68
December 7, 2011 saveONenergy Bi-Weekly Update Rouselle Gratela Training Specialist Kyle O’Hearn – Manager, Business Markets Steven Rothwell Energy Services Manager, Midland PUC Bryan Flannigan CMVP Principal, ICF Marbek Alex Tiessen CMVP Senior Associate, ICF Marbek
Transcript

December 7, 2011

saveONenergy Bi-Weekly UpdateRouselle Gratela – Training SpecialistKyle O’Hearn – Manager, Business Markets Steven Rothwell – Energy Services Manager, Midland PUC Bryan Flannigan – CMVP Principal, ICF Marbek Alex Tiessen – CMVP Senior Associate, ICF Marbek

2

Meet the Presenters

Rouselle Gratela

Training Specialist

Steven Rothwell

Energy Services Manager,

Midland PUC

Bryan Flannigan

CMVP Principal,

ICF Marbek

Kyle O’Hearn

Manager, Business Development

3

Agenda

1. saveONenergy Update

• Upcoming Webinars Schedule

• Training & Support Updates

• 2010 ERIP Update

2. LDC Best Practices Feature: Engaging Channels and

Supply Chains

3. Evaluation Measurement and Verification (EM&V)

Primer: Why It’s Important to LDCs

4. Questions

saveONenergy Webinars

4

Upcoming Webinars Schedule:

Date Webinar Topics Duration Time

Wed Dec 14 saveONenergy Update

o iCon Bug Update

o RETROFIT Small Projects Submission

o Settlements Update

o Market Research Update:

•LDC-level Commercial and Institutional and Industrial profiles

• LDC and regional-level awareness of and attitudes towards

consumer programs and advertising

90 mins 10-11:30

Wed Jan 11 saveONenergy Update

o Marketing and Market Research Webinar

90 mins 10-11:30

5

Other Training & Support

• LDC E-blasts• Email us at [email protected]. In your email

subject line, please say SUBSCRIBE

• Distribute the email to others within your organization who may

benefit from the updates

• 2012 CRM Workshops• Small regional RETROFIT CRM demonstrations and training

• Will be looking for centrally-located regional host LDCs

• Please complete this short survey to help us determine specific

areas of focus:

https://www.surveymonkey.com/s/CRM_Workshops

6

2010 ERIP and ERII ‘Blend and Extend’ Process

• OPA has developed a solution to address the many

2010 ERIP applications which missed the December 1,

2011 deadline1. Projects that will be completed by December 31, 2011

will fall under ERIP

2. Projects that will NOT be completed by December 31,

2011 must withdraw from ERIP by December 31, 2011• Projects in this category must resubmit completed

applications in RETROFIT before January 1, 2012

• Letters will be sent to LDC Conservation Officers explaining the

process in detail

• These letters will also be attached to this week’s LDC E-Blast

(estimated publication Friday, Dec 9)

7

2010 ERIP and ERII ‘Blend and Extend’ Process (cont’d)

• IMPORTANT: Need list of affected projects in both

situations from LDCs by mid January to enable OPA to

complete waivers on your behalf

• Email the completed lists to

[email protected]

• Any questions?

1. See letters attached to E-Blast (Fastest)

2. Contact [email protected]

LDC Best Practices Feature:

Engaging Channels and Supply Chains

Steven Rothwell, Energy Services Manager, Midland Power Utility Corporation

Midland Power Utility Corporation:

Who Are We?

• We have 17 employees and a total of 6,996 customers:

• General service customers >50kW: 279

• Small commercial customers <50kW: 700

• Residential customers: 6017

Internal Resources for CDM Program

• Management assistance is provided by Administrator

• Energy Services Manager, manages the CDM portfolio

CDM Strategy C&I and Industrial

• Midland PUC long term CDM Strategic Plan

• Build underlying capacity for present and future incentive

programs

• Build supply chain communication

• Build a community education program

• Build a community culture of energy awareness

• Build a local energy management industry

• Agree with Ralph Williams – Energy Services Supervisor

at Hydro One Brampton – get into the buildings.

Building Capacity

• Definition: Wikipedia

• development that focuses on understanding the

obstacles that inhibit people, organizations and

governments, from realizing their developmental

goals while enhancing the abilities that will allow them

to achieve measurable and sustainable results

• Two Questions

1. What are Midland’s as a community, obstacles in this

process?

2. What existing abilities (capacity) can we enhance and

build upon?

Our Supply Chain

• Supply chain mapping helped us identify strength and

weaknesses in our community area.

• Identified who are the players

• Identified what I can change (obstacles) and what I

cannot (barriers).

• Identify and direct obstacles to organizations in other Tier

Levels.

