Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.2 H2540-SAF-PLN-001-49; 31 Oct 2014
About th is Document
This document is available for all project employees via the project network. Weregularly revise this document and the latest version is always availableelectronically. Once printed, the document should no longer be considered to be thelatest version. It may be distributed to Highway Department and/or the SupervisingOfficer on the understanding that any such document may not be the latest versionor it may be distributed to Highway Department and/or the Supervising Officer as acontrolled document in which case the front cover is to be stamped ControlledCopy in red and a copy number added.
The Project Safety Manager is responsible for updating and maintaining the planincluding the original hard copy, which should be signed by the Project Director toindicate approval.
The status of this plan is identified by a revision number and date on each page.Changes to the document are identified by yellow colour highlighted. On revision, theplan will be uploaded as a whole to the project server or within the Leighton Asia,India and Offshore (LAIO) Document Management System Technical DocumentsModule. The Project Safety Manager maintains a record of the revision status of theplan, which is available on request.
If you have any enquiry relating to this plan, please contact the Project SafetyManager.
Revision Date Section/Descript ion Prepared By Approved By
49 31 October 2014 Revision 49 Alex Cheung Jimmy Chu
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
3/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.3 H2540-SAF-PLN-001-49; 31 Oct 2014
Contents
PROJECT DESCRIPTION .............................................................................. 10
SECTION 1 HEALTH AND SAFETY POLICY ............................................. 11
1.1 Health and Safety Policy Statement ........................................................... 11
1.2 Project Health and Safety Objectives ........................................................ 12
1.3 Distribution and Display of Policy Statement.............................................. 13
1.4
Review Procedure ..................................................................................... 13
1.5 Appendix .................................................................................................... 14
SECTION 2 SAFETY ORGANIZATION ...................................................... 15
2.1 Safety Organization Chart ......................................................................... 15
2.2
Safety Management Committee ................................................................ 15
2.3
Site Safety and Environmental Committee ................................................ 17
2.4
Individual Responsibilities ......................................................................... 17
2.5
Lines of Communication ............................................................................ 32
2.6 Appendix .................................................................................................... 32
SECTION 3 SAFETY AND HEALTH TRAINING ......................................... 33
3.1 Advance Safety Induction Training (ASIT) ................................................... 33
3.2 Safety Induction .......................................................................................... 33
3.3 Induction Training Test ............................................................................... 34
3.4 Re-induction Course ................................................................................... 34
3.5
Safety Training for Special Activities ........................................................... 34
3.6
Tool-box Meetings ....................................................................................... 34
3.7 Safety-management Training ...................................................................... 36
3.8 Green Card ................................................................................................. 36
3.9 Silver Card .................................................................................................. 37
3.10 Blue Card .................................................................................................... 37
3.11 Construction Workers Registration ............................................................. 37
3.12
Confined Space Certified Worker Certificate ............................................... 37
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
4/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
5/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.5 H2540-SAF-PLN-001-49; 31 Oct 2014
6.4 Follow-up Action and Monitoring ................................................................. 85
6.5
Records, Certificates and Registers ............................................................ 85
6.6 Preventive Maintenance .............................................................................. 86
6.7 Specific Safety Inspections to Area / Plant / Equipment .............................. 86
SECTION 7 RISK MANAGEMENT / JOB HAZARD ANALYSIS ................ 89
7.1
Construction Risk Assessment .................................................................... 89
7.2
Job-hazard Analysis .................................................................................... 89
7.3 Construction Risk Assessment Reports ...................................................... 94
7.4
Risk Register ............................................................................................... 94
7.5 Change Management .................................................................................. 94
7.6 Appendix ..................................................................................................... 95
SECTION 8 PERSONAL PROTECTIVE EQUIPMENT ............................... 96
8.1 Legal Reference .......................................................................................... 96
8.2 Identification and Selection of Personal Protective Equipment .................... 96
8.3 Use, Storage and Maintenance ................................................................... 97
8.4
Instruction and Training ............................................................................... 98
8.5
Common Personal Protective Equipment Used on Site ............................... 98
SECTION 9 ACCIDENT/INCIDENT INVESTIGATION .............................. 102
9.1 Accident Investigation, Recording and Statistics ....................................... 102
9.2 Appointment and Responsibilities of Competent Person ........................... 103
9.3 Follow-up Actions ...................................................................................... 103
9.4
Accident Statistics ..................................................................................... 103
SECTION 10 EMERGENCY PREPAREDNESS ........................................ 105
10.1 Accident / Incident Reporting Procedure ................................................... 105
10.2 First Aid and First-aid Facilities ................................................................. 111
10.3 Tropical-cyclone Procedures ..................................................................... 113
10.4
Rainstorm-warning Procedures ................................................................. 114
10.5
Follow-up Action........................................................................................ 118
10.6
Fire Procedures......................................................................................... 118
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
6/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.6 H2540-SAF-PLN-001-49; 31 Oct 2014
10.7 Flooding Procedures ................................................................................. 119
10.8
Emergency Procedures Release of hazardous materials ....................... 119
10.9 Traffic Accident / Incident Reporting Procedures ....................................... 120
10.10 Emergency Procedures Damage to Underground Utilities ...................... 120
10.11
Accident Emergency Procedures .............................................................. 121
10.12
Emergency-procedures Training ............................................................... 123
10.13
Emergency/Rescue Teams ....................................................................... 124
10.14 Programme for Testing Emergency Procedures ........................................ 126
10.15 Air Quality Health Index ............................................................................. 126
10.16 Appendix ................................................................................................... 127
SECTION 11 SAFETY PROMOTION ........................................................ 128
11.1 Safety Information Communications .......................................................... 128
11.2 Safety Award and Incentive Scheme ......................................................... 129
11.3 Site Safety Cycle ....................................................................................... 131
11.4 New Comer / Probation Workers Management System ............................. 132
SECTION 12 HEALTH-ASSURANCE PROGRAMME .............................. 135
12.1
Noise Monitoring and Control .................................................................... 135
12.2
Dust Monitoring and Control ...................................................................... 135
12.3 Control of Hazardous Substances ............................................................. 136
12.4 Pre-job and Regular Medical Examinations ............................................... 137
12.5 Display-screen-equipment Health and Safety Measures ........................... 137
12.6 Implementation of Control Measures ......................................................... 137
12.7
Housekeeping ........................................................................................... 138
12.8 Lighting ..................................................................................................... 138
12.9 Welfare Facilities ....................................................................................... 139
12.10 Management of Severe Acute Respiratory Syndrome (Atypical
Pneumonia) ............................................................................................... 140
12.11 Management of Avian Flu and Swine Flu ................................................ 142
12.12 Prevention of Mosquito Breeding/Dengue Fever ..................................... 144
12.13 Prevention of Heat Stroke ........................................................................ 147
12.14
Alcohol, Drug and Smoking Control .......................................................... 147
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
7/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.7 H2540-SAF-PLN-001-49; 31 Oct 2014
12.15 Rodents Control ....................................................................................... 148
12.16 Red Imported Fire Ants ............................................................................ 148
