.49%) (2,850) (1,739) (2,505) (1,841)

Mission (20 1 I Actual = 19.51%) (687) (422) (607) (444)

$ (3,537) $ (2,161) $ (3, 112) $ (2,285)

Notes: 1) Abbotsford and Mission cost share regional water and sewer expenditures. Operational cost sharing is based on

the percentage of flows attributed to each community, with 2011 flows used to allocate 2012 funds .

2) The 201 I YTD revenue has been restated to re flect changes made to cost/revenue sharing in 20 II.

$

$

3) The 2012 WSC Approved Plan was based on cost sharing percentages of 80.57% Abbotsford and 19.43% Mission.

2011 Actual

1,120

62

160

40

104

1,486

1,070

165

1,235

1,331

851

2,182

466

454

920

4,337

(2,851 )

(2,298)

(553)

(2,851)

Page 28: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

28

ABBOTSFORD / MISSION WATER CAPITAL Statement of Financial Activities

Dec Eligible 87.84% 12.16%

For the period ended October 31st, 2012 Non DeC-Eligible 73.53% 26.47%

wse wse 2012 Revenue Expenses 2012 DeC Approved Plan Amended Plan Actual Abbotsford Mission Abbotsford Mission Projection EIi~ible

Capital Expenditures

Key DeC Eligible I CF - Mitigation Wells at Garibaldi & Allen Park $ 200,000 S 200,000 $ 290,954 $ $ $ 255,574 $ 35,380 300,000 100% 2 CF - Norrish Intake Pipeworks 1,000,000 1,000,000 793,746 697,226 96,519 950,000 100% 3 CF - Gladwin Transmission Mains 9,500,000 9,500,000 7,097,300 6,23 4,268 863,032 8,900,000 100% 4 CF' - Fore Road PRe Station 30,000 30,000 27,232 23.921 3,311 30,000 100% 5 New Water Source - Options Study 300,000 300,000 9,074 7,322 1,753 10,000 50%

6 Slave Lake Grant (Jan - Mar) 40,783 5,951 (40,783) (5,95 1)

7 Stave Lake Grant (Apr - Dec) 472,258 (472,258)

Total DeC Eligible 11,030,000 11 ,030,000 8,218,305 513,041 5,951 6,705,269 994,044 10,190,000

Non-DeC Eligible 8 CF· Bulk Meter Installation 1,000,000 1,000,000 794 ,980 584,549 210,431 1,000,000

9 CF - Cannell Hydrometric Stations 75,000 75 ,000 32,179 23,661 8,518 75,000

10 CF - Norrish Intake Screens 550,000 550,000 428,826 3 15,316 113,510 500,000

II CF ~ Dickson Lake Upgrades 35,000 35,000 30,844 22,679 8,164 35,000

12 CF . Norrish Creek WTP Membrane Expansion for Turbidity 2,500,000 2,430,000 1,607,687 1,182,\32 425,555 1,900,000

13 CF . Water Conservation Master Plan 50,000 50,000 14 2012 Scada Upgrades 43 ,000 43,000 15,623 11,488 4,135 25,000

15 Aging Asset Assessment Procedures Study 50,000 50,000

16 Best Station Piping Upgrades 100,000 100,000 1,161 854 307 5,000

17 Cannell Water Treatment Study 100,000 100,000 4,539 3,338 1,202 6,000

18 IW A Leakage Study 150,000 150,000 19 Norrish Telephone Line Upgrade 200,000 200,000 2,311 1,699 612 200,000

20 Pickup Truck I - Replace on 4 year cycle 35,000 35,000 21 Pickup Truck 5 . Replace on 4 year cycle 35,000 35,000 22 Project Wrap Up Costs 10,000 10,000 428 315 113 10,000 23 Rain Harvesting Systems for Municipal Facilities 50,000 50,000 17,9 16 13,173 4,742 50,000

24 Riverside Generator Replacement 100,000 100,000 331 243 88 40,000

25 Water System Modelling 25 ,000 25,000 25,225 18,548 6,677 26,000

26 Norrish WTP Security Upgrades 40,000 561 412 148 40,000

27 Norrish WTP Health & Safety Upgrades 30,000 28 Contingency 500,000 480,000 29 Wells Disinfection Townline. Marshall, East Abbotsford 20,000 22 ,051 16,2 14 5,837 30,000

Total Non-DCC Eligible 5,608 ,000 5,608,000 2,984,661 2,194,621 790,040 3,942,000

Total $ 16,638,000 $ 16,638,000 $ 11 ,202,966 $ 513,041 $ 5,951 $ 8,899,890 $ 1,784,084 $ 14,132,000

Page 29: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

29

ABBOTSFORD / MISSION WATER CAPITAL Statement of Financial Activities

For the period ended October 31st, 2012

Proceeds on Disposals

Net Expenditures

wse wse Approved Plan Amended Plan

Dec Eligible

Non DeC-Eligible

2012 Revenue

Actual Abbotsford Mission

s $ $

87.84% 12.16% 73.53% 26.47%

Expenses 2012 DeC Abbotsford Mission Projection Eligible

$ $

S 8,899,890 $ 1,784,084

Page 30: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

30

ABBOTSFORD / MISSION JAMES PLANT CAPITAL Statement of Financial Activities Dec Eligible - Flow 8130% 1870%

