School Sanitation and Hygiene EducationProgramme
School Toilet/UrinalDesign
andDrawing
UNICEF, NepalMarch, 2006
School Toilet/UrinalDesign
andDrawing
-v- Note:-
A. Opening Details1. Doors (D)2. Collapsible Gate3. Ventilations (V)
75 x 180cm = 2Nos.90 x 180 cm = 2Nos.75 x 45 cm = 4 Nos.98.5 x 45 cm = 8 Nos.
B. Value of XS.No. No. of Students
12
Up to 200201 to 400
Value ofX
326.75 cm463.00 cm
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEwater Supply and Sanitation Division
Office/UNICEF
Designed By:Yagya ShresthaConsultant, UNICEF
SCHOOL TOiLET/URlNAL(Capacity: students<400)
PLAN
Parsa/Chitwan/Nawalparasi/Kaptlvastu/Dang Revised Date: January, 2005 Date: October 14, 2003 Drg.No.:
1 of 7
SECTION 7WV
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEwater Supply and Sanitation Division
Office/UN ICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity: students<400)
SECTIONAL VIEW
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January, 2005 Date: October 14, 2003 Drg.No.:
5 of 7
40 x 40 x 4mm thk MS 25 x 25 x 4mm thk MS
400
750
anqle
Hi105 |
angle frame for shutter
250 mm long tower-bolt/
1800
5 mm thk MS plateholdfast
25 x 25 x 4 mm MS angle frame
100
l\=100,00
95
100012 mm diaMS rcd@ I
Ventilation
Door Frame Door Shutter
(AH measurements are in mm)
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Diciston
Office/UN ICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINALDETAILS OF DOORS & VENTILATIONS
Parsa/Chitwan/Nawalparast/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003Drg.No.:
6 of 7
Note:-
188
i
132
1—
32.
l
r~I
100
X+287
X + 23
I I
253
(X+23V2
100 32
132
100
Value of XS.No.
12
188
288
No. of Students
Up to 200201 to 400
Value ofX
326.75 cm463.00 cm
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEwater Supply and Sanitation Division
Office/UN ICEF
Designed By:Yagya ShresthaConsultant, UNICEF
SCHOOL TOlLET/URiNAL(Capacity: students<400)
LAYOUT PLAN
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January, 2005 Date: October 14, 2003 Drg.No.:
7 of 7
23.00
A. Opening Details1. Doors (D)2. Collapsible Gate3. Ventilations (V)
All mesurements are in centimeters
401 to 600601 to 800801 to 1000
1001 and above
75x180cm = 4Nos.90x145cm = 2Nos.90 x 45cm = 6Nos.
100x 45cm = 2Nos.
Value of X165 cm240 cm315 cm390 cm
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity: students>401)
PLAN
Parsa, Chttwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. No.:
1 of 8
10 cm thk RCC roof CGI Roof with 2 nos of transparentsheets in each side
oor
FRONT
All me sure merits are in centimeters LEFT
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity: students>401)
ELEVATIONS
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Org. Ho.:
2 of 8
ELEVATION (right)
Ver J ationUrinal (Girls)
Separator
Urinal (Boys)t - 65 ,00 -
SECTION 'B-B'All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity: stuclents>401)
ELEVATION & SECTION
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. to.:
3 of 8
Floor Finishing Over 10 cm InkPCC (1:2:4)
"Flat Brick Soling
Sand Filing
SECTION 7WV
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
Designed By:
Yagya ShresthaConsultant, UNICEF
Revised Date: January, 2005
SCHOOL TOILET/URINAL(Capacity: students>401)
SECTION
Date: October 14, 2003Drg. No.:
4ofi
10 cm thick RCC roof slab over
onj
Natural Ground
od
-l-
All mesurements are in centimeter
1
90 cm high Separators
SECTION 'C-C
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity:stuctents>401)
SECTION
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. No.:
5of8
Roof Truss(Material: MS Circular Pipes, Span = 471 cm)
4 mm thk quesset plats
Details of BDetails of A
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan.Nawalparasi, Kapiivastu & Dang
Designed By:
Yagya ShresthaConsultant, UNICEF
Revised Dale: January, 2005
SCHOOL TOILET/URINAL
TRUSS DETAILS
Date: October 14, 2003 Dr9 NO6
40 x 40 x 4mm thk MS 25 x 25 x 4mm thk MSangle frame for shutter
5 mm thk MS plateholdfast
25 x 25 x 4 mm MS ancte frame
250 mm long tower-bolt/
ao
100.00 T\
g£gr c
J bJ1 i
-1000.00-
Ventilation
25 x 4 mm MS strips
Door Frame Door Shutter
(Alt measurements are in mm)
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Dicision
Office/UN ICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINALDETAILS OF DOORS & VENTILATIONS
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003Drg.No.:
7 of 8
Note:-
ValueofXS.No. No. of Students
1234
401 to 600601 to 800801 to 10001001 and above
Value ofX
165 cm240 cm315 cm390 cm
Ail mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Division
Office/UN ICEF
Designed By:Yagya ShresthaConsultant, UNICEF
SCHOOL TOILET/URINAL(Capacity: students<400)
LAYOUT PLAN
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January, 2005 Date: October 14, 2003 Drg.No.:
8 of 8
B
All mesurements are in centimeters
77 77 77 77 /
-571.50-
' 77 7~\77 77
-148.50-
(X+194,50)-
23.00
77 771%slo
77 77 77 // // 77 // //
(-70.0DH
Urinal (Girls)
15.00-77 77 7/
1% slope
(-6o.(xH i
oXh dhh (Khilope
77 77
L__| MO K I. _iUrinal (Boys)
i slopeV 77 77KV 77 7J\ 77 77 77 77 /7 77
X'7 77 77 7.
