+ All Categories
Home > Documents > SA Cost Model for IBS Site Issue1.0_100516

SA Cost Model for IBS Site Issue1.0_100516

Date post: 05-Jul-2018
Category:
Upload: taringtrenggana
View: 218 times
Download: 1 times
Share this document with a friend

of 26

Transcript
  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    1/26

    IBS Site Search

    IBS Site Lease

    Site Acquisition - IBS Site

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    2/26

    IBS Site Permit

    Options

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    3/26

    • Recommend the potential candidate that required IBS solution to improve coverage and s

    • Pre-survey with Network planning (NP!-i" required

    • #rrange$ and coordinate the %SS schedule (%echnical site survey!

    • Negotiation o" rent as per guideline$ collection o" primary ownership documents "or all ca

    • &egal veri"ication and collection o" "ull ownership documents "or #pproved Site location

    • Negotiation according to standard rental ranges

    • lause change approval and higher rental approval (i" applica)le!

    • Negotiation support to o)tain # connection "rom )uilding owner 

    • omplete all permit application documentation in accordance with local rules'

     Descriptions/Details

    • #rrangement*onduct %echnical Site Survey (%SS! and negotiation support "or required s,quipment implementation on a selected IBS site condidate'

    • Negotiations o" lease contract and*or amendments (i" applica)le!

    • andatory lease contract documentation completed and approved• andatory permitting documentation completed and approved "or Power conection$ ivi.ovt' (I" required!

    • / lease contract (amendments! signed )y )oth parties and handover o" heque*P0 to the  permission o" '

    • Site #ccess Support to allow all implmentation team (ivil work$ %I$ +#S$ Planning 1 0

    access to work$ conduct acceptance test$ ect on site'• ,valuate the permit requirements "or each site separately'(generally- ivil #vaiation$ &ocothers authority i" necessary!

    • ,sta)lish a permit plan "or each site and ensure that all necessary permit applications "or considered'

    • ollect all permit drawings "rom related teams (civil works$ %I*+#S Implementation$ Pla

    0ptimi2ation! and make a consolidated permitting documents'#ll permit drawing input to  particular implementation teams (civil work$ %I*+#S$ planning 1 optim2ation$ etc!

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    4/26

    • Su)mit permit package (documentation and drawings! per site to the relevant permit auth

    • ollect approval o" su)mission "rom actual permit authority'

    • 4ollow up the permit application and work with the permit authority as required to resolvissues' %ake responsi)ility "or resolving all permitting queries'

    • %he Site #cquisition agent is responsi)le to ensure that all the permits are legally )inding"inal inspection is ordered and done in time'

    • %he Permit work includes all needed traveling$ negotiations$ tools$etc' to get the required issued )y the relevant permit authority' (Permit 4ees*,5pense 1 +eposit are e5cluded and

     )y 0&!

    (Same Su)con have to o)tain all the permits a"ter*)e"ore the lease agreement sign as per inrequirements o" ustomer!

    6,SB Power #pplication$ +ocumentation and co-ordination support (applica)le only the c# connection has insu""icient capacity to support IBS equipments!

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    5/26

    Building Type 1 (Upto 1,500 Sq!)"o!!ercial# S!all $%ce

     Qty

    /'88

      /'88

      /'88

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    6/26

      /'88

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    7/26

    Building Type & (Upto 5,000 Sq!)"o!!ercial# Mediu! $%ce

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    8/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    9/26

    Building Type ' (Upto &0,000 Sq!)"o!!ercial# arge $%ce

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    10/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    11/26

     Building Type (Upto 10,000 Sq!)

    "o!!ercial# Mediu! Malls

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    12/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    13/26

    Site acquisition SBuilding Type 5 (Upto 0,000 Sq!)

    "o!!ercial# arge Malls

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    14/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    15/26

    rvice Price (MMK)Building Type * (Upto +,000 Sq!)

    "o!!ercial# Mediu! otels - ospitals

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    16/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    17/26

    Building Type . (Upto &&,500 Sq!)"o!!ercial# arge otels - ospitals

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    18/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    19/26

    Building Type + (Upto &5,000 Sq!)/overn!ent# "onvention "enters

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    20/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    21/26

    Building Type (Upto 50,000 Sq!)/overn!ent# $utdoor Stadiu!s

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    22/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    23/26

    Building Type 10 (Upto '0,000 Sq!)/overn!ent# irports

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    24/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    25/26

  • 8/16/2019 SA Cost Model for IBS Site Issue1.0_100516

    26/26


Recommended