+ All Categories
Home > Documents > Sameer Ahamed - pmguae.com2].docx  · Web view(Total of . 10. years’ Experience ... Ms-word,...

Sameer Ahamed - pmguae.com2].docx  · Web view(Total of . 10. years’ Experience ... Ms-word,...

Date post: 30-May-2018
Category:
Upload: nguyenmien
View: 214 times
Download: 0 times
Share this document with a friend
8
RESUME SAMEER AHMED Transgulf Electro Mechanical. P O Box: 2432, Dubai, U.A.E. Tel.: +971 6 5759679 . GSM: +971 555657928 Email: [email protected] Professional Objective To work in an esteemed Organization where work is a challenge, a passion and an opportunity to enhance my skills in a rewarding way to the company & myself. Core Strength: MEP Project Management, HVAC Team Leader Working Knowledge of all relevant MEP systems such as HVAC, Plumbing, Fire Protection, Power Distribution, Telecommunications and other Extra Low Voltage services. Able to control all aspects of the works including Planning, administration, Commercial, Engineering, Site Works & Documentations. Technical Delivery of Multiple Projects from Initial Client briefing to Final HVAC systems , Design Selection & execution, Testing & Commissioning & handover. Education: Graduate in Bachelors of Mechanical Engineering Manipal Institute of Technology, Manipal.
Transcript

RESUME

SAMEER AHMEDTransgulf Electro Mechanical.P O Box: 2432, Dubai, U.A.E.Tel.: +971 6 5759679 . GSM: +971 555657928 Email: [email protected]

Professional Objective

To work in an esteemed Organization where work is a challenge, a passion and an opportunity to enhance my skills in a rewarding way to the company & myself.

Core Strength: MEP Project Management, HVAC Team Leader

Working Knowledge of all relevant MEP systems such as HVAC, Plumbing, Fire Protection, Power Distribution, Telecommunications and other Extra Low Voltage services.

Able to control all aspects of the works including Planning, administration, Commercial, Engineering, Site Works & Documentations.

Technical Delivery of Multiple Projects from Initial Client briefing to Final HVAC systems , Design Selection & execution, Testing & Commissioning & handover.

Education:

Graduate in Bachelors of Mechanical Engineering Manipal Institute of Technology, Manipal.

Professional Experience: (Total of 10 years’ Experience-Project Management)

Designation : MEP PROJECT COORDINATOR [AUGUST 2011 – TILL DATE]

Firm : TRANSGULF ELECTRO MECHANICAL U.A.E, Dubai.

Designation : PROJECT HEAD [MARCH 2004 – MAY 2011]-7 Yrs

Firm : LG ELECTRONICS VIDEO HOME & ELECTRONIC CENTER DOHA-QATAR

Designation : HVAC DESIGN & PROJECT ENGINEER [DEC 2001 –FEB 2004]-2 years

Firm : BLUE STAR COMFORT CARE SYSTEMS INDIA

Professional Development

Professional project Management Certificate Training Course from Madras Management Training InstitutePMP (Professional Project Management)

Project management Primavera Software Training Course from CADD Center, India(Project Management Software –P6)

Certificate Training Course from LG –Air-Conditioning Academy ,Dubai

(Heat Load Calculation, Duct Design, Estimation, Model Selection)

Certificate Training Course from Carrier Air-Conditioning Systems(Design, Installation, Estimation and Maintenance of Air Conditioning project Works)

Certificate Training Course from TECNOLCO INSTITUTE OF HVAC & R (Design, Installation & Maintenance works of HVAC, Plumbing & Fire Fighting Services)

Professional Diploma Course in Finite Element Method and Finite Element Analysis.MSC/NASTRAN (Finite Element Pre & Post processing Analysis Software)Mechanical Desktop (3D Modeling Software)Auto CAD.

Course on piping Design from The Institution of Engineers ( India).

Computer Skills:

* Mechanical Design Software: MSC/NASTRAN, Mechanical Desktop & AutoCAD.

* Project Management Software: Primavera Project Planner (P6).

* Programming Languages: C, C++.* Operating system: Windows * Applications: Ms-word, Ms-Excel, PowerPoint.

Professional Experience Summary(MEP Project Coordinator):

1. Ensured successful achievement of Project Objectives & goals and was responsible for all day to day activities.

2. Followed up with various departments within the company in all project related matters of the operation of the Project.