_ L-111.50
Lavaf of Straw fPaf^>
25.00
SECTIOM X-X
Note:-A. Opening Details
1. Doors (D)2. Ventilations (V)S. VaijeofXS.No. No. of Students
1 401 to 6002 601 to 8003 801 to 1000
4 1001 and above
75x180cm =100x 45cm = 4Nos.
Value of X165 cm240 cm315 cm
390 cm
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL URiNAL(Capacity: stuctents>401)
PLAN
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. No.:
1 Of 7
CGI Roof
oqin
FRONT
A I! mesurements are in centimeterLEFT
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL URINAL(Capacity: students>401)
ELEVATIONS
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. No.:
2 of 7
• • ^ ^ ^ ^ ^ ^ ^M ^B ^H! • • MM ••§ ••§ • • HH • • flH MB
ELEVATION (right)
All mesurements are in centimeterSECTION 'A-A1
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNiCEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL URtNAL(Capacity:students>401)
ELEVATION& SECTION
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Org. No.:
3 of 7
Natural Ground
in• M -
7.50-
|t
Jl
-22.50
-(45.00)-
90 cm high Separators
SECTION 'B-B1
CGI Roofing cover
10in
inin
RCC Cover SlabEartti Bach Filling Leactimo Pit
/ RCCRirxi
Ail mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL URINAL(Capacity: students>401)
SECTION
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003Drg. No.:
4 of 7
I B ^B ^H ^M ^M ^B ^B ^M ^M ^M ^ » ^M ^M ^M ^M »» «^
32 mm <(» MS Pipe
Roof Truss(Material: MS Circular Pipes, Span = 471 cm)
15,00
50 mm ili MS Pipe
M10 Nut-bolts
32 mm ifr MS Pipe
25 mm i|> MS Pipe
4 mm thk guesset plate
Details of B Details of A
All mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Designed By:Yagya Shrestha
Consultant, UNICEF
SCHOOL URINAL
TRUSS DETAILS
Parsa, Chitwan, Nawalparast, Kapilvastu & Dang Revised Date: January, 2005 Date: October 14, 2003 Drg Nos:,5 o( 7
40 x 40 x 4mm thk MS 25 x25 x4mm thkMSangle frame for shutter
250 mm long tower-bolt/
25 x 25 x 4 mm MS anqte frame
5 mm thk MS plateholdfast
I2 mm 4a MS rod @ 100 DC
Door Frame Door Shutter
(All measurements are in mm)
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Dicision
Office/UN ICEF
Designed By:
Yagya ShresthaConsultant, UNICEF
SCHOOL URINALDETAILS OF DOORS & VENTILATIONS
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003Drg.No.:
6 of 7
Note:-
Value of XS.No. No. of Students
1234
401 to 600601 to 800801 to 10001001 and above
Value ofX
165 cm240 cm315 cm390 cm
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMMEWater Supply and Sanitation Division
Office/UN ICEF
Designed By:Yagya ShresthaConsultant, UNICEF
SCHOOL URINAL(Capacity: students<401)
LAYOUT PLAN
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January, 2005 Date: October 14, 2003 Drg.No.:
7 of 7
Single Unit Toilet Block
I krra I i
610 $$ 576 tt 578 (5 573 8V STB «f8T5 J t 830 j | 831 " (
[-150 mm LEV
G1! Flower Bed
ELEVATION ELEVATION
1
i
40 Dm fjl
^ -
^- ? i f j i i LSI H(e
!
s
OPENING SCHEDULEELEVATION GROUND FLOOR PLAN
S.1M.
