+ All Categories
Home > Engineering > RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Date post: 25-Jun-2015
Category:
Upload: railvolution
View: 60 times
Download: 1 times
Share this document with a friend
Description:
Great Expectations for Large-Scale TOD AICP CM 1.5 What kinds of expectations should you have when initiating a large-scale TOD project? Hear from three different perspectives -- a private developer, a transit agency and a redevelopment authority -- about how TOD projects evolve, from concept to implementation. Learn about the pitfalls, as well as the keys to success. Real project highlights, case studies and lessons that will help you make your large-scale TOD project a success. Moderator: William C Van Meter, Assistant General Manager of Planning, Regional Transportation District, Denver, Colorado James Kennedy, Redevelopment Director (retired), Walnut Creek, California Cynthia A Parker, President and Chief Executive Officer, BRIDGE Housing Corporation, San Francisco, California Bill Sirois, Senior Manager, TOD and Planning Coordination, FasTracks Team, Regional Transportation District, Denver, Colorado
Popular Tags:
33
Great Expectations for Large-Scale TOD Rail-Volution September 22, 2014 Jim Kennedy Contra Costa County, California Contra Costa Centre Transit Village
Transcript
Page 1: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Great Expectations for Large-Scale TOD

Rail-Volution

September 22, 2014

Jim Kennedy

Contra Costa County, California

Contra Costa Centre Transit Village

Page 2: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy
Page 3: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy
Page 4: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Contra Costa Centre Development Summary (9/14)1

Status Commercial2 (sf) Housing3 (du) Hotel (rooms)

Completed 2,440,487 2700 423

Under Construction -0- -0- -0-

Future Projects 310,000 100 -0-

Total 2,750,587 2800423

1. Includes specific plan area and immediate vicinity2. Includes office and retail square footage3. Residential dwelling units

Page 5: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Planning Landmarks

•1983/84 – County adopts Specific Plan and RDA Plan

•1989 – Specific & RDA Plans amended for Area 3•1999 – Major Specific Plan Amendments•2001 – BART Property Charrette

Page 6: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

1.0 Economic Cycles/Events

Page 7: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

1.1 Coggins Square/Iron Horse Lofts – FIRREA (Financial Institutions Reform, Recovery & Enforcement Act)

Page 8: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

• Over 50% of development sites change ownership prior to development

• Successful local developers >>> national/international

1.2 Changing Partnerships with a Changing Economy

Page 9: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Ownership Changes – Area 7B/8

Page 10: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

2.0 Political Factors

Page 11: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

2.1 Political Factors in Land Use

Contra Costa Centre is an unincorporated area at the confluence of 3 cities

Contra Costa Centre is an infill setting surrounded by existing neighborhoods

Regional accessibility to BART patrons is unequaled Fiscal issues

Competition with adjacent cities Regional retail Return on investment – BART & Contra Costa County

Page 12: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

BART Joint Development Site

Page 13: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy
Page 14: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Take Two – Citizens Create A Transit Village

• Development conceived during 2001 Charrette• Highly participatory public planning process

• Over 500 participants• 80 hours of “open door” time in six days

• Residential mixed use program• Rezoning – 2002• Final Development Plan - 2005

Page 15: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Charrette Action

Page 16: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

• Strong public realm• Strong connection to regional trail• Mixed use• Office on the north• BART parking

provided for

Citizen Plan Determines Final Site Plan

Page 17: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Avalon Walnut CreekDevelopment Description

• 522 Residential units• 422 rental• 100 for-sale townhomes

• 290,000 sf of office• 35,550 sf of retail• 20,000 sf business conference center• Parking for all uses in on-site structures

Page 18: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

2.2 Park Regency Apartments

• Privately owned• Properties added to Plan Area• Plan of finance

• Tax Exempt Bonds• RDA Assistance

• Mixed Income – 80/20• Completed - 1992

Page 19: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

2.3 Roadway corridor evolves to a Linear Green

Page 20: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.0 Institutional Change - Wally nails it

Page 21: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.1 Avalon Walnut Creek Business Partnership

Page 22: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Public Financial Goals

• Create a long term revenue stream via ground lease structure

• Acknowledge the major front end RDA expenditure - $59.9 milliono BART Replacement parkingo Placemaking elementso Backbone infrastructure

• Reflect RDA Affordable Housing Assistance• Provide BART with value capture in the near

term

Page 23: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Joint Powers Agency (JPA) Structure

Page 24: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

The Money99-year Revenue Projections - Cumulative

$0

$100

$200

$300

$400

$500

$600

$700

2006 2011 2016 2021 2026 2031 2036 2041 2046 2051 2056 2061 2066 2071 2076 2081 2086 2091 2096 2101

Millions

$696 Million

Page 25: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

AVALON WALNUT CREEK

Page 26: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.2 PUBLIC / PRIVATE PARTNERSHIPS

• Affordable Housing

• Child Care

• Transportation Demand Management

(TDM)

• Resident Deputy

• Landscape Maintenance

Page 27: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.2-1 Affordable Housing Production

Page 28: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

• RDA land subsidy • CC Centre Assoc. subsidy• County Tax Exempt Bond Financing• CCCA Child Care Affordability Fund

3.2-2 Child Care – Step Ahead Center

Page 29: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.3-3 Transportation Demand Management

• Operated by Contra Costa Centre Association

• County service area formed - $275,000/year

• TDM Performance:o Residential = 50% use BARTo Employees = +30% TDM

Page 30: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Pedestrian and Bicycle Overcrossing – RDA, Local & Federal Transportation Funds

Page 31: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

3.3-4 Resident Deputy

• Funded by Contra Costa Centre Association

• $250,000 annual payment to County Sheriff

Page 32: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

• Walden Green• Fox Creek Park• Roadway landscaped medians

3.3-5 Park Maintenance Privatized

Page 33: RV 2014: Great Expectations for Large-Scale TOD by James Kennedy

Thank you for your time


Recommended