Tel. (207) 287-2070 Drinking Water Program Fax (207) 287-4172 Title: Sanitary Survey Small System Procedure Prepared By: N. Saunders SOP ID: DWP0114-D Date: 3-14-2012 Revision: D Date of Revision:5-27-15 Maine Drinking Water Program Page 1 of 54 SANITARY SURVEY SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used for small public water systems (PWS). SCOPE: This procedure covers the sanitary survey process for small PWS which include Transient, Non-Community Non-Transient, and Small Community systems, generally not regulated by the Public Utilities Commission. EXECUTIVE SUMMARY: For Ground Water Systems, field inspectors will use two forms to complete a sanitary survey: 1. the Small System Sanitary Survey Inspection Checklist, 2. the Sanitary Survey Summary Report. The checklist is used to ensure that all necessary areas of inspection are covered during each sanitary survey, consistently by all field inspectors. The report form is used to document deficiencies, recommendations, and requirements for PWS and Drinking Water Program (DWP) record, while providing a tracking method for monitoring the resolution of actions required of the PWS. The remainder of this procedure provides reference information for use during the sanitary survey as needed and for training field inspectors. This procedure documents the general steps of completing a sanitary survey, the creation of the sanitary survey inspection report, and the updating of the DWP electronic database: SDWIS. For Surface Water Systems: Large NTNC systems (such as paper mills) use the “Non- Community Surface Water Sanitary Survey Form - See Appendix D. Other small surface water systems using bag or cartridge filters use the “Alternative Technologies Sanitary Survey Form See Appendix E. For Small “Spring WaterBottlers using wells that do not meet the definition of a “Significant Groundwater Well” (bottlers using a well that is not regulated by the DEP under 38 MRSA §480 requiring a Natural Resources Protection Act [NRPA] permit), See Appendix G.
Transcript
Page 1: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

Tel. (207) 287-2070 Drinking Water Program Fax (207) 287-4172

Title: Sanitary Survey – Small System Procedure Prepared By: N. Saunders SOP ID: DWP0114-D Date: 3-14-2012 Revision: D Date of Revision:5-27-15 Maine Drinking Water Program Page 1 of 54

SANITARY SURVEY – SMALL SYSTEM PROCEDURE

PURPOSE: This procedure is written to document the sanitary survey process used for small public water systems (PWS). SCOPE: This procedure covers the sanitary survey process for small PWS which include Transient, Non-Community Non-Transient, and Small Community systems, generally not regulated by the Public Utilities Commission. EXECUTIVE SUMMARY:

For Ground Water Systems, field inspectors will use two forms to complete a sanitary survey: 1. the Small System Sanitary Survey Inspection Checklist, 2. the Sanitary Survey Summary Report. The checklist is used to ensure that all necessary areas of inspection are covered during each sanitary survey, consistently by all field inspectors. The report form is used to document deficiencies, recommendations, and requirements for PWS and Drinking Water Program (DWP) record, while providing a tracking method for monitoring the resolution of actions required of the PWS. The remainder of this procedure provides reference information for use during the sanitary survey as needed and for training field inspectors. This procedure documents the general steps of completing a sanitary survey, the creation of the sanitary survey inspection report, and the updating of the DWP electronic database: SDWIS. For Surface Water Systems: Large NTNC systems (such as paper mills) use the “Non-Community Surface Water Sanitary Survey Form - See Appendix D. Other small surface water systems using bag or cartridge filters use the “Alternative Technologies Sanitary Survey Form – See Appendix E.

For Small “Spring Water” Bottlers using wells that do not meet the definition of a “Significant Groundwater Well” (bottlers using a well that is not regulated by the DEP under 38 MRSA §480 requiring a Natural Resources Protection Act [NRPA] permit), See Appendix G.

Page 2: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 2 of 54

Index

Purpose…………………………………………………………………………………………… 1 Scope……………………………………………………………………………………………… 1 Executive Summary…………………………………………………………………………….. 1 Originator/Owner………………………………………………………………………………… 3 Definitions………………………………………………………………………………………… 3 Responsibilities………………………………………………………………………………….. 4 A. Sanitary Survey Steps……………………………………………………………………….. 4 B. Inspection Procedure………………………………………………………………………… 4 C. Inspection Report: …………………………………………………………………………… 25 D. SDIWS Entry Related to a Sanitary Survey………………………………………………. 25 E. Equipment Needed for a Sanitary Survey………………………………………………… 26 Associated Documents: ………………………………………………………………………… 26 Superseded Documents: ……………………………………………………………………….. 27 Retention: ………………………………………………………………………………………….. 27 Revision Log ………………………………………………………………………………………. 27 Appendix A Small System Sanitary Survey Inspection Checklist ……………………… 29 Appendix B Sanitary Survey Summary Report ……………………………………………… 32 Appendix C Inspection Report: Site Directions and Diagrams…………………………… 34 Appendix D Non-Community Surface Water Sanitary Survey Form ………….………… 36 Appendix E Alternative Technologies Sanitary Survey Form …………………………,… 45 Appendix F Sanitary Defects……………………………………………………………………. 50 Appendix G Procedure for Small “Spring Water” Bottlers and Small Bulk Load out

Stations using a Spring Source ………………………………………..………. 51 Appendix H Small System Sanitary Survey Deficiency Bullets…………………………… 52

Page 3: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 3 of 54

ORIGINATOR/OWNER: The Field Inspection Team/ Field Inspection Team Manager DEFINITIONS:

Deficiency: A finding during a Sanitary survey that results in a requirement, as detailed in this document or otherwise. Deficiencies can be “Minor” or “Significant” DWO: Drinking Water Order DWP: Drinking Water Program (either): In this document this term is used to identify requirements that can be either “Minor” or “Significant” deficiencies, depending on the circumstances. MSDS: Material Safety Data Sheet (Minor): A minor deficiency requiring resolution but not reaching a level that warrants a Notice of Non-Compliance at the time it is identified. When a minor deficiency is not resolved in the time frame given for resolution, pre-enforcement options are to be considered and potentially the PWS is issued a Notice of Non-Compliance and entered into the enforcement process. MOR: Monthly Operating Report NSF: National Sanitary Foundation POC: Point of Contact – Administrative Contact, Emergency Contact, Designated Operator, Operator, Financial Contact, Sampler, Owner POU: Point of Use PSC: Potential Sources of Contamination PWS: Public Water System RTCR: Revised Total Coliform Rule Sanitary Defect: is a defect that could provide a pathway of entry for microbial contamination into the distribution system or that is indicative of a failure or imminent failure in a barrier that is already in place. Sanitary Survey: A Sanitary Survey is defined in 40 CFR 141.2 as “an onsite review of the water source (identifying sources of contamination using results of source water assessments where available), facilities, equipment, operation, and maintenance and monitoring compliance of a public water system for the purpose of evaluating the adequacy of such sources, facilities, equipment, operation, and maintenance for producing and distributing safe drinking water.”

(S.D.): A “Sanitary Defect” SDWIS: The Safe Drinking Water Information System is the database used by the DWP to capture PWS information and data.

Page 4: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 4 of 54

(Significant): A significant deficiency requiring resolution which serves as Formal Notice of Non-Compliance of Maine’s Water for Human consumption Act and Rules Relating to Drinking Water

SOP: Standard Operating Procedure

RESPONSIBILTIES: DWP Field Inspectors complete sanitary survey inspections every five years for Transient and Non-Transient Non-Community PWS, or every three years for Community PWS. Included in the sanitary survey process is the following:

On-site Inspection of the PWS

A written record of the inspection provided to the owner

A written or electronic record of the inspection retained by the DWP

Completion of SDWIS Updates

Communicating SDWIS changes to DWP staff

Entering compliance schedules in SDWIS for required PWS action

Following SDWIS compliance schedules through to completion

Writing inspection related violations as necessary

Referring PWS to DWP Enforcement as necessary A. SANITARY SURVEY STEPS

1. Review previous PWS sanitary survey before site-visit if available or if possible 2. Ask DWP staff for system specific input related to compliance, DO needs. 3. Complete the sanitary survey inspection as detailed in this procedure, taking pictures of key

system components 4. Sketch/update a system schematic 5. Complete the Sanitary Survey Summary Report (Appendix B), providing a copy or copies to

the system per instructions on the report 6. Enter Site Visit in SDWIS, including Compliance Schedules to monitor the resolution of any

deficiencies found during the sanitary survey 7. Enter SDWIS Information and Data as necessary 8. E-mail a summary of SDWIS Changes to the DWP distribution list 9. Complete the Sanitary Survey Inspection Report (per instructions provided in this procedure) 10. Send completed report to Field Inspection Manager

B. INSPECTION PROCEDURE: The sanitary survey inspection is completed using the Small System Sanitary Survey Inspection Checklist found in Appendix A of this document. The checklist covers the required elements a Sanitary Survey:

1. General 2. Source 3. Treatment 4. Pumps (Facilities, controls, etc,) 5. Finished Water Storage 6. Distribution System

Page 5: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 5 of 54

7. Monitoring & Reporting and Data Verification 8. Management & Operations 9. Operator Compliance 10. Security 11. Financial

The following includes each of the above eleven categories broken down into inspection checklist bullets followed by related inspection details. Also included are example recommendations and requirements associated with any deficiencies found during the sanitary survey inspection.

1. GENERAL ___ Review System Summary with PWS contact

Is the system classification correct (C, NTNC, T)?

Is the population on record correct per the DWP Multiplication factors Policy DWP0084

Is the annual operating period correct?

Are the names of all points of contact correct with correct contact information

Are emergency phone numbers directed to individuals vs. general business numbers? (Using “Superintendent” for a school is acceptable)

Obtain/update valid e-mail address for key individuals

Capture an e-mail address on the System Summary sheet

___ Discuss violations that have occurred since the last sanitary survey

Violations will be listed on the System Summary

Discuss each violation and why it occurred

Ask what has been done to prevent a reoccurrence of the violation(s)

Help resolve public notification issues if possible

2. SOURCE

Note: for Small Systems (not PUC Regulated) that use surface water as a source, see the appropriate sanitary survey inspection report in either Appendix D or E.

___ Inspect each well Inspection Details

Grasp the well cap with both hands and try to move it to see if it is secure

Is the well cap a sanitary seal wellcap?

Does the well cap have a vent?

Is the vent screened with 24 mesh bug screen?

Is the conduit securely connected to the wellcap?