1.
2.
3
4.
5,
6
7.
DESCRIPTION
DOOR(D2)
DOOR (D3)
DOOR (D3)
ENTRANCE GATE (EG1)
ENTRANCE GATE (E61J
WINDOW GRILL (WG'i)
WINDOW GRILL (WG2)
SIZE
900 XZ175
592X2175
592 X 2175
12D0 X 1950
B75X 1950
S75 X 450
1250X450
NOs
1
3
3
1
9
6
MATERIAL
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
METAL. FRAME
METAL FRAME
REMARKS
LEFT OPENING
RIGHT OPENING
LEFT OPENING
RIGHT OPENING
LEFT OPENING
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Single Unit Toilet BlockGROUND FLOOR PLAN
Drawing no: A - j Scale:
Dale: 25lh December. 2005
Drawn tiy: P.Thakur |ctiecked by: {Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
ELEVATION
ELEVATION
..;
ELEVATION
ELEVATION GROUND FLOOR PLANOPENING SCHEDULE
SN.
1
2.
3
4.
5
6.
DESCRIPTION
DOOR(D2)
DOOR (03)
DOOR (D3)
ENlRANCEGATEfEG'j
ENTRANCE GATE (EG 1)
WINDOW GRILL (WG1)
WINDOW GRILL (WG2)
SIZE
1200X2575
592 X 2175
592X2175
875X195U
875 X1950
875 X 450
1250X 450
NOs.
1
3
3
\
1
9
MATERIAL
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
METAL FRAME
REMARKS
LEFT OPENING
RIGHT OPENING
LEFT OPENiNG
RIGHT OPENING
LEFT OPEK1KG
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
Single Unit Toilet Block (Alternate)GROUND HOOR PLAN
Drawing no: A - ] Scale:Dale: 2Sir December. 2005
Drawn py P Thakur [checked by. |Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
M iimMi'iiuiuiLniim^iuiiiirjjiiiiimiiiiiiiimiiiiiiiiiiiii iiiiiminriiiiuiin
vzr-\ . -_n- . :.T~TI:
ELEVATION 1
r ' "i ~ r~ 1 T~ T
; r;-r|-T-p-|r; r , rrT tTiT i : Y:i
ELEVATION 2
(B) ELEVATION 4 g )
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Single Unit Toilet BlockEl. EVAT1ONS
Draw-r,g no: A - Scale:Dare: 25th December, 2005
Drawn by: P.Thakur [CnecKed by: JApproved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
Bk. Facta wrihHeader Finisl
7^ _ Cement Plaster at Iraide wall
- B 0 BAR @150 C/C
4 NO5 100 BAR
_ Qernent Plasteral (op of partition
- - Nr -
Lintel Detail foropenings above 1200mm
DETAIL 1
DETAIL 2
40 MM CEMENT SCREED[NGQ:675MMPCC (1:2:4)
2!iO
+3710 RIDGE LVL.
+2100 LINTEL LVL
+ 1650 SILL LVL.v \ •
Bk. faced wallt>5rnm Ttik. Side Wcill for Urinal(1in Vlicjh for Girls B." 1 2HIHLI#
Epoxy Paint upto 1M Hl.(ForGi& f.2M Hi- (for Boys) from Flo±r Level
+0 PLINTH LVL.
J Cemeni Piaster ui
lor Boys)
is)
-450 GROUND LVL
SAND AND GRAVEL
COMPACTED EARTH
SECTION AT AA
HIS MAJESTY'SGOVERNMENT OF
NEPAL
TUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
Single Unit ioilet BlockSECTION AT A A'
j nn: A - Scale:
Uate: 2bta Decemuef. 2005
wn ny: P Thakur |Chfecke:i JApproved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
Bfc. Facra witfiHeads* Finish
fi / } -80 BAR @I50 C/C
Cement Plas^ei ai ir>5ide waN
JQR-4NOS1O0BAR
Lintel Detail foropenings above 1200mm
DETAIL 1
^A\N;^>Cv>>>y'N-vr-.Av^
EPOXY LAYERCEMENT PUNNING40 MM CEMENT SCREEDING(1:675MM PCC (1:2:4)150 MM SAND FILLINGRAMMED EARTH FILLING
+3710 RIDGE LVL
+2100 LINTEL LVL.
