Minutes of 45th SOAP Meeting held on 28.09.2018. Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 4455tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2288..0099..22001188
Minutes of 45th SOAP Meeting held on 28.09.2018. Page 2
Minutes of 45th meeting of Sub Committee for Operation and Protection
(SOAP) held at SLDC, Raipur on 28.09.2018.
The 45th meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 28th September 2018 at SLDC Conference
Hall. The list of participants is enclosed in Annexure-I.
Shri. A. K. Shrivastava, CE (SLDC) welcomed all the participants of 45th SOAP meeting. Item no. 1 Confirmation of minutes:
No comments have been received from any office. Therefore
minutes of 44th SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of August-
2018:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 State Energy Account (SEA) Data:
The data regarding State Energy Account for the month of August -
2018 was submitted to this office on 27.09.2018 by O/o ED
(Revenue) CSPDCL and representatives from O/o ED (S/s: O&M)
CSPTCL submitted the data on 22.09.2018.
Vide T.O. letter no. 1323 dated 16.10.2018 it was requested
to the O/o ED (S/s: O&M) Raipur, CSPTCL for re-checking of the
data for the month of August -2018 as the transmission loss for
the month of August-2018 appear to be abnormally on higher
side than previous months. Reply is awaited.
Minutes of 45th SOAP Meeting held on 28.09.2018. Page 3
Item no. 4 Outage planning for the month of November-2018 &
December-2018:
Outage planning of Transmission feeders, Power transformers for
the month November-2018 & December-2018, submitted by O/o
ED (S/s: O&M) CSPTCL is enclosed in Annexure III. Sub Committee agreed and noted.
Item no.5. Status of FGMO { Free Governor Mode Operation } in
thermal units as on 28.09.2018:
Event-29 Event-30 Event-31
WR-890 ER-852 NR-1200
07-08-18
14:17:00
12-08-18
05:31:00
29-08-18
04:02:10
49.89 50.04 50.01
49.85 49.99 49.96
-0.04 -0.06 -0.05
It was requested to the representative of O/o ED (O&M: Gen)
CSPGCL to submit the Primary response by state generating
stations for the above events.
Item no.6. Details of new transmission lines, transformer or any other
transmission elements to be charged in November-2018 &
December-2018:
The representative from O/o CE (S/s: O&M) CSPTCL has
intimated the following list of new substation and transformers
likely to be charged in November-2018 & December-2018.
Minutes of 45th SOAP Meeting held on 28.09.2018. Page 4
S.
No
Name of
S/stn
Details of equipments &
lines to be commissioned Remark
1
220 KV S/s
Kuthrel
[New S/s]
160 MVA Transformer
Expected to be
charged on first
week of
November 2018
2
220 KV S/s
Kuthrel
[New S/s]
220 KV Kuthrel- Raita
feeder
Expected to be
charged on first
week of
November 2018
3 220 KV S/s
Bhatapara 40 MVA Transformer
Expected to be
charged in
October 2018
4 132 KV S/S
Kurud
132/33 KV 40 MVA Xmer-
II, Make: ECE
(Augmentation from 20
MVA Xmer to 40 MVA
Xmer)
Expected to be
charged in
October 2018
5 220 KV S/S
Paraswani
132/33 KV 40 MVA Xmer-
II, Make: ECE
(Augmentation from 20
MVA Xmer to 40 MVA
Xmer)
Expected to be
charged in
October 2018
The representative from O/o ED (S/s: O&M) Raipur, CSPTCL and
O/o CE (S/s: O&M) Bilaspur, CSPTCL were requested to provide
single line diagram of newly charged sub-stations along with
feeder names at 33 KV end also. Further it was also requested to
arrange telemetry of these new stations already commissioned in
past months, as early as possible. In case of any delay in
commissioning of RTU the data from other sub-station may at
Minutes of 45th SOAP Meeting held on 28.09.2018. Page 5
least be provided so that the newly commissioned S/s may be
monitored effectively.
Sub Committee noted.
Item no. 7 Details for Installation of capacitors to be furnished to WRPC:
The status of Installation of capacitors for August-2018 was
furnished during the meeting by the representatives from O/o ED
(S/s:O&M) Raipur, CSPTCL.