Is the well prone to be hit by vehicles, snow plows, recreational vehicles?

Requirements:

Well cap off/missing (Significant)(S.D.)

Secure/tighten well cap (Minor)(S.D.)

Secure conduit securely to the well cap (Minor)(S.D.) For a sanitary seal well cap,

Page 6: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 6 of 54

All public water systems shall have a watertight well cap at the termination of the well casing (Minor)(S.D.)

Install a vent if no vent is present (Minor)(S.D.)

Install bug (24 mesh) screen on vent if it is not screened properly (Minor)(S.D.) Recommendations:

Obtain funds for a sanitary seal well cap as available from the DWP

Provide bollards, large rocks, or a well tile to protect a well from being hit by a vehicle. ____ Identify potential sources of contamination within 300 feet each well Inspection Details

Is the well in a pit?

Can the pit drain by gravity?

Do pumps drain the pit… are the pumps working?

Are there water marks on the wall of the pit suggesting the water levels have risen above the well cap?

Does the well casing extend 18” above grade?

Does the land slope toward the well head leaving a pool of water around it during wet periods; is the well head subject to flooding? If yes, what can be done to prevent this?

Does the well have a good surface seal: no cracks or gaps around the casing?

Refer to the Potential Sources of Contamination (PSC) Form for a list of sources to look for/identify.

Inspect the condition water in a dug well (see requirement) Requirements

If the well is in a pit and covered with water, the casing must be raised to be 18” above grade. A sanitary seal cover under water is not acceptable (Significant) (S.D.)

The pit must drain by gravity or have active pumping capabilities. (Significant if water is above well head) (S.D.)

If the well head is flush to the ground and there are bacteria issues, require the casing to be raised to 18” above grade. (Significant) (S.D.)

Remove significant sources of contamination within the 300 foot circle such as gasoline, paint, or chemical storage, manure piles, or provide secondary containment if applicable. (either) (S.D.)

As part of the DWP sanitary survey inspection, a cover on a dug well must be removed to enable an inspection of the dug well and the water. Contact the Field Inspection Team manager if conditions are poor. Make the requirement to open the cover on a dug well known to the PWS owner in advance of the site visit to ensure that the cover can be moved (equipment to remove the cover is available if needed, e.g. a backhoe.

Recommendations

If the well is in a dry pit and no bacteria issues are present, recommend raising the well casing to be 18” above grade

If applicable, recommend better management of minor PSCs within the 300 foot circle

____ Does PWS own entire source protection area of their water source(s)? ____yes/no

Inspection Details:

Page 7: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 7 of 54

Requirements: Recommendations:

For source water protection, it is strongly recommended that a PWS have ownership or control of the primary source water protection area. The source water protection area is defined as a 300 foot radius for small systems, or a calculated radius for NTNC and small community systems with a population greater than 250.

____ (NTNC & C only) Are there zoning, ordinances, or other legal restrictions in place

in the source water protection area to limit activities that may threaten the source? ______ yes/no

Inspection Details: Requirements: Recommendations:

If a property within a 300 foot radius is not owned, an easement or ordinance may provide the protection/control that is needed. This information is taken into account when considering sampling schedules; incomplete ownership of the primary source water protection area may reduce the chance of obtaining a sampling waiver for some contaminants or increase the chance of requiring more frequent sampling, depending on the activities occurring in the primary source water protection area.

____ (NTNC & C only) Does PWS have an updated Source Water Protection Plan?

______ yes/no Inspection Details:

A Source Water Protection Plan may be in the form of a Wellhead Protection Plan (groundwater systems), or Watershed Protection Plan (surface water systems).

A plan designed to protect groundwater or surface water by eliminating or controlling sources of pollution to the surface and sub-surface area surrounding a well, well field, or surface water source. Plans cover a delineated area either a circle (300ft for small systems, or a calculated radius for NTNC and community systems with a population greater than 250). Plans have certain required elements, and include threat assessments and a plan to manage the threats. The SWPP will also identify all of the potential contaminant sources in the wellhead protection area.

If yes: Is the plan up to date and actively being used by PWS? _____yes/no o Clues to answer this question: o Has PWS actively implemented any part of the plan within the last 3 years?

Examples:

Reduction or elimination of PSCs identified in the Plan

Use of Best Management Practices to reduce identified threats to the source within the source water protection area

Public outreach and education to increase landowner’s and the general public’s awareness of need for source water protection

o Does the SWPP contain an updated inventory of PSC’s within the source water protection area?

o Can PWS produce a copy of the plan?

Recommendations:

Page 8: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 8 of 54

If system does not have a plan or it is not up to date and actively being used, the DWP should recommend creating one. The DWP can also give guidance and direction to help a PWS create a SWPP. Direct to contact Education and Outreach Coordinator on Water Resources Team.

____ If source is a spring, evaluate the condition of the spring Inspection Details:

Is the structure covering the spring structurally sound?

Is there a secure surface seal around the spring, and is surface drainage routed away from the spring?

Is the structure tight enough to keep rodents and insects out

Does the spring have an overflow that is screened with insect screen (24 mesh)?

Is the building vented?

Is the vent protected with insect screen (24 mesh) ____ Review the water system’s capability to meet the volume demands of the PWS Inspection Details

Can the system maintain a minimum of 20 psi at each service?

Has the system dewatered?

Does the system have a redundant source? Requirements

System must maintain a minimum of 20 psi at each service (either) (Significant if no water) (S.D.)

System must follow the DWP Drinking Water Order policy for dewatering events Recommendations

Plan ahead for future water needs at the PWS

Develop a redundant source in case of emergency and to facilitate well maintenance ____ Determine if the system has a raw water tap for each source Requirements

From the Maine Rules Relating to Drinking Water (Sec 3, F10), all new public water systems shall have a raw water (prior to any treatment or storage) sampling port. See “Source Water Sampling and Tap Installation Procedure” DWP0088 for installation details (Minor)

Recommendations

For existing sources, as part of the inspection (sanitary survey or other) a system can be required to install a raw water sampling tap in preparation for raw water sampling that will be required upon a positive routine bacteria sample. See DWP0088, 1A)

See DWP088 for best raw water tap design

Label the raw water tap as “Raw Water”

3. TREATMENT

Page 9: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 9 of 54

When evaluating treatment processes and equipment, consider the following:

Have changes to equipment, system, or processes occurred without the necessary DWP prior approval?

Is there water system equipment (valves, pumps, treatment, etc.) located in a confined space (valve pit, treatment pit)?

Are current material safety data sheets (MSDS) available for the specific chemical being used, located where that chemical is used (not in a central office offsite)?

Is the proper safety equipment, including personal protective equipment, available (e.g. chemical resistant gloves, safety glasses, splash shield, chemical apron, eyewash, hand washing sink, etc.)

Are chemicals labeled properly? Are secondary chemical containers labeled? (e.g. bleach bottles labeled, day tanks labeled)

Is secondary containment provided where needed (day tanks, drum chemicals)

Is housekeeping adequate?

Is electronic test equipment calibrated per manufacturer’s recommendations, annually at minimum or more frequently, depending on the device? (electronic meters including chorine and pH… pH meters are commonly calibrated at each use)

Are equipment maintenance logs kept? Are the logs kept at the equipment?

[See 8. MANAGEMENT & OPERATIONS, “___ Review Management and Operations Practices”, this document, for requirements and recommendations relative to the above bullets]

Whenever reasonable, record the configuration of treatment equipment on the Sanitary Survey Inspection Report to facilitate investigation at a later date, as needed.

What is inside each vessel, e.g.: o Anion (type) o Cation o Carbon o Filter aggregate o Birm (for iron & manganese removal) o Greensand o Calcite o Other

___ Evaluate NSF/ANSI 60 Certification of all chemicals in contact with drinking water Inspection Details

Look for marking on chemical containers indicating certification

Review shipping documentation for evidence of certification

Determine which certification entity has certified the chemical(s) to ANSI/NSF Std 60: Water Quality Association (WQA), National Sanitary Foundation (NSF), Underwriter’s Laboratory (UL).

As needed, use certification entity websites to verify certification

Waivers on this requirement may be possible.

See NSF guidance document and handout in section 30 of the Electronic Field Manual

Requirements

Page 10: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 10 of 54

Per the Maine Rules Relating to Drinking Water, all chemicals in contact with drinking water must be certified to meet ANSI/NSF Standard 60 – 2005: Drinking Water Treatment Chemicals – Health Effects. (Significant)

Label tanks identifying the contents/chemical/mineral inside (Minor) Recommendations

Have the system develop an SOP for receipt of chemicals to ensure proper certification upon chemical delivery.

___ Evaluate NSF/ANSI 61 Certification of all materials, products, and coatings in contact with drinking water

Inspection Details

Look for markings that indicate certification

Purchase specifications or shipping documents provided by the water system may indicate certification

As needed, use certification entity websites to verify certification

Waivers on this requirement may be possible.

See Maine Rule Related to Drinking Water for exemptions from this requirement.

See NSF guidance document and handout in section 30 of the Electronic Field Manual Requirements

Per the Maine Rules Relating to Drinking Water, all materials, products, and coatings that contact drinking water must be certified to meet ANSI/NSF Standard 61-2007: Drinking Water System Components – Health Effects. Check exemptions in Rule. (Significant)

Recommendations

Have the system develop a purchasing SOP that will ensure Std 61 certification on materials, products, and coatings in contact with drinking water.

___ Inspect treatment equipment and record components and connections on a schematic Treatment Inspection Details: ____ Chlorination

What is the chlorination used for? Disinfection or Oxidation?

Is the equipment operating properly?

Review Monthly Operating Reports

Does the chlorine pump turn on when the well pump turns on?

Is the chlorination feed “paced to flow” based on a flow meter?

Are chlorine residual measurements being taken and submitted on Monthly Operating reports – chlorine measurements must also be taken at the time bacteria samples are taken.

Have the owner/operator show you how they take a chlorine residual and provide training as needed

For required chlorination, is there adequate contact time?

Can the system meet 4-log inactivation if necessary?

Page 11: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 11 of 54

Is the chlorine tank being filled properly and frequently enough to enable continuous operation?

Does the unit have a multifunction valve and is it operating properly… the pump does not become air bound?

Requirements

Systems triggered by a ground water rule violation must meet 4-log inactivation of viruses by a combination of proper dosing of chlorine and providing adequate contact time. (Significant) (S.D.)