DeC Eligible - Load 85.00% 15.00%

For the e.eriod ended October 31st, 2012 Non-DeC Eligible 80.49% 19.51%

wse wse 2012 Revenue Expenses 2012 DeC Approved Plan Amended Plan Actual Abbotsford Mission Abbotsford Mission Projection Eligible

Capital Expenditures

Key DeC Elig ible - Flow

1 CF - Headworks. Add Screen #3 & Upgrade Screenings Handling $ 571 ,000 $ 656,000 $ 346,945 $ $ $ 280,577 S 66,368 $ 37 1,000 47%

2 CF - Effluent, Emueot Pump Station Upgrade 2,708,000 2,708,000 9,154 7,403 1,751 350,000 ~7%

3 CF - Electrical, Add Two Pad Mounted TransfOTTTlcrs 1,923,000 1,923,000 1,134,570 917,534 217,035 1, 165,000 47%

4 CF - Electrical, Add Second Generator 369,000 369,000 244,948 198,091 46,857 245,000 47%

5 CF - Influent., Engineering Study - Installing DI)' Pil Centrifugal Pumps 15,000 15,000 5,944 4,832 1,112 6,000 100% In Existing Wet Well

6 CF - Influent, Add Screw Pump #4 (With Odour Ducling and 572,000 572,000 1,626 1,315 311 5,000 47%

7 JAtVlES Environmentalimpaci Study 75 ,000 75 ,000 9,692 7,880 1,812 65,000 100%

Dee Eligible - Load

8 CF - Secondary, Slage VII Upgrade: Add RBS Pump Station 2,866 ,000 2,866,000 37,255 30,776 6,479 350,000 47%

9 CF - Secondary, Stage VII Upgrade: Add Secondary Clarifier #4 2,729,000 2,729,000 35,386 29,233 6,154 350,000 47%

10 CF - Solids, Add was Thickener #2 746,000 746,000 5,364 4,431 933 75,000 47%

11 CF - Solids, Centrifuge Solids Dewatering 102,000 17,000 5,924 4,894 1,030 6,000 47%

12 CF - Secondary, Slage VII : New Primary Effluent Pump Station #2 2,867,000 2,867,000 37,255 30 ,776 6,479 350,000 47%

13 CF - Centrale, Pilot-Scale Process Investigation 53 ,000 53,000 47%

14 CF - General , Engineering Study for Local Beneficial Use ofBiosolids 105,000 105,000 64,812 53 ,629 11,183 75 ,000 50%

Prior Year Projects:

15 Water Stations at Val -E-Gro Production Site 377 3 12 65 400 50%

Total Dee Eligible 15,701,000 15 ,701,000 1,939,251 1,571 ,682 367,569 3,413 ,400

Non-DCC Eligible

16 CF - UV Disinfection Pilot Study 20,000 20,000 7,056 5,680 1,377 7,200

17 CF - Digester Gas Upgrades I Emerg. Shut off Valve 100,000 200,000 18,329 14,753 3,576 20,000

18 CF - Electrical, Security and Video Surveillance 326,000 326,000 135,589 109, 135 26,453 136,000

19 CF - Detail Survey 19,000 19,000 5,939 4,781 1,159 10,000

20 CF - Misc. Repairs to Concrete Tanks and Channels 51,000 51,000

21 CF - HVAC in Operations Building 51,000 51,000 13,525 10,887 2,639 14,000

22 CF - Revamping of Change Rooms in Operations Building 77,000 77,000 25,273 20,342 4,931 27,000

23 CF - FRP Grating on TF#! and #2 153,000 53,000 41,357 33,288 8,069 53,000

24 CF - Physical testing and condition evaluation of trick ling filter media 45,000 45 ,000 22,360 17,997 4,362 23 ,000 for TF#1

25 eF - Cleaning and Repairing Digester # I 530,000 530,000 8,830 7, 108 1,723 150,000

26 CF - Replacement of Fume Hoods in JAMES Laboratory 16,000 16,000 17,522 14, 104 3,419 18,000

27 CF - Replacement of Loader (IS-year cycle) 250,000 250,000 248,409 199,944 48,465 250,000

28 Emuent, Outfall Monitoring Program 53 ,000 53,000 23,300 18,754 4,546 43 ,000

29 Emergency Response Plan 81,000 81,000 11 ,000

30 JAMES Outfall Restoration of Pipe Coyer 2,600,000 2,600,000

Page 31: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

31

ABBOTSFORD / MISSION JAMES PLANT CAPITAL Statement of Financial Activities

For the e.eriod ended October 3 f st, 2012

31 Replacement of Forklift (15 year cycle)

32 Secondary, Physical Testing and Condition Evaluation of Trickling Filter Media

33 Joint Sewer Contingency

Prior Year Projects:

34 Non-Destructive Testing of Digester #3 Roof Allowance

35 Improve Pasteurization Tank Odour System

Total Non-DeC Eligible

Total

Proceeds on Disposals Loader - IS 500

Net Expenditures

wse Approved Plan

58,000

51,000

500,000

4,981,000

S 20,682,000

wse Amended Plan

58,000

51,000

500,000

4,981,000

$ 20,682,000 $

$

Dec Eligible - Flow 8130% 18.70%

DeC Eligible - Load 85 .00% 15.00%

Non-DeC Eligible 80.49% 19.51%

2012 Revenue Expenses 2012 DeC Actual Abbotsford Mission Abbotsford Mission Projection Eligible

58,000

15 12 3 100

5,036 4,054 983 6,000

572,541 460,839 111,703 826,300

2,511,792 $ $ $ 2,032,521 479,272 S 4,239,700

16,166 13,313 2,853 (13,313) (2,853)

16,166 S 13,313 $ 2,853 $ (13,313) (2,853)

$ 2,019,208 476,418

Page 32: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

32

Joint Water Major Projects

Key Project Description Total Project Value StudylDesignl Anticipated Engineering (Project Timeframe) Construction Completion Date ConsultanU

Project Status Contractor (as of October 31,2012)

2 Norrish Intake Installation of new creek $B.BM Pipeline and intake Spring 2013 Associated 10 and Pipes intake and twinning of (200B-2013) generally completed, Pedre

pipeline between finishing details underway. Norrish Intake and WTP Final tie-ins awaiting review

of pipeline coatings. 3 Gladwin 1200 mm pipeline along $10M Construction 95% complete. Spring 2013 OpusDaytonKnight

Transmission Gladwin Road from (2010-2013) Pipeline is generally Sandpiper Main Maclure to north of finished , tie-ins to be

Townshipline Rd . completed in Nov to Feb, remainder of paving in Spring 2013.

B Bulk Meter To improve flow $1 .3M Construction substantially December 2012 KW LIT ritech Installation monitoring reliability and (2010-2012) complete. Final

redundancy deficiencies to be rectified and equipment calibrated.

12 Norrish Creek WTP improvements to $4.3M Construction completed. Completed CH2M HILL WTP increase plant output (2010-2012) Maple Reinders Improvements during turbidity spikes GE Water

Page 33: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

33

JAMES Plant Major Upgrades (As of October 31,2012)

Key Project Description Total Project Study/Design! Anticipated Engineering Value (Project Construction Completion Date Consultant!

Timeframe) Project Status Contractor (as of October 31,2012)

2,12 Effluent pump Upgrade effluent pump $2.548M Design - 100% ! 2014 AECOM ! Westpro station station with new pumps (2010-2013) Construction 5% Complete

and header pipe to increase capacity

1 Head works Install one screens to $860K Design 100%1 2013 AECOMI Screening take debris out of (2008-2012) Construction (screen Gerry Enns

sewage stream channel) 100% complete Construction (screen) 5%

8, 9 Stage VII Trickling Filter and Solids $23.5M Design - 100% 1 2014 AECOMI Westpro Upgrades Contact Tank #3, (2009-2013) Construction - 5%

Primary Effluent Pump Station #2, RBS Pump Station

17 Digester Gas Upgrade Plant's Digester $1.29M Design - 100% 1 2013 Besant & Upgrades Gas System to meet (2009-2012) Construction - 100% Associates 1

current code AECOMI Lockerbie Design (Heat Exchanger) - & Hole 1 100%1 Construction 5% Gerry Enns

Page 34: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

34

: Abbotsford rr > I IMission Water & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Len Stein, Director of Utility Operations

Date: October 10, 2012

Subject: The National Water and Wastewater Benchmarking Initiative

File: 5500-30/5600-30

Report No.: WSC 103-2012

WATER & SEWER COMMISSION (WSC) RECOMMENDATION

THAT Report No. WSC 103-2012, dated October 10, 2012, from Len Stein, Director of Utility Operations, regarding the National Water and Wastewater Benchmarking Initiative, be received.

BACKGROUND

The National Water and Wastewater Benchmarking Initiative (NWWBI) for the water and wastewater industry started in 1997. There are currently 43 municipalities representing 60% of Canada's population involved. AECOM Inc., a consulting engineering company, is coordinating the initiative.

DISCUSSION

The NWWBI compares performance measures from different utilities. The purpose of benchmarking is to record internal changes, compare results with other local governments in order to assess value for money spent, and learn ways to improve. For example, operations and maintenance (O&M) costs per kilometer of water main length are calculated, and then are plotted on a graph showing comparable utilities.

AECOM visits each utility to verify that the cost collection methods are consistent. This ensures that valid comparisons can be made, given that utilities are different ages, sizes, etc. As part of this process, utility staff attend a seminar to discuss the results and operational methods. This forum provides an opportunity for those with new ideas to share their thoughts and innovations with others.