3. Involved in Planning & scheduling all major activities of the Project to achieve timely completion of Project.

4. Involved in reviewing the scope of Work to determine the appropriate strategies to meet the deadlines and satisfactory delivery of work.

5. Actively discussed and established the Project Construction methodology with the Project Team.

6. Closely Monitored & Controlled to ensure a successful completion of project within the Budget & on Time.

7. Fully responsible for all contractual issue related to day to day running of Project.

8. Responsible for acquiring, developing & managing the Project Team.

9. Responsible for overall overseeing and effective execution of all Project related activities in line with Organizational Policies & Client requirements.

10. Responsible for ensuring the timely submittal of all Project Submittals and obtaining the approvals for the same( Material Samples, Shop Drawings, Design details, Work Procedures, Method Statements, Schedules, Programs etc.

11. Arranged timely obtaining of all MEP related clearances, Approvals, permissions etc as may require from time to time any of the statutory authorities during the execution of the Project.

12. Scheduled and planned all project activities in line with Master Program in Coordination with Planning Engineer.

13. Transmit, Communicate and implement necessary effective Action upon receiving all Project related instructions from the Client, Engineer, and Main Contractor etc.

14. Evaluated the requirement of all Project Resources (Materials, Machinery, and Manpower) as per schedule and arranged for availability of the same.

Professional Experience Summary(HVAC Project Leader):

1. Worked in Team Environments, where I was given complete

responsibility of Technical Delivery of Multiple Projects from Initial Client briefing to Final HVAC systems , Design Selection & execution, Testing & Commissioning & handover.

2. Liaise directly with Clients , Consultants and Architects in presenting the Design Solutions to comply their specifications, Providing Tender Technical Evaluations, Tender Estimations & Co –ordinating with Engineering/ Civil Contractors for systems Installations & Commissioning with an In – House supports of Junior Engineers & Design Drafters.

3. To Design & to plan reliable HVAC systems to attain best possible efficiency keeping the cost to the minimum. This included Thermal Load, Sizing for Duct, Pipes, and Grilles/Diffusers etc. This included HVAC systems like –DX, Chilled Water, Air Cooling, Ventilation, Pressurization & Heat Recovery System, District Cooling systems etc.

4. To prepare Design, Shop & As Build drawings( Builders Work, Co-ordination & HVAC Systems) with details of Fabrication, Routing & Equipment Arrangements as per given specifications & standards with an In House Support of Junior Engineers & Design Drafters.

5. Generate Material Submittals & obtain approvals.6. Generate Take Offs & purchase the materials with Continuous

follow ups for timely delivery.7. Negotiations & dealing with the Various Vendors, To retain & to

increase the gross margin declared by Sales Team, To Validate the system after Commissioning & meeting all TECHNICAL & COMMERCIAL requirements as per the ISO & Company standards.

8. Creating alternate sources of Procurement of Various materials.9. Provide Technical support to other Departments & Resolve Site

Co-ordination issues by Co-ordinating Electro Mechanical Services.

SYNOPSIS OF JOBS EXECUTED AS MEP PROJECT COORDINATOR

1. Marriott Hotel and Marriott Executive Apartments at Dubai health care city-Phase-2( 5 star Hotel- 350 Guest Rooms and 125 Hotel Apartments with Specialty Restaurants, Health Club, Ball Room, Meeting Rooms etc.

2. Bab Al Bahr, Luxury Collection Hotel, Ajman- U.A.E (5 star Hotel – 300 Guest Rooms with Specialty restaurants, SPA, Ball Rooms etc.

3. 3B+G+M+18 Storey ENBD Office building at Deira, Dubai.

4. Meydan Beach Club in Dubai Marina ( Dining, Spa Treatment Rooms, Gymnasiums, Swimming Pool, Outside Dining & Leisure)

5. 2B+G+ M+ 7 Offices & Residential Building, Doha Qatar.6. Al Rayya Private Palace – 8 Buildings, Doha Qatar.