All new chlorination systems required by the DWP must designed to meet 4-log removal of viruses, but only have to operate to 4-log if required by the ground water rule.

Recommendations

Develop a written SOP on operating the chlorination system

Include the day tank mixture recipe on the side of the day tank

A peristaltic pump is preferred over a diaphragm pump

Refer to the DWP Chlorination System Design Guidelines ___ Inspect Chlorine Contact Tanks

Inspection Details

Confirm that the contact tank is a flow-through contact tank (the easiest way to tell this is when a contact tank has an inlet pipe at the top and an outlet pipe at the bottom. If tank has only one inlet/outlet connection, the internal piping of the tank may make it a contact tank by design. In this case, record the tank make and model and verify internal piping design on its product specification sheet… web search for spec sheet)

Is the tank structurally sound; is the tank damaged?

Is there corrosion visible?

Is the tank leaking?

What is the tank’s volume?

Does the tank provide 10 minutes of contact time (well gal/min x 10 min = contact tank volume (gallons) required for 10 minutes of contact time.

(Optional, unless triggered by the Ground Water Rule) Calculate “CT” time with available CT calculator to verify that system can reasonably meet 4-log inactivation of viruses if necessary

Requirements:

Repair or replace tank if it is leaking (Minor) (S.D.)

Newly installed chlorination systems must be designed to be capable of achieving 4-log inactivation of viruses yet do not have to operate at 4-log unless triggered by the Ground Water Rule. Meeting this requirement involves an achievable chorine dose and an appropriate contact tank size. See DWP available CT calculator.

Recommendations:

Plan for replacing the tank if condition is poor or if heavy corrosion exists

Page 12: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 12 of 54

____ Adsorptive Media

What is the adsorptive media removing?

What is the predicted life of the media?

What testing is done to evaluate the performance of the media as a method of determining when the media should be changed out?

How will the media be disposed of properly?

Requirement

Media disposal method must meet state and federal disposal requirements. Work with media supplier to identify proper disposal methods and potential disposal issues. (Minor)

Recommendations

Develop a plan for media replacement ____ Aeration

What is the aeration used for?

Is the aeration provided by a blower or by an air inlet eductor?

Does the blower aerator have a HEPA filter on the air inlet?

Is the air outlet properly vented outside the building? Is the vent screened?

Requirements

For radon removal, the external vent needs to extend above roof level to avoid human contact with exiting air. (Minor)

Vent must be screened ( ¼ ” to ½” mesh) to prevent birds from entering. (Minor)

The area surrounding an air inlet eductor must be clean and free of dust and debris. (either) (S.D.)

Recommendations

A system that is having bacteria problems should be using a HEPA filter on an aeration system air inlet

____ Ion Exchange (including water softening)

What is the ion exchange system removing?

How frequently does it backwash?

How is the backwash waste water disposed of?

Is the brine tank full of salt?

Is the salt ANSI/NSF Standard 60 certified?

Is the brine tank full of water? (softener not working properly?)

When (time of day) does the backwash cycle occur? (Backwash cycle should occur when water is not being used)

Requirements

Ion exchange backwash waste water can be disposed of in a sanitary leach field or a Publically Owned Treatment Works (POTW.... a municipal sewer). Waste water may not be disposed of in a leach field built specifically for ion exchange backwash only. (Minor)

Backwash waste water may not be disposed of on the ground or in a dry well. (Minor)

Page 13: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 13 of 54

Where backwash waste water lines drain into a sewer pipe, an air gap of two times the inlet diameter pipe must be maintained. Air gap fittings approved by the plumbing code are “listed and labeled”. (Significant) (S.D.)

Use ANSI/NSF Std 60 Certified Salt (Significant)

Recommendations

Have the ion exchange system serviced/maintained annually

Keep brine tank filled with salt.

Develop a written SOP for operating the ion exchange unit which will include how often to fill the brine tank with salt.

____ Corrosion Control - Inhibitor Addition

What is the chemical being used?

Is the chemical dose under the maximum recommended does? (information on this should be on the MSDS or NSF literature)

How is the dosage of this chemical measured?

What criteria will be used to determine is a change in dosage is needed?

Is the chemical ANSI/NSF Std 60 Certified?

Is injection or delivery equipment working properly?

Review Monthly Operating Reports ____ Sediment Filters (including cyclone type)

How is it determined that a sediment filter needs to be replaced/cleaned?

When was the last time a sediment filter was replaced/cleaned?

Recommendations:

Create a schedule or SOP for sediment filter replacement (or cleaning if applicable)

____ Activated Carbon

What is the purpose of the carbon?

How is it determined that a carbon filter needs to be replaced?

When was the carbon filter last replaced?

Does the carbon remove chlorine at a system that is required to have a chlorine residual?

Requirements:

A carbon filter cannot remove chlorine from a system that is required to chlorinate, except as point of use (POU) device for drinking purposes, such as a restaurant serving glasses of water. In this exception, routine bacteria sampling is not taken after the POU carbon filter. (Significant) (S.D.)

Recommendations:

Create a schedule or a written SOP for carbon filter replacement ____ Ultraviolet (UV) Radiation

Is the unit operating?

Does the unit shut down flow upon a unit malfunction?

Is there a piped bypass around the unit?

Page 14: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 14 of 54

Is there a pre-filter? Has it been maintained?

Is the unit NSF 55 certified? (Certified units will shut down flow when there is an equipment failure)

See DWP UV Policy DWP0047 Requirements

UV systems can have a hard piped bypass as long as the bypass valve has a durable tag attached to it indicating that upon opening the bypass valve, the system will be on a Boil Water Order (whether the UV was required for disinfection or not) and to call the DWP.

All UV systems used for disinfecting drinking water must be NSF 55 or ANSI/NSF Std 61 certified. (Significant)

Recommendations

Have a maintenance plan for the UV device. Maintenance can be provided by a maintenance contract. Either keep a spare bulb(s) onsite, or have a method to rapidly obtain a spare if needed. Bulb manufacturers commonly recommend annual bulb replacement

Refer to the DWP UV Policy DWP0047

____ Reverse Osmosis (RO)

Is the unit operating properly?

How is the discharge water disposed of?

Is there a pretreatment filter and is it being maintained?

Requirements

RO waste water can be disposed of in a sanitary leach field or a Publically Owned Treatment Works (POTW.... a municipal sewer). Waste water may not be disposed of in a leach field built specifically for Reverse Osmosis waste water only. (Minor)

RO waste water may not be disposed of on the ground or in a dry well. (Minor)

Where RO waste water lines drain into a sewer pipe, an air gap of two times the inlet diameter pipe must be maintained. Air gap fittings approved by the plumbing code are “listed and labeled”. (Significant) (S.D.)

Recommendations

Schedule regular pretreatment filter changes as needed.

Have the RO unit maintained annually ____ Point of Use (POU) for regulated contaminants

Does the POU device use a filter, reverse osmosis, adsorptive media, or other type of treatment?

How long has it been since the filter or membrane has been replaced

Is an operations and maintenance manual present that would supply a part number to use when replacing the filter or membrane

Are samples taken from this point of use unit (refer to sampling plan)

Are there permanent signs displayed over all other faucets in the facility directing consumers not to use the water for consumption

Do signs direct individuals where to get water for consumption?

Page 15: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 15 of 54

Are the POU devices secured to avoid tampering by unauthorized personnel? (i.e. locked underneath the sink cabinet )

Requirements

Routine monitoring samples can only be taken from the point of use if agreed upon by the DWP Compliance Officer. The PWS sampling plan should provide sampling details.

Recommendations

Replace POU filters per manufacturer’s recommendations

____ pH Adjustment

What is the chemical being used?

Is the chemical ANSI/NSF Std 60 Certified?

Is injection or delivery equipment working properly?

Review Monthly Operating Reports if used (calcite contactors do not require a MOR)

For Calcite Contactors, inspect to make sure there are solids in the contactor… chips can stain the contactor walls, making it appear that material is inside when is it actually empty.

____ Iron and Manganese Removal

What is the process/chemical being used?

Is the chemical ANSI/NSF Std 60 Certified?

Is injection or treatment equipment working properly?

Review Monthly Operating Reports ____ Other Treatment (Name)*: ____________________ (boiler water treatment, manufacturing process water treatment)

What is the process/chemical being used?

Are pipes providing treated process water labeled appropriately?

Are potable water taps taken off from treated process water piping (eg. for an eyewash, water fountain, sink)?

If a chemical is used in contact with potable water, is the chemical ANSI/NSF Std 60 Certified?

Is the treatment equipment working properly?

Review Monthly Operating Reports

Requirements

The use of chemicals to treat water used in a boiler require that a Reduced Pressure Zone Backflow Preventer (RPZ) be placed on the line supplying water to the boiler. (Significant if no backflow protection)

When water treatment is provided for manufacturing process water, an appropriate cross connection control device must be installed on the line supplying water to the manufacturing process, before the water treatment application. (Significant if no backflow protection)

Treated process water cannot be used for potable purposes. Recommendations

Page 16: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 16 of 54

Properly label all piping carrying treated waste with flow arrows so these lines are not confused with potable water lines.

In a manufacturing environment, label all potable water lines and provide arrows to show flow direction.

Note: When a water treatment system wastewater is discharged to a water body, a dry well, or to a leach field that does not manage sanitary waste, the field inspector or supervisor needs to contact the DEP (by e-mail, phone, in person) about the issue. The only exception known at this time is for a water stream emitted by a continuous analyzer that does not use a reagent (straight water) discharged to a dry well.

____ Check for hard piped bypasses around required treatment

Requirements:

Hard piped bypasses are not allowed on required treatment, but a removable pipe section (flexible or hard) with quick disconnect fittings is acceptable for use when equipment is being maintained. The only exception to this is for Ultra Violet systems (see UV treatment section below) (either) (S.D. if bypass is around required disinfection)

____ Identify Inactive Treatment Equipment

Requirement

Physically disconnect any inactive treatment equipment to eliminate the potential of contamination due to a stagnant system being connected to the water system. (Minor)

____ Evaluate Cross Connections Related to the Treatment Equipment.

Identify high hazard (health risk) and low hazard (no health risk) cross connections Requirements

All high hazard and low hazard cross connections must be protected by backflow prevention devices as specified in the Maine Internal Plumbing Code, Chapter 6. Water Supply and Distribution (either) (may be a S.D., depending on the potential contamination)

All testable backflow protection devices must be tested on an annual basis. (either) (may be a S.D.)