The accompanying presentation shows a series of graphs for works performed in 2010, for both water and wastewater. The 2011 NWWBI analysis is currently underway. For reasons of confidentiality , names of other municipalities are not published . Utilities are plotted along the "X" axis in order of increasing size so that those of similar size are together.

Page 35: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

35

wse Report No. 103-2012 Page 2 of 2

ANALYSIS

Regional Water

The majority of water produced by the AMWSe is from surface sources, which have significantly lower costs than groundwater. Surface costs are kept low since gravity piping prevents the need for pumping water to the distribution system and the excellent raw water quality reduces the level of treatment required. Since staffing levels are low and major turnover can be expected in the next few years, a retirement transition plan should be put into place as soon as possible. Major upgrades to both surface and groundwater sources in 2010 easily met the recommended reinvestment targets.

Regional Wastewater

The JAMES pee has reached more than half of its expected life. It typically runs at 75% capacity, allowing for seasonal and daily fluctuations in flow, as well as some redundancy in case of failure. No non-conformances occurred in 2010. Staffing levels and O&M costs are typical for the size and type of plant. Although capital reinvestment levels have risen over the last number of years, they still did not meet the recommended target levels.

FINANCIAL IMPLICATIONS

N/A

COMMUNICATION PLAN

No communication plan is required.

SUMMARY

The benchmarking program was designed so that performance measurement data from different utilities could be compared. The results show that the wse compares very well with those in the survey group. The wse has a well maintained water and sewer system with a very low operating cost.

Jim Gordon, .Eng. Len Stein, A.Sc.T. ager, Engineering and Regional Director of Utility Operations

LS/sv

Page 36: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

36

BENCHMARKING

2010

~~~ ABBOTSFORD

Page 37: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

37

r .... .... ,

I J

'R.#.. ~ • Thund" ----'1._ 8.!'fj-

Graphic from www.nationalbenchmarking.ca

, • •

National Project Started in 1997 43 Municipalities 60% of population

Page 38: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

38

Implement Process Changes

Collection (2011 )

Data QC (2011 )

, Report! ~ AnaIYSiS~ (2012)

• Thorough QA/QC • Continuous

Improvement ~

~~~ ABBOTSFORD

Page 39: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

39

• What we spend

• Who's looki ng after it

• How it's working

~~

~~~ ABBOTSFORD

Page 40: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

40

~ --- -~

~..:;:::.: Com'le~ Lake Ch/orinll;tion Stttiion

~~~creek ...... Ol; r Trvatn.lert Plontl_~

Cannons Pit Ammooio Stillion

ug .... d _ .6.101"" le Tl, nlnllll lon IlIalnl --..... .6 _ C!tyof .Ul>OtllordI)III I110 IlUOn I A BBOTSFORD

1. Slow sand Filtrat ion

2. Membrane Filtration

Cannell Lake and 19 wells

~1500 -C\I

~1200 ..J :i!: 900 -.c 3: 600 ..)t!

300

0

Breakdown of Energy Consumed in kWh I ML Treated 2010

r-- f- f- 0- f-

r- f- f- l- I-

to t-r f-r I-r

;-

l-

OOil

• Natural Gas

• Diesel

• Electricity

n f- I-

1. [ '-r

\.J yv v\..l -, ... h ..}

~~~ ABBOTSFORD

Page 41: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

41

Water Treatment (Surface water)

Water Treatment (Ground water)

WT 36

$1,609,983* $62.43*

$344,014 $357.23

* Includes all transmission system O&M costs

66 0/0 2.8 % $142.8 M

~~~ ABBOTSFORD

Page 42: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

42

$1500

$1200

"tl

~ $900 ... I­..J

~ $600 -I/) o u :2: $300 0/$ o

$0

~-

O&M Cost I ML Treated

! 02008 I . 2009 I

i

02010 i i i i ----., I I I I

" i i I I I

I 1

] [J]rI]~ i

....- I rT1 .--. U) U)

I

U U)

I? \)

$1600

$1200 "tl CII -l'CI ~ $800 I-

..J :2: --I/) $400 0 u :2: 0/$ 0 $0

O&M Cost I ML Treated

I'.

I~ '~ ' ~'

::;: (9

I

U

::;:

V

I 02008 I . 2009

r- 02010

11 n.., ~r., I ...

~~~ ABBOTSFORD

Page 43: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

43

4

3 -

0/0 2

1

-- -

Surface Water Ground Water

'06 '07

• '08

• '09 • '10

~~~ ABBOTSFORD

Page 44: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

44

WT 7.1

Supervisor I Support*

2.0

*Support includes clerical staff

Lab Staff

0.1

9.0

8.0

7.0 "0

CD 6.0 -C\I

CD ... I- 5.0 ...J ::i: 4.0 0 0 0

3.0 .... -VI 2.0 w -l-LL 1.0 ::i:

-

01:1 0 0 •

Treated 2018

.. Fl

. Lab FTEs ====n -DTech/Eng FTEs

-

o Supervisor FTEs -

• Field FTEs - -

Maintenance o Field FTEs - -

Operation 1\

!III !III D ..., • -,V

~~~ ABBOTSFORD

Page 45: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

45

350

300

o C; 250 N "0 ~ 200 ns f! ~ 150 :2: -N 100 o u ~ 50

o

GNGEM ........ hm ...... Consumed in the Operation of the

Treatment Plant

02008

. 2009

02010

-

,-

I- -. I ,

l- I-

f .., ' L ' L

W U

r-

r--

I

500

400 0 .... 0 N 300 "0 CD -ns CD ... I- 200 ...J :2: -N 100 0 u OJ

.lO:

0

Consumed In the Operation of the Treatment Plant

~ 02008

737.5 . 2009

02010

('\

nil .-' U ' U

S • ()

v,

I-

r--

,~

Page 46: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

46

• 0 confirmed coliforms

• 52 quality complaints (13th lowest per pop of 31 cities)

• Well nitrates are high due to agricultural area

• All nitrates well below target level (10 mg / L)

02008 . 2009 02010 9.0 +-----'----------L___�

8 .0 +--------------1

~ 7.0

:!:: 6.0 +----I-~-----___1 Z ... G) 1V 5.0 +-----1------+-- -------1 ;: -g 4.0 t---H H--------1 -IV G) .= 3.0 t---t-l I-t-------j

2.0 +-----l l--l-l I-t-------.,---i

1.0 -t-tI--lH H t-------11

Page 47: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

47

0.40

- 0.35 :::l I-z

0.30 ~

>-:!:: "C

0.25 :c ... ~

0.20 ... CI> -lIS

3: 0.15 "C

CI> - 0.10 lIS CI> ... I-iii 0.05 ::l c C 0 <I: CI> Cl lIS ... CI>

~

Turbidity (NTU)

Group Target is < 0.3

02008 . 2009 02010

I ~ ~nn [J] ~ni ' L •

,...

r

\r! , u (/)

~

1.2

- 1.0 :::l I-Z ~

>- 0,8 :!:: "C :c ... ::l

0.6 I-... CI> -~ 0.4

"C CI> -lIS CI> 0.2 ... I-iii ::l C 0 c

<I: CI> Cl lIS ... CI>

~

Turbidity (NTU)

Group Tarqet is < 1

02008 . 2009 02010

" -

+-

1 r 111 1 Ilill 1 'L

(!)

I' 1.86

I r~ rwl 'L

~jr~ ABBOTSFORD

Page 48: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

48

- Average Flow: 61.3 ML / day

- Design Capacity Used: 75 %

- Necessary redundancy

a. 60% .: 40% Q '0 20%

'#. 0 % -lrJ',lIl,l.."...C1,lA!,lIl,1

Liquid flow:

UTILITIES

- Primary Treatment (red)

-Secondary Treatment (yellow)

-Disinfection (green)

-Discharge (blue)

Page 49: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

49

WWT 37

5-Year Average Capital Reinvestment

5 ,--------'06

. '07 4 1------- • '08

. '09 3 1------- • '10

2 /---------7"

1

o L--_

WWT

45% 2.7 % $120.0 M

Wastewater Treatment

• Total O&M Cost = $4,330,029

• O&M Cost / ML = $193.42

~~~ ABBOTSFORD

Page 50: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

50

$250 -+---:;;0----;;;;1

"0 $200 -'I- ---t-i

~ ~ ~$150 :2: -u; $100 o u :2: ..., $50 o

$0

. 2009

02010

~~~ ABBOTSFORD

Page 51: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

51

WWT 11.7

Supervisor , I Support*

2.1

*Support includes clerical staff

Lab Staff

2.0

2.0

't:I 1.6

Gl -10 ~ ~ 1.2 (II

E :::I

f$ 0.8 ..J :2: 0 g 0.4 .... -.Ul W ~

0 u.. :2: ad 0

~

~ '. \d '> ~

Volume Treated 2010

'.

. Lab FTEs

• Supervisor FTEs

DTech/Eng FTEs

• Field FTEs - maintenance

o Field FTEs - operation

-

~ '.'.'. '.

~tr~ ABBOTSFORD

Page 52: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

52

1200

1000

800 '0 CD -t1I CD 600 ... I-...J :iii: - 400 N 0

/'\. , U OJ ~ 200

0

't ~

GHG Emissions from Energy Consumed In Operation of the Treatment Plant

f--

f-- -

lri.rn ill , ~ ~ T ..........

02008

. 2009

02010

ill ~

~~~ ABBOTSFORD

Page 53: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

53

• OUt of 1 "non-compliances"

kg of BOD Discharged to Environment per Capita 2010 8

"C

~ 7 ... ns ~ 6 .!!! c 5 c o III 4

Ol 3 .:.:

2

1

o

• , , , , , , , ;

~

; ~

, , , I i.

~ .• lry : rima ;

- .- - - -- ---

f'

Ilhlli • I •• I I I II I I

'" Secondary and BNR

--

h i I.

• • , , , ~

,

· , , , , , ~

, , , . .1 -... ~ II .

