+ All Categories
Home > Automotive > RV 2014: Growing BRT with Your Super Team by Kari Turner

RV 2014: Growing BRT with Your Super Team by Kari Turner

Date post: 18-Jun-2015
Category:
Upload: railvolution
View: 85 times
Download: 0 times
Share this document with a friend
Description:
Growing BRT with Your Super Team People are headed back to the cities, transforming and developing neighborhoods. But that growth in city living is also congesting streets and stifling the development anticipated through this urban revitalization. Cities want transit, but they can often not afford the cost of heavy or light rail solutions. BRT (bus rapid transit) can be a solution, but it can be a hard sell to business leaders, the community, and even the project team. What are the political challenges? How can you win over opponents and apathetic communities? Hear how political, business and community collaborations and partnerships have led to successful -- and some not-so-successful -- BRT projects in Chicago, San Francisco, Fresno, Los Angeles, Eugene and Grand Rapids. Moderator: Marsha J Kaiser, AICP, Managing Principal, Parsons Brinckerhoff, Washington, DC Peter Skosey, Executive Vice President, Metropolitan Planning Council, Chicago, Illinois Joel Ramos, Regional Planning Director, TransForm, Oakland, California Conrad Venema, Strategic Planning Manager, The Rapid, Grand Rapids, Michigan Kari Turner, Associate, PIVOT Architecture, Eugene, Oregon Sean Libberton, Principal, Parsons Brinckerhoff, Washington, DC
Popular Tags:
5
Kari Turner, AIA Design Solutions Team September 2014
Transcript
Page 1: RV 2014: Growing BRT with Your Super Team by Kari Turner

Kari Turner, AIA

Design Solutions Team

September 2014

Page 2: RV 2014: Growing BRT with Your Super Team by Kari Turner

The Team

• Civil Engineer

• Transit Planner

• Architect

• Landscape Architect

• Traffic Engineer

• Environmental Consultant

• Public Outreach Lead

• Real Estate Analyst

• Transit Agency

• City Planner

Design Solutions Team – Superhero Problem Solvers

Page 3: RV 2014: Growing BRT with Your Super Team by Kari Turner

The Process

• Meet with Property Owners

• Brainstorm alternatives

• Draw multiple options

• Review with Jurisdictional partners

• Take design back to the property owners

Design Solutions Team – Superhero Problem Solvers

Page 4: RV 2014: Growing BRT with Your Super Team by Kari Turner

Example workshop drawing

Design Solutions Team – Superhero Problem Solvers

Page 5: RV 2014: Growing BRT with Your Super Team by Kari Turner

The Successes

• Property Owners and City included in the process

• Reduced total property acquisition and impacts

• Eliminated 2 full acquisitions

• 117 to 93 properties

• 3.2 acres to 2.7 acres

• Reduced impacts to parking

• Relocated terminus stations to more prominent location

• Preserved core elements of BRT

Design Solutions Team – Superhero Problem Solvers

Example refined concept drawing


Recommended