\
+ 1650 SILL LVL.
8k. faced wall65mm Thk. Side wali for Urinal{1m High lor Girls 8,12m Hign for Soys)
Epoxy^ainljijplo 1M Ht.(forGi Is)-&'1'.2MHI. (foFEoys) from Floi
L500 200
SECTION AT AA'
r Level±0 PLINTH LVL.
450 GROUND LVL
</^0&P"~ SAND AND GRAVEL
COMPACTED EARTH
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Single Unit Toilet Block (Alternate)SECTION ATA-A1
Drawing no: A - | Scale:
Date: 25lh December. 2005
Drawn ay: P.Thakur |Checkecl by: |Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CER1D, NLA and BTTC
900
REF, DETAIL 4,FOR CGI SHEET FIXING
40 NB (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
TOILET ROOM TRUSSWHEREVER PURLINS ARE CONNECTED
TRT-1
90022 GAUGE 900mm PLAIN Gl SHEET
.,- 25 NB (M) PURLIN PIPE
40 N6 (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
81 0" LONG CGI SHEET
TOILET ROOM TRUSSWHEREVER PURLIN CONTINUE.
TRT-2
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
j TYPE DESIGN
I Truss Details (Toilet Block)
f Drawing no: j Scale: 1:20
Date: 3rd Jan. S006
Drawn by S Upreti [checked by: iApprc.'Od tjy
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERIO, NLA and BTTC
90025 NB(M) PURLIN PIPE
40 NB (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
HEADER HIGH INC LINED GABLE BWD
ONEBK. HEADER HIGH HORIZONTAL GABLE BAND
4979
TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS \- 250 4
WHEREVER PURLINS ARE CONNECTED22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND
NPIPE
81 0" LONG CGI SHEET
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
TYPE DESIGN ~Truss Details (Toilet Block)
! Drawing no: Scale: 1:20
250 4 TOILET BLOCK GABLE TRUSSWHEREVER PURLIN CONTINUE.
250 4
Date: 3nJj_ar>, 2006
Drawn by: S. Upreti [checked by: Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
IPS FLOOR FINISH40 MM CEMENT SCRE£DING(1:6)
150MM SANO FILINGRAMMED EARTH FILLING
CEMENT PUNNING40 MM CEMENT SCRE£DING(1:6>75MM PCC (1:2:4)
75 MM THICK DPC
200
8mm bar® 175o'cr - ~ - Levelling for PCC with Sand
4 nos 10mm bar @ 200 cfc40 MM CEMENT SCREED1NG(1:6
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Single Unit Toilet Block
DETAIL OF STEPS TRENCH PLAN & FOUNDATION DETAILS
Dale: 21 si Nov. 2005Drawn py: P.Thakur |checked ay:
SILT Consultanls (P) Ltd IN ASSOCIATIONWITH CFRID. NLA and BTTC
on top of internal member& 3mm Ihk. MS plate weldedon 5r i Omm MS tat
-120ft--B75-
I I I I I T f 1 1 I I I—I—I—i—I—Shutter frame main 4 secondary -•—I—•—1—•—"—r—<-
-!—•—I—i—I—rtmemher 40 x 5 mm flat -I—•—'——•—•—L 016 «lOOmmPrvothuirje
250 mm brie* Wall
125 mm Nickelplated sleel hinges
(IS 1541 heavyduly)\
016 x 100 mm Pivot hinge
Secon. member
Top View: Hold fasl & Hinoe arranqemenl
Scale:-1:4
250mmbnckWal l
Internal member20 x 3 mm Rat
One end ol hofd 'astweloed to lower
part arid door shutter frame welded to
upper part ol 1 6 m m 0 pivot hing
Kote:
1. Complete fabricated (loot 1o be hot dip galvanizedHinge lixing delail
Scale:-1:4
Scale:-1:16
TOILET ENTRANCE MS GATE
Dimensions are in mmHIS MAJESTY'S
GOVERNMENT OFNEPAL
40 x 5 mm Flal Hold fasl
H
1 I
UNICEF -Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Entrance Gale Detai.s ( E G 1 )
Drawing no: A -
Date: 26lr> Dec. 20K
Prawn by: P Aryal Icheck&d by Approved hy:
SILT Consultants (P) Lid IN ASSOCIATION
WITH CERID, NLA and BTTC
-75-
2 75
863
125 mm long Hinge
863
-432 - -65-
Q.5B mm thk plain
color Gl sheet Panel
0,58 mm thk plaincolor Glsheel Panel
Toilet Dour Elevation
Wall OmilterJ
Door Fiamemadaof25 x 25 x '-.2 mm
/Galvanized MSRectangular Pipe
I-12--
10x10x0.5mm
ehannei
25x50x1.2 mmrecta hgulafgalvanisedsimile!