12.17 Work Rehabilitation Program ................................................................... 149
SECTION 13 EVALUATION, SELECTION AND CONTROL OF
SUBCONTRACTORS ................................................................................... 150
13.1 General Subcontractor Assessment ......................................................... 150
13.2 Policy ....................................................................................................... 150
13.3 Evaluation and Selection Procedure ......................................................... 150
13.4
Pre-contracting Meeting ........................................................................... 151
13.5 Subcontract Agreement ............................................................................ 152
13.6
Control of Subcontractors ......................................................................... 152
13.7
Weekly Coordination Meeting ................................................................... 153
13.8 Subcontractors Listing ............................................................................. 153
SECTION 14 PROCESS CONTROL PROGRAMME ................................ 154
14.1 Traffic Control and Transportation ............................................................ 155
14.2
Fire-prevention Measures and Fire-fighting Equipment ............................ 160
14.3 Excavation ............................................................................................... 161
14.4 Working in Confined Spaces .................................................................... 167
14.5 Hot Work .................................................................................................. 170
14.6 Electrical Equipment and Installations ...................................................... 171
14.7 Welding/Cutting Operations ..................................................................... 172
14.8 Personal Protective Equipment ................................................................ 176
14.9
Lifting Operations Involving Cranes and Hoists, etc ................................. 176
14.10
Manual Handling ...................................................................................... 184
14.11 Scaffolding and Working Platforms........................................................... 187
14.12 Ladders and Accesses .............................................................................. 189
14.13 Hand Tools and Portable Power-driven Tools .......................................... 190
14.14 Use and Storage of Hazardous Substances, including Chemicals ............ 204
14.15 Working Over Water or Adjacent to Water................................................. 207
14.16 Working at Height .................................................................................... 209
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
8/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.8 H2540-SAF-PLN-001-49; 31 Oct 2014
14.17 Floor and Wall Openings and Stairways ................................................... 210
14.18
Lighting ................................................................................................... 210
14.19 Protection Against Falling Objects ............................................................ 211
14.20 Protection Against Lightning ..................................................................... 212
14.21
Sheet Piling .............................................................................................. 212
14.22
Working in Vicinity of Utilities ................................................................... 213
14.23
Housekeeping ......................................................................................... 215
14.24 Occupational Health and Safety in Offices ............................................... 219
14.25 Temporary Works ..................................................................................... 220
14.26 Electrical Power Supplies ......................................................................... 220
14.27 Plant and Equipment ................................................................................ 222
14.28 Wood-working Machinery ......................................................................... 223
14.29 Noise at Work .......................................................................................... 224
14.30 Structural Steel Erection ........................................................................... 224
14.31 Demolition ................................................................................................ 225
14.32 Pipe Pile ................................................................................................... 227
14.33 Diaphragm Wall ........................................................................................ 228
14.34 Bridge Deck Construction ......................................................................... 230
14.35 Cut and Cover Tunnel .............................................................................. 230
14.36 Substructure, Basement and Foundations ................................................ 231
14.37 Drainage/ Sewerage Works ...................................................................... 232
14.38 Landscaping Works include Transplanting ................................................ 233
SECTION 15 MISCELLANEOUS REQUIREMENTS ................................ 235
15.1 Site Security ............................................................................................ 235
15.2 Construction Design Management (CDM) ............................................... 236
APPENDIX .................................................................................................... 239
1.5.1 Definition of Project Health and Safety Objectives ..................................... 239
2.6.1 Contact list of members in Safety Organization ......................................... 241
3.18.1 Structure of Induction Training Course ...................................................... 242
4.9.1 Applicable Regulations .............................................................................. 244
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
9/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.9 H2540-SAF-PLN-001-49; 31 Oct 2014
7.6.1 Summary of Risk Assessment ................................................................... 248
10.6 Site Layout Plan ........................................................................................ 253
10.13 Typhoon and Rainstorm Checklist ............................................................. 254
10.16.1 Summary of Emergency Procedures ........................................................ 256
10.16.2 Emergency Contact List ............................................................................ 258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
10/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.10 H2540-SAF-PLN-001-49; 31 Oct 2014
Project Description
The Central Interchange is part of the 4.5km Central-Wan Chai Bypass (CWB) trunk
road project linking the Rumsey Street Flyover in Central to the Island East Corridor
(IEC) in North Point. The works comprise mainly a cut and cover tunnel starting from
the west portal to connect the section East of Man Yiu Street under the Central
Reclamation contract, an approach structure with a series of retaining walls, linking
the tunnel portal with surface level and elevated roadways towards the west.
Scope of work
Cut and cover tunnel between the CWB west portal and the limit of tunnel to be
completed under the CRIII contract 224 kilometres
Approach ramp leading to the CWB west portal 116 kilometres
Bridge deck for westbound carriageway of Rumsey Street flyover extension 190
kilometres
Bridge for eastbound slip road of Rumsey Street flyover extension 115kilometres
At grade roads between bridges and approach ramp
Realignment / reconstruction of adjacent existing roads and services
Precast concrete roof panels to form ventilation ducts in the tunnel 1120
kilometres Landscaping
The Central Interchange project site is located within a busy business district in
Central. Comprehensive traffic diversion schemes and utility diversions / protection
measures are required at various stages to facilitate the construction of the
interchange tunnel, viaduct and roads.
A Community Liaison Centre (CLC) will need to be established at early stage of the
contract to interface with various stakeholders and mange public issues. Detailed
planning in site logistics is required to tackle the restrictions due to limited compound
space and room around the works areas, especially during the construction of
diaphragm walls and excavation of tunnel structures.
The work is commenced in September 2010 and is anticipated to be completed by thethird quarter of 2016.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
11/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.11 H2540-SAF-PLN-001-49; 31 Oct 2014
Sect ion 1 Health and Safety Policy
1.1 Health and Safety Policy Statement
Class 1 Incident refer an incident with potential to permanently alters a
persons future e.g. death, paraplegia, amputation, permanent back damage.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
12/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.12 H2540-SAF-PLN-001-49; 31 Oct 2014
1.2 Project Health and Safety Objectives
The objective of the implementation of this Project Safety Plan is to create
a safe working environment which will give a measurable deliverable of:
Objectives
Output objectives
Target
a) Accident Frequency Rate
b) Incident Rate
c) Severity Rate
d) Average Loss Time Rate
e) Loss Time Injury Frequency Rate
f) Total Recordable Injury Frequency Rate
g) Total Fatalities
h) Class 1 Damage Frequency Rate
0.6
5
120
45
2
7.4
0
0
Input objectives
i) Safe Working Cycle
j) Near Miss Reporting Frequency Rate per
1,000,000 MH
k) % Close out of Incident Alerts
l) % Close out of Investigation Report
m) No. of uncontrolled Class 1 risk being identified
n) Staff / Workers engagement in the SFL walk
o) % Toolbox Meeting conducted to schedule
p) % Strive for LIFE Walk conducted to schedule
q) % of H&S Management System Compliance
Audits conducted to schedule
r) % of Staff complete the Strive for LIFE Safety
Leadership Training schedule
20.8 day per
worker
>5
>95%
100%
1
3
100%
100%
100%
100%
The management of Leighton Contractors (Asia) Limited will work to
achieve these objectives by: Developing safe work system and methods
Use of appropriate plant and equipment
The provision of personal protective equipment
Adequate training
Requiring all accidents to be reported
Maintaining a high standard of occupational health and hygiene
Maintaining a high level of security to the project
Provide appropriate training and equipment to minimize fire hazards
Comply with safety responsibilities and loss performance standard set
for individuals
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
13/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.13 H2540-SAF-PLN-001-49; 31 Oct 2014
The management will actively seek support of all operatives engaged onthe project to look after their own health and safety, as well as that of their
colleagues, by working within the spirit of this plan.