SYNOPSIS OF JOBS EXECUTED AS HVAC PROJECT LEADER

(VRV Systems)

1. Dahlak Resort Project – VRV System-30 set ODUs/165 IDUs with ECO V system.

2. Al Kazem Group – 2B+G+M+9 Office Buildings – VRV System-450 TR)

3. Al Jazi Tower- 2B+G+M+18 Khaliji bank- VRV System-200 TR)4. St Reiges Hotel – 2 Towers- VRV system- 8 sets/161 IDUs.5. Lusail car parks at Lusail City Qatar- VRV system6. Nakhilat Ship Repair Yard- 5 buildings and Offices, Raslaffan- VRV

System / 27 ODUs/167 Indoor units.7. Gloria Hotel- 2B+G+M+14- MPS system-1100 TR.8. Merwab hotel – 2B+G+M+12-MPS System-950 TR.

( Premium Villas)

1. PALM CITY GARDENS COMPOUND-128 VILLAS-2170 TR-DX DUCTED 2. BEVERLY HILLS 1-33 VILLAS-SHK KHALID-815 TR-DX DUCTED3. BEVERLY HILLS 2-76 VILLAS-SHK KHALID-1850 TR-DX DUCTED4. BEVERLY HILLS 3-144 APARTMENTS-SHK KHALID-3600 TR-DX

DUCTED5. BEVERLY HILLS 4- 216 VILLAS-SHK KHALID-4800 TR-DX DUCTED-

WIP6. MESAEED RESIDENTIAL VILLAS-PACKAGE 1, 2, 3-WALL SPLIT-2145

TR.7. AL FAISALIYA COMPND(210 VILLAS + AMENITIES)- WALL SPLIT -

3200 TR

(HIGH RISE BUILDINGS)

1. IBA-4 Nos OFFICE BUILDINGS-B+G+2-2650 TR-DX DUCTED SPLIT.2. 2B+G+14+P-TWIN OFFICE BUILDINGS -1385 TR-DX DUCTED SPLIT.3. 2B+G+M+7- 2BLDGS-SHK JASSIM AL THANI-600 TR DUCTED

SPLIT.4. MUSHERIB TOWER-1&2-SHKA HESSA-B+G+9-1450 TR-DUCTED

SPLIT.5. MUSHERIB TOWER-3-SHKA KHALID-B+G+12-1050 TR-DUCTED

SPLIT.6. MUSHERIB TOWER-4-SHK FAISAL-B+G+M+7-950 TR-DUCTED

SPLIT.7. 53 FLATS RESI APARTMENTS-SHK ABDUL AZIZ-500 TR DUCTED

SPLIT.

8. 67 FLATS RESI APARTMENTS-SHKA HESSA-650 TR DUCTED SPLIT.9. MUSHERIB APARTMENTS-THANI BIN ABDULLAH GROUP-9000TR-

WAC.

(MOSQUE PROJECTS)

1. MOSQUE @ NEW RAYYAN- CASSETTE/WSU-130 TR2. FRIDAY MOSQUE @ SHAHANIYA-PACKAGE/DUCTED/WSU-120 TR.3. MOSQUE @ GHARRAFA-PACKAGE /DUCTED SPLIT-260 TR.4. MAIZER MOSQUE-FLOOR STANDING/WALL SPLIT UNITS-175 TR.5. MOSQUE @ UMSALAL ALI-PACKAGE/DUCTED SPLIT-170 TR.

(SCHOOL PROJECTS)

1. EZDAN INTERNATIONAL SCHOOL- PACKAGE ACS/DUCTED/WSU- 700 TR/FAHU WITH HEAT RECOVERY & HEAT PIPE SYSTEMS.

2. DELHI PUBLIC SCHOOL MODERN INDIAN SCHOOL- PACKAGE ACS/DUCTED/WSU- 1400 TR/FAHU WITH HEAT RECOVERY SYSTEMS.

3. BIRLA PUBLIC SCHOOL MODERN INDIAN SCHOOL- PACKAGE ACS/DUCTED/WSU- 1000 TR/FAHU WITH HEAT RECOVERY SYSTEMS.

Personal Strengths

* Good Negotiations & People Skills with high Commitment Level & ability to work under pressure.

* Develop desire to learn quickly with autonomy yet to be a part of a Dynamic Team Environment.

* Strong Working Knowledge of all aspects of Project management, Contracting Procedures, Tactics & Commercial Realities.

* Good Written & Oral Communication Skills.* Self-Motivated & Quick Learner.* Able to Multitask.* Courteous & Professional.

Personal Details

Date of Birth: - 12/10/76Marital Status: -MarriedLanguages Known: -English, Hindi & KannadaPassport No: - E5069255Driving License: - For Light Motor Vehicle-Indian, Qatar & International


Recommended