, ,

Tertiarv

~~~ ABBOTSFORD

Page 54: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

54

10,000,000 97% 97%

8,000,000 -----

6,000,000 +------

4,000,000 +--

2,000,000 +--

o +--

cBOD TSS

29%

TKN

33% 45%

Ammonia TP

~~~ ABBOTSFORD

Page 55: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

55

'! Abbotsford rr >J/Mission \vater & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Stella Chiu, P. Eng . Senior Drainage and Wastewater Engineer

Date: November 30,2012

Subject: Industrial Extra Strength Rates Review

File: 5330-60

Report No.: WSC 119-2012

WATER & SEWER COMMISSION (WSC) RECOMMENDATIONS

1. THAT Report No. WSC 119-2012, dated November 30, 2012 from, Stella Chiu, Senior Drainage and Wastewater Engineer, regarding the Industrial Extra Strength Rates Review, be received; and

2. THAT staff develop an industrial extra strength rates review formula to recover capital upgrade costs, review permitting process and fines, consult with industry stakeholders and report back.

BACKGROUND

Currently industries pay extra strength user fees to discharge in the JAMES Plant sewerage area. These are mainly food processing industries in Abbotsford that produce organic wastes. The strength of the organic wastes is measured by Biochemical Oxygen Demand (BOD) and Total Suspended Solids (TSS). The extra strength user rate comprises three main components: (1) Operation and Maintenance (O&M) Costs of the JAMES Plant; (2) Asset Replacement Sinking Fund; and (3) Industrial Source Control Program Costs. The current extra strength rates are $0.42/kg of BOD and $0.47/kg of TSS. The revenue received from the extra strength customers is shared between Abbotsford and Mission based on historical average flow data .

While the extra strength user fee is a means to recover O&M and asset replacement cost from the extra strength industries, it does not account for the capital upgrades that are required at the JAMES Plant when these industries expand and increase their discharge. This report provides a review of this issue and recommendations of next steps.

DISCUSSION

In the past few years, the JAMES Plant has seen an increase in BOD and TSS loading coming to the Plant. An increase in loading was also observed from the industries. Historical flow and load to and from the Plant, digester gas produced at the Plant, biosolids production and industry loading data are summarized in Appendix A. A simplified process diagram that illustrates the data points is included in Appendix B. Note the 2012 projected data and data collected to date are also presented for reference.

Page 56: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

56

Report No. WSC 119-2012 Page 2 of 6

The following observations were noted from data in Appendix A:

1) Comparing data in 2010 to 2011 (Table 1), flow to the Plant has decreased by about 10%. At the same time, BOD loading has increased by about 21%. However, this increase in BOD was not reflected in the biosolids production at the Plant during the same period (Table 3). The discrepancy may be due to the changes made to the influent channel to improve sampling methodology during 2010/2011.

2) Loading from the industries has gone up since 2010 (Table 6), and is partially causing the loading to the JAMES Plant to increase.

There are several issues relating to the increasing industrial loading to the JAMES Plant:

• The extra strength industries are mainly food processing industries that discharge organic loading such as BOD and TSS. Some of the industries operate all year around, while some operate seasonally. These industries can expand and change their process within a short period of time, causing large variations in the amount of BOD and TSS loading they discharge.

• Increased BOD and TSS loading to the JAMES Plant uses up secondary treatment capacity at the JAMES Plant seasonally or permanently depending on the industrial processes. This increases the need to move forward capital upgrades before they are planned.

• The current extra strength user fees only accounts for Operations and Maintenance and asset replacement costs. They do not account for growth or expansion from the industries.

• Historically the calculation of Development Cost Charges (DCC) is based on volume, instead of organic loading such as BOD and TSS. Organic loading from industries has a larger impact than flow to the JAMES Plant. For comparison, Joint Sewer DCC collected from the industries since 2010 estimated $56K, based on a total expansion of 1.96 ha. Flow generated from the 1.96 ha is equivalent to 63 people, or 19 homes. It is projected there is an increase of approximately 700 tonnes of BOD during the same period (Table 3). Assuming an average home generates 50 kg BOD/year, the increase in BOD is equivalent to 14,000 homes in Abbotsford, and has 740 times more impact than its flow.

Currently Source Control requires industries submit Wastewater Discharge Permit Applications on an annual basis. Through the permit application process, industries advise JAMES Plant staff their planned wastewater discharge volume and characteristics for the current year.

While the application provides valuable information of each industry, a funding mechanism needs to be in place to account for secondary treatment capacity and upgrades due to industrial loading at the JAMES Plant.

Page 57: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

57

Report No. WSC 119-2012 Page 3 of 6

One option is to develop a three-tier system (on a kg/d basis), which is outlined as follows:

• Baseline: Review historical data of each industry and develop a baseline for each. The baseline would be the average of historical data. A nominal rate will be charged if industry discharges are less than or equal to its baseline. Each year the baseline will be adjusted taking into account the loading from previous year.

• Level 1: If the discharge is higher than the baseline but below Level 2, a premium rate will be charged.