The Management will also actively seek the support of all subcontractor
engaged on the project to abide by the plan, site rule and regulations.
1.3 Distribution and Display of Policy Statement
The health and safety policy statement shall be displayed at a prominent
place on safety notice boards within the site office and
worker/subcontractor facilities areas. Such policy statement shall be
notified to all staff through safety newsletters, safety handbooks, tool-box-
meetings and induction training.
1.4 Review Procedure
The policy statement will be reviewed at least yearly according to the
following procedures:
1) The Leightons Safety Management Committee will issue amemorandum to the project requesting ideas and opinions for a
review of the safety policy.
2) On receipt of that memorandum, the project will discuss the content
of the existing Health and Safety Policy Statement with personnel on
site, including subcontractors, via a Site Safety Committee meeting
and tool-box meetings to collect feedback.
3) The Project Director will then collate the feedback received and
report any recommendations to the Safety Management Committee.
4) The Safety Management Committee will decide whether to revise
the Health and Safety Policy Statement at a formal Safety
Management Committee meeting. The draft revised policy statement
shall then be distributed to all sites for further comment.
5) The finalized Health and Safety Policy Statement will be signed by
the managing director and adopted by the project.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
14/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
15/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
16/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.16 H2540-SAF-PLN-001-49; 31 Oct 2014
General Manager (Human Resource);
General Manager (Operation); Project Managers;
Business Partner - Safety;
Corporate Safety Manager (secretary);
Construction Managers;
Plant Manager;
Works agents (who act as the employees representative), and
Other staff members as appointed by the chairman of Safety
Management Committee
It is noted that as required by the Factories & Industrial Undertakings(Safety Management) Regulation, at least 50 per cent of the members
shall represent employees interest in health and safety issues.
2.2.2 Terms of Reference
The functions of the Safety Management Committee include:
the development of a Health and Safety Policy and the monitoring of its
implementation;
on-going evaluations of hazards and arrangements to implement safety
measures;
studies of accident/incident statistics and trends so that reports can be
made to senior management on unsafe conditions and practices and
recommendations made for corrective actions;
studies of safety audit reports;
scrutiny of health and safety reports and direction on appropriate
actions;
monitoring the adequacy and effectiveness of employee health and
safety training;
monitoring the adequacy of health and safety communication andpublicity in the workplace;
organizing health and safety promotion activities;
providing links with external sources for health and safety advice;
evaluating health and safety performance, ie, health and safety
performance indicators;
reviewing/revising Safety Management Procedures, and
arranging for Safety Management Committee members to monitor
project health and safety performance by conducting Strive for LIFE
walk.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
17/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
18/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.18 H2540-SAF-PLN-001-49; 31 Oct 2014
Significant contributions to health and safety are key elements in thesuccessful implementation of this Project Safety Plan.
2.4.1 Director / Executive General Manager
The Director / Executive General Manager shall:
establish a Health and Safety Policy;
make sure that the Health and Safety Policy is implemented;
promote awareness of relevant legislation;
incorporate safety objectives and targets into Leightons Business
Plan;
report to their managing directors on safety matters, and
coordinate management reviews of safety management system.
2.4.2 Project Director / Manager
The Project Director / Manager shall:
implement the Project Safety Plan;
understand Leightons policy and appreciate the responsibility
allocated to each level of project management and make sure thatthose responsibilities are clearly defined in writing;
determine at the planning stage:
- the most appropriate order and method of working;
- the allocation of responsibilities with subcontractors and others;
- those hazards that may arise on this project (from overhead or
underground power lines, geological features, tunnelling, etc) that
may lead to unnecessary improvisations on site; and
- facilities for welfare and sanitation.
check working methods and precautions before work starts and
approve method statement prepared by the site agents; make sure that work, once started, is carried out as planned and that
the Construction Sites (Safety) Regulations and other legislation on
safety, health and welfare are observed;
make sure that all project management staff understand that injuries,
equipment damage and material wastage are taken into consideration
when deciding the overall performance of the site personnel
concerned;
establish and maintain a direct line of communication between himself
and the Project Safety Manager and appoint adequate Safety Officers
and safety supervisors;
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
19/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.19 H2540-SAF-PLN-001-49; 31 Oct 2014
chair Site Safety Committee meetings, and
set a good personal example.
2.4.3 Site Agent/Deputy Site Agent/Construction Manager
The Site Agent/Deputy Site Agent/Construction Manager shall:
understand Leightons Safety Policy and appreciate the responsibility
allocated to each grade of staff;
organize work so that it is carried out to the required standard with
minimum risk to personnel, equipment and material and, if required,
issue work method instructions in written form;
know the requirements of the Construction Sites (Safety) Regulations
and other relevant legislation;
implement arrangements with subcontractors on site to avoid any
confusion about areas of responsibility;
investigate any accident that occurs in their area and remind
subordinates/colleagues to take all necessary steps to prevent
recurrence;
accompany the Labour Departments Occupational Safety Officer on
site visits and respond to his recommendations;
release supervisors and operatives, when necessary, for on- or off-site
safety training;
cooperate with safety personnel and act on their recommendations;
liaise with the Fire Services Department on fire prevention; particular
in tunnel;
consider safe-working methods at the planning stage, and review the
method statement prepared by sub agents;
attend the Site Safety and Environmental Management Committee;
act as the emergency coordinator;
report any safety related issues to his superior;
provide necessary facilities and resources to carry out daily cleaningand weekly tidying according to contract,
Check and inspect the overall cleanliness and tidiness of the site with
Engineers Representative on the day following the Cleaning Week
Day,
Attend or assign a senior staff on his behalf to lead the pre-work
exercise and safety meeting,
Carry out daily safety inspection in person or by his appointed
representatives, record any unsafe act or unsafe conditions observed
in dairy and arrange for rectification,
Chair or assign a senior staff on his behalf to chair the daily and
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
20/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.20 H2540-SAF-PLN-001-49; 31 Oct 2014
weekly safety coordination meeting, and
set a good personal example.