Item no. 8 LGBR Preparation for the Year 2019-20 in Western Region:
It was requested to the representatives from O/o ED (O&M:
Gen),CSPGCL , O/o ED(S/s:O&M) CSPTCL and O/o
CE(RA&PM),CSPDCL to submit the data regarding LGBR at the
earliest so that the LGBR report can be prepared and sent to
WRPC .
The data only from O/o CE (RA&PM), CSPDCL is still
awaited. The correspondence Vide T.O. letter no. 955 dated
14.08.2018, 1159 dated 25.08.2018 and 1330 dated 16.10.2018
has already been done with O/o CE (RA&PM), CSPDCL
Item No. 9. Meeting on AGC held on 17.09.2018 at WRPC Mumbai.
It was conveyed to the members that there was no representation
from CSPGCL in the above meeting as such SLDC, Chhattisgarh,
representative informed in the meeting that the issue of AGC is
under discussion with the Management and the outcome of the
decision shall be intimated later.
Item No. 10. Regarding LILO of 220 KV Raigarh- Budhipadar Ckt at
400/220 KV S/s PGCIL Raigarh.
It was intimated by the representative from O/o ED(S/s:O&M)
CSPTCL that an estimate has been sanctioned for installation of
communication (PLCC) equipments at 220 KV PGCIL end for 220
KV Budhipadhar direction vide no. 44/438/8888/18/0045 dtd
26.9.18. At present the PLCC panel with protection coupler is not
Minutes of 45th SOAP Meeting held on 28.09.2018. Page 6
available at any area store. Two number panels are available
under this circle (for Kotmikala-Annupur Ckt.). Due to emergent
nature of work (LILO of 220 KV Raigarh-Budhipadar Ckt) this two
number panels may be utilized. After release of this material, the
installation and commissioning work will be completed within 15
days.
Item No. 12. Non availability of telemetry from DSPMTPS.
The data from DSPM station was restored on 27.09.2018.The
breaker status is still pending.
Item No. 13. Mock drill of Black start at Bango HPS
The last Mock drill of black start at Bango HPS was done on
26.11.2017.WRLDC is pressing for early mock drill this year also.
WRLDC has also desired to extend the Black start power through
alternate route which in our case would be through 220/132 KV
Churri S/s.
All heads of Power stations, CE(S/s:O&M) Bilaspur and
CE(BR),CSPDCL are requested to depute their concerned
representative to SOAP Meeting to be held on 29.10.2018 at
SLDC to finalise the route and plan for Black start at Bango
HPS.
Date & Venue of next meeting:
The 46th SOAP meeting is proposed to be held on 29th October
2018 (Monday) at SLDC Raipur. The time of meeting will be
from 12:00 hrs sharp.
*******
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.N.K.Bizora ED O/o ED(O&M:Gen),CSPGCL 9407739777 [email protected]
2 Shri.A.K.Shrivastava Addl. CE O/o ED(SLDC), CSPTCL 9827177466 [email protected]
3 Shri.S.K.Tiwari SE O/o CE(SLDC), CSPTCL 9827117925 [email protected]
4 Shri.D.K.Khicharya SE O/o ED(SLDC), CSPTCL 9827117925 [email protected]
5 Shri H.K Deota SE O/o SE(Back-up SLDC), CSPTCL 9893150920 [email protected]
6 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]
7 Shri.V.K.Dixit SE O/o SE(O&M), Bhilai,CSPTCL 9425536310 -----
8 Shri.Y.K.Rao EE O/o CE(SLDC), CSPTCL 9826518820 [email protected]
9 Shri Girish Gupta EE O/o CE(SLDC), CSPTCL [email protected] ,
10 Shri.Vinod Agrawal EE O/o CE(SLDC), CSPTCL 9300040007 [email protected]
11 Shri.Shashank Dhabre EE O/o ED(O&M:), GCC,CSPGCL 9329296556 [email protected]
12 Smt. Veena Narang EE O/o CE(S/s:O&M), CSPTCL 9713990560 [email protected]
13 Shri.S.Surya Prakash AE O/o ED(SLDC), CSPTCL 9329012913 [email protected]
14 Shri.G.P.Singh AE O/o ED(SLDC), CSPTCL [email protected] ,
15 Shri.K.K.Bajaj AE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]
16 Mrs.Pratibha Khunte AE O/o ED(SLDC), CSPTCL 8305447363 [email protected]
17 Ms. Namita Vibha Lakra AE O/o ED(SLDC), CSPTCL 8435002692 [email protected]
18 Ms. Juvena Gomes AE O/o SE(Back-up SLDC), CSPTCL 9827495849 [email protected]
List of participants attended the 45th SOAP (Sub-committee of Operation & Protection) Meeting.
