+ All Categories
Home > Documents > San Onofre PWR

San Onofre PWR

Date post: 03-Jan-2016
Category:
Upload: jelani-underwood
View: 48 times
Download: 0 times
Share this document with a friend
Description:
San Onofre PWR. San Onfre PWR Decom. PWR. Reactor Building. 36 Ci/m 3. [2 – 4 r/h]. Reactor. Shroud: 3 million Ci/m 3. [> 600 k r/h]. Thermal shield 0.15 million Ci/m 3. [>80k r/h]. Vessel Inner Cladding 1.58 thousand Ci/m 3. [2 - >5 r/h]. Radioactivity with time. - PowerPoint PPT Presentation
Popular Tags:
20
San Onofre PWR San Onofre PWR
Transcript
Page 1: San Onofre PWR

San Onofre PWRSan Onofre PWR

Page 2: San Onofre PWR

San Onfre PWR DecomSan Onfre PWR Decom

Page 4: San Onofre PWR

Reactor Reactor BuildingBuilding

36 Ci/m3 [2 – 4 r/h]

Page 5: San Onofre PWR

ReactorReactor

Shroud: 3 million Ci/m3

Thermal shield0.15 million Ci/m3

Vessel Inner Cladding1.58 thousand Ci/m3

[2 - >5 r/h]

[>80k r/h]

[> 600 k r/h]

Page 6: San Onofre PWR

Radioactivity Radioactivity with timewith time

Page 7: San Onofre PWR

Decommissioning Decommissioning AlternativesAlternatives

Dismantlement – remove all Dismantlement – remove all radioactive materials. Terminate radioactive materials. Terminate license, except for spent fuel and hot license, except for spent fuel and hot core components. In VT, hopefully core components. In VT, hopefully return to greenfield.return to greenfield.

Safstor – remove much of external Safstor – remove much of external contamination. After cooling 20 years, contamination. After cooling 20 years, all fuel in storage casks. Remove all fuel in storage casks. Remove cooling water pipes. Seal up reactor cooling water pipes. Seal up reactor internals and wait. Revise license.internals and wait. Revise license.

Page 8: San Onofre PWR

CT Yankee Dry StorageCT Yankee Dry Storage

Page 9: San Onofre PWR

StonehengeStonehenge

Page 10: San Onofre PWR

NUHOMSNUHOMS

Page 11: San Onofre PWR

Dry Shielded CanisterDry Shielded Canister

Page 12: San Onofre PWR

Loading ConfigurationLoading Configuration

Page 13: San Onofre PWR

Horizontal Storage ModuleHorizontal Storage Module

Page 15: San Onofre PWR

Transfer CaskTransfer Cask

Page 16: San Onofre PWR

Key IssuesKey Issues

Burnup: heat of individual fuel Burnup: heat of individual fuel assemblies and the total. Requires assemblies and the total. Requires distributed heat load; hottest on distributed heat load; hottest on outside; some SONGS fuel too hot; outside; some SONGS fuel too hot; cool down over 20 yearscool down over 20 years

Criticality –must be some burnup; Criticality –must be some burnup; boral plate thicknessboral plate thickness

32PTH2 DSC not licensed for high 32PTH2 DSC not licensed for high burnup fuelburnup fuel

Page 17: San Onofre PWR

Cask 1.0Cask 1.0

Page 18: San Onofre PWR

Then what? Canister into Then what? Canister into transport overpacktransport overpack

Page 19: San Onofre PWR

Heavy Haul Heavy Haul ConfigurationConfigurationHeavy Haul Truck Configuration

220 feet

Legal-Weight Truck Caskbusvancarbicycle

70 ft30-40 ft20 ft15 ft6 ft

Source of irradiated fuel shipping drawings: Kelderhouse, 1999. “LWT, HH and Rail transportation graphics,” electronic communication with attachment to R. Best (Jason Technologies Corporation), JAI Corporation, Las Vegas, Nevada.

Page 20: San Onofre PWR

IssuesIssues

Timing – 20 year cooldown, high Timing – 20 year cooldown, high burnup fuelburnup fuel

Who pays? DOE fuel, decom fund Who pays? DOE fuel, decom fund adequacy, heat exchanger screw-upadequacy, heat exchanger screw-up

What remains? Fuel mausoleum, What remains? Fuel mausoleum, valuable site is wastelandvaluable site is wasteland

What can be done? Navy evicts SCE?What can be done? Navy evicts SCE?


Recommended