2.4.4 Business Partner Safety
Business Partner Safety shall:
reporting to Leightons Executive General Manager on the
implementation and effectiveness of the Safety Management System
at the Project;
ensuring that the Safety Management System requirements are
established, implemented and maintained across the Project;
reporting on the performance of the Safety Management System tosenior management;
promoting awareness of relevant legislation;
coordinating safety management activities;
giving advice and assistance to the project on safety management
issues; and
Coordinating reviews of the operations and effectiveness of the Safety
Management System and providing feedback to senior staff
2.4.5 Corporate Safety Manager
Corporate Safety Manager shall:
reporting to the Head of Health, Safety and Environmental on the
implementation and effectiveness of the Safety Management System
at the Project level;
ensuring that Safety Management System requirements are
established, implemented and maintained across the Project
reporting on the performance of the project with regards to Health,
Safety and Environmental management
reporting on the performance of the project with regards to Health,
Safety and Environmental management
promote awareness of relevant legislation;
coordinate safety-management activities;
giving advice and assistance to the Project team on safety
management give advice and assistance on safety management to
projects;
training personnel in the use of the Safety Management System; and
conducting safety compliance audits
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
21/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.21 H2540-SAF-PLN-001-49; 31 Oct 2014
2.4.6 Project Safety Manager/Safety Officers/Safety Officer
TraineesIn compliance with the requirements of the Factories and Industrial
Undertakings (Safety Officers and Safety Supervisors) Regulations and
contractual requirements, Leighton will appoint one full-time Safety
Manager and an appropriate number of registered Safety Officers.
For Contracts HY/2009/18, Leighton will employ fulltime through out the
duration of the project a Project Safety Manager and at least one Safety
Officer. The Project Safety Manager will supervise the works of Safety
Officers and the safety team. Additional Safety Officers will be employed
as the workforce increases, as shown in the following table:
Average Workforce on Site Number of Safety Of ficers
201 - 700 2
701 1200 3
1200 or above 4
The Project Safety Manager, Safety Officers, Safety Officer Trainees and
Safety Supervisors are empowered to order any person working on the
Site to suspend any unsafe operation or to take urgent action to make
safe the Site or the Works or to disallow any practice which mat infringe
the Safety Plan or any statutory safety requirement.
The Project Safety Manager shall:
coordinate with the Engineers Representatives, Contractor
Representative at management level and other government
department on occupational safety and health matters;
prepare and submit for approval, supervise and monitor
implementation of the Project Safety Plan; supervise the works of Safety Officers and their team;
attend the Site Safety and Environmental Management Committee,
Site Safety and Environmental Committee Meetings and other meeting
as required by the Engineer;
participate in Weekly Safety Walks with Engineers Representative;
carry out internal safety audits for the Project Safety Plan at intervals
of not less than once every three months;
advise management on:
- preventing injury to personnel and damage to plant and equipment;
- legal requirements related to safety, health and environmental
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
22/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.22 H2540-SAF-PLN-001-49; 31 Oct 2014
protection;
- changes in legislation and safe codes of practice, and- further improvement to existing sound-working methods;
carry out site inspections, liaise with the person in charge of the works
and superintendents to see that safe methods of working are in
operation, and that all statutory regulations and Leightons rules are
being observed;
carry out accident investigations, determine the causes of any serious
accident or dangerous occurrence and recommend corrective or
preventive measures;
review the overall safety performance of subcontractors and analyze
information on injuries and damage to identify any particular hazard ortrend;
determine and design safety training for all levels of employee;
keep contact with official and professional bodies;
promote safety to all levels of employee by holding safety promotion
activities, safety campaigns, etc;
notify the Highway Departments Representative, either directly or by
telephone, immediately on becoming aware of any serious accident
likely to result in, or actually resulting in, the death or hospitalization of
any personnel on site;
promptly, and in any event within 24 hours, notify the Highway
Departments Representative of any incident that has occurred on site
in which any personnel on site has been injured;
prepare a monthly safety report to project management and, among
other things, include:
- a report of all accidents/dangerous occurrences during the reporting
period;
- the results of Labour Department or other bodies inspections;
- a training summary for the reporting period and training proposals
for the next period;
- a list of all competent persons;
- a summary of all examination and test certificates required by
legislation or the Contract, and
- a report on follow-up action taken on irregularities identified during
safety inspections and weekly safety walks and safety audit reports
on the implementation of the Project Safety Plan;
review and update the Project Safety Plan on a monthly basis
according to the progress of construction;
suspend the works with the consent from the agent if work either
violates legislative requirements or could cause severe loss to
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
23/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.23 H2540-SAF-PLN-001-49; 31 Oct 2014
Leighton;
arrange and attend mandatory safety audits not less than every sixmonths; and
set a good personal example.
The Safety Officer(s) shall:
carry out comprehensive safety inspections on all activities on the site
at weekly intervals and prepare inspection reports;
supervise and monitor implementation the Project Safety Plan;
ensure that subcontractors and all persons working on the site are
made aware of and comply with the Project Safety Plan; carry out internal safety audits for the Project Safety Plan at intervals
of not less than once every six months;
advise management on:
- preventing injury to personnel and damage to plant and equipment;
- legal requirements related to safety, health and environmental
protection;
- changes in legislation and safe codes of practice, and
- further improvement to existing sound-working methods;
participate in Weekly Safety Walks, liaise with the person in charge of
the works and superintendents to see that safe methods of working
are in operation, and that all statutory regulations and Leightons rules
are being observed;
carry out accident investigations, determine the causes of any serious
accident or dangerous occurrence and recommend corrective or
preventive measures;
review the overall safety performance of subcontractors and analyze
information on injuries and damage to identify any particular hazard or
trend;
conduct safety training for all levels of employee, and keep records of
such training for reference;
keep contact with official and professional bodies;
promote safety to all levels of employee by holding safety promotion
activities, safety campaigns, etc;
keep up-to-date with recommended codes of practice and new safety
literature and circulate information applicable to all levels of employee;
notify the Highway Departments Representative, either directly or by
telephone, immediately on becoming aware of any serious accident
likely to result in, or actually resulting in, the death or hospitalization of
any personnel on site;
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
24/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
25/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.25 H2540-SAF-PLN-001-49; 31 Oct 2014
assist the Safety Officer in carrying out his duties; supervise worker observance of safety standards;
advise management or the Safety Officer as to worker observance of
safety standards;
promote the safe carrying out of work on site;
prepare and submit prescribed Form 3A in accordance with the
Factories and Industrial Undertakings (Safety Officers and Safety
Supervisors) Regulations to management or the Safety Officer at the
end of each week,
report any safety related issues to his / her superior; and
set a good personal example.
2.4.8 Engineering Manager
The engineering manager shall:
overviewing the safety and constructability matters of the project;
establish, review and update of Safety and Constructability Plan;
establish, review and update of Temporary Works Management Plan;
administer traffic management and geotechnical matter;
administer internal system assurance audits and report results to
project management, and coordinate method statement audits.
2.4.9 Risk Manager
The risk manager shall:
establish project risk committee;
coordinate develop, review and maintain of project risk register;
organise regular risk review meeting with respective parties and follow
up recommendations; and
review and endorse method statement of site operations.
2.4.10 Qualit y and Administration Manager
The quality and administration manager shall:
administer registration and distribution of project safety plan; and
administer document control and record keeping of safety related plan
and documentation (controlled copy).