• Level 2: If the discharge is higher than Level 2, the industry needs to resubmit its application . A higher rate may be applied, or pre-treatment at the facility may be required . Consideration may also be given to implement fines above the limit, e.g. $500/day.

This option will provide the JAMES Plant a mechanism to recover costs for secondary upgrades due to additonal discharge from industries, but at the same time provide a limit to prevent excessive industry discharges.

Regarding the high BOD and TSS coming into the JAMES Plant, it appears that some of the extra BOD and TSS is not accounted for from the extra strength industries. Staff will be working with Source Control to place composite samplers along the main trunk line to determine if any other customers are accounted for the extra BOD and TSS. Note part of the higher BOD and TSS could be accounted for from improved sampling at the JAMES Plant.

FINANCIAL PLAN IMPLICATIONS

With the proposed new Joint Sewer Capital Cost Sharing Formula, the growth-related capital costs for the JAMES Plant are proportioned based on flow and mass load. Industries in Abbotsford are currently included as part of Abbotsford 's load projection. It is therefore proposed that the extra strength revenue collected to cover capital upgrades be allocated to the city in which the revenue is collected, as this is consistent with the mechanism for sharing load-related costs.

COMMUNICATION PLAN

The proposed rate increase would need to be consulted with and communicated to the industry stakeholders, prior to implementation.

Page 58: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

58

Report No. WSC 119-2012 Page 4 of 6

SUMMARY

The organic loading from industries to the JAMES Plant has increased in the past few years. The current extra strength user fees recover costs for Operation and Maintenance and asset replacements due to industrial loading, but do not collect for capital upgrades to address growth or expansion. A funding mechanism needs to be in place to account for secondary treatment capacity and upgrades due to industrial loading at the JAMES Plant. It is recommended that staff develop an industrial extra strength rates review formula to recover capital upgrade costs, review permitting proc d fines, consult with industry stakeholders and report back.

, P.Eng. General anager, Engineering and Regional Utilities

ROb-f.:.l~ Director of Wastewater, Drainage & Asset Management

SC/sv

Attachment

Stella Senio

Iman Azam , SA, CPO Director of Finance

Page 59: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

59

Report No. WSC 119-2012 Page 5 of 6

Appendix A JAMES Plant and Industrial Loading Data

Table 1 Influent Flow BOD and TSS to the JAMES Plant - , Year Total Flow (ML) Total BOD Load Total TSS Load

(dry tonnes) (drv tonnes) 2010 22,400 4,950 9,310 2011 '20,500 5,920 8,510 2012 14,500 6,900 8,700

(To September 2012) £2012 19,400 9,200 11,600

(Projected to year end) Note. The reduction In flow from 2010 to 2011 IS mainly due to Aldergrove being offline.

2 Assume the monthly plant flow and load in October to December is the same as from January to September, 2012.

Table 2 - Effluent Flow BOD and TSS at the JAMES Plant , Year Total Flow (ML) Total BOD Load Total TSS Load

(dry tonnes) (drv tonnes) 2010 22,400 130 290 2011 20,500 190 270 2012 14,500 150 170

(To September 2012) '2012 19,400 190 230

(projected to year end) Note. Assume the monthly plant flow and load In October to December IS the same as from January to

September, 2012.

Table 3 - Biosolids Production Year Biosolids

Production (dry tonnes)

2010 1,530 2011 1,480 2012 1,150

(To September 2012) '2012 1,530

(Proiected to year end) Note: 1 Assume the monthly plant flow and load In October to December IS the same as from January to

September, 2012 .

. Table 4 - Digester Gas Production Year Digester Gas

Production (m3)

2010 2,333,800 2011 2,144,700 2012 1,642,000

(To September 2012)

' 2012 2,189,400 (Projected to year end)

Note: 1 Assume the monthly plant flow and load In October to December IS the same as from January to September, 2012.

Page 60: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

60

Report No. WSC 119-2012 Page 6 of 6

Table 5 - Material to Mission Landfill

Year Digester Gas Production (m3

)

2010 2,333,800 2011 2,144,700 2012 1,642,000

(To September 2012)

'201 2 2,189,400 (Projected to year end)

Note: 1 Assume the monthly plant flow and load In October to December IS the same as from January to September, 2012.

Table 6 - Extra Strength Industries Flow BOD and TSS , Year Total Flow (ML) Total BOD Load Total TSS Load

(dry tonnes) (dry tonnes) 2010 1,630 1,600 710 2011 1,690 1,900 770 2012 1,490 1,710 650

(To September 2012) ' 2012 1,990 2,280 870

(Projected to year end) Note. Assume the monthly plant flow and load In October to December IS the same as from January to

September, 2012.