0.58 mm cote sheetrivelerj with 10X10X0.5mmchanrvel
Section at "A-A"
150 mm heavy duty/Aluminium HJIKIIG
75 mm long Aluminum Lrxk
MSFIat!tel(IFasl
Door Frame made of25 x 25 x 12 mm
Shutter Frame made of25x50x1.2 mm
Rectangular Pipe
125 nun Bride wall
Section at "Y-Y"
3x20«200MS
Plan ofMS Flat Holdfast
Floor i.Ev
10x10x0.5mm
channel \
\ , llI-4Section a; "Fj-u!1
25x5Q(!.2 mm GalvanizedMS Shutter frame riveted wishOx 10(0.5mm galvanized
channel
•12J—25—
;5x25x1.2mrnG^:aniz«iMS rectangular pipe riveted
Refer dimensions as mentioned in drawing.Dimensions are not to measure only to read.
HIS MAJESTY'SGOVERNMENT OF
NEPAL
UNICEF-Neoal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
TOILFT BLOCK
Dooi Delails (03)
Drawing no: A - S;ale:
Date: 21a Dec. 2005 _
Uiitwn by: V. Aryal ]ciiucktitl >jy: JA|jjj,svti! B/
StLT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
-900--620-
Aid rap Fastener
12 0
6 9
ISO
25-
Dimensions are in mm
-10
4—40-4-20 •
FramB Profile Detail
I IPrilScale:-1:4
in»in»nGunnel
Floor Level
O i 25-ISection at Y-Y
Scale:-1:16Wall and dole fast omitted
3 Nos. 7mm Torxari reinforcing barHold last on both side^-2 Nos. @ ZOO mm from both ends-1 No. @ center (length-140 mm)
-660-
4 t t i M 5 - | —
Aldrop Kaslenei /
-820-
-630- -JDS-t40l
SeclionalY-VScale:-V.10
X75
- 8 0 -
I12HKH SO-
Section at A-A
Scale:-1:4
OSS mm cclQr sheet
nvetedwiih 10XiDXO|5mcnannel
Seclion at B-BScale:-1:4
60-
Section at C-C
Scale:-1:4
- Mela! Oal welded onframe for fixing hinge
p. Holes for screwingHinge
Hinge fixingdetail of Door Frame
10x10x0.5 mmChannel
2to
V
•-- Holes la weldingMetal ftal for fixinghinge
^ Holes (or safewing/ Hinge
Hinge fixing
detail of Door Shutter
Note:1- Frame Profile to be made from l.Bmmthk
Galvanized US sheel2.Shu!tertobe made from 1.2 mm Galvanised MSSheet.
HIS MAJESTY'S
GOVERNMENT OFNEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOU FT BLOCK
Door DetaLis"(D2]TDrawing no: A - Scale:
rials ?1sl Dm:, ?M>
Drawn by: P. Atyil
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and 8TTC
IDin7mm ROO
HOLD FAST
200
3x20 MS flat wetdedon MS Angle Frame
il
125 125 125 125 125 125
25x25mmX2.5mmMS Angle Frame _
r
125875
IT)CMCM
200
3x20 MS flat weldedon MS Angle Frame
25x25mmX2.5mmMS Angle Frame
• 125 125 I 125 125 125 I 125i > -
1250
125 | 125 125 125
HOLD FAST7mm ROD if)
— — — — CMCM
tnCMCM
WINDOW GRILL (WG1) WINDOW GRiLL (WG2)
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Single Unit Toilet BlockWindow Grill Details
nu: A I Scale:
Date: 2Sin December. 2005
Drawn iiy: PThaktif |cneck&tl by ed by:
SILT Consuitants (P) Ltd IN ASSOCIATIONWITH CER1D, NLA and BTTC
2.5"PVCPerferated Pipe
1200mmdia.Leaching Pit
5"PVC1.25
12Q0mmdia.Leaching Pit
Manhole450x450
-150 mm LEV
+0.00 mm LEV.
BOYS
// // .i
±0.00 mm LEV
s\f-S\f S\fW '////Ar
-450 mm LEV. 4"PVCSoj[Pi&e_
Manhole450x450
GIRLS
Flower Bed
K 2.5"PVCPerferated Pipe
±0.00 mm LEV.