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
26/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.26 H2540-SAF-PLN-001-49; 31 Oct 2014
2.4.11 Commercial Manager
The commercial manager shall:
administer budgeting and cost monitoring for safety related matter;
administer purchase of safety equipment and services;
implement the subcontractor evaluation and selection procedure in
tendering stage; and
notify bidders the Leightons safety requirements during the tendering
stage.
2.4.12 Sub Agents
The sub agents shall:
prepare method statements and carried out the work in accordance
with the approved method statements;
organize work so that it is carried out to the required standard with
minimum risk to personnel, equipment and material and, if required,
issue work method instructions in written form;
know the requirements of the Construction Sites (Safety) Regulations
and other relevant legislation;
give all trade foremen and gangers precise instructions on theirresponsibilities for proper working methods so that they do not require
or permit personnel to take unnecessary risks;
implement arrangements with subcontractors and other contractors on
site to avoid any confusion about areas of responsibility;
investigate any accident that occurs in their area and remind
subordinates/colleagues to take all necessary steps to prevent
recurrence;
accompany the Labour Departments Occupational Safety Officer on
site visits and respond to his recommendations;
cooperate with the safety personnel and act on his recommendations; liaise with the Fire Services Department on fire prevention,
conduct group communication meetings to discuss safety issues with
all employees of their areas and management representatives from
each subcontractors at least twice a years;
act as the team leader under the Team Management Program and set
a good personal example;
report any safety related issues to his / her superior; and
be familiar with emergency procedures
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
27/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
28/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
29/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.29 H2540-SAF-PLN-001-49; 31 Oct 2014
develop a personal concern for safety for themselves and for others,
particularly newcomers and younger people; avoid improvising which entails unnecessary risk;
warn new personnel of known hazards;
refrain from horseplay and the abuse of welfare facilities;
report any safety related issues to his / her superior; and
suggest ways of eliminating hazards.
2.4.17 Safety Representative / Subcontractor Safety
Representative
The safety representative/subcontractor safety representative shall:
make sure work is carried out in a safe manner and that all safety
regulations are adhered to;
make sure work is carried out in accordance with the approved
method statement and safe system of work;
attend Site Safety and Environmental Committee meetings so as to
discuss and review safety aspects or future improvements;
arrange for all newcomers to attend safety-induction training on their
arrival on site;
immediately respond to all shortcomings identified by supervisory staffso as to maintain a healthy and safe working environment for the
workers, and
set a good personal example.
Safety representatives shall be appointed from subcontractors, labour
groups, etc. They shall be responsible for ensuring that the directives from
project management, Safety Officer and safety supervisors on safety and
health matters are duly carried out, safety practices are adopted and
protective clothing and equipment provided are at the relevant time.
Safety representatives shall attend monthly Site Safety and Environmental
Committee meetings, which serve as the major communication channel
with the site management team and other subcontractors. A subcontractor
that does not send its safety representative to a Site Safety and
Environmental Committee Meeting without a valid reason may be
reprimanded.
2.4.18 Healthcare Officer
Healthcare officer shall:
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
30/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
31/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
32/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.32 H2540-SAF-PLN-001-49; 31 Oct 2014
Ensure you carry your site security pass, closed area permit and Green
Card at all times when on site; and Actively participate in the sites safety promotional activities.
2.5 Lines of Communication
The line of communication between safety personnel, construction
personnel, subcontractors and others are identified in the project safety
organization chart.
On site communication between construction personnel and/or
supervisory staff shall be provided by means of mobile telephone, pager
and radio facilities.
Safety bulletin boards will be erected that will carry as a minimum
appropriate safety information, such as the Safety Policy, emergency
telephone list and first-aid facilities.
Feedback from workers or others in relation to safety will be collected
during tool-box talks and from a suggestion box that shall be fixed at the
entrance of the site office.
The importance of good communication will also be discussed at:
weekly safety coordination meetings;
Site Safety and Environmental Committee meetings, and
pre-work activity meetings.
Each month, the site agent and the Safety Officer shall meet to discuss
the Safety Officers report (Form 2A).
A register of competent persons, such as competent person and certified
workers for confined spaces, will be kept and updated regularly by theSafety Officer.
2.6 Appendix
2.6.1 Contact list of members in Safety Organization
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
33/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
34/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
35/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.35 H2540-SAF-PLN-001-49; 31 Oct 2014
relevant to trade and hazards arising out of the construction of the works
are disseminated to all levels of site personnel. Competent trainers, i.e.Safety Officer, Safety Supervisors or gangers, who have received training
on safety training techniques organized by the Hong Kong Construction
Association Ltd., CICTA OSHC or other approved training organizations,
will hold weekly tool-box meetings to be attended by all workers on site.
After each meeting, the presenter will complete the Tool-box Meeting Record
and send it to the Safety Office for records. The Safety Officer will prepare a
Summary Record of Tool Box Meetings on a monthly basis.
The topics of Tool Box Meetings will be included in monthly trainingprogramme to be submitted for Highway Departments Representative,
which include but not limited to the followings:
1. Housekeeping2. Falling objects3. Fire prevention4. Electricity5. Lighting, Ventilation, Welfare6. Pre-work check7. Hand Protection
8. PPE9. Manual Handling10. Lifting Appliances11. Lifting Gear12. Rigging Safety13. Prestressing Safety14. Loadshifting machinery15. Temporary work16. Boring rig17. Power handtools18. Woodworking machinery19. Abrasive wheel
20. Air compressor & vessel21. Other machinery22. Material storage23. Inflammable liquid & gas
24. Hazardous substances25. Excavation26. Work near public facilities27. Working platform28. Ladder29. Scaffolding30. Aerial Platform
31. Confined spaces32. Public work33. Work over or near water34. Demolition35. Arc welding36. Gas welding & flame cutting37. Ground drilling38. Piling39. Metal formwork40. Site transport41. Tree felling42. Accident news
43. Strive for LIFE Safe
Behaviour
44. Heat Stoke
The content of Tool Box Meetings will be based on the training kits
published by Hong Kong Construction Association, Occupational Safety
and Health Council or developed by the project to a similar standard.
For workers undertaking scaffolding work including truss-out scaffolds,
demolition work and work in confined spaces, suitable Tool Box Meetings
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
36/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.36 H2540-SAF-PLN-001-49; 31 Oct 2014
will be conducted prior to their commencement of these works on site.
Tool Box Meeting on Prevention of Dengue Fever will be provided to the
frontline workforce and site supervisory staff on monthly basis.
3.7 Safety-management Training
Such training is aimed at equipping site personnel with supervisory and
managerial responsibilities with the necessary knowledge and skill to
tackle safety-management situations likely to arise on site.
It is important that senior site-management staff possess adequate safety
knowledge and have a high degree of safety awareness so that they are
able to:
recognize the importance of safety and assign sufficient resources to
handle it;
give proper consideration to safety during planning and design stages
to eliminate/reduce safety problems during later stages of the project;
take into account potential safety problems during preparation/vetting
of method statements;
avoid performing unsafe acts;
avoid creating unsafe conditions, and
identify unsafe acts/conditions and arrange for rectification.