• Target specific sectors (retail, service, professional) using

a variety of communication channels

Supply Chain Chart

Industrial – Retrofit Program

• Major Strength (existing capacity)• Existing customer internal capacity - technical workforce

• Existing experience in ERIP Program with positive results

• Some industry involved in ISO

• Wholesaler Field Reps best allies

• Drivers• Remain competitive

• Replace obsolete technology

• Major weakness (obstacles)• Tier 1 – Education and Incentives

• Industrial experience of the Energy Services Manager

• Knowledge of program opportunities

• Economy

• ROI

Commercial - Retrofit Program

• Major Strength (existing capacity)

• One contractor worked in previous ERIP program

• Energy Services Manager area of strength

• Can draw contractors from Direct Install Program

• Major weakness (obstacles)

• Tier 1 – Project Development

• Lack of a sales force

• Lack of knowledge – technology

• Contractors - Confidence to complete applications and

submit data

• Economics – presenting a business case to customers

Making Decisions

Long Term Strategic

Plan

Medium Term Targeted

Daily Operational

GOALS• Work on each level on a regular basis.

• Move projects forward with flexible time lines.

• Avoid distractions from Strategic Plan, your intent must be clear.

• Make time for customers.

Industrial Capacity Success

1. Breakfast Meeting to discuss programs and operational issues. OPA Business Manager presented – June 2011

2. Two day - Dollars to $ense Program in Midland – Oct. 2011

3. Bi-monthly industrial sector updates via E Blast

4. Periodic mail inserts to accounting dept.

5. Introduced ISO 50001 and NRCan Incentives of $25,000

6. Working towards developing networking opportunities with gas utility

7. Schedule Site Visits

8. Continue with Energy Services Manager education• Courses: OPA, AEE, CIET

• Ask questions at site visits, they are the experts

Long Term

Strategic Plan

Medium Term

Targeted

Daily Operational

Commercial Capacity

Success

1. Initiated Contractor Training Program

engaging electrical trades, wholesalers,

Energy Advisors (CEA’s)

2. Drew participants from Direct Install

3. Host learning seminars on the use of

technology (motion sensors, LED

lighting) for the Tier 1 - Project

Development side of the supply chain

– keeps engaged

4. Commercial Bi-monthly E Blast

5. Ongoing support and site visits with

contractors

6. Creating networking opportunities with

Associations and gas utility

Long Term

Strategic Plan

Medium Term

Targeted

Daily Operational

Day 1 – Module A - 2 hours

Group Work Prescriptive Worksheet

Group Work Custom Worksheet

Day 1 - Module B – 2 hours

Opening Online Accounts

Customer Representative

Day 2 – Module C – 2 hours

Measurement & Verification

Engineered Worksheet

Day 2 - Module D – 2 hours

Creating a Business Case

Using RETScreen Economic Analysis

Contractor Training Program

•Use MPUC training room

•Small Group 6 participants

Intent of Education Program

• Users gain confidence in saveONenergy program

• Encourage local contractor engagement

• Increase the level of understanding for the issues the saveONenergy program addresses

• Build capacity for uptake of program for future marketing

Milestones

• 3 Programs run to date – next scheduled in early Feb 2012

• 14 participants completed• 2 wholesaler Reps

• 1 Energy Advisor

• 10 Electrical Contractors

• 1 business owner

Benefits of Contractor Training

• Contractor gains confidence in saveONenergy program

and applications

• Become a sales force (driven by profit)

• Streamline customer experience

• Increase incentive amounts for customers

• Fewer stranded opportunities

• Collect lost watts for utility

• Reduce involvement of CDM Team in administration

Unexpected Benefits of Contractor Training

• Wholesalers, and contractors teaming up to sub-contract

application submissions to saveONenergy website, one

applicant representative for six contractors. This means I

deal with one expert individual not six.

• Attracting industrial electrical contractors

Moving Forward

• Goal achieved - increased underlying capacity for the

lighting retrofits

• 2012

• Break out customer groups

• Increase target marketing and site visits

• Keep electrical contractors plugged in using various

initiatives

• Move on to the HVAC industry and industrial clients

Questions?

Evaluation, Measurement and VerificationWhy it’s important to LDCs

Bryan Flannigan, CMVP Principal ICF MarbekAlex Tiessen, CMVP Senior Associate ICF Marbek

27

Overview of Evaluation

28

Why do EM&V?