•W>/ s\/\rv
Ramp -450 mm LEV,
GROUND FLOOR PLAN
HBUAJBBTVSBWHBfNEMLPWMAflY SCHOOL MPROfflMBIT
PROJECT (PfflP)
WITHLtd M AMOCUTKMM A n d BTTC
2.5TVCPerforatedWaster Pipe
HIS MAJESTY'SGOVERNMENT OF
NEPAL
PLAN Scale: 1:20
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Double Unit Tdiet BlockManhole & Leaching Pit Detail
[ Drawing no: SA-
I Dale: 11 Ih July. 2005
[Drawn by: P. Aryal [checksd by: ] Approved by:
SILT Consullanls (P) Lid IN ASSOCIATIONWITH CER1D, NLA and BTTC
Double Unit Toilet BlockUnit A and Unit B
(75, 1200 360 1250 . 62i i 8"i 5 250 B75 250 875 250 875 3'
1 Sl-t
600
90° Elbow -150x25x5MS Plate
©
Details of fixing Grab Bar 1in Handicapped Toilet
40 DiaG! Pipe- welded on
150x25x5fnmMS Plate
•A]
V 25 Dia Gl Pipe
omi
Ftoor Level
Section at 1-1'
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Double Unit Toilet BlockDelail Plan {Toilet Block)
Drawing no: A - Scale:
Dale: 25ih December, 2005
Drawn by: P. Arya] ICrtecked by: | Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
2SQ 875 250 875 250 875 3 150x25x5 ,MS (Plate \
+ O.0 mm LVL;i Details of fixing Grab Bar_ YA
in Handicapped Toilet
4D0ia Gt Pipewelded on150x25x5 mmMS Plate
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSiP)
5 25tp B75 E5
f4625
Double Unit Toilet BlockDetail Plan (Toilel Block) Alternate
Drawn by: P. Arya] ICfieckarJ by: [Approved by: '
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC ;
UNIT A
<•>
UNITB
CD (5> EAST ELEVATION © (§ 0 (3) NORTH ELEVATION (|)
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT jPROJECT (PSIP) i
DoutJIe Unit Toilet BtockE le rations (Toilet Block)
Drawing no: A - Scale:
Date: 25th December, 2005
Drawn by: P. Aryal [Checked by: (Approved by:
I SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID. NLA and BTTC
Cemer.t Piaster at inside wad
'—as BAR @
" V r 1 4 HOS 100 BAR
Lintel Detail foropenings above 1200mm
DETAIL 1 Scale 1:20
al lop of pavilion v
DETAIL 2
UNIT A
DOOHf RAME 150 mm CLEARANCEFROM Ft OOrl MID SHUTT E R 1 ? S
mm CLEARANCE FROM F LOOP
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Orawinij tio: A
_ DoubieJJnit Toilet BlockSection at A-A' (Toilet Block) Alternale
1" Scaia:
I Oats^_25tri December, 2005_
- Sirawn by: P. Aryal [Clieckbd by: JApproued by:
| SILT Consultants (P) Ltd IN ASSOCIATION[ WITH CERID, NLA and BTTC
UNITB
21M LIMTEL LVL.
H650 SILL LVL
+371ORIDGELVL.
±0 PLINTH LVL.
L450 GROUND LVL
- SAND AND GRAVEL
COMPACTED EARTH
SECTION AT BB'
HIS MAJESTY'SGOVERNMENT OF
NEPAL
UNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Section at B-8' (Toilet Block)
Drawing no: A -
Dale: 25th December, 2005
Drawn by: P. A^al _Jcheckect by: j Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and BTTC
900
REF. DETAIL 4,FOR CGI SHEET FIXING
J-2SCl4
40 NB (M) RAFTER PIPE
TOILET ROOM TRUSSWHEREVER PURLINS ARE CONNECTED
TRT-1
40 NB (M) PURLIN PIPE
I-250 4
900
L 32 N8 (L) BOTTOM TIE PIPE
TOILET ROOM TRUSS
22 GAUGE 900mm PLAIN Gl SHEET
— 25 NB (M) PURLIN PIPE
40 NB (M) RAFTER PIPE
<e'°"cG/ 40 NB (M) PURLIN PIPE
81 0" LONG CGI SHEET
WHEREVER PURLIN CONTINUE.