26/10/2018
1
STATE LOAD DISPATCH CENTRE
RAIPUR CHHATTISGARH
45thSOAP MEETING
28.09.2018
1.1 PERFORMANCE OF CSPGCL
THERMAL & HYDEL POWER PLANT :
Generation (in MU)PLANT AVAILABILITY FACTOR
PAF (in %)
PLANT LOAD FACTOR
PLF (in %)
Generator Capacity AUG-18Prog. from
Apr-18
Annual
Target as
per CSERC
norms
AUG-18Prog.
from
Apr-18
Annual
Target as
per CSERC
norms
AUG-18Prog.
from
Apr-18
Annual
Target
as per
CSERC
norms
KTPS440 MW
{4X50 +
2X120}153.72 765.62 1537.38 59.99 59.99
60%- PH2
70%- PH346.96 47.39 66.76
DSPM500 MW
{2X250}341.424 1646.726 3723.00 97.37 96.83 85.00 91.781 89.69 85.00
HTPS 840 MW
{4X210}510.77 2347.29 5472.94 85.18 79.43 74.38 81.73 76.10 74.38
KWB
Extn
500 MW
{1X500}238.291 1611.14 3723.00 64.57 89.24 85.00 64.057 87.75 85.00
MARWA
1000
MW
{2X500}616.520 2959.224 7446.00 83.35 80.27 85.00 82.866 80.589 85.00
THERMAL3280
MW1860.717 9330.004 21902.32 --- --- 82.00 76.249 77.465 80.00
BANGO
HPS
120 MW
{3X40} 33.23 71.548 --- --- --- --- --- --- ---
26/10/2018
2
1.2 PERFORMANCE OF CSPGCL
Generating
Station Capacity
Auxiliary Consumption (in %)
No. of Forced Outage
AUG-18
Progressive from Apr-
18
Annual Target as
per CSERC norms
AUG-18
Tube Leakage
Progressive from Apr-18
KTPS440 MW {4X50 + 2X120}
13.21 13.27 11.25 12 4 51
DSPM500 MW {2X250} 8.046 8.08 9.00 2 0 10
HTPS840 MW {4X210} 9.18 9.54 9.70 4 1 25
KWB Extn.
500 MW {1X500} 5.851 4.67 5.25 0 0 3
MARWA1000 MW {2X500} 5.245 5.55 5.25 5 2 22
THERMAL 3280 MW 7.574 7.48 --- 23 7 111
BANGO120 MW {3X40} 0.21 0.482 --- --- --- ---
1.3 Frequency ParticularsFrequency status during JUL-18 , AUG-18 & AUG-17 (As per WRLDC)
Other Frequency parameters during the month of Aug - 2018.
Frequency Range JUL-18 AUG-18 AUG-17
IEGC band % of time % of time % of time
Between 49.90 & 50.05 Hz
78.48 80.44 76.82
< 49.90 Hz 10.25 8.93 7.2
> 50.05 Hz 11.27 10.63 15.98
Frequency Status Frequency {Hz}
Time { h:mm:ss}
Date
Average Freq. 49.98 -- --
Max Instantaneous Freq.
50.22 06.08.18 13:06:40
Min Instantaneous Freq.
49.62 09.08.18 19:12:30
26/10/2018
3
1.4 Demand Pattern.
JUL-18 AUG-18 AUG-17% Change
compared to previous year
Max. Demand Met
3915 MW31.07.2018
19:15
4186 MW05.08.2018
19:15
3998 MW03-08-2017
23:004.70%
Max. Unrestricted
Demand at the time of Max. Demand Met
3977 MW 4190 MW 3998 MW 4.80%
Min. Demand Met
2251 MW08.07.2018
17:00
2404MW27.08.2018
12:30
2687 MW28-08-2017
16:00-10.53%
Max. Unrestricted
Demand
3977 MW30.07.2018
20:15
4190 MW05.08.2018
19:15
4008 MW16-08-2017
20:004.54%
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of July-18,August-18 & August-17. MAX 4186 MW on 05.08.2018 at 19:15 hrs.