All Community PWS with a cross connection (low or high) and all non-community PWS with a high hazard cross connection must have a Cross Connection Control Program (See the Model Cross Connection Control Program for Non-PUC Regulated PWS, DWP0089) (either)

4. PUMPS (FACILITIES, CONTROLS, ETC.)

___ Inspect Pumping Facilities Inspection Details

Is all of the pumping equipment operable and in good condition? (submersible, jet-pump, centrifugal, vertical turbine, chemical feed pumps) e.g. leaking water, excessive vibration, noise?

Page 17: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 17 of 54

Are there redundant pumping facilities?

Are replacement pumps and/or parts onsite or rapidly available? Requirements:

Repair any leaks (Minor) (may be a S.D.) Recommendations:

Create redundant pumping facilities

Maintain pump spare parts or a complete replacement pump

When pumping problems exist, ensure pump is sized appropriately (too big, too small) (leading to cavitation, inefficiency)

5. FINISHED WATER STORAGE

___ Inspect Atmospheric Storage Tanks Inspection Details

Is the tank structurally sound; is the tank damaged?

Is there corrosion visible?

Is algal growth visible on the inside or outside?

Is the tank leaking?

What is the tank’s useable volume?

Does the system run out of water; is the storage size adequate for the system?

Are controls related to tank level adequate? (is there a high level cutoff of some kind?)

Is the tank vented?

If outside, is the vent protected so that rainwater does not enter the tank?

Is the tank vent screened (inside or outside tank) with insect screen (24 mesh screen)

Is stagnation a problem; does the tank turn over at least 25% of its volume each day?

How long has it been since the tank has been cleaned?

Is there an overflow pipe? Is it screened with insect screen (24 mesh)?

Is the overflow pipe connected directly to a sewer (cross connection)

Can the tank be isolated from the system for maintenance purposes?

Is there a procedure to maintain water supply when the tank is out of service for maintenance?

Is the tank made of a material that is compatible with water? (Yes = steel, stainless steel, galvanized steel [not preferred], food grade plastic, concrete, coated concrete, glass lined) (no= polyethylene, PVC, wood)

Is the interior surface coating approved (ANSI/NSF 60 certified)?

Is there a tank that is out of service yet still connected to the system (simply valved off)? Requirements:

Repair or replace tank if it is leaking (Minor) (S.D.)

Screen tank vent and/or overflow (Minor) (S.D.)

An overflow pipe outlet must have an air gap between it and a sewer line of 2x dia of the overflow pipe, but not less than 1 inch. (Significant)(S.D.)

If the overflow is outside, the overflow must be constructed so that it drains freely and will not be impeded by snow or ice (terminates 12-24” above the ground) (Minor) (S.D.)

Page 18: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 18 of 54

Clean and/or disinfect tank if positive bacteria sample occurs and the tank has not been cleaned recently

Tank material and inside coating must be compatible with water (See Maine Rules for NSF/ANSI Std 61 requirements and exemptions) (Significant)

Physically disconnect any tank that is not in use yet is still hard-pipe connected to the system (only valved off from system). (Minor) (S.D.)

Recommendations:

Clean atmospheric tanks approximately every 5 years (depending on water quality and system), and disinfect annually.

Clean plastic atmospheric tanks annually.

Plan for replacing tank if condition is poor or if heavy corrosion exists

Provide adequate storage capacity to avoid running out of water

Provide adequate controls to prevent overfilling

Size storage to prevent excess stagnation (as evidenced by poor water quality or positive bacteria samples)

Be able to isolate tank from system

Create a written SOP for tank maintenance (cleaning), disinfection, and water system operation during maintenance activities (how to operate without the tank, or, water system will be shutdown).

Plan for replacement of a galvanized steel storage tank

Install a splash plate or rock bed for outfall from the overflow to prevent erosion. ___ Inspect Pressure (Bladder) Tanks Inspection Details

Is the bladder tank waterlogged (bladder broken): no sweat line (depending on the humidity, sweat will be present where water is in the tank, while there will be no sweat on the portion of the tank that is filled with air… look for a line demarking sweat from no-sweat), no change in tapping sound between top half and bottom half of bladder tank (thud everywhere=waterlogged). Another indicator of a waterlogged bladder tank is that the well pump comes on immediately as soon as there is any demand (faucet turned on)… pressure drops immediately and the well pump kicks on immediately.

Is the tank structurally sound; is the tank damaged?

Is there corrosion visible?

Is the tank leaking?

What is the tank’s useable volume? This varies depending on the pressure switch range [20-40 psi, 30-50 psi, 40-60 psi] (see Manufacturer’s Specs for details)

Is the bladder storage size adequate for the system; does the pump run constantly or turn on frequently (refer to pump duty cycle if questions)?

Is there a tank that is out of service yet still connected to the system (simply valved off)? Requirements:

Replace waterlogged bladder tanks (broken bladder). (Minor) (S.D. if bacteria are present)

Replace leaking tanks (Minor) (S.D.)

Physically disconnect any tank that is not in use yet is still hard-pipe connected to the system (only valved off from system) (Minor) (S.D.)

Page 19: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 19 of 54

Recommendations:

Plan for replacement of corroded tanks

Provide adequate bladder tank volume to enable operation of the well pump within its rated duty cycle (how frequently it turns on an off)

___ Inspect Hydro-pneumatic Pressure Tanks (air over water) Inspection Details

Is the tank structurally sound; is the tank damaged?

Is there corrosion visible?

Is the tank leaking?

What is the tank’s useable volume?

Does the system run out of water; is the storage size adequate for the system

How is air space maintained/ensured above the water: is the tank waterlogged?

If a lubricated air compressor is used, does the compressor use a food grade lubricant?

Is stagnation a problem; does the tank turn over at least 25% of its volume each day?

Can the tank be cleaned? If yes, how long has it been since the tank has been cleaned?

Can the tank be isolated from the system for shock chlorination or maintenance purposes?

Is there a procedure to maintain water supply when the tank is out of service for maintenance.

Is there a tank that is out of service yet still connected to the system (simply valved off)? Requirements:

Repair or replace tank if it is leaking (Minor) (S.D.)

Clean and/or disinfect tank if positive bacteria sample occurs and tank has not been cleaned recently

If a lubricated air compressor is used, a food grade lubricant must be used. (Minor)

Tank material and inside coating must be compatible with drinking water (See Maine Rules for NSF/ANSI Std 61 requirements and exemptions) (Significant)

Physically disconnect any tank that is not in use yet is still hard-pipe connected to the system (simply valved off) (Minor) (S.D.)

Recommendations:

Clean tank approximately every 5 years (depending on water quality and system characteristics), and disinfect annually.

Plan for replacing the tank if condition is poor or if heavy corrosion exists

Provide adequate storage capacity to avoid running out of water

Size storage to prevent excess stagnation (as evidenced by poor water quality or positive bacteria samples)

Be able to isolate tank from system

Create a written SOP for tank maintenance (cleaning), disinfection, and water system operation during maintenance activities (how to operate without the tank, or, water system will be shutdown).

Plan for replacement of a galvanized steel storage tank 6. DISTRIBUTION SYSTEM

Page 20: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 20 of 54

___ Evaluate the Distribution System Inspection Details

Is there a map of the distribution system, is it accurate, and does it identify problem areas (low flow, low pressure)?

Have there been breaks in the distribution system?

Does the system have known leaks currently?

Is there a sense of how much water is lost due to leaks?

Is there an SOP for flushing the distribution system?

For systems operating year round, are there sections of pipe that are susceptible to freezing?

Does the distribution system pressure maintain 20 psi?

Does the system have dead ends that create water quality issues?

Requirements:

The system pressure must maintain a minimum of 20 psi at each service.

The DWP Drinking Water Order Policy (DWP0061) must be followed for loss of pressure events.

Recommendations:

Create an accurate map of the distribution system, identifying problem areas

Create an SOP on how to properly flush the system

For systems with service connections, install meters for identifying leaks by comparing water produced vs. water delivered

Bury pipe with five feet of cover minimum to prevent freezing

Loop dead ends whenever possible ____ Determine/ Evaluate Cross Connections in the Distribution System.

Identify high hazard (health risk) and low hazard (no health risk) cross connections

A community PWS with a high or low Hazard cross connection are required to have a Cross Connection Control Plan.

A non-community PWS with a high hazard cross connection is required to have a Cross Connection Control Plan

See the Model Cross Connection Control Program for Non-PUC Regulated Public Water Systems, DWP0089

Requirements

All high hazard and low hazard cross connections must be protected by backflow prevent devices as specified in the Maine Internal Plumbing Code, Chapter 6. Water Supply and Distribution. (either) (may be a S.D., depending on the possible contamination)

All testable backflow protection devices must be tested on an annual basis. (either) (may be a S.D.)

All Community PWS with a cross connection (low or high) and all non-community PWS with a high hazard cross connection must have a Cross Connection Control Program (See the Model Cross Connection Control Program for Non-PUC Regulated PWS, DWP0089) (either)

Page 21: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 21 of 54

Recommendations

For critical equipment at a critical facility (hospital boiler using chemicals), recommend parallel backflow devices that will enable testing of each without service interruption.

____ Create or Review an Existing Sampling Site Plan

Specify where routine bacteriological samples are taken on a sketch or simply write down on the sanitary survey report where the samples are taken from. (Consider taking a picture of the site for additional detail)

____ Evaluate sanitary condition of the sampling location Requirements:

If sampling point is inadequate, require that sampling point (faucet) be replaced or an alternate, adequate sampling point be used. (either) (may be a S.D.)

____ Review Bacteria Sampling Technique with PWS Contact

Have PWS contact describe how they take a sample and provide training on sampling techniques as needed

If the system chlorinates, have the individual take a residual in your presence. Provide training as needed

Is the faucet strainer removed before sampling

Is the faucet end disinfected with bleach one minute before turning on water

If the base of the faucet is leaking water, disinfect the faucet base with bleach

Run water for 5 minutes at a steady stream

Turn water down to a slow and steady stream and allow to run for one minute

If the unused bottle has a liquid or powder in it, do not remove it.

Take cap off bottle, hold cap in hand and fill sample bottle to the fill line, which will leave an air space at the top of the bottle. If a fill line is not present on the bottle, leave a small (1/4 inch) air space at the top of the bottle.

Remove bottle from stream of water and put cap back on bottle tightly.