TRT-2
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
~ ' ^ DESIGNTruss Details (Toilet Block)
; Drawing no. | Scale: 1:20
| Date: 3rd jan, 2006^
! Drawn by: S. Upreli [checked by: [Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
90025 N8 (M) PURLIN PIPE
40 NB (M) RAFTER PIPE
40 NB(M} PURLIN PIPE
HEADER HIGH INQLINED GABLE BftND
BK. HEADER HIGH HORIZONTAL GABLE BAND
,ONg BK. HEADER HIGHLINTEL BAND
\- 250 4 TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS [-250 4
WHEREVER PURLINS ARE CONNECTED22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
1034 •
40 NB (M) PURLJN PIPE
8'0'LONG CGI SHEET
HEADER HIGH I NOUN ED GABLE BfcND
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND
ONEBK. HEADERHIGHLINTEL BAND
J"- 250 4TOILET BLOCK^GABLE TRUSS
WHEREVER PURLIN CONTINUE.250 4
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT <PSIP)
TYPE DESIGNTruss Details (Toilet Btack)
Drawing no: i Scale: t:20
Date: 3rdjan, 2006
Drawn by: S. Upreti ICheckecl by: I Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
BK. OM EDGE ON 250MM SQUARE (Ref Delail I)
I PS FLOOR FINISH
STEP 2- Filling IheSquateby Incompressible Wasla Materials
HIS MAJESTVSGOVERNMENT OF
NEPALUNICEF-Nepal
COMPOSITE OF BRICK AND COMCRETE( Detail I )
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Double Unit Toilet BlockTrench Plan & Foundation Details (Toilet Block)
Drawing no: S- Scale:
Dale: 21st Nov. 2005
Drawn by: P. Aryal Checked by: Approved by;
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERtD, NLA and BTTC
3x20 MS flat weldedon MS Angle Frame
mi7mm ROD t-:HOLD FAST :
200
25x25mmX2.5mmMS Angle Frame
3x20 MS flat weldedon MS Angle Frame
125 I 125 ; 125 125 125 125 125
mCMC\J
i nCM
oIT
200
Of
25x25rrtmX2.5mmMS Angle Frame
HOLD FAST7mm ROD If)
— — — CMCM
CMCM
875
125 125 125 ; 125 ; 125 j 125 125 : 125 , 125 j 125 .
1250 ;
WINDOW GRILL (WG1) WINDOW GRILL (WG2)
HIS MAJESTrSGOVERNMENT OF
NgPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Double Unit Toilet BlockWindow Grill Details
Drawing no: A - Scale:
Date: 251h DecembeF, 2DO5Drawn by: P. Aryal TcrTecfced by: j Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
/ 2'i GAUGE gOOmm PLAIN Gl SHEET
25 NBfM) PURLIN PIPE
j ^ 40 NB (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
LONG CGI SHEET
32 NB <L> BOTTOM TIE PIPE
TOILET BLOCK TRUSS DETAIL
^250 422 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
103410W 1 064 -••--
40 NB (M) RAFTER PIPE
HIGH INCLINED GABLE BAND
8 mm0 Plain Rotf\
ONE BK HEADER HIGH HORIZONTAL GABLE BAND
ONE BK. HEADER HIGH
40 NB (M) PURL N PIPE
A-- 81 0" LONG CGI SHEET
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
\~ 250 4 TOILET BLOCK TRUSS DETAIL AT GABLE WALL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)1 SARASWOTI PRIMARY SCHOOL, Sirsiya, Parsa
Truss Details (Toilet Block): Drawing no: Parsa 1: SI3-027 ; Scale: 1:20
; Dale: Slh August. 2005
; Orawn by: S. Upretj Checked by: ;Approved by:
'. SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
250 mm bricfc Wall j
I125 mm Nicksj
plated sleelhinoes[IS 1341 heavydij|y}\
frame Main member
Int. member
I 016 x 100 mm Ptvot hinge
40 x 5 mm Fial Hold fast
Secon. member
I . ITop View. Hold fast & Hinge arrangement
Scale:-1:4
250 mm brick Wall
Internal member20* 3 mm Flat
One end of hold fasl welded to lower'part and door shutter frame welded toupper part of 16 rmn0 prvot hing
on top or internal member&3mmlhJc MS plate weWedon 5x40mm MS flal
Note:
1. Coraplele fabricated door lo tie hot dip galvanizedHinge fixing detail
Scale:-1:4
Scale:-1:16
TOILET ENTRANCE MS GATE
Dimensions are in mmHIS MAJESTTS
GOVERNMENT OFNEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS!P)
TOILET BLOCK
Entrance Gate Details (EG1)Drawing no: A- Seals:
Dais: 26th Dec, 2005
Drawn by: P.Aryal IChKtsd Uy:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CER!D,NLA and BTTC
-592-
-432- - 9 5 -Ocjor frame made of25x25x1.2 n an
ilvanized MSiectangular Pipe
/Gil
0.68 mm Ihk plancolor Gl sheet Panel
0.58 mm ink plaincolor Gl sheel Panel
Toilet Door Elevation
Wall OmiifaJ
10x10x0.5mrn
channel ^
25 x 50 x1.2rnmreclancufar \galvanisedshultef
0.58 mm cotar sheet Iriveted with 10X1OX0-5mmchannel
-12—
:
"I
•
Section at "A-A"
150 mm heavy duly/Aluminium Handle
Shutter Frame made of25 x 50x1.2 mm
-692-
- 7 5 - 125 mm Brick wall
3x20*200 MS
Galvanized MSRectangular Pipe
Plan of
Floor Level
10x5 0x0.5mm
channel \
. _ _ \ _ . . . .