The Project Manager will identify appropriate management and
supervisory staff to receive safety training commensurate with their duties,
which include but not limited to follows:
Managerial posts such as project manager, site agent, sub agent,
superintendent and engineer
- Occupational Safety Management Course- Basic Accident Prevention Course
Supervisory staff such as foreman and ganger including subcontractors of
all tiers
- Foreman Safety Training Course or Construction Safety Supervisor
Course
3.8 Green Card
All workers on site shall hold a valid Green Card, which can be obtained
from the Construction Industrial Training Authority or any other Labour
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
37/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
38/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
39/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.39 H2540-SAF-PLN-001-49; 31 Oct 2014
3.18 Training Records
Records of all safety training given to all direct or indirect employees,
including those on a re-induction course, will be kept by the Safety Officer.
A monthly summary of all training (safety induction, specific training, tool-
box meetings, etc) held in that particular month will be included in the
Monthly Safety Report and submitted to the Highway Departments
Representative for information.
3.19 Appointment of Competent Persons / Designated
Persons
Records of all safety training given to all direct or indirect employees,including those on a re-induction course, will be kept by the Safety Officer.
A monthly summary of all training (safety induction, specific training, tool-
box meetings, etc.) held in that particular month will be included in the
Monthly Safety Report and submitted to the Highway Departments
Representative for information.
3.20 Appendix
3.20.1 General Structure of Induct ion Training Course
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
40/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
41/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.41 H2540-SAF-PLN-001-49; 31 Oct 2014
designated smoking areas. Employees, when asked to take an alcohol breath
test, are required to comply.
6. Persons performing any activities requiring specific (specialised)
competencies, such as rigging, lifting, scaffolding, plant operation, electrical
works etc, shall have a valid recognised qualification / certificate and obtain
authorisation from the site staff or from their direct employer (in the case of a
sub-contractor) before commencing such activities.
7. All plant operators are responsible for carrying out daily Pre-Use Checks of
their equipment and shall be responsible for displaying the valid statutory
certificates in a prominent location on the item of plant in use.
8. Persons driving vehicles on site shall hold a valid driving licence, which shall
be carried with them at all times and observe all traffic control measures and
speed limits.
9. The site shall be kept clean and tidy: unobstructed access ways must also be
maintained. A high standard of personal hygiene shall be maintained and site
amenities shall be respected.
10. Appropriate, correctly functioning equipment and tools shall be used for each
task: seek guidance from your immediate supervisor, or the employer (in thecase of a subcontractor), on how each task is to be performed safely.
11. Working platforms and means of access & egress shall be constructed to meet
statutory requirements. The use of ladders should be restricted and used only
for access purposes.
12. All incidents must be reported to your immediate supervisor without delay.
Resulting injuries, damage and defects shall be recorded in the Incident/Injury
Book. For minor injuries seek assistance and go to the health care officer/first
aid station for initial treatment. You must advise your immediate supervisor
prior to leaving site for any treatment related to an injury sustained on site.
Employees are encouraged to report any Near Miss events and
Opportunities for Improvement.
13. No employee shall undertake specialised work for which a Permit-to-Work
system applies, without the required Permit-to-Work being in place, e.g.
Electrical Works, Confined Space, Arc & Gas Welding, Excavation Works,
Lifting, etc.
14. When working at height, and where there is a potential risk of falling from
height, a full body safety harness, fitted with double lanyards, shall be worn,
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
42/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
43/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
44/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.44 H2540-SAF-PLN-001-49; 31 Oct 2014
the system shall include a risk assessment, the gas detection result
of toxic or explosive gases or oxygen deficiency, the provision ofnecessary personal protective equipment and rescue equipment, a
checklist of recommended safety measures and checking on training
received by workers entering the confined space. The periods of time
that the Certified Workers are allowed to stay and work in a confined
space will be specified in the permit. The permit-to-work system will
be communicated to all personnel involved in a confined-space
activity. Implementation of the system will be closely monitored by
the responsible supervisor, with regular reviews to ensure
effectiveness.
c) Permit to Dig
Permit to dig is a system to ensure that the excavation work carried
out on site complies with the requirements concerning protection of
underground services prescribed by the Electricity Supply Lines
(Protection) Regulation, Code of Practice on Working near Electricity
Supply Lines and other relevant codes of practice.
Only Leighton authorized competent persons are delegated the
power to issue the permit to dig for excavation work on site. Thedirect or subcontractor supervisor who is required to carry out
excavation work on site must identify and demarcate all underground
utilities that may be affected by excavation work. Furthermore, the
direct or subcontractor supervisor is required to conduct a pre-work
briefing to all workers involved by using the Toolbox meeting record
and obtain the permit from Leightons authorized person before
commencing any excavation work on site.
The procedures in applying the Permit to Digare:
1. Prior to the excavation works, the applicant shall obtain a Permit
No. from the project office and complete PART A - Application
for Dig with the drawings showing the details of the excavation
area to the construction manager. The excavation works shall not
be commenced until the permit is approved by the construction
manager.
2. If the application is accepted, the construction manager shall
appoint a competent person approved by Electrical and
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
45/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
46/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
47/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.47 H2540-SAF-PLN-001-49; 31 Oct 2014
1. The area foreman or subcontractors supervisor shall notify the
Lifting Supervisor the location of cranes or piling rigs to beoperated in high risk area.
2. The Lifting Supervisor, area foreman/ subcontractors supervisor
and operators of piling rig and/or crane shall conduct joint
inspection to the proposed location and complete the specified
Permit to Operate.
3. If all parties have agreed that the requirements listed on the
Permit to Operate have been satisfied, they shall sign on the
Permit.
4. A copy of Permit shall be kept in driving cab of the crane or piling
rig for inspection and shall be retained for at least 7 days followingthe operation.
5. The validity period of the Permit shall not over 2 working days.
6. If the Permit is intended to cover a number of operations within a
shift, all the crane or piling rig operations shall be separately
assessed and details of each operation clearly stated on the
Permit.
7. All Permits shall be cancelled automatically upon a tropical
cyclone signal No. 8 or above, a red/black rainstorm signal, or
heavy rainfall for a long period of the site. A re-assessment shall
be made and new Permit shall be issued after all the requirements
are met.
The Permit to Operate system will be communicated to all crane and
piling rig operators by special Tool Box Meetings.
4.3 Construct ion Method Statement
The Construction Method Statement (CMS) is the main document that will
describe how the works will actually be carried out. The development of
the methodology and the method statement should be carried out with theinvolvement of the specified participants. It is essential that the
participants (especially subcontractors) fully involve themselves in order to
bring their expertise, experience and competency to managing the Class 1
risks associated with the works activities and tasks.
Refer to Appendix 1 of Class 1 Risk Management & Control
Procedurefor further information on Work activities considerations.
Refer to Appendix 2 of Class 1 Risk Management & Control
Procedure for further information on Considerations: Hazard
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
48/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
49/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
50/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
51/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.51 H2540-SAF-PLN-001-49; 31 Oct 2014
pre-determined to be produced by the project.