Average increase of 4.10 % compared to last year
JUL-
2018
AUG-
2017
AUG-
2018
4186 MW on
05.08.18 at
19:15 Hrs.
3915 MW on
31.07.18 at
19:15 Hrs
3998 MW on
03.08.17 at
23:00 Hrs
26/10/2018
4
2300
2500
2700
2900
3100
3300
3500
3700
3900
4100
4300
MW
Date
Daywise Min and Max Demand met in the month of August-18, [ Difference : Max 993 MW on 02.08.18 & Min 406 MW on 05.08.18 ]
406 MW
993 MW
2900
3100
3300
3500
3700
3900
4100
4300
MW
Date
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of August-18,
UNRESTRICTED
DEMANDRESTRICTED
DEMAND
26/10/2018
5
MW %
CSPGCL Thermal (Ex Bus)
2702 65%
CSPGCL Hydel 79 2%
CPP/IPP's (STOA+PPA) Injection + Inter state STOA
44 1%
Other Injection 36 1%
CS Share including BSP share in NSPCL
1163 28%
Net Import / Export 253 6%
OD(+) / UD(-) -90 -2.16%
Demand Met (MW) 4186
Availability during Monthly Peak Demand Met: (4186 MW on 05-08-2018 at 19:15 hrs)
CSPGCL Thermal 270265%
CSPGCL Hydel792%CPP/IPP's (STOA+PPA)
Injection + Inter state STOA441%
Other Injection361%
CS Share including BSP share in NSPCL
116328%
Net Import(+) / Export (-)2536%
OD(+) / UD(-) -90
-2.16%
Availability at the time of monthly peak demand.4186 MW on 05.08.18 at 19:15 Hrs.
26/10/2018
6
Total Import at the time of Max Demand Met
65362%
Total Export at the time of Max Demand Met
-400-38%
Import & Export at the time of Monthly Peak Demand.4186 MW on 05.08.18 at 19:15 Hrs.
1.5 LOAD SHEDDING
Load Shedding during August-2018:
Load Shedding Duration (in HH:MM)
Equivalent Load Relief
(in MU/Day)
Max Load Shedding
Done.
In Groups Feeders
29:28:00 0.06693 MW on
24.08.2018 at 20:00 Hrs
In Industrial feeders
16:55:00 0.04
TOTAL 46:23:00 0.10
26/10/2018
7
Power Cuts / Load shedding : CHHATTISGARH ( AUGUST : 2018 )
Date
Hour 1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
31st
1:00 0 0 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 0 0 77 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 0 0 214 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Power Cuts / Load shedding : CHHATTISGARH ( AUGUST : 2018 )
Date
Hour
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
31st
16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 82 0 0 0 0 0 0 0 0
18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19:00 0 0 0 0 0 0 0 0 67 0 0 0 0 0 0 0 168 0 0 0 0 0 292 317 0 0 0 0 241 0 0
20:00 0 0 32 0 0 0 0 0 189 0 0 0 0 0 0 0 70 0 0 0 0 0 88 693 0 0 0 0 56 0 0
21:00 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0 0 0 0 166 0 0
22:00 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33 0 0 0 0 0 0 0
23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33 0 0 0 0 0 0 0
24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AVG
(MW)0 0 21 0 0 0 0 0 11 0 0 0 0 0 0 0 10 0 0 0 0 0 19 54 0 0 0 0 19 0 0
MAX
(MW)0 0 214 0 0 0 0 0 189 0 0 0 0 0 0 0 168 0 0 0 0 0 292 693 0 0 0 0 241 0 0
MIN
(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
26/10/2018
8
1.6 - SOLAR POWER INJECTION (At 132 KV)
M/s Acme [30 MW]
M/s Azure [3X10 MW]
M/s Parampujya[2X50 MW] [Infirm
Power]
Total
APR-18 MU 4.33 4.25 20.10 28.68
MAY-18 MU 4.49 4.23 21.17 29.90
JUN-18 MU 4.01 3.72 18.51 26.25
JUL-18 MU 2.40 2.68 13.57 18.65
AUG-18 MU 2.43 2.31 11.98 16.72
Addition of new grid elements during August-2018.