If cap or open bottle drops, do not use the bottle… get another bottle

____ For Seasonal Systems, Evaluate Procedure for Shutdown and Startup Recommendations

Drain above ground lines and/or purge with compressed air before shut down (air compressor needs to use food grade lubricant or be of the “oil-less” type)

Disinfect well and distribution system upon startup

Take an O&M bacteria sample before using system

Recommend that the system create a written procedure on how to accomplish the above tasks

7. MONITORING & REPORTING AND DATA VERIFICATION

___ Ensure PWS understands their sampling requirements Inspection Details

The annual sampling schedule will be on the new System Summary

Page 22: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 22 of 54

Review annual sampling requirements with system (does the PWS contact understand the sampling requirements?)

Refer PWS to DWP Compliance Officer for detailed questions

A Designated Operator (DO) is responsible for ensuring that sampling is done correctly and on-time. Sampling may be done by a person other than the DO.

Requirements

Samples must be processed by a Maine certified lab (make sure the lab is certified for the specific test being taken)

Samples must be collected within the pre-determined compliance period Recommendations

Sample early within a compliance period to avoid problems with sample shipping or laboratory problems; don’t wait until the last minute

If the DO delegates sampling to another individual, recommend that the DO create a written procedure for the sampler.

If your public water system personnel have questions, call the Compliance Officer for that water system

____ Review Monthly Operating Reports (MORs) with PWS

Inspection Details

Ask to see recent MORs

Briefly review data entries and provide training as needed

Determine if MORs are being submitted for all chemical additions (chlorine, pH adjustment, corrosion inhibitors, etc.)

If the system has a Designated Operator (DO), are the MORs being signed by the DO?

For systems that chlorinate, verify that a chlorine residual is taken at the sample site when each routine bacteria sample is taken, and residual is recorded on MOR.

Requirements:

MORs must be sent to the DWP before 10th of the following month. (Minor)

Maine Rules Related to Drinking Water require that MORs be signed by the designated operator.

Not taking residuals measurements at all when required is considered a (Significant) deficiency. (S.D. if disinfection related)

Recommendations:

Send MORs to the DWP electronically

PWS keeps a copy of all MORs submitted to the DWP

8. MANAGEMENT & OPERATIONS ___ Determine if the PWS has a written emergency response plan

A PWS that is required to have a designated operator is required to have an adequate emergency response plan

All public water systems in Maine should have a written emergency response plan

Refer to the DWP Website (www.medwp.com) for the template “Emergency Response Plan of Action for PWS serving less than 500”

Page 23: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 23 of 54

___ Review Management and Operations Practices Inspection Details

A PWS that is required to have a designated operator is required to have adequate operational procedures.

Does the system have written SOPs for critical operations such implementing a Boil Water Order, disinfecting the system, isolating parts of the system, flushing the system, shutdown and startup for a seasonal PWS, etc.

Have changes to equipment, system, or processes occurred without the necessary DWP prior approval?

Is there water system equipment (valves, pumps, treatment, etc.) located in a confined space (valve pit, treatment pit)?

Are current material safety data sheets (MSDS) available for the specific chemical being used, located where that chemical is used (not in a central office offsite)?

Is the proper safety equipment, including personal protective equipment, available (e.g. chemical resistant gloves, safety glasses, splash shield, chemical apron, eyewash, hand washing sink, etc.)

Are chemicals labeled properly? Are secondary chemical containers labeled? (e.g. bleach bottles labeled, day tanks labeled)

Is secondary containment provided where needed (day tanks, drum chemicals)

Is housekeeping adequate?

Is electronic test equipment calibrated annually? (electronic meters including chorine and pH)

Are equipment maintenance logs kept? Are the logs kept at the equipment?

Does the PWS have a plan incase the water system is unable to keep up with demand, potentially due to equipment malfunction?

Does the system have an emergency generator to power their water system (note that if their sanitary wastewater system requires pumping, emergency generation must be provided for both water and wastewater in order to be valuable)

Does the PWS have a long term plan for maintaining their water system?

Are waste chemicals disposed of properly? Requirements:

A PWS that is required to have a Designated Operator is required to have “adequate operational and emergency response procedures”. (Minor)

As described on the Maine Department of Labor website, private sector employers are required to comply with the OSHA Safety and Health Regulations. The rules for public sector employees generally follow but are not necessarily identical to OSHA regulations covering the private sector. (either)

All changes and additions to the source, treatment, or storage must be approved by the DWP prior to making the changes or additions. System that have not received approval before making changes or additions have met the criteria for a violation. (either) (may be a S.D.)

OSHA requires that current MSDS for chemicals used are kept at the location where the chemical is used. The DWP requirement to the PWS is that they follow OSHA requirements for MSDS. (either)

Page 24: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 24 of 54

OSHA requires that proper safety equipment, including personal protective equipment, be available for water system personnel. The DWP requirement is for the PWS to follow OSHA requirements for having/using proper safety equipment. (either)

OSHA requires that chemicals are labeled properly, including secondary containers (e.g. day tanks). The DWP requirement is for the PWS to follow OSHA requirements regarding chemical container labeling. (either)

OSHA has requirements regarding the use of secondary containment for chemical storage. The DWP requirement is for the PWS to follow OSHA requirements related to the secondary containment of chemicals. (either)

Only use calibrated electronic test equipment (Calibrated per manufacturer’s specs) (either) (may be a S.D.)

Recommendations:

Create written SOPs for critical water system functions such as Boil Water Order, disinfecting the system, isolating parts of the system, flushing the system, shutdown and startup for a seasonal PWS, etc.

Remove confined spaces to facilitate safe access to critical water system components (DWP Field Inspectors do not enter confined spaces)

Keep good housekeeping practices regarding water system components and the facilities that they are located in

Follow manufacturer’s recommendations regarding the calibration of electronic test equipment.

Keep maintenance logs for all appropriate water system equipment. Keep logs available at the equipment.

Create a water conservation plan for use during emergencies

Provide emergency generator power for water (and wastewater system if pumped)

Develop a long term plan for maintaining the water system

When a PWS has potential OSHA issues, refer the PWS to “Safety Works” – Maine Department of Labor (623-7900 or 1-877-723-3345), for free and confidential consultation.

9. OPERATOR COMPLIANCE (for surface water Transient, NTNC, and Small C PWS) ___ Complete system points calculation form and include form with the sanitary survey inspection report.

Use Maine Rules Relating to the Licensure of Water System Operators, including Appendix A, to determine system classifications. The form comes from these rules.

Verify both treatment and distribution classifications for the PWS.

If the operator point tally shows that the PWS’s current treatment and/or distribution system classification is different than what is show in SDWIS, change the operating category in SDWIS either up or down to reflect the points tally made at this sanitary survey [treatment and distribution classifications can be changed downward]. Work with the system as needed to ensure that the PWS has operators with licenses that meet the classification of the PWS.

____ Verify that the PWS has a properly licensed operator(s)

Verify that the necessary Designated Operator forms have been submitted to the DWP. (Significant)

Page 25: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 25 of 54

____ Explain licensed operator responsibilities (re. all quality and quantity decisions)

The Maine Rule Related to Drinking Water state that all operating personnel making process control system integrity decisions about water quality or quantity that affect public health must be licensed.

For a contract operator, the contract must support the licensed operator being involved with all water quality and quantity decisions.

Refer to the Owner & Licensed Operator Responsibilities sheet located in DWP0071, provide PWS with a copy.

10. SECURITY

____ Identify and convey potential security concerns Inspection Details

Is water system equipment accessible by the public?

Is the water system in a locked location?

Does the system have a locking sanitary seal wellcap? Recommendations:

Keep water system equipment in a locked location, not available to the public.

Install fencing around outdoor pumping and storage facilities

Install a locking sanitary seal well cap. Contact the DWP for potential funding assistance regarding this.

11. FINANCIAL

___ Does the PWS have a financial plan if a major problem occurs with the water system? Recommendation

It is recommended that a PWS plans in advance on how to financially deal with a major water system failure, should it occur.

C. INSPECTION REPORT:

1. The completed Small Groundwater System Sanitary Survey Inspection Checklist 2. A copy of the completed Sanitary Survey Summary Report 3. Completed “Inspection Report: Site Directions and Diagrams”

Include pictures with descriptive comments

Include a schematic of the system 4. Include sampling site plan information (where routine bacteria samples are taken) on the

Inspection Report or provide a Supplemental Inspection Report (blank page) with a sketch of the sampling site plan

5. Include a Google Earth picture page or road map of the PWS location (optional) 6. Include a Google Earth picture with Potential Sources of Contamination (PSCs) identified

within 300 feet of the well, or provide a sketch if Google Earth is not available. 7. Include any letter written to the PWS as a result of the sanitary survey

D. SDIWS Entry Related to a Sanitary Survey

Page 26: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 26 of 54

1. Entering the Site Visit

Open a new Site Visit in SDWIS

Enter type of visit (SNSV)

Enter Date of visit

Enter for eleven elements (not applicable, not evaluated, no deficiencies/ recommendations, recommendation(s) made, minor deficiency(ies), significant deficiency(ies))

Enter inspector name and mark name as “priority”

Associate names of others on site or not (?) TBD

Calculate next visit date (SDWIS calculates this)

Enter compliance schedules for any deficiency 2. Enter/Update SDWIS Inventory

Bring up the PWS in SDWIS Inventory

Update service connections

Update population

Update operating period if needed

Initiate changes to Points of Contact (minor “Inventory” changes made by field inspector, for major changes involving changes to Legal Entities, use the Point of Contact Change (POC) form)

Update well information/data

Update setback indicators

Update storage information/data

Update Treatment information/data

Update Facility Flows

E-mail a SDWIS update summary to the DWP distribution Note: refer to specific SDWIS procedures in the Electronic Field Manual E. Equipment Needed for a Sanitary Survey

Safety Glasses

Chlorine Residual Test Kit

Generic sample kits

DWP handouts/forms

Small Bottle of Clorox Bleach

Camera

Pen/Pencil

clipboard

Blackberry (cell phone)

Flashlight

300 Foot Tape Measure

Steel toed shoes/boots for construction or industrial environments where OSHA requires foot protection

Blaze orange vest during hunting season ASSOCIATED DOCUMENTS/REFERENCES:

Page 27: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 27 of 54

40 CFR Sec 142.16 (b) 3 [requirements of a sanitary survey] Field Data “System Summary” for a specific PWS Form - Potential Sources of Contamination (PSC), Current or Past Drinking Water Orders Policy, DWP0061 DWP Multiplications Factors Policy, DWP0084 Source Water Sampling and Tap Installation Procedure, DWP0088 Maine Cross Connection Rules Maine Internal Plumbing Code Model Cross Connection Control Program for Non-PUC Regulated Public Water Systems,

DWP0089 DWP UV Policy, DWP0047 Policy for Administering the Maine Rules Relating to Drinking Water Regarding a PWS

Operating Without a Licensed Operator, DWP0071 Policy and Procedure for DWP’s Role in Addressing a Designated Operator’s Failure to

Perform the Operator’s Duties for a PWS Properly (DWP0183) DWP Electronic Field Manual DWP Chlorination System Design Guidelines EPA Drinking Water Inspection Field Reference for Small Ground Water Systems EPA Drinking Water Inspection Field Reference for Small Surface Water Systems Sample Site Plan SOP (DWP0192) SUPERCEDED DOCUMENTS: Field Inspector Sanitary Survey Checklist (all versions are obsolete) RETENTION:

This document is retained per the DWP Document Retention Requirements. REVISION LOG

Section Page Rev. Date Description Of Change Approved by: Original 3-14-2012

Nathan Saunders

Appendix B

31 A 7-21-2014 Modified language related to the Notice of Noncompliance in

Appendix B

Nathan Saunders

Definitions. Inspection Procedure.