To improve CDM activities by:

• Establishing CDM as a credible and reliable

resource

• Explaining the performance of each program

• Making recommendations to improve each program

• Establish the accountability of the program

administrator

29

The Theory of the Touching Mountains

30

Shared Values of All CDM Practitioners

Core Value:Improve CDM

Core Value:Improve CDM

Contracted Evaluator Team &Internal Evaluation Team CDM Program Team

31

Market

Opportunity

Market

Characterization

Design

Implementation

Tracking

Evaluation

Measurement &

Verification

Development

Adaptation

Energy

Use

System Planning

A Full Cycle of Information is Required

Summary

Report Baseline

Program

origin

Logic Model

&

Targets

Marketing

Metrics &

Indexes

Internal Data

Retrieval,

Performance

Indexes

Evaluation

Study

Final EM&V

Plan

Determine the

performance of

the program

Draft EM&V Plan

Tracking System,

& Forms

32

Types of EM&V Studies

Outcome Evaluation

Impact Evaluation

Process Assessment

Market Characterization

Study

Cost Effectiveness

Market Effect Evaluation

33

Process Evaluation

Ad

Logic

Goals

Activities

Software

34

Documentation and Aspects Reviewed during

Process Evaluation

F) Energy audit conducted by an energy engineer at the participant’s facility

Incomplete

H) Administrator provides the FD w/ request for incentive

A) Marketing/ Communication activities by Administrator

C) Applicant makes an application to participate

B) Enterprises become aware of the program

G) Energy engineer files the report, along w/ request for incentive

K) Participant implements eligible measures

N) Disbursement of incentive to participant

L) Participant sends notice of completion

J) Administrator and participant sign agreement

O) Energy Savings

D) Administrator

assesses completeness of

application

E) Independent reviewer

reviews the application

Refused

I) FD reviews the request for

incentive and approves measures

Refused

M) Independent Reviewer

verifies impl-ementation

Refused

Participation Process, Procedures and Eligibility Criteria:

35

Documentation and Aspects Reviewed during

Process Evaluation

Marketing

Strategy

Marketing & Communication

Plan

Communi-cation

Activities

Marketing Strategy: Audiences, Messages, Media, Quality,

Quantity and Effectiveness at Promoting Participation

36

Types of EM&V Studies

Outcome Evaluation

Impact Evaluation

Process Assessment

Market Characterization

Study

Cost Effectiveness

Market Effect Evaluation

37

Net-to-Gross Ratio (NTG Ratio), Gross Saving and

Net Savings

Net Savings =

Gross SavingsX

NTGRatio

Realization RatioX

38

Net-to-Gross Ratio (NTG Ratio), Gross Saving and

Net Savings

Net Savings = Gross

SavingsX

NTGRatio

Realization RatioX

39

Gross Savings (Claimed Savings)

Gross Savings

What the applicant “Claims”

happened

40

Realized Savings

Net Savings =

Gross SavingsX

NTGRatio

Realization RatioX

41

Realized Savings

Net Savings =

Gross SavingsX

NTGRatio

Realization Ratio

X

42

What Happens on Site…Stays on Site?

43

Definition of Realization Rate

RealizationRatio

Project-Level Gross

(Claimed) Savings

Realized Project-Level Gross Savings

=X

44

Definition of Realization Rate

RealizationRatio

Project-LevelGross

(Claimed) Savings

Realized Project-Level Gross Savings=

45

Standard Project-Level M&V Methodological

Approaches

EM&V Scoping

Definition of Approaches and Deliverables

Develop Data Collection Instruments

Field Data Collection

Analysis

EM&V Report

M&VPathway

DocumentationReview

Pathway

Simulation ModelsPathway

Billing Data AnalysisPathway

Field Measurements &

More

MultipleOptions

Review of Simple Calculations

Extensive Calculations

Collection of Bldg. Blueprints &

Spec.s

Retrieval of Billing Database

MultipleOptions

RealizationRatio

46

Causality and Attribution

REALITY CHECK:

47

Net-to-Gross Ratio (NTG Ratio)

Net Savings =

Gross SavingsX

NTGRatio

Realization RatioX

48

Net-to-Gross Ratio (NTG Ratio)

Net Savings =

Gross SavingsXNTG

Ratio

Realization RatioX

49

Introduction to a Few Distortion Effects:

Free Ridership

Free RidershipParticipants who would have naturally implemented the measure

Source: EM&V Protocols and Requirements, 2010

50

Introduction to a Few Distortion Effects:

Spillover

SpilloverNon-participants who have implemented a measure as a result of the program

51

Net-to-Gross Ratio (NTG Ratio), Gross Saving and

Net Savings

NTGRatio =

Free Ridership

%100% - Spillover

%+Other

Effects

Net Savings =

Gross SavingsX

NTGRatio

Realization RatioX

52

Net Savings

Net Savings =

Gross SavingsX

NTGRatio

Realization RatioX

53

Preparing for Evaluators!

What will the evaluators be looking for?