S.No
NAME OF SUB STATION
NAME OF CHARGED EQUIPMENTS & LINES
DATE TIME REMARKS
1132 KV S/s
Rawanbhata63 MVA Transformer No. II 3-Aug-18 17:27 ---
2 132 KV S/s Rasmada 40 MVA Transformer No. II 7-Aug-18 20:09 ---
3132 KV S/s Kansabel
[New S/stn]
1). 132 KV Main Bus.
11-Aug-18
10:55First time charged.
2). 40 MVA Transformer . 13:50First time charged.
4132 KV S/s Rajpur
[New S/stn]
1). 132 KV Main Bus.
13-Aug-18
18:28First time charged.
2). 40 MVA Transformer . 18:29First time charged.
26/10/2018
9
Addition of new grid elements during August-2018.S.No
NAME OF SUB
STATION
NAME OF CHARGED EQUIPMENTS & LINES
DATE TIME REMARKS
5132 KV S/s
Wadrafnagar[New S/stn]
1). 132 KV Bishrampur-Wadrafnagar Line. [At 220 KV S/stn Bishrampur]
14-Aug-18
17:44
First time charged. [From
Bishrampur end]
2). 132 KV Main Bus. 17:51First time charged.
3). 40 MVA Transformer . 17:54First time
charged. [From 132 KV side]
6220 KV S/s
Raigarh220 KV Raigarh-PG Raigarh III 25-Aug-18
18:49 [Raigarh end]
First time charged.
18:53 [PG Raigarh
end]
7132 KV S/s
Nagri[New S/stn]
1). 132 KV Kanker-Nagri Ckt.
31-Aug-1815:41
First time charged.
3). 40 MVA Transformer . 17:12First time charged.
1.7 - TRANSMISSION LOSS
Performance of CSPTCL : Transmission Loss(%) as per data provided by O/o of CSPGCL, CSPTCL & CSPDCL.
2018-19 2017-18% Change
compared to previous year
APR 3.16% 3.33% -5%
MAY 3.13% 2.88% 9%
JUN 3.00% 2.89% 4%
JUL 3.13% 2.87% 9%
26/10/2018
10
Percentage Status of Compliances of Backing Down Instruction issued by SLDC to Generating Stations of CSPGCL :
1.8 - BDI Compliance
MonthTotal no of BDI issued
by SLDC
Compliance % by Generators/Generating Stations
Total Non Compliance
< 25% 25 to 50% 50 to 90% > 90%
AUG-18 104 0 3 2 52 47
MonthTotal
(In Mus)
Backing Down by Generators/Generating Stations. (In Mus)
KTPS HTPS KWB Extn MTPP DSPM
AUG-18 43.68 1.26 21.77 1.61 0.00 19.04
ANNEXURE III
Maintenance / Shutdown programme of Transmission Elements for the month of November-2018.
Date Time Date Time
Routine Maintenance
1 400400 KV Khedamara-Raita-I at 400
KV S/s Khedamara.01.11.18 9:00 01.11.18 17:00 Daily Annual Maintenance Programme. CSPTCL ---
2 400
400 KV Khedamara-Korba
Extension-I at 400 KV S/s
Khedamara.
14.11.18 9:00 14.11.18 17:00 Daily Annual Maintenance Programme. CSPTCL ---
3 400400 KV Khedamara-Seoni at 400
KV S/s Khedamara.16.11.18 9:00 16.11.18 17:00 Daily Annual Maintenance Programme. CSPTCL ---
4 400400 KV Khedamara-Raita-III at 400
KV S/s Khedamara.19.11.18 9:00 19.11.18 17:00 Daily
Annual Maintenance Program & Replacement of 1 No.
