CONCRETE REPORTProject: MTC Landside Primary and Secondary RoadsProject No.: G-0024Location: Abu Dhabi AirportEngineer: AECOMMain Contractor: CSCECPile No.: S1B-B1-PC1- 07 Pile Length 23.869
Pile Diameter: 1200 Theoretical Volume of Pile 27.00
Pile Type: Working Pile Date 10/25/2014
No. Depth
1 7 7.92 7.92 8 8
2 14 7.92 15.84 8 16
3 20.9 7.80 23.64 8 24
4 23.869 3.36 27.00 3 27
BAUER __________________ CSCEC__________________ ENGINEER_________________
Theoritica Quantity (m3)
Commulative Theoritical
Quantity (m3)Actual Quantity (m3) Cumulative Actual (m3)
5 10 15 20 25 300
5
10
15
20
25
30
Actual
Theoritical
16, 14
24, 20.9
7.92, 7
15.8, 14
23.64, 20.9
27, 23.8
Dep
th
8, 7
27, 23.8
Concrete