54

2-Pronged Level of Evaluation Support

LDC Support

Provide Access to Documentation

Provide Communication

Logistical Support

55

Access to Documentation

Process Evaluation

All documents related to Market Characterization

All documents related to the implementation plan:

• In particular: the communication plan, and the transactional

infrastructure (processes and procedures)

The program database (i.e. the content of the tracking system)

Impact Evaluation

Application documentation (hard copy or electronic):

• Application forms, worksheets, equipment spec sheets, project

invoices, M&V Plan, M&V Report, Review reports,

Both

Contact information for:

• Applicants, their service providers, and the third-party reviewers (if

applicable)

56

Source: Northwest Energy Efficiency Alliance, Market Research Report - Variable Frequency Drive, June 2000

‘Market Structure’, or, ‘The History of the

Market’

Manufacturers:•Who are they?•Where are they located?•What are their driving factors?•How do they sell?, etc.

Distributors:•Who are they?•How do they buy?•How do they sell?•Where is their highest profit?

etc.

Competing technologies:•What are they?•How do they buy?•How do they sell?•Where is their highest profit?, etc.

Market Intermediaries:•Who are they?•How do they make money?•How effective are they?•What is their level of capacity?•To what human resources do they have access?

etc.

Consumers:•Who are they?•How can they be segmented?•Where do they buy?•Why do they buy?•What are their driving factors?•What are the barriers to purchases?, etc.

57

Implementation Plan

58

Tie Up

Target Audiences, Key Messages and Media

Target Audience(s)

a.k.a. Channels

MessagesWhat will they want to

know about the program and the Typical Measure

Profile(s)?

MediaHow does the Program

best reach them?

Indicator of Scale and Scope

What level of priority does this audience

have?(Low/Medium/High)

Audience AInnovatorsEarly AdoptersPragmatists

•Program info•Monetary Savings•GHG Reductions•Effect of Innovation on the Market

•Trade Shows•Real-Estate Websites•Green Associations Memberships

High

Audience BInstallationContractors

•Program Info•Profitability Increase•Sales Increase•Staff Training Opportunity

•Trade Shows•Cold Calling

High

Audience COther Consumers

•Program Info•Monetary Savings•Property Value Increase

•Real-Estate Websites•Realtors

Low

59

Operations ManualOperations Manual Contents

Overview of Program

Program Stages

Program Flow Charts

Responsibility Chart

Program Procedures

Annex: Application Forms

Annex: Program Guide

Annex: Internal Forms

60

Operations Manual ContentsOperations Manual

Overview of Program

Program Stages

Program Flow Charts

Responsibility Chart

Program Procedures

Annex: Application Forms

Annex: Program Guide

Annex: Internal Forms

61

Operations Manual ContentsOperations Manual

Overview of Program

Program Stages

Program Flow Charts

Responsibility Chart

Program Procedures

Annex: Application Forms

Annex: Program Guide

Annex: Internal Forms

62

Operations Manual ContentsOperations Manual

Overview of Program

Program Stages

Program Flow Charts

Responsibility Chart

Program Procedures

Annex: Application Forms

Annex: Program Guide

Annex: Internal Forms

• Program Procedures

• Describe what is to be done, by

whom, when and using what forms

as required

• Should contain service

requirements (“within 5 business

days”)

• Usually separate from the

software/tracking system

instructions (may require their own

instructions)

63

Access to Documentation

Process Evaluation

All documents related to Market Characterization

All documents related to the implementation plan:

• In particular: the communication plan, and the transactional

infrastructure (processes and procedures)

The program database (i.e. the content of the tracking system)

Impact Evaluation

Application documentation (hard copy or electronic):

• Application forms, worksheets, equipment spec sheets, project

invoices, M&V Plan, M&V Report, Review reports,

Both

Contact information for:

• Applicants, their service providers, and the third-party reviewers (if

applicable)

64

Application Documentation

65

Access to Documentation

Process Evaluation

All documents related to Market Characterization

All documents related to the implementation plan:

• In particular: the communication plan, and the transactional

infrastructure (processes and procedures)

The program database (i.e. the content of the tracking system)

Impact Evaluation

Application documentation (hard copy or electronic):

• Application forms, worksheets, equipment spec sheets, project

invoices, M&V Plan, M&V Report, Review reports,

66

Communication Logistics

Internal

CDM Staff should be available for interviews

Third-Party Review Staff should be available for interviews

External – Part 1

Implementation phase:

• Applicants should be notified that

an evaluator may be reviewing

their file and visiting their facility.

• Service Providers should be

notified that they may need to

accompany evaluators on site if

the applicant isn’t familiar enough

with the project.

67

Communication Logistics

External – Part 2

Evaluation phase :

• Sample applicants should be notified in advance of being contacted by

the evaluator

• Sample applicants should contact their service provider when

applicable.

• Reviewers should be prepared to answer questions and support their

findings

The evaluator may contact applicants, service

providers and/or reviewers to ask questions

about applications, to coordinate a site visit, or

to administer a survey to collect attribution and

process evaluation data.

68

Discussion & Questions

Bryan Flannigan, P.Eng. CVMPPrincipal - CDM Program Services

ICF Marbek

613-523-0784

[email protected]


Recommended