CVT (B-phase)CSPTCL ---
5 400400 KV Khedamara-Raita-II at 400
KV S/s Khedamara.26.11.18 9:00 26.11.18 17:00 Daily Annual Maintenance Programme. CSPTCL ---
6 400400 KV Khedamara-Madwa at 400
KV S/s Khedamara.30.11.18 9:00 30.11.18 17:00 Daily Annual Maintenance Programme. CSPTCL ---
7 400
80 MVA,400 KV Station
Transformer No. 2 (Bay No. 404) at
400 KV switchyard Marwa.
12.11.18 8:30 14.11.18 17:30 Continuous
1. Annual Testing of Relays, CT, Circuit Breaker. 2.
Cleaning and Terminal tightness of CT JB, Breaker . 3.
General Checking, Cleaning & lubrication of
operating mechanism of Circuit Breaker & Isolators.
CSPTCL ---
8 400
400 KV Bus Coupler (Bay No. 8) at
400 KV Switchyard at HTPS, Korba
West.
06.11.2018 8:30 06.11.2018 18:00 Daily
(1) Cleaning and tightness of clamps of bus and line
isolator, CT's & CVT's and breaker.Cleaning of
insulator of CT's & CVT's ,isolator and breaker.
CSPTCL ---
9 400400 KV Raita-Khedamara-III (Bay
No. 420) at 400 KV S/s Raita.02.11.2018 8:00 02.11.2018 17:00 Daily
Scheduled maintenance of
Reactor,Breaker,CT,Isolator,L.A. CVT & WTCSPTCL ---
10 400400 KV Raita-Marwa-I at 400 KV
S/s Raita.12.11.2018 8:00 12.11.2018 17:00 Daily
Scheduled maintenance of
Reactor,Breaker,CT,Isolator,L.A. CVT & WTCSPTCL ---
11 400400 KV Raita-Marwa-II at 400 KV
S/s Raita.16.11.2018 8:00 16.11.2018 17:00 Daily
Scheduled maintenance of
Reactor,Breaker,CT,Isolator,L.A. CVT & WTCSPTCL ---
12 400400 KV Raita-Korba West (Bay No.
404) at 400 KV S/s Raita.22.11.2018 8:00 22.11.2018 17:00 Daily
Scheduled maintenance of
Reactor,Breaker,CT,Isolator,L.A. CVT & WTCSPTCL ---
13 400400 KV Raita-Jagdalpur-II at 400
KV S/s Raita.29.11.2018 8:00 29.11.2018 17:00 Daily
Scheduled maintenance of
Reactor,Breaker,CT,Isolator,L.A. CVT & WTCSPTCL ---
14 220 220 KV Bus Coupler (Bay No.
205) at 400 KV switchyard Marwa.19.11.2018 8:30 21.11.2018 17:30 Continuous
1. Annual Testing of Relays, CT, Circuit Breaker. 2.
Cleaning and Terminal tightness of CT JB, 3. General
Checking, Cleaning & lubrication of operating
mechanism of Circuit Breaker & Isolators.
CSPTCL ---
15 220220 KV Kotmikala-Anupur Ckt-I at
220 KV S/s Kotmikala05.11.2018 8:00 05.11.2018 13:00 Daily Annual Maintenance Programme. CSPTCL ---
16 220220 KV Kotmikala-Anupur Ckt-II at
220 KV S/s Kotmikala06.11.2018 8:00 06.11.2018 13:00 Daily Annual Maintenance Programme. CSPTCL ---
RemarksS.No KV Lines/ ICT Particulars From To Daily /
Continuous Reason Agency
ANNEXURE III
From To
1132KV S/s
kawardha40MVA X-MER 02.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
63MVA X-mer and adjacent EHV S/s.
2132KV Dallirajhara-Gurur
feeder03.11.2018 10:00 13:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
132KV Dallirajhara-Balod feeder.
3132KV Dallirajhara-Balod
feeder03.11.2018 13:00 17:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
132KV Dallirajhara-Gurur feeder.
4132KV S/s
Pandariya40MVA X-MER -I 06.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
40MVA X-mer-II and adjacent EHV S/s.
5132KV S/s
Nawagarh40MVA 08.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
6 40MVA 09.11.2018 10:00 13:00 DailyPost monsoon
Mainteanance
This shutdown will be taken only if Load managed by
20MVA X-mer and other adjacent EHV S/s.
7 20MVA 09.11.2018 13:00 17:00 DailyPost monsoon
Mainteanance
This shutdown will be taken only if Load managed by
40MVA other adjacent EHV S/s.