Several B 3-4-2015 Defined each deficiency as Minor or Significant. Identified applicable deficiencies as “Sanitary Defects” Added related definitions and Appendix F – Sanitary Defects

Nathan Saunders

Exec Sum. Inspection Procedure 2 Source. Survey Checklist Appndx G.

1, 6-8, 29,50

C 3-13-2015 Modified questions related to source water protection. Added inspection details for small “spring water” bottlers- Appendix G.

Nathan Saunders

Page 28: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 28 of 54

Appndx H 52 D 5-27-15 Added Appndx H: Small System Sanitary Survey Deficiency Bullets

Nathan Saunders

Page 29: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 29 of 54

Appendix A

Small System Sanitary Survey Inspection Checklist

See the following page

Page 30: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 30 of 54

PWS Name:_____________________________________________ PWSID# ________________

Field Inspector: _________________________________________ Date: ___________________ Check all items evaluated. A blank line will denote that the item was not applicable (N/A) for this PWS. ___ Review System Summary with PWS contact ___ Discuss violations that have occurred since the last sanitary survey ___ Inspect each well ___ Identify potential sources of contamination within 300 feet each well

___ Does PWS own entire source protection area of their water source(s)? ____ yes/no ___ (NTNC & C only) Are there zoning, ordinances, or other legal restrictions in place in the source water

protection area to limit activities that may threaten the source? ____ yes/no ___ (NTNC & C only) Does PWS have an updated Source Water Protection Plan? ____ yes/no

____ If yes: Is the plan up to date and actively being used by PWS? ____yes/no ___ If source is a spring, evaluate the general condition of the spring ___ Review the water system’s capability to meet the volume demands of the PWS ___ Determine if the system has a raw water tap for each source

___ Inspect treatment equipment and record components and connections on a schematic ___ Evaluate NSF/ANSI 60 Certification of all chemicals in contact with drinking water

___ Evaluate NSF/ANSI 61 Certification of all materials, products and coatings in contact with drinking water

___ Chlorination ___ Adsorptive Media ___ Inspect Chlorine Contact Tanks ___ Aeration ___ Ion Exchange (incl. water softening) ___ Corrosion Control - Inhibitor Addition ___ Sediment Filters (including cyclone type) ___ Activated Carbon ___ Ultraviolet (UV) Radiation ___ Reverse Osmosis (RO) ___ Point of Use for Regulated Contaminants ___ pH Adjustment ___ Iron and Manganese Removal ___ Other Treatment (Name)*: _____________________________________________

(*boiler water treatment, manufacturing process water treatment) ___ Check for hard piped bypasses around required treatment ___ Identify Inactive Treatment Equipment

___ Evaluate Cross Connections Related to the Treatment Equipment ___ Determine/Evaluate Cross Connections in the Distribution System. ___ Inspect Pumping Facilities ___ Inspect Atmospheric Storage Tanks ___ Inspect Pressure (Bladder) Tanks ___ Inspect Hydro-pneumatic Pressure Tanks (air over water) ___ Evaluate the Distribution System ___ Create or Review an Existing Sampling Site Plan ___ Evaluate sanitary condition of the sampling location ___ Review Sampling Technique with PWS Contact ___ For Seasonal Systems, Evaluate Procedure for Shutdown and Startup ___ Ensure PWS understands their sampling requirements

___ Review Monthly Operating Reports (MORs) with PWS ___ Determine if the PWS has a written emergency response plan ___ Review Management and Operations Practices

___ Complete system points calculation form, include with survey inspection report. ___ Verify that the PWS has a properly licensed operator(s) ___ Explain licensed operator responsibilities (re. all quality and quantity decisions) ___ Identify and convey potential security concerns ___ Does the PWS have a financial plan if a major problem occurs with the water system ___ Ask Appendix G questions for Small Water Bottlers or Small Bulk Load-out Stations with spring source.

Maine Drinking Water Program Small Groundwater System Sanitary

Survey Inspection Checklist

Page 31: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 31 of 54

Notes: __________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________

Page 32: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 32 of 54

Appendix B

Sanitary Survey Summary Report

See Following Page For printing purposes, the electronic file for this form is located at G:\DWP\Field Inspection\Sanitary Survey\SS Forms\Sanitary Survey Summary Report X-XX-XXXX.doc

The footer on the actual form cannot be replicated here in this document. This form is printed on three page paper (front page white, and two carbon copy pages, yellow and pink)

Page 33: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 33 of 54

Name of water system: PWSID#:

Date of sanitary survey: Survey by:

This document officially summarizes the results of your system’s sanitary survey, authorized by 22 M.R.S. § 2612 (3).

Findings: No deficiencies were noted Deficiencies were noted as identified below Recommendations Only

For deficiencies identified below that require action, the Drinking Water Program requires you to complete the

following actions on or before the due date(s) shown below. A copy of this engineering order and report indicating

the date of completion of the required action(s) must be submitted to the Drinking Water Program Field Inspector

completing this report. Failure to complete the required actions and submit written notice of completion may

result in future enforcement actions, including but not limited to Administrative Orders and financial penalties

(See 10-144 CMR 231 Section 1-C and 22 M.R.S. § 2616-2630). For any requirements below intended to correct a

significant deficiency, this engineering order and report serves as Formal Notice of Noncompliance of Maine’s

Water for Human Consumption Act and Rules Relating to Drinking Water (See 22 M.R.S. § 2619 (1); and 10-144

CMR 231).

Deficiencies Noted (DWP inspector, identify the deficiency as Minor or Significant – M or S – circle one.

Also, circle “S.D.” if deficiency is a “Sanitary Defect”) :

Source: (M or S)(S.D.) ____________________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Treatment: (M or S)(S.D.)__________________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Distribution: (M or S)(S.D.)________________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Finished Water Storage: (M or S)(S.D.)_______________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Pumps: (M or S)(S.D.)_____________________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Monitoring & Reporting, Data Verification: (M or S)(S.D.)________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Management & Operation: (M or S)(S.D.)______________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Operator Compliance: (M or S)(S.D.)_________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

Other: (M or S)(S.D.)______________________________________________________________________________________Due: _______

Action Required: ____________________________________________________________________________________Completed: _______

The Drinking Water Program makes the following recommendations: ________________________________________________________________________________________________________

________________________________________________________________________________________________________

________________________________________________________________________________________________________

________________________________________________________________________________________________________

___________________________________________ ___________________________________ Owner/Operator Signature Drinking Water Program Official Signature

___________________________________________ Printed Name

Maine Drinking Water Program

Sanitary Survey Summary Report

Page 34: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 34 of 54

Appendix C

Inspection Report: Site Directions and Diagrams

See Following Page

Page 35: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 35 of 54

Inspection Report: Site Directions and Diagrams

PWS Name: Inspector: Date:

PWSID: District: PWS Type:

Inspection Type: Sanitary Survey Contact

.

Schematic Drawing

Site

Plan

Source Detail Location Plan

See Attached Map.

well

300 feet

radius

Page 36: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 36 of 54

Appendix D

For large NTNC systems (such as paper mills) use the “Non-Community Surface Water Sanitary Survey Form” below.

Page 37: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 37 of 54

Non-Community Surface Water Sanitary Survey Form

Date: Date of Last Survey:

Inspector(s): , , _

System Information

PWSID: Contact Person:

System Name: Alternate Contact:

Mailing Address: Telephone:

Fax:

Other Phone:

E-Mail:

Operator Information

Superintendent: Class (circle One): I II III IV

Operators: Class (circle One): I II III IV

Class (circle One): I II III IV

Inspection Summary

Recommendations/Requirements:

Management/Operation

Were past sanitary survey forms reviewed prior to inspection? Yes No

Does the system have history of water quality/quantity problems? Yes No

Does system have schematic of the treatment system? Yes No

Page 38: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 38 of 54

Emergency Response Plan

Does the system have an emergency response plan? Yes No

Is it adequate? Yes No Is it up to date? Yes No

Who is notified and how?

Distribution System

Service Connections

Number of metered connections: Number of unmetered connections:

Population:

Are there any low pressure points in the distribution system? Yes No

Where are they?

Are plans of the distribution system available and current? Yes No

Does the system have any booster stations (must be inspected? Yes No

LOCATION

# OF Pumps/Type

Pressure Tanks

Chemicals

Applied?

Notes?

How often is the system flushed? Spring Fall Both

Are dead ends monitored for bacteria contamination? Yes No

Do distribution personnel have the proper equipment? Yes No

Are valves regularly exercised? Yes No

Cross Connection Control

Are there cross connections in the system? Yes No

Are approved backflow prevention devices installed? Yes No

How often are these devices checked?

Page 39: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 39 of 54

Source(s) Information

SOURCE

NAME

TYPE EST. YIELD (GPD) ACTIVELY USED NOTES

Type: River, Lake, Stream, Impoundment Pond, Reservoir, etc.

Raw Water Monitoring

Does the system monitor for Giardia lamblia, and Crptosporidium? Yes No

Which of the following does the utility routinely monitor?