MS Flat Holdfast25x50x1.2mm GalvanizedVIS Shutter frame riveted with0x10x0.5mm galvanized
;hannei
Seciion at "B-B"Sea e:-1:2
12-
L—
—25—
25x25x1.2 mm Galvanized' S rectangular p,pe nveted.vim 10x10x0.5 mm galvanized channel
Refer dimensions as mentioned in drawing.Dimensions are not to measure only to read.
Dimensions are >ri mm•a
HIS MAJESTY'SGOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
TOILET BLOCK
Door Details (D3)
Gracing no:A - I Scaie:
Dale: 21sl Dec, 2005
Drawn by: P. Checked by: Approved by:
SILT Consultants (P) Lid IN ASSOCIATION
WITH CERID, NLA and BTTC
p40
Aldrap Fastener
1
IF- 9 0 0 -- « 2 0 -
8 9
25-1
Dimensions are in mm
csttv Gi siuM Var*
4-1-10
4—W-4-2O--Frame Profile Detail
40
Scale:-1:4
1WMchanm
Floor Level
Section at Y-YScale:-1:16
Wall and hole fast omitted
3 Nos. 7mm Torkari reinforcing barHold (asi on both sides-2 Mos. @ 200 nvn from both ends-1 No. @ center (lenglh-140 mm)
-660 -
- 6 3 0 -
Aktrop fastener / SeclionatV-VScale:-1:10
57 5
t-3M 80-
Seclion at A-A
Scale:-1:4
a-33-j ar>
Section at B-8Scale:-1:4
¥-SecBon at C-C
Scale:-1:4
r<U- Mstal flat welded on
frame lor fixing hinge
^ Holes for screwing
Hinge fa ing
delail of Door Frame
10* 10x0.5 mmChannel
2K)
- Holes for weldingMetal flat for fixinghinge
> Holes lor screwingHinge
Hinge ftxino
detail of Door Shutter
Mole:1. Frame Profile to be made from 1.6 mm thk
Galvanized MS sheet2. Shutier lo be made from 1.2 mm Galvanised MSSheet.
HIS MAJESTTSGOVERNMENT OF
NEPALUNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Door Details (D2)
Drawing no: A- State:
Bate: 21S1O8C, 2005
Drawn by: PAr jS Crwctedby
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and 8TTC
lOOOmmdia.Leaching Pit
Manhole450x450
1000
•
0001-
1000
KJitn TOIJO
- "2.5"PVCPerferatedPipe
1200mmdia.Leaching Pit
HIS MAJESTY'SGOVERNMENT OF
NEPALUNICEF-Nepal
f \ lOOOmmdiaI /Leaching Pit
PRIMARY SCHOOL IMPROVEMENTPROJECT (PS1P)
Double Unit Toilet Biock
2.5"PVCPerferateHPipe
Waste & Sewerage Pipe Line Diagram
Drawing no: SA- I Scaie:
:_Da1e: 11th J j y 2005I D'ii'.vn by: P hr-jh- ^Chccised by lApproje
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC
2.5"PVCPerforatedWaster Pipe
HIS MAJESTY'SGOVERNMENT Of
NEPAL
PLAN Scale: 1:20
PRIMARY SCHOOL IMPROVEMENTPROJECT (PSIP)
Double Unit Toilet BlockManhole & Leaching Pit Detail
Drawing no: SA- Scale:
Drawn by: P. Aryal Checked by: ] Approved by:
SILT Consultants (P) Ltd IN ASSOCIATIONWITH CERID, NLA and BTTC