8132KV S/s
Nawagarh132KV Nawagarh-Mungeli 13.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
9132KV Thelkadih-Dongargarh-I
feeder14.11.2018 10:00 13:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-II
10132KV Thelkadih-Dongargarh-
II feeder14.11.2018 14:00 17:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-I
11 220KV Bemetara-Suhela Ckt-I 15.11.2018 10:00 13:00 DailyPost monsoon
Mainteanance
Load will be managed by another ckt-I & Khedamara
Ckt.
12 220KV Bemetara-Suhela Ckt-II 15.11.2018 13:00 17:00 DailyPost monsoon
Mainteanance
Load will be managed by another ckt-II & Khedamara
Ckt.
13132KV S/s
Dallirajhara20 MVA X-mer 16.11.2018 10:00 17:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
12.5MVA-I & 12.5MVA-II and other adjacent EHV
S/s.
14 40MVA X-mer 22.11.2018 10:00 17:00 DailyPost monsoon
Mainteanance
There will be total intrruption during s/s load can be
managed by adjacent EHV S/s.
15132KV Gendpur-Kawardha Ckt-
I22.11.2018 10:00 13:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-II
16132KV Gendpur-Kawardha Ckt-
II22.11.2018 14:00 17:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-I
17132KV S/s
Rajnandgaon132KV Rajnandgaon-Pulgaon 26.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
18132KV S/s
Dongargarh132kv Dongargarh-Benegaon 28.11.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
40MVA other adjacent EHV S/s.
From To
1 132KV Rajnandgaon-Traction-I 03.12.2018 10:00 13:00 DailyPost monsoon
Mainteanance
This shutdown will be taken only if Load managed by
132KV Rajnandgaon-Traction-II feeder.
2 132KV Rajnandgaon-Traction-II 03.12.2018 14:00 17:00 DailyPost monsoon
Mainteanance
This shutdown will be taken only if Load managed by
132KV Rajnandgaon-Traction-I feeder.
S.No.Name of
Substation
OUTAGE PLANNING OF TRANSMISSION FEEDER / POWER TRANSFORMER OF E.E. (S/S) DN.,CSPTCL, RAJNADGAON DURING THE
PERIOD (01.11.2018 to 31.12.2018)
S.No.Name of
Substation Name of feeder /X-mer Bay
Proposed /
Tentetive
Duration of ShutdownBasis Purpose of Shutdown Remarks
Remarks
132KV S/s
Dallirajhara
132KV S/s
Dongargarh
220KV S/s
Thelkadih
220KV S/s
Bemetara
220KV S/s
Kawardha
Gendpur
Name of feeder /X-mer Bay Proposed /
Tentetive
Duration of ShutdownBasis Purpose of Shutdown
132KV S/s
Rajnandgaon
3220KV S/s
Bemetara220KV Bemetara-Khedamara 06.12.2018 10:00 17:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
4132KV S/s
Gandai132KV Gandai-Saja Ckt 12.12.2018 10:00 13:00 Daily
Post monsoon
Mainteanance
There will be total intrruption during s/s load can be
managed by adjacent EHV S/s.
5220KV Khedamara-Thelkadih
Ckt-I14.12.2018 9:00 13:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-II
6220KV Khedamara-Thelkadih
Ckt-II14.12.2018 13:00 17:00 Daily
Post monsoon
Mainteanance Load will be managed by another ckt-I
7220KV S/s
Kawardha
Gendpur
160MVA X-mer -I 19.12.2018 10:00 16:00 DailyPost monsoon
Mainteanance
There will be total intrruption during s/s load can be
managed by adjacent EHV S/s.
8132KV S/s
Pandariya
132KV Pandariya-Mungeli
feeder21.12.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
9132KV Rajnandgaon-
Dongargaon24.12.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
10 40MVA-I 26.12.2018 10:00 16:00 DailyPost monsoon
Mainteanance
This shutdown will be taken only if Load managed by
40MVA-II other adjacent EHV S/s.
11132KV S/s
kawardha
132KV Pandariya-kawardha
feeder29.12.2018 10:00 16:00 Daily
Post monsoon
Mainteanance
This shutdown will be taken only if Load managed by
other adjacent EHV S/s.
220KV S/s
Thelkadih
132KV S/s
Rajnandgaon