Page 61: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

61

Grit/Screenings To Mission Landfill

WSC 119-2012 Appendix B - Simplified Process Diagram

---------------------------------------------------

Prl·mary Secondary Fraser In fl u e nt 1--1--'---71 +-----3>1 r----7i Dis i nfe ct ion J-----;--71

~ Treatment Treatment ! River

Residential

Industries

Pasteu rizationj Digestion

\

Dewatering

------------------------------------------- r--------II

~ Biosolids

! / Digester Gas

Page 62: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

62

s: Abbotsford rr > ,IIMission Water & Sewer Services

REPORT

To: Abbotsford/Mission Water & Sewer Commission (WSC)

From: Brent Schmitt, Water Planning Engineer

Date: November 28, 2012

Subject: Bevan Wells - 2012 Operations Summary

File: 5650-15

Report No.: WSC 120-2012

WATER & SEWER COMMISSION (WSC) RECOMMENDATION

THAT Report No. WSC 120-2012, dated November 28, 2012, from the Water Planning Engineer, regarding the Bevan Wells - 2012 Operations Summary, be received .

BACKGROUND

The Bevan Wells Environmental Assessment Certificate (Certificate) was issued in April 2011 . The Certificate required that a number of mitigation measures and commitments be fulfilled in order to operate the wells at full capacity. An amendment to the Certificate issued on August 8, 2012 allowed for the completion of the commitment to the Clearbrook Waterworks District. Shortly after the Certificate amendment was issued, the Bevan Wells production was increased.

DISCUSSION

Prior to issuance of the Certificate, the Bevan Wells production was not to exceed 6.5 MLD (75 lis). The allowable production limit with the Certificate is now 25 MLD, however this limit will not be reached unless the system hydraulics and overall demand require it. Usage of Bevan Wells in 2012 was maximized from August 13 through September 30. Daily flow rates during this period ranged from 6 to 19 MLD, with an average of 10 MLD. The highest output by an individual well was 6 MLD.

ANALYSIS

In order to evaluate the long term capacity of the wells , additional flow data and groundwater level monitoring will be conducted at higher production levels. While the wells were not utilized to the full design capacity of 25 MLD, staff will consider options for temporary system modifications in 2013 to allow for increased production from the wells.

An important consideration in determining the viability of the wells is the rate of drawdown of the wells during periods of increased production. In 2012, from June 1 to September 30, the groundwater level in the wells was drawn down by up to 2.2 m, with approximately 0.7 m recovery by the end of November (see Attachment A). The rate of drawdown was noticeably increased in mid-August during the period of peak production, but the groundwater level stabilized at lower production. Further monitoring of this trend will be conducted during the May

Page 63: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

63

Report No. WSC 120-2012 Page 2 of 2

to September operational phase in 2013. Particu lar attention will be given to periods when peak production is encountered over a timeframe of several weeks. Excessive drawdown of the water levels in the wells could limit the pumping capacity.

Minor operational issues were encountered in 2012 . Modifications to the building ventilation system were required due to high temperatures in the control room when all four pumps were operational. Additionally, configuration of the level control transducer resulted in two of the pumps kicking-out frequently , thus not providing full production capacity. The transducers were modified and the issue was resolved.

When the Bevan Wells facility was first constructed the pumping capacity was limited to 6.5 MLD. Due to the reduced production capabilities, only a portion of the hypochlorite generation unit was constructed . The second hypochlorite generation cell is located on-site, but not yet installed. This unit is required in order to provide sufficient production of chlorine when the facil ity is operating at full design capacity for an extended period . Installation of the second cell is scheduled for 2013.

FINANCIAL IMPLICATIONS

There are no financial implications.

COMMUNICATIONS PLAN

There is no communications plan .

SUMMARY

Amendment of the Environmental Assessment Certificate for the Bevan Wells in August 2012 allowed for increased production from the wells in August and September 2012. Well production was previously limited to 6.5 MLD, but with increased pumping encountered a peak flow of 19 MLD in August. Groundwater levels dropped notably during the peak demand period, but stabilized at lower production . Operation of the wells at a higher capacity will again be conducted in 2013 in order to assess impacts on the groundwater level and the long term viability of the Bevan Wells .

Gener Utilities

n, P. Eng. Tracy Kyle, P. Eng . Manager of Engineering & Regional Director of Water &

~E~n-g-. ------------­Water Planning Engineer

Attachment

Page 64: rr '! Abbotsford #> - Mission, British ColumbiaParameter Regulation 2012 2011 Variance Variance Variance TSS Influent mg/l n/a 452.8 382.1 +70.7 +434.3 +356.8 TSS Effluent mg/l 45.0

64

Attachment A

Bevan Wells - 2012 Groundwater Levels 16 20

15 18

14 16

13 14 --' - ~ !. 12 12 -c: QI 0 > '';:; QI 11 10 u -' :::s ... "C QI 0 ... ... til 10 8 0-:l:

QI

9 6 :l:

8 4

7 2

6 0 c c C tlO tlO a. a. ..... ..... > > :::J :::J :::J

:::J :::J :::J :::J OJ OJ u u a a ...., ...., ...., 0 0 , ...., ...., , , « « Vl Vl Z Z Bevan Production .-t , , m "

, , , , , , , , LI1 0"\ .-t N 0 <:t " .-t LI1 0"\ N U) - Well 1 level .-t N .-t N N .-t .-t - Well2level

- Well3level

- Well4level


Recommended