Transparency (secchi disk) Total Phosphorous Temperature Herbicides

Dissolved Oxygen Chlorophyll-a Alkalinity Pesticides

Apparent Color pH Turbidity VOC’s

Which conditions change water quality?

Watershed Control

Is a shoreline buffer zone owned or controlled by the system? Yes No

Does the system have an active program for watershed acquisition or control? Yes No

Are portions of the watershed controlled by land owner agreements or zoning? Yes No

Is existing watershed control sufficient? Yes No

Is the watershed posted as a drinking water source? Yes No

Does the utility use GIS to delineate watershed? Yes No

Does the utility inspect septic systems and leach fields in the watershed? Yes No

Are there any agricultural runoffs in the watershed? Yes No

Industrial and Commercial Pollution Sources

Are there any industrial discharges in the watershed? Yes No

Describe operation and potential contaminants:

Are zoning restrictions in place that control manufacturing in the watershed? Yes No

Page 40: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 40 of 54

Intake Restrictions

How many intakes are in use? Are they at different locations/depths? Yes No

Is the intake marked with signs and buoys? Yes No

Are waterfowl a problem around the intake? Yes No

Raw Water Pumping

PUMP # 1 2 3 4 5

Source Name

Capacity (GPM)

HP Rating

Pump Type

Manufacturer

Last Service Date

condition

Finish Water Pumping

PUMP # 1 2 3 4 5

Source Name

Capacity (GPM)

HP Rating

Pump Type

Manufacturer

Last Service Date

Condition

Treatment Plant

Production Capacity

Average Daily Production: Max. Daily Production:

Plant Design Capacity:

Does system have master meter? Yes No

How often is it calibrated? (recommend annually)

How often is it replaced? (recommend every five years)

Page 41: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 41 of 54

Interior Piping

What is the condition of the interior piping? Good Average Marginal Poor

*look for corrosion, chafing, etc.*

Disinfection

Chlorine Gas Chlorine Dioxide Ozone Chloramines

Hypochlorite - Calcium or Sodium

Is chemical ANSI/NSF Std 60 Certified? Yes No

Application Point? Pre Post Both

Pump Type? LMI Prominent Other

Redundant/Spare Parts Available? Yes No

Paced To Flow? Yes No

Size of Day tank? Gals. Bulk Storage? Gals.

Is amount on hand adequate? Yes No

How is chemical monitored? Continuously Daily Other

Will plant shut down on High/Low levels of Disinfectant? Yes No

What are the levels? High ppm Low ppm

NSF/AWWA Approved? Yes No

EPA/ME Registered? Yes No

Material Safety Data Sheets Available? Yes No

Proper safety equipment available? Yes No

Spill Containment adequate? Yes No

Contact Time

What is the required contact time? Min-mg/l

Is this checked daily? Yes No If not, what are suggestions to improve?

Does operator understand concept of contact time? Yes No

pH Adjustment Chemicals

Chemical (s) used?

Application point?

Type of metering pump?

Paced To Flow? Yes No

Page 42: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 42 of 54

Material Safety Data Sheets Available? Yes No

Proper safety equipment available? Yes No

Spill Containment adequate? Yes No

ANSI/NSF STD 60 Certified? Yes No

Filtration and Backwashing

Filtration Process

Type: Conventional Direct Slow Sand Other

Filter Manufacturer:

Number of Filters in Use: Design Flow Rate:

Depth (Ft): Width (Ft): Length (Ft):

Date the filter media last changed or regenerated?

Is air scour used to clean the filters? Yes No

Is there a turbidimeter on each filter? Yes No

Is there a combined effluent turbidimeter? Yes No

Notes:

Filter Media

Media Layer Depth of Media (in) Type of Media

1 (top)

2

3

4

5 (bottom)

*Types of media: anthracite, garnet, GAC, sand, Gravel, support gravel, manganese greensand

How is media loss measured?

Is media occasionally sent to manufacturer for analysis? Yes No

Backwashing

Frequency (hrs)? Volume (Gals):

Does the system backwash with clean water? Yes No

Is backwash recycled? Yes No If yes, percentage: %

Backwash is started by which if the following parameters?

Headloss Turbidity Particle Counts Time

Page 43: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 43 of 54

Is filter to waste used? Yes No

What is the average filtered water turbidity? NTU

What criteria are used to determine when a filter goes back on-line?

Do turbidity records indicate spiking after start-up? Yes No

Will the plant shut down on high turbidity? Yes No

Notes:

Other Treatment

Name:

Purpose:

Design Parameter:

Recommendations:

Storage Tanks

Tank Name:

Location:

Volume (gals)

Type

Manufacturer

Date of Construction

Date of Last Inspection

Protected from vandalism?

Can tank be isolated from system?

Overflows/drains screened?

General Condition: (good, bad,

ugly)

Page 44: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 44 of 54

How many days of storage does the system have? Days

Notes:

Sampling

How often are bacteriological samples taken?

Is this adequate based on the population of the water system? Yes No

Does the water system submit monthly reports? Yes No

*Ask if the operator has questions concerning the monthly reporting forms*

Does the DWP have a sampling site plan on file? Yes No

TC monitoring frequency for community water systems

Population Range # of samples per month

25 1000 1

1001 2500 2

2501 3300 3

3301 4100 4

4101 4900 5

4901 5800 6

5801 6700 7

6701 7600 8

7601 8500 9

8501 12900 10

12901 17200 15

17201 21500 20

Page 45: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 45 of 54

Appendix E For small surface water systems using bag or cartridge filters use the “Alternative Technologies Sanitary Survey Form” below.

Page 46: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 46 of 54

Alternative Technologies Sanitary Survey Form

Date: Date of last survey:

Inspector(s): , ,

Location Plan (directions, include route # and road name)

PWSID:

System name: Contact person:

Mailing address: Alternate contact:

Telephone:

Other phone: Fax:

Population

Number of connections: Population:

System Information

Type of system: Campbell Bag filters other

Inspection Summary

Violations:

1.

2.

3.

4.

5.

Recommendations/requirements:

1.

2.

3.

4.

5.

Page 47: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 47 of 54

Source Information

Name of source: Source type (river, lake, etc.):

Size of source: square feet

Treatment challenges presented by source include:

__________

Is source treated w/ chemicals? yes no Describe:

Other sources/connections:

Pumps

Type: Number of pumps:

Horsepower:

Production Capacity

Average production: Maximum production:

Filtration Process

Type: Bag Cartridge Other:

Filter manufacturer:

Number of finish filter banks: # filters per bank: Filter size ()

Number of roughing filter banks: # filters per bank: Filter size () _____

Design flow rate: gpm

How often are filters changed out?

Average filtered water turbidity: NTU

Log reduction assigned to filters is: log

Is there a turbidimeter on site? yes no Calibration date:

Formazin standards calibration date:

Have records been kept up to date?

Notes:

__________

Disinfection

Disinfectant used: sodium hypochlorite HTH other _____

Is disinfection chemical ANSI/NSF STD 60 Certified? Y/N ________________________________

Are residuals monitored and recorded daily?

Average disinfectant residual at first customer is: ppm

Is disinfectant stored and applied safely?

Describe disinfection system operation.

_____

List recommended improvements:

_____

Page 48: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 48 of 54

Contact time

Engineer who calculated contact time:

Log reduction assigned to disinfection process is: log

Engineered minimum disinfectant leaving filtration building: ppm

Does contact time seem sufficient for the treatment type?

Disinfection / contact notes:

System schematic:

Chemicals used on site

Disinfection:

Other:

Notes:

Page 49: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 49 of 54

System Storage

Type of tank: Volume of tank:

gallons

Is tank suitable for use in contact equations?

Storage tank notes:

_____

Notes:

________________

Contact Time Worksheet

Step 1: Determine the time available in the basin at peak flow

A. basin volume gallons

B. baffling factor

C. Peak hourly flow gallons per minute

D. Time available minutes

Step 2: Determine the contact time available at peak flow

E. Time (from “D” above) minutes

F. Chlorine concentration mg/l

G. Actual CT min mg/l

Step 3: Find the required CT from the tables at peak flow

H. Required CT min mg/l

Step 4: Does your water system meet CT requirements?

I. Actual CT (from “G” above) min mg/l

J. Required CT (from “H” above) min mg/l

K. CT ratio (actual / required)

L. Is CT ratio greater than or equal to 1.0 (yes or no)?*

Page 50: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 50 of 54

Appendix F List of “Sanitary Defects”

(as requested by the Revised Total Coliform Rule) 3/3/15

Sanitary Defect: is a defect that could provide a pathway of entry for microbial contamination into the distribution system or that is indicative of a failure or imminent failure in a barrier that is already in place. (S.D. = Sanitary Defect)

Significant Minor (Major)

Sanitary Defect Deficiency Deficiency Physical/System Defect (pathway of entry for microbial contamination): Well cap missing/off X No water (system dewatered) X Well head in a pit under water (including sanitary seal cover) X Well head flush to ground with bacteria problem X Improperly screened vent (wellhead, wetwell, clearwell, tank, etc.) either Messy/dirty around intake for an air eductor (aeration) either Inadequate sampling point either Inactive treatment or tank still connected to system either Large storage tank uninspected (may be a sanitary defect) either Loose well cap X Conduit not secured to well cap X No well vent (usually in well cap) X Inadequate vent height (may be a sanitary defect) X Leaking tank X System leaks (may be a sanitary defect) X Waterlogged bladder tank (failed bladder) S.D. if bacteria present X Failure of a Barrier to Microbial Contamination: Not meeting 4-log inactivation when required by GW Rule X Carbon filter after required chlorination X Not talking disinfection residual measurements X Un-calibrated UV Intensity sensors (power/area) X Un-calibrated UV Transmissivity sensors (%) X Inadequate or failed disinfection when required for a GW source either Inadequate or failed disinfection for a system using SW either Inadequate or failed filtration for a system using SW either Unapproved changes to source, treatment, or storage (may be a S.D.) either Significant sources of contamination (e.g. manure) within 300 feet either Cross Connection Related (Imminent Failure of a Barrier…): Treatment backwash cross connection to sewer line X RO waste water line cross connection to sewer line X Hard piped bypass around required disinfection treatment either High hazard cross connection (may be a sanitary defect) either Testable backflow devices not tested annually (may be a sanitary defect) either

Page 51: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 51 of 54

Appendix G Additional Sanitary Survey Procedure for Small “Spring Water” Bottlers and Small Bulk Load

out Stations using a Spring Source

Small “Spring Water” Bottlers and Small Bulk Load-out Stations include those using a well that is not regulated by the DEP as a “Significant Groundwater Well” under 38 MRSA §480 requiring a Natural Resources Protection Act [NRPA] permit. A list of small “spring water” bottlers and small bulk load-out stations using a spring source has been developed by the DWP Geologist, identified by Field Inspection Team District, that need to have their SS completed during the August timeframe of the year that they are due. This is the lowest anticipated flow of the year, barring unusual circumstances (an unusually wet period). In addition to the inspection items for source through treatment only identified on the “Small Groundwater System Sanitary Survey Inspection Checklist” (see Appendix A, this document), follow the procedure included below:

1. Ask to see the spring

2. Take a picture of whatever can be seen

3. By your own evaluation, is the spring visibly “free flowing”? Answers to this question can be:

Flowing water is visible

A wet area is visible

A wet area is not visible

Other: describe

4. Ask the owner if the current condition of the spring is similar throughout the year or if there are seasonal differences.