- Working under inclement weather
- Prevention of dengue fever
Those site activity safety rules will be displayed on site where related
tasks are being undertaken for the attention of those involved. Each of the
items listed above is depicted on adhesive labels to promote awareness of
the rules governing the use of the equipment involved or the activity.
4.5 Safety Standard
Safety standards were issued to ensure that the safety features required
for critical activities across all Leightons projects are consistent and well
defined. Total 37 standards had been issued to cover following items and
the company will continuously review and issue new standards as
required.
Requirements for Signalmen & Banksmen
Safety Harnesses & Double Lanyards
Control of Slewing Plant & Equipment
Control of Reversing Plant & Site Vehicles
Electrical Distribution Boards Electrical Tools and Equipment Inspection & Tagging
Edge & Slope Protection
Covering / Protection of Floor Openings
Safe Access to Tower Cranes
Scaffold & Working Platforms
Tagline & Push-sticks for Lifting Operations
Excavators / Backhoes
Tracking / Slewing Cranes
Access Gondolas
Mobile Elevated Working Platforms (MEWPS)
Bench Saws Safe Stacking of Materials
Aquasep Equipment
Protection to Lift Shaft Openings
ARC Welding Works
Pedestrian and Vehicle Demarcation
Lifting Gear
Fire Prevention
Excavations
Crane Lorries
Mobile Cranes
Working with Re-bar
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
52/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
53/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
54/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.54 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
a lightning strike (e.g. radio towers, steel sheds etc.).
13. Overhead cable is eliminated wherever possible, especially over routes of vehicularor pedestrian access.
14. All underground and overhead cables are located or arranged so they are not in theway of activities on site (i.e. redirected, buried with sufficient ground clearance).
15. Where cables are buried, they are at a safe depth (at least 0.5m below final groundlevel).
16. Underground cables are adequately protected and insulated (warningsigns/pegs/maker tape, and also clear symbols so that anyone who cannot read willunderstand the danger below, compacted sand/indicator material, PVC / conduit,etc.) and their routes surveyed, clearly marked on site (marker posts) with siteservice plans updated.
17. All cables are suitably designed for the duty and expected load.
18. Cables are sufficiently insulated, sheathed, or armoured, have protection fromchemical damage and where necessary additional protection, e.g. guarding, toprevent mechanical damage.
19. Socket outlets for distribution cables are located as close to the working point aspossible to prevent the need for long trailing wires.
20. Power and lighting circuits are keeping separated.
21. Cables are hanged up at work stations whenever practicable to reduce trip hazardsand damage to cables.
22. All temporary electrical leads are secured off the ground by insulated hooks and/orlead stands.
23. Joints in cables are made in purpose-built housing.
24. No handheld breaker is used within 500mm in any direction from any undergroundpower cable or other services installation, e.g. gas lines, telecom or other datainstallations except when breaking out paved concrete where a horizontal clearanceis required.
25. All welding machines are installed with voltage reducing devices.
26. Welding machines are connected to the power supply by heavy-duty cables, and anefficient isolating switch, together with protective fuses or circuit breaker.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
55/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
56/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.56 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
any electrical installation, testing, commissioning, repair or maintenance work isdone; when working with high voltage switching or in proximity to power sources e.g.inside electrical switch-rooms; where digging / breaking of excavation works arecarried out in close proximity to underground electrical cables.
41. Permit-to-Dig / Excavation Permit includes requirement for verification of electricalservices.
42. All services are accurately located by a designated competent person using therelevant services drawings and the location verified by a secondary means such as,
but not limited to electronic detection of horizontal and vertical location; groundpenetrating radar or trial hole.
43. When working near live Overhead Line Equipment (OHLE) or live electrical parts,regulated safe working distances/exclusion zones are maintained.
44. Appropriate type of fire extinguisher (non-water/foam type) is provided at theworkplace with electrical works.
45. Site services plans, schematics, distribution diagrams and other appropriate recordsare kept for all electrical installations and are updated when alterations are made.
46. The location and type of all electrical installations and services are visibly markedand identified in compliance with statutory requirements, for example, via signage,markers and / or line marking, including on walls, floors and ceilings.
47. Height markers, signs, sacrifice cables, floating markers, goal posts etc. isinstalled/provided for vehicle crossings under overhead power lines.
48. Floor and wall demarcation are in place to prevent obstruction to main DBs andpanels.
49. All electrical panels, enclosures, control centres, substations, electrical circuits,breakers and equipment are provided with statutory signage, equipment/location
identification numbers, and wiring diagrams kept on file.
50. Isolation points for electrical equipment and power outlets are clearly labelled.
51. All circuit boards have RCDs or RCBOs labelled and listed on a locationmap/diagram placed in the panel door or nearby for easy reference when faultfinding or isolating circuits.
52. All outlets and switches are labelled to correlate to distribution panels and whererequired specific voltage indicated (e.g. 110V in all circumstances).
53. Power generation sets (Gensets) and other temporary power supplies are inspected
before use and as per the agreed schedule, such as weekly or quarterly, by a
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
57/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.57 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
competent person with records kept of inspections on all sites.
54. All RCBOs, RCDs and MCBs are tested every three months with records kept oftesting (amperage and trip out time).
55. For portable RCDs, push button tests are conducted prior to use and recorded everythree months.
56. Earth continuity of all circuits, apparatus and where required earth grounding forstructures are tested and results recorded (measured resistance level not exceeding
1 ohm)
57. Portable electric tools and extension cables are inspected and tagged every threemonths by a competent person in compliance with colour coding requirements.
58. Pre-use checks (PUC) are conducted for the power generation set and weldingmachine.
59. All testing equipment are properly selected, inspected, tested and calibrated atregular intervals as recommended by the manufacturer.
60. Power outlets or extension cables/cords are not overloaded.
61. The electrical tools and extension cables are checked for damage before use.
62. All repairs are carried out by suitably qualified / competent persons.
63. Faulty electrical equipment or equipment without a tag are taken out of service andlabelled with an out of service tag and reported to a supervisor and where possibleput into quarantine.
64. No person use or operate a piece of portable electrical equipment if it shows visiblesigns of being unsafe due to damage, has been put into quarantine or if it does nothave a valid inspection tag.
65. Electrical appliances are kept away from water or moisture.
66. Electrical workers wear correct PPE when doing electrical works. For example, theappropriate insulated footwear, eye protection and gloves where required.
67. Adequate lightning protection is provided to structures (earthing) and lighting surgeprotection to structures and cranes (mobile and tower types so as to protect theonboard sensitive electronic detection and warning systems.
68. Weather data and warning and alarms systems are used to anticipate heightenedelectrical storm activity.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
58/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.58 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
69. During heightened electrical storms, workers seek shelter in an enclosed building orvehicle and keep away from high ground.
70. All plant with booms is lowered where possible.
71. Crane operators and operators of other equipment with extendable booms orplatforms stand down during electrical storm activity and remain in the cabin until thethreat has passed.
72. Mobile equipment operators park away from high and open ground (e.g. away from
dumps) and remain in cabins. No person exits a cabin or hides under equipmentduring electrical storms.
