+ All Categories
Home > Documents > SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf ·...

SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf ·...

Date post: 07-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
10
SCE PEV Demand Response Pilot
Transcript
Page 1: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

SCE PEV Demand Response

Pilot

Page 2: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Background

1

SCE’s strategic plan includes industry support for developing

interoperable field technologies and ensuring their integration

with utility back-office systems

1. Open Standards (Since 2007) - Enabling Smart Energy Profile 1.X and 2.0

- SEP2.0 Harmonization with SAE & IEC

- Leading the development of Electric Service Provided Interface (ESPI)

and Automated Demand Response (OpenADR) standards

2. Equipment Lab Testing (Since 2009) - Evaluate market available smart charging products

- Work with industry partners to develop interoperable products

- Verify that smart charging devices are compatible with back-office

systems

3. Pilots (2012-2014) - Evaluate smart charging products in “real world” conditions

- Use results to structure future PEV specific programs

- End to End Integration Testing (System and Field)

Page 3: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

PEV/Grid Communications

2

2. Direct (Residential)

• AMI, Internet, Zigbee, Wi-Fi

• Program Enrollment for residential

customers

• SEP 1.X and SEP 2.0 function sets

• DRLC, Pricing and TOU programs,

Metering, Response, Charge

Reservation

SCE

Field Devices

3rd

Parties

(C&I, Aggregators)

Indirect/Aggregated

Direct

B2B

1. Business to Business (B2B)

• Internet (HTTPS)

• 3rd Party Programs

• OpenADR 2.0, ESPI

• DRLC, Pricing and TOU Programs,

Sub-metering

3. 3rd Party Communications

• Translation between

OpenADR/ESPI and local

communications

• Workplace Charging

• DR, Pricing and TOU programs,

sub-metering

Page 4: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

SCE PEV Communications Architecture

3

3rd Party Cloud

Public

Residential Home Area Network

SEP 2.0 Network(Wi-Fi)

SEP 2.0 Network(ZIP)

SEP 1.X Network

Gateway/Router

ZIP EVSE

Wi-Fi EVSE

1.X EVSE

SCE Back Office (ATO Labs) Fleet (C&I)

Internet

SEP 2.0

SEP 1.X

Sub-meter (3rd Party)

Aggregator

?

EMS

SEP 1.1

SEP 1.1

?

SEP 1.1 ?

?

SEP 1.1

SEP 2.0 Web Server ALCS

NMS

OpenADR 2.0 DRAS

ESPI Web Server

OpenADR 2.0

OpenADR 2.0

ESPI MDMA

4 Domains:

• SCE Back Office

• Residential HAN with

multiple topologies

• Fleet (C&I)- Includes

SCE workplace

charging

• Public (TBD)

Page 5: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Direct Communications

4

SCE

Field Devices

3rd

Parties

(C&I, Aggregators)

Indirect/Aggregated

Direct

B2B

SEP1.x ESI

SEP1,x

Network

Gateway/

Router

SEP2.0

Network (Wi-Fi)

SEP2.0

Network (ZIP)

SEP2.0 Cloud Server

Internet

Wi-Fi EVSE

(SEP 2.0)

ZIP EVSE

(SEP 2.0)

Zigbee 1.1

EVSE

SEP 2.0

Meter

(ZIP)

SEP 2.0

Meter

(Wi-Fi)

Communications tested:

• AMI to Zigbee SEP 1.X EVSE

• AMI to Zigbee/Wi-Fi Bridge to Zigbee IP/

Wi-Fi EVSE

• Internet to Gateway to Zigbee IP

• Internet directly to Wi-Fi EVSE

Functions Tested:

• Demand Response Load Control

• Pricing and TOU programs

• Metering

• Response

• Messaging

• Charge Reservation

Various HAN Topologies

Page 6: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Direct Communications- Considerations

5

AMI to Zigbee EVSE

• EVSE must be Zigbee

SEP 1.1 enabled

• Utilize existing AMI

communications

• Provides ‘real time’

consumption

information to HAN

Gateway

• Translates SEP 1.x to

2.0 for energy

consumption info to

Wi-Fi devices

• Bridges Wi-Fi to ZIP

• Could include routing

functions

SEP 2.0 Cloud Server to ZIP or Wi-Fi EVSE

• Direct communications

to Wi-Fi devices possible

• Cloud server would be utility ESI

• DR, pricing, etc. (energy info from SEP 1.x)

Potentially: Test communication directly to PEVs via PLC

Potentially: Test SEP2.0 metering using the internet

Page 7: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Business to Business Communications

6

SCE

Field Devices

3rd

Parties

(C&I, Aggregators)

Indirect/Aggregated

Direct

B2B

ESPI Web Server OpenADR 2.0 DRAS

EVSE

Internet

PLC

?

3rd Party Aggregator/ EMS

Internet

3rd Party

??

Communications tested:

• ESPI over the internet

• OpenADR 2.0 over the internet

Functions Tested:

• Demand Response Load Control

• Pricing and TOU programs

• Metering

Page 8: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

B2B Communications- Considerations

7

ESPI interface with 3rd Party

• ESPI sub-metering server must interface with Billing systems for automation (TBD)

• OAuth necessary for 3rd

party/customer authentication and authorization

• Certification

• Communication of data from sub-meter to 3rd party systems and translation to ESPI

OpenADR interface with 3rd Party

• OpenADR 2.0 under

development

• Technical details for OpenADR EV communications will need to be aligned with current/ future SCE OpenADR plans (to device?)

Potentially: Testing of OpenADR 2.0 communications to include both EV

aggregators (including telematics providers) C&I customers

Potentially: Testing of OpenADR 2.0 to SEP Gateway for Workplace Charging

Page 9: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Timeline

8

Page 10: SCE PEV Demand Response Pilot - EPRImydocs.epri.com/docs/PublicMeetingMaterials/0712/D2-3.pdf · SCE Ba ck Of f i ce ( ATO La b s) Fl e e t ( C& I ) I n t e r n e t SEP 2.0 SEP 1.X

Thank you Joshua McDonald

[email protected]

9


Recommended