5. Include the picture and your notes on the SS report and provide the report with a note

indicating it is a small water-bottler or small bulk load-out station with a spring source. The FIT manager will route the SS report to the DWP Geologist for review.

Page 52: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 52 of 54

Appendix H SMALL SYSTEM SANITARY SURVEY DEFICIENCY BULLETS

DEFINITIONS: Deficiency: A finding during a sanitary survey that results in a requirement, as detailed in this

document or otherwise. Deficiencies can be “Minor” or “Significant” (either): In this document this term is used to identify requirements that can be either “Minor” or

“Significant” deficiencies, depending on the circumstances. (Minor): A minor deficiency requiring resolution but not reaching a level that warrants a Notice of

Non-Compliance at the time it is identified. When a minor deficiency is not resolved in the time frame given for resolution, pre-enforcement options are to be considered and potentially the PWS is issued a Notice of Non-Compliance and entered into the enforcement process.

Sanitary Defect (S.D.): is a defect that could provide a pathway of entry for microbial contamination into the distribution system or that is indicative of a failure or imminent failure in a barrier that is already in place.

(Significant): A significant deficiency requiring resolution which serves as Formal Notice of Non-Compliance of Maine’s Water for Human consumption Act and Rules Relating to Drinking Water

SOURCE 12. Well cap off/missing (Significant)(S.D.)

Secure/tighten well cap (Minor)(S.D.)

Secure conduit to the well cap (Minor)(S.D.)

PWS does not have a watertight well cap (Minor)(S.D.)

No well vent present (Minor)(S.D.)

Install bug (24 mesh) screen on vent (Minor)(S.D.)

A sanitary seal cover under water is not acceptable (Significant) (S.D.)

For a well in a pit, the pit must drain by gravity or have active pumping capabilities. (Significant if water is above well head) (S.D.)

If the well head is flush to the ground and there are bacteria issues, require the casing to be raised to 18” above grade. (Significant) (S.D.)

Remove significant sources of contamination within the 300 foot circle such as gasoline, paint, or chemical storage, manure piles, or provide secondary containment if applicable. (either) (S.D.)

System must maintain a minimum of 20 psi at each service (either)(Significant if no water)(S.D.)

No raw water sampling port (Minor) TREATMENT 13. Chemicals in contact with drinking water not certified to meet ANSI/NSF Standard 60

(Significant)

Tanks not labeled identifying the contents/chemical/mineral inside (Minor)

Materials, products, and coatings that contact drinking water not certified to meet ANSI/NSF Standard 61. Check exemptions. (Significant) Chlorination

Systems triggered by a ground water rule violation must meet 4-log inactivation of viruses by a combination of proper dosing of chlorine and providing adequate contact time. (Significant) (S.D.)

Inspect Chlorine Contact Tanks

Repair or replace tank if it is leaking (Minor) (S.D. Adsorptive Media

Media disposal method must meet state and federal disposal requirements. (Minor) Aeration

For radon removal, the external vent needs to extend above roof level to avoid human contact with exiting air. (Minor)

Page 53: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 53 of 54

Vent must be screened ( ¼ ” to ½” mesh) to prevent birds from entering. (Minor)

Area surrounding an air inlet eductor must be clean and free of dust and debris.(either) (S.D.) Ion Exchange (including water softening)

Ion exchange backwash waste water can be disposed of in a sanitary leach field or a Publically Owned Treatment Works (POTW.... a municipal sewer). Waste water may not be disposed of in a leach field built specifically for ion exchange backwash only. (Minor)

Backwash waste water may not be disposed of on the ground or in a dry well. (Minor)

Where backwash waste water lines drain into a sewer pipe, an air gap of two times the inlet diameter pipe must be maintained. Air gap fittings approved by the plumbing code are “listed and labeled”. (Significant) (S.D.)

Use ANSI/NSF Std 60 Certified Salt (Significant) Activated Carbon

A carbon filter cannot remove chlorine from a system that is required to chlorinate, except as point of use (POU) device for drinking purposes. (Significant) (S.D.)

Ultraviolet (UV) Radiation

All UV systems used for disinfecting drinking water must be NSF 55 or ANSI/NSF Std 61 certified. (Significant)

Reverse Osmosis (RO)

RO waste water can be disposed of in a sanitary leach field or a Publically Owned Treatment Works (POTW.... a municipal sewer). Waste water may not be disposed of in a leach field built specifically for Reverse Osmosis waste water only. (Minor)

RO waste water may not be disposed of on the ground or in a dry well. (Minor)

Where RO waste water lines drain into a sewer pipe, an air gap of two times the inlet diameter pipe must be maintained. Air gap fittings approved by the plumbing code are “listed and labeled”. (Significant) (S.D.)

Other Treatment (Name)*: ____________________ (boiler water treatment, manufacturing process water treatment)

The use of chemicals to treat water used in a boiler require that a Reduced Pressure Zone Backflow Preventer (RPZ) be placed on the line supplying water to the boiler. (Significant if no backflow protection)

When water treatment is provided for manufacturing process water, an appropriate cross connection control device must be installed on the line supplying water to the manufacturing process, before the water treatment application. (Significant if no backflow protection)

Hard piped bypasses are not allowed on required treatment, but a removable pipe section (flexible or hard) with quick disconnect fittings is acceptable for use when equipment is being maintained. The only exception to this is for Ultra Violet systems (see UV treatment section below) (either) (S.D. if bypass is around required disinfection)

Physically disconnect any inactive treatment equipment to eliminate the potential of contamination due to a stagnant system being connected to the water system. (Minor)

All high hazard and low hazard cross connections must be protected by backflow prevention devices as specified in the Maine Internal Plumbing Code, Chapter 6. Water Supply and Distribution (either) (may be a S.D., depending on the potential contamination)

All testable backflow protection devices must be tested on annual basis. (either) (may be a S.D.)

All Community PWS with a cross connection (low or high) and all non-community PWS with a high hazard cross connection must have a Cross Connection Control Program (See the Model Cross Connection Control Program for Non-PUC Regulated PWS, DWP0089) (either)

PUMPS (FACILITIES, CONTROLS, ETC.)

Repair any leaks (Minor) (may be a S.D.)

Page 54: Sanitary Survey - Small System Procedure · 2015-06-19 · SANITARY SURVEY – SMALL SYSTEM PROCEDURE PURPOSE: This procedure is written to document the sanitary survey process used

DWP SOP ID#: DWP0114-D Maine Drinking Water Program Page 54 of 54

FINISHED WATER STORAGE 14. Repair or replace tank if leaking (Minor) (S.D.)

Screen tank vent and/or overflow (Minor) (S.D.)

An overflow pipe outlet must have an air gap between it and a sewer line of 2x dia of the overflow pipe, but not less than 1 inch. (Significant)(S.D.)

If the overflow is outside, the overflow must be constructed so that it drains freely and will not be impeded by snow or ice (terminates 12-24” above the ground) (Minor) (S.D.)

Tank material and inside coating must be compatible with water (See Maine Rules for NSF/ANSI Std 61 requirements and exemptions) (Significant)

Physically disconnect any tank that is not in use yet is still hard-pipe connected to the system (only valved off from system). (Minor) (S.D.)

Replace waterlogged bladder tanks (broken bladder). (Minor) (S.D. if bacteria are present)

If a lubricated air compressor is used, a food grade lubricant must be used. (Minor) DISTRIBUTION SYSTEM

All high hazard and low hazard cross connections must be protected by backflow prevent devices as specified in the Maine Internal Plumbing Code, Chapter 6. Water Supply and Distribution. (either) (may be a S.D., depending on the possible contamination)

All testable backflow protection devices must be tested on an annual basis. (either) (may be S.D.)

All Community PWS with a cross connection (low or high) and all non-community PWS with a high hazard cross connection must have a Cross Connection Control Program (See the Model Cross Connection Control Program for Non-PUC Regulated PWS, DWP0089) (either)

If sampling point is inadequate, require that sampling point (faucet) be replaced or an alternate, adequate sampling point be used. (either) (may be a S.D.)

MONITORING & REPORTING AND DATA VERIFICATION

MORs must be sent to the DWP before 10th of the following month. (Minor)

Not taking residuals measurements at all when required is considered a (Significant) deficiency. (S.D. if disinfection related)

MANAGEMENT & OPERATIONS 15. A PWS that is required to have a Designated Operator is required to have “adequate operational

and emergency response procedures”. (Minor)

As described on the Maine Department of Labor website, private sector employers are required to comply with the OSHA Safety and Health Regulations. (either)

All changes and additions to the source, treatment, or storage must be approved by the DWP prior to making the changes or additions. System that have not received approval before making changes or additions have met the criteria for a violation. (either) (may be a S.D.) The DWP requirement to the PWS is that they follow OSHA requirements

OSHA requires that current MSDS for chemicals used are kept at the location where the chemical is used. (either)

OSHA requires that proper safety equipment, including personal protective equipment, be available for water system personnel. (either)

OSHA requires that chemicals are labeled properly, including secondary containers (e.g. day tanks). (either)

OSHA has requirements regarding the use of secondary containment for chemical storage. (either)

Only use calibrated electronic test equipment (Calibrated per manufacturer’s specs) (either) (may be a S.D.)

OPERATOR COMPLIANCE (for surface water Transient, NTNC, and Small C PWS)

Necessary Designated Operator forms have not been submitted to the DWP. (Significant) OTHER: _________________________________________________________________________