PROJECT PURPOSE
• Widen roadway and improve condition of pavement
• Improve pedestrian access, movement and safety
• Address residential flooding problems
• Improve water quality of Rosewood Branch
SE 12th Street Roadway Improvements
February 8, 2005
DESIGN ELEMENTS
• Reconstruction/widening of SE 12th Street
• Addition of curb & gutter and storm drain system
• Sidewalk and ADA-compliant ramps
• Paved driveway entrances
• Parking reconfiguration in commercial area
• Construction of stormwater pond
• Rosewood Branch stream bank stabilization
SE 12th Street Roadway Improvements
February 8, 2005
26
PROPOSEDIMPROVEMENTS
STREAM WORK
• Roadway widened from 20’ to 24’• Curb & gutter and storm drain system • Paved driveway entrances at all existing locations• 6’ sidewalk along west side of roadway for entire street length• 8’ sidewalk and parallel parking along east side of street in front of commercial area • Utility relocations • Stormwater management (SWM) pond south of SE 2nd Avenue for water quality• Grade and stabilize stream banks south of SE 2nd Avenue
E. UNIVERSITY AVENUE
SE 1
2th S
TREE
T
SE 1st AVENUE
SE 2nd AVENUE
N
PARKING
8’ SIDEWALK
6’ SIDEWALK
SWM POND
SE 12th Street Roadway Improvements
February 8, 2005
ROADWAY TYPICAL SECTION
Existing Roadway Proposed Typical Section
SE 12th Street Roadway Improvements
February 8, 2005
SE 12th STREET - Looking Towards SE 2ND Avenue
Existing Conditions Artist’s Rendering
SE 12th Street Roadway Improvements
February 8, 2005
SE 2nd AVENUE AT SE 12TH STREET (Looking East)
Existing Conditions Artist’s Rendering
SE 12th Street Roadway Improvements
February 8, 2005
SE 12th STREET AT SE 2nd AVENUE (Looking North)
Existing Conditions Artist’s Rendering
SE 12th Street Roadway Improvements
February 8, 2005
SE 12th STREET - Looking At East University Avenue
Existing Conditions Artist’s Rendering
SE 12th Street Roadway Improvements
February 8, 2005
ROSEWOOD BRANCH STREAM WORK• New endwall • Stabilize stream banks
• Lay back slopes• Revegetation
• Erosion Protection • Reforestation
SE 12th Street Roadway Improvements
February 8, 2005
CONSTRUCTION GOALS• Minimize disruptions to residents and businesses • Keep all impacts within City right-of-way
• Grading for sidewalk• Driveway entrance tie-ins
• Maintain one lane of traffic at all times during construction • Road to be closed to through traffic• Access for local residents only• Maintain access to all residential/commercial driveways/entrances
• Complete construction as quickly as possible
SE 12th Street Roadway Improvements
February 8, 2005
PROJECT SCHEDULE
DATE ACTIVITY
JANUARY 2005 PRELIMINARY DESIGN PLANSCOMPLETED
FEBRUARY 2005 PUBLIC MEETING
APRIL 2005 FINAL DESIGN PLANS COMPLETED
SUMMER 2005 BEGIN CONSTRUCTION
DECEMBER 2005 FINISH CONSTRUCTION
We Are Here