73. If caught out in the open, all person keep in a low crouched position away from otherpeople or tall objects (e.g. keep away from trees).
4.7.2 Driving Safety Standards
The following standards will be applied where specified tasks associated
with driver Safety and the risks associated with speeding are identified as
significant:
ITEM STANDARD
1. GPS shall be fitted to all vehicles working within the Scope Location and identifiedwithin the Scope Vehicles section of this standard and risk based assessments.
2. Road designs, which include traffic calming measures such as lane dividers on fastbends, speed bumps etc shall be considered and risk assessed for necessity on allsite and haulage roads at locations specified within the Scope Location of thisdocument.
3. Fingerprint recognition systems shall be assessed for necessity for all vehicles,which are required to be driven in 24hr shifts so as to ensure drivers are not loggingexcessive working hours.
4. All vehicles will be subject to comprehensive maintenance programs, to include as aminimum the checking of all braking, steering, vehicle lighting, directional indicatorsand rear view systems.
5. All projects, facilities and mines will actively support, implement and promote theLAIO Speed Kills campaign, which will include an approved LAIO promotionalposter and require driver focused toolbox talks, which will cover the main messages
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
59/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
60/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.60 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
4.Only LA and LG that are designed and fit for purpose are to be used. All LA and LGare used / operated as per the designer and / or manufacturers requirements,inclusive of all aspects relating to SWL.
5.All relevant LA are fitted with performance limiting devices
6.Automatic Safe Load Indicator (ASLI) is installed to prevent overloading.
7.Over Hoist Limiting Device is installed to prevent lifting of hook into jib.
8.All crawler cranes with jibs are fitted with back-stops or other devices to prevent
over hoisting of jib.9.
Over Hoist of Jib Limiting Device is present to prevent jib pulling back beyond safeoperating radius.
10.Independently Acting Brake Systems (emergency) based on relevant cranespecification is in place to hold the load in cases of main brake or other failure.
11. Overspeed Cut-out Devices based on relevant crane specification is in place toprevent uncontrolled overspeed lowering.
12. Anti-collision is present to prevent the jibs of tower cranes coming into contact witheach other.
13. Anti-free fall is present to prevent uncontrolled lowering of load. All loads are loweredby means of power lowering or positively engaged drive down system.
14. Manual Emergency Stops are fitted and functioning in relation to assessed andrequired controls systems.
15. Stability Control is fitted on cranes where feasible, to prevent overturning moments.
16. Counterweights are fitted with finger warning probes.
17. To avoid collisions when multiple cranes are working in overlapping zones;
- Tower crane jibs are set higher than ground based crane jibs,
- Ground based crane jibs are shortened / retracted and set lower than the towercrane jibs,- Tower cranes are locked out to prevent its use when mobile crane is operatingwithin the area.
18. Tower crane masts are designed with landing platforms at a height of no greaterthan 9m apart. Each section of the ladder has safety hoops and is offset horizontallyfrom adjacent sections or the landing platforms have trap doors.
19. Other plant used for lifting, e.g. excavator, is by design being suitable for thepurpose. In addition, a designated and designed lifting point is available from theoriginal manufacturer on its arm or boom for attaching LG.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
61/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
62/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
63/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.63 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
45. For all non-standard lifts:
- All specific actions required for Basic / Standard Lift are conducted.
- Permit to Lift conducted by Lifting Supervisor
46. For all complex / criti cal lift:
- All specific actions required for non-standard lift are conducted.
- Lifting plan is prepared to determine and verify the following by a designatedcompetent person: verify the accuracy of lift calculations, confirm weight of load to
be lifted, centre of gravity and sling positions, survey / set out crane position, marout radius / radii, ground bearing capacity and pads, know wind parameters andmonitor wind, taglines / restraint system, test load gauges and computer.
- The lift is approved by Project Leader or delegated person in writing.
47. Specific lifting plans, method statements and, where required, permit are developedincluding coverage for LA erection, alternation and dismantling operations.
48. No lift is undertaken where a required lifting permit / plan are not present or wherethe necessary competent persons, lifting supervisors or signalmen are not present.
49. Operators or other relevant designated competent persons have conducted pre-start/ pre-use checks of equipment before starting work and conduct any other relevantlegally required inspections.
50. Load charts, procedures and operation manuals specific for LA being used are keptin the machine.
51. Unless expressly designed for the purpose, cranes are not telescope in or out withloads under suspension.
52. Calibrated test weights are conducted to verify the accuracy of crane load indicatorsfor all critical / complex lifts or calibrated load cell.
53. Assessment of the materials being handled and the weights for all loads are knownand determined by competent persons.
54. Self-weights of loads which are regularly lifted (concrete skips, drill rods, etc.) areclearly marked to be easily visible using reliable methods (stamping / welding etc.).Loads which cannot have markings applied are recorded and this information isreadily accessible to those involved within their lifting.
55. All loads are secured and loose loads are strapped before any lifts, e.g. use ofratchet straps or other devices.
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
64/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
65/258
8/10/2019 Safety Plan for CWB_Rev.49 (Oct 2014)
66/258
Leighton
Contractors
(Asia) Limited
Contract No. HY/2009/18
Central Wan Chai Bypass Central Interchange
Project Safety Plan
Copyright Leighton. 2010 P.66 H2540-SAF-PLN-001-49; 31 Oct 2014
ITEM REQUIREMENT
threat has passed.
85. Tower cranes are left in rotation mode e.g. free swing, when not being operated toprevent damage due to wind.
86. In the absence of specific information from the crane manufacturer or agent,personnel did not operate a crane in wind speeds in excess of 10 meters persecond.
87. LA are parked in a safe condition, brakes fully applied and, as necessary, the wheels
or tracks are blocked when not in use, in line with manufacturers and Leightonrequirements.
88. No loads, including LG, is left suspended from any hooks whilst unattended and jibsare retracted / directed away from potential locations of risk, roads, public accessways, building, etc.
89. All parts of crane and equipment, jibs, hooks, LG, are stowed and secured whentravelling unless as part of a planned travelling lift.
90. As relevant to crane type, slew locking pins are in place when travelling with loadsand where LA is itself required to be lifted.
91. All cranes used to lift man-cages / rescue cages are:
- fitted with a double acting or positively locking safety catch on the crane hook;- equipped with drive up and down controls for hoisting and luffing motions (no free-fall); and- equipped with controls that return to the neutral position when released and this
action cause the motion to stop.
92. Cranes have a SWL capacity of at least two times the rated requirement for theradius that man-cage is used.
93. Working speed for lifting / lowering is limited to 0.5m/s.
94. Man-cages and rescue cages are fitted with an LG back-up / redundancy device,which is separately attached to the main hook of the crane, should failure in the mainLG occur.
95. Access and egress from a man-cage / rescue cage is prohibited except whereapproved by the Project Leader.
96. Moving the crane with personnel in the man-cages is prohibited.
97. Personnel working in a suspended man-cage are trained and wear a safety harness,
which is connected to a fixed anchor point at all times.